iiiiiiiiiiif -fl1g-hft-cti-vi (aefa) - dtic.mil · april 1989 aviation ... 61-07 ao-iaf cold...
TRANSCRIPT
-W-A-207 46if4 iFS ARMY AVIATION EiNGNEERING -FL1G-HfT-CTI-VI (AEFA) 112REPORT BIBLIOGRAPHY (U) ARMY AVIATION ENGINEERINGFLIGHT ACTIVITY EDWARDS AFB CA S LEWIS ET AL APR 89
UNCLASSIFIED F/G 5/2 NL.IIIIIIIIIIIfI IIIIIIIIIIIlIIIIIIIIIIIIIIIffllfllfEIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIfllfll.
BI~LP ,__136
La
1I.8
1111.25 1 4 I .6
MICROCOPY FCESO.UTION TEST CHARTNATIONAL RUPF l iJ ' TANDARDS 1963 A
/
rEFA Project No. 89-90,U
U.S. ARMYAVIATION ENGINEERING FLIGHT ACTIVITY
(AEFA)REPORT BIBLIOGRAPHY
1961 - 1988
AEF Compiled By: Sheila Lewis
AndA Maryanna Lake
April 1989
AVIATION ENGINEERING FLIGHT ACTIITYEdwards Air Force Base, California 93523-5000
PREFACE
"' The mission of the U.S. Army Aviation Engineering Flight Activity (AEFA) is toconduct airworthiness qualification flight tests of air vehicles developed and/or procuredas integrated systems and airworthiness evaluations of those vehicles proposed orconsidered for Army application or which incorporate advanced concepts having potentialmilitary application; produce test data on basic air vehicle performance, handlingqualities, system/subsystem interface, and integrated system performance; and conduct atest pilot orientation course to prepare Army aviators for attendance at U.S. Naval TestPilot School.
4 This bibliography is listed by both project number and aircraft type tested orinvolved in the test of equipment or procedures. The project listing is in chronologicalorder from 1961 through 1988: Missing numbers in the sequential project listing occurbecause of cancellations or restructuring of programs. The aircraft listing contains projectnumbers as well as all other information and allows the user an alternate method forobtaining necessary project information. Appendix A provides a quick reference list ofthe aircraft by contractorABibliography holders of record will automatically receive futurecopies of updated bibliographies.
The reports listed are defined as:
Formal Test Report. A report that is formally publishedfor widespread distribution to other DOD agencies andstaff, the Defense Technical Information Center (DTIC),appropriate contractors, and other agencies as directedby the U.S. Army Aviation Systems Command(AVSCOM). These reports are identified by only theproject number. "
Letter Report. A report that is prepared to provide ..
immediate information to the customer for milestone . -events or for portions of a test in progress. They are also i>12 9to report on very limited tests or tests where the datahave very restricted application or little historical value. [These reports are identifiable by the LR, LOE, or TWRwith the project number and are identified in the subjectline as letter report, report, letter of effort, test witnessreport, or memorandum for record.
Formal reports are on file with DTIC or the National Technical Information Service(NTIS). They may be obtained from DTIC by use of the AD Number and from NTISthrough their normal procedures. Letter Reports are controlled by AVSCOM and may beobtained by contacting:
U.S. Army Aviation Systems CommandATTN: AMSAV-84300 Goodfellow Blvd.St. Louis, MO 63120-1798
-- A
TABLE OF CONTENTS
PREFACE
REPORT NUMBERS
1961 (61-01 thru 61-10) ....................................... 11962 (62-01 thru 62-72) ....................................... 1
1963 (63-01 thru 63-93) ....................................... 21964 (64-01 thru 64-44) ....................................... 51965 (65-01 thru 65-47) ... .................................... 5
1966 (66-04 thru 66-29) ....................................... 71967 (67-02 thru 67-29 ........................................ 91968 (68-02 thru 68-55) ....................................... 101969 (69-01 thru 69-21) ....................................... 121970 (70-02 thru 70-43) ....................................... 141971 (71-01 thru 71-47) ......... ............................. 161972 (72-01 thru 72-44) ....................................... 181973 (73-01 thru 73-71) ....................................... 211974 (74-02 thru 74-94) ....................................... 231975 (75-01 thru 75-28) ....................................... 251976 (76-02 thru 76-13) ....................................... 271977 (77-02 thru 77-38) ....................................... 281978 (78-01 thru 78-23) ....................................... 311979 (79-01 thru 79-86) ....................................... 33
1980 (80-01 thru 80-21) ....................................... 351981 (81-01-1 thru 81-90-1A) .................................. 361982 (82-01 thru 82-86) . ....................................... 391983 (83-03 thru 83-30) ....................................... 401984 (84-02 thru 84-90) ................................... /. 431985 (85-02 thru 85-25) .. 461986 (86-01 thru 86-25) ....................................... 471987 (87-01 thru 87-34) ....................................... 491988 (88-07 thru 88-18) ....................................... 50
AIRCRAFT LISTING
Fixed WingBeech Aircraft Corp ................ ........................ 51Bell Helicopter Corp........... . . ......... 53Breguet Aviation ................ ... .............. 53Canadair, Ltd .................... ..t . . 53Cessna Aircraft Co ............... ..................... 53DeHavilland Aircraft of Canada ..... 54
Grumman Aerospace Corporation ........................... 54Lockheed Corporation .................................... 56North American Aviation .................................. 57Pilatus .................................................. 57Ryan Aeronauticai Co . .................................... 57ROTEC Engineering, Inc ................................... 58RUTAN Aircraft Factory .................................. 58Schweizer Aircraft Corp .................................... 58
Rotary WingBell Helicopter Textron .................................... 59Boeing-Vertol Co ......................................... 81Bolkow-Messerschmitt-Blohm .............................. 85H iller Aviation ........................................... 86McDonnell Douglas Aircraft Corp ............................ 86Kaman Aerospace Corp .................................... 90Lockheed Corporation .................................... 91Piasecki Aircraft Corp ..................................... 91Rotorway Inc . ........................................... 91Sikorsky Aircraft ......................................... 92
M iscellaneous Aircraft ............................................. 99
A ppendix A ..................................................... i02
1961
Project Aircraft AdNumber Type Report Title Date Author(s) Number
61-01 L-19A Evaluation of L-19A Equipped with Continental Feb 1961 J. Kidwcll 722 8250-470-1 ICI Fuel Injection Engine CPT W. Clay
61-02 Model Bell Model 47G-3 High Altitude Flight Feb 1961 J. Kidwell 722 82647G-3 Evaluation
61-03 UH-12E High Altitude Evaluation of the Hiller Mar 1961 J. Kidwell 722 827Model 1961 UH-12E Helicopter MAJ J. Seigler
D. Armstrong
61-04 Limited Cold Weather Evaluation of Multi- Jun 1961 A. Ruddell 884 882Purpose Ground Service Unit Model 2100-5
61-05 Evaluation of the Republic Electronic Industries Jul 1961 CWO D. Scott 884 883Pitot and Static System Tester
61-06 L-19A Evaluation of the Mark XII Auxiliary Fuel and Jul 1961 CPT J. Johnston 884 884H-13G Oil System
61-07 AO-IAF Cold Weather Suitability Test of the AO-IAF Nov 1961 A. Ruddell 884 888
61-08 Evaluation of the Aerosonic Corporation Nov 1961 CWO D. Scott 884 889Pitot and Static System Tester
61-09 Evaluation of the North American Aviation 1961 W. Swope 884 885Inc. Dynamic Flight Simulator
61-10 Evaluation of the North American Aviation 1961 W. Swope 884 890Inc. Visual Presentation Flight Simulator
1962
62-01 XV-3 Pilot Evaluation of the Bell Model Feb 1962 MAJ E. Kleuver 884 870XV-3 Vertical Take-Off and Landing Aircraft
62-02 H-37 Drop Test Evaluation of Mark XII Auxiliary Feb 1962 2LT J. Mellon 884 871Torso Fuel Tank MAJ E. Kleuve-
62-03 H-23D Qualitative Flight Evaluation of the Torque-Bias, Apr 1962 W. Swope 884 872Throttle-Governor and Yaw-Damper Systems for CPT J. Johnstonthe Hiller H-23D Helicopter CWO E. Nelson
62-04 H-37B Evaluation of the SWE-1165 Blade Tracker May 1962 R. Finnestead 884 873H-23DH-21B
1962(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
62-05 Model Limited Evaluation of the Bell Model 47J-2 May 1962 E. Smith 88489147J-2 J. Kidwell
62-06 Evaluation of the Helicopter Load and Hovering May 1962 W. Golyer 884 875Computer A. Higgins
62-07 UH-12E-4 Evaluation of the Hiller Model UH-12E 1962 J. Kidwell 884 876Helicopter CPT J. Johnston
62-08 TB-25N Flight Test Evaluation of a TB-25N Aerial Sep 1962 K. Jordon 884 877Tanker MAJ E. Kluever
62-09 H-34 H-34 Helicopter 50-Caliber Machine-Gun Kit Oct 1962 J. Kidwell 951 582Calibration CWO E. Nelson
62-11 TBM-3 Evaluation of a Grumman TBM-3 Air Tanker Nov 1962 J. Blaha 884 894CWO E. Nelson
62-12 Model Limited High-Altitude Evaluation of the J. Kidwell 884 89647G-3B Bell 47G-3B Helicopter CWO E. Nelson
A. Averill
62-13 OH-13H Final Report Engineering Test of the Stability Apr 1964 L. Schroers 951 587aka and Control Characteristics of the OH-13H CWO E. Nelson62-30 Equipped with the XM-l Armament Kit
62-28 CH-37B Final Report Engineering Test of the CH-37B Mar 1965 R. Turk 884 897CWO J. Watts
62-30 SEE USAAEFA PROJECT NO. 62-13
62-35 XV-SA Letter Report,Preliminary Pilot Qualitative Oct 1965 R. FnnesteadLR Evaluation of the XV-SA Research Aircraft K. Ferrell
62-72/ XV-SA Engineering Flight Research Evaluation of the Aug 1966 R. Finnestead 800 973Pt I XV-SA Lift-Fan Aircraft, Pt 1, Stability and K. Ferrell
Control MAJ W. WelterW. Anderson
62-72/ XV-5A Engineering Flight Research Evaluation of the Aug 1967 K. Ferrell 821 123Pt 2 XV-SA Lift-Fan Aircraft, Pt II, Performance MAJ W. Welter
1963
63-01 OH-13H OH-13H Gross Weight Increase/XM-! Jun 1963 R. Finnestead 951 596Armament Kit Performance Test CWO E. Nelson
2
1963(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
63-04 CV-2B Take-Off and Landing Capabilities of the Sep 1963 J. Kidwell 440 406aka Caribou CV-2B Aircraft onUnprepared Surfaces, J. Blaha
63-73 USATECOM Project No. 4-4-1142-01 R. FinnesteadCPT M. Antoniou
63-05 PC-6/A Report of USATECOM Project No. 4-3-1048-01 Sep 1963 L. Schroers 951 586aka Takeoff and Landing Evaluation of the CPT J. Johnston
63-70 Pilatus Turbo Porter Model PC-6/A Airplane CWO J. Watts
63-06 Model Flying Qualities and Performance Evaluation Jan 1964 CPT M. Antoniou 951 590aka 941 of the Breguet 941 Turbo-Prop Troop Transport
63-85
63-07 UH-13R Report of USATECOM Project No. 4-4-0240-02, Jan 1964 L. Schroers 951 588aka Flight Evaluation of the T63-A-5 Turbo Shaft CPT M. Antoniou
63-16 Engine Installed in a UH-13R Helicopteraka
64-01
153-12 H-23D Helicopter Airspeed System Investigation Dec 1962 2LT J. MeltonCPT J. Johnston
63-13 YCV-7A Engineering Test Requirements for the Nov 1963 J. Blaha 951 587DeHavilland YCV-7A Tactical Troop Transport,USATECOM Project No. 4-3-1170-01
63-14 CV-7A Letter Report on Preliminary Engineering Flight Oct 1964 J. Blaha LREvaluation of the CV-7A Tactical TransportAirplane, DA Project No. I-R-1-41815-D-193,USATECOM Project No. 4-3-1170-04
63-16 SEE USAAEFA PROJECT NO. 63-07
63-20 OV-1C Final Report of the Airworthiness Certification Jan 1965 J. Blaha 465 079Test of the QRC-160-1 Installed on the OV-IC MAJ J. JohnstonAirplane, USATECOM Project No. 6-3-6711-03
63-23/ OH-4A Report of the Engineering Flight Test Stability Aug 1964 R. Finnestead 909 271Pt 1 and Control Phase of the OH-4A Helicopter, MAJ J. Foster
Unarmed (Clean) and Armed with the XM-7 orXM-8 Weapon Subsystem, USATECOM ProjectNo. 4-3-0250-11/12/13
63-231 OH-4A Report of the Engineering Flight Test Perform- Aug 1964 J. Melton 909 272Pt 2 ance Phase of the OH-4A Unarmed (Clean) CWO J. Watts
and Armed with the XM-7 or XM-8 WeaponSubsystem, USATECOM Project No. 4-3-0250-12/13
63-24/ OH-SA Report of the Engineering Flight Test of the Aug 1964 R. Turk 909 269Pt 1 OH-SA Helicopter, Unarmed (Clean) and MAJ J. Johnston
Armed with the XM-7 or XM-8 Weapon J. BlahaSubsystem, Part I Stability and Control, J. ReichertUSATECOM Project No. 4-3-0250-31/32/33
3
1963(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
63-24/ OH-5A Report of Engineering Flight Test of the OH-SA, Aug 1964 L. Schroers 909 -70Pt 2 Helicopter Unarmed (Clean) and Armed with CWO E. Nelsonthe XM-7 or XM-8 Weapons Subsystem, Part IIPerformance PhaseUSATECOM ProjectNo. 4-3-0250-31/32/33
63-25/Pt I OH-6A Report of the Engineering Flight Test Stability Aug 1964 C. Statur 951 591and Control Phase of the OH-6A Helicopter, W. AndersonUnarmed (Clean) and Armed with the XM-7or XM-8 Weapon Subsystem, USATECOMProject No. 4-3-0250-51/52/53
63-25/ OH-6A Report of the Engineering Flight Test Perform- Aug 1964 J. Kudirka 951 592Pt 2 ance Phase of the OH-6A Helicopter Unarmed CPT D. Wray(Clean) and Armed with the XM-7 or XM-8Weapon Subsystem, USATECOM ProjectNo. 4-3-0250-51/52/53
63-38 T-34B Evaluation of the U.S. Forest Service T-34B Sep 1963 J. Kidwell 951 583T-34B Airplane with Smoke Generator Installed
63-70 SEE USAAEFA PROJECT NO. 63-05
63-73 SEE USAAEFA PROJECT NO. 63-04
63-74 CV-2B Final Report Performance Tests of the CV-2B Jun 1965 R. Finnestead 467 490Airplane USATECOM Project No. 4-4-114-01 CPT M. Antoniou
63-77 UH-ID Letter Report on the High-Altitude Evaluation Jun 1965 L. SchroersLR of the U.S. Army UH-ID Helicopter Equipped
with the 48-Foot Rotor Blade, USATECOMProject No. 4-4-0205-01
63-81 UH-IB Engineering Flight Test of UH-IB Helicopter Jun 1966 0. Yamakawa 488 791aka Equipped with XM-16 Armament Subsystem MAJ J. Foster65-01 and XM-21 Armament Subsystem, USATECOM
Project No. 4-4-1532-03 and 4-5-1535-04
63-85 SEE USAAEFA PROJECT NO. 63-06aka63-06
63-92 CV-2B Final Test Report of the Integrated Engineering/ Jul 1964 J. KramerLR Service Test of Low Level Extraction Techniques
(LOLEX) from CV-2B Aircraft, USATECOMProject No. 4-4-7475
63-93 UH-IB Military Potential Test of the Model 540, Feb 1964 J. Kidwell 951 593"Door Hinge" Rotor System, USATECOM CPT D. WrayProject No. 4-40108-01
4
1964
Project Aircraft AdNumber Type Report Title Date Author(s) Number
64-01 SEE USAAEFA PROJECT NO. 63-07 aka 63-16
64-0 UH-IB Engineering Test of UH-1B Helicopter Aug 1966 J. Blaha 805 698Equipped with Flotation Landing Gear, LT R. RichUSATECOM Project No. 4-5-5301-01
64-05 CH-37B Final Report, USATECOM Project , Apr 1964 R. Turk 951 589No. 4-4-0180-01 Engineering Flight Tests of CWO J. Wattsthe CH-37B
64-20 UH-ID Final Report of Engineering Test of the Mar 1965 J. KudirkaYT53-L-13 Engine Installed in the UH-ID D. WilsonHelicopter, USATECOM Project No. 4-3-0150-10
64-20 UH-ID Engineering Test of the UH-1D Helicopter with Apr 1966 J. Melton 845 032XT67 Power Plant Installed, USATECOM W. AndersonProject No. 4-3-0150-17
64-28 UH-IB Engineering Evaluation of the UH-IB Helicopter Jun 1966 L. Schroers 804 242Equipped with the Model 540 Rotor System, CPT M. AntoniouPhase B,USATECOM Project No. 4-4-0108-03
64-28 UH-IB Engineering Flight Test of the UH-IB Dec 1966 L. Schroers 811 782Helicopter Equipped with the Model 540 Rotor J. MeltonSystw", Phasc D, USATECOM Project J. WattsNo. 4-4-0105-03 J. Shapley
MAJ A. DarlingMAJ D. DuganMAJ E. SampsonW. Anderson
64-31 OH-6A Final Report of Climatic Hangar Test of the Jul 1965 S. Kennedy 813 862OH-6A Light Observation Helicopter, C. Martin
USATECOM Project No. 4-3-0250-72/80 K. Dorris
64-44 YOH-6A Continued Flight Test of the YOH-6A Hell- May 1967 F. Dominick A951 581copter, USATECOM Project No. 4-3-0250-78 J. Watts
1965
65-01 SEE USAAEFA PROJECT NO. 63-81
65-07 U-6 Final Report of Qualitative Flying Qualities Jun 1965 MAJ E. KleuverLR Evaluation of the Turbine Powered U-6 Airplane,
USATECOM Project No. 4-5-1020-02
5
1965(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
65-10 CV- 7A Stability and Control and Performance Test Mar 1966 MAJ N. Mattmuller 483 183
(Phase D) of the CV-7A Transport Airplane, D. WilsonUSATECOM Project No. 4-3-1170-08 J. Blaha
65-11 YOH-6A Letter Report of Engineering Test of YOH-6A Jun 1966 D. MacphersonLR Helicopter in the Desert Environment,
USATECOM Project No. 4-3-0250-75
65-12 UH-lB Engineering Flight Test of UH-IB/540 Rotor Dec 1966 J. Nagata 811 7N1
Helicopter Equipped with XM-16/M-5, XM-21/ MAJ G. Hall
M-5 or XM-3/M- SArmament Subsystem. MAJ R. ChubboyUSATECOM Project No. 4-5-1591-01 MAJ D. Wray
65-12 UH-1C Engineering Flight Test of the U4-IC Feb 1967 J. Petrie 815 629aka Helicopter Equipped with the M-5 Grenade MAJ G. Hall66-09 Launcher and the XM-158 or XM-159 Airborne
Rocket Launcher Pods Suspended from the
XM-1 56 Multiarmament Mount, USATECOMProject No. 4-4-1542-06 and -09
65-22 UH-1B Engineering Flight Test of UH-IB Helicopter Nov 1966 M. Reif 809 915
Equipped with XM-47 Antipersonnel Mine MAJ N. Mattmuller
Di.pensing Subsystem, USATECOM J. ShapleyProject No. 4-4-6516-05
65-27 S-61 Engineering Evaluation of S-61 Mar 1966(No final published copy)
65-30 Model Engineering Flight Evaluation of the Bell May 1966 J. Kidweil 811 482209 Model 209 Armed Helicopter, USATECOM MAJ J. Foster
Project No. 4-6-0300-01
65-31 UH-2B Engineering Flight Evaluition of UH-2B Mar 1966 J. Johnson 831 862Armed Helicopter, USATECOM Project W. Anderson
No. 4-6-0300-01
65-37 OH-6A Letter Report, OH-6A XM-27 Army Mar 1969 J. Shapley
ake LR Preliminary Evaluation J. Nagata65-41B
65-37 OH-6A Engineering Flight Test (Product Improvement Mar 1968 J. Nagata 834 574
aka Test) of Production OH-6A Helicopter H. Wolf
65-41 Unarmed and Armed with the XM-27E1 J. ShapleyWeapon System, Phase D
65-37 OH-6A Engineering Flight Test of the OH-6A Apr 1969 J. Nagata 855 043
Helicopter (Cayuse), Phase D J. Shapley
65-41A SEE USAAEFA PROJECT NO. 65-37/PT I
65-41B SEE USAAEFA PROJECT NO. 65-37 (LETTER REPORT) AND 65-37/PT 1
65-46 A Note on Rotary Wing Hovering and Takeoff 1965 J. Kidwell
Performance, Data Acquisition and Analysis
6
1965(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) NUMbCr
65-47 XV-5A A Review of AGARD Recommendations for 1965 W. AndersonV/STOL Handling Qualities (Rep. 408) in theLight of U.S. Army Experience with the XV-SAand other V/STOL Aircraft Including Helicopters
1966
66-04 UH-IH Engineering Flight Test of the UH-IH Aug 1967 F. DominickHelicopter, Phase D Product Improvement Test, L. ThomasInterim Report USATECOM Project CWO E. NelsonNo. 4-5-0150-04
66-04 YUH-IH Engineering Flight Test of the YUH-IH Nov 1970 F. Dominick 879 656Phase D. Limited LTC E. Nelson
66-05 UH-IC Engineering Test (Airworthiness and Performance Jan 1967 G. Yamakawa 808 293Tests) of UH-IC Helicopter with Cluster, MAJ W. WelterCanister, Riot Control CS, 130 IB, E-159,USAETCOM Project No. 5-5-3405-10
66-06 AH-IG Letter Report of Pilot Qualitative Evaluation of Sep 1966 MAJ G. HallLR Handling Qualities and Cockpit Environment of J. Melton
AH-IG Helicopter After Contractor Optimiza-tion of Stability Augmentation System andImprovement of Cockpit Ventilation System,USATECOMProject No. 4-6-0500-01
66-06 AFI-IG Engineering Flight Test of the AH-IG Jan 1968 J. Melton 830 136Helicopter Hucycobra, Phase B Part 1, MAJ G. HallUSATECOM Project No. 4-6-0500-01
66-06 AH-IG Engineering Flight Test of the AH-IG May 1969 J. Melton 855 629Helicopter Hueycobra, Phase B, Part 2, MAJ G. HallUSATECOM Project No. 4-6-0500-01
66-06 AH-1G Engineering Flight Test of the AH-IG Mar 1968 J. Melton 834 379aka (Hueycobra) Helicopter Equipped with the MAJ G. Hall
67-26 XM-28 Chin Turret with Twin XM-134 Miniguns,Phase B, Part 3
66-06 AH-1G Engineering Flight Test of AH-IG Mar 1968 J. Melton 836 901aka Hueycobra Helicopter Equipped with XM-28 MAJ G. Hall
67-27 Chin Turret with Twin XM-129, 40MM GrenadeLauncher, Phase B, Part 4
7
1966(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
66-06 AH-IG Engineering Flight Test of the AH-IG Helicopter Apr 1968 SP5 P. Passinisi 838 004aka Equipped with the XM-28 Chin Turret with One CW4 W. Connor68-03 7.62MM Automatic Gun (M-134) and One 40MM
Grenade Launcher (XM-129) Hybrid, Phase B,Part 5, USATECOM Project No. 4-6-0500-01
66-06 AH-IG Engineering Flight Test AH-IG Heli- Nov 1969 R. Finnestead 862 700copter Hueycobra Phase B, Pat 6. USATECOM CW4 W. ConnorNo. 4-6-0500-01
66-06 AH-IG Engineering Flight Test AH-IG Helicopter Dec 1970 R. Finnestead 880 558(Hucycobra) Phase D, Part 1, Handling R. PelikanQualities, USATECOM Project No. 4-6-0500-01 MAJ D. Wray
M. Buss
66-06 AH-IG Engineering Flight Test AH-IG Helicopter Apr 1970 R. Finnestead 874 210(Hueycobra) Phase D, Part 2 Performance, E. LaingUSATECOM Project No. 4-6-0500-01 CW4 W. Connor
M. Buss
66-06 AH-IG Engineering Flight Test AH-IG Helicopter Mar 1971 R. Finnestead 882 220(Huey,;obra) Phase D Part 2 Performance M. BussAddendum, USATECOM Project CW4 W. ConnorNo. 4-6-0500-01 7
66-06 AH-IG Engineering Flight Test AH-IG Helicopter, Sep 1970 R. Finnestead 878 122Phase D, Part 3 Vibration Characteristics, E. BailesUSATECOM Project No. 4-6-0500-01 MAJ D. Wray
M. Buss
66-06 AH-IG Engineering Flight Test of the AH-1G Helicopter Feb 1968 J. Melton 832 419to Determine the Area of Inadequate Directional MAJ G. HallControl Power at 8100 Lb. Gross Weight
66-06 AH-IG Feasibility Test of Tractor Tall Rotor Mar 1968 MAJ G. Hall 832 820Modification on the AH-IG Helicopter 1. Melton
66-09 SEE USAAEFA PROJECT NO. 65-12
66-14 U-21A Engineering Flight Test U-21A Airplane Oct 1969 MAJ A. Darling 951 584Phase B and Limited Phase D MAJ W. Welter
66-17 CH-47A Letter Report of USA Preliminary Engineering Sep 1966 K. FerrellLR Evaluation (Product Improvement Test (PIT) MAJ N. Mattmuller
Limited, Phase B), of the Proposed CH-47A, J. Shapley36,000-pound Flight Envelope, USATECOMProject No. 4-3-0200-32
66-23 CH-47B Engineering Flight Test of the CH-47B Mar1968 G. Yamakawa 834 597(Chinook) Helicopter, Phase D, Interim Report, LTC L. MillerUSATECOM Project No. 4-6-0200-03 MAJ H. Chambers
66-23 CH-47B Airworthiness and Qualification Test, (Phase D), Mar 1970 G.Yamakawa 871 209CH-47B Helicopter, USATECOM Project LTC L. MillerNo. 4-6-0200-03
8
1966(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
66-26 YCH-47B Engineering Flight Test of the YCH-47B, Army Jun 1967 MAJ N. MattmullerLR Preliminary Evaluation I & 11, USATECOM G. Yamakawa
Project No. 4-6-0200-02 MAJ D. DuganMAJ H. Chambers
66-26 YCH-47B Engineering Flight Test of the YCH-47B Jan 1969 G. Yamakawa 848 849Helicopter Army Preliminary Evaluation 1, ii, & MAJ N. MattmullerII, USATECOM Project No. 4-6-0200-02 MAJ D. Dugan
MAJ H. Chambers
66-28 YCH-47C Engineering Flight Test of the YCH-47C Mar 1968 MAJ R. ForsythMedium Transport Helicopter Army MAJ H. ChambersPreliminary Evaluation I, Interim Report ILT J. Jester
SP4 F. Wilson
66-28 YCH-47C Engineering Flight Test of the YCH-47C, Mar1968 CPT J. Jester 844 427Medium Transport Helicopter Army SP4 F. WilsonPreliminary Evaluation i, USATECOM LTC H. ChambersProject No. 1-5-0201-02 MAJ R. Forsyth
66-28 YCH-47C Engineering Flight Test of the YCH-47C, Feb 1969 CPT J. Jester 855 630Medium Transport Helicopter, Army ILT T. LanePreliminary Evaluation Part II, USATECOM LTC H. ChambersProject No. 4-6-0201-02 MAJ R. Forsyth
66-28 YCH-47C Army Preliminary Evaluation III and IV Oct 1970 CPT J. Jester 878 571YCH-47C, Medium Transport Helicopter, LTC R. ForsythUSATECOM Project No. 4-6-0201-02
66-29 CH-47C Airworthiness and Flight Characteristics Test Sep 1971 LTC R. Forsyth 892 400CH-47C (Chinook) Helicopter, Performance, J. NagataUSATECOM Project No. 4-6-0201-03 LTC G. Marr
MAJ J. Burden
