Presented by

© Copyr i gh t 2013 OSIso f t , LLC.

Implementation of

PI System in ČEZ

Martin ZECHOVSKÝ

© Copyr i gh t 2013 OSIso f t , LLC.

Agenda

– Introducing Czech Power Company CEZ

– Project CUTD

2

© Copyr i gh t 2013 OSIso f t , LLC.

Czech Power

Company CEZ

3

© Copyr i gh t 2013 OSIso f t , LLC.

About CEZ Group

– 1992 ČEZ a.s. founded by the National Property

Fund

– 2003 Created CEZ Group

– 2005 Foreign expansion started, three

distribution companies in Bulgaria

– 2012 Commissioning of the 600 MW wind farm

in Constanta Country

4

© Copyr i gh t 2013 OSIso f t , LLC.

CEZ Group in Europe – 112 companies

5

Energy activity

Business activity

Country conditional interest

Active subsidiary companies

© Copyr i gh t 2013 OSIso f t , LLC.

10 larges energy companies in Europe

6

GdF Suez

EdF

E.ON

Enel

Ibedrola

RWE

Fortum

CEZ

EnBW

PGE

39.7

32.2

27.8

27.6

25.9

16.8

12.5

11.9

8.2

7.5

Enel

EdF

Ibedrola

E.ON

RWE

GdF…

EdP

CEZ

EnBW

PGE

61.0

37.0

30.7

26.0

24.3

11.3

11.1

9.7

5.5

5.0

10 Largest energy companies in Europe

Number of customers in 2011, in millions

10 Largest energy companies in Europe

Market capitalization in € bn as of May 2013

© Copyr i gh t 2013 OSIso f t , LLC.

CEZ Power plants in Czech Republic

7

Nuclear

Hydro

Pumpe storage

Brown Coal-fired

Biomass

Heating plant

Black Coal

Wind

Solar

Black coal and coke oven gas

CCGT

Ownership ČEZ, a.s.

Ownership of another member

ČEZ Group

© Copyr i gh t 2013 OSIso f t , LLC.

CEZ in Czech Republic

8

Installed capacity Production of electricity

© Copyr i gh t 2013 OSIso f t , LLC.

Project CUTD

9

© Copyr i gh t 2013 OSIso f t , LLC.

Project CUTD

– Baseline

– Selecting a solution

– PI System implementation

– Current status and first experience

– Expected benefits and advantages

10

© Copyr i gh t 2013 OSIso f t , LLC.

Baseline

11

Interfaces

Control systems

User applications

© Copyr i gh t 2013 OSIso f t , LLC.

Technical requirements for new solution

– Data collection method of collection, storage, work with data…

– Data processing calculations, time slices, export data…

– Long term data storage identification data structure, data history, creating groups of data…

– Provision of Data unified interface, report generation ...

– General requirements for the system centralized solution respecting standards

ČEZ ICT Services, buffering ...

– System Security Administration access, logging, auditing, ...

– Integration of the surrounding systems

– Connection to centrally manage access roles

– Infrastructure requirements

12

© Copyr i gh t 2013 OSIso f t , LLC.

Selecting a solution

– Technical requirements • Detailed technical evaluation

• Ready-to-use product or custom development

– Reference visits

EDP Portugal

Ibedrola Spain

Mondi Štětí Czech Republic

Lovochemie Lovosice Czech Republic

13

© Copyr i gh t 2013 OSIso f t , LLC.

Implementation of the PI environment

14

– Phase I Implementation of preparatory work, the creation of the project schedule

– Phase II Implementation of test and production environment for pilot plants

– Phase III Implementation environment for other plants, data migration of all data storages to CÚTD

– Phase IV Support for other projects providing links to applications CUTD

– Phase V Solution acceptance

© Copyr i gh t 2013 OSIso f t , LLC.

Solution architecture

15

– Local PI Servers • For the key assets

• NPP’s Temelin and Dukovany

– Central PI Server

• For the thermal plants and

hydro

• Collects data from NPP’s

• 100.000 tags currently

© Copyr i gh t 2013 OSIso f t , LLC.

Current status and first experience

– Connecting of power plants • ETU, ETE, CC EPC – pilot

• EPR, EPO, EPC - rollout

– Challenges to address • Understand what’s where

• Prepare the IT environment to start collecting data

– Testing, tuning

16

© Copyr i gh t 2013 OSIso f t , LLC.

New applications

– In progress • Operating economy

• PowerOPTI

• Valves revisions

– Upcoming • Chemical laboratories

• Turbine condition monitoring

• Vibrations

17

Operating economy

Valves revisions

PowerOPTI

© Copyr i gh t 2013 OSIso f t , LLC.

Expected benefits and advantages

– Technical advantages

• unification methods of collecting

• unification data sharing

• reducing access request directly to the control systems

– Economic benefit

• lower cost for manage applications

• lower infrastructure costs

18

© Copyr i gh t 2013 OSIso f t , LLC.

Future plans

• More applications on top of the CUTD

• More data

– PI Servers extensions

• Robustness

– HA

• More users

– PVS

• Access for equipment vendors

19

PI System

Users outside CEZ

Operating economy

Valves revisions

PowerOPTI

© Copyr i gh t 2013 OSIso f t , LLC.

Martin ZECHOVSKÝ

[email protected]

ČEZ, a.s.,

Power Plant Ledvice

www.cez.cz

+420 724 880 596

20

Brought to you by

© Copyr i gh t 2013 OSIso f t , LLC.

