ilias gw meeting mallorca - october 23-24, 2005luca taffarello status of the commissioning of the...

26
ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova) on behalf of AURIGA Collaboration

Upload: may-day

Post on 11-Jan-2016

219 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Status of the commissioning of the AURIGA detector

Luca Taffarello

(INFN Sezione di Padova)

on behalf of AURIGA Collaboration

Page 2: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Summary of the talk: New detector set-up First Results, calibration and thermal behaviour Investigation of the un-modelled noise peaks

• Up-conversion of low frequency vibrations

Solution of the problem• New mechanical isolation at low frequency

Result achieved: very stable and gaussian behaviour• Duty Cycle 98 % (from 19th May 2005)

Page 3: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

new mechanical suspensions: attenuation > 360 dB at 1 kHz FEM modelled

new capacitive transducer: two-modes (1 mechanical+1 electrical) optimized mass

new amplifier: double stage SQUID 200 energy resolution

new data analysis: C++ object oriented code frame data format

Expected target AURIGA II run with 1999-2003 upgrades

Page 4: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

II RUN @ T = 4.5K = data = simulation

Best initial result of II run

Noise hunting in cryogenic operation

•Spurious peaks in the sensitive band•High false alarm rate

Page 5: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Non Stationary Performances

F5

F5

F5

F5

F1

F1

F1

F1

It is possible to classify spurious peaks in correlated “Families” (F1..F5..)in time families appear and dissapear

Tim

e (5

hou

rs)

Sensitive frequency band

Page 6: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Measurement of the real part of the impedence seen by the SQUID

No evidence of discharge

HV E bias=7.5 MV/m

‚ ƒ =865.68 Hz

‚ =914.14 Hz

ƒ =955.63 Hz

Calibration: The dissipations of the 3 sensitives modes

Q in operation ~ 400-1000cold-damping

QLV=1.15 106

QHV=1.15 106

QLV=5 106

QHV=0.74 106

QLV=0.45 106

QHV=0.75 106

Page 7: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Calibration: the mechanical transfer function of the antenna

VERY IMPORTANT not evident excitation with mechanical and-or electromagnetic actuators

A

B

C

A

mechanical modes in the transducer charge line

B

Electromechanical modes

C

Mechanical modes of the charge plates

Page 8: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

894 Hz Spurious peak in the sensitive band

SQUID output18-22 Hz

Seismometer 8-22 Hz

Accelerometer Inside vacuum chamber8-22 Hz

4 days friday-monday

Low Frequency Motions are Up-Converted!

Page 9: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Evidence of the connection between the external (seismic) activity

and the spurious peaks excitation in the sensitive band

1

DAY

OUTPUT ofSEISMOMETERon top of the cryostat0-22 Hz

sensitive bandwidth

to determine a correlation between the external disturbances and the response in the sensitive bandwidth

Evidence for nolinear behaviour

Page 10: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Run 590 (Time-Frequency) from Sat 11h-13/11/04 to Mon 12h-15/11/04

Clean Raw Data

Noisy Raw Data

Sat

Sun

Mon

Only during the Sunday nigth it is possible to get clean spectraThe duty cycle “gaussian and stationary” very poor 20 %, evidence of effects of Human Activity

Page 11: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Low frequency mechanical excitation and response in the detector bandwidth

2 example also without electrical field

Shaking frequency 18.62 HzEffect: all the multiple

Shaking frequency 16.57 HzEffect: some cluster with more peaks equidistant 16.57/3 Hz

Not possible to reach shaking frequencybelow 10 Hz the seismic noise is too power

Page 12: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Strategy: new mechanical isolation at low frequency

Step 1: Dissipation stacks material: Polyurethane (Sylodamp by Angst

Pfister),high dissipation Q=2roll-off frequency 8-10 Hz

Step 2: Active-air mounts (Vibraplane by Kinetic Systems)

internal damping Q=2 lower natural frequencies 1-2 Hz,automatic leveling/height control

Hardware up-grades integrated during cryogenic operations

Page 13: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Position control feed-backlift used with the liquid heliuminside the dewars

STEP 1: rubber stacks between floor and cryostat supports2 Dec. 2004

Page 14: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

800 850 900 950 10001x10-22

1x10-21

1x10-20

1x10-19

AURIGA T=4.5K

Sh

h

0.5 [

Hz-1

/2]

Frequency [Hz]

- noise prediction- mechanical thermal - LC thermal- SQUID back action - SQUID additive

First breakthrough: achieved design sensitivity (Dec 2004)

60% DUTY CYCLE !!!

Go ahead !!

Page 15: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

F5 Veto 236.95+/- 0.2 Hz F5 893.63 Hz

F5 Veto

Page 16: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

F5Threshold

veto

F5Noise Amplitude @ 236.95+/- 0.2 Hz

F5Veto

ampl

itude

Page 17: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

AURIGA Events [no vetoes]

SN

R

Italian Holiday

Page 18: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

AURIGA Events AFTER vetoes

SN

R

Is possible to apply the epoch vetoes and the result is a duty cycle 60 %

Page 19: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

SNR Distribution AFTER vetoes (Simulation=Red)

SNR

3 eventswith SNR >10during9 days

Page 20: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Second Step: seismic isolation up-gradeexternal suspensions low frequency with vibrational damping

Air springs: effective above 1-2 Hz

Page 21: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Metal-arc welding on cryostat while keeping liquid helium in

“wings” to support Auriga above the center of mass of the cryostat

Page 22: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Step 2: integration of low frequency suspensions (May 19th)

Final configuration Ferroconcrete Pillar

Page 23: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

“Before the up-grade”

“After the up-grade”

Last breakthrough:

achieved 98% Duty Cycle (May 2005)

Page 24: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

On line effect (May 19th)

suspension activation

1 hour

Sensitive frequency band

Page 25: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Low frequency motion comparison

0 20 40 60 80 1001E-14

1E-13

1E-12

1E-11

1E-10

1E-9

1E-8

1E-7

1E-6Bar endface displacement

24/05/05 air suspensions on 17/05/05 air suspensions off

S xx

1/2

m/H

z1/2

Frequency [Hz]

Page 26: ILIAS GW Meeting Mallorca - October 23-24, 2005Luca Taffarello Status of the commissioning of the AURIGA detector Luca Taffarello (INFN Sezione di Padova)

ILIAS GW Meeting Mallorca - October 23-24, 2005 Luca Taffarello

Absolute amplitude 5.7 10-22 / Hz

Current AURIGA Burst Search• Thermal at 4.5 K • 13.6 days,• Epoch vetoes not needed apart from cryogenic maintenance• Duty time 98%• Very stationary• Gaussian noise• Outliers 9 events/day with SNR > 6• Event rate 3700 /day with SNR > 4