IMPROVEMENT OF THE SAFETY OF THE WORK IN NRIC
Opera&onal program “Human resources development” 2007-‐2013, Scheme: BG051PO001-‐2.3.03 “Safe labor”
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree
-
Key dates for the implementaBon of the project
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
Commencing of the
procedure
Final term for submission of applica&ons
List of the approved projects
Signing of Agreement
Confirming of the schedule for
tendering procidures
Analyses of the labor’s ac&vi&es
End of the tendering procedure for
equipment and training – signed Agreement
End of the tendering
procedures for СРО-‐signed agreement
End of the ac&vi&es
Submission of final report
18.09.2012г. 26.11.2012г. 23.05.2013г. 28.06.2013г. 11.09.2013г.
27.09.2013г. 28.02.2014г. 08.08.2014г. 06.09.2014г. \.
-
Accomplished objecBves? Ø General objecBve:
§ Improved of the labor condi&ons and safety of the work force in NRIC.
Ø Specific objecBves: § Achieved factor of labor trauma&sm in NRIC is Кlт-‐0,91, which is lower than the average trauma&sm (Klt-‐1,22) under the economic ac&vi&es. From the beginning of the year up to the moment we have 4 registered case of labor trauma&sm. For the same period of the last year the registered cases had been 9; § Improvement of safety, health and produc&vity of the employees; § Gaining of knowledge and skills for work with the new equipment; § Becer produc&vity and effec&veness of the work force.
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
-
Task force
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
Ø 3800 employee of NRIC working in the fields of maintenance and repairing of the railway lines in different weather condi&ons wearing a special working clothes a n d w o r k i n g w i t h s p e c i a l equipment.
-
Employees of NRIC working in the following units:
Ø Maintenance and repairing of the railway lines and equipment; Ø Maintenance and repairing of signaling and tele-‐communica&on
equipment; Ø Maintenance and repairing of the catenary; Ø Rapid response units for recovering of the railway traffic in case of
accidents and incidents.
Task force IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
-
AcBviBes • 100% progress D1: Commencing of the project and formaBon of the team (opera&onal management)
• 100% progress D2: Performance of analyses of the labor acBviBes in NRIC
• 100% progress D3: Performing of tendering procedure and delivery of special working clothes
• 100% progress D4: Performing of tendering procedure and delivery of equipment (polyester sapans)
• 100% progress D5: Training of the employees for safety work with new delivered equipment
• 100% progress D6: Publicity and informa&on
• Forthcoming in near future D7: Audit of the project
up to 28.08.2014
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
-
Financing and duraBon of the project Ø Financing
§ Total amount of the project– 232 540 лв.
§ GFC (ESF + EFRD) – 186 032 лв.
Ø DuraBon § 12 months § June 2013 – September 2014 (temporary interrup.on for 2
months)
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
-
Special working clothes
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Ø Water resistance suit: jacket with hood and trouser with signaling elements for becer visibility.
Ø The general purpose of the suit is protec&on of the employees from the impact of different weather condi&ons and from vehicles moving along the railway line.
-
Ø Polyester sapans – used for equipment of the railways cranes working for recovering of the railway traffic aoer accidents or incidents;
Ø Reducing the heavy physical labor during the work with the exis&ng steel sapans (especially when is necessary their movement from one place to the other);
Ø The polyester sapans are not so heavy, they are more reliable, required significantly less number of employees to work with them and do not influence the health and the abili&es of the employees.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Delivered equipment
-
Ø Performed training for safety exploita&on of the new equipment • DuraBon of the training: 45 hours • Form of the training – every day lectures
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Theore&cal part: Module 1-‐ Introduc&on and horizontal principles: 1. General requirements for safety work 2. Rights, requirements and responsibili&es of the employees, related with safety work. 3. Circled sapans from polyester fibers: 3.1. Defini&on, construc&on, terms and marking 3.2. Color codding. 3.3. Table for hois&ng capacity. 4. Determina&on of working angel and choice of sapans
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Theore&cal part: Module 2 – Working with the new equipment: 1. Safety requirements 1.1. Signs and signals 1.2. Collec&ve protec&ve equipment. 1.3. Personal protec&ve equipment /PPE/ 2. Instruc&ons for exploita&on: 2.1. Control and check-‐up of sapans. 2.2. Way of exploita&on and types of catches. 2.3. Exploita&on in extreme working and weather condi&ons. 3. Keeping and condi&ons for discarding.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Theore&cal part: Module 3-‐ Improvement of the working process and implementa&on of good
prac&ces 1. Use of special joint elements. 2. Dobри практики при повдигане и монтаж 2.1. Laser leading 3. Contemporary technics for working posi&oning.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Ø PracBcal training
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Trainings of 106 employees and issue of cerBficate for accomplishment работещи и предоставено
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
Training
-
Results Ø Set up a team for project management; Ø Analyses for the present working condi&ons in
the company; Ø Have been performed 2 tender procedures; Ø On &me delivery of working clothes and
equipment in accordance with preliminary prepared specifica&on;
Ø Training of the employees working with new delivered equipment;
Ø Organiza&on and performance of two press conferences, issued 200 brochures, folders and ball-‐point pens;
Ø Prepara&on and installa&on of tree informa&on boards;
Ø Forthcoming prepara&on of audit report.
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
-
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree
The team
-
Take care!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
-
What should not be done in electrified secBons with tracBon current 25 КV :
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!
• Do not go up to the roof of the vehicles; do not open apertures of cisterns, freezing and other special wagons. • Do not go near and do not touch broken or hanging wires and ropes of the catenary and catenary’s elements, despite that they might touch the ground or grounded constructions.
-
Thank you for your apenBon!
PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”
Financed by the Operational program “Human resources development” and co-financed by the European Social Fund
IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!