implementation of internal quality audits in a large...
TRANSCRIPT
![Page 1: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/1.jpg)
CONFIDENTIALCONFIDENTIALCONFIDENTIALCONFIDENTIAL
Produced by: Information Technology / KFQMDate: February 2006
Slide 1
IMPLEMENTATION OF INTERNAL IMPLEMENTATION OF INTERNAL IMPLEMENTATION OF INTERNAL IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE IT QUALITY AUDITS IN A LARGE IT QUALITY AUDITS IN A LARGE IT QUALITY AUDITS IN A LARGE IT ORGANIZATIONORGANIZATIONORGANIZATIONORGANIZATION
Michael K. SteinhMichael K. SteinhMichael K. SteinhMichael K. Steinhööööfel, Petros Matiatosfel, Petros Matiatosfel, Petros Matiatosfel, Petros Matiatos
SOFTWARE & SYSTEMS QUALITY CONFERENCESSOFTWARE & SYSTEMS QUALITY CONFERENCESSOFTWARE & SYSTEMS QUALITY CONFERENCESSOFTWARE & SYSTEMS QUALITY CONFERENCES
Düsseldorf, 11 May 2006
![Page 2: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/2.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 2
� Introducing Credit Suisse It's approach to fulfill CMMI process
and product quality assurance requirements
� Presenting the set up challenges and risks
� Showing you the organization deployment
� Sharing lesson learnt with you
Presentation Objectives
![Page 3: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/3.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 3
Content
� Company profile
� Development framework
� Internal assessment process
� Organizational deployment
� Operational results
� Lessons learnt
![Page 4: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/4.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 4
Company ProfileKey facts and figures on Credit Suisse Group� Credit Suisse Group’s registered shares (CSGN) are listed in
Switzerland (SWX) and as American Depositary Shares (CSR) in NewYork (NYSE)
� For the first nine months of 2005, the Group reported net income of CHF 4,747 million
� As of September 30, 2005, the Group reported assets under management of CHF 1,404.6 billion
� Total number of staff: around 62,000
� As of September 30, 2005, BIS tier 1 ratio stood at 11.1%
� Winterthur, the insurance business, is a financial investment ofCredit Suisse Group
� The Group’s long term ratings are: Moody’s Aa3, Standard & Poor’s A, Fitch Ratings AA-
![Page 5: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/5.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 5
By 30. September 2005, in Bn. CHF
5
2 666
1 882
1 818
1 781
1 453
1 450
1 440
1 405
1 096
1 067
988
785
783
757
676
670
664
659
659
599
UBS
Allianz Group*
State Street
Barclays*
AXA*
Deutsche Bank
Fidelity Investments*
Credit Suisse GroupCredit Suisse GroupCredit Suisse GroupCredit Suisse Group
Vanguard Group*
JP Morgan Chase
Mellon Financial Corp.
ING Group*
Northern Trust
Morgan Stanley
Merrill Lynch
Goldman Sachs
Aviva*
Citigroup
Prudential Financial*
BNP Paribas*
Company Profile Managed Assets
![Page 6: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/6.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 6
Company Profile Credit Suisse Group at a glance
Credit Suisse
InvestmentBanking
PrivateBanking
Credit Suisse Group
AssetManagement
Life & Pensions
Winterthur
Non-Life
![Page 7: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/7.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 7
CREATE SUCCESS
Business Initiatives
Streamline and disentangle application landscape
Support CS growth strategy
abroad
Maximize the full potential of innovative
banking solutions
IT Priorities
Provide efficient infrastructure within
CSG
Extend global sourcing strategy
Deliver CMMI and OE programs
IT Values
Development Framework IT Priorities
![Page 8: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/8.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 8
Optimising5
QuantitativelyManaged
4
Defined
Managed2
Initial1
Project planingProject monitoring and controlSupplier agreement managementRequirements managementConfiguration managementProcess and Product Quality AssuranceMeasurement and Analysis
3
Development Framework CMMI® Model
![Page 9: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/9.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 9
Development Framework Process & Product Quality Assurance
![Page 10: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/10.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 10
� Coach and Train assessors
� Develop assessment plan
� Coordinate and Communicate
� Track non-compliances
� Report / Escalate
� Prepare for Assessment
� Perform Assessment
� Prepare Assessment Report
� Conduct Debriefing Meeting
� Communicate
Local Assessment Local Assessment Local Assessment Local Assessment Central Assessment Central Assessment Central Assessment Central Assessment Training/SupporTraining/SupporTraining/SupporTraining/Suppor
ca. 100ca. 100ca. 100ca. 100Support
Internal Assessors
(Part Time)