66-29 CH-47C Airworthiness and Flight Characteristics CH-47C Mar 1972 J. Nagata 903 488Helicopter (Chinook), Stability and Control, G. SkinnerUSATECOM Project No. 4-6-0201-03 SP4 P. Bohn
MAJ A. ToddMAJ D. Broadhurst
LTC D. Hendrickson
1967
67-02 UH-1C Letter, Report Engineering Flight Test of the Aug 1967 J. PetrieLR UH-IC/XM-26 (TOW/H) Armament System, MAJ R. Holasek
Army Preliminary Evaluation MAJ R. Forsyth
9
1967(continued)
Project Aircraft AdNumber Type Report Title Date Author(u) Number
67-04 CH-47 Engineering Flight Test of the CH-47 (Chinook) Mar 1968 A. Higgins 832 821Helicopter Integral Weight and Balance ILT S. SchwartzSystems (ENSURE) H. Catey
67-06 Model Letter Report Bell 206A SAS Evaluation Apr 1967 MAJ R. ChubboyLR 206A
67-07 UH-1C Analytical Study of Range Performance of the May 1968 R. Finnestead 839 031LR UH-IC Helicopter Equipped withLycoming
T53-L-13 Engine
67-08 UH-1H Sling-Load Performance Capability of the Dec 1970 F. Dominick 878 570UH-IH Helicopter, Analytical Study
67-09 UH-IC Engineering Flight Test of the UH-IC Helicopter Nov 1967 K. Ferrell 827 184Equipped with the XM-30 Weapon System, MAJ D. DuganArmy Preliminary MAJ R. Holasek Evaluation
67-13 Model Light Observation Helicopter (LOH) Model 206A, Dec 1967 LTC E. Preisendorfer 951 595206A Armed (XM-27EI) and Unarmed, Performance LTC W. Crouch
and Stability and Control F. Dominick
67-22 TlI-55A Engineering Flight Test TH-55A Primary Nov 1969 CPT S. Schwartz 864 071Helicopter Trainer Limited Performance MAJ D.WrayEvaluation
67-23 OV-IB Engineering Flight Test of an IR Suppression Kit Jul1969 SPS G. Higley 857 774Installation on the OV-IB Aircraft MAJ R. Forsyth
67-25 RU-21B Engineering Flight Test, RU-21B and RU-21C Mar 1970 CPT J. Brecker 869 281RU-21C Aircraft Army Preliminary Evaluation LTC G. Swecker
MAJ R. Holt
67-26 SEE USAAEFA PROJECT NO. 66-06/PHASE B/PT 3
67-29 OH-6A Engineering Flight Test of the Production OH-6A Jul 1969 ILT T. Lane 859 435Helicopter with Fairings Removed MAJ D. Wray
M. Buss
1968
68-02 CH-47B CH-47B Height Velocity Evaluation Feb 1970 CPT A. Hoffman 866 347MAJ W. DavisJ. Shapley
68-03 SEE USAAEFA PROJECT NO. 66-06, PHASE B PT 5
10
1968(continued)
Project Aircraft Ad
Number Type Report Title Date Author(s) Number
68-04 UH-lB Special Study of Autorotational Procedures Apr 1968 J. Shapley 676 820K. Ferrell
68-09 AH-IG Letter Report Engineering Flight Test of Mar 1968 MAJ G. Hall 830 120
LR the AH-IG Helicopter Equipped with XM-20 S. DorrisArmament Subsystem Automatic 20MM Cannon
68-12 UH-1C Wind Tunnel and Flight Evaluation Rosemount Apr 1969 K. Ferrell 708 859Shielded Pitot-Static Tube Model 850N J. Shapley
1. Mishlof
68-13 UH-IC Flight Evaluation, AN/APN 191 Radar Sep 1970 G. Bender 714 638Altimeter MAJ J. Burden
68-14 A Mathematical Model for Estimating Jan 1968 R. KykerHelicopter Power Components
68-21 TH-13T Letter Report Final Flight Test Results for Jun 1969 CPT J. BreckerLR TH-13T Helicopter
68-22 UH-IC Rotary Wing Vehicle External Stores Jettison Aug 1970 CPT A. Hoffman 713 872
CH-47C Envelope Pilot Established Requirements MAJ W. Davis
68-24 CH-47A Qualitative Flight Evaluation of the Flight Nov 1968 ILT T. Lane 844 426
LR Engagement Tactical Cargo Hook (FETCH) MAJ R. Forsyth
on a CH-47A Helicopter LTC T. Wright
68-25 UH-IC A Flight Research Investigation of Autorotational Mar 1976 K. Ferrell A071 153
Performance and Height-Velocity Testing of A. Fredericksona Single Main Rotor Single Engine Helicopter R. Kyker
J. Shapley
68-30 OH-58A Airworthiness and Flight Characteristics Test Sep 1970 G. Yamakawa 878 560Production OH-58A Helicopter Unarmed and J. WattsArmed with XM27EI Weapon System,
Performance
68-30 OH-58A Airworthiness and Flight Characteristics Test Oct 1970 E. Laing 875 793Production OH-58A Helicopter Unarmed and LTC W. Graham
Armed with XM27EIArmament Subsystem, MAJ P. Stringer
Stability and Control
68-31 AH-IG Engineering Flight Test AH-IG (Hueycobra) Nov 1969 N. Donaldson 865 018Helicopter Equipped with the XM35 Armament MAJ. 0. HallSubsystem (20MM Automatic Gun)
68-32 YCH-47C Letter Report of the YCH-47C Helicopter Jan 1969 MAJ G. Marr
LR 50,000-Pound Gross Weight Evaluation
68-37 All-lU Army Preliminary Evaluation of the AII-IG Jun 1969 J. Nagata 860 948
Tractor Tail Rotor Modification M. Buss
68-41 OH-58A Army Preliminary Evaluation PrototypeOH-58A Jan 1970 J. Nagata 865 456Helicopter with XM27E1 Weapon Subsystem E. Bailes
J. Watts
11
1968(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
68-42 OH-6A Performance Evaluation of the OH-6A with Jan 1969 1LT T. Lane 847 558LR Expanded Tolerance Main Rotor Blades J. Shapley
MAJ I. Rundgren
68-43 OV-1D Army Preliminary Evaluation Preproduction Mar 1970 G. Yamakawa 870 260OV-1D (Mohawk) LTC W. Graham
LTC T. Wright
68-46 Model Army Preliminary Evaluation of the Mar 1969 J. Nagata 849 063211 Prototype BHC Model 211 Hueylug LTC T. Wright
MAJ I. Rundgren
68-47 YO-3A Army Preliminary Evaluation I YO-3A Aug 1970 CPT G. Condon 876 022Airplane LTC I. Rundgren
MAJ W. Davis
68-49 Letter Report Evaluation, High-Speed Apr 1971 E. BailesLR Swivel-Head Pitot Probe
68-51 RU-8D Letter Report Airworthiness Qualification Jul 1969 CW4 W. Connor 857 693LR Test RU-8D Airplane (Winebottle Configuration)
68-51 RU-8D Airworthiness and Flight Qualification Tests Oct 1970 LTC J. Wing 876 954RU-SD Airplane Winebottle Configuration, S. DorrlsPhase 11 LTC D. Boyle
CW4 W. Connor
68-53 OH-58A Climatic Laboratory Test OH-58A Helicopter Jul 1970 SP4 D. Tyson 875 578Equipped with XM27E1 Machine Gun SP4 J. PincavageArmament System N. Donaldson
CW3 J. Thomson
68-55 AH-IG Flight Evaluation, Compliance Test Techniques Apr 1974 K. Ferrell 109 440for Army Hot Day Hover Criteria A. Frederickson
J. KishiJ. Watts
1969
69-01 AH-1G Airworthiness and Flight Characteristics AH-IG Dec 1969 G. Bender 864 070Helicopter with Stabilized Nigh ISight (SNS), M. BussPhase I
69-01 AH-IG Airworthiness and Flight Characteristics Test Aug 1970 G. Bender 874 211AH-IG Helicopter with Stabilized Night Sight M. Buss(SNS), Phase I
12
1969(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
69-01 AH-1G NASA Report Static Load Tests of a Jul 1969 R. RosecransSimulation Package on an AH-IG Helicopter
69-07 UH-IC Jettison Test XM19/MK45 Flare Dispenser Dec 1969 MAJ D. Wray 864 077Installed in the UH-IC Helicopter
69-08 UH-1H Letter Report Flight Evaluation on the Big Nov 1969 MAJ G. HallLR Ear Cannister Deployment Subsystem
69-09 OH-6A 5.56/7.62MM Weapons Comparative Evaluation Jun 1971 LTC J. Wing 884 980OH-6A Helicopter V. Diekmann
MAJ R. Holasek
69-11 AH-IG Engineering Flight Test AH-IG Helicopter Mar 1971 R. Lewis 882 771(Hueycobra) Maneuvering Limitations E. Bailes
R. McClellanCPT J. ClaxtonM. BussCW4 W. ConnorLTC J. Johnston
69-13 AH-IG Height-VelocityTest AH-IG Helicopter Feb 1971 CPT G. Condon 881 633E. BailesCW4 W. Connor
69-14 YO-3A Army Preliminary Evaluation, II. YO-3A Aug 1970 CPT G. Condon 874 733Airplane LTC I. Rundgren
CW4 W. Connor
69-15 UH-IH Letter Report Airworthiness Qualification Oct 1969LR of the UH-IH Helicopter with the Airborne
Searchlight System (AN/ASS-2) Installed
69-16 OI-58A Height Velocity Test OH-58A Helicopter Jun 1971 J. Watts 884 973CPT G. CondonSP5 J. Pincavage
69-17 CH-47C Height-Velocity Evaluation CH-47C Sep 1972 J. Nagata 904 930Helicopter with T55-L-1 IA Engines A. Steinmetz
MAJ A. ToddMAJ J. Burden
69-18 RU-21A CEFIRM Leader Airworthiness Qualification Dec 1970 LTC J. WingLR RU-21B Test RU-21-ABC Aircraft
RU-21C
69-21 UH-IM Letter Report Airworthiness Evaluation of Feb 1970 CW4 W. ConnorLR the UH-IM with Infant Subsystem Installed
13
1970
Project Aircraft AdNumber Type Report Title Date Author(s) Number
70-02 AH-56A Army Preliminary Evaluation I and Mar 1972 F. Dominick 905 910aka Research and Development Acceptance Test I, G. Bender71-17 AH-56A Cheyenne Compound Helicopter LTC G. Hall
R. McClellanMAJ P. StringerM. Buss
70-03 OV-ID Army Preliminary Evaluation Ii Production Mar 1971 G. Yamakawa 881 649OV-11D (Mohawk), Performance and Handling ILT K. BrauerQualities LTC W. Graham
70-03-2 OV-ID Army Preliminary Evaluation, Production Apr 1972 G. Yamakawa 903 107OV-ID (Mohawk) Performance Addendum ILT K. Brauer
LTC W. GrahamMAJ J. Henderson
70-08 AH-IG Letter Report, QualitativeAirworthiness Sep 1970 M. BussLR Assessment of AH-IG Cobra Night Fire Control
System (CONFICS)
70-09 YO-3A Army Preliminary Evaluation Ill YO-3A Sep 1970 LTC I. Rundgren 876 095Airplane MAJ A. Deel
70-10 AH-IG Airworthiness and Flight Characteristics Test Oct 1970 G. Bender 951 594(Limited) AH-IG Helicopter with the Southeast M. BussAsia Multisensor Armament System Helicopter(SMASH)
70-12 CH-47C CH-47C 50,000-Pound Gross Weight Mar 1971 MAJ A. ToddLR Evaluation CH-47C ILT D. D'Amore
LTC H. Chambers
70-14 UH-IH Airworthiness Qualification Test of the UH-IH Jan 1971LR Helicopter with Airborne Searchlight Infrared
Filter Installed
70-15-I OH-58A Instrument Panel and Avionics Compartment Sep 1972 E. Laing 907 738Environmental Survey Production OH-58A CPT J. ClaxtonHelicopter MAJ L. Hepler
LTC W. Graham
70-15-2 UH-IH Vibration and Temperature Survey Production Jan 1973 E. Laing 909 441UH-IH Helicopter MAJ L. Hepler
MAJ R. Merrill
70-15-3 CH-54B Vibration and Temperature Survey CH-54B Mar 1973 E. Laing 910 495Helicopter MAJ R. Merrill
CW4 J. Reid
70-15-4 OH-6A Vibration and Temperature Survey Aug 1973 E. Laing 914 172Production OH-6A Helicopter MAJ J. Smith
CW3 J. Hill
14
1970(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
70-15-5 AH-IG Vibration and Temperature Survey Production Mar 1974 E. Laing A002 063AH-1G Helicopter CPT A. Weand
70-15-6 CH-47C Vibration and Temperature Survey Sep 1975 E. Laing A022 348Production CH-47C Helicopter CPT M. Hawley
R. SmithCPT J. O'ConnorCPT L. Kronenberger
70-16 Interim Report, Comparison of VSTOL Sep 1970LR Specifications to Helicopter Flight Test Data
70-17 A Portable Instrumentation Kit Feasibility Jun 1972 R. Jefferis 751 188Study W. Rivers
70-19 Letter Report, Advanced Instrumentation and Mar 1972 V. DiekmannLR Data Analysis System Demonstration
70-20 UH-1D Letter Report, Handling Qualities of the UH-ID Aug 1970LR Helicopter with Terminal Communications System
(TACSAT) Antenna Installation
70-22 UH-IH Letter Report, UH-1H Helicopter with the Oct 1972 J. PetrieLR Airborne Ambush Detector (AAD), Qualitative MAJ A. Todd
Handling Qualities Evaluation
70-23 UH-1C Investigation of Engine Rigging, Airspeed and Dec 1970 LTC J. Fitch 717 047Rotor RPM Effects on Steady State Autorotational J. ShapleyPerformance
70-24 TH-55A Autorotational Entry Improvement Program Dec 1972 B. Boirun 908 657TH-55A Helicopter LTC W. Benoit
70-25 AH-IG Engineering Flight Test AH-1G (Hueycobra) Apr 1971 CPT B. Nicholson 887 550Helicopter Autorotational Entry Characteristics M. Buss
70-29 UH-IM Letter Report, Vibration Survey Tests on the Nov 1970 LTC D. HendricksonLR UH-IM Helicopter with the ForwardLooking
Infrared (FLIR) System Installed
70-29 UH-IM Vibration and Elevator Loads Survey Tests of Jun 1971 R. Finnestead 885 839the UH-IM Helicopter with the Forward- LTC D. HendricksonLooking Infrared (FLIR) System Installed
70-32 U-8 Letter Report, U-8 Aircraft Procedures Dec 1970 K. FerrellLR Evaluation
70-33 UH-IC Evaluation of Fuel Flowmeter Instrumentation Jan 1971 A. Winn 219 280R. Jefferis
70-38 Model Letter Report, Reevaluation of Boeing-Vertol Oct 1971 G. YamakawaLR 347 Model 34 LTC D. Hendrick
15
1970(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
70-38 Model Tech Eval Boeing-Vertol Model 347 Advanced Jan 1972 G. Yamakawa 900 263347 Technology Helicopter, Phase I A. Steinmetz
SP4 R. GreenlandLTC D. Hendrickson
70-40 UH-IH Letter Report, Helicopter-Mounted Insecticide Feb 1973 MAJ R. WaddellLR Spray System Evaluation SP4 J. Lehman
70-43 Scorpion Evaluation of the Scorpion Helicopter Mar 1972 MAJ R. ChaplinLR MAJ J. Alvis
1971
71-01 CH-54B Letter Report, Qualitative Evaluation of Aug 1971 J. WattsLR Instrument Flying Qualities of the MAJ J. Henderson
CH-54B Helicopter
71-01 CH-54B Instrument-Flight-Rules Capability Evaluation Dec 1972 E. Bailes 908 658CH-54B (TARHE) Helicopter V. Diekmann
J. WattsMAJ J. Henderson
71-03 OH-6A Study, Pilot Perceived Jettison Envelope Jun 1973 A. Winn 768 171OH-58A J. KishiAH-56
71-04 UH-IB Letter Report, Airworthiness Qualification Test Apr 1971 MAJ D. BroadhurstLR UH-IB Helicopter with XM26 Armament TOW ILT R. Thomas
System Installed Under Asymmetric Loading
1-05 OH-6A Letter Report, Evaluation of Stability and Jan 1974 V. DiekmannLR Control Test Methods LTC R,. Waddell
71-07 UH-IM Letter Report, Army Preliminary Evaluation May 1971 MAJ D. BroadhurstLR of the UH-IM Helicopter Multifunction System CPT B. Nicholson
(HELMS)
71-09 UH-IM Letter Report, Follow-On Vibration Survey May 1971 R. FinnesteadLR of the UH-IM/FLIR MAJ R. Holasek
S. Streulker
71-11 OH-6A Letter Report, Evaluation, AN/APN 171 Oct 1971 J. WattsLR Radar Altimeter S. Streutker
71-16 TS-2A Letter Report, Phase I TS-2A Airtanker Jul 1972 MAJ Rt. HolasekLR Evaluation SP4 J. Lehman
16
1971(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Numbcr
71-17 SEE USAAEFA PROJECT NO. 70-02aka
70-02
71-18 UH-IH Letter Report, UH-IH Tail Rotor Hover Oct 1971 R. FinnesteadLR Performance LTC W.Graham
71-18 UH-IH Tail Rotor Performance and Translational Flight Jan 1972 R. Finnestead 901 787Handling Qualities Tests UH-IH Helicopter LTC W. Graham
71-21 OH-58A Letter Report Monitoring of OH-58A Snow Dec 1971 MAJ HeplerLR Ingestion Test
71-22 NUH-IB Letter Report, Airworthiness Test of the NUH-IB Aug 1971 MAJ R.HolasekLR Helicopter Equipped with an Automatic Terrain- SP4 J. Lehman
Avoidance/Following System
71-24 OH-58A Evaluation of theOH-58A Helicopter with Dec 1972 E. Laing 907 291an Allison 250-C20 Engine T. Benson
SP5 A. WernerMAJ D. Broadhurst
71-27 UH-IC Airworthiness Evaluation UH-IC XM156/ Jan 1972 A. Winn 892 242Hornet Missile System J. Kishi
71-29 UH-IH Letter Report, Reevaluation of the DSPG Aug 1971 MAJ J. BurdenLR SPIKE-EXRAY Program
71-30 UH-IC Flight Evaluation, Elliott Low-Airspeed Sep 1972 A. Winn 753 343Sensor, Final Report I J. Kishi
71-30 UH-IC Flight Evaluation, Aeroflex True Airspeed Mar 1973 K. Ferrell 764 240OH-58A Vector System Low-Airspeed System, Final A. WinnF-51D Report ii J. Kishi
B. Jefferis
71-30 UH-IC Flight Evaluation, Pacer Systems Inc. LORAS I1 Mar 1974 B. Boirun 780 018Airspeed System, Low-Airspeed F. DominickSensor, Final Report III J. Kishi
MAJ J. SmithMAJ R. Merrill
71-30 NUH-IC Flight Evaluation, J-Tee Airspeed System Apr 1974 F. Dominick 780 019Low-Airspeed Sensor, Final Report IV B. Boirun
J. KishiR. Jefferis
71-30-5 NUH-IM Flight Evaluation, Rosemount Orthogonal Low Nov 1974 CPT J. O'Connor 009 711Airspeed System, Low-Airspeed Sensor, Final SP4 J. BullockReport V R. Jefferis
71-30-6 NUH-IM Flight Evaluation, Elliott Dual-Axis Low Sep 1975 F. Dominick A019 360Airspeed System, LASSIE I!, Low Airspeed K. FerrellSensor, Final Report VI CPT J. O'Connor
17
1971(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
71-31 UH-li- ALARM System Airworthiness Test Feb 1972 MMJ R. HolasekLR MAJ J. Alvis
PFC J. Lehman
7 1-32 Utility Tactical Transport Aircraft System Apr 1972 0. Yamakawa. 902 767(UTTAS) Maneuver Criteria MA] G. Broadhurst
MAJ J. Smith
71-34 OH-6C Army Preliminary Evaluation, Prototype Feb 1972 GJ. Skinner 901 268Hughes, Model 369C (OH-6C) Helicopter R. McClellan
LTC A. Deel
71-41 CH-47C CH-47C Improved Flight Control System Dec 1972 MMJ W. HortonLR SP4 C. Bowers
71-42 UK-lit UH-l/XM56, Army Preliminary Evaluation Fcb 1972 MA] R. ChaplinLR PFC J. Lehman
71-43 AH-1G AK-IG Lateral Flight Performance Test Jun 1972 MAJ L. HeplerLR J. Kishi
A. Winn
71-45 UH-IH XM56 Mini-Dispersion Test Feb 1972 MMJ R. ChaplinLR SF4 1. Lehman
71-46 OH-58A OH-58 Autorotational Evaluation Feb 1972 J. Watts 035 727LR V. D-ekmann
7 1-47 RU-21B CEFIRM LEADER RU-21B and RU-21C Air- Sep 1972 MMJ R. ChaplinLR RU-21iC worthiness Tests SF4 3. Lehman
1972
72-01 OH-58A Instrument Flight Evaluation OH-58A Sep1972 T. Benson 907 317Helicopter MAJ J. Smith
72-02 CL-215 Limited Evaluation of Canadair's CL-215 Nov 1970 MA] R. HolasekLR Water Bomber/Utility Aircraft
72-02 CL-215 Limited Evaluation Canadair CL-215 Oct 1972 MA] J. AlvisAmphibious Airplane MMJ R. Holasek
J. Kishi
72-03 OH-58A Fluidic Yaw Damper Evaluation Installed Dec 1972 MA] J. SmithLR on the OH-58A Helicopter MMJ R. Chaplin
R. Smith
18
1972(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
72-05 UH-IM Rotor Flow Survey Program UH-IM Helicopter May 1974 B. Boirun 787 428R. JefferisMAJ R. Holasek
72-06 OH-6A Instrument Flight Evaluation OH-6A Helicopter, Nov 1973 A. Wl.n 780 C16Part I LTC W. Griffith
MAJ C. Mittag
72-06 OH-6A Flight Evaluation, OH-6A Helicopter Kaiser Feb 1973 A. Winn 781 990FP-50B Flight Director System, Part 11 LTC W. Griffith
MAJ C. Mittag
72-08 AH-56A Attack Helicopter Evaluation AH-56A Jun 1972 J. Johnson 771 914Cheyenne Compound Helicopter G. Bender
R. McClellanMAJ J. BurdenCPT M. Larsen
72-09 S-67 Attack Helicopter Evaluation Blackhawk Jul 1972 G. Yamakawa 771 161S-67 Helicopter A. Winn
R. SmithSP4 R. AndersonMAJ W. GriffithMAJ W. Horton
72-10 Model Attack Helicopter Evaluation Model 309 Jul 1972 J. Nagata 771 151309 KingCobra Helicopter G. Skinner
PFC G. SmithR. JungelMAJ L. HeplerLTC P. Stringer
72-12 Model EngineeringFlight Test Boeing-Vertol Model 347 Oct 1972 A. Steinmetz 909 933347 Advanced Technology Helicopter Phase 11 SP4 C. Bowers
LTC A. DeelMAJ W. Horton
72-13 RU-21E Modified LEFT-FOOT RU-21E Direction Jun 1972 MAJ R. ChaplinLR Finding (DF) Demonstration PFC G. Smith
72-14 OH-58A Helicopter Autorotational Demonstration Jun 1972 J. WattsLR S. Streutker
72-15 CH-47C CH-47C Weight and Balance System Mar 1973 J. NagataLR
72-16 AH-IG AH-IG Vertical Climb Height-Velocity Sep 1972 K. FerrellLR Diagram A. Frederickson
J. Kishi
72-18 AH-IG Army Preliminary Evaluation Improved Dec 1972 G. Yamakawa 907 694AH-IQ Cobra Armament System ILT L. Toman
SP5 A. WernerMAJ R. Holasek
19
1972(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
72-19 OV-ID OV-ID 300-Gallon External Drop Tank Sep 1972 MAJ R. ChaplinLR Performance Evaluation SP4 J. Lehman
72-20 OH-58A Handling Qualities Evaluation of the OH-58A Feb 1973 R. Smith 909 536Helicopter Incorporating the Model 570B Three- T. BensonAxis Stability and Control Augmentation System MAJ J. Smith
72-21 Oll-6A OH-6A/Bifurcated Exhaust Duct Jul 1972 MAJ R. ChaplinLR T. Benson
72-24 OH-58A OH-58A/Insulated Infrared ExhaustAirworthiness Aug 1972 J. WattsLR Evaluation S. Streutker
72-26 S-67 Attack Helicopter High-AltitudeEvaluation Jul 1972 G. Yamakawa 771 051Blackhawk S-67 Helicopter A. Winn
MAJ W. Horton
72-28 OH-6A Engineering Flight Test OH-6A Helicopter Aug 1973 SP4 R. Anderson 913 954with Cambered Tail Rotor Blades and Pedal LTC R. WaddellForce Compensators
72-29 AH-IG Instrument Flight Evaluation AH-IG Jul 1975 G. Skinner A026 633Helicopter CPT M. Larsen
SP4 G. SmithSP4 P. BoninCW4 J. ReidLTC R. WaddellMAJ L. HeplerMAJ R. Merrill
72-30 AH-IG Engineering Flight Test AH-IG Helicopter with Jun 1973 G. Skinner 776 359Model 212 Tail Rotor, Part I, Load Survey SP4 G. Smith
MAJ L. HeplerPFC P. Bonin
72-30 AH-IG Engineering Flight Test AH-IG Helicopter with Sep 1973 J. Nagata 776 360Model 212 Tail Rotor, Part 11, Performance G. Skinnerand Handling Qualities SP4 G. Smith
MAJ L. HeplerPFC P. Bonin
72-31 Model Sideward Flight, High-Altitude Evaluationand Aug 1972 J. Nagata A109 512aka 309 Simulated Engine Failures KingCobra Model 309 R. Jungel
72-34 Attack Helicopter MAJ L. HeplerPFC G. SmithG. Skinner
72-32 OH-6A OH-6A Autorotational Evaluation Nov 1972 MAJ W. GriffithLR R. McClellan
72-34 SEE USAAEFAPROJECT NO. 72-31
20
1972(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
72-35 CH-47C Helicopter Icing Spray System Qualification Oct 1973 J. Hayden 775 803E. BailesJ. WattsCPT L. Brewer
72-38 01-58A OH-58A/ISTAR Airworthiness Evaluation Dec 1972 MAJ R. ChaplinLR G. Bender
72-39 CH-47C CH-47C Tandem Cargo Hook Demonstration May 1973 J. NagataLR CPT L. Brewer
'2-40 CH-54B Limited Performance Tests CH-54B (TARHE) Feb 1973 J. Johnson 910 263Helicopter V. Diekmann
SP4 J. JohnsonMAJ R. MerrillCW4 J. Reid
72-43 AH-IQ Airworthiness and Flight Characteristics Jul 1973 G. Yamakawa 914 458Evaluation AH-IQ Helicopter CPT K. Schrantz
1LT M. HanksSP4 A. WernerMAJ R. MerrillCW4 J. Reid
72-44 AII-56A Engineering Evaluation AH-56A Compound Mar 1973 J. Johnson 910 Zo2Helicopter with Advanced Mechanical Control G. BenderSystem MAJ J. Burden
1973
73-01 NUH-IM Helicopter Lift Margin System and Low-Speed Aug 1977 F. Dominick A060 553Performance Evaluation NUH-1M Helicopter D. Belie
R. JefferlsJ. O'ConnorA. KrynytzkyLTC W. Griffith
73-02 OH-58A Evaluation of the Teledyne Ryan Model 622 Nov 1973 MAJ C. Mittag 775 806Terrain-Following Radar System Installed on T. Bensonan OH-58A Helicopter CPT R. Tart
CW3 J. Meiss
73-04 CH-47C Icing Tunnel Test Hot-Film Anemometer Feb 1974 SP4 P. Bonin A005 )44R. Jefferis
21
1973(continued)
Project Alrcrart AdNumber 'ype Report 'Title Date Author(s) Numberi
73-04-1 CH-47C Artificial Icing Tests CH-47C Helicopter Aug 1974 MAJ C. Mittag A004 008CPT M. HanksCPT J. O'ConnorCPT L. Kronenberger
73-04-2 AH-IG Artificial Icing Tests AH-IG Helicopter Nov 1974 R, Smith A009 712CPT M. HanksMAJ C. MittagCW4 J. Reid
73-04-4 UH-IH Artificial Icing Tests UH-1H Helicopter Jan 1974 R. Smith 779 502Part I CPT M. Hanks
CPT L. BrewerCW4 J. ReidLTC W. Griffith
73-04-4 UH-IH Artificial Icing Tests UH-IH Helicopter, Jan 1974 CPT M. Hanks 779 503Part 11 Heated Glass Windshield MAJ C. Mittag
ILT M. HawleyLTC W. Griffith
73-04-7 All- 10 Artificial Icing Tests AII-IQ Helicopter (U) Jan 1974 CPT M. Hanks 531 5,10CW4 J. ReidMAJ R. Merrill
73-05 CH-47C CH-47C Terminal Radar Area Correlator Apr 1973 CPT L. BrewerLR Experiment (TRACE)
73-07 UH-1H Helicopter Night Landing System Airworthiness Jun 1973 MAJ R. ChaplinLR Evaluation R. Smith
73-09 OV-I NASA OV-l Accident Investigation Jun 1973 MAJ R. ChaplinLR LTC W. Griffith
73-10 UH-IH Tail Rotor Shaft Vibration Survey, Production Jul 1974 E. Laing A002 574UH-IH Helicopter CPT M. Hawley
CPT A. Weand
73-41 Instrumentation Specification for Climatic Aug 1973 K. Ferrell 771 053Laboratory Tests T. Lynch
73-71 Minutes of AVSCOM Helicopter IFR Conference Jan 1973
22
1974
Project Aircraft Ad
Number Type Report Title Date Author(s) Number
74-02 AH-IG AH-IG Helicopter Main Rotor Flow Survey Apr 1978 B. Boirun A057 443E. BailesR. JefferisMAI J. ArnoldCW3 3. Meiss
74-06-1 YUH-60A Government Competitive Test, Utility Tactical Nov 1976 J. Nagata B059 73SLTransport Aircraft System (UTTAS) Sikorsky, G. SkinnerYUH-60A Helicopter S. Kolwey
R. BuckaninMAJ C. MittagLCdr M. CoumnatosCW3 J. Meiss
74-06-2 YUH-61A Government Competitive Test, Utility Tactical Nov 1976 A. Winn B035 08 11.Transport Aircraft System (UTTAS) Boeing- MMJ J. JenksVertol, YUH-61A Helicopter F. Deprospero
CPT E. TavaresCPT J. O'ConnorLCdr J. Ludwig
74-07-1 YAH-63 Development Test 1 Advanced Attack Helicopter Dec 1976 G. Bender A 109 531Competitive Evaluation Bell YAH-63 Helicopter V. Diekmann
CPT M. Mathew%R. SmithMAJ C. ThomasR. WoratschekMAJ J. ArickCPT J. Arnold
74-07-2 YAH-64 Development Test I Advanced Attack Helicopter Dec 1976 MAJ R. Stewart A109 532Competitive Evaluation Hughes YAH-64 MAJ R. TarrHelicopter ILT M. Hill
B. BoirunT. BensonE. BailesW. Abbott
74-10 AH-IG AH-IG Heavyweight Autorotational Jan 1974 MAJ L. Hepler 785 553
LR Evaluation G. Yamakawa
74-10 AH-IG Engineering Flight Test AH-IG Helicopter May 1974 G. Yamakawa 785 553
Heavyweight Autorotational Evaluation I LT L. FreeJ. WattsMAJ L. Hepler
74-1 3 UHf-lH Artificial Icing Tests, Lockheed Advanced Jun 1975 CPT L. Kronenbcrgcr B00t7 2441.
