ild related r&d activities @ ifca f uture linear collider workshop, sevilla , feb. 10 th

42
ILD related R&D Activities @ IFCA Future Linear Collider Workshop, Sevilla, Feb. 10 th E. Currás, J.González, D. Moya, F. J. Muñoz, I. Vila, A. L. Virto., J.González Instituto de Física de Cantabria (CSIC-UC) G. Carrión, M. Frövel. Instituto Nacional de Técnica Aeronautica (INTA) M. Ritzert University of Heidelberg. S. Hidalgo, P. Fernández, A. Merlos, D. Quirion, G. Pellegrini, V. Greco, Instituto de Microelectrónica de Barcelona (CSIC)

Upload: chynna

Post on 14-Feb-2016

25 views

Category:

Documents


1 download

DESCRIPTION

ILD related R&D Activities @ IFCA F uture Linear Collider Workshop, Sevilla , Feb. 10 th. E. Currás , J.González , D . Moya , F. J. Muñoz, I. Vila, A. L. Virto ., J.González Instituto de Física de Cantabria ( CSIC-UC ). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

ILD related R&D Activities @ IFCA Future Linear Collider Workshop, Sevilla, Feb. 10th

E. Currás, J.González, D. Moya, F. J. Muñoz, I. Vila, A. L. Virto., J.GonzálezInstituto de Física de Cantabria (CSIC-UC)

G. Carrión, M. Frövel.Instituto Nacional de Técnica Aeronautica (INTA)

M. RitzertUniversity of Heidelberg.

S. Hidalgo, P. Fernández, A. Merlos, D. Quirion, G. Pellegrini, V. Greco,Instituto de Microelectrónica de Barcelona (CSIC)

Page 2: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Outline— A structural and environmental

monitor for Belle-2 vertex detector based on Fiber Optic Sensor (FOS)

—R&D on microstrips sensors (resistive & low signal gain)

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013, DESY. 2

Page 3: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

FOS Monitor

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Page 4: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

L-shape basics — Temperature & strain to displacement transducer

with custom geometry for integration in PXD— Readout speed from zero to 1KHz (vibrations)— Currently three demonstrators manufactured

[email protected], 13th DEPFET Workshop, June 12-15h,2013, RingBerg.

Contact surface

Contact ball

Locked partFBG sensors

Page 5: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

L-Shape Demostrators

[email protected], 13th DEPFET Workshop, June 12-15h,2013, RingBerg.

One millimiter Diameter Quartz contact ball

L-shape tipball

glued

Clamping system

Page 6: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

FOS Monitor Timeline2009 Oct FOS Monitor proposal

2010 Jan Omega-shape proposal

2010 Oct. FOS radiation hardness study (1.5 GRads ,3.3 1015 p/cm2)

2011 January First omega mechanical dummies

2011 Sept. FOS radiation hardness study ( 10 Mrads )

2011 Dec Proof-of-concept-prototype omega

2012 Feb Omega calibration.

2012 March New transducer design L-shape

2012 May Test in depfet mock-up at IFIC

2012 October L –shape calibration

(resolution less 1 um ,accuracy≈10 um )

2013 May Test in mock-up at IFIC (N2 atmosphere)

2014 January commissioning at PXD-SVD common test beam

D.Moya, LC2013 Tracking-Vertex session, Desy May. 30th 2013

,

Page 7: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Thermal calibrations & temperature compensation

[email protected], 13th DEPFET Workshop, June 12-15h,2013,

RingBerg.

— Calibration using a SIKA thermocouples calibrator. — The sensitivity of three sensors was constant and near the same

(difference<0.6%) Maximum deviation < 3 pm (0.3 ºC)

Error X 10Error X 10

Error X 10

— Trivial approach to temperature compensation

Page 8: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Displacement Calibration

[email protected], 13th DEPFET Workshop, June 12-15h,2013, RingBerg.

D.Moya, LC2013 Tracking-Vertex session, Desy May. 30th 2013

Contact ball

Contact surface

Micrometric stage

L-shape

— Displacement measured with Michelson interferometer for high precision calibration (tenth of a micron)

— Readout of L-shape compared with true position (interferometer)

Page 9: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

L-shape Output Stability — Short term studies (temperature constant ± 0.1° )— Continuous readout of the sensor output.— Stabilities below or about 1um (convolution with

mechanics stability)

[email protected], 13th DEPFET Workshop, June 12-15h,2013, RingBerg.

