implementation of management information system (mis) including...

298
Projects MIS User Manual Version 20.0 Oracle Projects MIS User Manual Implementation of Management Information System (MIS) Including Financial Management System (FMS) ICAR Version No.: 20.0 INDIAN AGRICULTURAL STATISTICS RESEARCH INSTITUTE (INDIAN COUNCIL OF AGRICULTURAL RESEARCH) LIBRARY AVENUE, PUSA, NEW DELHI 110 012 www.iasri.res.in 2013

Upload: ngothuan

Post on 01-May-2019

227 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

Oracle Projects MIS – User Manual

Implementation of Management Information System (MIS)

Including Financial Management System (FMS)

ICAR

Version No.: 20.0

INDIAN AGRICULTURAL STATISTICS RESEARCH INSTITUTE

(INDIAN COUNCIL OF AGRICULTURAL RESEARCH)

LIBRARY AVENUE, PUSA, NEW DELHI – 110 012

www.iasri.res.in

2013

Page 2: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

2 of 298

Project Team

Mission Leader Dr. N.S. Rathor, DDG (Engg.)

IASRI, New Delhi (Lead Institute)

Dr. A.K. Choubey, HoD, CA

Dr. Alka Arora, Sr. Scientist

Dr. Sudeep Marwaha, Sr. Scientist

Smt. Shashi Dahiya, Scientist

Sh. S. N. Islam, Scientist

Smt. Angshu Bhardwaj, Scientist

Sh. Soumen Pal, Scientist (till 30th September, 2012)

Sh. A.P. Sharma, F&AO

Sh. K.P.S. Gautam, SAO

IBM Team

Sh. Amit Bothra

Sh. Madhur Keswani

Sh. Sameer Sachdeva

Sh. Anil Sharma

Sh. Ravi Kant Singh

Sh. Navroz Singh Dhillon

Sh. Alok Saraogi

Sh. Pushpendu Roy

Sh. Sapthagiri Srirangam

Smt. Sneha Yadav

Sh. Sourabh Kumar

Sh. Nitin Batta

Smt. Lakshmi Sowmya

List of Resource Personnel

ICAR

Sh. Devendra Kumar, Dir (F)

Sh. Sanjay Gupta, Dir (A) (till July, 2012)

Sh. J. Ravi, Dir (P)

Dr AK Vasisht, ADG(PIM/ESM)

Ms. Namrta Sharma, DS (P)

Sh. Rupesh Sharma, SO (GA)

Sh. Harpal, SO (Cash-I)

Sh. Dilip Roy, CASH DISBURSEMENT

Sh. SK Behera, DS (GAC)

Sh. Rajiv Mangotra, DS (P)

Smt. Rashmi Rao, Deputy Director Finance

Sh. GP Sharma, DDF

Sh. S K Pathak, SF&AO

Sh. S K Sharma, F&AO

Smt. Sunita Arya, SF&AO

Smt. Rajashree Sunil, US (Tech & WS)

Sh. Naresh Kumar Arora, F&AO (Edn)

Sh. Kanhaiya Lal Chowdhary, DS (Edn)

NDRI, Karnal

Sh. J.K. Kewalramani, JD (Admn) & Registrar

Sh. Vishal Acharya, AF&AO

Sh. Brahm Parkash, AAO

Sh. S George, CF&AO

Page 3: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

3 of 298

CIFE, MUMBAI

Sh. Suresh Chandra, CF&AO

Sh. Suresh Kumar, CAO

Dr. S. Jahageerdar, Officer In-Charge, IT

NAARM, Hyderabad

Sh. Sanjay Kant, JD (Admn) & Registrar

Sh. Jakir Hussain Khilji, F &AO

CMFRI

Sh. Rakesh Kumar, CAO

Sh. AV Joseph, SF&AO

CRIJAF

Sh. K.P. Nath, F&AO

Sh. M.K. Pachauri, SAO

Dr. D. Barman, Scientist

NBPGR

Sh. B K Bansal, F&AO

Sh. S K Sinha, SAO

IARI

Sh. Radhey Shyam, CF&AO

Sh. P.K. Jain, CAO

DKMA

Sh. Himanshu, Scientist, DIPA, ICAR

Sh. Naresh Kumar Arora, F&AO(Edn)

NAIP

Sh. S Bilgrami, CF&AO

Sh. Kumar Rajesh, US

IVRI

Sh. Pankaj Kumar, Joint Secretary

ICAR-REC

Sh. Pushapanayak, CAO

Page 4: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

4 of 298

DOCUMENT RELEASE NOTICE

ORACLE PROJECTS – User Training Manual

Version no: 20.0

Release no:

Date of Release : 20th

August, 2013

Client : Indian Council of Agricultural Research

Project : MIS & FMS Implementation

Author : Sh. Navroz Singh Dhillon

Reviewer : Sh. Anil Sharma Date: 25th August, 2013

Page 5: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

5 of 298

REVISION HISTORY

Document No.:

Document Title: Oracle Projects MIS – User Training Manual

Version No. Issue Date Change Details Owner Authorized by Remarks

1.0 20th

August, 2013 No Previous Document

10.0 25th

November, 2014 Version No. 1.0 Navroz Dhillon

20.0 24th

May, 2015 Updated Report details, Page No.276

Creation of Project Receipts, Page

No. 278

Enter Budget for Externally Funded

Project, Page No. 286

Ravi Kant Singh

Page 6: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

6 of 298

Table of Contents

1 LOGGING INTO ORACLE APPLICATIONS ................................................................................................................................................................................... 8

2 DOCUMENT NUMBERS .................................................................................................................................................................................................................... 14

3 STATUS REPORT ................................................................................................................................................................................................................................ 16

3.1 STATUS REPORT CREATION ................................................................................................................................................................................................................ 17 3.2 STATUS REPORT COMPLETION ........................................................................................................................................................................................................... 23 3.3 STATUS REPORT APPROVAL ................................................................................................................................................................................................................ 34 3.4 SR RELATED REPORTS ....................................................................................................................................................................................................................... 39

4 RPPI (SINGLE INSTITUTE) .............................................................................................................................................................................................................. 48

4.1 RPPI CREATION ................................................................................................................................................................................................................................ 49 4.2 RPPI COMPLETION ........................................................................................................................................................................................................................... 56 4.3 RPPI – OBJECTIVE AND ACTIVITY INFORMATION ................................................................................................................................................................................ 64 4.4 RPPI - ENTER BUDGETARY INFORMATION INCLUDING ITEM DETAILS .................................................................................................................................................. 83 4.5 RPPI – CAPTURING RPPI CHECKLIST ............................................................................................................................................................................................... 94 4.6 RPPI APPROVAL (INCLUDING PME CELL APPRAISAL) ...................................................................................................................................................................... 105 4.7 RPPI RELATED REPORTS ................................................................................................................................................................................................................. 124

5 RPPII .................................................................................................................................................................................................................................................... 125

5.1 RPPII CREATION............................................................................................................................................................................................................................. 126 5.2 RPPII COMPLETION ........................................................................................................................................................................................................................ 132 5.3 RPPII APPROVAL INCLUDING RATINGS ............................................................................................................................................................................................ 155 5.4 RPPII RELATED REPORTS ................................................................................................................................................................................................................ 171

6 RPPIII................................................................................................................................................................................................................................................... 172

6.1 RPPIII CREATION ........................................................................................................................................................................................................................... 173 6.2 RPPIII COMPLETION ...................................................................................................................................................................................................................... 179 6.3 RPPIII CHECKLIST .......................................................................................................................................................................................................................... 194 6.4 RPPIII APPROVAL (INCLUDING RATINGS) ........................................................................................................................................................................................ 205 6.5 RPPIII RELATED REPORTS ............................................................................................................................................................................................................... 218

7 RPPIV ................................................................................................................................................................................................................................................... 220

7.1 RPPIV CREATION AND COMPLETION ............................................................................................................................................................................................... 221 7.2 RPPIV RELATED REPORTS ............................................................................................................................................................................................................... 233

Page 7: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

7 of 298

8 RPPI AMENDMENT .......................................................................................................................................................................................................................... 234

9 PROJECT ABEYANCE/TERMINATION ....................................................................................................................................................................................... 244

10 INTER-INSTITUTIONAL PROJECT.......................................................................................................................................................................................... 255

11 FIND/OPEN A DOCUMENT ......................................................................................................................................................................................................... 266

12 RUN/VIEW A REPORT ................................................................................................................................................................................................................. 269

13 REPORTS ........................................................................................................................................................................................................................................ 276

14 CREATION OF PROJECT RECEIPTS ....................................................................................................................................................................................... 278

15 ENTER BUDGET FOR EXTERNALLY FUNDED PROJECT................................................................................................................................................. 286

Page 8: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

8 of 298

1 Logging into Oracle Applications

Navigation

Open the link for the Oracle Instance

http://fms.iasri.res.in:8005/ (for User Training Instance)

Page 9: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

9 of 298

Logging into

Oracle Apps Enter the Username and Password as provided (individual user name/password to be used). Password need to be changed

on first time login.

On logging into the application, a new page consisting of the responsibilities assigned to the user and the active

notifications for the user will open up.

User Name

Password

Page 10: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

10 of 298

Click on Project Details function.