Internal Assessors
(Full Time)
2 Days/M2 Days/M2 Days/M2 Days/M
Internal Assessment ProcessOrganization & Tasks
![Page 11: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/11.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 11
Internal Assessment ProcessCycles and their scopes
Regular Cycle (Regular Cycle (Regular Cycle (Regular Cycle (executionexecutionexecutionexecution of assessments of assessments of assessments of assessments onlyonlyonlyonly))))
2005 2006 2005 2006 2005 2006 2005 2006 2007200720072007Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb MarSept Oct Nov Dec
55 5566 66
77 7788 88
99 99
REQMREQMREQMREQMother PAs
PP, PMC, CM, VERPP, PMC, CM, VERPP, PMC, CM, VERPP, PMC, CM, VERother PAs
PP, PMC, CM, VERPP, PMC, CM, VERPP, PMC, CM, VERPP, PMC, CM, VERother PAs
Mock AssessmentClass A Appraisal
SAMSAMSAMSAMother PAs
CM, VER, SAMCM, VER, SAMCM, VER, SAMCM, VER, SAMother PAs
FieldFieldFieldField
Assessment ScopeAssessment ScopeAssessment ScopeAssessment Scope
PoliciesPoliciesPoliciesPolicies
Deployment Delivery Steps
![Page 12: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/12.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 12
Your taskas a
InternalAssessor
5. Analyze and
Report
Organization
Process Management
Assessment
Scope, Plan
Internal Assessment Process
1. Develop
Assessment Plan
Assessment Report
Assessment Findings
Lessons learned
Improvement Proposal
3. Conduct
Assessment
2. Prepare
Assessment Cycle
Noncompliances4. Resolve
non-compliances
Assessment
Require-
ments
Assessment
Kit
CS IT
Organization
6. Monitor and
Escalate
Project Management
Internal Assessment ProcessContext Diagram
![Page 13: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/13.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 13
IT PLIT PLIT PLIT PL
SectorSectorSectorSector
SubSubSubSub----DepartmentDepartmentDepartmentDepartment
DepartmentDepartmentDepartmentDepartment
CIOCIOCIOCIO
Assessment
6 weeks
3 weeks
3 weeks
3 weeks
1st Escalation 2nd Escalation 3nd Escalation Last Escalation
Internal Assessment ProcessEscalation Procedure
![Page 14: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/14.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 14
Field Training
(3 days)
CMMI Model Training
(2-3 days)
Basic Training for Internal Assessors
(2 days)
Ass
esso
r T
rain
ing
on P
A X
Internal Assessor
Organizational DeploymentTraining Concept
Ass
esso
r T
rain
ing
on P
A Y
![Page 15: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/15.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 15
Understand the CMMI principles
�This course describes the fundamentals of model-based process
improvement
�Illustrates the benefits of process improvement
�Introduces CMMI model content
CMMI Model Training
(2-3 days)
Organizational Deployment Step 1: CMMI Model Training
![Page 16: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/16.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 16
Understand the assessment principles and perform first steps
� Internal Assessment as Quality Management Instrument
� Understanding our internal assessment process
� Required interview techniques
� Soft skills and assessment culture
� Checklists for assessors
� Demonstrations and role-play exercises
Basic Training for Internal Assessors
(2 days)
Organizational Deployment Step 2: CMMI Basic Training for Assessors
![Page 17: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/17.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 17
Train to conduct assessments on real projects
� Field Trainings:Field Trainings:Field Trainings:Field Trainings: Participate in two assessment as co-Assessor and
conduct one assessment as Lead Assessor
� Debriefing MeetingDebriefing MeetingDebriefing MeetingDebriefing Meeting with the experiencedthe experiencedthe experiencedthe experienced internal assessor (Coach)
Field Training
(3 days during 3 weeks)
Organizational Deployment Step 3: Field Training for Assessors
![Page 18: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/18.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 18
Field Training
(3 days during 3 weeks)
Mo Tu We Th Fr Sa/Su
A1 A2 A3 A4 A5
Coach
Internal Assessor (Co-Assessor)
Internal Assessor (Lead Assessor)
Mo Tu We Th Fr Sa/Su
A6 A7 A8 A9 A10
Mo Tu We Th Fr Sa/Su
A11 A12 A13 A14 A15
2nd Week2nd Week2nd Week2nd Week 3rd Week3rd Week3rd Week3rd Week1st Week 1st Week 1st Week 1st Week
CoachCoachCoachCoach
TraineeTraineeTraineeTrainee
TraineeTraineeTraineeTrainee
RolesRolesRolesRoles
Organizational Deployment Step 3: Field Training for Assessors
![Page 19: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/19.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 19
� Internal Assessors are not influenced in their judgment and give only true information based on assessment evidences. Internal Assessors cooperate in a fair, honest, and sincere way.
