Illiana DBE and Industry Outreach Event

2

The Cooperative Development of the Illiana Corridor through Public Private Partnerships and the States of Illinois and Indiana

3

Agenda

• Project Status• Illinois & Indiana Procurements• The P3 Process• Scope of Work• DBE/Local/Small Firm Opportunities

44

Project Status

National Environmental Policy Act (NEPA)

Design will continue only as needed to achieve environmental permit assurance

All further design will be turned over to the P3 Team

55

Project Status

Right of Way Acquisition• “Background work” underway• Property Acquisition will begin upon

receipt of ROD• IDOT/INDOT Acquiring the Right of Way

Utility Relocation• Utility owners engaged• Work Plan development w/cost estimates

& schedule establishment underway• Utility relocation work may be performed

by the Developer Team

6

Illinois and Indiana Procurements

Illinois Project - IDOT• I-55 to Illinois/Indiana State Line

Indiana Project – IFA/INDOT• Illinois/Indiana State Line to I-65• Widening portions of I-65

Two Projects

Two Procurements

Availability Payment Approach on Both – 35 Year Agreement

77

Illinois P3 Procurement Status & Schedule

o Request for Qualifications Issued November 8, 2013

o Statements of Qualification Due December 19, 2013

o Proposer Shortlist Announcement January 17, 2014

o Draft RFP to Shortlisted Teams January 2014

o Issue Final RFP 2nd Quarter 2014

o Proposals Due 3rd Quarter 2014

o Award & Execution of PPA 4th Quarter 2014

88

o Request for Qualifications Issued November 8, 2013

o Statements of Qualification Due December 19, 2013

o Proposer Shortlist Announcement January 17, 2014

o Draft RFP to Shortlisted Teams January 2014

o Issue Final RFP 2nd Quarter 2014

o Proposals Due 3rd Quarter 2014

o Award & Execution of PPA 4th Quarter 2014

Illinois P3 Procurement Status & Schedule

99

Indiana P3 Procurement Status & Schedule

o Request for Qualifications Issued November 12, 2013

o Statements of Qualification Due January 10, 2013

o Proposer Shortlist Announcement February 19, 2014

o Draft RFP to Shortlisted Teams February 2014

o Issue Final RFP 2nd Quarter 2014

o Proposals Due 3rd Quarter 2014

o Award & Execution of PPA 4th Quarter 2014

1 01 0

Indiana P3 Procurement Status & Schedule

o Request for Qualifications Issued November 12, 2013

o Statements of Qualification Due January 10, 2013

o Proposer Shortlist Announcement February 19, 2014

o Draft RFP to Shortlisted Teams February 2014

o Issue Final RFP 2nd Quarter 2014

o Proposals Due 3rd Quarter 2014

o Award & Execution of PPA 4th Quarter 2014

1 1

Public Private Partnership

Public Private Partnerships (P3) are contractual agreements formed between a public agency and a private sector entity that allow for greater private sector participation in the delivery and financing of transportation projects.

U.S. DOT

Definition

1 2

The P3 Process

Request for Qualifications (RFQ)o Already issued for

both stateso High level team evaluation

based on Major Team Entitieso Results in “Shortlist” for

each state

Request for Proposals (RFP)

o Detailed Technical & Financing Requirements

o Detailed team evaluation including all entities

o “Preferred Proposers” selected based on project approach, team members, price

STEP 1 STEP 2

Two Step

Process

Teams selected based on a Best Value approach • Technical & Financial Capabilities• Price

1 3

State DOT

Permits (+/-)Utilities

RailroadsConcessionaire

(SPV)

Equity InvestorsBanks

BondholdersTIFIA Loans

PABs

O & M Advisors Other

NEPAPermits (+/-)

R/W

Design-Build Joint Venture

Lead DesignerSubconsultants

Construction JVSubcontractors

Material SuppliersFabricators

Etc.

ContractorSubcontractors

Material SuppliersFabricators

Etc.

Engineering Services

P3Contractual Structure

1 41 4

Scope of WorkDBE/Local/Small Firm Opportunities

o “Typical” construction but on a much larger scale

o Potentially Construction Engineering and Inspection (CEI)

o Long Term Operations and Maintenance

o Design Elements

What are the

SpecificOpportunities

?

1 51 5

DBE Scope of Worko 91 Bridgeso 38 Box Culvertso Drainageo 14 M CY of

Earthworko 17 M lbs. of

Structural Steel

o Erosion Controlo Signingo Pavementso Traffic Controlo Highway Lightingo Utilitieso Misc.

o 43 Bridgeso 28 Box Culvertso Drainageo 3.5 M CY of

Earthworko 2 M lbs. of

Structural Steel

o Erosion Controlo Signingo Pavementso Traffic Controlo Highway Lightingo Utilitieso Misc.

o All Design Elements

o Operations & Maintenance

o Potential CEI, Design, & General Engineering Assessments

Construction

SCOPE

Non-Construction

SCOPE

1 6

DBE/Local/Small Firm Opportunities

How do DBE/Local/Small firms get engaged in this project?

• Take advantage of this Forum• Engage with

Developers/Contractors/Design firms as soon as possible

• Watch the website for shortlist announcement

• Reach out to ShortlistedTeams – Teams will continue to form during the Proposal preparation period

• A DBE Coordinator is expected on all Shortlisted Teams

• 2nd Forum after Shortlisting Announcement

• Become familiar with the procurement documents found on the website

• Ensure that Certifications are up to date in each state

1 7