RMS ≈ 0.6 um RMS ≈ 1.1 um

Page 10: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

L-shape Linearity vs. Displacement — Calibration over a range of 1mm— Resolution (readout resolution) 0.5 um.— Accuracy (diff. Between inter & L-shape) ≈ 2 um

[email protected], 13th DEPFET Workshop, June 12-15h,2013, RingBerg.

Sensitivity 1.2 pm/um

Page 11: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

PXD – SVD Integrated test beam

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Page 12: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

PXD – SVD Integrated test beam

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Page 13: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

FOS Monitor: FOS Packing

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Page 14: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

FOS Monitor: DAQ – SC integration

— Optical routing of the sensors up to the interrogating units— Readout integrated in EPICS (dedicated driver over

Ethernet ). The integration went very smooth ready since the January 6th

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Page 15: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

FOS Monitor: Data: MARCO in-let & out-let lines

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Zero degrees cooling

Page 16: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

FOS Monitor Data: Ambient Temp

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Zero degrees cooling

Page 17: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

FOS Monitor: Ambient Temp+%RH

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

N2 injection

Page 18: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

FOS Monitor:Humidity measurements

— Comparing the wavelength shift of ambient sensors (naked fibers) vs. commercial Humidity sensors inside the dry box.

— Excellent linearity and sensibility after temperature compensation

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Page 19: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013, DESY.

Conclusions— A FOS-based temperature and humidity monitor

read-out through EPICS commissioned and running smoothly since the beginning of the test beam.

— Most of the R&D activities required for the implementation of FOS monitor (environmental and displacement) are completed. Still some more “academic “ loose ends to be completed this year.

— Next: System-wise activities for mechanical integration in Belle-II.

Page 20: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

PART 2 - R&D ON MICROSTRIPS

—Microstrip sensors with resistive electrodes.

—Low Gain Microstrip Sensors.

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Page 21: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

R&D Motivation— Charge division in microstrips:

_ Long microstrips ladders (several tens of centimeters) proposed for the ILC tracking detectors.

_ Getting the particle hit coordinate along the strip using the charge division method.

_ Avoid the complexity of double sided sensors and the additional material of a second layer of sensors.

— Low gain segmented p-type pixels (strips) _ Implementing a small gain in the segmented diode so

we can reduce the thickness of the sensors without reducing the signal amplitude

_ Smaller contribution to the material budget.

21E. Currás - LC Workshop 27-31 May 2013, DESY

Page 22: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

22

Simple single-side AC-coupled microstrip detectors

X-coordinate: cluster-finding algorithms for strip detectors.

Aluminiumx

L

S1

S1=f(y)S2=f(L-y)

with resistive coupling electrodes.

AluminiumResistive material

x y

L

S1

S2

Y-coordinate: Resistive charge division method.

Resistive material: high doped polysilicon

** V. Radeka, IEEE Transaction on Nuclear Science NS-21 (1974) 51

** Electrode resistance >> preamplifier impedance.

y A2L A1+A2

=

Charge Division in uStrips

E. Currás - LC Workshop 27-31 May 2013, DESY

Page 23: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

23

• 256 channels• peaking time =

25ns• S/N≈20 for

standard no irradiated detectors

ALIBAVA DAQ system for microstrip detectors, based on

the Beetle analogue readout ASIC

2 Beetle chips

Pulsed DFB laser λ=1060nm

• Gaussian beam spot width ≈ 15 μm

• pulse duration 2ns

3D axis stage with displacement accuracy ≈ 10 μm

Clean room laboratory at IFCA, Santander

Proof-of-Concept Prototype

E. Currás - LC Workshop 27-31 May 2013, DESY

Page 24: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Equivalent Electrical Circuit

24E. Currás - LC Workshop 27-31 May 2013, DESY

Peaking time 25ns (Beetle chip ALIBAVA DAQ

system).• rise time 2ns• Q~4fC

Detector (p+-on-n) model ***80 cells 250 μm

long

p

Vbias

e-

h+

Page 25: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Signal Propagation – Linearity (Simulation)

25E. Currás - LC Workshop 27-31 May 2013, DESY

t tt1

t2

V

ParticleS1 S2 2 mm

S1

S2

y

18 mm

Page 26: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

26E. Currás - LC Workshop 27-31 May 2013, DESY

Systematic error=>

Ballistic deficit

R/l=2.8 Ω/μm R/l=12.2 Ω/μm

20000 events ∀measurement

Page 27: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

27E. Currás - LC Workshop 27-31 May 2013, DESY

Longitudinal spatial resolution for 6 MIPs signal

σA1=1.83 ADU σA2=1.80 ADU

R/l=2.8 Ω/μm R/l=12.2 Ω/μm

1.1% L => 220 μm 1.2% L => 240 μm

A2

A1+A2

Page 28: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

28E. Currás - LC Workshop 27-31 May 2013, DESY

• Test beam at CERN SPS Pion Beam, Nov 2012

• First successful integration and synchronization with AIDA MIMOSA pixel telescope

• Prelimirary results:• Monitoring of beam profile.