This is the Projects MIS

responsibility for the user

These are the

notifications for

the user

These are the various

functions available in the

particular responsibility

Page 11: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

11 of 298

Menu Bar and

Shortcuts A new form in Oracle opens up. The menu bar icons and various keyboard shortcuts have been displayed below:

New Find Save Clear Record Delete Record

Attachment

Page 12: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

12 of 298

1. New: Use this icon to create a new invoice. Alternative navigation: File->New

2. Find: Use this icon to invoke find (query) screen. The keyboard short cut is F11 key.

3. Save: Use this icon to save the record. Alternative navigation: File->Save or press CTRL + S

4. Clear Record: Use this icon to clear the current (selected) record. This however does not delete a record that has

already been saved. Alternative navigation: Edit->Clear->Record

5. Delete Record: Use this icon to delete the current (selected) record. Alternative navigation: Edit->Delete

6. Attachment: Use this icon to attach text files or other files if required.

Page 13: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

13 of 298

Keyboard

Shortcuts

Important Keyboard shortcut

Function/Purpose Keyboard Shortcut

Enter into query mode F11

Query with partial information Prefix or suffix with %

Execute query CTRL + F11

Close/Exit screen F4

Invoke List of Values CTRL + L

Insert duplicate field SHIFT +F5

Insert duplicate record SHIFT +F6

To query the form:

1. For query, first press F11.

2. Give partial information on screen like partial employee name, and prefix or suffix with %.

3. Execute the query by pressing CTRL and F11.

List of Value (LOV)

LOV facilitates the completion of a text entry field when there are numerous values that may be assigned. LOVs are a useful

alternative to drop-down lists, particularly in cases where displaying a long list of selections in a drop-down list would require

excessive scrolling.

Search within LOV list

1. Click on the LOV icon.

2. The list of LOV is displayed.

3. If short list then scroll and select the required value. Press OK.

4. If the LOV list is long, then enter any partial/full value and suffix with the ‘%’ in the Find field. The ‘%’ as prefix and

suffix is also used where the subsequent word(s) of the total value is used for query.

5. Then click Find button.

6. This displays a shortened list of values that will match the query submitted.

Select the value desired and click OK. The original text entry screen is populated.

Page 14: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

14 of 298

2 Document Numbers

Document

Numbering Logic The document numbering will be automatic and numeric; and will be generated from the system.

Example 1: If the Document Number is 55200130017:

The first three digits represent the institute. Here 552 is for IASRI.

The fourth and fifth digits represent the document type.

00 is for SR

10 is for RPPI

11 is for RPPI Amendment

13 is for Externally Funded Projects

14 is for Consultancy/Contract Research Projects

20 is for RPPII

30 is for RPPIII

40 is for RPPIV

The sixth and seventh digit represent the year in which the document was created. So 13 means it was created during

the period April 2012-March 2013.

The last four digits are a running sequence and start with the number 0001. So here this is the 17th

Status Report

created in the period April 2012-March 2013 in IASRI.

Example 2: If the Document Number is 15611140012:

Page 15: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

15 of 298

The first three digits represent the institute. Here 156 is for IASRI.

The fourth and fifth digits represent the document type. 11 is for RPPI Amendment

The sixth and seventh digit represent the year in which the document was created. So 14 means it was created during

the period April 2013-March 2014.

The last four digits are a running sequence and start with the number 0001. So here this is the 12th

RPPI Amendment

created in the period April 2013-March 2014 in IARI.

Page 16: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

16 of 298

3 Status Report

Process Map

Page 17: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

17 of 298

3.1 Status Report Creation

Process

Overview

Descriptio

n

According to the latest guidelines issued by ICAR, the first stage for initiation of a research project is the creation of a status report

for proposal of a new project. So it is the first Performa which a scientist has to prepare, before the initiation of his/her project. It

helps to objectively assess the need of the project.

It covers the basic project information like project title, employee information, genesis and rationale of the project,

knowledge/technology gaps and justification for taking up the present project, Critical review of present status of the technology at

national and international levels, details on propriety/patent perspective and expected output and clientele etc. It has to be approved

before the PI can continue with the creation of RPP-I for his project.

Document

Numberin

g

The document numbering will be automatic and numeric; and will be generated from the system.

For example, if the Document Number is 55200130017:

The first three digits represent the institute. Here ‘552’ is for IASRI.

The fourth and fifth digits represent the document type. 00 is for SR

The sixth and seventh digit represent the year in which the document was created. So '13' means it was created during the period April

2013-March 2014.

The last four digits are a running sequence and start with the number 0001. So here this is the 17th

Status Report created in the period

April 2012-March 2013 in IASRI.

Navigation Responsibility: IASRI Projects

Navigation->Project Details

Page 18: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

18 of 298

Oracle

Process –

Status

Report

Creation

Double Click on Project Details; or Click on Project Details and Click on Open.

Click here

Page 19: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

19 of 298

Creating a

new Status

Report

New Screen opens up as shown in the figure below. This screen is used to create a new document or open an existing document. Click on

“New Document” button to create a new Status Report.

For new Status Report

Creation, click here

Page 20: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

20 of 298

Creating a

new Status

Report

A new form opens up. Select the second option “Create new Status Report from Status Report Template” and click on the “Next” Button.

Page 21: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

21 of 298

Creating a

new Status

Report

Again click on “Next” Button. A note will appear. Click on OK.

Page 22: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

22 of 298

Creating a

new Status

Report

Click on Finish.

After clicking on Finish Button, a note will appear. Click on OK. A new Status Report is created.

Click here to

finish Status

Report creation

Page 23: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

23 of 298

3.2 Status Report Completion

Completin

g a new

Status

Report –

Project

Header

Details

This is the Project Header Tab. Here enter details such as “Type of Project”, “Lead Division” and “Project Title”.

Type of Project

Lead Division

Project Title

Page 24: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

24 of 298

Completin

g a new

Status

Report –

Project

Header

Details

For example, to enter the “Type of Project”, click on the LOV Button in the field and select the desired value from the new form which

opens up.

Page 25: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

25 of 298

Enter

Team

Member

Informatio

n

Click on “Project Team Info/Doc Approval” Tab. This tab is used to store member information and to send the document for approval. Enter

team member information (team member name and role).

Employee name Employee Role

Page 26: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

26 of 298

Enter

Project

Item

Details

Click on the “Project Items” Tab. This tab is used to enter project item details. Click on the “Standard” Checkbox. A note will appear.

Click on OK. Then a new window opens up. Click on “Status Report” and then Click on “Copy”.

1. Click on Standard

Check Box

2. Select Status Report

3. Click on

Copy Button

Page 27: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

27 of 298

Enter

Project

Item

Details

Status Report Project Items get copied. Click on a Project Item and enter the relevant data for that project item in the text field below.

Click on Project Item

Enter the relevant

text field

Page 28: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

28 of 298

Enter

External

Member

Informatio

n

If there are any external members in the project (optional), click on “External Members” Tab. This tab is used to enter external team

member information (and team ratings etc. in other documents).

In “Team Information” LOV, select External Team Member 1. Enter External Member Name and Institute. Then in the DFF enter other

details such as member role, start date etc. Repeat the above step for other external team members as well.

s

1. Choose option

External Team Member

1

2. Capture External

Team Member Name

3. Capture External

Team Member Institute

4. Click here to

open this window

Page 29: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

29 of 298

Team

Member

Concurren

ce

Now all the information related to Status Report has been entered. The next step is to submit this report for approval.

To get team member approval, click on Go To Button and select the “Communications” option.

Click here

Page 30: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

30 of 298

Team

Member

Concurren

ce

Click on New Button. A new window will open up.

Click on “Action” field.

Then Select the team member from which you wish to take approval.

In text field, enter the communication subject that you wish to send to the team member.

Then save the communication.

Note: Save the communication only after you have entered all the necessary details, especially the person from which approval is

needed.

Page 31: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

31 of 298

1. Click here

2. Enter Team Member

whose approval is needed

3. Enter Text 4. SAVE the Record

Page 32: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

32 of 298

Team

Member

Concurren

ce – Co-PI

Login

Open the link for the Oracle Instance

http://fms.iasri.res.in:8005/ (For User Training Instance)

Team

Member

Concurren

ce – Co-PI

Login

Team Member will enter his/her Username and Password as provided (individual user name/password to be used). Password need to be

changed on first time login.

On logging into the application, a new page consisting of the responsibilities assigned to the user and the active notifications for the user will

open up.

Page 33: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

33 of 298

Team

Member

Concurren

ce – Co-PI

Login

The Team Member will see a notification regarding the approval in his/her login; and will click on the notification for approval.

Team

Member

Concurren

ce – Co-PI

Login

Clicking on the notification, the team member will be able to see notification details. On verifying that all the information entered is valid

and correct, he will give his concurrence by clicking on “OK” button.

Concurrence will not be achieved until user clicks on OK button, and only then will the Team Member Signature be captured in the

report output.

Notification for approval

OK Button

Page 34: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

34 of 298

3.3 Status Report Approval

Submit

Status

Report for

Approval

PI will open the Status Report (refer to Process 10).

Go To “Project Team Info/Doc Approval” Tab. Click on “Forward” Button. The approval process is initiated.

Click here to start

approval process

Page 35: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

35 of 298

Status

Report

Approval

– HoD

Login

HoD will open the link for the Oracle Instance

Open this URL: http://fms.iasri.res.in:8005/ in your browser.

On logging into the application, a new page consisting of the responsibilities assigned to the user and the active notifications for the user will

open up.

Page 36: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

36 of 298

Status

Report

Approval

– HoD

Login

The notification will include basic details like document type, document number, project title, team member information etc.

The HoD can enter his overall comments and approve/reject the document by clicking on approve/reject button.

HoD can click on “View Project Form” link to open the

Project Details Form for that particular document.