Ice Protection System Installed on a UH-IH CPT M. HanksHelicopter MAJ R. Merrill
74-16 B30-105C BO-105C Evaluation Jan 1975 CPT M. Mathews
LR
23
1974(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
74-19 AH-1C Height-Velocity Test AH-IG Helicopter at Jun 1974 ILT L. Free A034 424Heavy Gross Weight, Low Elevation MAJ L. Hepler
74-20 OV-ID Hot Brick III Airworthiness Evaluation Nov 1974 D. Macpherson A012 202OV-11D Airplane CW4 J. Reid
74-21 Model Army Preliminary Evaluation I Model 200 Jun 1974 T. Benson A009 713200 Cefly Lancer CPT M. Hawley
G. YamakawaMAJ L. Brewer
74-21 Model Army Preliminary Evaluation II Model 200 Aug 1974 G. Yamakawa A009 714200 Cefly Lancer T. Benson
MAJ L. Brewer
74-22 JOH-58A Engineering Evaluation JOH-58A Helicopter Jun 1975 T. Benson A019 407with an Automatic Engine Relight System R. Buckanin
MAJ C. Mittag
74-23 OH-58A Handling Qualities Evaluation OH-58A Feb 1975 E. Bailes A033 827Helicopter Incorporating a Ministab 3-Axis R. BuckaninStability Augmentation System MAJ C. Mittag
74-25 T-42A T-42A Single-Engine Operation and Stall Feb 1974 MAJ W. HortonL Evaluation SP4 P. Bonin
74-27 CH-47C CH-47C Prototype Infrared Countermeasures Jun 1974 MAJ W. HortonLR (ICRM) Airworthiness Demonstration J. Nagata
SP4 P. Bonin
74-30 Model Airworthiness and Flight Characteristics Jul 1975 LTC W. Horton B014 228L214A Evaluation, Iranian Model 214A Helicopter G. Bender
ILT L. FreeCPT J. O'ConnorJ. NagataCPT R. Ward
74-31 UH-1H Natural Icing Tests, UH-IH Helicopter Jun 1974 LTC W. Griffith A002 007CPT M. HanksMAJ C. MittagCW4 J. Reid
74-32 Model Climatic Laboratory Evaluation, Iranian Aug 1976 MAJ R. Ward B030 107L214A Model 214A Helicopter CW4 J. Coleman
D. BelteK. Dorris
74-33 YAH-IR Army Preliminary Evaluation YAH-IR Improved May 1975 F. Dominick A018 420Cobra Agility and Maneuverability Helicopter R. Smith
MAJ R. Stewart
74-33 YAH-IR Army Preliminary Evaluation, YAH-IR Aug 1975 F. Dominick A024 850Improved Cobra Agility and Maneuverability R. SmithHelicopter Addendum MAJ R. Stewart
24
1974(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) NtJnlh.1
74-34 YAH-IS Airworthiness and Flight Characteristics Aug 1975 G. Skinner A025 476Evaluation, YAH-IS Improved Cobra Agility W. Abbottand Maneuverability Helicopter CPT R. Tarr
74-35 RU-21H Guardrail IIA RU-21H Evaluation Jul 1974 G. Yamakawa A004 009T. BensonMAJ L. Brewer
74-36 RV-ID Army Preliminary Evaluation 1, RV-1D/ Aug 1974 G. Bender A005 220Quick Look 11 Aircraft CPT J. O'Connor
74-48 OH-58A Evaluation of an OH-58A Helicopter with Apr 1975 T. Benson A018 861an Allison 250-C20B Engine R. Buckanin
MAJ C. MittagCPT J. Jenks
74-77 Rotary Wing Icing Symposium Summary Jun 1974 COL D. WrightReport Commander
Volume I A061 445Volume 1I A061 422Volume III A061 423
74-87 Flight Evaluation of Non-dimensional Static Jul 1979 B. Boirun A082 831Longitudinal Stability Test Methods K. Ferrell
MAJ J. Jenks
74-94 An Advanced Instrumentation and Data Jul 1973 R. Lew.s 882 771Analysis System for Army Flight Testing Study
1975
75-01 AH-1G Performance and Handling Qualities AH-1G Apr 1975 A. Winn A019 482Helicopter Equipped with Three Metal/Plume MAJ R. StewartInfrared Suppressors Hot
75-03 RU-21A Flying Qualities Evaluation RU-21A Dec 1974 J. JohnsonCEFIRM LEADER Airplane CPT M. Hawley
MAJ R. Stewart
75-04 CH-47C Modified Helicopter Icing Spray System Mar 1977 G. Bender A055 039Evaluation CPT M. Mathews
CW4 J. Tulloch
75-05 CH-147 Qualitative Army Preliminary Evaluation Oct 1974 MAJ W. HortonLR (CH-47C) of the Canadian Production CH-147 Helicopter J. Watts
25
1975(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
75-06 CH-47C Letter of Effort, CH-47C, Active Arm External Apr 1976 CPT G. NeperenyLOE Load Stabilization System (AAELSS) II Flight
Evaluation Program
75-08 C-12A Airworthiness and Flight Characteristics Oct 1976 V. Diekmann A040 239Evaluation C-12A Aircraft R. Smith
J. WattsMAJ J. HannonCPT W. Norton
75-09 AH-IG Performance and Handling Qualities Evaluation Aug 1975 A. Winn A021 407
AH-1G Helicopter with Low Reflective ILT E. TavaresInfrared/Optical Paint MAJ R. Stewart
G. Skinner
75-10 U-21A Airworthiness and Qualification Evaluation Jan 1976 R. Smith A047 656U-21A Airplane with Low Reflective Paint CPT W. Nortonand Hot Metal Suppressors
75-11 JOH-58A Army Preliminary Evaluation, JOH-58A Hell- Dec 1975 T. Benson A024 727copter with Low Reflective Paint and Infrared MAJ C. ThomasCountermeasure Exhaust System R. Buckanin
75-12-1 YUH-60A Climatic Laboratory Evaluation, Utility Tactical Jul 1977 MAJ R. Ward B033 049LTransport Aircraft System (UTTAS) Sikorsky, J. GivensYUH-60A Ground Test Vehicle E. Walbey
C W4 R. Seefeldt
75-12-2 YUH-61A Climatic Laboratory Evaluation, Utility Tactical Jul 1977 D. Belte B031 052LTransport Aircraft System (UTTAS) Boeing- R. FollowillVertol, YUH-61A Ground Test Vehicle R. Seefeldt
D. Wallis
75-15 OV-IC Advanced Report, Engineering Flight Evaluation, May 1976C PT G. NeperenyLR OV-IC Aircraft Equipped with Angle-of-Attack/ MAJ R. Stewart
Stall Warning System
75-17-1 AH-1G Flight Evaluation, Pacer Systems, Low-Range May 1977 W. Abbott A045 222Airspeed System, LORAS 1000 B. Boirun
CPT G. HillCPT E. Tavares
75-17-2 AH-1G Flight Evaluation, J-TEC VT-1003 Vector May 1977 W. Abbott A046 553Airspeed Sensing System CPT S. Spring
MAJ R. Stewart
75-17-3 NUH-1M Flight Evaluation Rosemount Low Range Mar 1977 W. Abbott A046 491Orthogonal Airspeed System with 853 Sensor MAJ J. Guin
75-18 YAH-IQ Army Preliminary Evaluation, YAH-10 Heli- Aug 1975 ILT L. Free A020 111copter with a Flat Plate Canopy CPT J. Arnold
75-18 YAH-IQ YAH-IQ Fiat Plate Canopy Follow-on Feb 1976 CPT J. ArnoldEvaluation
26
1975(continued)
Project Aircrart AdNumber Type Report Title Date Author(s) Number
75-19-1 AH-IG Low Airspeed Sensor Location Tests AH-IG Feb 1977 K. Ferrell A052 467Helicopter B. Boirun
CPT G. Hill
75-19-2 AH-1G Flight Evaluation Honeywell Ultrasonic Jun 1976 CPT G. Hill A052 467Wind Vector Sensor System Fire Control CW3 J. MeissWind Sensor ReportB. Boirun
75-20 YOH-58A Army Preliminary Evaluation, YOH-58A Dec 1975 G. Skinner A024 501Helicopter with Flat-Plate CPT J. Arnold
75-21 YAH-1R Letter of Effort, YAH-IR Lateral Agility/IR Mar 1977 MAJ R. StewartLOE
75-22 NUH-IM Letter of Effort, Engine Characteristics Test Jun 1977 F. DominickLOE
75-24 JOH-58A Integrated Controller Evaluation Sep 1976 CPT J. Arnold A035 064CPT M. MathewsMAJ C. Thomas
75-25 AH-IG Letter of Effort, Qualitative Evaluation of Oct 1975LOE AH-IG with Kaiser Ministab
75-26 UH-1H Lockheed Advanced ice Protection System May 1976 CPT L. Kronenberger
75-27 JUH-1H Letter of Effort, Qualitative Evaluation of Jan 1976LOE JUH-IH with Kaiser 3-Axis MINISTAB
75-28 Letter of Effort, Phase 11 of Joint Acoustic Test Jan 1976 CPT J. ArnoldLOE Program with AMRDL/AMES
1976
76-02 Model Performance and Systems Evaluation Iranian Mar 1977 G. Yamakawa B027 647L214C Model 214C Helicopter R. Woratschek
CPT S. Spring
76-03 C-12A Landing Gear Capability Tests Mar 1977 V. Diekmann A046 554J. Watts
76-04 SEE JSAAEFA PROJECT NO. 75-26
76-07 YAII-IR Army Preliminary Evaluation, Improved Main Jun 1977 J. Watts A072 83(0Rotor Blade Installed on a YAH-IR Helicopter F. Dominick
MAJ J. Guin
27
1976(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
76-08 YAH-IR Airworthiness and Flight Characteristics Nov 1977 G. Yamakawa A074 895Evaluation Improved Main Rotor Blade J. NiernannInstalled on a YAH-IR Helicopter R. Smith
R. WoratschekMMJ J. JenksCPT W. NortonCW4 J. Tulioch
76-09-1 YUH-60A Artificial Icing Test, Utility Tactical Transport Feb 1977 R. Buckanin A109 530Aircraft System (UTTAS), Sikorsky YUH-60A W4 J. Tulloch
76-09-2 YUH-61A Artificial Icing Test, Utility Tactical Transport Jan 1977 CPT J.O'ConnerAircraft System (UTTAS), Boeing-Vertol CPT E. TavaresYUH-61A Helicopter MMJ J. Hagen
76-10 OV-11D OV-ID Low Reflective Paint Evaluation undated J. WattsLR
76-11-I OH-58C Preliminary Airworthiness Evaluation Mar 1978 G. Yamakawa A071 699OH-58C Helicopter MAJ J. Hagen
R. BuckaninCPT T. Burch
76-11-2 OH-58C Airworthiness and Flight Characteristics Apr 1979 MAJ S. Spring A080 138OH-58C Interim Scout Helicopter CPT T. Burch
R. BuckaninJ. Niemann
76-13 NUH-IH Airworthiness Evaluation NUH-1H Helicopter May 1977 T. Benson A047 971with Global Positioning System MMJ C. Thomas
1977
77-02 Temperature Effects of Sunlight on Helicopter Feb 1977 MMJ M. MathewsLR Rotor Blades
77-04 YAH-IS Army Preliminary Evaluation, YAH-IS, NH- Aug 1977 MMJ J. Arnold A066 573copter with Modified Flat Plate Canopy Installed MMJ J. Gumn
CW4 J. BishopG. Skinner
77-OS U-21A Icing Evaluation U-21A Airplane with Low May 1977 T. Benson A046 852Reflective Paint R. Woraisehek
MAM C. ThomasMMJ R. Stewart
28
1977(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
77-07 TS-2A TS-2A Air Tanker Evaluation, Phase II May 1978 J. Watts A060 940E. BailesMAJ S. SpringMAJ J. Guin
77-09 UH-1H Preliminary Airworthiness Evaluation, UH-IH May 1978 V. Diekmann A078 476Helicopter Equipped with Multiple Target MAJ M. MathewsElectronic Warfare System (MULTEWS) MAJ S. Spring
MAJ J. HagenCW4 J. Tulloch
77-10 UH-IH Qualitative Evaluation of Flying Qualities of a Jul 1977 MAJ R. StewartLR UH-IH Helicopter with GE Infrared Exhaust
Suppressor Installed
77-11 OH-58A Flight Evaluation, MK II Integrated Controller Apr 1978 MAJ J. Hagen A065 072Installed on an OH-58 Helicopter CPT P. Moe
R. Woratschek
77-14 Letter of Effort, Lightweight Launcher Jun 1977 MAJ C. ThomasLOE Vibration Study T. Benson
MAJ P. Moe
77-15 EH-IH Preliminary Airworthiness Evaluation, Oct 1977 MAJ J. Guin A058 785EH-IH Helicopter Quick Fix, Phase IA R. Buckanin
77-17-3 UH-60A Letter Report UH-60A Aft CG Aug 1980 CPT M. HanksLR MAJ B. Picasso
J. Niemann K. Flaig
77-17-5 UH-60A Report, Experimental Testing of the UH-60A Nov 1981 R. BuckaninLR Black Hawk Helicopter at Heavy Gross Weight MAJ R. Robbins
and Extended Forward Center of Gravity MAJ J. BensonCPT R. Vincent
77-18 YUH-60A Preliminary Airworthiness Evaluation, YUH-60A Jan 1978 A. WinnBlack Hawk Helicopter with Electronic Flight MAJ C. MittagControl System CW4 J. Bishop
J. Nagata
77-19 RU-21H Preliminary Airworthiness Evaluation, RU-21H Mar 1978 J. Niemann A068 347Guard Rail V Aircraft R. Smith
CPT W. NortonMAJ F. Doten
77-20 U-21A Evaluation of Experimental Radio Meteorological May 1977 MAJ C. MittagMeasurement Package Antenna Installed on aU-21A Wing
77-22 OV-ID Preliminary Airworthiness Evaluation, OV-ID Feb 1978 MAJ R. WardAirplane with AN/ALQ 147 XE-I and XE-2 G. YamakawaSystems Installed MAJ R. Taff
29
1977(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
77-23 UH-60A Production Validation Test-Government (PVT-G) Oct 1979 G. YamakawaPerformance Guarantees UH-60A Black Hawk 0. BenderHelicopter R. Buckanln
CPT R. RobbinsE. BailesCW4 J. Tulloch
77-24 CH-47C CH-47C Inlet Flow Distortion Evaluation May 1978 MAJ J. GuinLR
77-25 AH-1S Preliminary Airworthiness Evaluation, AH-lS May 1980 G. Bender A089 625Helicopter with Ogee Tip Shape Rotor Blades R. Woratschek
D. OttomeyerH. ArnaizMAJ L. HigginsCW4 J. Tulloch
77-26 OH-58C OH-58C Rain Removal System Test Oct 1977 MAJ J. HagenLR
77-27 Letter of Effort, Hellfire Launcher Vibration Oct 1977 CPT P. MoeLR Survey
77-29 CH-47C Airworthiness and Flight Characteristics Aug 1978 MAJ R. TarrLR Evaluation, CH-47C Helicopter with MAJ J. Guln
T55-L-712 Engines G. Skinner
77-30 UH-1H Artificial Icing Test Ice Phobic Coatings Jun 1978 CW4 J. Tulloch A059 875on UH-IH Rotor Blades R. Smith
MAJ F. DotenCW4 J. Bishop
77-31 CH-47C Preliminary Airworthiness Evaluation CH-47C Apr 1979 MAJ S. Spring A069 891with Fiberglass Rotor Blades (with T55-L-712 J. NiemannEngines) MAJ G. Wilson
77-32 Model Limited Airworthiness and Flight Character- May 1979 MAJ J. Guin A071 271214A istics Evaluation Model 214A Helicopters G. Bender
with Fiberglass Rotor Blades E. BallesCPT R. Robbins
77-33 AH-IS Preliminary Airworthiness Evaluation, AH-IS May 1978 G. Bender A067 757Helicopter Equipped with Garrett Infrared E. BallesRadiation Suppressor System and AN/ALO-144 LTC C. FrankenbergerJammer MAJ S. Spring
77-34 OH-58A Preliminary Airworthiness Evaluation OH-58A/ Dec 1977 G. BenderLR XM-130 Chaff Dispenser CPT T. Burch
77-35 AH-IS AH-ISIXM-130 Chaff Dispenser, Preliminary Mar 1978 J. NiemannLR Airworthiness Evaluation CPT T. Burch
30
1977(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
77-36 YAH-64 Engineering Design Test 1, Hughes YAH-64 Sep 1978 MAJ R. Tarr A064 359Advanced Attack Helicopter V. Diekmann
MAJ R. StewartR. Woratschek
77-37 Model Handling Qualities Test on a Model 214A Dec 1977 CPT S. SpringLR 214A Helicopter
77-38 AH-IS Production Validation Test - Government Oct 1979 V. Diekmann A097 689Kaman K747 Improved Main Rotor Blade MAJ G. Mullen
CW4 J. TullochT. BensonCPT F. BowersR. Woratschek
1978
78-01 UH-60A UH-60A Command Instrument System Mar 1978 LTC W. GriffithLR Preliminary Evaluation MAJ R. Stewart
78-02 AH-IG Preliminary Airworthiness Evaluation, AH-IG Jul 1979 MAJ P. Moe A078 340with the Airborne Targe tAcquisition Fire R. SmithControl System and the Hellfire Modular MissileSystem Installed
78-03 Al-IS Preliminary Airworthiness Evaluation, AH-IS Feb 1979 CPT P. Moe A071 343Helicopter Installed with Enhanced Cobra R. SmithArmament System (AH-IS/ECAS) CW3 R. Williams
R. Woratschek
78-04 UH-IH Preliminary Airworthiness Evaluation UH-IH Jul 1978 J. NagataLR Helicopter with Interim-Interim-Standoff MAJ J. Hagen
Target Acquisition System (12 SOTAS)
78-05 UH-60A Letter Report, Artificial and Natural Icing Tests Oct 1979 CW4 J. TullochLR Production UH-60A LTC G. Mullen
D. Belite
78-07 OV-IC Airworthiness and Flight Characteristics Test May 1979 R. Smith A069 827OV-IC Takeoff Performance J. Watts
J. NlemannMAJ J. GuinG. Yamakawa
31
1978(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
78-09 OH-58C Preliminary Airworthiness Evaluation OH-58C May 1980 CW4 J. Bishop A094 172Helicopter with a Mast Mounted Sight CPT M. Hanks
T. BensonA. Arrigo
78-10 AH-1G AH-IG Helicopter, 19-Round Lightweight Mar 1979 G. Skinner A069 828Airborne Launcher Jettison Envelope MAJ F. DotenDetermination
78-11 YUH-60A Preliminary Airworthiness Evaluation IIA Dec 1978 CW4 J. BishopLR YUH-60A Helicopter with Production Avionics, CPT T. Burch
Electronic Flight Control System and CW3 R. WilliamsCommand Instrument Systems
78-12 OH-58C Letter Report Airworthiness and Flight Feb 1981 MAJ R. CarpenterLR Characteristics Test of OH-58C with XM-130 G. Yamakawa
Chaff Dispenser System
78-15 AH-IS Preliminary Airworthiness Evaluation Aug 1978 LTC C. FrankenbergerLR Production AH-IS Helicopter Equipped with T.Benson
AN/ALQ-136 (XE-2) Countermeasures System
78-16 AH-IS Preliminary Alrwotthite$$ Evaluation Modified Aug 1978 LTC C. FrankenbergerLR AH-IS Helicopter Equipped with AN/ALQ-136 T. Benson
Countermeasures System
78-17-1 JAH-IS Airworthiness Demonstration, JAH-IS PNVS May 1979 CPT T. BurchSurrogate Trainer (Martin-Marietta) COMP SENS R. Smith
78-17-2 JAH-IS Airworthiness Demonstration, JAH-IS PNVS Aug 1979 MAJ F. DotenSurrogate Trainer (Northrop) COMP SENS CPT F. Bowers
78-18 CH-47C Artificial Icing Tests with CH-47C Helicopter Jul 1979 J. Niemann A081 860with Fiberglass Rotor Blades CPT F. Bowers
MAJ S. Spring
78-19 OV-IC Airworthiness and Flight Characteristics OV-lC Apr 1979 MAJ R. Taffwith Angle-of-Attack/Stall Warning and G. SkinnerSpeed Control System
78-21 UH-IH Artificial and Natural Icing Tests for Aug 1979 MAJ G. WilsonLR Qualification of UH-IH Kit A Aircraft R. Woratschek
78-21-2 UH-IH Microphysical Properties of Artificial and Aug 1979 MAJ G. Wilson A084 633Natural Clouds and Their Effects on UH-IH R. Woratschek
Helicopter Icing
78-22 UH-60A Preliminary Airworthiness Evaluation III Apr 1979 J. NagataLR UH-60A Black Hawk Helicopter CW4 J. Bishop
CW3 R. WilliamsG. Skinner
32
1978(continued)
Project Aircraft AdNurnber Type Report Title Date Author(s) Number
78-23 YAH-64 Engineer Design Test 2 Hughes YAH-64 Jun 1979 V. Diekmann A098 923
Advanced Attack Helicopter T. BensonR. Woratschek
S. Snakenberg
MAJ R. TarrMAJ P. MoeCW3 R. Williams
1979
79-01 AH-IS Letter Report, Preliminary Airworthiness Oct 1979 V. DiekmannLR Evaluation of AH-IS with Fixed Wings Removed LTC G. Mullen
79-02 JUH-IH JUH-IH Ice Phobic Coating Icing Tests Jul 1980 MAJ P. Morris A096 361R. Woratschek
79-02-2 CH-47C Helicopter Icing Spray System (HISS) Nozzle Sep 1981 D. Belte A109 405Improvement Evaluation
79-03 AH-IS AH-1 Lightweight Airborne Launcher MAJ L. Higgins A101 461
Jettison Evaluation D. Ottomeyer
79-04 AH-IS Letter Report of Preliminary Airworthiness Mar 1980 R. WoratschekLR Evaluation of Production AH-IS Helicopter with MAJ P. Morris
90 degree Gearbox and Skid Cross-Tube FairingsRemoved
79-06 YCH-47D Preliminary Airworthiness Evaluation 1 May 1980 J. Niemann A092 633
(PAE 1) of the YCH-47D Helicopter MAJ G. WilsonMAJ C. Adam
CPT F. BowersS. Arthur
79-08 AH-lS AH-IS PRODUCTION Airworthiness and Flight Nov 1980 CW4 J. Tulloch A100 946
Characteristics for Instrument Flight D. OttomeyerLTC C. FrankenbergerMAJ B. Picasso
79-09 AH-IS Preliminary Airworthiness Evaluation AH-IS Jun 1980 MAJ P. Morris A092 614(Prod) Helicopter with a Substitute Straight LTC C. Frankenberger
Exhaust Pipe J. NlemannR. Woratschek
79-10 OV-ID Airworthiness and Flight Characteristics Oct 1979 MAJ G. WilsonLR Evaluation OV-ID with Ange-of-Attack/ LTC C. Frankenberger
Stall Warning System CPT F. Bowers
33
1979(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
79-I UH-60A Letter Report Preliminary Airworthiness Dec 1979 J. NagataLR Evaluation (PAE) IliA, UH-60A Helicopter LTC G. Mullen
with the Infrared (IR) Reduction Subsystem CW3 R. WilliamsG. Skinner
79-12 OH-58C Letter Report, OH-58C Directional and Mar 1981 CW4 J. BishopLR Longitudinal Control Mapping Evaluation T. Benson
D. Ottomeyer
79-14 AH-IS Letter Report AH-1S Helicopter Tail Boom Oct 1979 J. NiemannLR 3-Way Temperature Survey MAJ P. Morris
79-15 OH-58C Preliminary Airworthiness Evaluation, OH-58C Dec 1979 T. BensonLR Helicopter with Installed Bell Helicopter Textron CW4 J. Bishop
Model 206L-1 Tail Rotor
79-16 AH-IS Letter of Effort and Data Transmittal AH-IS Oct 1979 R. WoratschekLOE Main Transmission Top Cover Flange Stress
Measurements Evaluation
79-8 OH-58C Letter Report Preliminary Airworthiness Jul 1980 T. BensonLR Evaluation OH-58C Helicopter with 206L-1 CW4 J. Bishop
Tail Rotor and Bell Helicopter Textron 570B D. OttomeyerStability and Control Augmentation System MAJ J. Benson
79-19 UH-60A Artificial and Natural Icing Tests Production Jun 1980 CPT M. Hanks A090 527UH-60A Helicopter MAJ L. Higgins A096 239
V. Diekmann
79-22 Hughes Potential Airworthiness Evaluation of the Jul 1980 MAJ B. PicassoLR 500D Hughes 500D CW4 J. Tulloch
G. BenderD. Ottomeyer
79-23 OH-58C Letter Report Preliminary Airworthiness Jun 1980 MAJ J. BensonLR Evaluation OH-58C Configured with a Wire T. Benson
Strike Protection System
79-24A UH-60A Report Flight Evaluation of UH-60 with the Dec 1981 G. SkinnerLR Roll Trim Actuator Disconnected MAJ J. Benson
D. Macpherson
79-86 UH-1H Ice Phobics Blade Tracking and Comparison May 1981 W. Abbott AI08 121of Vibration Analysis Techniques F. Dominick
34
1980
Project Aircraft AdNumber Type Report Title Date Author(s) Number
80-01 OV-IC Letter Report OV-IC (Short Wing) Fuel Apr 1980 MAJ R. CarpenterLR Siphoning Evaluation
80-02 Model Letter Report Preliminary Airworthiness Aug 1980 G. YamakawaLR 249 Evaluation (PAE) of Bell Helicopter MAJ B. Picasso
Textron (BHT) Model 249 Cobrai. Brown
80-03 YAH-64 Engineering Development Test 4, YAH-64 Jan 1980 G. Bender A098 922Advanced Attack Helicopter MAJ B. Picasso
MAJ L. HigginsV. DiekmannD. Ottomeyer
80-04 CH-47C Helicopter Icing Spray System (HISS) Jun 1981 R. WoratschekLR Evaluation and Improvements LTC G. Wilson
80-04-2 CH-47C Helicopter Icing Spray System (HISS) Evaluation Jun 1982 R. Woratschekand Improvement
80-05 YCH-47D Letter Report Preliminary Airworthiness Jul 1980 LTC G. WilsonLR (EvaluationPAE) II of the YCH-47D with MAJ C. Adam
Modified Advanced Flight Control J. Niemann
80-06 UH-IH Preliminary Airworthiness Evaluation of UH-IH Jun 1981 MAJ B. Picasso Al I) 213with Hot Metal Suppressor and Infrared Jammer CPT L. A. Haworth
D. OttomeyerCPT R. Vincent
80-07 YAH-64 Climatic Laboratory Survey, Hughes Mar 1982 G Bender A124 670CPT R. SavageMAJ C. Adam
80-08 YAH-64 YAH-64 Icing Survey Sep 82 MAJ M. Hanks
80-11 AH-IS Letter Report Drag Characteristics Evaluation Nov 1980 G. BenderLR of Prototype Hellfire Modular Missile System CW4 J. Tulloch
(HMMS) Launcher
80-11-2 AH-1S Letter Report Drag Characteristics Evaluation Nov 1980 G. BenderLR of Prototype Hellfire Modular Missile System MAJ B. Picasso
(HMMS) Launcher - Masking/Unmasking D. Ottomeyer
80-12 YAH-64 Engineer Design Test, Government EDT-5 Mar 1981 MAJ P. MorrisLR of the Advanced Attack Helicopter (AAH) D. Ottomeyer
80-13 CH-47C Helicopter Icing Spray System Calibration, Ice Aug 81 J. HendersonPhobics and FAA R&D Evaluation R. Woratschek
CPT L. Haworth
80-14 UH-60A Limited Artificial and Natural Icing Tests Aug 1981 MAJ M. Hanks A112 582Production UH-60A Helicopter (Re-evaluation) V. Dlekmannn
MAJ J. Benson
35
1980
Project Aircraft AdNumber Type Report Title Date Author(s) Number
80-15 O1t-58C Preliminary Airworthiness Evaluation of the Jul 1981 LTC R. WardLR OH-58C Helicopter with Fixed Short Landing MAJ J. Benson
Gear with Two Position Landing Gear G. Yamakawa
80-16 OV-1D Letter Report Limited Artificial Icing Jul 1981 E. GilmoreLR Tests of the OV-ID CPT R. Robbins
80-17-1 YAH-64 Airworthiness and Flight Characteristics Test, Sep 81 MAJ P. MorrisPart 1, YAH-64 Attack Helicopter J. Ottomeyer
MAJ L. HigginsMAJ B. PicassoCPT R. SavageG. Bender
80-17-2 YAH-64 Airworthienss and Flgiht Characteristics Test, Feb 82 MAJ B. Picasso A125 270Part 2, YAH-64 Advanaed Attack Helicopter B. Buckanin
J. OttomeyerMAJ G. Downs
80-17-3 YAH-64 Airworthiness and Flgiht Characteristcs Test Oct 82 MAJ B. Picasso(A&FC), YAH-64 Advanced Attack Helicopter R. BuckaninPrototype Qualification Test M. Herbst
MAJ G. Downs
80-18 Model Memo for Record, Preliminary Airworthiness Feu 1981 CW4 R. WilliamsLR 500D Evaluation (PAE), of Hughes Helicopters (HH) W. Norton
50OMD Modified to a Light Combat R. BuckaninHelicopter (LCH)
80-19 JOH-58(- Report Preliminary Airworthiness Evaluation of Jun 1981 G. YamakawaLR JOH-58C Modified to a Light Combat CPT A. Marshall
Helicopter with a M197 20MM Gun MAJ R. Carpenter
