implementation of master plan and green policy at iit kanpur
DESCRIPTION
Implementation of Master Plan and Green Policy at IIT Kanpur. BOG approved Master Plan (i.e. 2011/4th meeting of the BOG held on 03.12.2011) Im plement the Green Policy of MHRD/IIT Council (Ref. MHRD DO No.1-11/2013-TS I ( Sectt .) dated 05.06.2013). - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/1.jpg)
Implementation of
Master Plan and
Green Policy at IIT Kanpur
Green Policy Workshop Held at IIT Kanpur, L7 on January 18th, 2014 (Saturday)
![Page 2: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/2.jpg)
1. BOG approved Master Plan (i.e. 2011/4th meeting of the BOG held on 03.12.2011)
2. Implement the Green Policy of MHRD/IIT Council (Ref. MHRD DO No.1-11/2013-TS I (Sectt.) dated 05.06.2013).
Open House Forum on 14.01.2014 at 4 P.M. to collect views and opinion from the IIT Kanpur Community so that an inclusive and cohesive strategy can be formulated for the implementation of Master Plan and Green Policy (prior mails/views are welcome).
On 14th Jan (4-6.30 pm): 35 members (staff, students, scholars, faculty members) expressed their views
Joint EAC and GC meeting held on 15.01.2014: Ten (10) immediate action plans identified
![Page 3: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/3.jpg)
IIT Kanpur Campus
![Page 4: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/4.jpg)
Need for augmenting infrastructure
• To create new departments, academic programs• To augment research facility + infrastructure• To enhance research scholar community • To increase student strength in phases • To improve quality of life on campus• To promote translational research • To initiate new research projects• To create new faculty offices• To accommodate scholars
![Page 5: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/5.jpg)
Ground Coverage
(in %)(A)
Area under roads(in %)
(B)
(A) + (B)Open Space(in %)
Phase I (1959-96) 3.7 8.8 12.5 87.5
Phase II (1996-2011) 5.6 10.4 16 84
Expansion(Future Growth)
8.5 13.9 22.4 77.6
Land Use in IIT Campus*
*Source: Master Plan 2021 (20th Sept 2011)
![Page 6: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/6.jpg)
Green Initiative at IITK• 46th meeting (07.01.2013) of IITs Council decided to establish a
Green Cell.• MHRD vide its guidelines as per letter DO No. 1-11/2013-TS I
(Sectt.) dated 05.06.2013) advised IIT Kanpur to implement.• Theme Workshop on Green Policy at IITK (Open House) was
held on 07.10.2013.• Internal meetings were held on 03.10.2013, 07.10.2013 and
16.10.2013.• MHRD vide its letter D.O. F. No. Misc/HRD-IITs/2013 dated
19.11.2013 has circulated clarification about Green Office. • The Institute vide Office orders dated 03.12.2013 constituted an
Environmental Advisory Committee (EAC) and a Green Cell (GC).
![Page 7: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/7.jpg)
Green Policy
• A National Workshop on Green Policy was held
on October 17, 2013 at IIT Kanpur following a
recent initiative of MHRD
It was decided to:a) Reconstitute the Environmental Advisory
Committee(EAC) and give it a broader role in formulating the environmental policy of the institute
b) Set up a Green Cell (GC) for educating and sensitizing the campus regarding environmental issues besides formulating, initiating, implementing and monitoring various environmental initiatives in the campus
![Page 8: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/8.jpg)
Environmental Advisory Committee
• It shall be the primary policy making body regarding environmental issues inside the campus
• The EAC will be responsible in implementing the Green Policy of MHRD
• The EAC will represent the viewpoints of all stakeholders, both inside and outside the campus
• The EAC will be headed by the Director and SE(IWD) shall be its convener
• The EAC will normally meet once or twice a semester and formulate the broad agenda for the green initiatives to be pursued in the institute
![Page 9: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/9.jpg)
Composition of EACChairperson DirectorConvener SE(IWD)Members Deputy Director, DORA, Two
representatives of Student Gymkhana, Secretary of Alumni Association, External Environmental Expert, Faculty Forum Representative, Officer Representative(to be nominated by the Registrar), Non Teaching Staff Representative, Campus Community Representative
Special Invitees
PIC(Civil), PIC(Electrical), PIC(Refrigeration), Chairperson of Green Cell
![Page 10: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/10.jpg)
Green Cell
• Shall gather the initial baseline data regarding various environmental parameters in IIT Kanpur campus and update/maintain this data on an ongoing basis
• Shall offer strategic input to the EAC regarding environmental initiatives to be adopted
• Offer advice to the IWD regarding environmental initiatives to be adopted
• Monitor the effectiveness of the adopted environmental initiatives
![Page 11: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/11.jpg)
Electricity consumption and air conditioning
Sanctioned load : 8.5 MVaPeak load: 7.8 MVa
With the proposed construction, the peak is likely to touch 13 MVa.
Cost to institute will be about 40 crores / yr (present tariff, present bill is about 25 crore)
Air-conditioning load is about 6000 tonnes, which is likely to go to 8000 t !!
![Page 12: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/12.jpg)
Water as a resource
100% dependence on ground water
Surface water (Ganga water) is likely to reach campus in a few months
Plan to go for hybrid consumption, and depending on the quality and reliability of the supply, the dependence on ground water to be reduced.
![Page 13: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/13.jpg)
POLICY ISSUES:1. Open ground on campus: at least 70% (70-30
policy)2. Space audit – both open + occupied areas 3. Semi-perforated parking lots – open space4. 25% of campus be declared and developed as
‘forests’ (pristine state)5. Allow passage to neighboring villages and
population (peaceful co-existence) 6. Concerns and issues (OPEN HOUSE): forest,
wet lands, waste, recycling, safety, buildings, CO2 emission, biomass, rain water, animals, paper less office policy (senate), lighting, refrigeration, ventilation, gardening, roof treatment, traffic control
7. GIS mapping and comparison with Master Plan
8. Make campus ‘physically challenged friendly’
![Page 14: Implementation of Master Plan and Green Policy at IIT Kanpur](https://reader036.vdocument.in/reader036/viewer/2022062501/56816915550346895de03180/html5/thumbnails/14.jpg)
• Identification of green field sites for development
• Re-densification of existing development• Redevelopment of older buildings • Refurbishment / renovation of existing
buildings• Space and energy audit of buildings/campus
– Internal and External auditRoadmap: Green Policy/Office = EAC and GCell Baseline data collection, documentation,
dissemination/reporting – Website Policy on flora and fauna, water, energy, waste, rain,
effluent, infrastructure augmentation New technology of construction, monitoring, auditing,
maintenance, power saving (sensors) MOOC, Website, Books on birds, animals, vegetation