� Internal Assessors conduct the assessment objectively, professionally and do not represent conflicting or competing interests.
� Internal Assessors handle information received during an assessment confidentially.
� Internal Assessors follow the internal assessment process and are committed to the communicated assessment scope. Internal Assessors conduct only assessments they are competent to perform.
� Internal Assessors give constructively feed back on strengths and potential for improvements. Internal Assessors share their knowledge to support continuous improvement.
Organizational Deployment Code of Conduct
ConfidentialityConfidentialityConfidentialityConfidentiality
ObjectivityObjectivityObjectivityObjectivity
HonestyHonestyHonestyHonesty
IntegrityIntegrityIntegrityIntegrity
ConstructiveConstructiveConstructiveConstructive
FeedFeedFeedFeed----backbackbackback
![Page 20: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/20.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 20
Project scopeProject scopeProject scopeProject scope� Active N+ and N- projects
(international projects excluded)
� Assessment scope identical to Assessment scope identical to Assessment scope identical to Assessment scope identical to previous reporting periodprevious reporting periodprevious reporting periodprevious reporting period
Process scopeProcess scopeProcess scopeProcess scopeCS IT Solution Delivery Policies(effective since 04/05) with specialfocus on� Project Planning� Project Monitoring and Control� Requirements Management
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
REQM PP PMC SAM CM VER PPQA MA TS GOV
Assessment scope: coverage of effective policiesAssessment scope: coverage of effective policiesAssessment scope: coverage of effective policiesAssessment scope: coverage of effective policies
Operational ResultsAssessment Scope
![Page 21: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/21.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 21
� Non-Compliance Distribution by Effective Policies
� Number of closed and open Non-Compliances
� Mean Committed Fix Time of Non-Compliance
� Discovered Non-Compliances per Assessment
� Improvement Recommendations on assessed processes
� Assessment effort
� Assessor and Assessee feed back on the internal assessment
process
Operational ResultsMeasures
![Page 22: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/22.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 22
� No. of non compliances found so far: 1628162816281628
� No. of open non compliances today: 680 680 680 680 ----> open & rework> open & rework> open & rework> open & rework
� No. of closed non compliances so far: 658658658658
� No. of performed assessments so far: 234234234234
� No. of trained assessors so far: 66666666
� Mean time to fix non compliances at current status: 51,43 days51,43 days51,43 days51,43 days
� No. of identified good practices: 11111111
� No. of process improvement proposals: 8888
Operational ResultsKey figures
![Page 23: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/23.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 23
� Involvement of assessor in the definition phase pays out
� Sub department heads as assessors give high degree of credibility
� Cross departmental assessments foster knowledge transfer
� Intensive training and coaching of internal assessors pays out
� A good combination of assessment know how and
organizational/technical experience increases the quality of the
assessment process
� Transparent assessment rules for the Project Manager and the
internal Assessor speed the process execution
� Process improvement requires commitment of senior management
Lessons learnedPractices to follow
![Page 24: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/24.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 24
� Not to have a clean project portfolio before you start the process
� Manual central administration of internal assessments
� Not having a central resource availability plan up front
Lessons learnedPractices to avoid
![Page 25: IMPLEMENTATION OF INTERNAL QUALITY AUDITS IN A LARGE …itq.ch/pdf/sqm/sqm_steinhoefel_CS_Assessment_pr.pdf · Produced by: Information Technology / KFQM Date: February 2006 Slide](https://reader031.vdocument.in/reader031/viewer/2022011913/5fb2f2484ae8867aaf16a3a2/html5/thumbnails/25.jpg)
Produced by: Information Technology / KFQMDate: February 2006
Slide 25
Q&A