Page 1: Implementation progress – second stage Olaf Islei European Strategy and Environment

Implementation progress – second stage

Olaf Islei

European Strategy and Environment

Page 2: Implementation progress – second stage Olaf Islei European Strategy and Environment

2

Project backgroundGas Flows Transmission Capacity(F1) Daily flow and

interruptions(C1) Max technical capacity

(F2) Daily prompt allocations (C2) Interruption probability

(F3) Daily aggregate day-ahead nominations (C3)

Daily commercial firm and interruptible capacity

(F4) Historic gas flows  

• TSO agreement to release new data during 2008

• Focus on a priority subset of information

• Three stages of implementation

• Transparency key for market developments

Page 3: Implementation progress – second stage Olaf Islei European Strategy and Environment

3

Export/Import Points

Page 4: Implementation progress – second stage Olaf Islei European Strategy and Environment

4

Overall Progress

16 TSOs x 7 Data Types = 112

Page 5: Implementation progress – second stage Olaf Islei European Strategy and Environment

5

Overview: Status October 08

  E.ON GT

Fluxys

Sven. Kraft.

RWE TNG

Nat. Grid

Interconnector

Gaslink

WINGAS Ontras GRT

gazEnerginet

Gasunie DEP Swed

egasGdF DT GTS BBL

(C1) Max technical capacity in place in

place N/A in place

in place in place in

placein

placein

placein

placein

placein

placein

place final in place

in place

in place

(C2) Interruption in place 2009 ? N/A in

placein

place in place 2010?

in place 3 - rule in

placein

placein

placein

place final in place

in place final

(C3) Daily commercial firm and interruptible capacity

in place in place N/A in

placein

place in place in place

in place

in place

in place

in place

in place

in place final in

placein

place final

(F1) Daily flow / aggregated Allocation

in place 2009 ? N/A in

placein

place in place in place final 3 - rule in

place final in place

in place final in

placein

place final

(F2) Daily prompt allocation information

in place in place

in place

in place

in place in place in

placein

placein

placein

placein

placein

placein

place N/A in place

in place

in place

(F3) Daily aggregate day-ahead nominations

in place 2009 ? Final in

place final in place in place final 3- rule 2009

?2009

? final final N/A 2009?

in place

2009?

(F4) Historic gas flow information database

in place in place N/A in

placein

place in place in place

in place 3 - rule in

placein

placein

placein

place final in place

in place final

Number of IPs 22 23 1 5 8 4 1 8 3 9 6 7 2 1 5 25 4

3 minus rule IPs 0 8 0 3 0 0 0 3 3 0 0 0 0 0 0 12 0

Later Publication Existing October 2008 In placeDecember 2008 Final Three minus or not required

Overall Implementation Progress

Page 6: Implementation progress – second stage Olaf Islei European Strategy and Environment

6

December 2008 – Final Stage

Page 7: Implementation progress – second stage Olaf Islei European Strategy and Environment

7

Late implementation - 2009 ?

Page 8: Implementation progress – second stage Olaf Islei European Strategy and Environment

8

Next Steps

• Phase I– Publish final implementation report (February 2009)– Stakeholder workshop end of February 2009

• Phase II (still to be agreed – indicative)– Workstream on harmonisation of data definitions and format– Workstream on incremental data release at import/export

points– Discussion at workshop in February 2009– Target = agreement by April 2009

Page 9: Implementation progress – second stage Olaf Islei European Strategy and Environment

9