• Currently in progress:• Efficiency and resolution using tracking

information.

Test Beam Characterization

Page 29: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Poly

Mimosa

Transparente

Haz RMS de 12 mm

Vista frontal del setup a escala (aproximada)

Page 30: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

30E. Currás - LC Workshop 27-31 May 2013, DESY

s/n test beam vs s/n radioctive source Resistive strips detector

Conventional strips detector

Page 31: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Tracking (Telescopio)

Proyección plano DUT

Trazas del telescopio proyectadas en el plano del DUT

Distribución del número de trazasTotales por evento del telescopio

en el plano del DUT

Page 32: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Tracking (PolyA)

Distribución del número de clustersDetectados en el DUT:Corte de 4 y 2 sigmas

No hay corte en tiempo 0-100 nsCon un corte de 20-40 ns (selecciono

el pico), no varían las resoluciones.

Page 33: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

X Resolution (transversal)

Page 34: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Y resolution (logitudinal)

Se usan sólo los clusters que machean previamente el la posición transversal,Se toma un corte de 5 sigmas (0.025 mm).

Page 35: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Summary

— In terms of position resolution the sensors behaves as predicted. Is it enough ?

— No result on efficiency due to problems with the timing sensor and wrong sensor biasing.

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.

Page 36: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

SEGMENTED P-TYPE SENSORS WITH CHARGE AMPLIFICATION

36E. Currás - LC Workshop 27-31 May 2013, DESY

Page 37: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

37

Charge Multiplication- pixel detectors

We are starting the fabrication of new p-type pixel detectors with enhanced multiplication effect in the n-type electrodes, very low collection times and with no cross-talk.Three different approaches:

1.Thin p-type epitaxyal substrates2.Low gain avalanche detectors 3.3D with enhanced electric field.

Two projects funded by CERN RD50 collaboration to work on these technologies.

E. Currás - LC Workshop 27-31 May 2013, DESY

http://rd50.web.cern.ch/rd50/

Page 38: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

38

Low gain avalanche detectors (LGAD)

Implating an n++/p+/p- junction along the centre of the electrodes. Under reverse bias conditions, a high electric field region is created at this localised region, which can lead to a multiplication mechanism (impact Ionization).

E. Currás - LC Workshop 27-31 May 2013, DESY

285 um

N+

P

High Electric Field region leading to

multiplication

P. Fernandez et al, “Simulation of new p-type strip detectors with trench to enhance the charge multiplication effect in the n-type electrodes” , Nuclear InstrumentsandMethodsinPhysicsResearchA658(2011) 98–102.

Advantages = Thinning while keeping same S/N as standard detectors.

Page 39: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

39

Standard Strip Strip with P-type diffusion

0 5 10 151012

1013

1014

1015

1016

1017

1018

1019

Dopi

ng C

once

ntra

tion

(cm

-3)

Depth (µm)

Phosphorus Boron Net Doping

Strip with P-type diffusion: 2D and 1D doping profiles

Simulation of the Electric Field

E. Currás - LC Workshop 27-31 May 2013, DESY

- To obtain the manufacture parameters (doping profiles)

Page 40: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

40

Red laser TCT characterization

E. Currás - LC Workshop 27-31 May 2013, DESY

285 ume-

h+

Red laser (1060 nm)

Bottom injectionStandard diode n on p P-type diffusion diode

5ns

Page 41: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

Red laser TCT characterization

41E. Currás - LC Workshop 27-31 May 2013, DESY

Charge collection efficiencyStandard diode P-type diffusion diode

Page 42: ILD  related R&D Activities @  IFCA  F uture Linear Collider Workshop,  Sevilla , Feb.  10 th

GRACIAS !

[email protected], 5th PXD-SVD Joint Workshop, January 22-24,2013,

DESY.