Overall Comments

Approve Reject

Page 37: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

37 of 298

Status

Report

Approval

– HoD

Login

Optionally the HoD can open the document by clicking on “View Project Form”. The below form opens up.

HoD can check all the details of the Status Report here.

Page 38: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

38 of 298

Status

Report

Approved

After approval, the status of the document is changed to “Document Approved” as shown below:

Document Approved

Page 39: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

39 of 298

3.4 SR Related Reports

Run/View

a Report From the toolbar menu at the top, select View Requests

Page 40: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

40 of 298

Run a

Report Click on "Submit a new Request" to run a report.

Click here to run a

report

Page 41: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

41 of 298

Select "Single Request” and click "OK"

Run a

Report Enter Report Name as ‘ICAR Status Report’

Enter Parameters and click on OK.

Page 42: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

42 of 298

1. Enter Report Name

2. Enter Parameter 1

Institute Name

3. Enter Parameter 2

Status Report

Page 43: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

43 of 298

Run a

Report Click on Submit Button.

A note will come. Click on No.

Page 44: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

44 of 298

Report

Output Given below is a sample Status Report output:

Page 45: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

45 of 298

Page 46: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

46 of 298

Page 47: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

47 of 298

Run/View

Report User can run the following reports:

Report Name Report Parameters Report Functionality

ICAR Status Report Institute Name

Status Report Number

It provides the Status Report

output.

Page 48: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

48 of 298

4 RPPI (Single Institute)

Process Map

Page 49: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

49 of 298

4.1 RPPI Creation

Process

Overview

Descriptio

n

This Performa provides details on the project, project team, institutions involved, objectives, activities and output details, technical

programme, financial implications, expected output, expected benefits in economic terms and risk analysis and finally observation

of PME Cell. The Performa essentially identifies activities against which the future research output evaluation will be carried out

including team assessment.

Navigation Responsibility: IASRI Projects

Navigation->Project Details

Oracle

Process –

RPPI

Creation -

Screenshot

and Steps

Double Click on Project Details; or Click on Project Details and Click on Open.

Page 50: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

50 of 298

Click here

Page 51: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

51 of 298

Click on New Document Button

Click here

Page 52: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

52 of 298

Select the Option “Copy From Existing Document” and click on Next.

Choose this option for creating

RPPI, RPPII, RPPIII and RPPIV

Page 53: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

53 of 298

In the next window, mention the details of the Status Report from which you wish to create the RPPI Document. Then click on “Next”.

Enter Status Report details

Page 54: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

54 of 298

Then enter details of the new document which you wish to create. In this case, choose RPPI document type. A note will appear; click on

“OK” button. Then enter Project Start Date as the Start Date and click on “Finish”.

A note will appear. Click on “OK”. RPPI Document is created.

Choose RPPI type

Capture Project Start Date

Click here

Page 55: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

55 of 298

Note: Here in document type, 4 RPPI Document Types exist (for each institute):

o IASRI-RPPI: This is for Institute Funded Project

o IASRI-RPPI (Amendment): This is for creating an RPPI Amendment (covered as a separate process later)

o IASRI-RPPI (Consultancy/Contract): This is for Consultancy/Contract Research Projects

o IASRI-RPPI (Externally Funded): This is for externally funded projects

Note: In this example, we have taken an Externally Funded Project. However, the same process is valid for Institute funded and

Consultancy/Contract research projects as well.

Page 56: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

56 of 298

4.2 RPPI Completion

Capture

Project

Details

Form

Project Header form opens.

Enter Priority Area and End Date.

Note: The RPPI number is copied in the Project Code. The actual PME code is generated automatically but only after the RPPI is approved.

Till then, the RPPI number serves as a temporary project code.

End date Priority Area

Page 57: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

57 of 298

Enter

Project

Items

Details

Click on Project Item Tab. Here enter Project Item Details for RPPI as shown (similar to Status Report).

1. Click here

2. Choose RPPI

3. Click here

Page 58: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

58 of 298

Enter

Project

Items

Details

Click on first section “1. Key Words” and capture details in the free text field “Project Item Detail”.

Capture Key Words Detail

here

Click on item

“1. Key Words”

Page 59: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

59 of 298

Click on second section “2. If Project not already in the Priority Area, give Justification” and capture details in the free text field “Project

Item Detail”.

Similarly, capture details for all sections one by one.

Click on this item

Capture Details

here in text format

Page 60: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

60 of 298

Enter

Team

Member

Contributi

on

Click on External Members/Member Contribution Tab. In Team Information field, choose the value “Individual Contribution by Team

Members”.

In the bottom portion of the form, enter serial number. A message will pop up saying that the member information needs to be entered in the

flex field. Click on OK.

Press “Tab” button twice; or press “Ctrl+L”. A new window will open up. Enter details for one team member.

Repeat the above two steps for all team members.

Page 61: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

61 of 298

1. Choose “Individual Contribution

by Team Members”

2. Choose Serial Number

beginning with ‘101’

3. Capture Individual

Contribution Details

Page 62: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

62 of 298

Creation

of Project The next step is to create a project. In a project, the budgetary and objective/activity information is stored.

Go to Project Headers Tab. Click on Project Code field. A note will pop up asking you to validate that you have entered all the

information correctly. Once you click on OK, a project is created successfully.

Note: each project is identified with a unique project number and a unique project code.

1. Click here

2. This Note will pop

up. Click on OK.

Page 63: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

63 of 298

Associatio

n of

Project to

Document

You have to associate the project to the document. For that, click on the project field. Your project number will automatically be

captured in the field.

Click here

Page 64: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

64 of 298

4.3 RPPI – Objective and Activity Information

Enter

Workplan

Informatio

n

Double Click on Project List; or Select Project List and click on Open. A web page will open.

Page 65: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

65 of 298

Enter

Workplan

Informatio

n

Project List page shows all the ongoing projects in which you are a team member.

Click on your RPPI Number or your Project Number. A new window will open.

Enter

Workplan

Informatio

n

This page contains details regarding your objective, activities and monitorable target details. Click on the workplan tab.

Click here

Click here

Page 66: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

66 of 298

Creating

Objectives

and

Activities

Workplan Tab opens up. The next step is to define your objective and activities. For this click on the Create Objectives and Activities

Button.

Creating

Objectives

and

Activities

A new page opens up. To enter objective and activities, select the outline level according to the type.

o Outline level '1' is for defining a year; '2' is for objective and '3' is for activity.

o In serial number, please enter running sequence number 1, 2, 3 irrespective of type.

o In the next column, enter the year, objective or activity as the case may be.

o For activity, enter the activity start date, finish date, % to be carried out and scientist responsible as well.

Click here

Page 67: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

67 of 298

o Note: For each activity, please specify the percentage to be carried out for the year that you have entered. For example, in the

screenshot below, for activity with serial number 3, it means that 45% of the activity will be completed in year 2012 (January-

December 2012). Similarly, for activity with serial number 4, 60% of the activity will be completed in the period January-December

2012.

Page 68: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

68 of 298

Page 69: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

69 of 298

Create objectives and activities only for one year and click on apply button.

Note: for future years, the same data will be copied in a later step. So you have to define objectives and activities only for one year.

Page 70: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

70 of 298

Creating

Output

Monitorab

le Targets

After clicking on apply button, you will come back to the previous page.

Now to create output monitorable targets, click on the output monitorable target tab under workplan tab.

Click here to create targets

Page 71: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

71 of 298

Defining

Output

Monitorab

le Targets

To create a new monitorable target, click on Go button as indicated below.

Defining

Output

Monitorab

le Targets

On this page, enter the target name and short description for the first output monitorable target.

To create another Output Monitorable Target, click on “Add Another” button. Then enter same details for other monitorable targets as

well. Like this, define all your targets in one go.

After you define your all output monitorable targets, click on “Apply”.

Click here

Page 72: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

72 of 298

Associate

Activities

and

Output

Monitorab

le Targets

Now you can view all the targets which you have defined. The next step is to associate these output monitorable targets with activities.

To accomplish this, for the first target, click on the update button.

Output Monitorable Target (which

will be printed in the report output)

Click here for the first target

Page 73: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

73 of 298

Associate

Activities

and

Output

Monitorab

le Targets

Click on the Associate Activities Tab; and then click on “Associate Output Monitorable Targets and Activities” button.

Associate

Activities Click on Expand All. Then select the “activity/activities” with which you want to associate that particular target and click on “Apply”

button

Click here

Page 74: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

74 of 298

and

Output

Monitorab

le Targets

You reach the previous page. Again click on “Apply” Button.

Repeat these steps for all monitorable targets.

3. Click on Apply 1. Click on Expand All

2. Select the Activity

Page 75: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

75 of 298

Copying

informatio

n for

future

years

Go to Objective and Activity Details Tab and click on Expand All. Then select the year, and click on Copy Button.

`

1. Click here

Page 76: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

76 of 298

Copying

informatio

n for

future

years

A new window opens up. In Prefix, add any character. For example, initially add A. This value is for internal maintenance of the system

and has no impact on your work.

Note: Please ensure that you use different Prefix every time you copy the objective and activity details for other years.

Click on Expand All and Select the year. Then click on Apply.

Enter Prefix as A

Click on Expand All

Page 77: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

77 of 298

Copying

informatio

n for

future

years

You will come back to the objective and activity details tab. Click on Expand All.

1. Choose the year

2. Click here

Page 78: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

78 of 298

Page 79: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

79 of 298

Copying

informatio

n for

future

years

Clean the Data for the new tasks. Rename “A2012” as “2013” and remove “A” from all objectives and activities. Also enter the

percentage of activity to be carried out in the next year.