80-20 AH-IS Letter Report AH-IS Vibration Evaluation Mar 1981 CW3 J. WebreLR MAJ B. Picasso
G. BenderG. Yamakawa
83-21 OH-58C Preliminary Airworthiness Evaluation of OH-58C May 1981 MAJ J. BensonLR Expanded Gross Weight and Lateral CG Envelope G. Yamakawa
1981
81-01-1 UH-IH Fuel Conservation Evaluation of USA Helicopter Jan 1982 MAJ G. DownsPart I, UH-IH Flight Operation ImprovementAnalysis
36
1981(continued)
Project Aircraft Ad
Number Type Report Title Date Author(s) Number
81-01-3 UH-IH Fuel Conservation Evaluation of USA Helicopter Aug 1982 CPT F. StellarPart 3, UH-IH Flight Testing MAJ D. Underwood
F. Dominick
81-01-4 OH-58C Fuel Conservation of USA Helicopaters, Part 4 Aug 1982 MAJ M. StrattonOH-58C Flight Testing D. Belte
81-01-5 AH-IS Fuel Conservation Evaluation of USA Helicopter Jan 1983 MAJ L. ToddPart 5, AH-IS Flight Testing CPT R. Savage
CPT R. Vincent
CW4 R. WilliamsM. Herbst
81-01-6 Fuel Conservation Evaluation of US Army Jul 1986 F. Dominick
Part 6, Performance Calculator Evaluation MAJ R. Lockwood
81-04 OH-6A Airworthiness and Flight Characteristics Test of Nov 1983 CW3 J. Webre A161 255OH-6A Configured to a Light Combat Helicopter CPT E. Mitchell
(JOH-6A LCH) R. Woratschek
R. Adler
81-05 OH-58C Report OH-58C Wire Strike Protection System Jul 1981 LTC R. WardLR (WSPS) Lower Cutter Ground Contact MAJ J. Benson
Investigation
81-06-1 OV-1 Preliminary Airworthiness Evaluation of a Jul 1984 MAJ D. UnderwoodNational Aeronautics and Space Administration R. Adler
Automated Stall Warning Sytem for an OV-1Aircraft
81-06-2 OV-1D Maximum Performance Takeoff and Landing Oct 1984 G. Bender
Capabilities for OV-ID
81-07 OH-58C Airworthiness and Flight Characteristics of an Oct 1981 MAJ A. Marshall A 112 581
OH-58C Configured to a Light Combat LTC R. Ward
Helicopter (LCH) R. Woratschek
81-08 RU-21H Report Preliminary Airworthiness Evaluation of Oct 1981 MAJ M.rianks
LR theRU-21H Guardrail V Single Engine Climb MAJ D. Underwood
Performance and Static VMC Performance CW3 J. WebreG. Yamakawa
81-09 JOH-8A Preliminary Airworthienss Evaluation of JOH-8A Sep 81 MAJ A. MarshallClassified
81-10 JOH-58A Report Preliminary Airworthiness Evaluation Sep 1981 MAJ M. Stratton
LR of JOH-58A with Composite Tail Boom J. Niemann
81-11 JUH-IH JUH-IH Pneumatic Boot Deicing System Flight May 1983 MAJ R. Oliver A140 986Test Evaluation R. Woratschek
CPT L. Haworth
81-12 Aerial Preliminary Airworthiness Evaluation System Jun 82 MAJ D. Underwood B073 .2iS
Platform Platform If Individual Lift Device (ILD) J. Nagata
37
1981(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
81-13 Model Letter of Effort for Support of Bell Helicopter Apr 82 LTC R. WArdLOE 214 Textron, Icing Certification of the 214ST
Helicopter
81-14 OH-58C OH-58C with Installed Mast Mounted Sight Aug 82 MAJ M. StrattonLR (MMS) Masking and Unmasking Time Line J. Ottomeyer
Analysis Evaluation
81-15 S-76 Letter of Effort for Support of United Techologies Apr 82 LTC R. WardLOE Corp., Sikorsky Aircraft Division, Icing Certifi-
Cation Effort of the S-76 Helicopter
81-16 UH-60A UH-60A Expanded Gross Weight and Center Aug 1985 R. Buckaninof Gravity Evaluation M. Herbst
MAJ R. MacMullinCW4 J . MiessG. SkinnerMAJ E. TavaresCW4 R. Williams
81-17 OV-! OV-1 Propeller Reverser Fault Protection Jun 1982 MAJ D. UnderwoodCircuit Evaluation G. Bender
81-18 UH-60A UH-60A Light Icing Envelopes Evaluation with Jun 82 R. Robbins A125 630Deicing Kit Installed but Inoperative
81-19 EH-1X EH-IX Qualitative Flight Evaluation Dec 1981 CW4 R. WilliamsLR G. Yamakawa
81-20 UH-60A Report, UH-60A Engine and APU Exhaust Gas Dec 1981I.R Temperature Survey
81-21 OV-ID Limited Artificial and Natural Icing Test of Aug 82 MAJ R. Carpenter A127 191OV-1D (Re-Evaluation) LTC. R. Ward
R. Robbins
81-22 AH-IS Preliminary Airworthiness Evaluation of Kamen Apr 1982 MAJ G. DownsLR K747 Tip Weight Retention System CPT W. Clay
81-89 OH-58C Preliminary Airworthiess Evaluation of the Apr 1982 MAJ A. MarshallOH-58C with Prototpye AN/AVR-2 Detection G. BenderSystem Installation
81-90 US Army Aviation Engineering Flight Activity Jun 1982 K. Ferrell A129 859(USAAEFA) Report Bibliography I. Tucker
81-90-1 US Army Aviation Engineering Flight Activity Mar 1984 K. Ferrell A129 859(USAAEFA) Report Bibliography Update i. Tucker1981-1982
81-90-IA US Army Aviation Engineering Flight Activity Junj 1984 K. Ferrell A129 859(USAAEFA) Author Report Bibliography I. Tucker
38
1982
Project Aircraft AdNumber Type Report Title Date Author(s) Number
82-01 AH-IS Airworthiness and Flight Characteristics of Aug 82 CW3 J. WebreAH-IS with Aircraft General Purpose Dispenser J. OttomeyerSystem (AGPDS)
82-02 OH-58C Preliminary Airworthiness Evaluation of the Apr 82 MAJ R. MarshallLR OH-58C with Prototpye AN/ANR-2 Laser G. Bender
Detection System Installation
82-03 UH-60A Letter of Effort for Support of the UH-60A/C-130 May 82 MAJ A. MarshallLOE Air Refueling Proximity Test
82-04 AH-IS Letter Report, Preliminary Airworthiness Eval- Jul 82 CW3 P. SullivanLR uation of AH-IS Configured with Helicopter G. Bender
Wire Strike Protection System
82-05-1 CH-47C Helicopter Icing Spray System (HISS) Boom Aug 82 R. WoratschekLR Structural Dynamics Evaluation with Fiberglass MAJ M. Hanks
Blades
82-05-2 Report, Helicopter Icing Spray System (HISS) Oct 85 D. BelteLR Evaluation and Improvements
82-05-3 JCH-47C Helicopter Icing Spray System (HISS) Evaluation Apr 86 D. BelteHISS and Improvements R. Woratschek
82-06 AH-1 AH-I Ground Engagement Simulation/AIr Sep 82 CPT R. Savage 122 623Defense (AGES/ADES) Pod Jettison Evaluation
82-07 CH-47D Airworthiness and Flight Characteristics Test Feb 84 G. Bender(A&FC) of the CH-47D Helicopter G. Yamakawa
M. HerbstR. RobbinsCW3 P. SullivanCW4 R. Williams
82-09 UH-60A Preliminary Airworthiness Evaluation of UH-60A Apr 83 CPT R. MacMulli A148 676with an Improved Airspeed System G. Skinner
MAJ M. Hanks
82-11 UH-60A Preliminary Airworthiness Evaluation of UH-60A Oct 82 CPT R. OliverLR Pilot and Copilot Cockpit Doors Removed CPT A. Marshall
82-12 UH-IH Evaluation of UH-IH Hover Performance Aug 83 D. Belte A141 252Degradation Caused by Rotor Icing CW4 R. Williams
CPT F. StellarW. Abbott
82-13 EH-IX/ Airworthiness and Flight Characteristics of the Jan 84 LTC G. Downs A144 881EH-IH EH-IX/EH-IH Helicopter Configuration CPT J. Kimberly
CPT R. SavageCW4 J. AdklnsJ. NagataJ. Linehan
39
1982(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
82-14 UH-60 Preliminary Airworthiness Evaluation UH-60 Mar 83 MAJ A. Marshall A132 964with External Stores Support System (ESSS) MAJ R. Olier
R. BuckaninR. Adler
82-15 UH-60A Airworthiness and Flight Characteristics Test of Dec 83 MAJ A. Marshallthe Prototype External Stores Support System (ESSS) MAJ R. Oliver
J. NagataC. Cassil
82-15-1 UH-60A UH-60A External Stores Support System Fixed May 84 CW4 R. Williams A147 188Provision Fairings Drag Determination CPT R. MacMullin
CW4 J. MlessR. BuckaninG. SkinnerW. Abbott
82-17 YEH-60B Preliminary Airworthiness Evaluation YEH-60B Feb 83 CW3 J. WebreLR with AN/ASN-132 Integrated Inertial Navigation J. Nagata
System Installed MAJ J. Benson
82-18 LONG-EZ Preliminary Airworthiness Evaluation of the Jun 83 MAJ D. Underwood A140 765Rutan Factory (RAF) Inc., LONG-EZ Airplane LTC R. Ward
M. GrahamV. Diekmann
82-19 YEH-60A Letter of Effort, Transmittal of Selected Vibra- Aug 84 G. SkinnerLOE tion Data of the YEH-60A Quick Fix System MAJ E. Tavares
CW4 R. WilliamsCPT G. Bishop
82-86 UH-I Main Rotor lade Container Program Investigation Oct 82 CPR R. Savage
1983
83-03 OH-58 Report, OH-58 Vertical Fin Blockage Oct 83 MAJ A. MarshallLR Evaluation LTC R. Carpenter
MAJ M. Hanks
MAJ J. BensonJ. NagataCPT R. SavageCPT F. StellarM. GrahamMAJ L. ToddR. Adler
40
1983(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
83-02 UH-60A Test Witness Report, UH-60A ESSS External Apr 83 MAJ G. DownsTWR Stores Separation Flight Test
83-04 CH-47D Preliminary Airworthiness Evaluation, CH-47D May 83 CPT R. Williamsat 54,000 Pounds Gross Weight CW3 P. Sullivan
R. RobbinsG. YamakawaM. HerbstG. Bender
83-05 JOH-6A Airworthiness and Flight Characteristics of the Nov 83 CW3 J. WebreJOH-6A Light combat Helicopter Configured CPT E. Mitchellwith a Wire Strike Protection System R. Woratschek
R. Adler
83-07 MH-6E MH-6E Extended Pilot Tube Modification May 83 MAJ R. OliverCalibration and Evaluation MAJ L. Todd
MAJ A. Marshall
83-08 OH-eA Letter of Effort, Government Pilot Evaluation Jun 83 MAJ R. OliverLOE OH-6A/NOTAR D. Belte
83-09 UH-60A Test Witness Report, UH-60A ESSS, M-56 May 83 W. AbbottTWR Helicopter Mine Dispensing Subsystem Flight
Test
83-10 UH-60 Test Witness Report, UH-60A ESSS, M-56 May 83 CPT F. StellarTWR Helicopter Mine Dispensing Subsystem Flight
Test
83-10-1 UH-60A Test Witness Report ESSS, External Stores Jun 3 MAJ A. MarshallTWR Separation Flight Test
83-13 JUH-IH JUH-IH Redesigned Pneumatic Boot Deicing Aug 87 M. GrahamCPT L. HaworthCPT J. Kimberly
83-14 AH-IS Report, Airworthiness and Flight Characteristics Apr 84 CW4 R. WilliamsLR Test of AH-IS (Modernized Cobra) with Skid G. Bender
Cross-Tube Fairings Removed
83-12 Government Pilot Evaluation of the BHTI 206/ Jan 85 J. NagataRinig Fin Tail Rotor CW4 J. Adkins
83-15 OH-58C Preliminary Airworthiness Evaluation of the Oct 83 MAJ M. HanksOH-58C with 3-Axis Stability Control MAJ L. ToddAugmentation System and Improved Tall J. NagataRotor System M. Graham
83-16 Rally Preliminary Airworthiness Evaluation Inc., Aug 83 J. JohnsonUltralight Rally 3 and Rally Sport Ultralight Aircraft MAJ G. Downs
83-17 UH-60 Preliminary Airworthiness Evaluation of the Aug 83 CW3 J. MlessUH-60 Hellopter with T700-GE-701A Engines CPT L. HaworthInstalled
41
1983(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
83-18 LONG-EZ Report, Preliminary Airworthiness Evaluation of Dec 83 MAJ D. UnderwoodLR Rutan Aircraft Factory Inc., LONG-EZ Airplane V. Diekmann
(S/N 1241)
83-19 OH-58C Report, OH-58C Oil Cooling System Evaluation Apr 84 MAJ A. MarshallLR C. Cassil
83-20 Limited Airworthiness and Flight Characteristics Oct 84 G. Skinner(A&FC) Test of the Quick Fix Configuration MAJ E. Tavares
CW4 R. MurrellCPT G. Bishop
83-21 YEH-60A Artificial and Natural Icing Tests YEH-60A Jun 84 MAJ E. TavaresQuick Fix Helicopter CW3 P. Sullivan
MAJ M. HanksR. Woratschek
83-22 UH-60A Limited Artificial and Natural Icing Tests of the Jun 84 MAI M. HanksExternal Stores Support System (ESSS) Installed R. Woratschekon a UH-60A Aircraft
83-23 UH-1H Evaluation of the UH-IH Level Flight Perform- Jul 84 W. Abbottance Degradation Caused by Rotor Icing J. Linehan
CPT R. LockwoodMAJ L. Todd
83-24 UH-60A Airworthiness and Flight Characteristics Test of Jun 85 MAJ A. Marshall A180 18182-23748 A Sixth Year Production UH-60A MAJ R. MacMullin
MAJ R. LockwoodMAJ T. ReynoldsMAJ E. TavaresR. BuckaninG. SkinnerM. HerbstC. CassilCW4 P. SullivanCW4 R. Williams
83-26 OH-58D Preliminary Airworthiness Evaluation (PAE) of Dec 84 G. Bender A178 740the OH-58D Helicopter (AHIP) CPT J. Kimberly
MAJ E. MitchellMAJ G. Sharon
83-27 OH-58D Interim Report, Airworthiness and Flight Oct 84 J. NagataLR Characteristics (A&FC) of the OH-58D MA F. Stellar
Helicopter MAJ G. BishopCPT L. CaytonCPT T. Walsh
83-29 CH-53 Letter of Effort for Support of Marine CH-53 Apr 84 LTC R. WardLOE Icing Test
83-30 OH-58C Report, Pilot-Static System Evaluation of Dec 83 C. CassilLR OH-58C with Air-to-Ground Engagement System MAJ A. Marshall
(AGES) Installed
42
1984
Project Aircraft AdNumber Type Report Title Date Author(s) Number
84-02 RC-12D Airworthiness and Flight Characteristics of the Jul 84 G. Yamakawa A148 046RC-12D Guardrail V CW4 J. Webre
MAJ R. RatcliffR. Adler
84-03 NASA-Ames Letter of Effort, Test Pilot Support for Scout/ Mar 84 MAJ A. MarshallLOE VMS Attack Helicopter Simulation Study Simulator
84-04 LONG-EZ Preliminary Airworthiness Evaluation of the May 84 MAJ D. UnderwoodRutan Aircraft Factory (RAF) Inc., LONG-EZ 0. YamakawaAirplane with External Sight CPT T. Reynolds
CPT W. Carmona
84-05 MH-6E Report, Preliminary Airworthiness Evaluation Sep 84 CW4 J. WebreLR Test of MH-6E with Light Weight Airborne MAJ R. Olivere
FLIR System (LAFS) Installed R. WoratschekR. Adler
84-06 CH-47D Report, Preliminary Airworthiness Evaluation Aug 84 CW4 P. SullivanLR Test of the CH-47D with Light Weight Airborne R. Woratschek
Forward Looking Infrared (FLIR) System (LAFS) R. RobbinsInstalled
84-07 UH-60 Report, Preliminary Airworthiness Evaluation of Aug 84 R. RobbinsLR the UH-60A with Light Weight Airborne Forward R. Woratschek
Looking Infrared (FLIR) System (LAPS) Installed CPT T. Reynolds
84-08 AH-64A Letter of Effort T-28 High Speed Pace Support Jul 84 J. JohnsonLOE for the AH-64A
84-09 AH-IS(MC) Preliminary Airworthiness Evaluation of AH-IS Jul 84 MAJ J. Voss A148 091(MC) Helicopter with Exteral Fuel Tanks CW4 R. WilliamsInstalled J. Nagata
84-10 AH-64A First Article Preproduclion Tests of the AH-64A Nov 84 G. BenderHelicopter MAJ J. Voss
MAJ R. MacMullinCW4 J. Adktns
84-11 AH-IS Preliminary Airworthiness Evaluation of the Oct 84 MAJ R. MacMullin A160 862AH-IS (Modernized Cobra) with the Hellfire. MAJ J. LawrenceTOW, and Stinger Missiles Installed LTC G. Downs
MAJ L. Todd
MAJ E. TavaresCPT W. Carmona
84-13 OV-1D Evaluation of the OV-ID Stall Warning Jan 86 J. LinehanCharacteristics R. Robbins
G. Yamakawa
43
1984(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
84-14 UH-IH Preliminary Airwothiness Evaluation of the Jan 85 CW4 J. Adkins A179 498UH-IH HIND-D Surrogate CPT M. White
D. MacphersonCPT D. CrippsMAJ W. Grogan
84-16 AH-1F AH-IF Instrument Meteorological Conditions Feb 87 MAJ J. Lawrence(IMC) Flight Evaluations MAJ J. Martin
MAJ A. OmlieCW4 P. SullivanMAJ T. ReiningerR. Adler
84-16-1 AH-IS(MC) AH-IS(MC) Degraded Hydraulic Modt Jan 86 R. Adler A178 764Evaluation CW4 P. Sullivan
CPT A. Omlie
84-16-2 AH-IS(MC) Preliminary Reort, AH-IS(MC) Roll SCAS Jan 86 CPT A. OmlieLR Card Evaluation
84-16-2 AII-IS(MC) Letter Report, AH-IS (MC) Roll SCAS Card Apr 86 R. AdlerLR Evaluation CPT A. Omlie
CW4 P. SullivanW. Kelly
84-17 UH-60A Report, Infrared Measurement Test of the Sep 84 MAJ E. TavaresLR UH-60A Helicopter with Garret AiResearch
Infrared Suppressor System Installed
84-20 SH-60B Letter of Effort for Support of Navy SH-60B Feb 85 MAJ E. TavaresLOE Icing Test
84-21 AH-IS Letter of Effort, Al--IS Air-to-Air Combat Jan 85 CP4 P. SullivanLOE Test (AACT) III Fvaluation MA G. Sharon
W. AbbottMAJ J. LawrenceR. Adler
84-22 BK-I 17 Preliminary Airworthiness Evaluation of the Nov 85 MAJ G. Sharon B105 .302)1MBB BK-117 Helicopter (Germany/Japan) MAJ E. Tavares
W. AbbottR. Adler
84-23 AH-64A Report, Artificial & Natural Icing Tests of the Sep 85 CW4 J. AdkinsLR AH-64 R. Woratschek
84-23 AH-64A Report, Artificial & Nataural Icing Tests of the Jul 86 CW4 AdkinsLR Phase II AH-64A (Phase I1) R. Woratschek
84-23 AH-64 Artificial and Natural Icing Tests of AH-64 Mar 87 CW4 J. Adkins A188 231Phase II (Phase II) R. Woratschek
84-24 AH-IS Letter of Effort, Firing Evaluation of the All-IS Jan 85 MAJ R. RatcliffLOE (MC) with the HELLFIRE, TOW, & Stinger CW4 R. Murrell
Missile Configuration
44
1984(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
84-24-1 AH-IS(MC) Report, Evaluation of the AH-IS(MC) May 85 CW4 R, MurrellLR Helicopter, TOW Helicopter/Stinger Head-Up CPT A. Omlie
Display
84-25 UH-IH Preliminary Airworthiness Evaluation of the Jun 86 C. Cassil A182 369UH-IH Helicopter with the T53-L-703 Engine MAJ R. LockwoodInstalled
84-28 UH-60A. Flight Evaluation of the UH-60A Helicopter Sep 86 CW4 R. Murrell A183 954with the Pitch Bias Actuator Centered and MAJ R. LockwoodElectrically Disconnected CW4 R. Williams
M. HerbstG. SkinnerCPT D. Cripps
84-29 OH-58C Report, Pitot-Static System Evaluation of the Dec 83 MAI A. MarshallLR OH-58C with Air-to-Ground Engagement System C. Cassil
(AGES) Installed
84-30 Letter of Effort, Evaluation of the MCT Jul 86 K. FerrellLOE ROTORTUNER
84-31 UH-IH Report, Evaluation of the UH-IH with the Hub Sep 85 J. JohnsonLR Spring Improvement CW4 R. Murrell
84-33 UH-1H Combined Preliminary Airworthiness Evaluation Jul 88 G. Skinner A202 316and Airworthiness Flight Caracteristics Evaluation J. Piotrowskiof the UH-IH with Preproduction Hub Spring CPT M. Whiteand Composite Main Rotor Blades Installed MAJ A. Omlie
MAJ J. Brown
84-34 OH-58C Flight Test Evaluation of the OH-58C Main Feb 86 M. GrahamRotor Blade Erosion Tape MAJ J. Martin
MAJ F. StellarR. Woratschek
84-35 JOH-58C Letter of Effort, Transmittal of the Results of Jan 85 MAJ E. MitchellLOE the Qualitative Evaluation for the JOH-58C
Helicopter
84-90 U.S. Army Aviation Engineering Flight Activity Jan 85 1. Tucker(USAAEFA) Report Bibliography 1983-1984 M.A. Lake
K. Ferrell
45
1985
Project Aircraft AdNumber Type Report Title Date Author(s) Number
85-02 UH-60A Test Witness Report, Continuation of UH-60A Apr 85 MAJ T. ReynoldsTWR ESSS, Externai Stores Separation Test
85-03 JOH-58C Airworthiness and Flight Characteistics of the Feb 86 CW4 J. Webre A180 259JOH-58C (OH-58X Surrogate) Helicopter MAJ F. Stellar
MAJ J. MartinR. WoratschekM. Graham
85-07 UH-60A Flight Characteristics Test of the UH-60A Oct 86 MAJ R. Lockwood A180 791with Tail Boom Mounted Strake W. Kelly
MAJ R. Cason
85-08 AH-64A Engine/Airframe Response Evaluation of the Jun 84 CW4 J. AdkinsAH-64A Helicopter G. Bender
MAJ J. Correia
A 5-09 CH-47D Aerial Refueling Evaluation of the CH-47D Aug 85 M. Herbst A167 575Helicopter R. Robbins
CW4 P. Sullivan
85-10 214ST Airworthiness and Flight Characteristics Test of Feb 5 CW4 R. Williams A175 349
BHTI 214ST Helicopter R. BuckaninCPT R. Cason
85-11 AH-IS Report, Evaluation of the AH-IS with the Hub Sep 85 J. JohnsonLR Spring Improvement CW4 R. Murrell
85-14 UH-60A Report, Phase 11 Evaluation of Solar Heating of Dec 86 MAJ R. CasonLR UH-60A Fusleage Skin (High Temperature W. Kelly
Testing) MAJ R. Lockwood
85-15 Rotor System Evaluation, Phase I Mar 88 R. BuckaninW. GouldMAJ P. LosierCPT D. DowneyMAJ R. LockwoodCW4 J. WebreCOL J. HagenMAJ R. CasonC. Young
85-16 OV-1D Evaluation of the Safe Flight Instrument Feb 86 J. Linehan A177 364Corporation Stall Warning System for the OV- ID CW4 J. MiessAircraft R. Robbins
85-17 OV-ID Evaluation of the OV-ID Aircraft with the Jun 86 CW4 J. MiessPhase I OV-ID Aircraft with the Yt53-L-704 Engines G. Yamakawa
and Rudder Augmentalon System, Phase I
85-17 OV-ID Evaluation of the OV-1D Aircraft with the Nov 86 CW4 J. MiessPhase II OV-1D Aircraft with the YtS3-L-704 Engines G. Yamakawa
and Rudder Augmentalon System, Phase !I J. iUnehanJ. Piotrowski
46
1985(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
85-17-1 OV-I Flaps-Up Takeoff Performance of the OV-ID May 87 CW4 J. Miess A 185 960Aircraft with YT53-L-701 Engine Installed G. Yamakawa
J. LinehanR. Robbins
85-18 AH-64A Engine/Airframe Response Evaluation of the Nov 85 CW4 J. AdkinsAH-64A Helicopter G. Bender
MAJ J. Correia
85-19 Letter of Effort, Advanced Digital-Optical Dec 85 CW4 R. WilliamsLOE Control System (ADOCS) Single Pilot Simulator CW4 J. Webre
85-20 SH-60B Letter of Effort for Support of Navy SH-60B May 86 MAJ T. ReynoldsLOE Test
85-21 UH-60A Test Witness Report, UH-60A H ELLFIRE Jan 86 MAJ T. ReynoldsTWR Jettison Test
85-22 Report, Evaluation of the Light Helicopter Jan 86 J. NagataLR Family (LHX) Specification Demonstration MAJ R. Lockwood
Maneuvers CPT G. BishopCW4 R. WilliamsCW4 R. MurrellW. KellyT. Griffen
85-24 UH-1H Report, Structural Flight Loads Correlation of Jan 87 M. Grahamthe Structural Integrity Recording System (SIRS) W. Abbotton the UH-IH Helicopter MAJ R. Simmons
CW4 Adkins
85-25 Letter of Effot, Test Pilot Support for NASA Mar 86 MAJ G. SharonLOE Ames Simulation for LHX Type Handling MAJ F. Stellar
1986
86-01 UH-60A Level Flight Performance Evaluation of the Sep 86 R. BuckaninUH-60A Helicopter with the Production External W. KellyStores Support Sysatem and Ferry Tanks Installed CW4 J. Webare
MAJ T. ReynoldsMAJ R. LockwoodCPT R. Cason
86-02 HH-60A Engine/Airframe Response Evaluation of the Oct 86 G. Bender A184 443HH-60A Helicoplaer Equipped with the CW4 J. AdkinsT700-GE-701 Transient Droop Improvement MAJ R. LockwoodElectronic Control Unit
47
1986(continued)
Project Aircraft AdNumber Type Report Title Date Author(*) Nuniber
86-03 UH-IH Letter of Effort, UH-IH Composite Main Rotor May 86 CPT A. OmlieLOE Blades Rain Errosion Pattern
86-04 Letter of Effort, Test Pilot Support for NASA- Jul 86 CW4 J. WebreLOE Ames Single-Pilot Advancaed Cockpit Engineering MAJ T. Reynolds
Simulation (SPACES) Evaluation LTC D. UnderwoodCPT R. Cason
86-05 UH-60A Preliminary Airworthiness Evalautin of the Aug 87 G. BenderUH-60A with Advanced Digital Optical Control R. RobbinsSystem (ADOCS)
86-06 AH-IS Airworthiness and Flight Characteristics Test Aug 86 CW4 P. Sullivan B114 673of the AH-1S with Hub Spring Installed CW4 J. Lyle
MAJ A. OmlieR. Adler
86-08 Bell Report, Technology Flight Evalaution of the CAE Aug 86 R. RobbinsLR 205A Electronic Ltd., Hand Controller on a Bell 205A MAJ F. Stellar
Helicopter
86-10 UIi-60A Preliminary Airworthiness Evaluation of the Aug 87 MAJ T. Reynolds A 190 t(,4UH-60A Equipped with the XM-139 VOLCANO J. NagataMine Dispensing System MAJ R. Cason
D. Belte
86-14 UH-60A Airworthiness and Flight Characteristics Test of Aug 87 MAJ R. Cason A191 414a Ski Assembly for the UH-60A Black Hawk J. Nagat-.Helicopter MAJ T. Reynolds
D. Belte
86-15 SA 2-37A Report, Flight Evaluation of the Schweizer Aug 86 MAJ R. SimmonsLR SA 2-37A Airplane with Wing Leading Edge Cuffs
86-18 CH-47D Interim Report, Aerial Refueling Evaluation Jan 87 R. RobbinsLR of the CH-47D Helicipter, Phase II
86-18 CH-47D Aerial Refueling Evaluation of the CH-47D Jan 87 R. RobbinsHelicopter, Phase 11 MAJ R. Cason
MAJ T. Reininger
86-19 UH-60A Test Witness Report, UH-60A VOLCANO Jan 87 MAJ T. ReynoldsJettison Test
86-20 UH-i Preliminary Airworthiness Evaluation of a UH-I Feb 87 MAJ F. Stellar A 186 274Equipped with a Terrain Mapping Receier MAJ J. BrownAntenna C. Butler
86-25 UH-60A Preliminary Airwothiness Evaluation of the Oct 87 D. BelteUH-60/ESSS with HELLFIRE Launcher Installed CPT T. Walsh
MAJ T. ReynoldsMAJ P. LosierMAJ R. Cason
48
1987
Project Aircraft AdNumber Type Report Title Date Author(s) Ntinibvr
87-01 TG-8A Preliminary Airworthiness Evaluation of the Oct 87 MAJ R. Simmons B120 244TG-8A Airplane MAJ T. Reininger
87-03 Letter of Effort, Aviation Engineering Flight Jul 87 CW4 J. LyleLOE Activity Participation in Air-to-Air Combat
