Sandomierz, 12.12.2016
Report on Public Consultations of the Land Acquisition and Resettlement Action Plan
for the Contract 3B.1:
Flood protection Sandomierz
implemented within the
Odra-Vistula Flood Management Project
The draft of Land Acquisition and Resettlement Action Plan (RAP) for the Contract
3B.1 Flood protection Sandomierz was subject to the public consultation carried out in
accordance with the World Bank Operational Policy (OP 4.12.) requirements. Public
consultations were to enable the public to become familiar with the document and to ensure a
possibility of submitting comments, questions and suggestions to its contents.
After completion of the draft of RAP and obtaining acceptance of the World Bank to
start the public disclosure procedure, on 18.11.2016 an electronic version of the document (in
Polish and in English) was published on the websites of the Świętokrzyski Board of
Amelioration and Hydraulic Structures in Kielce (www.szmiuw.kielce.com.pl, Fig. 1),
Sandomierz Municipality (www.sandomierz.pl, Fig. 2) and Project Coordination Unit
(www.odrapcu.pl, Fig. 3).
Information on a possibility of reading the draft RAP and submitting suggestions and
comments, including contact person (e-mail address, address of a place where it was possible
to read the document, office hours, telephone number) were published in the local press. The
Announcement was published on 18.11.2016 in the local supplement to Gazeta Wyborcza
(Fig. 4). The announcement was also made public by placing it on the notice board of
ŚZMiUW in Kielce (Photo 1), local branch of ŚZMiUW in Sandomierz (Photo 2),
Koprzywnica Town and Commune Office (Photo 3), Samborzec Commune Office (Photo 4)
and City Hall in Sandomierz (Photo 5), as well as on the websites of the above mentioned
institutions. The published Announcement included also information on the planned
consultation meeting within public consultations of LARAP (jointly with providing a date,
time, location and purpose of the meeting).
2
Individual invitations were sent to the Marshall of Świętokrzyskie Voivodeship,
Świętokrzyski Voivode, Starost of Sandomierz Poviat, Mayor of Sandomierz, Mayor of
Koprzywnica Town and Municipality, Head of Samborzec Commune, City Council of
Sandomierz, Town Council in Koprzywnica, Commune Council of Samborzec, Director of
RZGW in Kraków, Member of the Board of Świętokrzyskie Voivodeship, Director of the
Rural Areas Development and Environment Department, Head of Koćmierzów village, Head
of Sośniczany village, Head of Szewce village, Head of Zajeziorze village and Club of
Sandomierz Fans.
Hard copy of the document was also provided and made available to all interested
parties in the period between 18.11.2016 and 09.10.2016 (21 calendar days) at the offices of
ŚZMiUW in Kielce (ul. Witosa 86, Kielce) and at the offices of the ŚZMiUW in Kielce,
Sandomierz Department (ul. Staromiejska 14, Sandomierz). During the public disclosure
period there were no persons who were interested to become familiar with a copy of the
document at the indicated locations. However, downloading of the files from the indicated
websites, was observed.
After the end of the 21 calendar day public disclosure period of draft RAP, there was a
meeting open to all the interested parties. Meeting took place on 12.12.2016 at the seat of the
Sandomierz District Governor’s Office (Mickiewicza Street 34), at 4:00 p.m. 23 people
attended the meeting (List of participants of the meeting in Sandomierz, Fig. 5 and Fig. 6).
The meeting was opened by the Consultant, who, presented purpose and plan of meeting, and
then presented (in the form of multimedia presentation) the rules of developing and
functioning of Land Acquisition and Resettlement Action Plan during the implementation of
the projects co-financed by the World Bank as well as detailed information on the draft RAP
for the Contract 3B.1 Flood protection Sandomierz.
Upon completing a presentation, the representative of the Consultant encouraged the
public to ask questions and submit any suggestions and doubts concerning the document
which was subject to public consultations. During the debates, participants asked a few
questions that were answered directly during the meeting. The participants drew the attention
to the following issues related to the draft RAP and the implementation of the construction
works.
3
1. There was a request to specify the term of construction works implementation within
the 3B.1 Contract.
In reply the representative of ŚZMiUW in Kielce informed that physical entry to the
site is planned for 1st/2nd quarter of 2017, whereas completion of construction works
is planned for 1st/2nd quarter of 2020.
2. There was a request for information if the flood gate at Glassworks is within the scope
of 3B.1 Contract Flood Protection Sandomierz.