&

Presented by

© Copyr i gh t 2013 OSIso f t , LLC.

I & C Energo

PI Implementation

&

SW Solutions

Petr HOŘENÍ

© Copyr i gh t 2013 OSIso f t , LLC.

Agenda

– I & C Energo, OSIsoft partner - introduction

– PI implementation in ČEZ

– PI based software solutions

• Operating Economy - operation efficiency evaluation

• PowerOPTI - operation efficiency optimization

23

© Copyr i gh t 2013 OSIso f t , LLC.

I & C Energo - Introduction

I & C Energo (since 1993) • An engineering and supplier organization providing services

in the field of I&C systems, electric systems a information systems for power generation, power distribution and other industries

• Main offices in Czech Republic and Slovakia, projects worldwide

Selected indicators • Approx. 1300 employees

• 2011 revenues > 100 mil. EUR

• 2011 EBIT > 10 mil. EUR

Main products • Capital projects

• Service (nuclear, industrial)

• Power Production Optimization

24

© Copyr i gh t 2013 OSIso f t , LLC.

Power Production Optimization Division

25

OUR CUSTOMERS ARE:

Power plants:

Nuclear

Coal-fired

Combined cycle

Renewable energy sources

Heating plants and heat supply systems

Industry

WE DELIVER TO OUR CUSTOMERS:

Process and technology analyses; Advanced data processing; Process modeling and simulation

Software solutions; Data warehouses; Diagnostics and optimization systems; Special instrumentation

Information systems; SCADA systems; Control systems

Software and hardware integration and consolidation

Complex deliveries

OSIsoft Partner since 2011

© Copyr i gh t 2013 OSIso f t , LLC.

PI Implementation in ČEZ

Should-Be Analysis • 2011 - Comprehensive comparison of

– Oracle based in-house solution

– WonderWare historian

– OSIsoft PI

Implementation • 2012 – 2013 (presented by Martin Zechovský)

• Mainly OPC, RDBMS and UFL Interfaces

• New WDPF interface (NPP Temelín)

Integration • More than 20 applications to be connected or based on PI System

• SQL and WebServices interfaces to PI and AF

• SharePoint applications using PI WebParts

26

© Copyr i gh t 2013 OSIso f t , LLC.

Operating Economy

Operation efficiency evaluation • First PI based application in ČEZ

• Raw operation data from I&C systems

• Supplementary data (coal quality, water consumption, etc.) entered or imported through SharePoint application

• Data aggregated into 10 minutes values using PI Totalizer

• Energy balancing in calculation module using customized equation tree

• 10 minutes (NPP) or 1 day balanced data returned to PI

• Energy balance .xls reports using PI Datalink available in web browser using SharePoint Excel Services

27

© Copyr i gh t 2013 OSIso f t , LLC.

Operating Economy – I&C Data Collection

28

© Copyr i gh t 2013 OSIso f t , LLC.

Operating Economy – Web Client Application

29

© Copyr i gh t 2013 OSIso f t , LLC.

Operating Economy – Energy Balance Report

30

© Copyr i gh t 2013 OSIso f t , LLC.

PowerOpti – Main Functions and Benefits

• PowerOpti - monitoring, diagnosis and optimization of the performance of power plants and heating plants – Based on power plant thermodynamic model

– Increase in the precision, accuracy and reliability of measurements (gross error detection and data reconciliation)

– Obtaining a real picture of the actual condition of the equipment and the technological process

– Timely detection of equipment faults and malfunctions in the technological process

– Equipment diagnosis and degradation detection

– Technological process optimization

31

© Copyr i gh t 2013 OSIso f t , LLC.

PowerOpti – Data Reconciliation

32

© Copyr i gh t 2013 OSIso f t , LLC.

PowerOpti – Reactor Power Output Refinement

33

© Copyr i gh t 2013 OSIso f t , LLC.

PowerOpti – Cooling Circuit Optimization

34

920,0

930,0

940,0

950,0

960,0

970,0

980,0

990,0

2,0 4,0 6,0 8,0 10,0 12,0 14,0 16,0 18,0 20,0 22,0

Ele

ctr

ica

l Po

we

r O

utp

ut C

orr

ec

ted

[M

W]

Wet Bulb Temperature[°C]

Pre-optimization

Post-optimization

Polyg. (Pre-

optimization)

Polyg. (Post-

optimization)

© Copyr i gh t 2013 OSIso f t , LLC.

PowerOpti – PI Based Application

• PowerOpti RunTime – PI Reader, SnapShot Totalizer

– Reconciliation job executing

– PI Writer

• PowerOpti TechStudio – Plant thermodynamic model configuration

– Reconciliation job setup

– Test calculations

– Recalculation

• RECON – Plant thermodynamic model development

– Reconciliation library

• PowerOpti WebClient – Plant schema with raw, reconciled and estimated data using PI Graphic WebPart

– Easy comparison of selected values using PI Trend WebPart

35

© Copyr i gh t 2013 OSIso f t , LLC.

PowerOpti – WebClient Using PI WebParts

36

© Copyr i gh t 2013 OSIso f t , LLC.

Petr Hoření

I & C Energo a.s. Power Production Optimization Division

Vaculíkova 1a

638 00 Brno

Czech Republic

[email protected]

+420 602 546 822

37

© Copyr i gh t 2013 OSIso f t , LLC.