Repeat the same steps for other years as well.

Page 80: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

80 of 298

Saving the

Workplan To Save Workplan, click on “Save Workplan” Button.

Page 81: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

81 of 298

Then click on “Finally Save Workplan” Button.

Page 82: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

82 of 298

With this the Objective and Activity Details are saved.

Page 83: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

83 of 298

4.4 RPPI - Enter Budgetary Information including Item Details

Enter

Budget Click on “Enter Budget”

Page 84: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

84 of 298

Enter

Budget Enter the Project Number. Choose Expenditure Budget as the Budget Type

Note: There are two Budget Types: Expenditure Budget and Comprehensive Proposal Budget. For single institute project, we define

only the expenditure budget. It contains budget defined for that institute and expenditure transactions can be made against it.

1. Enter the project number

2. Choose Expenditure Budget

3. “DFF Field”. Click here to enter

source of fund and fund type.

Page 85: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

85 of 298

Enter

Budget Click on the DFF Field. A new window will open

Enter fund type, scheme name and division. As this is an externally funded project, user will enter funding agency name and country as

well.

After entering all the desired information, click on OK button.

Page 86: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

86 of 298

Enter

Budget Click on “Details” Button. A new form will open.

Page 87: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

87 of 298

Enter

Budget Select Major Expenditure Head (e.g. Grants – Capital) and click on “Budget Lines” Button. A new form will open. A note will open.

Click on OK.

Note: The Budget that you enter for a particular month is valid for that entire financial year. For example, if you enter the budget for

June 2013, it will be valid for the period April 2013 to March 2014.

User will enter Minor Expenditure Head and Amount Type as shown and enter budget for all years.

1. Choose the minor

expenditure head

2. Capture the amount

Page 88: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

88 of 298

Similarly enter budget for all other major and minor expenditure heads. Save your work.

Click on Submit Button.

Click here

Page 89: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

89 of 298

Click on Baseline Button.

Note: After clicking on Baseline button, the budget becomes available for financial transactions.

Click here

Page 90: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

90 of 298

With this the budget gets saved.

Enter Item

Details Click on “Project Item Details Form”

Page 91: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

91 of 298

Enter Item

Details Click on “New” Button

Page 92: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

92 of 298

Enter Item

Details Enter year, institute name, item name, project code, major and minor category as shown.

Page 93: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

93 of 298

Enter Quantity and Amount Sanctioned, Item Status and Approval Status as shown

Page 94: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

94 of 298

4.5 RPPI – Capturing RPPI Checklist

RPPI

Checklist Click on Project Details

Page 95: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

95 of 298

RPPI

Checklist Open the RPPI Document (Select your RPPI document and click on “Go To” Button. Choose the “Authoring Workbench” option)

Page 96: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

96 of 298

RPPI

Checklist Select the Ratings/Checklists Tab

Click on Ratings and Checklist LOV

Choose this tab

Click here

Page 97: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

97 of 298

RPPI

Checklist A new window opens up. Click on the LOV. Then choose RPPI Checklist and click on OK.

1. Click here

2. Choose RPPI

Checklist

Page 98: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

98 of 298

RPPI

Checklist Enter data for RPPI Checklist as shown below

Click on OK Button.

Page 99: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

99 of 298

Team

Member

Concurren

ce

For team member concurrence, click on Go To Button and select the “Communications” option.

1. Click here

2. Click here

Page 100: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

100 of 298

Team

Member

Concurren

ce

Click on New Button. A new window will open up.

Click on “Action” field.

Then Select the team member from which you wish to take approval.

In text field, enter the communication subject that you wish to send to the team member.

Then save the communication.

Note: Save the communication only after you have entered all the necessary details, especially the person from which approval is

needed.

Page 101: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

101 of 298

1. Click here

2. Enter Team Member

whose approval is needed

3. Enter Text 4. SAVE the Record

Page 102: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

102 of 298

Team

Member

Concurren

ce – Co-PI

Login

Open the link for the Oracle Instance

http://fms.iasri.res.in:8005/ (For User Training Instance)

Team

Member

Concurren

ce – Co-PI

Login

Team Member will enter his/her Username and Password as provided (individual user name/password to be used). Password need to be

changed on first time login.

On logging into the application, a new page consisting of the responsibilities assigned to the user and the active notifications for the user will

open up.

Page 103: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

103 of 298

Team

Member

Concurren

ce – Co-PI

Login

The Team Member will see a notification regarding the approval in his/her login; and will click on the notification for approval.

Team

Member

Concurren

ce – Co-PI

Login

On clicking on the notification, the team member will be able to see notification details. On verifying that all the information entered is

valid and correct, he will give his concurrence by clicking on “OK” button.

Concurrence will not be achieved until user clicks on OK button, and only then will the Team Member Signature be captured in the

report output.

Notification for approval

Page 104: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

104 of 298

OK Button

Page 105: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

105 of 298

4.6 RPPI Approval (including PME Cell Appraisal)

RPPI

Approval To initiate RPPI Approval, click on “Forward” Button. With this, the approval process gets initiated.

Page 106: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

106 of 298

RPPI

Approval

– HoD

Login

HoD will login into the system (refer to process 1). He will click on the relevant notification.

RPPI

Approval

– HoD

Login

HoD will check all the details provided in the notification

Click here

Page 107: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

107 of 298

Page 108: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

108 of 298

Additionally, the HoD can click on “View Project Form” link to check more details. The HoD can also give his comments, reject the

document, reassign it to or request information from another user

After HoD approves the document, it goes to the PME Cell Incharge for approval

Click here to open the document details

Page 109: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

109 of 298

RPPI

Approval

– PME

Incharge

Login

PME Cell Incharge will check all the details provided in the notification (similar to HoD) (refer to process 1).

Page 110: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

110 of 298

PME Cell

Appraisal

and

Approval

PME Cell will click on view project form in the notification. A new window with the Project Header Tab will open.

Click here to capture PME Appraisal

Page 111: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

111 of 298

Page 112: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

112 of 298

Click on Project Team Info/Doc Approval Tab.

Note: Before any approving authority does the evaluation or rating of a project, it needs to temporarily “stop” the approval process by

clicking on the stop button as shown below.

Click here to halt the process so

that appraisal can be done

Page 113: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

113 of 298

A note saying “Workflow process stopped successfully” will pop up. Click on OK.

Next, click on Ratings/Checklists Tab.

Page 114: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

114 of 298

Page 115: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

115 of 298

Select PME Cell Appraisal Report (process similar to RPPI Checklist).

Note: Appraisal by the PME Cell will be based on important parameters to recommend to IRC whether the project is worth execution.

Page 116: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

116 of 298

Page 117: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

117 of 298

The PME Cell will fill up all the information shown above (except for Total Score (out of 100) – it will be automatically calculated).

After filling all the information, it will click on OK.

Page 118: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

118 of 298

Page 119: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

119 of 298

Now the PME Cell will reinitiate the Approval Process by clicking on “Project Team Info/Doc Approval” Tab and clicking on

“Forward” button.

Click here to

reinitiate approval

Page 120: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

120 of 298

With this the PME Cell Appraisal and Approval is complete. The document will go to the next approving authority (Director/JD (R)) for

approval.

RPPI

Approval

– Director

Login

The Director will login into the application (refer to process 1) and click on the notification.

User will approve or reject the document as he deems fit.

Page 121: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

121 of 298

RPPI

Approved With this the RPPI gets approved.

Page 122: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

122 of 298

Update

PME Code When the PI opens the RPPI document the next time (refer to process find/open a document), a note saying that the PME Code has been

updated will pop up. Click on OK.

The Project Code has been automatically updated with the PME Code.

Page 123: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

123 of 298

Project Code automatically updated with the

PME Code after the RPPI gets approved.

Page 124: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

124 of 298

4.7 RPPI Related Reports

Run/View

a Report To run a report, refer to process 12

User can run the following reports:

Report Name Report Parameters Report Type Report Functionality

ICAR RPP-I Report Institute Name

RPPI Number

Adobe pdf It provides the RPPI output.

ICAR RPP-I Checklist Report Institute Name

RPPI Number

Adobe pdf It provides the RPPI Checklist

Report output

ICAR RPPI Checklist Summary

Report

Institute Name

Division

From Date

To Date

MS Excel It provides the RPPI Checklist

details for a list of projects for a

particular institute (or division)

for a particular period (signified

by the start date and end date)

ICAR PME Cell Appraisal

Report

Institute Name

RPPI Number

Adobe pdf It provides the PME Cell

Appraisal Report output

ICAR Proposal Vs Expenditure

Budget Report

Institute Name

RPPI Number

MS Excel It provides the comprehensive

proposal budget (if applicable)

and expenditure budget details

for a particular project

Page 125: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

125 of 298

5 RPPII

Process Map

Page 126: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

126 of 298

5.1 RPPII Creation

Process

Overview

Descriptio

n

RPPII provides annual progress of the project covering activities and outputs and achievements earmarked for the year for each of

the team member.

Navigation Responsibility: IASRI Projects

Navigation->Project Details

RPPII

Creation User will create a new RPPII Document from the related RPPI Document. The process is similar to creating RPPI from Status

Report.

Click on Project Details. A new window opens

Page 127: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

127 of 298

RPPII

Creation Click on “New Document” Button.

Page 128: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

128 of 298

Click here

Page 129: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

129 of 298

RPPII

Creation Select the “copy from existing document” option so that the relevant information is copied from RPPI Document. Click on Next.

Page 130: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

130 of 298

RPPII

Creation In the next screen, select the document type and RPPI Number as shown below. Then click on Next.