Test IV (AACT IV)
87-06 EH-60A Report, Preliminary Airworthiness Evaluation Apr 87 CW4 R. Murrellof the EH-60A CW4 J. Webre
M. Herbst
87-08 JUH-IH Letter of Effort, Loads Survey of a JUH-1H Jan 88 G. BenderLOE Helicopter with the Modified Second-Generation M. Herbst
Pneumatic Boot Deicing System
87-09 EH-60A Report, Preliminary Airworthiness Evaluation of Sep 87LR the EH-60A Aircraft in a Low Drag Configuration
87-10 Report, Technology Flight Evaluation of the Jun 87 CPT D. DowneyLR NOTAR Anti-Torque System COL A. Todd
Mr. C. Cassil
87-11 RC-12H Preliminary Airworthiness Evaluation of the Jun 88 CW4 J. MiessRC-12H Airplane CW4 R. Murrell
R. Buckanin
87-16 EH-60 Report, Preliminary Airworthienss Evaluation of Oct 87 CW4 J. WebreLR DELTA the EH-60 DELTA CPT D. Downey
F. Dominick
87-23 UH-60A Report, Evaluation of the UH-60A Cyclic Sep 87 CW4 R. MurrellLR Stabilator Slew Switch
87-23 EH-60A Report, EH-60A Stabilator Evaluation, Adjunct Apr 88 CPT D. CrippsLR to AEFA Proj. No. 84-23
87-25 OV-1D Evaluation of the Improved OV-lD Anti-Icing Apr 88 CW4 J. MiessSystem M. Blacker
J. Plotrowski
87-28 Letter of Effort for Joint NASA-Lewis/U.S. 18 Aug 88 R. RobbinsLOE Army Aviation Engineering Flight Activity Icing D. Belte
Flight Research
87-29 01-58D Report, Preliminary Airworthiness Evaluation Jan 88 MAJ F. StellarLR (PAE) of an Increased Gross Weight External G. Bender
Stores Configuration for the OH-58D Helicopter
87-33 Bell 222 Report, Technology Flight Evaluation of the Apr 88 MAJ J. LawrenceLR Helicopter Bell Helicopter Textron Inc. (BHTI)/Lucas MAJ W. Carmona
Aerospace Adaptive Fuel Control on a Bell 222 R. BuckaninHelicopter R. Woratschek
49
1987(continued)
Project Aircraft AdNumber Type Report Title Date Author(s) Number
87-34 0-2A Report, Preliminary Airworthiness Evaluation of Mar 88 CW4 J. MiessLR the 0-2A Aircraft Eq6 oped with the AMIDARS J. Piotrowski
System
1988
88-07 Letter of Effort, Support to the US Naval Air Jun 88 MAJ T. WallaceLOE T-st Center Evaluation of an Acoustic Air Data
Sensor Device (Mini-SODAR)
88-09 Letter of Effort, Support to the Naval Weapons Jun 88 MAJ T. Wallace
LOE Test Center (NWC)
88-11 CH-47D Report, C H-47D Emergency Descent Evaluation Sep 88 MAJ R. Cason
LR CW4 P. SullivanR. RobbinsJ. Piotrowski
88-12 Letter of Effort Pilot Support of Adaptive Fuel Aug 88 MAJ J. LawrenceLOE Control Development Flight Tests R. Buckanin
88-12 Report, Pilot Support of Adaptive Fuel Control Sep 88 MAJ J. LawrenceLR Development Flight Tests R. Buckanin
88-18 Letter of Effort, Support to the USAF Space Nov 88 CPT M. WhiteLOE Fest Office, Military Man in Space (MMIS) MAJ T. Wallace
Equipment and Procedures Evaluation
50
BEECH AIRCRAFT CORPORATION
Alircraft Project AdType Number Report Title Date Author(s) Number
T-34B 63-38 Evaluation of the U.S. Forest Service T-34B Sep 1963 J. Kidwell 951 583Airplane with Smoke Generator Installed
T-42A 74-25 T-42A Single-Engine Operation and Stall Feb 1974 MAJ W. HortonLR Evaluation SP4 P. Bonin
U-8 70-32 Letter Report, U-8 Aircraft Procedures Dec 1970 K. FerrellLR Evaluation
RU-8D 68-51 Letter Report Airworthiness Qualification Test Jul 1969 CW4 W. Connor 857 693LR RU-8D Airplane (Winebottle Configuration)
RU-8D 68-51 Airworthiness and Flight Qualification Tests Oct 1970 LTC J. Wing 876 954RU-8D Airplane Winebottle Configuration, S. DorrisPhase II LTC D. Boyle
CW4 W. Connor
U-21A 66-14 Engineering Flight Test U-21A Airplane Oct 1969 MAJ A. Darling 951 584Phase B and Limited Phase D MAJ W. Welter
U-21A 75-10 Airworthiness and Qualification Evaluation Jan 1976 R. Smith A047 656U-21A Airplane with Low Reflective Paint CPT W. Nortonand Hot Metal Suppressors
U-21A 77-05 Icing Evaluation U-21A Airplane with Low May 1977 T. Benson A046 852Reflective Paint R. Woratschek
MAJ C. ThomasMAJ R. Stewart
U-21A 77-20 Evaluation of Experimental Radio Meteorological May 1977 MAJ C. MittagMeasurement Package Antenna Installed on aU-21A Wing
RU-21A 69-18 CEFIRM Leader Airworthiness Qualification Dec 1970 LTC J. WingRU-21B LR Test RU-21-ABC AircraftRU-21C
RU-21A 75-03 Flying Qualities Evaluation RU-21A CEFIRM Dec 1974 J. Johnson A109 514LEADER Airplane CPT M. Hawley
MAJ R. Stewart
RU-21B 67-25 Engineering Flight Test, RU-21B and RU-21C Mar 1970 CPT J. Brecker 869 281RU-21C Aircraft Army Preliminary Evaluation LTC G. Swecker
MAJ R. Holt
RU-21B 69-18 CEFIRM Leader Airworthiness Qualification Dec 1970 LTC J. WingRU-21A LR Test RU-21-ABC AircraftRU-21C
RU-21B 71-47 CEFIRM LEADER RU-21B and RU-21C Air- Sep 1972 MAJ R. ChaplinRU-21C LR worthiness Tests SP4 J. Lehman
RU-21C 67-25 Engineering Flight Test, RU-21B and RU-21C Mar 1970 CPT J. Brecker 869 281RU-21B Aircraft Army Preliminary Evaluation LTC 0. Swecker
MAJ R. Holt
51
BEECH AIRCRAFT CORPORATION
Aircraft Project AdType Number Report Title Date Author(s) Number
RU-21C 71-47 CEFIRM LEADER RU-21B and RU-21C Air- Sep 1972 MAJ R. ChaplinRU-21B LR worthiness Tests SP4 J. Lehman
RU-21E 72-13 Modified LEFT-FOOT RU-21E Direction Jun 1972 MAJ R. ChaplinLR Finding (DF) Demonstration PFC G. Smith
RU-21H 74-35 Guardrail IIA RU-21H Evaluation Jul 1974 G. Yamakawa A004 009T. BensonMAJ L. Brewer
RU-21H 77-19 Preliminary Airworthiness Evaluation, RU-21H Mar 1978 J. Niemann A068 347Guard Rail V Aircraft R. Smith
CPT W. NortonMAJ F. Doten
RU-21H 81-08 Report Preliminary Airworthiness Evaluation of Oct 1981 MAJ M. HanksLR the RU-21H Guardrail V Single Engine Climb MAJ D. Underwood
Performance and Static VMC Performance CW3 J. WebreG. Yamakawa
Model 74-21 Army Preliminary Evaluation I Model 200 Jun 1974 T. Benson A009 713200 Cefly Lancer CPT M. Hawley
G. YamakawaMAJ L. Brewer
Model 74-21 Army Preliminary Evaluation II Model 200 Aug 1974 G. Yamakawa A009 714200 Cefly Lancer T. Benson
MAJ L. Brewer
C-12A 75-08 Airworthiness and Flight Characteristics Oct 1976 V. Diekmann A040 239Evaluation C-12A Aircraft R. Smith
J. Watts
MAJ J. HannonCPT W. Norton
C-12A 76-03 Landing GearCapability Tests Mar 1977 V. Diekmann A046 554J. Watts
RC-12D 84-02 Airworthiness and Ilight Characteristics Test of Jul 1984 G. Yamakawa A148 046the RC-12D Guardrail V CW4 J. Mless
MAJ R. RatcliffR. Adler
RC-12H 87-11 Preliminary Airwortiness Evaluation of the Jun 1988 CW4 J. Mless A202 957RC-12H Airplane CW4 R. Murrell
R. Buckanin
52
BELL hIELICOPTER CORPORATION
Aircraft Project AdType Number Report Title Date Author(s) Number
XV-3 62-01 Pilot Evaluation of the Bell Model XV-3 Feb 1962 MAI E. Kleuver 884 8-0Vertical Take-Off and LandingAircraft
BREGUET AVIATION(France)
Model 63-06 Flying Qualities and Performance Evaluation Jan 1964 CPT M. Antoniou 951 590941 aka of the Breguet 941 Turbo-Prop
63-85 Troop Transport
CANADAIR, LTD(Canada)
CL-215 72-02 Limited Evaluation of Canadair's CL-215 Nov 1970 MAJ R. HolasekLR Water Bomber/Utility Aircraft
CL-215 72-02 Limited Evaluation Canadair CL-215 Oct 1972 MAJ J. Alvis A109 513Amphibious Airplane MAJ R. Holasek
J. Kishi
CESSNA AIRCRAFT COMPANY
L-19A 61-01 Evaluation of L-19A Equipped with Continental Feb 1961 J. Kidwell 722 8250-470-11CI Fuel Injection Engine CPT W. Clay
L-19A 61-06 Evaluation of the Mark XII Auxiliary Fuel and Jul 1961 CPT J. Johnston 884 884H-13G Oil System
0-2A 87-34 Report, Preliminary Airworthiness Evaluation of Mar 1988 CW4 J. MiessLR the 0-2A Aircraft Equipped with the AMIDARS J. Piotrowski
System
53
DeHAVILLAND AIRCRAFT OFCANADA LTD
Aircraft Project AdType Number Report Title Date Author(s) Number
CV-2B 63-04 Take-Off and Landing Capabilities of the Sep 1963 J. Kidwell 440 406aka Caribou CV-2B Aircraft on Unprepared J. Blaha
63-73 Surfaces, USATECOM Project No. 4-4-1142-01 R. Finnestead
CPT M. Antoniou
CV-2B 63-74 Final Report Performance Tests of the CV-2B Jun 1965 R. Finnestead 467 490Airplane USATECOM Project No. 4-4-114-01 CPT M. Antoniou
CV-2B 63-92 Final Test Report of the Integrated Engineering/ Jul 1964 J. KramerLR Service Test of Low Level Extraction Techniques
(LOLEX) from CV-2B Aircraft, USATECOMProject No. 4-4-7475
YCV-7A 63-13 Engineering Test Requirements for the Nov 1963 J. Blaha 951 587DeHavilland YCV-7A Tactical Troop Transport,USATECOM Project No. 4-3-1170-01
CV-7A 63-14 Letter Report on Preliminary Engineering Flight Oct 1964 J. BlahaLR Evaluation of the CV-7A Tactical Transport
Airplane, DA Project No. 1-R-1-41815-D-193,USATECOM Project No. 4-3-1170-04
CV-7A 65-10 Stability and Control and Performance Test Mar 1966 MAJ N. Mattmuller 483 183(Phase D) of the CV-7A Transport Airplane, D. WilsonUSATECOM Project No. 4-3-1170-08 J. Blaha
U-6 65-07 Final Report of Qualitative Flying Qualities Jun 1965 MAJ E. KleuverLR Evaluation of the Turbine Powered U-6 Airplane,
USATECOM Project No. 4-5-1020-02
GRUMMAN AEROSPACECORPORATION
AO-1AF 61-07 Cold Weather Suitability Test of the AO-IAF Nov 1961 A. Ruddell 884 888
OV-I 73-09 NASA OV-1 Accident Investigation Jun 1973 MAJ R. ChaplinLR LTW W. Griffith
OV-1 81-06-1 Preliminary Airworthiness Evaluation of a Jul 1984 MAJ D. UnderwoodNational Aeronautics and Space Administration R. AdlerAutomated Stall Warning System for an OV-1Aircraft
OV-I 81-17 OV-1 Propeller Reversser Fault Protection Circuit Jun 1982 MAJ D. Underwood
Evaluation G. Bender
OV-IB 67-23 Engineering Flight Test of an IR Suppression Jul 1969 SP5 G. Higley 857 774Kit Installation on the OV-IB Aircraft MAJ R. Forsyth
54
GRUMMAN AEROSPACECORPORATION
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
OV-1C 63-20 Final Report of the Airworthiness Certification Jan 1965 J. Blaha 465 079Test of the QRC-160-1 Installed on the OV-1C MAJ J. JohnstonAirplane, USATECOM Project No. 6-3-6711-03
QV-1C 75-15 Advanced Report, Engineering Flight Evaluation. May 1976 CPT G. NeperenyLR OV-IC Aircraft Equipped with Angle-of-Attack/ MAJ R. Stewart
Stall Warning System
OV-IC 78-07 Airworthiness and Flight Characteristics Test May 1979 R. Smith A069 827OV-1C Takeoff Performance J. Watts
J. NiemannMAJ J. GuinG. Yamakawa
OV-lC 78-19 Airworthiness and Flight Characteristics OV-IC Apr 1979 MAJ R. Tarrwith Angle-of-Attack/Stall Warning and Speed G. SkinnerControl System,
OV-IC 80-01 Letter Report OV-1C (Short Wing) Apr 1980 MAJ R. CarpenterLR Fuel Siphoning Evaluation
OV-1D 68-43 Army Preliminary Evaluation Preproduction Mar 1970 G. Yamakawa 870 260OV-ID (Mohawk) LTC W. Graham
LTC T. Wright
OV-ID 70-03 Army Preliminary Evaluation 1H Production Mar 1971 G. Yamakawa 881 649OV-ID (Mohawk), Performance and Handling ILt K. BrauerQualities LTC W. Graham
OV-ID 70-03 Army Preliminary Evaluation II Production Apr 1972 G. Yamakawa 903 107OV-1D (Mohawk) Performance Addendum ILT K. Brauer
LTC W. GrahamMAJ J. Henderson
OV-ID 72-19 OV-ID 300-Gallon External Drop Tank Sep 1972 MAJ R. ChaplinLR Performance Evaluation SP4 J. Lehman
OV-ID 74-20 Hot Brick III Airworthiness Evaluation Nov 1974 D. Macpherson A012 202OV- I D Airplane CW4 J. Reid
OV-ID 76-10 OV-ID Low Reflective Paint Evaluation undated J. WattsLR
OV-ID 77-22 Preliminary Airworthiness Evaluation, OV-1D Feb 1978 MAJ R. Ward A109 522Airplane with AN/ALQ 147 XE-I and XE-2 G. YamakawaSystems Installed MAJ R. Tarr
OV-1D 79-10 Airworthiness and Flight Characteristics Oct 1979 MAJ G. WilsonLR Evaluation OV-1D with Angle-of-Attack/ LTC C. Frankenberger
Stall Warning System CPT F. Bowers
OV-ID 80-16 Letter Report Limited Artificial Icing Tests of Jul 1981 E. GilmoreLR the OV-ID CPT R. Robbins
OV-ID 81-06-2 Maximum Performance Takeoff and Landing Oct 1984 G. BenderCapabilities for OV- ID
55
GRUMMAN AEROSPACE(ORPORATION
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
OV-1D 81-21 Limited Artificial and Natural Icing Test of Aug 1982 MAJ R. Carpenter A127 191OV-ID (Re-Evaluation) LTC R. Ward
R. Robbins
OV-1D 84-13 Evaluation of the OV-1D Stall Warning Jan 1986 J. LinehanCharacteristics R. Robbins
G. Yamakawa
OV-ID 85-17-1 Flaps-Up TAkeoff Performance of the OV-ID May 1987 CW4 J. Miess A185 960Aircraft with YT53-L-701 Engine Installed G. Yamakawa
J. LinehanR. Robbins
OV-ID 85-16 Evaluation of the Safe Flight Instrument Feb 1986 J. Linehan A177 364Corporation Stall wArning System for the OV-1D CW4 J. MiessAircraft R. Robbins
OV-1D 85-17 Evaluation of the OV-ID Aircraft with the Jun 1986 CW4 J. MiessPhase I YT53-L-704 Engine and Rudder Augmentation G. Yamakawa
System, Phase I J. LnehanJ. Piotrowski
OV-ID 87-25 Evaluation of the Improved OV-1D Anti-Icing Apr 1988 CW4 J. MiessSystem M. Blacker
3. Piotrowski
OV-ID 85-17 Evaluation of the OV-ID Aircraft with the Jun 1986 CW4 J. MiessPhase II YT53-L-704 Engine and Rudder Augmentation G. Yamakawa
System, Phase II
RV-1D 74-36 Army Preliminary Evaluation I, RV-ID/ Aug 1974 G. Bender A005 220Quick Look II Aircraft CPT J. O'Connor
TBM-3 62-11 Evaluation of a Grumman TBM-3 Air Tanker Nov 1962 J. Blaha 884 894CWO E. Nelson
TS-2A 71-16 Letter Report, Phase I TS-2A Airtanker Jul 1972 MAJ R. HolasekLR Evaluation SP4 J. Lehman
TS-2A 77-07 TS-2A Air Tanker Evaluation, Phase I! May 1978 J. Watts A060 940E. BailesMAJ S. SpringMAJ J. Guin
LOCKHEED CORPORATION
YO-3A 68-47 Army Preliminary Evaluation I YO-3A Airplane Aug 1970 CPT G. Condon 876 022LTC i. RundgrenMAJ W. Davis
56
LOCKHEED CORPORATION
Aircraft Project AdType Number Report Title Date Author(s) Number
YO-3A 69-14 Army Preliminary Evaluation, 1I, YO-3A Aug 1970 CPT G. Condon 874 733Airplane LTC I. Rundgren
CW4 W. Connor
YO-3A 70-09 Army Preliminary Evaluation III YO-3A Sep 1970 LTC 1. Rundgren 876 095Airplane MAI A. Deel
NORTH AMERICAN AVIATION
TB-25N 62-08 Flight Test Evaluation of a TB-25N Aerial Sep 1962 K. JordonTanker MAJ E. Kluever
F-51D 71-30 Flight Evaluation, Aeroflex True Airspeed Mar 1973 K. Ferrell 764 240Vector System Low-Airspeed System, Final A. WinnReport II J. Kishi
B. Jefferis
PILATUS
PC-6/A 63-05 Report of USATECOM Project No. 4-3-1048-01 Sep 1963 L. Schroers 951 586aka Takeoff and Landing Evaluation of the Pilatus CPT J. Johnston63-70 Turbo Porter Model PC-6/A Airplane CWO J. Watts
RYAN AERONAUTICAL CO.
XV-SA 62-35 Letter Report, Preliminary Pilot Qualitative Oct 1965 R. FinnesteadLR Evaluation of the XV-5A Research Aircraft K. Ferrell
XV-SA 62-72/Pt I Engineering Flight Research Evaluation of the Aug 1966 R. Finnestead 800 973XV-SA Lift-Fan Aircraft, Pt 1, Stability and K. FerrellControl MAJ W. Welter
W. Anderson
57
RYAN AERONAUTICAL CO.(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
XV-SA 62-72/Pt 2 Engineering Flight Research Evaluation of the Aug 1967 K. Ferrell 821 123XV-5A Lift-Fan Aircraft, Pt H1, Performance MAJ W. Welter
XV-5A 65-47 A Review of AGARD Recommendations for 1965 W. AndersonV/STOL Handling Qualities (Rep. 408) in theLight of U.S. Army Experience with the XV-SAand other V/STOL Aircraft Including Helicopters
ROTEC ENGINEERING, INC.
Rally 83-16 Report, Preliminary Airworthiness Evaluation of Apr 1983 MAJ G. DownsUltralight LR ROTEC Engineering Inc., Rally 3 and Rally
Sport Ultralight Aircraft
RUTAN AIRCRAFT FACTORY,
INC.
LONG-EZ 82-18 Preliminary Airworthiness Evaluation of the Jun 1983 MAJ D. Underwood A140 765Rutan Aircraft Factory (RAF) Inc, LONG-EZ LTC R. WardAirplane M. Graham
V. Diekmann
LONG-EZ 83-18 Report, Preliminary Airworthiness Evaluation Dec 1983 MAJ D. UnderwoodLR of Rutan Aircraft Factory Inc., LONG-EZ V. Diekman
Airplane (S/N 1241)
LONG-EZ 84-04 Preliminary Airworthiness Evaluation of the May 1984 MA D. UnderwoodRutan Aircraft Factory (RAF), Inc., LONG-EZ G. YamakawaAirplane with External Sight CPT T. Reynolds
CPT W. Carmona
SCHWEIZER AIRCRAFTCORPORATION
SA 2-37A 86-15 Report, Flight Evaluation of the Schwelzer Aug 1986 MAJ R. SimmonsLR SA 2-37A Airplane with Wing Leading Edge
Cuffs
TG-8A 87-01 Preliminary Airworthiness Evaluatin of the TG-8A Oct 1987 MAJ R. Simmons ABI20 244Evaluation of the TG-8A Airplane MAJ T. Reininger
58
BELL HELICOPTER TEXTRONINC.
Aircraft Project AdType Number Report Title Date Author(s) Number
AH-1 82-06 AH-1 Ground Engagement Simulation/Air Sep 1982 CPT R. Savage 122623Defense (AGES/ADES) Pod Jettison Evaluation
AH-IF 84-16 AH-IF Instrument Meteorological Conditions Feb 1987 MAJ J. Lawrence(IMC) Flight Evaluations MAJ J. Martin
MAJ A. OmlieCW4 P. SullivanMAJ T. ReningerR. Adler
AH-IG 66-06 Letter Report of Pilot Qualitative Evaluation of Sep 1966 MAJ G. HallLR Handling Qualities and Cockpit Environment of J. Melton
AH-lG Helicopter After Contractor Optimizationof Stability Augmentation System and Improvementof Cockpit Ventilation System, USATECOMProject No. 4-6-0500-01
AH-1G 66-06 Engineering Flight Test of the AH-IG Jan 1968 J. Melton 830 136Helicopter Hueycobra, Phase B Part 1, MAJ G. HallUSATECOM P;oject No. 4-6-0500-01
AH-IG 66-06 Engineering Flight Test of the AH-IG Helicopter May 1969 J. Melton 855 629Hueycobra, Phase B, Part 2, USATECOM MAJ G. HallProject No. 4-6-0500-01
AH-IG 66-06 Engineering Flight Test of the AH-1G Mar 1968 J. Melton 834 379aka (Hueycobra) Helicopter Equipped with the MAJ G. Hall67-26 XM-28 Chin Turret with Twin XM-134 Miniguns,
Phase B, Part 3
AH-IG 66-06 Engineering Flight Test of AH-IG Hueycobra Mar 1968 J. Melton 836 901aka Helicopter Equipped with XM-28 Chin Turret MAJ G. Hall67-27 with Twin XM-129, 40MM Grenade Launcher,
Phase B, Part 4
AH-IG 66-06 Engineering Flight Test of the AH-IG Helicopter Apr 1968 SP5 P. Passinisi 838 004aka Equipped with the XM-28 Chin Turret with One CW4 W. Connor68-03 7.62MM Automatic Gun (M-134) and One
40MM Grenade Launcher (XM-129) Hybrid,Phase B, Part 5, USATECOM Project No.4-6-0500-01
AH-IG 66-06 Engineering Flight Test AH-lG Helicopter Nov 1969 R. Finnestead 862 700Hueycobra Phase B, Part 6, USATECOM CW4 W. ConnorNo. 4-6-0500-01
AH-IG 66-06 Engineering Flight Test AH-IG Helicopter Dec 1970 R. Finnestead 880 558(Hueycobra) Phase D. Part 1. Handling R. PelikanQualities, USATECOM Project No. 4-6-0500-01 MAJ D. Wray
M. Buss
59
IEI.I. II:I.ICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
AH-1G 66-06 Engineering Flight Test AH-IG Helicopter Apr 1970 R. Finnestead 874 210(Hueycobra) Phase D, Part 2 Performance, E. LaingUSATECOM Project No. 4-6-0500-01 CW4 W. Connor
M. Buss
AH-IG 66-06 Engineering Flight Test AH-IG Helicopter Mar 1971 R. Finnestead 882 220(Hueycobra) Phase D Part 2 Performance M. BussAddendum, USATECOM ProjectNo. 4-6-0500-01 CW4 W. Connor
AH-IG 66-06 Engineering Flight Test AH-IG Helicopter, Sep 1970 R. Finnestead 878 122Phase D, Part 3 Vibration Characteristics, E. BailesUSATECOM Project No. 4-6-0500-01 MAJ D. Wray
M. Buss
AH-IG 66-06 Engineering Flight Test of the AH-IG Helicopter Feb 1968 J. Melton 832 419to Determine the Area of Inadequate Directional MAJ G. HallControl Power at 8100 Lb. Gross Weight
AH-1G 66-06 Feasibility Test of Tractor Tail Rotor Mar 1968 MAJ G. Hall 832 820Modification on the AH-1G Helicopter J. Melton
AH-IG 68-09 Letter Report Engineering Flight Test of the Mar 1968 MAJ G. Hall 830 120LR AH-IG Helicopter Equipped with XM-20 S. Dorris
Armament Sutsystcm Autom=atic 20MM Cannon
AH-IG 68-31 Engineering Flight Test AH-IG (Hucycobra) Nov 1969 N. Donaldson 865 018Helicopter Equipped with the XM35 Armament MAJ. G. HallSubsystem (20MM Automatic Gun)
AH-IG 68-37 Army Preliminary Evaluation of the AH-IG Jun 1969 J. Nagata 860 948Tractor Tail Rotor Modification M. Buss
AH-IG 68-55 Flight Evaluation, Compliance Test Techniques Apr 1974 K. Ferrell 109 440for Army Hot Day Hover Criteria A. Frederickson
J. KishiJ. Watts
AH-IG 69-01 Airworthiness and Flight Characteristics AH-IG Dec 1969 G. Bender 864 070Helicopter with Stabilized Night Sight (SNS), Phase I M. Buss
AH-IG 69-01 Airworthiness and Flight Characteristics Test Aug 1970 G. Bender 874 211AH-IG Helicopter with Stabilized Night M. BussSight (SNS), Phase II
AH-1G 69-01 NASA Report Static Load Tests of a Simulation Jul 1969 R. RosecramsPackage on an AH-IG Helicopter
60
BELL . ElICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
AH-1G 69-11 Engineering Flight Test AH-IG Helicopter Mar 1971 R. Lewis 882 771(Hueycobra) Maneuvering Limitations E. Bailes
R. McClellanCPT 1. ClaxtonM. BussCW4 W. ConnorLTC J. Johnston
AH-IG 69-13 Height-Velocity Test AH-1G Helicopter Feb 1971 CPT G. Condon 881 633E. BailesCW4 W. Connor
AH-IG 70-08 Letter Report, Qualitative Airworthiness Sep 1970 M. BussLR Assessment of AH-IG Cobra Night Fire Control
System (CONFICS)
AH-IG 70-10 Airworthiness and Flight Characteristics Test Oct 1970 G. Bender 951 594(Limited) AH-IG Helicopter with the M. BussSoutheast Asia Multisensor Armament SystemHelicopter (SMASH)
AH-IG 70-15-5 Vibration and Temperature Survey Production Mar 1974 E. Laing A002 063AH-IG Helicopter CPT A. Weand
AH-IG 70-25 Engineering Flight Test AH-IG (Hueycobra) Apr 1971 CPT B. Nicholson 887 550Helicopter Autorotational Entry Characteristics M. Buss
AH-IG 71-43 AH-IG Lateral Flight Performance Test Jun 1972 MAJ L. HeplerLR J. Kishi
A. Wlnn
AH-IG 72-16 AH-IG Vertical Climb Height-Velocity Sep 1972 K. FerrellLR Diagram A. Frederickson
J. Kishi
AH-IG 72-18 Army Preliminary Evaluation Improved AH-IQ Dec 1972 G. Yamakawa 907 694Cobra Armament System 1LT L. Toman
SPS A. WernerMAJ R. Holasek
AH-IG 72-29 Instrument Flight Evaluation AH-IG Helicopter Jul 1975 G. Skinner A026 633CPT M. LarsenSP4 G. SmithSP4 P. BoninCW4 J. ReidLTC R. WaddellMAJ L. HeplerMAJ R. Merrill
61
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
AH-1G 72-30 Engineering Flight Test AH-IG Helicpter with Jun 1973 G. Skinner 776 359Model 212 Tail Rotor, Part 1, Load Survey SP4 G. Smith
MAJ L. HeplerPFC P. Bonin
AH-IG 72-30 Engineering Flight Test AH-IG Helicopter with Sep 1973 J. Nagata 776 360Model 212 Tail Rotor, Part II, Performance G. Skinnerand Handling Qualities SP4 G. Smith
MAJ L. HeplerPFC P. Bonin
AH-IG 73-04-2 Artificial Icing Tests AH-IG Helicopter Nov 1974 R. Smith A009 712CPT M. HanksMAJ C. MittagCW4 J. Reid
AH-1G 74-02 AH-IG Helicopter Main Rotor Flow Survey Apr 1978 B. Boirun A057 443E. BailesR. Jefferis
MAJ J. ArnoldCW3 J. Meiss
AH-IG 74-10 AH-IG Heavyweight Autorotational Jan 1974 MAJ L. HeplerLR Evaluation G. Yamakawa
AH-1G 74-10 Engineering Flight Test AH-IG Helicopter May 1974 G. Yamakawa 785 553Heavyweight Autorotational Evaluation ILT L. Free
J. Watts
MAJ L. Heplcr
AH-IG 74-19 Height-Velocity Test AH-IG Helicopter at Heavy Jun 1974 ILT L. Free A034 424Gross Weight, Low Elevation MAJ L. Hepler
AH-1G 75-01 Performance and Handling Qualities AH-IG Apr 1975 A. Winn A019 482Helicopter Equipped with Three Metal/Plume MAJ R. StewartInfrared Suppressors Hot
AH-IG 75-09 Performance and Handling Qualities Evalution Aug 1975 A. Winn A021 407
