IntroductionIt is a pleasure of mine to tell you about my company IKY Technosoft Pvt. Ltd. which is an Engineering Service Provider Company based on Jaipur, Rajasthan, India.IKY Technosoft Private Limited is a Private Company incorporated on 28 October 2014. ... Directors of IKY Technosoft Private Limited are Mr. Ippan Kumar Yadav and Mr. Amar kumar Yadav.We aspire to develop and deliver a value system to the customer with excellent quality and cost effectiveness and with a focus on speed

ServicesMobile Tower Upgradation & Maintenance R-APDRP, POI, and GIS Survey Modem Installation Annual Maintenance Contract(AMC) Auto CAD Designing and Drafting Auto CAD GIS Mapping work HVAC/LVAC Tower Line Maintenance and Survey Sub Station Maintenance and Survey Data Conversion/Creation

LIVE PROJECTSOnline Exam portalMobile Tower Maintenance (Rajasthan)BTS InstallationElectrical Modem Installation (Kota)R-APDRP Survey (Goa)Mould & Foundation Civil Construction Work (Rajasthan)

WORKING WITH

Aditya Engineering and GIS Solution ADCC Ask Me Dot Square Getit Infoservies Pvt. Ltd. HCL Petro IT Partap Engineering Softech Solution Cosmo InfrasolutionRS Infrasolutions

Mobail Tower Maintenance

MCCB BOXIIPMS(Intelligent Power Management System)PIU(External, Internal)(Power Interference Unit)DG(Distributed Generation)SMPS(Switch Mode Power Supply)Battery BankACDB(Alternative Current Distribution Box )DCDB(Direct Current Distribution Box)Cable Tray Transmission RackBiniks Box CONTENT

12. EGB (External Grounding Base)13. IGB (Internal Grounding Base)14. B.B And SMPS COMBO15. Duck Pipe16. SPD (Surge Protective Device)17. GI Strip18. Module ( Rectifire )19. Power Cables20. Aviation Lamp21. LA ( Lighting Arester )22. AC (Air Condisner)23. Earthpit

PIU(Power Interface Unit)PIU work on three phase AC supply input and two phase AC supply output each phase 230 volts. PIU control ac power coming from DG and MCCB boxPIU mostly used in telecom sector.PIU work on automation Output supply conncting with ACDB (when outdoor PIU) and SMPS ( when indoor PIU)

IIPMS (Intelligent Power Management System)IIPMS work as a PIU but there no recured any SMPS or ACDBIIPMS direct convert 440 volt AC supply into 48 volt DC supplyIIPMS always outdoorWhen shelter is avalable on the site then ACDB and DCDB COMBO installed in the shelter

SMPS(Switch Mode Power Supply) SMPS convert 230 volt AC power into 48 volt DC power by the using module ( rectifier) Input supply of SMPS coming from PIU or ACDBSMPS mostly use for destibut 48 volt DC power to opratior

Battery Bank

Battery bank is used for backupBattery bank provide standby power for equipment Batteries provide direct current (DC) electricity, which may be used directly by using SMPS equipment

DCDB(Direct Current Distribution Box)

DCDB is used to protect the system if there is any fault during failure in DC side It a important part of SPV system as there should be adequate protection in DC sideThe DCDB incorporates isolator/breaker to switch off the system during fault, there is a meter which tells you exact PV array voltage and current you are getting. It also have surge protection to save your system from

ACDB(Alternative Current Distribution Box)

ACDB used for distribute the AC power to the equipment.It is used when PIU outdoor and when PIU not avalable at the site.

Shelter Grid

Shelter grid is made from highly insulated prefabricated.

Shelter grid used when equpment more then four in the shelter then it is used for grounding of all equpment.Shelter grid is connected with EGB

EGB (External Grounding Base)

EGB is the reference point in an electrical circuit from which voltages are measured, a common return path for electric current, or a direct physical connection to the Earth.In electrical power distribution systems, a protective ground conductor is an essential part of the safety earthing system.

Instruction Regarding SiteCall The Technician Of SiteSite Engineer Send The Pic With INDUS Id And SafetySend All Pics After Work Start After All Work Finish Sign The MBSite Engineer Leave Site After Permission Granted By Project Coordinator or Project HeadAll Remaining Material Submit In The Office

GATEMCCBDG PAD!.25X3SHELTER PIUSMPSBBrackBTS

TOWER

CABLE TRAYBasic Block Diagram Of Electrical Site With internal PIU

GATEMCCBDG PAD!.25X3SHELTER SMPSBBrackBTS

TOWER CABAL TRAYOUT DOORPIUACDB Basic Block Diagram Of Electrical Site With External PIU

DG PADIIPMS AND BB PADBTSPAIDMCCBGATETOWER

IIPMS

Binix BoxBinix Box is used for alarms where PIU not installed In this alarm is smoke fire and shelter door open