Page 131: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

131 of 298

RPPII

Creation In the next screen, select type as RPPII. In start date field, enter the start of RPPII reporting period. Then click on finish.

With this the RPPII document with a unique RPPII number is successfully created.

Enter RPPII

Reporting Period

Enter RPPII Type

Page 132: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

132 of 298

5.2 RPPII Completion

RPPII

Completio

n

All the relevant information is copied from RPPI to RPPII Document.

In the Project Header Tab, enter the reporting period end date as the end date.

Reporting Period

End Date

Page 133: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

133 of 298

RPPII

Project

Items

Click on Project Items Tab. Enter Project Section details (similar to RPPI and Status Report)

Click on “Standard” Checkbox

A note will appear asking you to select the relevant sections. Click on OK.

Page 134: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

134 of 298

RPPII

Project

Items

Click on “RPPII” and click on Next Button.

1. Click here

2. Choose RPPII

3. Click on Next

Page 135: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

135 of 298

RPPII

Project

Items

The RPPII sections will get copied into the document. Click on each item and enter the relevant text.

Capture the details

Page 136: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

136 of 298

Updating

Activity

Progress

Click on Project List. A new page will open in browser.

Page 137: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

137 of 298

Updating

Activity

Progress

Click on the Project Code/Project Number which you want to update.

Updating

Activity

Progress

Project Tab will open. Click on Workplan Tab.

Click on Project Number

Page 138: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

138 of 298

Updating

Activity

Progress

User will come on the Objective and Activity Details SubTab. Click on Expand All.

Updating

Activity

Details

Now, each team member (PI, Co-PI etc.) will update his/her respective activities from his/her login.

To achieve that, click on update progress button (pencil link)

Page 139: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

139 of 298

Updating

Activity

Details

In the summary screen, user can see the % to be completed as envisaged in RPPI. Against that, user will enter the % achieved as

targeted.

Note: for example as shown below, 45% of the activity is envisaged to be completed in this particular year. If the user has

completed the entire work (i.e. 45% of the total activity has been successfully completed, he/she will enter 100% as % achieved as

targeted).

Click here

Page 140: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

140 of 298

Updating

Activity

Details

Optionally in the Progress Report SubTab, user may enter the activity status (completed, not started, in progress, on hold), progress

status (at risk, on track, in trouble), and the progress comments for that particular activity.

1. Enter % achieved as targeted

2. Click here

Page 141: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

141 of 298

Updating

Activity

Details

After updating the progress, user will click on submit. Then click on Yes on the next page.

Page 142: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

142 of 298

Saving

Workplan User will come back to the Objective and Activity Details SubTab.

Note: Similarly, each user will update all the activities for which he/she is responsible using his login credentials.

Finally, the PI will save the workplan. Choose “Update Current Working Version” as shown and click on “Go”.

Page 143: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

143 of 298

Saving

Workplan On the next page, click on “Save Workplan” button.

On the next page, click on “Finally Save Workplan” Button.

Page 144: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

144 of 298

Page 145: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

145 of 298

Saving

Workplan With this the workplan is successfully saved.

Page 146: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

146 of 298

RPPII

Team

Rating

Click on Project Details

Page 147: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

147 of 298

RPPII

Team

Rating

To open the document, user will select the RPPII Document and click on Go To Button; then select Authoring Workbench and click

on OK (refer to process Find/Open a Document).

Page 148: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

148 of 298

RPPII

Team

Rating

Click on Team Rating Tab.

In Team Information, choose the “Team Rating by PI – RPPII” option.

Note: The process of team rating is similar to the process of entering the individual contribution of team members in RPPI.

Choose “Team Rating

by PI – RPPII”

Page 149: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

149 of 298

RPPII

Team

Rating

In Sr. No., choose 1.

A note will open asking user to enter member rating. Click on OK.

Page 150: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

150 of 298

RPPII

Team

Rating

Next, press “Tab” twice or press “Ctrl+L”

A new window will open. Here enter the member name and member rating. Then click on OK.

Note: Similarly, the PI will enter ratings for each of his team members (including him).

Page 151: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

151 of 298

Page 152: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

152 of 298

Project

Rating by

PI

User will open the document and click on Ratings/Checklists Tab

Similar to RPPI Checklist and PME Cell Appraisal, user will select the “Project Rating by PI” option.

1. Click here

2. Click here

3. Choose “Project Rating by PI”

Page 153: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

153 of 298

Project

Rating by

PI

PI will enter the rating awarded to the project along with the period of rating. Then click on OK.

Page 154: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

154 of 298

Team

Member

Concurren

ce

The process to take Team Member Concurrence will be the same as in Status Report and RPPI.

Page 155: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

155 of 298

5.3 RPPII Approval including Ratings

RPPII

Approval The RPPII Approval process is same as that of Status Report and RPPI.

The PI will open the RPPII Document and go on Project Team Info/Doc Approval Tab.

User will click on Forward button. With this the approval process is initiated.

Click here to initiate

approval

Page 156: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

156 of 298

RPPII

Approval

– HoD

Login

HoD will login into the application and open the notification.

User will check the notification details.

To give the project rating, user will click on “View Project Form”. The document will get opened.

Page 157: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

157 of 298

Click here to provide ratings

Page 158: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

158 of 298

RPPII

Rating HoD will go to Project Team Info/Doc Approval Tab and click on Stop button so that the approval process gets temporarily halted

and he/she can provide his/her rating.

Page 159: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

159 of 298

User will go to Ratings/Checklists Tab and select “Project Rating by HoD” option.

Page 160: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

160 of 298

HoD will provide his rating and overall comments; and click on OK.

RPPII

Approval

– HoD

Login

HoD will go back to the Project Team Info/Doc Approval Tab and click on Forward button so that the document gets forwarded to

the next authority.

Page 161: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

161 of 298

Click here to

reinitiate approval

Page 162: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

162 of 298

RPPII

Approval

– PME

Incharge

Login

PME Incharge will login into the application.

User will check the notification details.

Page 163: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

163 of 298

To record the IRC Comments, user will click on “View Project Form”. The document will get opened.

Click here to Capture IRC Comments

Page 164: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

164 of 298

Comments

of IRC User will go to the Project Team Info/.Doc Approval Tab and click on Stop button to temporarily halt the approval process

User will go to the Project Items Tab and select the “Comments of IRC” section.

Page 165: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

165 of 298

Next, PME will capture the comments of IRC in Project Item Detail Field.

Page 166: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

166 of 298

User will then reinitiate the approval process by going to Project Item Detail/Doc Approval Tab and forwarding the document to the

next approver.

RPPII

Approval

– Director

/JD (R)

Login

Director/JD (R) will login into the application.

User will check the notification details.

Page 167: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

167 of 298

To give ratings, user will click on “View Project Form” link and the document will get opened.

Click here to give ratings

Page 168: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

168 of 298

Director/

JD (R)

Rating

User will temporarily halt the approval process by going to Project Team Info/Doc Approval Tab and clicking on Stop button.

Next, user will go to Ratings/Checklists Tab and select the “Project Rating by Director” option.

Page 169: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

169 of 298

Director/

JD (R)

Rating

User will capture his/her rating and comments.

User will go to Project Team Info/Doc Approval Tab and click on Forward button. As in this case, the Director/ JD (R) is the last

approving authority, RPPII will get approved.

Page 170: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

170 of 298

RPPII

Approved With this the RPPII gets approved and the status becomes “Document Approved”.

RPPII is now approved

Page 171: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

171 of 298

5.4 RPPII related reports

Run/View

a Report To run a report, refer to process 12

User can run the following reports:

Report Name Report Parameters Report Type Report Functionality

ICAR RPP-II Report Institute Name

RPPII Number

Adobe pdf It provides the RPPII report

output.

ICAR Statement of Expenditure

Report

Institute Name

Project Number

From Date

To Date

Microsoft Excel It provides the Statement of

Expenditure for a particular

project.

You can optionally give the

period for which the expenditure

report is required.

ICAR Project Rating Report Institute Name

Division

Document Type

Document Number

From Date

To Date

Microsoft Excel It Provides Rating given to a

range of projects undertaken in a

particular period by HoD,

Director etc.

It is valid for both RPPII and

RPPIII document types.

ICAR Project Publication Detail

Report

Institute Name

Division Name

Report Type

From Date

To Date

Microsoft Excel It provides the output/cumulative

output for a range of documents

(RPPII/RPPIII) created in a

particular period.

Page 172: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

172 of 298

6 RPPIII

Process Map

Page 173: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

173 of 298

6.1 RPPIII Creation

Process

Overview

Descriptio

n

RPPIII is a final project report that covers details on the project basic information, objectives, materials and methods used, results

and discussion, objective wise achievements and conclusions. It also has information on financial aspects and cumulative outputs.

The most significant information is on the extent of achievement of objectives/activities and outputs earmarked as per RPP-I. It also

gives details the efforts made for commercialization/ technology transfer, proposed utilization of outputs, its significance in

knowledge creation, expected benefits and economic impact, future line of research work/other identifiable problems and a

certificate on handing of research data generated out of the project deposited to PME Cell for future use.

Navigation Responsibility: IASRI Projects

Navigation->Project Details

RPPIII

Creation User will create a new RPPIII Document from the related RPPI Document. The process is similar to creating RPPI from Status

Report; or RPPII from RPPI

Click on Project Details. A new window opens

Page 174: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

174 of 298

Page 175: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

175 of 298

RPPIII

Creation Click on “New Document” Button.

Page 176: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

176 of 298

RPPIII

Creation Select the “copy from existing document” option so that the relevant information is copied from RPPI Document. Click on Next.

