ii bill of quantities / schedule of rates water and... · bill 2: construction of 4 doors vip...
TRANSCRIPT
![Page 1: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/1.jpg)
II BILL OF QUANTITIES / SCHEDULE OF RATES
![Page 2: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/2.jpg)
RENJA PRIMARY SCHOOL
![Page 3: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/3.jpg)
BILL 1: CONSTRUCTION OF 50 M3 FERRO-CEMENT TANK - 1 NO.
AS PER DRAWING NO. UN-HABITAT-RAIN-2014- FERRO -CEMENT TANK
Item Description Unit Quantity Unit price Ksh.
Total Amount Ksh.
1 Site preparation, trimming and Excavation of tank foundation to remove black cotton/ top soil upto 300 mm
m3 9.0
2 Hardcore filling - well rammed and compacted -300 mm thick m3 9.0
Slab reinforcement
3 Weld mesh- BRC 104 pcs 12
4 Y 10 bars - column pcs 1.0
5 Starter bars for the walls - Y 8 pcs 4
6 Chicken mesh- starter rolls 1.0
Floor concrete
7 Casing of floor slab 100 mm -1.2.4 ratio m3 3
Walls
Reinforcement
8 Y 8 bars pcs 25
9 Chicken mesh- walls rolls 5
Mortar
10 Cast layers of mortar in walls upto 75mm thickness, mix 1:3 with water proof cement
m2 195
Roof
Reinforcement
11 Y 8 bars pcs 38
12 Chicken mesh rolls 3
Mortar
13 Cast layers of mortar in walls upto 60 mm thickness, mix 1:3 with water proof cement
m2 54.0
![Page 4: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/4.jpg)
Item
Description Unit Quantity Unit price Ksh.
Total Amount Ksh.
Formwork
14 Plywood pcs 19
15 Props pcs 40
16 Timber -3 x 2 ft 200
Nails
17 Assorted Kg 10
Fittings
18 GI pipe 11/2" ( 38 mm) pcs 2
19 Elbow 11/2" pcs 12
20 Elbow (¾") pcs 4
21 Socket 11/2" pcs 4
22 ¾" GI pipe (Class B) pcs 2
23 Mosquito screen pcs 2
24 Plug (11/2") pcs 2
25 ¾" nipple pcs 4
26 Thread tape pcs 8
27 ¾" tap (Pegler) pcs 2
Gutters
28 Fix at least 30 m of gutters, connected to the tank through a 3”
medium duty uPVC pipe sum 1
Total amount materials and labour
Add 5% contigiency
Total amount
![Page 5: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/5.jpg)
BILL 2: CONSTRUCTION OF 4 DOORS VIP LATRINE- SANPLAT TYPE- 1 NO.
AS PER DRAWING NO. UN-HABITAT-RAIN-2014-VIP LATRINE BOYS WITH URINAL
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
Excavation
1 Site preparation, trimming and Excavation Soil trimming up to 600 mm depth
m3 16
2 Excavation of 4 pits each measuring 1m diameter and depth not less than 15m
m3 48
Lining of the walls
3 Casting of trapezoidal cement blocks measuring 355 mm x 200 mm x 75mm, with cement/sand 1:7,
m3 4000
4 Y 10 bars -foundation - strip foundation pcs 5
5 Foundation walls - stones/blocks 600 mm m2 16
6 Hardcore filling - 600 mm m3 8
Slab reinforcement
7 Y 10 bars- for squat blocks pcs 2
8 Weld mesh - slab pcs 3.6
Floor concrete
9 Casing of floor slab 100 mm -1.2.4 ratio ( squat blocks separate as per the drawing and removable)
m3 2
Walls
10 Brick walls as per the drawing m2 49
11 Wall pass kg 25
Lintel
13 Reinforcement - 4 Y8 +links pcs 3
14 Lintel concrete m3 0.2
![Page 6: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/6.jpg)
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
15 Timber formwork - 8x1 ft 36
16 Timber formwork - 3x2 ft 50
17 Round poles pcs 3
Roofing
18 Nails 4" kg 2
19 Nails 3" kg 2
20 Nails 2" kg 2
21 Roofing nails kg 1
22 Timber 8"x1" ft 50
23 Timber 3"x2" ft 50
24 Timber 2"x2" ft 80
25 Install Galvanized Iron sheet (30 gauge)- 2.5 m pcs 7
26 Fix roof as per dimension sum 1
Doors
