ilrs 2008 poznan, poland - 13-17 october 2008 development of quality control tools for the mlro g....

21
ILRS 2008 Poznan, Poland - 13-17 October 200 ILRS 2008 Poznan, Poland - 13-17 October 200 8 Development of Development of quality control quality control tools for the MLRO tools for the MLRO G. Bianco G. Bianco , V. Luceri, D. Iacovone , V. Luceri, D. Iacovone

Upload: francine-cole

Post on 16-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

Development of Development of quality control tools quality control tools for the MLROfor the MLRO

G. BiancoG. Bianco, V. Luceri, D. Iacovone, V. Luceri, D. Iacovone

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

One year ago…One year ago…

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

At that time we At that time we concluded…concluded… A A dedicateddedicated SLR system engineer is SLR system engineer is

mandatory.mandatory. A set of A set of quasi quasi real-time SLR station real-time SLR station

health indicatorshealth indicators should be agreed should be agreed upon, defined and developed by upon, defined and developed by system specialists and data analysts. system specialists and data analysts. This should allow to rapidly pinpoint a This should allow to rapidly pinpoint a problem arising at a stationproblem arising at a station

Is range bias monitoring enough?Is range bias monitoring enough? Standardizing calibration procedures?Standardizing calibration procedures?

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

The three souls in SLR:The three souls in SLR:

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

The scientist (DA)The scientist (DA)

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

The engineer (EN)The engineer (EN)

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

The operator (OP)The operator (OP)

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

Internal QCInternal QCData acquisition

send data

Report to DA Check

OP

CheckDA

Action (EN/AD/OP)

Feedback to OP

OP = OperatorsDA = Data analystsEN = Engineers

ok

nok

ok

nok

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

Internal QCInternal QC

Acquisition phaseAcquisition phase– Calibration stability (mean, rms)Calibration stability (mean, rms)– Pass parameters stability (editing, Pass parameters stability (editing,

rms, other)rms, other) Routine checksRoutine checks

– Diagnostics, calibrationsDiagnostics, calibrations– Other procedures in collaboration Other procedures in collaboration

with ENwith EN

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

MLRO health indicator MLRO health indicator parametersparameters Automatically monitored params Automatically monitored params

(DA is automatically notified if (DA is automatically notified if threshold values are reached):threshold values are reached):– System delay rms (should be <2 System delay rms (should be <2

mm)mm)– System delay variationsSystem delay variations– Transmitted energy stdTransmitted energy std– Pass residuals rmsPass residuals rms

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

System delaySystem delay

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

External QCExternal QC

Info from Analysis Center

No action

Action(EN/DA/OP)

CheckDA

OP = OperatorsDA = Data analystsEN = Engineers

ok

nok

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

External QCExternal QC

ILRS reportsILRS reports ILRS station performanceILRS station performance Biases from Hitotsubashi Univ.Biases from Hitotsubashi Univ. GeoDAF MLRO monitorGeoDAF MLRO monitor

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

ILRS 2008 Poznan, Poland - 13-17 October 2008ILRS 2008 Poznan, Poland - 13-17 October 2008

Lesson learned, and Lesson learned, and conclusionsconclusions Improve interaction between DA, Improve interaction between DA,

EN and OPEN and OP Web based monitor system on line Web based monitor system on line

and workingand working Better understanding of the systemBetter understanding of the system Clear identification of issuesClear identification of issues Still a lot to be done…Still a lot to be done…