AH-IG Helicopter with Low Reflective Infrared/ ILT E. TavaresOptical Paint MAJ R. Stewart
G. Skinner
AH-IG 75-17-1 Flight Evaluation, Pacer Systems, Low-Range May 1977 W. Abbott A045 222Airspeed System, LORAS 1000 B. Boirun
CPT G. HillCPT E. Tavares
AH-IG 75-17-2 Flight Evaluation, J-TEC VT-1003 Vector May 1977 W. Abbott A046 553
Airspeed Sensing System CPT S. SpringMAJ R. Stewart
AH-IG 75-19-1 Low Airspeed Sensor Location Tests AH-IG Feb1977 K. Ferrell A052 467Helicopter B. Boirun
CPT G. Hill
62
BELl. IIEIICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
AH-IG 75-19-2 Flight Evaluation Honeywell Ultrasonic Wind Jun 1976 CPT G. Hill A052 467Vector Sensor System Fire Control Wind Sensor CW3 J. MeissReport B. Boirun
AH-IG 75-25 Letter of Effort, Qualitative Evalution of AH-IG Oct 1975LR with Kaiser Ministab
AH-IG 78-02 Preliminary Airworthiness Evaluation, AH-IG Jul 1979 MAI P. Moe A078 340with the Airborne Target Acquisition Fire R. SmithControl System and the Hellfire ModularMissile System Installed
AH-1G 78-10 AH-IG Helicopter, 19-Round Lightweight Mar 1979 G. Skinner A069 828Airborne Launcher Jettison Envelope MAJ F. DotenDetermination
AH-IQ 72-18 Army Preliminary Evaluation Improved AH-IG Dec 1972 G. Yamakawa 907 694Cobra Armament System ILT L. Toman
SPS A. WernerMAJ R. Holasek
AH-1Q 72-43 Airworthiness and Flight Characteristics Jul 1973 G. Yamakawa 914 458Evaluation AH-IQ Helicopter CPT K. Schrantz
ILT M. HanksSP4 A. WernerMAJ R. MerrillCW4 J. Reid
AH-IQ 73-04-? Artiticial Icing Tests AH-lQ Helicopter (U) Jan 1974 CPT M. Hanks 531 589CW4 J. Reid
MAJ R. Merrill
YAH-1Q 75-18 Army Preliminary Evaluation, YAH-1Q Heli- Aug 1975 ILT L. Free A020 Illcopter with a Flat Plate Canopy CPT J. R. Arnold
YAH-IQ 75-18 YAH-IQ Flat Plate Canopy Follow-on Evaluation Feb 1976 CPT J. R. Arnold
YAH-1R 74-33 Army Preliminary Evaluation YAH-IR Improved May 1975 F. Dominick A018 420Cobra Agility and Maneuverability Helicopter R. Smith
MAJ R. Stewart
YAH-IR 74-33 Army Preliminary Evaluation, YAH-IR Improved Aug 1975 F. Dominick A024 850Cobra Agility andManeuverability Helicopter R. SmithAodendum MAJ R. Stewart
YAH-IR 75-21 Letter of Effort, YAH-IR Lateral Agility/IR Mar 1977 MAJ R. StewartLR
YAH-1R 76-07 Army Preliminary Evaluation, Improved Main Jun 1977 J. Watts A072 830Rotor Blade Installed on a YAH-IR Helicopter F. Dominick
MAJ J. Guin
63
BELL IIELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
YAH-IR 76-08 Airworthiness and Flight Characteristics Nov 1977 G. Yamakawa A074 895Evaluation Improved Main Rotor Blade J. NiemannInstalled on a YAH-IR Helicopter R. Smith
R. WoratschekMAJ J. Jenks
CPT W. NortonCW4 J. Tulloch
AH-IS 77-25 Preliminary Airworthiness Evaluation, AH-1S May 1980 G. Bender A089 625Helicopter with Ogee Tip Shape Rotor Blades R. Woratschek
D. OttomeyerH. ArnaizMAJ L. HigginsCW4 J. Tulloch
AH-IS 77-33 Preliminary Airworthiness Evaluation, AH-IS May 1978 G. Bender A067 757Helicopter Equipped with Garrett Infrared E BailesRadiation Suppressor System and AN/ALO-144 LTC C. FrankenbergerJammer MAJ S. Spring
AH-IS 77-35 AH-1S/XM-130 Chaff Dispenser. Preliminary Mar 1978 J. NiemannLR Airworthiness Evaluation CPT T. Burch
AH-1S 77-38 Production Validation Test - Government Oct 1979 V. Diekmann 097 689Kaman K747 Improved Main Rotor Blade MAJ G. Mullen
CW4 J. TullochT. BensonCPT F. BowersR. Woratschek
AH-I S 78-03 Preliminary Airworthiness Evaluation, AH-IS Feb 1979 CPT P. Moe A07I 343Helicopter Installed with Enhanced Cobra R. SmithArmament System (AH-IS/ECAS) CW3 R. Williams
R. Woratschek
AH-IS 78-15 Preliminary Airworthiness Evaluation Production Aug 1978 LTC C. FrankenbergerLR AH-IS Helicopter Equipped with AN/ALQ-136 T. Benson
(XE-2) Countermeasures System
AH- IS 78-16 Preliminary Airworthiness Evaluation Modified Aug 1978 LTC C. FrankenbergerLR AH-IS Helicopter Equipped with AN/ALQ-136 T. Benson
Countermeasures System
AH-IS 79-01 Letter Report, Preliminary Airworthiness Oct 1979 V. DlekmannLR Evaluation of AH-IS with Fixed Wings Removed LTC G. Mullen
AH-IS 79-03 AH-I Lightweight Airborne Launcher MAJ L. Higgins A101 461Jettison Evaluation D. Otuomeyer
AH-IS 79-04 Letter Report of Preliminary Airworthiness Mar 1980 R. WoratschekLR Evaluation of Production AH-IS Helicopter MAJ P. Morris
with 90 degree Gearbox and Skid Cross-TubeFairings Removed
64
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
AH-IS 79-08 AH-IS PRODUCTION Airworthiness and Flight Nov 1980 CW4 J. Tulloch AIOO 94oCharacteristics for Instrument Flight D. Ottomeyer
LTC C. FrankenbergerMAJ B. Picasso
Ali-IS 79-09 Preliminary Airworthiness Evaluation Al-IS Jun 1980 MAJ P. Morris A092 614(Prod) Helicopter with a Substitute Straight LTC C. FrankenbergerExhaust Pipe J. Niemann
R. Woralschek
AH-IS 79-14 Letter Report AH-1S Helicopter Tail Boom Oct 1979 R. NiemannLR 3-Way Temperature Survey MAJ P. Morris
AH-IS 79-16 Letter of Effort and Data Transmittal AH-IS Oct 1979 R. WoratschekLR Main Transmission Top Cover Flange Stress
Measurements Evaluation
AH-1S 80-11 Letter Report Drag Characteristics Evaluation Nov 1980 G. BenderLR of Prototype Hellfire Modular Missile System CW4 J. Tulloch
(HMMS) Launcher
AH-IS 80-11-2 Letter Report Drag Characteristics Evalualion Nov 1980 G. BenderLR of Prototype Hellfire Modular Missile System MAJ B. Picasso
(HMMS) Launcher - Masking/Unmasking D. Ottomeyer
AH-IS 80-20 Letter Report AH-IS Vibration Evaluation Mar 1981 CW3 J. WebreLR MAJ B. Picasso
G. BenderG. Yamakawa
AH-1S 80-11-2 Letter Report, Drag Characteristaics Evaluation Nov 1980 G. BenderLR of Prototype Hellfire Modular Missile System MAJ B. Picasso
(HMMS) Launcher-Masking/Unmasking
AH-IS 81-01-5 Fuel Conservation Evaluation of USA Jan 1983 MAJ L. ToddHelicopters, Part 5, AH-IS Flight Testing CPT R. Savage
CPT R. VincentCW4 R. WilliamsM. Herbst
AH-IS 81-22 Preliminary Airworthiness of Kaman K747 Apr 1982 MAI G. DownsLR Tip Weight Retention System
AH-IS 82-01 Airworthiness and Flight Characteristics of Aug 1982 CW3 J. WebreAH-1S with Aircraft General Purpose Dispenser J. OttomeyerSystem (AGPDS)
AH-IS 82-04 Letter Report, Preliminary Airworthiness Jul 1982 CW3 P. SullivanLR Evaluation of AH-IS Configured with Helicopter G. Bender
Wire Strike Protection System
AH-IS 83-14 Report, Airworthiness and Flight Characteristics Apr 1984 CW4 R. WilliamsLR of AH-IS (Modernized Cobra) with Skid Cross- G. Bender
Tube Fairings Removed
65
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
AH-IS 84-09 Preliminary Airworthiness Evaluation of Jul 1984 MAJ J. Voss A148 091(MC) AH-IS(MC) Helicopter with Exernal Fuel Tanks CW4 R. Williams
Installed J. Nagata
AH-1S 84-11 Preliminary Airworthiness Evaluation of the Oct 1984 MAJ R. MacMullin A160 862AH-IS (Modernized Cobra) with the Hellfire, MAJ J. LawrenceTOW, and Stinger Missiles Installed LTC G. Downs
MAJ L. ToddMAJ E. TavaresCPT W. Carmona
AH-iS 84-16-1 AH-IS (MC) Degraded Hydraulic Mode Jan 1986 R. Adler A178 764(MC) Evaluation CW4 P. Sullivan
CPT A. Omlie
AH-IS 84-16-2 Preliminary Report, AH-IS(MC) Roll SCAS Jan 1986 CPT A. Omlie(MC) Prelim LR Card Evaluation
AH-IS 84-16-2 Report, AH-1S(MC) Roll SCAS Card Evaluation Arp 1986 R. Adler(MC) LR CPT A. Omlie
CW4 P. SullivanW. Kelly
AH-IS 84-21 Letter of Effort, AH-IS Air-to-Air Combat Jan 1985 CW4 P. SullivanLOE Test (AACT) III Evaluation MAJ G. Sharon
W. AbbottR. AdlerMAJ J. Lawrence
AH-IS 84-24 Letter of Effort, Firing of the AH-IS (MC) with Jan 1985 MAJ R. RatclilffLOE the HELLFIRE, TOW and Stinger Missile CW4 R. Murrell
Configuration
AH-1S 84-24-1 Report, Evaluation of the AH-IS(MC) Helicopter May 1985 CW4 R. Murrell(MC) LR TOW Helicopter/Stinger Head-Up Display CPT A. Omlie
AH-IS 85-11 Report, Evaluation of the AH-1S with the Hub Sep 1985 J. JohnsonLR Spring Improvement CW4 R. Murrell
AH-IS 86-06 Airworthiness and Flight Characteristics Test of Aug 1986 CW4 P. Sullivan B114 673the AH-IS with Hub Spring Installed CW4 J. Lyle
MAJ A. OmlieR. Adler
JAH-IS 78-17-1 Airworthiness Demonstration, JAH-IS PNVS May 1979 CPT T. BurchSurrogate Trainer (Martin-Marietta) COMP SENS R. Smith
JAH-IS 78-17-2 Airworthiness Demonstration, JAH-IS PNVS Aug 1979 MAJ F. DotenSurrogate Trainer (Northrop) COMP SENS CPT F. Bowers
YAH-IS 74-34 Airworthiness and Flight Characteristics Aug 1975 G. Skinner A025 476Evaluation, YAH-IS Improved Cobra Agility W. Abbottand Maneuverability Helicopter CPT R. Tart
66
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
YAH-1S 77-04 Army Preliminary Evaluation, YAH-IS, Heli- Aug 1977 MAJ J. Arnold A066 573copter with Modified Flat Plate Canopy Installed MAJ J. Guin
CW4 J. BishopG. Skinner
UH-1 82-86 Letter Report, Main Rotor Blade Container Oct 1982 CPT R. SavageLR Program Investigation
UH-1 86-20 Preliminary Airworthiness Evaluation of a UH-1 Feb 1987 MAJ F. Stellar A186 274Equipped with a Terrain Mapping Receiver MAJ J. BrownAntenna C. Butler
UH-1B 63-81 Engineering Flight Test of UH-IB Helicopter Jun 1966 G. Yamakawa 488 791aka Equipped with XM-16 Armament Subsystem MAJ J. Foster65-01 and XM-21 Armament Subsystem, USATECOM
Project No. 4-4-1532-03 and 4-5-1535-04
UH-1B 63-93 Military Potential Test of the Model 540 "Door Feb 1964 J. Kidwell 951 593Hinge" Rotor System, USATECOM Project CPT D. WrayNo. 4-40108-01
UH-1B 64-02 Engineering Test of UH-IB Helicopter Equipped Aug 1966 J. Blaha 805 698with Flotation Landing Gear, USATECOM 1LT R. RichProject No. 4-5-5301-01
UH-IB 64-28 Engineering Evaluation of the UH-IB Helicopter Jun 1966 L. Schroers 804 242Equipped with the Model 540 Rotor System, CPT M. AntoniouPhase B, USATECOM Project No. 4-4-0108-03
UH-1B 64-28 Engineering Flight Test of the UH-IB Helicopter Dec 1966 L. Schroers 811 782Equipped with the Model 540 Rotor System, J. MeltonPhase D, USATECOM Project No. 4-4-0105-03 J. Watts
J. ShapleyMAJ A. DarlingMAJ D. DuganMAJ E. SampsonW. Anderson
UH-IB 65-12 Engineering Flight Test of UH-IB/540 Rotor Dec 1966 J. Nagata 811 781Helicopter Equipped with XM-16/M-5,XM-21/M-5, or XM-3/M-5 Armament Subsystem,USATECO Project No. 4-5-1591-01
UH-IB 65-22 Engineering Flight Test of UH-IB Helicopter Nov 1966 M. Reif 809 915Equipped with XM-47 Antipersonnel Mine MAJ N. MattmullerDispensing Subsystem, USATECOM Project J. ShapleyNo. 4-4-6516-05
UH-IB 68-04 Special Study of Autorotational Procedures Apr 1968 J. Shapley 676 820K. Ferrell
UH-IB 71-04 Letter Report, Airworthiness Qualification Test Apr 1971 MAJ D. BroadhurstLR UH-IB Helicopter with XM26 Armament TOW ILT R. Thomas
System Installed Under Asymmetric Loading
67
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Numbcr
NUH-1B 71-22 Letter Report, Airworthiness Test of the NUH-IB Aug 1971 MAJ R. HolasekLR Helicopter Equipped with an Automatic Terrain- SP4 J. Lehman
Avoidance/Following System
UH-IC 65-12 Engineering Flight Test of the UH-IC Helicopter Feb 1967 J. Petrie 815 629aka Equipped with the M-5 Grenade Launcher and MAJ G. Hall66-09 the XM-158 or XM-159 Airborne Rocket Launcher
Pods Suspended from the XM-156 Multiarmament
Mount, USATECOM Project No. 4-4-1542-06and -09
Ul-1C 66-05 Engineering Test (Airworthiness and Performance Jan 1967 G. Yamakawa 808 293Tests) of UH-IC Helicopter with Cluster, MAJ W. WelterCanister, Riot Control CS, 130 1B, E-159,USAETCOM Project No. 5-5-3405-10
UH-IC 67-02 Letter, Report Engineering Flight Test of the Aug 1967 J. Petrie LRUH-IC/XM-26 (TOW/H) Armament System, MAJ R. HolasekArmy Preliminary Evaluation
UH-IC 67-07 Analytical Study of Range Performance of the May 1968 R. Finnestead 839 031LR UH-1C Helicopter Equipped with Lycoming
T53-L-13 Engine
UH-IC 67-09 Engineering Flight Test of the UH-IC Helicopter Nov 1967 K. Ferrell 827 184Equipped with the XM-30 Weapon System, MAJ D. DuganArmy Preliminary Evaluation MAJ R. Holasek
Ulf-IC 68-12 Wind Tunnel and Flight Evaluation Rosemount Apr 1969 K. Ferrell 708 859Shielded Pitot-Static Tube Model 850N J. Shapley
J. Mishlof
UH-IC 68-13 Flight Evaluation, AN/APN 191 Radar Sep 1970 G. Bender 714 638Altimeter MAJ J. Burden
UH-IC 68-22 Rotary Wing Vehicle External Stores Jettison Aug1970 CPT A. Hoffman 713 872CH-47C Envelope Pilot Established Requirements MAJ W. Davis
Ui-IC 68-25 A Flight Research Investigation of Autorotational Mar 1976 K. Ferrell A071 153Performance and Height-Velocity Testing of a A. FredericksonSingle Main Rotor Single Engine Helicopter R. Kyker
J. Shapley
UH-IC 69-07 Jettison Test XMI9/MK45 Flare Dispenser Dec 1969 MAJ D. Wray 864 077Installed in the UH-IC Helicopter
UH-IC 70-23 Investigation of Engine Rigging, Airspeed and Dec 1970 LTC J. Fitch 717 047Rotor RPM Effects on Steady State J. ShapleyAutorotatlional Performance
UH-IC 70-33 Evaluation of Fuel Flowmeter Instrumentation Jan 1971 A. Winn 219 280R. Jefferis
68
BELL HELICOPTER 1EXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
UH-1C 71-27 Airworthiness Evaluation UH-IC XM156/ Jan 1972 A. Winn 892 242Hornet Missile System J. Kishi
UH-IC 71-30 Flight Evaluation, Elliott Low-Airspeed Sensor, Sep 1972 A. Winn 753 343Final Report I J. Kishi
UH-IC 71-30 Flight Evaluation, Aeroflex True Airspeed Mar 1973 K. Ferrell 764 240OH-58A Vector System Low-Airspeed System, Final A. WinnF-51D Report II J. Kishi
B. Jefferis
UH-1C 71-30 Flight Evaluation, Pacer Systems Inc. LORAS II Mar 1974 B. Boirun 780 018Airspeed System, Low-Airspeed Sensor, Final F. DominickReport III J. Kishi
MAJ J. SmithMAJ R. Merrill
NUH-IC 71-30 Flight Evaluation, J-Tec Airspeed System Apr 1974 F. Dominick 780 019Low-Airspeed Sensor, Final Report IV B. Boirun
J. KishiR. Jefferis
UH-ID 63-77 Letter Report on the High-Altitude Evaluation Jun 1965 L. SchroersLR of the U.S. Army UH-ID Helicopter Equipped
with the 48-Foot Rotor Blade, USATECOMProject No. 4-4-0205-01
UH-ID 64-20 Final Report of Engineering Test of the Mar 1965 J. KudirkaYT53-L-13 Engine Installed in theUH-1D D. WilsonHelicopter, USATECOM Project No. 4-3-0150-10
UH-ID 64-20 Engineering Test of the UH-ID Helicopter with Apr 1966 J. Melton 845 032XT67 Power Plant Installed, USATECOM Project W. AndersonNo. 4-3-0150-17
UH-ID 70-20 Letter Report, Handling Qualities of the UH-ID Aug 1970LR Helicopter with Terminal Communications System
(TACSAT) Antenna Installation
EH-IH 77-15 Preliminary Airworthiness Evaluation, EH-IH Oct 1977 MAJ J. Guin A058 785Helicopter Quick Fix, Phase IA R. Buckanin
UH-IH 66-04 Engineering Flight Test of the UH-IH Helicopter, Aug 1967 F. DominickPhase D Product Improvement Test, Interim L. ThomasReport USATECOM Project No. 4-5-0150-04 CWO E. Nelson
UH-IH 67-08 Sling-Load Performance Capability of the Dec 1970 F. Dominick 878 570UH-IH Helicopter, Analytical Study
UH-IH 69-08 Letter Report Flight Evaluation on the Big Nov 1969 MAJ G. HallLR Ear Cannister Deployment Subsystem
69
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
UH-IH 69-15 Letter Report Airworthiness Qualification of the Oct 1969LR UH-1H Helicopter with the Airborne Searchlight
System (AN/ASS-2) Installed
UH-1H 70-14 Airworthiness Qualification Test of the UH-IH Jan 1971LR Helicopter with Airborne Searchlight Infrared
Filter Installed
UH-IH 70-15-2 Vibration and Temperature Survey Production Jan 1973 E. Laing 909 441UH-IH Helicopter MAJ L. Hepler
MAJ R. Merrill
UH-IH 70-22 Lcticr R, eport, L'I-IH Helicopter with the Oct 1972 J. PetrieLR Airborne Ambush Detector (AAD), Qualitative MAJ A. Todd
Handling Qualities Evaluation
UH-IH 70-40 Letter Report, Helicopter-Mounted Insecticide Feb 1973 MAJ R. WaddellLR Spray System Evaluation SP4 J. Lehman
UH-1H 71-18 Letter Report, UH-IH Tail Rotor Hover Oct 1971 R. FinnesteadLR Performance LTC W. Graham
UH-1H 71-18 Tall Rotor Performance and Translational Jan 1972 R. Finnestead 901 787Flight Handling Qualities Tests UH-IH LTC W. GrahamHelicopter
UH-1H 71-29 Letter Report, Reevaluation of the DSPG Aug 1971 MAJ J. BurdenLR SPIKE-EXRAY Program
UH-IH 71-31 ALARM System Airworthiness Test Feb 1972 MAJ R. HolasekLR MAJ J. Alvis
PFC J. Lehman
UH-IH 71-42 UH-I/XM56, Army Preliminary Evaluation Feb 1972 MAJ R. ChaplinLR PFC J. Lehman
UH-IH 71-45 XM56 Mini-Dispersion Test Feb 1972 MAJ R. ChaplinLR SP4 J. Lehman
TIH-IH 73-04-4 Artificial Icing Tests UH-IH Helicopter Part I Jan 1974 R. Smith 779 502CPT M. HanksCPT L. Brewer
CW4 J. ReidLTC W. Griffith
UH-IH 73-04-4 Artificial Icing Tests UH-IH Helicopter, Jan 1974 CPT M. Hanks 779 503Part II Heated Glass Windshield MAJ C. Mittag
ILT M. HawleyLTC W. Griffith
UH-IH 73-07 Helicopter Night Landing System Jun 1973 MAJ R. ChaplinLR Airworthiness Evaluation R. Smith
70
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
UH-IH 73-10 Tail Rotor Shaft Vibration Survey, Production Jul 1974 E. Laing A002 574UH-IH Helicopter CPT M. Hawley
CPT A. Weand
UH-IH 74-13 Artificial Icing Tests, Lockheed Advanced Ice Jun 1975 CPT L. Kronenberger B007 244LProtection System Installed on a UH-1H CPT M. HanksHelicopter MAJ R. Merrill
UH-1H 74-31 Natural Icing Tests, UH-1H Helicopter Jun 1974 LTC W. Griffith A002 007CPT M. HanksMAJ C. MittagCW4 J. Reid
UH-1H 75-26 Lockheed Advanced Ice Protection System May 1976 CPT L. Kronenberger
UH-IH 77-09 Preliminary Airworthiness Evaluation, UH-IH May 1978 V. Diekmann A078 476Helicopter Equipped with Multiple Target MAJ M. MathewsElectronic Warfare System (MULTEWS) MAJ S. Spring
MAJ J. HagenCW4 J. Tullock
UH-IH 77-10 Qualitative Evaluation of Flying Qualities of a Jul 1977 MAJ R. StewartLR UH-IH Helicopter with GE Infrared Exhaust
Suppressor Installed
UH-IH 77-30 Artificial Icing Test Ice Phobic Coatings on Jun 1978 CW4 J. Tulloch A059 875UH-1H Rotor Blades R. Smith
MAJ F. DotenCW4 J. Bishop
UH-1H 78-04 Preliminary Airworthiness Evaluation UH-1H Jul 1978 J. NagataLR Helicopter with Interim-Interim-Standoff MAJ J. Hagen
Target Acquisition System (12 SOTAS)
UH-1H 78-21 Artificial and Natural Icing Tests for Aug 1979 MAJ G. WilsonLR Qualification of UH-IH Kit A Aircraft R. Woratscheck
UH-IH 78-21-2 Microphysical Properties of Artificial and Aug 1979 MAJ G. Wilson A084 633Natural Clouds and Their Effects on UH-IH R. WoratschekHelicopter Icing
UH-IH 79-86 Ice Phobics Blade Tracking and Comparison May 1981 W. Abbott A108 121of Vibration Analysis Techniques F. Dominick
S. Arthur
UH-1H 80-06 Preliminary Airworthiness Evaluation of UH-IH Jun 1981 MAJ B. Picasso A 110 213with Hot Metal Suppressor and Infrared Jammer CPT L. A. Haworth
D. OttomeyerCPT R. Vincent
UH-IH 81-01-1 Fuel Conservation Evaluation of US Army Jan 1982 MAJ G. DownsLR Helicopters, Part I, Flight Operation Improvement
Analysis
71
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
UH-1H 81-01-3 Fuel Conservation Evaluation of USA Helicopter Aug 1982 CPT F. StellarPart 3. UH-IH Flight Testing
IJH-lH 82-12 Evaluation of UH-IK Hover Performance Aug 1983 D. Belt. A141 252Degradation Caused by Rotor Icing CW4 R. Williams
CPT F. StellarW. Abbott
UH-IH 83-23 Evaluation of the UH-IH Level Flight Perform- Jul 1984 W. Abbottance Degradation Caused by Rotor Icing L. Linehan
CPT R. LockwoodMAM L. Todd
UH-1H 84-14 Preliminary Airworthiness Evaluation of the Jan 1985 CW4 J. Adkins A179 495UH-IH HIND-D Surrogate CPT M. White
D. MacphersonCPT D. CrlppsMMJ W. Grogan
UH-lH 34-25 Preliminary Airworthiness Evalautlon of the Jun 1986 C. Cassil A182 369UH-IH Helicopter with the T53-L-703 Engine MMJ R. LockwoodInstalled
UH-IH 84-31 Report, Evaluation of the UH-IH with the Hub Sep 83 J. JohnsonLI Spring Improvement CW4 R.. Murrell
tJH-1H 84-33 Combined Preliminary Airworthiness Evaluation Jul 1988 G. Skinner A202 316and Airworthiness and Plight Characteristics J. PiotrowskiEvaluation of the UH-1H with preproduction CPT M. WhiteHub Spring and Composite Main Rotor lades MMJ A. OmlieInstalled MAM J. Brown
UH-IH 85-24 Report, Structural Flight Loads Correlation of Jan 1987 M. GrahamLR the Structural Integrity Recording System (SIRS) W. Abbott
on the UN-IH4 Helicopter
UH-IH 86-03 Letter of Effort, UH-IH Composite Main Rotor May 1986 CPT A. OmnlieLOB Blades Rain Erosion Pattern
.JUH-IH 75-27 Letter of Effort, Qualitative Evaluation of Jan 1976LI JUH-IN with Kaiser 3-Axis MINISTAB
JUH-IH 79-02 JUH-IN Ice Phobic Coating Icing Tests Jul 1980 MMJ P. Morris A096 361R. Woratschek
JUH-1H 31-11 JUH-IN Pneumatic Boot Deicing System May 1983 MMJ R. Oliver A140 986Pligt Test Evaluation R.. Woratschek
CPT L. Haworth
.IUH-IH 83-13 JUN-IH Redesigned Pneumatic Boot Deicing Aug 1937 M. GrahamSystem Flight Test Evaluation CPT L. Haworth
CPT J1. Kimberly
72
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project Ad
Type Number Report Title Date Author(s) Number
JUH-IH 87-08 Letter of Effort, Loads Survey of a JUH-IH Jan 1988 G. Bender
LOE Helicopter with the Modified Second-Generation M. Herbst
Pneumatic Boot Deicing System
NUH-IH 76-13 Airworthiness Evaluation NUH-IH Helicopter May 1977 T. Benson A047 971
with Global Positioning System MAJ C. Thomas
YUH-IH 66-04 Engineering Flight Test of the YUH-IH Nov 1970 F. Dominick 879 656Phase D. Limited LTC E. Nelson
UH-IM 69-21 Letter Report Airworthiness Evaluation of Feb 1970 CW4 W. Connor
LR the UH-IM with Infant Subsystem Installed
UH-IM 70-29 Letter Report, Vibration Survey Tests on the Nov 1970 LTC D. HendricksonLR UH-IM Helicopter with the Forward-Looking
Infrared (FLIR) System Installed
UH-IM 70-29 Vibration and Elevator Loads Survey Tests of the Jun 1971 R. Finnestead a85 839UH-IM Helicopter with the Forward-Looking I TC D. HendricksonInfrared (FLIR) System Installed
UH-IM 71-07 Letter Report, Army Preliminary Evaluation May 1971 MAI D. Broadhurst
LR of the UH-IM Helicopter Multifunction CPT B. Nicholson
System (HELMS)
UH-IM 71-09 Letter Report, Follow-On Vibration Survey May 1971 R. FinnesteadLR of the UH-IM/FLIR MAJ R. Holasek
S. Streutker
UH-IM 72-05 Rotor Flow Survey Program UH-IM Helicopter May 1974 B. Boirun 787 428R. JefferisMAJ R. Holasek
NUH-1M 71-30-5 Flight Evaluation, Rosemount Orthogonal Low Nov 1974 CPT J. O'Connor 009 711
Airspeed System, Low-Airspeed Sensor, Final SP4 J. BullockReport V R. Jefferis
NUH-IM 71-30-6 Flight Evaluation, Elliott Dual-Axis Low Sep 1975 F. Dominick A019 360
Airspeed System, LASSIE II, Low Airspeed K. FerrellSensor, Final Report VI CPT J. O'Connor
NUH-1M 73-01 Helicopter Lift Margin System and Low-Speed Aug 1977 F. Dominick A060 553
Performance Evaluation NUH-IM Helicopter D. BelleR. JefferisJ. O'ConnorA. KrynytzkyLTC W. Griffith
NUH-1M 75-17-3 Flight Evaluation Rosemount Low Range Mar 1977 W. Abbott A046 491
Orthogonal Airspeed System with 853 Sensor MAJ J. Guin
NUH-IM 75-22 Letter of Effort, Engine Characteristics Test Jun 1977 F. 9ominickLR
73
IIlL ILIIC()TFrIR TEXTRONINC.