27 Butt joint timber doors ( 1900 x 850) with hinges, locks both inside and outside
No 4
Paints and finishes
Plaster
28 2 layers of plaster ( 15mm )on all walls m2 90
29 Floor screed m2 16
30 Undercoat paint ltrs 4
31 Emulsion paint - 4l - external tin 2
32 Gloss paint - 4l - internal - wet areas tin 2
33 White tiles- urinal wall up to 1.2 m cuttons 3
![Page 7: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/7.jpg)
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
Plumbing
34 Install 4" Vent pipe (10 ft) + vent cover+ screen pcs 4
35 Install uPVC 6" waste pipe - urinal No 1
36 2" - waste pipe uPVC - urinal drain to soak pit No 2
Total amount materials and labour
Add 5% contingency
Total amount
![Page 8: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/8.jpg)
BILL 3: CONSTRUCTION OF 4 DOORS VIP LATRINE- SANPLAT TYPE- 2
AS PER DRAWING NO. UN-HABITAT-RAIN-2014-VIP LATRINE IRLS WITHOUT URINAL
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
Excavation
1 Site preparation, trimming and Excavation Soil trimming up to 600 mm depth
m3 16
2 Excavation of 4 pits each measuring 1m diameter and depth not less than 5m
m3 48
Lining of the walls
3 Casting of trapezoidal cement blocks measuring 355 mm x 200 mm x 75mm, with cement/sand 1:7,
m3 4000
4 Y 10 bars -foundation - strip foundation pcs 5
5 Foundation walls - stones/blocks 600 mm m2 16
6 Hardcore filling - 600 mm m3 8
Slab reinforcement
7 Y 10 bars- for squat blocks pcs 2
8 Weld mesh - slab pcs 4
Floor concrete
9 Casing of floor slab 100 mm -1.2.4 ratio ( squat blocks separate as per the drawing and removable)
m3 2
Walls
10 Brick walls as per the drawing m2 49
11 Wall pass kg 25
Lintel
13 Reinforcement - 4 Y8 +links pcs 3
14 Lintel concrete m3 0.2
15 Timber formwork - 8x1 ft 36
![Page 9: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/9.jpg)
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
16 Timber formwork - 3x2 ft 50
17 Round poles pcs 3
Roofing
18 Nails 4" kg 2
19 Nails 3" kg 2
20 Nails 2" kg 2
21 Roofing nails kg 1
22 Timber 8"x1" ft 50
23 Timber 3"x2" ft 50
24 Timber 2"x2" ft 80
25 Install Galvanized Iron sheet (30 gauge)- 2.5 m pcs 7
26 Fix roof as per dimensions and details sum 1
Doors
27 Butt joint timber doors ( 1900 x 850) with hinges, locks both inside and outside
No 4
Paints and finishes
Plaster
28 2 layers of plaster on all walls m2 90
29 Floor screed m2 16
30 Undercoat paint ltrs 4
31 Emulsion paint - 4l - external tin 2
32 Gloss paint - 4l - internal - wet areas tin 2
Plumbing
33 Install 4" Vent pipe (10 ft) + vent cover+ screen pcs 4
Total amount materials and labour
Add 5% contingency
Total amount
![Page 10: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/10.jpg)
BILL 4: SUPPLY OF HAND WASHING FACILITIES
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
1 Supply 4 No. plastic hand washing basins - 60 litres fixed with GI taps -1/4" type Pegler and a fabricated steel stand
pcs 4
Total amount
SUMMARY- RENJA PRIMARY SCHOOL AMOUNT KSH
1 Bill 1: Construction of 50 m3 Ferro Cement Tank - 1 No.
2 Bill 2: Construction of 4 doors VIP latrine- SANPLAT TYPE- 1 No.
3 Bill 3: Construction of 4 doors VIP latrine- SANPLAT TYPE- 2
4 Bill 4: Supply of hand washing facilities
Project total
![Page 11: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/11.jpg)
MATETE PRIMARY SCHOOL
![Page 12: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/12.jpg)
BILL 1: CONSTRUCTION OF 50 M3 FERRO CEMENT TANK - 1 NO.