Page 177: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

177 of 298

RPPIII

Creation In the next screen, select the document type and RPPI Number as shown below. Then click on Next.

Page 178: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

178 of 298

RPPIII

Creation In the next screen, select type as RPPIII. In start date field, enter the project start date. Then click on finish.

With this the RPPIII document with a unique RPPIII number is successfully created.

Page 179: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

179 of 298

6.2 RPPIII Completion

RPPIII

Completio

n

All the relevant information is copied from RPPI to RPPIII Document.

In the Project Header Tab, enter the actual completion date of the project as the end date.

Actual date of completion

Page 180: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

180 of 298

RPPIII

Project

Items

Click on Project Items Tab. Enter Project Section details (similar to RPPII, RPPI and Status Report)

Click on “Standard” Checkbox

A note will appear asking you to select the relevant sections. Click on OK.

Page 181: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

181 of 298

RPPIII

Project

Items

Click on “RPPIII” and click on Next Button.

Page 182: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

182 of 298

RPPIII

Project

Items

The RPPIII sections will get copied into the document. Click on each item and enter the relevant text.

Page 183: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

183 of 298

Updating

Activity

Progress

Click on Project List. A new page will open in browser.

Page 184: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

184 of 298

Updating

Activity

Progress

Click on the Project Code/Project Number which you want to update.

Updating

Activity

Progress

Project Tab will open. Click on Workplan Tab.

Page 185: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

185 of 298

Updating

Activity

Progress

User will come on the Objective and Activity Details SubTab. Click on Expand All.

Page 186: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

186 of 298

Updating

Activity

Details

Now, each team member (PI, Co-PI etc.) will update his/her respective activities.

To achieve that, click on update progress button (pencil link)

Note: The process is same as explained for RPPII

Page 187: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

187 of 298

Updating

Activity

Details

In the summary screen, user can see the % to be completed as envisaged in RPPI. Against that, user will enter the % achieved as

targeted.

Note: for example as shown below, 45% of the activity is envisaged to be completed in this particular year. If the user has

completed the entire work (i.e. 45% of the total activity has been successfully completed, he/she will enter 100% as % achieved as

targeted).

Page 188: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

188 of 298

Updating

Output

Monitorab

le Targets

Click on Output Monitorable Targets Tab.

Click on Update Progress Link.

Optionally, user can enter the Percent Complete and Completion Date here.

Updating

Output

Monitorab

le Targets

User will enter the “Actual Output Achieved” and click on Submit button.

1. Click here

2. Click here

Enter Actual Output Achieved

Page 189: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

189 of 298

Updating

Activity

Details

Click on Yes on the next page.

Updating

Activity

Details

User will come back to the previous screen. Again click on Submit, and then on Yes,

1. Click here

Page 190: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

190 of 298

Saving

Workplan User will come back to the Objective and Activity Details SubTab.

Note: Similarly, each user will update all the activities and output monitorable targets for which he/she is responsible using his login

credentials.

Finally, the PI will save the workplan. Choose “Update Current Working Version” as shown and click on “Go”.

2. Click here

Page 191: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

191 of 298

Saving

Workplan On the next page, click on “Save Workplan” button.

On the next page, click on “Finally Save Workplan” Button.

Page 192: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

192 of 298

Page 193: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

193 of 298

Saving

Workplan With this the workplan is successfully saved.

Page 194: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

194 of 298

6.3 RPPIII Checklist

RPPIII

Checklist Click on Project Details

Page 195: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

195 of 298

RPPIII

Checklist To open the document, user will select the RPPIII Document and click on Go To Button; then select Authoring Workbench and

click on OK.

Page 196: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

196 of 298

RPPIII

Checklist User will open the document and click on Ratings/Checklists Tab

Similar to RPPI Checklist and PME Cell Appraisal, user will select the “RPPIII Checklist” option.

Page 197: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

197 of 298

RPPIII

Checklist Fill all the details of RPPIII Checklist and click on OK.

Page 198: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

198 of 298

Final

Project

Evaluation

by PI

Similar to RPPIII Checklist (as shown above), select “Final Project Evaluation by PI” option as shown below:

Page 199: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

199 of 298

Final

Project

Evaluation

by PI

Fill in all the details

Page 200: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

200 of 298

Team

Rating by

PI

Click on Team Rating Tab.

In Team Information, choose the option “Team Rating by PI – RPPIII” option.

Note: The process is same as filling “Individual Contribution by Team Members” and “Team Rating by PI – RPPII”,

Page 201: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

201 of 298

1. Click here

2. Choose this option.

3. Click here

Page 202: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

202 of 298

Team

Rating by

PI

In Sr. No. field, select the first value i.e.1.

A not will pop up. Click on OK.

Press Tab button twice, or press “Ctrl+L”. A new form will open up.

Fill in all the details. You need not fill the total score (out of 10) as it will be calculated automatically.

Page 203: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

203 of 298

With this the RPPIII preparation is complete.

Page 204: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

204 of 298

RPPIII

Team

Member

Concurren

ce

The process to take RPPIII Team Member Concurrence is similar to that for SR, RPPI and RPPII.

Page 205: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

205 of 298

6.4 RPPIII Approval (Including Ratings)

RPPIII

Approval The RPPIII Approval process is same as that of Status Report and RPPI.

RPPIII

Approval The PI will open the RPPIII Document and go on Project Team Info/Doc Approval Tab.

User will click on Forward button. With this the approval process is initiated.

Click here

Page 206: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

206 of 298

RPPIII

Approval

– HoD

Login

HoD will login into the application and open the notification.

User will check the notification details. Optionally he can check other details by clicking on “View Project Form”. The document

will get opened.

User will approve the document and it will get forwarded to the next approver.

Page 207: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

207 of 298

RPPIII

Approval

– PME

Incharge

Login

PME Incharge will login into the application and open the notification.

Page 208: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

208 of 298

User will check the notification details. User will click on “View Project Form” to capture “Final Project Evaluation by Evaluation

Committee”. The document will get opened.

Click here to provide final project evaluation

by Evaluation Committee

Page 209: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

209 of 298

RPPIII

Approval

– PME

Login

Rating

PME Incharge will go to Project Team Info/Doc Approval Tab and click on Stop button so that the approval process gets

temporarily halted and final project evaluation by evaluation committee can be captured.

Page 210: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

210 of 298

User will go to Ratings/Checklists Tab and select “Final Project Evaluation by Evaluation Committee” option.

1. Click here

2. Open List of Values

3. Choose option

4. Click on OK

Page 211: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

211 of 298

User will capture the evaluation done by the evaluation committee. Along with this, user will also capture whether or not RPPIV for

this document will be created; and if yes, then by what date.

Relevant to

RPPIV

Page 212: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

212 of 298

User will go to Project Item Tab to capture the Observations of PME Cell based on Evaluation of Research Project after

Completion.

Page 213: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

213 of 298

User will then reinitiate the approval process by going to Project Item Detail/Doc Approval Tab and forwarding the document to the

next approver.

RPPII

Approval

– Director

/JD (R)

Login

Director/JD (R) will login into the application.

User will check the notification details.

Page 214: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

214 of 298

To give rating and comments, user will click on “View Project Form” link and the document will get opened.

Director/

JD (R)

Rating

User will temporarily halt the approval process by going to Project Team Info/Doc Approval Tab and clicking on Stop button.

Next, user will go to Ratings/Checklists Tab and select the “Project Rating by Director” option.

Page 215: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

215 of 298

Page 216: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

216 of 298

Director/

JD (R)

Rating

User will capture his/her rating and comments.

User will go to Project Team Info/Doc Approval Tab and click on Forward button. As in this case, the Director/ JD (R) is the last

approving authority, RPPII will get approved.

Page 217: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

217 of 298

RPPIII

Approved With this the RPPIII gets approved and the status becomes “Document Approved”.

Document Approved

Page 218: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

218 of 298

6.5 RPPIII related reports

Run/View

a Report To run a report, refer to process 12

User can run the following reports:

Report Name Report Parameters Report Type Report Functionality

ICAR RPP-III Report Institute Name

RPPIII Number

Adobe pdf It provides the RPPIII report

output

ICAR RPP-III Checklist Report Institute Name

RPPIII Number

Adobe pdf It provides the RPPIII Checklist

Report output

ICAR RPPIII Checklist

Summary Report

Institute Name

Division Name

From Date

To Date

Microsoft Excel It provides the RPPIII Checklist

details for a list of projects for a

particular institute (or division)

for a particular period (signified

by the start date and end date

ICAR Final Project Evaluation

Report by PI

Institute Name

RPPIII Number

Adobe pdf It provides the Final Project

Evaluation Report by PI output

ICAR Final Project Evaluation

Report By Evaluation Committee

Institute Name

RPPIII Number

Adobe pdf It provides the Final Project

Evaluation Report by Evaluation

Committee output

ICAR Project Publication Detail

Report

Institute Name

Division Name

Report Type

From Date

To Date

Microsoft Excel It provides the output/cumulative

output for a range of documents

(RPPII/RPPIII) created in a

particular period.

ICAR Project Status Report for

IRC

Institute Name Microsoft Excel It provides the Project Status for

IRC. This report is relevant for

Page 219: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

219 of 298

Division

From Date

To Date

the PME Cell.

ICAR Project Funding Report Institute Name

Division

From Date

To Date

Microsoft Excel This report provides details of the

project funding.

ICAR Project Rating Report Institute Name

Division

Document Type

Document Number

From Date

To Date

Microsoft Excel It Provides Rating given to a

range of projects undertaken in a

particular period by HoD,

Director etc.