(continmed)
Aircraft Project AdType Number Report Title Date Author(s) Number
EH-1X 81-19 EH-IX Qualitative Flight Evaluation Dec 1981 CW4 R. WilliamsLR G. Yamakawa
EH-IX/ 82-13 Airworthiness and Flight Characteristics of the Jan 1984 LTC G. Downs A147 188EH-IH EH-IX/EH-1H Helicopter Configuration CPT J. Kimberly
CPT R. SavageCW4 J. AdkinsJ. NagalaJ. Inehan
OH-4A 63-23/Pt I Report of the Engineering Flight Test Stability Aug 1964 R. Finnestead 909 271and Control Phase of the OH-4A Helicopter, MAJ J. FosterUnarmed (Clean) and Armed with the XM-7or XM-8 Weapon Subsystem, USATECOMProject No. 4-3-0250-11/12/13
OH-4A 63-23/1l 2 Report of the Engineering Flight Test Perform- Aug 1964 J. Melton 909 272ance Phase of the OH-4A Unarmed (Clean) CWO J. Wtttsand Armed with the XM-7 or XM-8 WeaponSubsystem, USATECOM ProjectNo. 4-3-0250-12/13
JOH-8A 81-09 Preliminary Airworthiness Evaluation of JOH-8A Sep 1981 MAJ A. MarshallClassified
H-13G 61-06 Evaluation of the Mark XII Awdilary Fuel and Jul 1961 CPT J. Johnston 884 884L- 19A On System
OH-13H 62-13 Final Report Engineering Test of the Stability Apr 1964 L. Schroers 951 587aka and Control Characteristics of the OH-13H CWO E. Nelson62-30 Equipped with the XM-l Armament Kit
OH-13H 63-01 OH-13H Gross Weight Increame/XM-1 Jun 1963 R. Finnestead 951 596Armament Kit Performance Test CWO E. Nelson
UH-13R 63-07 Report of USATECOM Project No.4-4-0240-02, Jan 1964 L. Schroers 951 588aka Flight Evaluation of the T63-A-5 Turbo Shaft CPT M. Antoniou63-16 Engine Installed in a UH-13R Helicopteraka64-01
TH-13T 68-21 Letter Report Final Flight Test Results for Jun 1969 CPT J. BreckerLR TH-13T Helicopter
OH-58 83-03 Report, OH-58 Vertical Fin Blockage Evaluation Oct 1983 MAJ A. MarshallLR LTC R. Carpenter
MAJ M. HanksMAJ J. BensonJ. NagataCPT R. SavageCPT F. StellarM GrahamMAJ L. Todd
74
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
OH-58A 68-30 Airworthiness and Flight Characteristics Test Sep 1970 G. Yamakawa 878 560Production OH-58A Helicopter Unarmed and J.WattsArmed with XM27EI Weapon System, Performance
OH-58A 68-30 Airworthiness and Flight Characteristics Oct 1970 E. Laing 875 793Test Production OH-58A Helicopter Unarmed LTC W. Grahamand Armed with XM27EI Armament Subsystem, MAJ P. StringerStability and Control
OH-58A 68-41 Army Preliminary Evaluation Prototype OH-58A Jan 1970 J. Nagata 865 456Helicopter with XM27EI Weapon Subsystem
OH-58A 68-53 Climatic Laboratory Test OH-58A Helicopter Jul 1970 SP4 D. Tyson 875 578Equipped with XM27EI Machine Gun SP4 J. PincavageArmament System N. Donaldson
CW3 J. Thomson
OH-58A 69-16 Height Velocity Test OH-58A Helicopter Jun 1971 J. Watts 884 973CPT G. C.ondonSP5 J. Pincavage
OH-58A 70-15-1 Instrument Panel and Avionics Compartment Sep 1972 E. Laing 907 738Environmental Survey Production OH-58A CPT J. ClaxtonHelicopter MAJ L. Hepler
LTC W. Graham
OH-58A 71-03 Study, Pilot Perceived Jettison Envelope Jun 1973 A. Winn 768 171OH-6A J. KishiAH-56A
OH-58A 71-21 Letter Report, Monitoring of OH-58A Snow Dec 1971 MAJ L. HeplerLR Ingestion Test
OH-58A 71-24 Evaluation of the OH-58A Helicopter with Dec 1972 E. Laing 907 291an Allison 250-C20 Engine T. Benson
SPS A. WemerMAJ D. Broadhurst
OH-58A 71-30 Flight Evaluation, Aeroflex True Airspeed Mar 1973 K. Ferrell 764 240UH-IC Vector System Low-Airspeed System, Final A. WinnF-S1D Report II J. Kishi
B. Jefferis
OH-58A 71-46 OH-58 Autorotational Evaluation Feb 1972 J. Watts 035 727LR V. Diekmann
OH-58A 72-01 Instrument Flight Evaluation OH-58A Helicopter Sep 1972 T. Benson 907 317
MAJ J. Smith
OH-58A 72-03 Fluidic Yaw Damper Evaluation Installed on the Dec 1972 MAJ J. SmithLR OH-58A Helicopter MAJ R. Chaplin
R. Smith
75
BELL hELIACOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
OH-58A 72-14 Helicopter Autorotational Demonstration Jun 1972 J. WattsLR S. Streutker
OH-58A 72-20 Handling Qutalities Evaluation of the OH-58A Feb 1973 R. Smith 909 536Helicopter Incorporating the Model 5703 T. BensonThree-Axis Stability and Control Augmentation MAJ J. SmithSystem
OH-58A 72-24 OH-58A/Insulated Infrared Exhaust Airworthi - Aug 1972 J. WattsLR ness Evaluation S. Streutker
OH-58A 72-31 OH-SIA/ISTAR Airworthiness Evaluation Dec 1972 MAJ R. ChaplinLR G. Bender
OH-58A 73-02 Evaluation of the Teledyne Ryan Model 622 Nov 1973 MMJ C. Mittag 775 806Terrain-Following Radar System Installed T. Bensonon an OH-5IA Helicopter CPT Rt. Taff
CW3 1. Meiss
OH-58A 74-23 Handling Qualities Evaluation OH-58A Feb 1975 E. Balles A033 827Helicopter Incorporating a Ministab 3-Axis R. BuckaninStability Augmentation System CPT C. Mittag
OH-SSA 74-48 Evaluation of an OH-SSA Helicopter with Apr 1975 T. Benson A018 861an Allison 230-C203 Engine Rt. Buckanin
MMJ C. MittagCPT 3. Jenks
OH-58A 77-11 Flight Evaluation, MK 11 Integrated Controller Apr 1978 MMJ J. Hagen A065 072Installed on an OH-S8 Helicopter CPT P. Moe
R. Woratachek
OH-59A 77-34 Preliminary Airworthiness Evaluation OH-5SA/ Dec 1977 G. BenderLR XM-130 Chaff Dispenser CPT T. Burch
JOH-58A 74-22 Engineering Evaluation JOH-59A Helicopter Jun 1975 T. Benson A019 407with an Automatic Engine Relight System R. Buckanin
MMJ C. Mittag
JOH-58A 75-1' Army preliminary Evaluation, JOH-59A Hell- Dec 1975 T. Benson A024 727copter with Low Reflective Paint and Infrared MMJ C. ThomasCotiermesuwe Exhaust System R. Buckanin
JOH-58A 75-24 Integrated Controller Evaluation Sep 1976 CPT J. Arnold A035 064CPT M. MathewsMMJ C. Thomas
JOH-58A 11-10 Report Preliminary Airworthiness Evaluation Sep 1981 MMJ M. StrattonLR of JOH-58A ofth Composite Tall Boom J. Nlemann
YOH-59A 75-20 Army preliminary Evaluation, YOH-58A Dec 1975 G. Skinner A024 501Helicopter with Flat-Plate CPT J. Arnold
76
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
OH-58C 76-11-1 Preliminary Airworthiness Evaluation OH-58C Mar 1978 G. Yamakawa A071 699Helicopter MAJ J. Hagen
R. BuckaninCPT T. Burch
OH-58C 76-11-2 Airworthiness and Flight Characteristics OH-58C Apr 1979 MAJ S. Spring A080 138Interim Scout Helicopter CPT T. Burch
R. BuckaninJ. Niemann
OH-58C 77-26 OH-58C Rain Removal System Test Oct 1977 MAJ J. HagenLR
OH-58C 78-09 Preliminary Airworthiness Evaluation OH-58C M.y 1980 CW4 J. Bishop A094 I lHelicopter with a Mast Mounted Sight CPT M. Hanks
T. BensonA. Arrigo
OH-58C 78-12 Letter Report Airworthiness and Flight Feb 1981 MAJ R. CarpenterLR Characteristics Test of OH-58C with XM-130 G. Yamakawa
Chaff Dispenser System
OH-58C 79-12 Letter Report, OH-58C Directional and Mar 1981 CW4 J. BishopLR Longitudinal Control Mapping Evaluation T. Benson
D. Ottomeyer
OH-58C 79-15 Preliminary Airworthiaess Evaluation, OH-58C Dec 1979 T. BensonLR Helicopter with Installed Bell Helicopter CW4 J. Bishop
Textron Model 206L-1 Tail Rotor
OH-58C 79-18 Letter Report Preliminary Airworthiness Jul 1980 T. BensonLR Evaluation OH-58C Helicopter with 206L-1 CW4 J. Bishop
Tail Rotor and Bell Helicopter Textron 570B D. OttomeyerStability and Controi Augmentation System MAJ 1. Benson
OH-58C 79-23 Letter Report Preliminary Airworthiness Jun 1980 MAJ J. BensonLR Evaluation OH-58C Configured with a Wire T. Benson
Strike Protection System
OH-58C 80-15 Preliminary Airworthiness Evaluation of the Jul 1981 LTC R. WardLR OH-58C Helicopter with Fixed Short Landing MAJ J. Benson
Gear with Two Position Landing Gear G. Yamakawa
OH-58C 80-21 Preliminary Airworthiness Evaluation of OH-58C May 1981 MAJ J. BensonLR Expanded Gross Weight and Lateral CG G. Yamakawa
Envelope
OH-58C 81-05 Report OH-58C Wire Strike Protection System Jul 1981 LTC R. WardLR (WSPS) Lower Cutter Ground Contact MAJ J. Benson
Investigation
Off 58C 81-07 Airworthiness and Flight Characteristics of an Oct 1981 MAJ A. Marshall Al 12 58IOH-58C Configured to a Light Combat LTC R. WardHelicopter (LCH) R. Woratschek
77
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Numbcr
OH-58C 80-19 Report Preliminary Airworthiness Evaluation of Jun 1981 G. YamakawaLR JOH-SIC Modified to a Light Combat Helicopter CPT A. Marshall
with a M197 20MM Gun MAJ R. Carpenter
OH-58C 81-01-4 Fuel Conservation of USA Helicopters, Part 4, Aug 1982 MAJ M. StrattonOH-58C Flight Testing D. Belie
OH-58C 81-14 OH-58C with Installed Mast Mounted Sight Aug 1982 MAJ M. StrattonLR (MMS) Masking & Unmasking Time Line J. Ottomeyer
Analysis Evaluation
OH-58C 81-89 Preliminary Airworthiness Evaluation of the Apr 1982 MAJ A. MarshallOH-5I with Prototype AN/AVR-2 Laser Detection G. BenderSystem Installation
OH-58C 82-02 Preliminary Airworthiness Evaluation of the Apr 1932 MAJ R. MarshallLR OH-5SC with Prototype AN/AVR-2 Laser G. Bender
Detection System Installation
OH-58C 83-15 Preliminary Airworthiness Evaluation of the Oct 1983 MAJ M. HanksOH-58C with 3-Axis Stability Control MAJ L. ToddAugmentation System and Improved Tall J. NagataRotor System M. Graham
OH-58C 83-19 Report, OH-SIC Oil Cooling System Evaluation Apr 1984 MAJ A. MarshallLR C. Cassil
OH-5C 83-30 Report, Pitet-Static System Evaluation of Dec 1983 C. CassilLR OH-58C wit) Air-to-Ground Engagement System MAJ A. Marshall
(AGES) Installed
OH-58C 84-29 Report, Piltot-Static System Evaluation of the Dec 1983 MAJ A. MarshallLR OH-S8C with Air-to-Ground Engagement C. Cassil
System (AGES) Installed
OH-58C 84-34 Flight Test Evaluation of the OH-58C Main Feb 86 M. GrahamRotor Blade Erosion Tape MAJ J. Martin
MAJ F. StellarR. Woratschek
JOH-58C 84-35 Letter of Effort, Transmittal of the Rsults of the Jan 1985 MAJ E. MitchellLOE Qualitative Evaluation for the JOH-S8C Helicopter
JOH-58C 85-03 Airworthiness and Flight Characteristics of the Feb 1986 CW4 J. Webre A180 259JOH-58C (OH-S8X Surrogate) Helicopter MAJ F. Stellar
R. WoratschekM. GrahamMAJ J. Martin
OH-58D 83-26 Preliminary Airworthiness Evaluation (PAE) Dec 1984 G. Bender A178 740of the OH-58D Helicopter (AHIP) CPT J. Kimberly
MAJ E. MitchellMAJ G. Sharon
78
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
OH-58D 83-27 Interim Report, Airworthiness and FIgiht Oct 1984 J. NagataLR Characteristics (A&FC) of the OH-58D Helicopter MAJ G. Bishop
CPT L. CaytonCPT T. WalshMAJ F. Stellar
OH-58D 87-29 Report, Preliminary Airworthiness Evaluation Jan 1988 MAJ F. StellarLR (PAE) of an Increased Gross Weight External G. Bender
Stores Configuration for the OH-58D Helicopter
JYAH -63 74-07-1 Development Test 1 Advanced Attack Helicopter Dec 1976 G. Bender A109 531Competitive Evaluation Bell YAH-63 Helicopter V. Diekmann
CPT M. MatthewsR. SmithMAJ C. ThomasR. WoratschekMAJ J. ArickCPT J. Arnold
Bell 86-08 Report, Technology Flight Evaluation of the CAE Aug 1986 R. Robbins205A LR Electronic Lid, Hand Controller on a Bell 205A MAJ F. Stellar
Helicopter
Bell 87-33 Report, Technology Flight Evaluation of the Apr 1988 MAJ J. Lawrence222 LR Bell Helicopater Textron Inc. (3HTI)/Lucas MAJ W. Carmona
Aerospace Adaptive Fuel Control on a Bell 222 R. BuckaninHelicopter R. Woratschek
Model 61-02 Bell Model 47G-3 High Altitude Flight Evaluation Feb 1961 J. Kidwell 722 8t476-3
Model 62-12 Limited High-Altitude Evalua'ion of the J. Kidwell 884 89647G-3B Bell 47G-3B Helicopter CWO E. Nelson
A. Averill
Model 62-05 Limited Evaluation of the Bell Model 47J-2 May 1962 E. Smith 884-89147J-2 J. Kidwell
Model 83-12 Government Pilot Evaluation of the BHTI 206/ Jan 1985 J. Nagata206 Ring Fin Tail Rotor CW4 J. Adkins
Model 67-06 Letter Report Bell 206A SAS Evaluation P pr 1967 MAJ R. Chubboy206A LR
Model 67-13 Light Observation Helicopter (LOH) Model 206A, Dec 1967 LTC E. Preisendorfer 951 595206A Armed (XM-27E1) and Unarmed, Performance LTC W. Crouch
and Stability and Control F. Dominick
Model Engineering Flight Evaluation of the Bell May 1966 J. Kidwell 811 482209 Model 209 Armed Helicopter USATECOM
Project No. 4-6-0300-01
Model 68-46 Army Preliminary Evaluation of the Prototype Mar 1969 J. Nagata 849 (3211 BHC Model 211 Hucylug LTC T. Wright
MAJ I Rundgren
79
BELL HELICOPTER TEXTRONINC.
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
214ST 85-10 Airworthiness and Flight Characteristics Test Feb 1985 CW4 R. Williams A175 349of the BHTI 214ST Helicopter R. Buckanin
CPT R. Cason
Model 81-13 Letter of Effort for Support of Bell Helicopter Apr 1982 LTC R. Ward214 LOE Textron, Icing Certification of the 214st Helicopter
Model 74-30 Airworthiness and Flight Characteristics Jul 1975 LTC W. Horton B014 228L"14A Evaluation, Iranian Model 214A Helicopter G. Bender
ILt L. FreeCPT J. O'ConnorJ. NagataCPT R. Ward
Model 74-32 Climatic Laboratory Evaluation, Iranian Aug 1976 MAJ R. Ward B030 107L214A Model 214A Helicopter CW4 J. Coleman
D. BelteK. Dorris
Model 77-32 Limited Airworthiness and Flight Characteristics May 1979 MAJ J. Guin A071 271214A Evaluation Model 214A Helicopters with G. Bender
Fiberglass Rotor Blades E. BailesCPT R. Robbins
Model 77-37 Handling Qualities Test on a Model 214A Dec 1977 CPT S. Spring214A LR Helicopter
Model 76-02 Performance and Systems Evaluation Iranian Mar 1977 G. Yamakawa B027 647L214C Model 214C Helicopter t. Woratschek
CPT S. Spring
Model 80-02 Letter Report Preliminary Airworthiness Aug 1980 G. Yamakawa249 LR Evaluation (PAE) of Bell Helicopter Textron MAJ B. Picasso
(BHT) Model 249 Cobra J. Brown
Model 72-10 Attack Helicopter Evaluation Model 309 Jul 1972 J. Nagata 771 151309 KingCobra Helicopter G. Skinner
PFC G. SmithR. JungelMAJ L. HeplerLTC P. Stringer
M ndz. 72-31 Sideward Flight, High-Altitude Evaluation and Aug 1972 J. Nagata A109 512309 aka Simulated Engine Failures KingCobra R. Jungel
72-34 Model 309 Attack Helicopter MAJ L. HeplerPFC 6. SmithG. Skinner
80
BOEING-VERTOL
Aircraft Project AdType Number Report Title Date Author(s) Number
CH-47 67-04 Engineering Flight Test of the CH-47 (Chinook) Mar 1968 A. Higgins 832 821Helicopter Integral Weight and Balance Systems ILT S. Schwartz(ENSURE) H. Catey
MAJ R. Forsyth
CH-47A 66-17 Letter Report of USA Preliminary Engineering Sep 1966 K. FerrellLR Evaluation (Product Improvement Test (PIT) MAJ M. Mattmuller
Limited, Phase B), of the Proposed CH-47A, J. Shapley36,000-pound Flight Envelope, USATECOMProject No. 4-3-0200-32
CH-47A 68-24 Qualitative Flight Evaluation of the Flight Nov 1968 ILT T. Lane 844 426LR Engagement Tactical Cargo Hook (FETCH) on MAJ R. Forsyth
a CH-47A Helicopter LTC T. Wright
CH-47B 66-23 Engineering Flight Test of the CH-47B Mar 1968 G. Yamakawa 834 597(Chinook) Helicopter, Phase D, Interim Report, LTC L. MillerUSATECOM Project No. 4-6-0200-03 MAJ H. Chambers
CH-47B 66-23 Airworthiness and Qualification Test, (Phase D), Mar 1970 G. Yamakawa 871 209CH-47B Helicopter, USATECOM Project LTC L. MillerNo. 4-6-0200-03
CH-47B 68-02 CH-47B Height Velocity Evaluation Feb 1970 CPT A. Hoffman 866 347
MAJ W. DavisJ. Shapley
YCH-47B 66-26 Engineering Flight Test of the YCH-47B, Army Jun 1967 MAJ M. MattmullerLR Preliminary Evaluation I & II, USATECOM G. Yamakawa
Project No. 4-6-0200-02 MAJ D. Dugan
MAJ H. Chambers
YCH-47B 66-26 Engineering Flight Test of the YCH-47B Jan 1969 G. Yamakawa 848 849Helicopter Army Preliminary Evaluation 1, 11, & MAJ M. MattmullerIll, USATECOM Project No. 4-6-0200-02 MAJ D. Dugan
MAJ H. Chambers
CH-47C 66-29 Airworthiness and Flight Characteristics Test Sep 1971 LTC R. Forsyth 892 400CH-47C (Chinook) Helicopter, Performance, J. NagataUSATECOM Project No. 4-6-0201-03 LTC G. Marr
MAJ J. Burden
CH-47C 66-29 Airworthiness and Flight Characteristics CH-47C Mar 1972 J. Nagata 903 488Helicopter (Chinook), Stability and Control, G. SkinnerUSATECOM Project No. 4-6-0201-03 SP4 P. Bohn
MAJ A. ToddMAJ D. Broadhurst
LTC D. Hendrickson
CH-47C 68-22 Rotary Wing Vehicle External Stores Jettison Aug 1970 CPT A. Hoffman 713 872UH-IC Envelope Pilot Established Requirements MAJ W. Davis
81
BOEING-VERTOL(continued)
Aircrart Project AdType Number Report Title Date Author(s) Numbtr
CH-47C 69-17 Height-Velocity Evaluation CH-47C Helicopter Sep 1972 1. Nagata 904 930with TSS-L-11A Engines A. Steinmetz
MAJ A. ToddMAJ J. Burden
CH-47C 70-12 CH-47C 50,000-Pound Gross Weight Evaluation Mar 1971 MMJ A. ToddLR CH-47C ILT D. D'Amore
LTC H. Chambers
CH-47C 70-15-6 Vibration and Temperature Survey Production Sep 1975 E. Laing A022 348CH-47C Helicopter CPT M. Hawley
R. SmihbCPT J. O'ConnorCPT L. Kronenberger
CH-47C 71-41 CH-47C Improved Flight Control System Dec 1972 MAJ W. HortonLR SF4 C. Bowers
CH-47C 72-15 CH-47C Weight and Balance System Mar 1973 J. NagataLR
CH-47C 72-35 Helicopter Icing Spray System Qualification Oct 1973 J. Hayden 775 803E. BailesJ. Watts
CPT L. Brewer
CH-47C 72-39 CH-47C Tandem Cargo Hook Demonstration May 1973 J. NagataLR CPT L. Brewer
CH-47C 73-04 Icing Tunnel Test Hot-Film Anemometer Feb 1974 SP4 P. Bonin A005 044R. Jefferts
CH-47C 73-04-1 Artificial Icing Tests CH-47C Helicopter Aug 1974 MMJ C. Mittag A004 008CPT M. HanksCPT J. O'ConnorCFPT L. Kronenberger
CH-47C 73-05 CH-47C Terminat Radar Area Coffelator Apr 1973 CPT L. BrewerLRt Experiment (TRACE
CH-47C 74-27 CH-47C Prototype Infrared Countermeasures Jun 1974 MMJ W. HortonLR (ICRM) Airworthiness Demonstration Evaluation J. jNagata
SF4 P. Bonin
CH-47C 75-04 Modified Helicopter Icing Spray System Mar 1977 G. Bender A055 039Evaluation CPT M. Mathews
CW4 J. Tulloch
CH-47C 75-06 Letter of Effort, CH-47C, Active Arm External Apr 1976 CPT G. Nepereny LRLoad Stabilization System (AAELSS) 11 FlightEvaluation Program
CH-47C 77-24 CH-47C Inlet Flow Distortion Evaluation May 1978 MMJ J. GuinLR
82
BOEING-VERTOL(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
CH-47C 77-29 Airworthiness and Flight Characteristics Aug 1978 MAJ R. TarrLR Evaluation, CH-47C Helicopter with MAJ J. Guin
T55-L-712 Engines G. Skinner
CH-47C 77-31 Preliminary Airworthiness Evaluation CH-47C Apr 1979 MAJ S. Spring A069 S0 Iwith Fiberglass Rotor Blades (with T55-L-712 J. NiemannEngines) MAJ G. Wilson
CH-47C 78-18 Artificial Icing Tests with CH-47CHelicopter Jul 1979 J. Niemann A081-860with Fiberglass Rotor Blades CPT F. Bowers
MAJ S. Spring
CH-47C 79-02-2 Helicopter Icing Spray System (HISS) Nozzle Sep 1981 D. Belte A109 405Improvement Evaluation
CH-47C 80-04 Helicopter Icing Spray System (HISS) Evaluation Jun 1981 R. WoratschekLR and Improvements LTC 0. Wilson
CH-47C 80-13 Helicopter Icing Spray System Calibration, Ice Aug 1981 J. HendersonPhobics and FAA R&D Evaluation R. Woratschek
CPT L. Haworth
CH-47C 80-04-2 Helicopter Icing Spray System(HISS) Evaluation Jun 1982 R. Woratschekand Improvement
CH-47C 82-15-1 Helicopter Icing Spray System (HISS) Structural Aug 1982 R. WoratschekLR Dynamics Evaluation with Fiberglass Blades MAJ M. Hanks
JCH-47C 82-05-3 Helicopter Icing Spray System (HISS) Evaluation Apr 1986 D. BeliteHISS and Improvements
YCH-47C 66-28 Engineering Flight Test of the YCH-47C Mar 1968 MAJ R. ForsythMedium Transport Helicopter Army Preliminary MAJ H. ChambersEvaluation I, Interim Report ILT J. Jester
SP4 F. Wilson
YCH-47C 66-28 Engineering Flight Test of the YCH-47C, Mar 1968 CPT J. Jester 844 427Medium Transport Helicopter Army Preliminary SP4 F. WilsonEvaluation I, USATECOM Project LTC H. ChambersNo. 1-5-0201-02 MAJ R. Forsyth
YCH-47C 66-28 Engineering Flight Test of the YCH-47C, Feb 1969 CPT J. Jester 855 630Medium Transport Helicopter, Army Preliminary ILT T. LaneEvaluation Part II, USATECOM Project LTC H. ChambersNo. 4-6-0201-02 MAJ R. Forsyth
CH-147 75-05 Qualititalve Army Preliminary Evaluation of the Oct 1974 MAJ W. Horton(CH-47C) LR Canadian Production CH-147 Helicopter J. Watts
YCH-47C 66-28 Army Preliminary Evaluation III and IV Oct 1970 CPT J. Jester 878 571YCH-47C, Medium Transport Helicopter, LTC R. ForsythUSATECOM Project No. 4-6-0201-02
83
BOEI NG-VERTOL(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
YCH-47C 68-32 Letter Report of the YCH-47C Helicopter Jan 1969 MAJ G. MarrLR 50,000-Pound Gross Weight Evaluation
CH-47D 82-07 Airworthiness and Flgiht Characteristics (A&FC) Feb 1984 G. BenderTest of the CH-47D Helicopter G. Yamakawa
M. HerbstR. Robbins
CW3 P. Sullivan
CW4 R. Williams
CH-47D 83-04 Preliminary Airworthiness Evaluation, CH-47D May 1983 CW4 R. Williamsat 54,000 pounds Gross Weight CW3 P. Sullivan
R. Robbins
G. YamakawaM. HerbstG. Bender
CH-47D 84-06 Report, Preliminary Airworthiness Evaluation Aug 1984 CW4 P. SullivanLR Test of te CH-47D with Light Weight Airborne R. Woratschek
Forward Looking Infrared (FLIR) System (LAFS) R. RobinsInstalled
CH-47D 85-09 Aerial Refueling Evaluation of the CH-47D Aug 1985 M. Herbst A167 575Helicopter R. Robbins
CW4 P. Sullivan
CH-47D 86-18 Interim Report, Aerial Refueling Evaluation of Jan 1987 R. Robbins1.R the CH-47D Helicopter, Phase I1
CH-47D 86-18 Aerial Refueling Evaluation of the CH-47D Jan 1987 R. RobbinsHelicopter, Phase II MAJ R. Cason
MAJ T. Reininger
CH-47D 88-11 Report, CH-47D Emergency Descent Evaluation Sep 1988 MAJ R. CasonLR CW4 P. Sullivan
R. Robbins
J. Piotrowski
YCH-47D 79-06 Preliminary Airworthiness Evaluation I (PAE 1) May 1980 J. Niemann A092 633of the YCH-47D Helicopter MAJ G. Wilson
MAJ C. AdamCPT F. BowersS. Arthur
YCH-47D 80-05 Letter Report Preliminary Airworthiness Jul 1980 LTC G. WilsonLR Evaluation (PAE) II of the YCH-47D with MAJ C. Adam
Modified Advanced Flight Control J. Nlemann
YUH-61A 74-06-2 Government Competitive Test, Utility Tactical Nov 1976 A. Winn B035 081LTransport Aircraft System (UTTAS) Boeing- MAJ J. JenksVertol, YUH-61A Helicopter F. Deprospero
CPT E. TaveresCPT J. O'Connor
LCdr J. Ludwig
84
BOEING-VERTOL(continued)
Aircraft Project AdType Number Report Title Date Author(s) Numbcr
YUH-61A 75-12-2 Climatic LaLoratory Evaluation, Utility Tactical Jul 1977 D. Belte B031 052LTransport Aircraft System (UTTAS) Boeing- R. Followill
Vertol, YUH-61A Ground Test Vehicle R. SeefeldtD. Wallis
YUH-61A 76-09-2 Artificial Icing Test, Utility Tactical Transport Jan 1977 CPT J. O'Conner At09 515Aircraft System (UTTAS), Boeing-Vertol CPT E. TavaresYUH-61A Helicopter MAJ J. Hagen
Model 70-38 Letter Report, Reevaluation of Boelng-Vertol Oct 1971 G. Yamakawa
347 LR Model 347 LTC D. Hendrickson
Model 70-38 Tech Eval Boeing-Vertol Model 347 Advanced Jan 1972 G. Yamakawa 900 263347 Technology Helicopter, Phase I A. Steinmetz
SP4 R. GreenlandLTC D. Hendrickson
Model 72-12 Engineering Flight Test Boeing-Vertol Model Oct 1972 A. Steinmetz 909 933347 347 Advanced Technology Helicopter Phase II SP4 C. Bowers
LTC A. DeelMAJ W. Horton
BOLKOW-MESSERSCHMIDT-BLOHM
(Germany)
BO-105C 74-16 BO-105C Evaluation Jan 1975 CPT M. MatthewsLR
BK-I 17 84-22 Preliminary Airworthiness Evaluation of the Nov 1985 MAJ G. Sharon B105 302LMBB BK-117 Helicopter (Germany/Japan) MAJ E. Tavares
W. Abbott
R. Adler
85
IliLLER AVIATION
Aircraft Project AdType Number Report Title Date Author(s) Number
OH-5A 63-24/Pt I Report of the Engineering Flight Test of the Aug 1964 R. Turk 909 269OH-5A Helicopter, Unarmed (Clean) and MAJ J. JohnstonArmed with the XM-7 or XM-B Weapon J. BlahaSubsystem, Purl I Stabilitly and Control, J. ReichertUSATECOM Project No. 4-3-0250-31/32/33
OH-5A 63-24/Pt 2 Report of Engineering Flight Test of the OH-5A, Aug 1964 L. Schroers 909 27()
Helicopter Unarmed (Clean) and Armed with CWO E. Nelsonthe XM-7 or XM-8 Weapons Subsystem, Part 11
Performance Phase, USATECOM ProjectNo. 4-3-0250-31/32/33
UH-12E 61-03 High Altitude Evaluation of the Hiller Mar 1961 J. Kidwell 722 82'Model 1961 UH-12E Helicopter MAJ J. Seigler
D. Armstrong
UH-12E 62-07 Evaluation of the Hiller Model UH-12E 1962 J. Kidwell 884 876-4 Helicopter CPT J. Johnston
H-23D 62-03 Qualitative Flight Evaluation of the Torque-Bias, Apr 1962 W. Swope 884 872
Throttle -Governor and Yaw-Damper Systems CPT J. Johnstonfor the Hiller H-23D Helicopter CWO E. Nelson
H-23D 62-04 Evaluation of the SWE-1165 Blade May 1962 R. Finnestead 884 873H-37B TrackerH-21B
lI-23D 63-12 Helicopter Airspeed System Investigation Dec 1962 2LT J. Melton
CPT J. Johnston
McDONNELL DOUGLAS HELICOPTERCOMPANY
(Previously Hughes Helicopter)
OH-6A 63-25/Pt I Report of the Engineering Flight Test Stability Aug 1964 C. Statum 951 591and Control Phase of the OH-6A Helicopter, W. Anderson
Unarmed (Clean) and Armed with the XM-7 orXM-8 Weapon Subsystem, USATECOMProject No. 4-3-0250-51/52/53
OH-6A 63-25/Pt 2 Report of the Engineering Flight Test Perform- Aug 1964 J. Kudirka 951 592
ance Phase of the OH-6A Helicoper Unarmed CPT D. Wray(Clean) and Armed with the XM-7 or XM-8Weapon Subsystem, USATECOM Project
No. 4-3-0250-51/52/53
011-6A 64-31 Final Report of Climatic Hangar Test of the Jul 1965 S. Kennedy 813 ,2
OH-6A Light Observation Helicopter, C. MartinUSATECOM Project No. 4-3-0250-72/80 K. Dorris
86
McDONNELL DOUGLAS HELICOPTERCOMPANY
(Previously Hughes Helicopter)(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
OH-6A 65-37 Letter Report, OH-6A XM-27 Army Preliminary Mar 1969 J. Shapley
LR aka Evaluation J. Nagata65-41B
OH-6A 65-37 Engineering Flight Test (Product Improvement Mar 1968 J. Nagata 834 574
aka Test) of Production OH-6A Helicopter Unarmed H. Wolf
65-41 and Armed with the XM-27E1 Weapon System, J. ShapleyPhase D
OH-6A 65-37 Engineering Flight Test of the OH-6A Helicopter Apr 1969 J. Nagata 855 043(Cayuse), Phase D J. Shapley
OH-6A 67-29 Engineering Flight Test of the Production Jul 1969 ILT T. Lane 859 435
OH-6A Helicopter with Fairings Removed MAJ D. WrayM. Buss
OH-6A 68-42 Performance Evaluation of the OH-6A with Jan 1969 ILT T. Lane 847 558
LR Expanded Tolerance Main Rotor Blades J. ShapleyMAJ I. Rundgren
OH-6A 69-09 5.56/7.62MM Weapons Comparative Evaluation Jun 1971 LTC J. Wing 884 980
OH-6A Helicopter V. DiekmannMAJ R. Holasek
OH-6A 70-15-4 Vibration and Temperature Survey Production Aug 1973 E. Laing 914 172OH-6A Helicopter MAJ J. Smith
CW3 J. Hill
OH-6A 71-03 Study, Pilot Perceived Jettison Envelope Jun 1973 A. Winn 768 171
OH-58A J. KishiAH-56A
OH-6A 71-05 Letter Report, Evaluation of Stability and Jan 1974 V. Diekmann
LR Control Test Methods LTC R. Waddell
OH-6A 71-11 Letter Report, Evaluation, AN/APN 171 Oct 1971 J. Watts
LR Radar Altimeter S. Streutker
OH-6A 72-06 Instrument Flight Evaluation OH-6A Nov 1973 A. Winn 780 016Helicopter, Part I LTC W. Griffith
MAJ C. Mittag
OH-6A 72-06 Flight Evaluation, OH-6A Helicopter Kaiser Feb 1973 A. Winn 781 990
FP-50B Flight Director System, Part I! LTC W. GriffithMAJ C. Mittag
OH-6A 72-21 OH-6A/Bifurcated Exhaust Duct Jul 1972 MAJ R. Chaplin
LR T. Benson
OH-6A 72-28 Engineering Flight Test OH-6A Helicopter Aug 1973 SP4 R. Anderson 913 954
with Cambered Tail Rotor Blades and Pedal LTC R. WaddellForce Compensators
87
McDONNELL DOUGLAS HELICOPTERCOMPANY
(Previously Hughes Helicopter)(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
01-6A 72-32 OH-6A Autorotational Evaluation Nov 1972 MAJ W. Griffith
LR R. McClellan
OH-6A 81-04 Airworthiness and Flight Characteristics Test Nov 1983 CW3 J. Webre A161 255of the OH-6A Configured to a Light Combat CPT E. MarshallHelicopter (JOH-6A LCH) R. Woratschek
R. Adler
JOH-6A 83-05 Airworthiness and Flight Characteristics Test Nov 1983 CW3 J. Webreof the JOH-6A Light Combat Helicopter CPT E. Mitchell
Configured with a Wire Strike Protection System R. WoratschekR. Adler
OH-6A 83-08 Letter of Effort, Government Pilot Evaluation Jun 1983 MAJ R. OliverLOE OH-6A/NOTAR D. Belte
MH-6E 83-07 MH-6E Extended Pilot Tube Modification Aug 83 MAJ R. OliverCalibration and Evaluation MAJ L. Todd
MAJ A. Marshall
MH-6E 84-05 Report, Preliminary Airworthiness Evaluation Sep 84 CW4 J. WebreI.R Test of MH-6E with light Weight Airborne MAJ R. Oliver
FLIR System (LAFS) Installed R. WoratschekR. Adler
N'I I-6A 64-44 Continued Flight Test of the YOH-6A Helicopter, May 1967 F. Dominick A951 S IUSATECOM Project No. 4-3-0250-78 J. Walls
YOH-6A 65-11 Letter Report of Engineering Test of YOH-6A Jun 1966 D. MacphersonLR Helicopter in the Desert Environment, USATECOM
Project No. 4-3-0250-75
OH-6C 71-34 Army Preliminary Evaluation, Prototype Hughes. Feb 1972 G. Skinner 901 268Model 369C (OH-6C) Helicopter R. McClellan
LTC A. Deel
TH-55A 67-22 Engineering Flight Test TH-55A Primary Nov 1969 CPT S. Schwartz 864 071Helicopter Trainer Limited Performance MAJ D. WrayEvaluation
TH-55A 70-24 Autorotational Entry Improvement Program Dec 1972 B. Boirun 908 657TH-55A Helicopter LTC W. Benoit
AH-64 84-10 First Article Preprouction Test of the AH-64 Nov 1984 G. Bener
Helicopter MAJ J. VossMAJ R. MacMullinCW4 J. Adkins
AFf-64 84-23 Report, Artificial and Natual Icing Tests of the Sep 1985 CW4 J. Adkins
L1 AH-64 R. Woratschek
AH-64 84-23 Report, Artificial and Natural Icing Tests of the Jul 1986 CW4 J. Adkins(Phasell) LR AH-64 (Phase II) R. Woratschek
88
McDONNELL DOUGLAS HELICOPTERCOMPANY
(Previously Hughes Helicopter)(continued)
Aircrart Project AdType Number Report Title Date Author(s) Numrhc
A1"[-64 84-23 Artificial and Natural Icing Tests of AH-64 Mar 1987 CW4 J. Adkins A188 231(Phase 11) R. Woratschek
AH-64 85-08 Engine/Airframe Response Evaluation of the Jun 1984 CW4 J. AdkinsAH-64 Helicopter 0. Bender
MAJ J. Correia
AH-64 85-18 Engine/Airframe Response Evaluation of the Nov 1985 CW4 J. AdkinsAH-64 Helicopter G. Bender
MAJ J. Correia
AH-64A 84-08 Letter of Effort, T-28 High Speed Pace Support Jul 1984 J. JohnsonLOE for the AH-64A
YAH-64 74-07-2 Development Test 1 Advanced Attack Helicopter Dec 1976 MAJ R. Stewart A109 532Competitive Evaluation Hughes YAH-64 MAJ R. TarrHelicopter LT M. Hill
B. BoirunT. BensonE. BailesW. Abbott
YA11-64 77-36 Engineering Design Test I, Hughes YAH-64 Sep 1978 MAJ R. Tarr A064 351)Advanced Attack lVelicopter V. Diekmann
MAJ R. StewartP. Woratschek
YAH-64 78-23 Engineer Design Test 2 Hughes YAH-64 Jun 1979 V. Diekmann A098 923Advanced Attack Helicopter T. Benson
R. WoratschekS. SnakenbergMAJ R. TarrMAJ P. MoeCW3 R. Williams
YAH-64 80-03 Engineeing Development Test 4, YAH-64 Jan 1980 G. Bender A098 922Advanced Attack Helicopter MAJ B. Picasso
MA L. HigginsV. DiekmannD. Ottomeyer
YAH-64 80-12 Engineer Design Test, Government EDT-5 Mar 1981 MAJ P. MorrisLR of the Advanced Attac- Helicopter (AAH) D. Ottomeyer
Helicopter (LCH)
YAH-64 80-07 Climatic Laboratory Survey, Hughes Mar 1982 G. Bender A124 6701CPT R. SavageR. Adler
YAH-64 80-08 YAH-64 Icing Survey Sep 1982 MAJ M. Hanks
89
McDONNELL DOUGLAS HELICOPTERCOMPANY
(Previously Hughes Helicopter)(continued)
Aircraft Project AdT'ypc Number Report Title Date Author(s) Nimtwr
YAII-64 80-17-1 Airworthiness and Flight Characteristics Test, Sep 1981 MAJ P. MorrisPart 1, YAH-64 Attack Helicopter J. Ottomeyer
MAJ L. HigginsMAJ B. PicassoCPT R. SavageG. Bender
YAH-64 80-17-2 Airworthiness and Flight Characteristics Test, Feb 1982 MAJ B. Picasso A125 270Pat 2, YAH-64, Advanced Attack Helicopter R. Buckanin
J. OttomeyerMAJ G. Downs
YAH-64 80-17-3 Airworthiness and Flight Characteristics Test, Oct 1982 MAJ B. PicassoPart 3, YAH-64 Advanced Attack Helicopter, R. BuckaninPrototype Qualification Test M, Herbst
MAJ G. Downs
Hughes 79-22 Potential Airworthiness Evaluation of the Jul 1980 MAJ B. Picasso500D LR Hughes 500D CW4 J. Tulloch
G. BenderD. Ottomeyer
Model 80--18 Memo for Record, Preliminary Airworthiness Feb 1981 CW4 R. Wiliais500D LR Evaluation (PAE), of Hughes Helicoplers (HH) W. Norton
5GOMD Modified to a Light Combat Helicopter R. Buckanin(LCH)
KAMAN AEROSPACECORPORATION
UH-2B65-31 Engineering Flight Evaluation of UH-2B Mar 1966 J. Johnson 951 585Armed Helicopter, USATECOM Project W. Anderson No. 4-6-0300-01
90
LOCKHEED CORPORATION
Aircraft Project AdType Number Report Title Date Author(s) Numcr
AH-56A 70-02 Army Preliminary Evaluation I and Research Mar 1972 F. Dominick 905 91oaka and Development Acceptance Test I, G. Bender
71-17 AH-56A Cheyenne Compound Helicopter LTC G. HallR. McClellan
MAJ P. StringerM. Buss
AH-56A 71-03 Study, Pilot Perceived Jettison Envelope Jun 1973 A. Winn 768 121OH-58AOH-6A
AH-56A 72-08 Attack Helicopter EvaluationJ AH-56A Jun 1972 J. Johnson 771 914Cheyenne Compound Helicopter G. Bender
R. McClellan
MAJ J. BurdenCPT M. Larsen
AH-56A 72-44 Engineering Evaluation AH-56A Compound Mar 1973 J. Johnson 910 262Helicopter with Advanced Mechanical G. BenderControl System MAJ J. Burden
PIASECKI AIRCRAFTCORPORATION
H-21B 62-04 Evaluation of the SWE-1165 Blade Tracker May 1962 R. Finnestead 884-873H-23DH-37B
ROTORWAY INC.