As per Drawing No. UN-HABITAT-RAIN-2014- FERRO -CEMENT TANK
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
1 Site preparation, trimming and Excavation of tank foundation to remove black cotton/ top soil up to 300 mm
m3 9
2 Hardcore filling - well rammed and compacted -300 mm thick
m3 9
Slab reinforcement
3 Weld mesh- BRC 104 pcs 12
4 Y 10 bars - column pcs 1
5 Starter bars for the walls - Y 8 pcs 4
6 Chicken mesh- starter rolls 1
Floor concrete
7 Casing of floor slab 100 mm -1.2.4 ratio m3 3
Walls
Reinforcement
8 Y 8 bars pcs 25
9 Chicken mesh- walls rolls 5
Mortar
10 Cast layers of mortar in walls up to 75mm thickness, mix 1:3 with water proof cement
m2 195
Roof
Reinforcement
11 Y 8 bars pcs 37
12 Chicken mesh rolls 3
Mortar
13 Cast layers of mortar in walls up to 60 mm thickness, mix 1:3 with water proof cement
m2 54
Formwork
14 Plywood pcs 19
15 Props pcs 40
16 Timber -3 x 2 ft 200
![Page 13: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/13.jpg)
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
Nails
17 Assorted Kg 10
Fittings
18 GI pipe 11/2" ( 38 mm) pcs 2
19 Elbow 11/2" pcs 12
20 Elbow (¾") pcs 4
21 Socket 11/2" pcs 4
22 ¾" GI pipe (Class B) pcs 2
23 Mosquito screen pcs 2
24 Plug (11/2") pcs 2
25 ¾" nipple pcs 4
26 Thread tape pcs 8
27 ¾" tap (Pegler) pcs 2
Gutters
28 Fix at least 30 m of gutters, connected to the tank through a 3” medium duty uPVC pipe
sum
1
Total amount materials and labour
Add 5% contingency
Total amount
![Page 14: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/14.jpg)
BILL 2: CONSTRUCTION OF 4 DOORS VIP LATRINE
AS PER DRAWING NO. UN-HABITAT-RAIN-2014-VIP LATRINE BOYS WITH URINAL
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
Excavation
1 Site preparation, trimming and Excavation Soil trimming up to 600 mm depth
m3 16
2 Excavation of pit as per dimension up to 5m min
m3 80
Foundation walls
3 Y 10 bars -foundation - strip foundation pcs 5
4 Foundation walls - stones/blocks 600 mm depth
m2 16
5 Hardcore filling - 600 mm m3 8
Slab reinforcement
6 Y 10 bars pcs 5
7 Weld mesh - slab pcs 5
Floor concrete
8 Casing of floor slab 100 mm -1.2.4 ratio( squat blocks separate as per the drawing and removable)
m3 2
Walls
10 Brick walls as per the drawing m2 50
11 Wall pass kg 25
Lintel
13 Reinforcement - 4 Y8 +links pcs 3
14 Lintel concrete m3 0.2
15 Timber formwork - 8x1 ft 36
16 Timber formwork - 3x2 ft 50
17 Round poles pcs 3
Roofing
18 Nails 4" kg 2
19 Nails 3" kg 2
20 Nails 2" kg 2
21 Roofing nails kg 1
22 Timber 8"x1" ft 50
Item Description Unit Quantity Unit price Total
![Page 15: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/15.jpg)
Kshs. Amount Kshs.