In reply the representative of ŚZMiUW in Kielce informed, that rebuilding of the
surrounding embankment of Glassworks jointly with the flood gate performance on
the channel is an element planned for implementation within 3B.1 Contract Flood
Protection Sandomierz (facility: Extension of the surrounding embankment securing
against flood waters the Glassworks and residential district in Sandomierz jointly with
extension of flood embankment of the Vistula River from Lwowska Street to the
connection with Koćmierzów embankment), and therefore it is planned for
implementation.
3. There was a request for explanations as to the grounds of having public consultations
of Land Acquisition and Resettlement Action Plan for 3B.1 Contract in the situation
when the status of compensation payment for permanent occupancy is already 96%?
In reply the representative of PCU Kraków replied that the LARAP project concerns
not only payment of compensations for permanent occupancy already before the
commencement of construction works, but also includes numerous issues such as:
permanent limitation of property use manner, a possibility to lodge motions for
acquisition of remaining parts of the property left after division (so called “remaining
parts”), temporary occupancy, mitigation and compensation actions, complains and
motions lodging mechanisms in the scope of the implemented contract and
information issues. Relevant information on the above mentioned issues which are
valid during the contract’s implementation are included in the LARAP subject to
consultations.
4. There was a request for information on the guarantee of funds for the implementation
of 3B.1 Contract.
4
In reply the representative of ŚZMiUW in Kielce explained that 3B.1 Contract Flood
Protection Sandomierz is implemented within the Odra-Vistula Flood Management
project and it is co-financed by the International Bank for Reconstruction and
Development (World Bank - WB), Council of Europe Development Bank (CEB), state
budget and European Union funds within the Operational Programme Infrastructure
and Environment (OPIE). The task is on the non-competition list OPIE, the loan
agreement with WB was signed on 10th September 2015, whereas frame loan
agreement with CEB on 24th May 2016, therefore the funds for the implementation of
the Contract are already secured.
5. The attention was paid to the problem of flooding, during heavy rainfalls, of a
residential district located between the surrounding embankment and the Vistula
embankment in Sandomierz.
In reply the representative of ŚZMiUW in Kielce explained that under 3B.1 Contracts
there are works planned in relation to taking over flood water from Atramentówka
water course in order to prevent it from entering the area. Therefore, the embankment
water gate shall be rebuilt, a channel discharging water to the planned pumping station
in Koćmierzów shall be built. As a consequence flood water from Atramentówka
River shall not flow into the area of the residential district and the Glassworks.
6. Towards the end of the debate the significance of Glassworks, as an employer, for the
local community and the need to ensure its proper protection against flood was
underlined.
In reply the representative of ŚZMiUW explained that the works included under 3B.1
Contract are to improve flood safety of the area where not only Glassworks but also
dense residential developments of Sandomierz are located. Moreover, the planned
works concern other areas of Sandomierz and its surroundings (among others the
embankments of the Koprzywianka River, areas along Sielecka and Wielowiejska
Streets, pumping stations in Nadbrzezie, Szewce and Zajeziorze). Nevertheless, the
protection of the industrial area of Glassworks is also an essential purpose for the
implementation of 3B.1 Contract.
5
After providing the above clarifications, the participants were thanked for attending
and for active participation in the meeting. The meeting was adjourned. Comments submitted
by the community, does not result in making changes to the contents of this RAP.
Report done by: Jacek Jędrzejczyk
6
Fig. 1 An electronic version of draft RAP jointly with announcements concerning the social consultations
process of the draft RAP placed on the website of the ŚZMiUW in Kielce
7
Fig. 2 An electronic version of draft RAP jointly with announcements concerning the social consultations process of the draft RAP placed on the website of the
Sandomierz Municipal Office
8
Fig. 3 An electronic version of draft RAP jointly with announcements concerning the social consultations
process of the draft RAP placed on the website of the PCU
9
Fig. 4 The Announcement on public consultations of draft RAP placed in local press (supplement to
Gazeta Wyborcza, issue of 18th November 2016)
10
Phot. 1 The Announcement on public consultations of draft RAP placed on the noticeboard in ŚZMiUW
in Kielce
11
Phot. 2 The Announcement on public consultations of draft RAP placed on the noticeboard in ŚZMiUW
in Kielce, Sandomierz Department
12
Phot. 3 The Announcement on public consultations of draft RAP placed on the noticeboard in
Koprzywnica Municipal and Commune Office
13
Phot. 4 The Announcement on public consultations of draft RAP placed on the noticeboard in Samborzec
Commune Office
14
Phot. 4 The Announcement on public consultations of draft RAP placed on the noticeboard in Sandomierz
Municipal Office
15
Phot. 5 Public consultations of the draft RAP at the seat of the Sandomierz District Governor’s Office,
12.12.2016
Phot. 6 Public consultations of the draft RAP at the seat of the Sandomierz District Governor’s Office,
12.12.2016