Scorpion 70-43 Evaluation of the Scorpion Helicopter Mar 1972 MAJ R. ChaplinLR MAJ J. Alvis
91
SIKORSKY AIRCRAFT DIVISION OFUNITED TECHNOLOGIES
CORPORATION
Aircraft Project AdType Number Report Title Date Author(s) Number
11-34 62-09 H-34 Helicopter 50-Caliber Machine-Gun Oct 1962 J. Kidwell 951 582Gun Kit Calibration CWO E. Nelson
11-37 62-02 Drop Test Evaluation of Mark Xli Auxiliary Feb 1962 2LT J. Melton 884 871Torso Fuel Tank MAJ E. Kleuver
11-37B 62-04 Evaluation of the SWE-1165 Blade Tracker May 1962 R. Finnestead 884 873lt-23DHl-21B
Ci-37B 62-28 Final Report Engineering Test of the CH-37B Mar 1965 R. Turk 884 897CWO J. Watts
Cl 1-37B 64-05 Final Report, USATECOM Project No. Apr 1964 R. Turk 951 5894-4-0180-01, Engineering Flight Tests of the CWO J. WattsCH-37B
CH-53 83-29 Letter of Effort for Support of Marine CH-53 Apr 1984 LTC R. WardLOE Icing Test
CH-54B 70-15-3 Vibration and Temperature Survey CH-54B Mar 1973 E. Laing 910 495Helicopter MAJ R. Merrill
CW4 J. Reid
CH-54B 71-01 Letter Report, Qualitative Evaluation of Aug 1971 J. WattsLR Instrument Flying Qualities of the CH-54B MAJ J. Henderson
Helicopter
CII-54B 71-01 Instrument-Flight-Rules Capability Evaluation Dec 1972 E. Bailes 908 658CH-54B (TARHE) Helicopter V. Diekmann
J. WattsMAJ J. Henderson
CII-54B 72-40 Limited Performance Tests CH-54B (TARHE) Feb 1973 J. Johnson 910 263Helicopter V. Diekmann
SP4 J. JohnsonMAJ R. MerrillCW4 J. Reid
EH-60A 87-06 Report, Preliminary Airwortiness Evalautlion of Apr 1987 CW4 R. MurrellLR the EH-60A CW4 J. Webre
M. Herbst
YEI--60B 87-16 Report, Preliminary Airworthiness Evaluation of Oct 1987 CW4 J. WebreI)LTA IR the EH-60 DELTA CPT D. Downey
F. Dominick
EIt-60A 87-09 Report, Secure Test Site Support of the EH-60A Apr 1987 LTC D. UnderwoodLR
EH-60A 87-09 Preliminary Airworthiess Evaluation of the Sep 1987LR EH-60A Aircraft in a Low Drag Configuration
92
AtD-A207 464 U S ARMV FAVIA1 ENGINEERAhG FLIGHT #tl~t (R~REPORT BIBLIOGRAPHY R(U)AARMYAAVIATION ENGINEERING .FLIGHT ACTIVITY EDWIADS AFB CA S LEW~IS ET AL APR 8
iUNCLASSIFIED F/G 5/2 N
La~ U
liii, . I LS
11111L2 ..6'IH1 12511111. UIII 1.6
MICROCOPY RESOLUTION TEST CHARTNATIONAL BUREAU Of STANDAROS-1963 A
SIKORSKY AIRCRAFT DIVISION OFUNITED TECHNOLOGIES
CORPORATION(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
HH-60A 86-02 Engine/Airframe Response Evaluation of the Oct 1986 G. Bender A184 443HH-60A Helicopter Equipped with the T700-GE-701 CW4 J. AdklnsTransient Droop Improvement Electonic Control MAJ R. LockwoodUnit
SH-60B 84-20 Letter of Effort for Support of Navy SH-60B Feb 1985 MAJ E TavaresLOE Icing Test
SH-60B 85-20 Letter of Effort for Support of Navy SH-60B May 1986 MAJ T. ReynoldsLOE Icing Test
UH-60 82-14 Preliminary Airworthiness Evaluation UH-60 Mar 83 MAJ A. Marshall i32 964Configured with External Stores Support System R. Buckanin(ESSS) MAJ R. Oliver
R. Adler
UH-60 83-17 Preliminary Airworthiness Evaluation of the Aug 1983 CW3 J. MiessUH-60 Helicopter with T700-GE-701A Engine CPT L. HaworthInstalled
UH-60 84-07 Report, Preliminary Airworthiness Evaluation of Aug 1984 R. RobbinsLR the UH-60A With Light Weight Airborne R. Woratschek
Forward Looking Infrared (FLIR) System (LAFS) CPT R. ReynoldsInstalled
UH-60A 77-17 Airworthiness and Flight Characteristics Sep 1981 J. NagataEvaluation UH-60A (Black Hawk) Helicopter G. Skinner
R. BuckaninR. RobbinsCW4 R. Williams
UH-60A 77-17-3 Letter Report UH-60A Aft CG Aug 1980 CPT M. HanksLR MAJ B. Picasso
J. NiemannK. Flaig
UH-60A 77-17-5 Report, Experimental Testing of the UH-60A Nov 1981 R. BuckaninLR Black Hawk Helicopter at HeavyG ross Weight MAJ R. Robbins
and Extended Forward Center of Gravity MAJ J. BensonCPT R. Vincent
UH-60A 77-23 Production Validation Test Government (PVT-G) Oct 1979 G. Yamakawa B050 426Performance Guarantees UH-60A Black Hawk G. BenderHelicopter R. Buckanin
CPT R. RobbinsE. BailesCW4 J. Tulloch
UH-60A 78-01 UH-60A Command Instrument System Mar 1978 LTC W. GriffithLR Preliminary Evaluation MAJ R. Stewart
UH-60A 78-05 Letter Report, Artificial and Natura licing Oct 1979 CW4 J. TullochLR Tests Production UH-60A LTC G. Mullen
D. Belle
93
SIKORSKY AIRCRAFT DIVISION OFUNITED TECHNOLOGIES
CORPORATION(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
UII-60A 78-22 Preliminary Airworthiness Evaluation IfI Apt 1979 J. NagataLR UH-60A Black Hawk Helicopter CW4 J. Bishop
CW3 R. WilliamsG. Skinner
UH-60A 79-11 Letter Report Preliminary Airworthiness Dec 1979 J. NagataLR Evaluation (PAE) liA, UH-60A Helicopter LTC G. Mullen
with the Infrared (IR) Reduction Subsystem CW3 R. WilliamsG. Skinner
UH-60A 79-19 Artificial and "latural Icing Tests Production Jun 1980 CPT M. Hanks A090 527UH-60A Helicopter MAJ L. Higgins A096 239
V. Diekmann
UH-60A 79-24 Validation Flight Test of UH-60A for Rotorcraft Sep 1982 W. AbbottSystems Integration Simulator (RSIS) MAJ J. Benson
CPT R. OliverCW4 R. Williams
UH-60A 79-24-1 Report Flight Evaluation of UH-60 with the Dec 1981 G. SkinnerLR Roll Trim Actuator Disconnected MAJ J. Benson
D. Macpherson
UII-60A 80-14 Limited Artificial and Natural Icing Tests Aug 1981 MAJ M. Hanks Al 12 582Production UH-60A Helicopter (Re-evaluation) V. Diekmannn
MAJ J. Benson
UH-60A 81-16 UH-60A Expanded Gross Weight and Center Aug 1985 R. Buckaninof Gravity Evaluation M. Herbst
MAJ R. MacMullinCW4 J. MiessG. SkinnerMAJ E. TavaresCW4 R. Williams
UH-60A 81-18 UH-60A Light Icing Envelopes Evaluation with Jun 1982 R. Robbins A125 630Deicing Kit Installd but Inoperative
UH-60A 81-20 Report, UH-60A Engine and APU Exhaust Gas Dec 1981LR Temperature Survey
UH-60A 82-03 Letter of Effort for Support of the UH-60A/ May 1982 MAJ A. MarshallLOE C-130 Air Refueling Proximity Test
UH-60A 82-09 Preliminary Airworthiness Evaluation of Apr 1983 CPT R. MacMullin A148 676UH-60A with an Improved Airspeed System G. Skinner
MAJ M. Hanks
UH-60A 82-11 Preliminary Airworthiness Evaluation of UH-60A Oct 1982 CPT R. OliverLR Pilot and Copilot Cockpit Doors Removed CPT A. Marshall
94
SIKORSKY AIRCRAFT DIVISION OFUNITED TECHNOLOGIES
CORPORATION(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
UH-60A 82-15 Airworthiness and Flight Characteristics of the Dec 1983 MAJ A. MarshallUH-60A Configured with the Prototype External MAJ R. OliverStores Support System (ESSS) J. Nagata
C. Cassil
UH-60A 82-15-1 UH-60A External Stores Support System Fixed MAy 1984 CW4 R. Williams A147 188Provisions Fairings Drag Determination CPT R. MacMullin
CW4 J. Miess
R. Buckanin
G. SkinnerW. Abbott
UH-60A 83-02 Test Witness Report, UH-60A ESSS External Apr 1983 MAJ G. DownsTWR Stores Separation Flight Test
UH-60A 83-09 Report, UH-60A Engineering Flight Support for Apr 1984 W. AbbottLR Simulation Validation
UH-60A 83-10 Test Witness Report, ESSS, M-56 Helicopter May 1983 CPT F. StellarTWR Mine Dispensing Subsystem Flight Test
UH-60A 83-10-1 Test Witness Report, ESSS, External Stores Jun 1983 MAJ A. MarshallTWR Separation Flight Test
UH-60A 83-22 Limited Artificial and Natural Icing Tests of Jun 1984 MAJ M. Hanksthe External Stores Support System (ESSS) R. WoratschekInstalled on a UH-60A Aircraft
UH-60A 83-24 Airworthiness and Flight Characteristics Test of Jun 1985 MAJ A. Marshall A180 181a Sixth Year Production UH-60A MAJ R. MacMullin
MAJ R. LockwoodMAJ T. ReynoldsMAJ E. TavaresR. Buckanin
G. SkinnerM. HerbstC. CassilCW4 P. Sullivan
CW4 R. Williams
UH-60A 84-17 Report, Infrared Measurement Test of the Sep 1984 MAJ E. TavaresLR UH-60A Helicopter with Garret AiResearch
Infrared Suppressor System Installed
UH-60A 84-28 Flight Evalaution of the UH-60A Helicopter with Sep 1986 CW4 R. Murrell A183 954the Pitch Bias Actuator Centered and Electrically MAJ R. LockwoodDisconnected CW4 R. Williams
M. HerbstG. SkinnerCPT D. Cripps
95
SIKORSKY AIRCRAFT DIVISION OFUNITED TECHNOLOGIES
CORPORATION(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
UH-60A 86-01 Level Flight Performance Evaluation of the Sep 1986 R. BuckaninUH-60A Helicopter with the Production External W. KellyStores Support System and Ferry Tanks Instaled CW4 J. Webre
MAI T. ReynoldsMAJ R. LockwoodCPT R. Cason
UH-60A 86-05 Preliminary Airworthiness Evaluation of the Aug 1987 G. BenderUH-60A with Advanced Digital Optical Control R. RobbinsSystem (ADOCS)
UFI--60A 86-10 Preliminary Airworthiness Evaluation of the Aug 1987 MAJ T. Reynolds A190 604UH-60A Equipped with the XM-139 VOLCANO J. NagataMine Dispensing System MAJ R. Cason
D. Belle
Ull-60A 86-14 Airworthiness and Flight Characteristics Test Aug 1987 MAJ R. Cason A191 414of a Ski Assembly for the UH-60A Black Hawk J. NagataHelicopter MAJ T. Reynolds
D. Belte
UH-60A 86-19 Test Witness Report, UH-60A VOLCANO Jan 1987 MAJ T. ReynoldsTWR Jettison Test
UH-60A 86-21 Letter of Effort for UH-60 Flight Simulator Dec 1986 CW4 R. MurrellEvaluation
UH-60A 86-25 Preliminary Airworthiness Evaluation of the Oct 1987 D. BelteUH-60/ESSS with HELLFIRE Launcher CPT T. WalshInstalled MAJ T. Reynolds
MAJ P. LosierMA R. Cason
UHI-60A 87-23 Report, Evaluation of the UH-60A Cyclic Sep 1987 CW4 R. MurrellLR Stabilator Slew Switch
UII-60A 87-23 Report, EH-60A Stabilator Evaluation, adjunct Apr 1988 CPT D. CrippsLR to AEFA Project No. 87-23
YEII-60A 82-19 Letter of Effort, Transmittal of Selected Aug 1984 G. SkinnerLOE Vibration Date of the YEH-60A Quick Fix System MAJ E. Tavares
CW4 R. WilliamsCPT G Bishop
YEH-60A 83-20 Limited Airworthiness and Flight Characteristics Oct 1984 0. Skinner(A&FC) Test of the Quick Fix Configuration CPT G. Bishop
MAJ E. TavaresCW4 R. Murrell
YEH-60A 83-21 Artificial and Natural Icing Tests YEH-60A Jun 1984 MAJ E TavaresQuick Fix Helicopter CW3 P. Sullivan
MAJ M. HanksR. Woratschek
96
SIKORSKY AIRCRAFT DIVISION OFUNITED TECHNOLOGIES
CORPORATION(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
YEH-60B 82-17 Report, Preliminary Airworthiness Evalaution, Feb 1983 CW3 J. WebreLR YEH-60B with AN/ASN-132 Integrated J. Nagata
Navigation System Installed MAJ J. Brown
UHI-60A 84-29 Report, Evaluation of Solar Heating of UH-60A Nov 1984 MAJ J. VossLR Fuselage Skin CPT G. Bishop
MAJ T. ReynoldsCPT R. LockwoodCPT W. Carmona
CW4 P. Sullivan
UH-60A 85-02 Test Witness Report, Continuation of UH-60A Apr 1985 MAJ T. ReynoldsTWR ESSS, External Stores Separation Test
UH-60A 85-07 Flight Characteristics Test of the UH-60A with Oct 1986 MAJ R. Lockwood A180 791Tail Boom Mounted Strake W. Kelly
MAJ R. Cason
UH-60A 85-14 Report, Phase I! Evaluation of Solar Heating of Dec 1986 MAJ R. CasonLR UH-60A Fuselage Skin (High Temperature W. Kelly
Testing)
UH-60A 85-15 Rotor System Evalaution, Phase I Mar 1988 R. BuckaninW. GouldMAJ P. LosierCPT D. DowneyMAJ R. LockwoodCW4 J. WebreCOL J. HagenMAJ R. CasonC. Young
UH-60A 85-21 Test Witness Report, UH-60A HELLFIRE Jan 1986 MAJ T. Reynolds
TWR Jettison Test
UH-60A 85-22 Report, Evaluation of the Light Helicopter Family Jan 1986 J. Nagata
LR (LHX) Specification Demonstration Maneuvers MAJ R. LockwoodCPT G. Bishop
CW4 R. WilliamsCW4 R. MurrellW. KellyT. Griffin
YUH-60A 74-06-1 Government Competitive Test, Utility Tactical Nov 1976 J. Nagata B059 738LTransport Aircraft System (UTTAS) Sikorsky, G. SkinnerYUH-60A Helicopter S. Kolwey
R. BuckaninMAJ C. MittagLCdr M. CoumatosCW3 J. Meiss
97
SIKORSKY AIRCRAFT DIVISION OFUNITED TECIINOLOGIES
CORPORATION(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
YUH-60A 75-12-1 Climatic Laboratory Evaluation, Utility Tactical Jul 1977 MAJ R. Ward R033 049!LTransport Aircraft System (UTTAS) Sikorsky, J. GivensYUH-60A Ground Test Vehicle E. Walbey
CW4 R. Scefeldt
YUH-60A 76-09-1 Artificial Icing Test, Utility Tactical Transport Feb 1977 R. Buckanin A109 530Aircraft System (UTTAS), Sikorsky YUH-60A CW4 J. Tulloch
YUH-60A 77-18 Preliminary Airworthiness Evaluation, YUH-60A Jan 1978 A. WinnBlack Hawk Helicopter with Electronic Flight MAJ C. MittagControl System CW4 J. Bishop
J. Nagata
YUH-60A 78-11 Preliminary Airworthiness Evaluation IIA Dec 1978 CW4 J. BishopLR YUH-60A Helicopter with Production Avionics, CPT T. Burch
Electronic Flight Control System and Command CW3 R. WilliamsInstrument Systems
S-61 65-27 Engineering Evaluation of S-61 Armed Mar 1966 D. MacphersonHelicopter J. Watts
S-67 72-09 Attack Helicopter Evaluation Blackhawk S-67 Jul 1972 G. Yamakawa 771 161Helicopter A. Wlnn
R. SmithSP4 R. Anderson
MAJ W. GriffithMAJ W. Horton
S-67 72-26 Attack Helicopter High-Altitude Evaluation Jul 1972 G. Yamakawa 771 051Blackhawk S-67 Helicopter A. Winn
MAJ W. Horton
S-76 81-15 Letter of Effort for Support of United Apr 1982 LTC R. WardLOE Technologies Corporation, Sikorsky Aircraft
Division, Icing Certification Effort of the S-76Helicopter
98
MISCELLANEOUS
Aircraft Project AdType Number Report Title Date Author(s) Number
61-04 Limited Cold Weather Evaluation of Multi- Jun 1961 A. Ruddell 884 882Purpose Ground Service Unit Model 2100-5
61-05 Evaluation of the Republic Electronic Industries Jul 1961 CWO D. Scott 884 881Pitot and Static System Tester
61-08 Evaluation of the Aerosonic Corporation Pilot Nov 1961 CWO D. Scott 884 889and Static System Tester
61-09 Evaluation of the North American Aviation 1961 W. Swope 884 885Inc. Dynamic Flight Simulation
61-10 Evaluation of the North American Aviation 1961 W. Swope 884 8L)0Inc. Visual Presentation Flight Simulator
62-06 Evaluation of the Helicopter Load and Hovering May 1962 W. Golyer 884 875Computer A. Higgins
65-46 A Note on Rotary Wing Hovering and Takeoff 1965 J. KidwellPerformance, Data Acquisition and Analysis
68-49 Letter Report, Evaluation, High-Speed Swivel- Apr 1971 E. BailesLR Head Pilot Probe
70-16 Interim Report, Comparison of VSTOL Sep 1970LR Specification to Helicopter Flight Test Data
70-17 A Portable Instrumentation Kit Feasibility Study Jun 1972 R. Jefferis 751 188W. Rivers
70-19 Letter Report, Advanced Instrumentation and Mar 1972 V. DiekmannLR Data Analysis System Demonstration
71-32 Utility Tactical Transport Aircraft System Apr 1972 G. Yamakawa 902 767(UTTAS) Maneuvear Criteria MAJ G. Broadhurst
MAJ J. Smith
73-71 Minutes of AVSCOM Helicopter IFR Conference Jan 1973
74-77 Rotary Wing Icing Symposium Summary Jun 1974 COL D. WrightReport CommanderVolume I A061 445
Volume II A061 422Volume III A061 423
74-87 Flight Evaluation of Non-Dimensional Static- Jul 1979 B. Boirun A082 831Longitudinal Stability Test Methods K. Ferrell
MAJ J. Jenks
74-94 An Advanced Instrumentation and Data Jul 1973 R. Lewis 882 771Analysis System for Army Flight Testing SlDX
75-28 Letter of Effort, Phase II of Joint Acoustics Jan 1976 CPT J. ArnoldLOE Test Program with AMRDL/AMES
99
MISCELLANEOUS
(continued)
Aircraft Project AdType Number Report Title Date Author(s) Number
77-02 Temperature Effects of Sunlight on Helicopter Feb 1977 MAJ M. MathewsLR Rotor Blades
77-14 Letter of Effort, Lightweight Launcher Vibration Jun 1977 MAJ C. ThomasLR Study T. Benson
MAJ P. Moe
81-01-6 Fuel Conservation Evaluation of US Army, Jul 1986 F. DominickPart 6, Performance Calculator Evaluation MAJ R. Lockwood
81-12 Preliminary Airworthiness Evaluation System Jun 1982 MAJ D. Underwood B073 268Platform II Individual Lift Device (ILD) J. Nagata
81-90 US Army Aviation Engineering Flight Activity Jun 1982 K. Ferrell A129 859(USAAEFA) Report Bibliography I. Tucker
81-90-1 US Army Aviation Engineering Flight Activity Mar 1984 K. Ferrell(USAAEFA) Report Bibliography Update 1981-1982 1. Tucker
82-05-2 Report, Helicopter Icing Spra System (HISS) Oct 1985 D. BelieLR Evaluation and Improvements
84-03 Letter of Effort, Test Pilot Support for Scout/ Mar 1984 MAJ A. MarshallLOE Attack Helicopter Simulation Study Simulator
84-30 Letter of Effort, Evaluation of the MCT Jul 1986 K. FerrellLOE ROTORTUNER
84-90 US Army Aviation Engineering Flight Activity Jan 1985 1. Tucker(USAAEFA) Report Bibliography 1983-1984 M.A. Lake
K. Ferrell
85-19 Letter of Effort, Advanced Digital-Optical Dec 1985 CW4 R. Williams
Control System (ADOCS) Single Pilot Simulator CW4 J. Webre
85-25 Letter of Effort, Test Pilot Support for NASA- Mar 1986 MAJ G. SharonLOE Ames Simulation of LHX Tyne Handling MAJ F. Stellar
Qualities
86-04 Letter of Effort, Test Pilot Support for NASA- Jul 1986 CW4 J. WebreLOE Ames Single-Pilot Advanced Cockpit Engineering MAJ T. Reynolds
Simulation (SPACES) Evaluation LTC D. UnderwoodCPT R. Cason
87-03 Letter of Effort, Aviation Engineering Flight Jul 1987 CW4 J. LyleLOE Activity Participation in Air-to-Air Combat
Test IV (AACT IV)
87-10 Report, Technology Flight Evaluation of the Jun 1987 CPT D. DowneyLR NOTAR Anti-Torque System COL A. Todd
C. Cassil
87-28 Letter of Effort for Joint NASA-Lewis/U.S. Aug 1988 R. RobbinsArmy Aviation Engineering Flight Activity D. BelieIcing Flight Research
100
MISCELLANEOUS(continued)
Aircrart Project AdType Number Report Title Date Author(s) Number
88-07 Letter of Effort, Support to the U.S. Naval Jun 1988 MAJ T. WallaceAir Test Center Evaluation of an AcousticAir Data Sensor Device (Mini-SODAR)
88-09 Letter of Effort, IR Imager Support to Naval Jun 1988 MAJ T. WallaceLOE Weapons Test Center (NWC)
88-12 Report, Pilot Support of Adaptive Fuel Control Sep 1988 MAJ J. LawrenceLOE Development Flight Tests R. Buckanin
88-12 Report, Pilot Support of Adaptive Fuel Control Aug 1988 MAJ J. LawrenceLR Development Flight Tests R. Buckanin
88-18 Letter of Effort, Support to the USAF Space Nov 1988 CPT M. WhiteLOE Test Office, Militaty Man in Space (MMIS) MAJ T. Wallace
Equipment and Procedures Evaluation
101
APPENDIX A
Quick Reference List of Aircraft By Contractor
FIXED WING
BEECH AIRCRAFT' ROTEC ENGINEERING, INC.Rally Ultralight
T-34T-4 2 RYAN AERONAUTICAL CORP.U-8 XV-5AU2-21Model 300 RUTAN AIRCRAFT FACTORY INC.C-i 12 LONG-EZRC- 12
SCHWEIZER AIRCRAFT CORPORATIONBELL HELICOPTER CORP SA 2-37A
XV-3 TG-8A
BREGUET AVIATIONModel 941
CANADAIR, LTDCL-215
CESSNA AIRCRAFT CO.L- 190-2A
DeHAVILLAND AIRCRAFTCV-2CV-7U-6
GRUMMAN CORPOV- ITBM-3TS-2A
LOCKHED CORPORATIONYO-3
NORTH AMERICAN AVIATIONTB-25F-5 1
P1 LATUSqPC-6A
102
BELL HELICOPTER TEXTRON ROTORWAY INC.AH-1 ScorpionUH-1H-13 SIKORSKY AIRCRAFTOH-58 H-34AH-63 H-37EH-IX CH-54JOH-8A UH-60Model 47G3 EH-60Model 47J2 HH-60Model 205A S-61Model 206 S-67Model 209 S-76Model 211 SH-60BModel 214Model 222Model 249Model 309
BOEING VERTOL CO.CH-47UH-1Model 347
BOLKOW-MESSERSCHMITT-BLOHMBO-105BK- 117
HILLER AVIATIONOH-5UH-12H-23
McDONNELL DOUGLAS HELICOPTER CORPORATIONOH-6TH-55AH-64MH-6EModel 500
KAMAN AEROSPACE CORP.UH-2B
LOCKHEED CORPORATIONAH-56
PIASECKI AIRCRAFT CORPORATIONH-21
103
4,