23 Timber 3"x2" ft 50
24 Timber 2"x2" ft 80
25 Install Galvanized Iron sheet (30 gauge)- 2.5 m
pcs 7
26 Fix roof as per dimension sum 1
Doors
27 Butt joint timber doors ( 1900 x 850) with hinges, locks both inside and outside
No 4
Paints and finishes
Plaster
28 2 layers of plaster on all walls m2 90
29 Floor screed m2 16
30 Undercoat paint ltrs 4
31 Emulsion paint - 4l - external tin 2
32 Gloss paint - 4l - internal - wet areas tin 2
33 White tiles- urinal wall up to 1.2 m cuttons 3
Plumbing
34 Install 4" Vent pipe (10 ft) + vent cover+ screen
pcs 4
35 Install uPVC 6" waste pipe - urinal No 1
36 2" - waste pipe uPVC - urinal drain to soak pit No 2
Total amount materials and labour
Add 5% contingency
Total amount
![Page 16: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/16.jpg)
BILL 3: CONSTRUCTION OF 4 DOORS VIP LATRINE
AS PER DRAWING NO. UN-HABITAT-RAIN-2014-VIP LATRINE GIRLS WITHOUT URINAL
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
Excavation
1 Site preparation, trimming and Excavation Soil trimming up to 600 mm depth
m3 16
2 Excavation of pit as per dimension up to 5m min
m3 80
Foundation walls - stones
3 Y 10 bars -foundation - strip foundation pcs 5
4 Foundation walls - stones/blocks 600 mm m2 16
5 Hardcore filling - 600 mm m3 8
Slab reinforcement
6 Y 10 bars pcs 5
7 Weld mesh - slab pcs 5
Floor concrete
8 Casing of floor slab 100 mm -1.2.4 ratio ( squat blocks separate as per the drawing and removable)
m3 2
Walls
10 Brick walls as per the drawing m2 50
11 Wall pass kg 25
Lintel
13 Reinforcement - 4 Y8 +links pcs 3
14 Lintel concrete m3 0.2
15 Timber formwork - 8x1 ft 36
16 Timber formwork - 3x2 ft 50
17 Round poles pcs 3
Roofing
18 Nails 4" kg 2
19 Nails 3" kg 2
20 Nails 2" kg 2
21 Roofing nails kg 1
22 Timber 8"x1" ft 50
![Page 17: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/17.jpg)
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
23 Timber 3"x2" ft 50
24 Timber 2"x2" ft 80
25 Install Galvanized Iron sheet (30 gauge)- 2.5 m
pcs 7
26 Fix roof as per dimension sum 1
Doors
27 Butt joint timber doors ( 1900 x 850) with hinges, locks both inside and outside
No 4
Paints and finishes
Plaster
28 2 layers of plaster on all walls m2 90
29 Floor screed m2 16
30 Undercoat paint ltrs 4
31 Emulsion paint - 4l - external tin 2
32 Gloss paint - 4l - internal - wet areas tin 2
Plumbing
33 Install 4" Vent pipe (10 ft) + vent cover+ screen
pcs 4
Total amount materials and labour
Add 5% contingency
Total amount
![Page 18: II BILL OF QUANTITIES / SCHEDULE OF RATES Water and... · bill 2: construction of 4 doors vip latrine- sanplat type- 1 no. as per drawing no. un-habitat-rain-2014-vip latrine boys](https://reader031.vdocument.in/reader031/viewer/2022030412/5a9e61bb7f8b9a89178b47ea/html5/thumbnails/18.jpg)
BILL 4: SUPPLY OF HAND WASHING FACILITIES
Item Description Unit Quantity Unit price Kshs.
Total Amount Kshs.
1 Supply 4 No. plastic hand washing basins - 60 litres fixed with GI taps -1/4" type Pegler and a fabricated steel stand
pcs 4
Total amount
SUMMARY AMOUNT KSH
Bill 1: Construction of 50 m3 Ferro Cement Tank - 1 No.
Bill 2: Construction of 4 doors VIP latrine- SANPLAT TYPE- 1 No.
Bill 3: Construction of 4 doors VIP latrine- SANPLAT TYPE- 1 No.
Bill 4: Supply of hand washing facilities
Project total