It is valid for both RPPII and

RPPIII document types.

Page 220: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

220 of 298

7 RPPIV

Process Map

Page 221: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

221 of 298

7.1 RPPIV Creation and Completion

Process

Overview

Descriptio

n

As per the latest guidelines, for certain projects another document (RPP-IV) will also be created to capture the upscale of research

outcome to the end user.

Navigation Responsibility: IASRI Projects

Navigation->Project Details

RPPIV

Creation User will create a new RPPIV Document from the related RPPI Document. The process is similar to creating RPPI from Status

Report; or RPPII/RPPIII from RPPI

Click on Project Details. A new window opens

Page 222: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

222 of 298

Page 223: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

223 of 298

RPPIV

Creation Click on “New Document” Button.

New Document

Page 224: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

224 of 298

RPPIV

Creation Select the “Copy from Existing Document” option so that the relevant information is copied from RPPI Document. Click on Next.

Choose this option

Page 225: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

225 of 298

RPPIV

Creation In the next screen, select the document type and RPPI Number as shown below. Then click on Next.

Page 226: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

226 of 298

RPPIV

Creation In the next screen, select type as RPPIV. Then click on finish.

With this the RPPIV document with a unique RPPIV number is successfully created.

1. Choose RPPIV Document

2. Click here

Page 227: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

227 of 298

RPPIV

Completio

n

All the relevant information is copied from RPPI to RPPIV Document.

Page 228: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

228 of 298

RPPIV

Project

Items

Click on Project Items Tab. Enter Project Section details (similar to RPPIII, RPPII, RPPI and Status Report)

Click on “Standard” Checkbox

Page 229: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

229 of 298

A note will appear asking you to select the relevant sections. Click on OK.

RPPIV

Project

Items

Click on “RPPIV” and click on Next Button.

1. Click here 2. Choose RPPIV

3. Click on Next

Page 230: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

230 of 298

RPPIV

Project

Items

The RPPIV sections will get copied into the document. Click on each item and enter the relevant text.

1. Choose Section

2. Capture Information

Page 231: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

231 of 298

RPPIV

Completio

n –

Capturing

Efforts

Made

Click on Efforts Made (RPPIV) Tab.

Enter serial number, expected end users, details of research output etc. as shown below:

1. Enter Sr. No. 2. Choose End User

from a List of Values

3. Enter Details of

Research Output

4. Enter Efforts Made

Page 232: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

232 of 298

5. Click here

6. Enter Outcomes

Page 233: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

233 of 298

RPPIV

Team

Member

Concurren

ce

The process of RPPIV Team Member Concurrence is similar to all other documents.

RPPIV

Approval The process of RPPIV Approval is similar to all other documents.

7.2 RPPIV related reports

Run/View

a Report To run a report, refer to process 12

User can run the following reports:

Report Name Report Parameters Report Type Report Functionality

ICAR RPP-IV Report Institute Name

RPPIV Number

Adobe pdf It provides the RPPIV report

output

Page 234: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

234 of 298

8 RPPI Amendment

Process Map

Process

Overview

Descriptio

n

Once the RPPI Document is approved, user can make no modifications in it. To modify end date, project items, objective,

activities etc. user has to create a new RPPI Amendment document.

This document will again go to the appropriate channels for approval.

Navigation Responsibility: IASRI Projects

Page 235: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

235 of 298

Navigation->Project Details

RPPI

Amendme

nt

Creation

User will create a new RPPI Amendment Document from the related RPPI Document. The process is similar to creating other

documents.

Click on Project Details. A new window opens

Page 236: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

236 of 298

Page 237: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

237 of 298

RPPI

Amendme

nt

Creation

Click on “New Document” Button.

Page 238: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

238 of 298

RPPI

Amendme

nt

Creation

Select the “copy from existing document” option so that the relevant information is copied from RPPI Document. Click on

Next.

Page 239: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

239 of 298

RPPI

Amendme

nt

Creation

In the next screen, select the document type and RPPI Number as shown below. Then click on Next.

Page 240: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

240 of 298

RPPI

Amendme

nt

Creation

In the next screen, select type as RPPI Amendment. Then click on finish.

With this the RPPI Amendment document with a unique RPPI Amendment number is successfully created.

Choose RPPI

Amendment here

Page 241: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

241 of 298

RPPI

Amendme

nt

Completio

n

All the relevant information is copied from RPPI to RPPIV Document.

Page 242: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

242 of 298

RPPI

update For example, the user wants to update the key words. User will go to the Project Items Tab and update the key words text.

User will make the

required modifications

Page 243: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

243 of 298

RPPI

Amendme

nt

Approval

RPPI Approval process is same as that for other documents.

Page 244: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

244 of 298

9 Project Abeyance/Termination

Process

Overview

Description

A Project can be terminated or put into abeyance only by the PME Cell. If a project is put into Abeyance, it is temporarily closed.

No financial transactions can occur against the project till it is in abeyance. Further, no workplan activities can be updated.

Hence, to complete ongoing/pending financial transactions, if any, the PME would have access to take the Project out of abeyance.

If a project is terminated, it is closed forever and can never be opened again.

Navigation Responsibility: IASRI Projects

Navigation->Project Details

Project

Abeyance Click on “Change Document Status” Button.

Page 245: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

245 of 298

Click on Change Document

Status Button (only PME Cell

Incharge will have access to it)

Page 246: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

246 of 298

Project

Abeyance A new window will open. Select “Change Contract Status” and click on OK.

1. Choose this option

2. Click on OK

Page 247: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

247 of 298

Project

Abeyance User will enter New Status (Abeyance or Termination) and the reason for status change.

Optionally, user can enter Date of Abeyance and Comments.

1. Choose new

status as Abeyance

2. Choose reason

3. Provide Date &

Comments

Page 248: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

248 of 298

Click on OK Button.

Project

Abeyance The Status is changed to “Abeyance”.

Page 249: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

249 of 298

Note: The process to take a project out of abeyance and to terminate a project is exactly similar.

Note: Once a project is in abeyance, user cannot update the workplan or make financial transactions against it.

Project out

of

Abeyance

Click on “Change Document Status” Button.

Page 250: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

250 of 298

Click on Change Document

Status Button (only PME Cell

Incharge will have access to it)

Page 251: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

251 of 298

Project out

of

Abeyance

A new window will open. Select “Change Contract Status” and click on OK.

Page 252: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

252 of 298

Project out

of

Abeyance

User will enter New Status (Abeyance or Termination) and the reason for status change.

Optionally, user can enter Date of Abeyance and Comments.

1. Choose new

status

2. Choose reason

3. Provide Date &

Comments

Page 253: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

253 of 298

Click on OK Button.

Project out

of

Abeyance

The Status is changed back to “Document Approved”.

Page 254: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

254 of 298

Page 255: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

255 of 298

10 Inter-Institutional Project

Process Map

Page 256: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

256 of 298

Process

Overview

Descriptio

n

Even if a Project is Inter-Institutional, the process of documentation and evaluation remains the same.

However, there is a difference in budget creation.

Assume that a project has been undertaken in 1 Lead Institute and ‘n’ Collaborating Institutes. In this case, n+2 budgets will be

created:

One expenditure budget in every collaborating institute in which the budget allotted to that particular institute is captured.

One expenditure budget in the lead institute in which the budget allotted to the lead institute is captured.

One comprehensive proposal budget in the lead institute in which the entire Project Budget is captured.

For example, let us say that a project has IASRI as the lead institute and IARI as the collaborating institute. The total project budget

is Rs. 10 crore out of which IARI has been allotted Rs. 4 crore and IASRI Rs. 6 crore.

PI will create an expenditure budget in IASRI for Rs. 6 crore

PI will create an expenditure budget in IARI for Rs. 4 crore

PI will create a comprehensive proposal budget in IASRI for Rs. 10 crore

Note: Financial Transactions are done only against expenditure budget. The comprehensive proposal budget is only for reference.

Navigation Responsibility: IASRI Projects

Navigation->Project Details

Page 257: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

257 of 298

Multiple

Institute

Project

Click on “Enter Budget” option.

Page 258: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

258 of 298

Multiple

Institute

Project

First the PI will enter Comprehensive Proposal Budget.

Select the Project Number. In Budget Type field, select “Comprehensive Proposal Budget”.

1. Choose Comprehensive

Proposal Budget

2. Click on DFF

Page 259: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

259 of 298

Enter

Comprehe

nsive

Proposal

Budget

Click on the DFF Field. A new window will open

Enter fund type, scheme name and division. As this is an externally funded project, user will enter funding agency name and country as

well.

After entering all the desired information, click on OK button.

Page 260: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

260 of 298

Enter

Comprehe

nsive

Proposal

Budget

Click on “Details” Button. A new form will open.

Enter

Comprehe

nsive

Select Major Expenditure Head (e.g. Grants – Capital) and click on “Budget Lines” Button. A new form will open. A note will open.

Click on OK.

1. Choose the Major

Expenditure Head

2. Click here

Page 261: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

261 of 298

Proposal

Budget Note: The Budget that you enter for a particular month is valid for that entire financial year. For example, if you enter the budget for June

2013, it will be valid for the period April 2013 to March 2014.

User will enter Minor Expenditure Head and Amount Type as shown and enter budget for all years.

1. Choose minor

expenditure head 1. Choose Raw Cost 3. Enter amounts for

the year

Page 262: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

262 of 298

Similarly enter budget for all other major and minor expenditure heads. Save your work.

Click on Submit Button.

Click here

Page 263: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

263 of 298

Click on Baseline Button. With this the budget gets saved.

Note: After clicking on Baseline button, the budget becomes available for financial transactions.

Click here to

Baseline Budget

Page 264: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

264 of 298

Enter

Expenditu

re Budget

for Lead

Institute

Enter Expenditure Budget for Lead Institute (refer to process 4.4)

Enter

Expenditu

re Budget

for

Collaborat

ing

Institute

Note: For collaborating institute, a separate project with a unique project number is created in that institute. In this project, you can only

enter budget for that particular project i.e. you cannot enter workplan details, just expenditure budget for the collaborating institute.

Note: The Project Code for this Project will be the PME Code prefixed by the three digit institute code (same code used to represent

institute in document numbering) to mark a distinction with the lead institute project. So if the PME Code is

AGEDIASRICIL201332115347 for a project number 1000111 running in IASRI with IARI as the collaborating institute, for IARI the

budget created will be in project number 1000112 and project code 156-AGEDIASRICIL201332115347 as 156 is the institute code for

IARI.

Page 265: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

265 of 298

Enter Expenditure Budget for collaborating institute (refer to process 4.4)

Page 266: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

266 of 298

11 Find/Open a Document

Find/Open

a

Document

In Recent Documents, only the ten documents which the user has most recently accessed are displayed as shown below:

To find a document (which may not be displayed in the list of recent documents), click on Find Button.

Click on Torch (It is

the Find Icon)

Page 267: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

267 of 298

Find a

Document As shown below, enter the Document Number and click on Find

1. Choose Institute

2. Enter Document

Number

3. Click on Find

Page 268: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

268 of 298

Find a

Document Click on Go To Button and select Authoring Workbench Option. With this the Document is opened successfully.

1. Click here

2. Choose this option

3. Click on OK

Page 269: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

269 of 298

12 Run/View a Report

Run/View

a Report From the toolbar menu at the top, select View Requests

Page 270: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

270 of 298

Run a

Report Click on "Submit a new Request" to run a report (or “Find” to view a report).

Select "Single Request” and click "OK"

Click here to run a report Click here to view a

report

Page 271: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

271 of 298

Run a

Report Enter Report Name

Enter Parameters and click on OK.

Page 272: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

272 of 298

1. Enter Report Name

2. Enter Parameter 1

Institute Name

3. Enter Parameter 2

Status Report

Page 273: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

273 of 298

Run a

Report Click on Submit Button.

A note will come. Click on No.

Page 274: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

274 of 298

View a

Report Click on "Find" Button to view a report

Click here to view a

report

Page 275: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

275 of 298

View a

Report User will choose the report and click on “View Output” Button.

Click on View Output

Page 276: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

276 of 298

13 Reports

Reports Output for the following reports can be obtained from the system:

Report Name Report Description

ICAR Status Report It provides the Status Report output.

ICAR RPP-I Report It provides the RPPI output.

ICAR RPP-I Checklist Report It provides the RPPI Checklist Report output

ICAR RPP-I Checklist Summary Report It provides the RPPI Checklist details for a list of projects for a particular institute (or

division) for a particular period (signified by the start date and end date)

ICAR PME Cell Appraisal Report It provides the PME Cell Appraisal Report output

ICAR Proposal vs. Expenditure Budget Report It provides the comprehensive proposal budget (if applicable) and expenditure budget details

for a particular project

ICAR RPP-II Report It provides the RPPII report output.

ICAR Project Rating Report It Provides Rating given to a range of projects undertaken in a particular period by HoD,

Director etc.

It is valid for both RPPII and RPPIII document types.

ICAR RPP-III Report It provides the RPPIII report output

ICAR RPP-III Checklist Report It provides the RPPIII Checklist Report output

ICAR RPP-III Checklist Summary Report It provides the RPPIII Checklist details for a list of projects for a particular institute (or

division) for a particular period (signified by the start date and end date

ICAR Statement of Expenditure Report It provides the Statement of Expenditure for a particular project.

You can optionally give the period for which the expenditure report is required.

ICAR Final Project Evaluation Report by PI It provides the Final Project Evaluation Report by PI output

ICAR Final Project Evaluation Report by It provides the Final Project Evaluation Report by Evaluation Committee output

Page 277: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

277 of 298

Evaluation Committee

ICAR Project Publication Detail Report It provides the output/cumulative output for a range of documents (RPPII/RPPIII) created in

a particular period.

ICAR Project Status Report for IRC It provides the Project Status for IRC. This report is relevant for the PME Cell.

ICAR Project Funding Report This report provides details of the project funding.

ICAR RPP-IV Report It provides the RPPIV report output

Page 278: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

278 of 298

14 Creation of Project Receipts

Reports 1. Create Receipt in system (follow normal steps)

Page 279: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

279 of 298

Page 280: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

280 of 298

2. Additionally, to enter Project related information, click on DFF as shown below:

Page 281: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

281 of 298

3. New window will open. Click on LOV button and select “Project Receipt”.

Page 282: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

282 of 298

4. Select the correct project number (search via project number/PIMS Code/Project Title)

Page 283: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

283 of 298

5. Continue with the normal process – enter received from, nature of receipt etc.

Page 284: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

284 of 298

6. Continue with the normal process – click on distribution button and enter fund type, scheme etc.

Page 285: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

285 of 298

7. Continue with the normal process – save the receipt.

Page 286: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

286 of 298

15 Enter Budget for Externally Funded Project

Reports 1. Login into the ERP Application and click on the Projects folder

2. Click on “Enter Budget” link. The following window will open up.

Page 287: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

287 of 298

3. In the “Project Number” field: a. either enter your 7 digit system generated project number or

b. click on the dropdown (LOV) button.

i. A new window will open up

ii. In the find field, enter “%” symbol and click on Find button.

iii. Enter your project number or your PIMS/PME Code between “%” symbols and click on find button. E.g. if the PIMS code is IXX00125, enter

%IXX00125% and click on find button.

Page 288: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

288 of 298

4. The next field to be filled is Budget Type. If you are entering budget in which you will enter funds available for your institute to carry out the project,

select “Expenditure Budget” and click on OK.

Page 289: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

289 of 298

5. A new window will open up. Here let us enter the following values:

a. Fund Type: Enter the fund type of your project. For Example, institute funded project come under Plan. Externally Funded Projects come under Deposit

Schemes. If the Funding Agency for the externally funded project is Domestic, select Deposit Schemes – Domestic. If the Funding Agency for the

externally funded project is Foreign, select Deposit Schemes – Foreign. In this example, let us assume project is funded from domestic funding agency

(DBT).

b. Scheme Code: Select the name of the scheme under which your project is running.

Page 290: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

290 of 298

c. Division Name: Select the name of the division under which this project is running.

d. Funding Agency Name: Enter the name of the funding agency (mandatory and only for externally funded projects).

e. Funding Agency Country: Enter the country of the funding agency (mandatory and only for externally funded projects).

f. Click on OK.

6. Now user needs to allocate budget in the project. To accomplish this, click on “Details” button. A new window will open.

Page 291: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

291 of 298

7. Here user can see the 3 major expenditure heads. There are separate minor heads under each major head. Process to enter budget in any minor head will

remain the same. In this example, let us allocate under equipments. Equipments will come under Grants – Capital. So select Grants – Capital from the

window above and click on Budget Lines Button. A note will appear which says:

“Please note that Budget Amount that you enter for a particular month would be Applicable for that financial year.”

Page 292: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

292 of 298

Click on OK. A new window will open.

Page 293: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

293 of 298

8. Here we will enter the following information:

a. Minor Expenditure Head: Click on the drop-down button and you can see the minor heads under that particular major head (in this example, Grants –

Capital).

Page 294: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

294 of 298

Select the appropriate minor head and click on OK.

b. Amount Type: Click on the dropdown button. Value “Raw Cost” will come automatically.

Page 295: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

295 of 298

In the next 4 columns, user can see four months. Remember the note which says “Please note that Budget Amount that you enter for a particular month

would be Applicable for that financial year.” Therefore:

i. User may enter the budget in any month; he will be able to use that amount for the entire financial year. For example, if user enters amount in November

2012, he/she will be able to use that budget for April 2012-March 2013.

ii. All the reports related to Projects MIS give financial year wise fund availability and not month wise fund availability (even though amount is entered

Page 296: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

296 of 298

month wise).

iii. To enter budget in some other month, user can navigate using the arrow buttons on the window.

c. Saving the row: As soon as you save your work, two more lines will be generated with amount type “Currency” and “NA”.

These rows are generated automatically by the system and are used for integration with other areas. User needs to enter only the “raw cost”. Note: Do not

enter the same “minor expenditure head” twice. A minor head can be entered only once on a budget; to enter values for multiple years use the arrow

Page 297: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

297 of 298

buttons to navigate. Note: The Equipment Listing (details of item wise equipment name, quantity and amount) will be entered on a separate form. On

budget, enter only the total equipment budget.

d. In a similar fashion, enter budget for other minor heads.

e. Close windows and reach the first window which is shown below:

Page 298: Implementation of Management Information System (MIS) Including ...misfms.icar.gov.in/TrainingManual/TM_Project.pdf · Projects MIS – User Manual Version 20.0 Oracle Projects MIS

Projects MIS – User Manual Version 20.0

298 of 298

f. Submit and Baseline: All the information that user enters will get saved in the draft status only. To change the status from draft to final, click on the

“submit” button once. The name of button will change to “baseline”. Then click on “baseline” button. And the status is changed to final.

Note: Until user submits and baselines the budget, he/she will not be able to create an indent against that project budget.