improvement of the safety of the work in nric · nric. Ø specific objecbves : § achieved factor...

20
IMPROVEMENT OF THE SAFETY OF THE WORK IN NRIC Opera&onal program “Human resources development” 20072013, Scheme: BG051PO0012.3.03 “Safe labor” PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC” Financed by the Operational program “Human resources development” and co-financed by the European Social Fund I In nv ve es st ti in ng g i in n y yo ou ur r f fu ut tu ur re e

Upload: others

Post on 29-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • IMPROVEMENT  OF  THE  SAFETY  OF  THE  WORK  IN  NRIC  

    Opera&onal  program  “Human  resources  development”  2007-‐2013,    Scheme:  BG051PO001-‐2.3.03  “Safe  labor”    

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree

  • Key  dates  for  the  implementaBon  of  the  project    

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    Commencing  of  the  

    procedure  

    Final  term  for  submission  of  applica&ons  

    List  of  the  approved  projects  

    Signing  of  Agreement  

    Confirming  of  the  schedule  for  

    tendering  procidures    

    Analyses  of    the  labor’s  ac&vi&es    

    End  of  the  tendering  procedure  for  

    equipment  and  training  –  signed  Agreement  

    End  of  the  tendering  

    procedures  for    СРО-‐signed  agreement  

    End  of  the  ac&vi&es  

    Submission  of  final  report  

    18.09.2012г.   26.11.2012г.   23.05.2013г.   28.06.2013г.   11.09.2013г.  

    27.09.2013г.   28.02.2014г.   08.08.2014г.   06.09.2014г.   \.  

  • Accomplished  objecBves?  Ø General  objecBve:    

    §  Improved  of  the  labor  condi&ons  and  safety  of  the  work  force  in  NRIC.    

    Ø Specific  objecBves:  § Achieved   factor   of   labor   trauma&sm   in   NRIC   is   Кlт-‐0,91,   which   is   lower   than   the  average  trauma&sm  (Klt-‐1,22)  under  the  economic  ac&vi&es.  From  the  beginning  of  the  year  up  to  the  moment  we  have  4  registered  case  of   labor  trauma&sm.  For  the  same  period  of  the  last  year  the  registered  cases  had  been  9;    §   Improvement  of  safety,  health  and  produc&vity  of  the  employees;  § Gaining  of  knowledge  and  skills  for  work  with  the  new  equipment;  § Becer  produc&vity  and  effec&veness  of  the  work  force.  

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

  • Task  force  

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    Ø  3800   employee  of  NRIC  working   in  the   fields   of   maintenance   and  repairing   of   the   railway   lines   in  different   weather   condi&ons  wearing   a   special   working   clothes  a n d   w o r k i n g   w i t h   s p e c i a l  equipment.            

  •            Employees  of  NRIC  working  in  the  following  units:    

    Ø Maintenance  and  repairing  of  the  railway  lines  and  equipment;  Ø Maintenance  and  repairing  of  signaling  and  tele-‐communica&on  

    equipment;  Ø Maintenance  and  repairing  of  the  catenary;  Ø  Rapid  response  units  for  recovering  of  the  railway  traffic  in  case  of  

    accidents  and  incidents.  

    Task  force  IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

  • AcBviBes  •  100%  progress    D1:  Commencing  of  the  project  and  formaBon  of  the  team  (opera&onal  management)  

    •  100%  progress  D2:  Performance  of  analyses  of  the  labor  acBviBes  in  NRIC    

    •  100%  progress  D3:  Performing  of  tendering  procedure  and  delivery  of  special  working  clothes    

    •  100%  progress  D4:  Performing  of  tendering  procedure  and  delivery  of  equipment  (polyester  sapans)  

    •  100%  progress  D5:  Training  of  the  employees  for  safety  work  with  new  delivered  equipment  

    •  100%  progress  D6:  Publicity  and  informa&on  

    •  Forthcoming  in  near  future  D7:  Audit  of  the  project  

           up  to  28.08.2014  

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

  • Financing  and  duraBon  of  the  project  Ø  Financing  

    §  Total  amount  of  the  project–                                                                                                232  540  лв.  

    §  GFC  (ESF  +  EFRD)  –                  186  032  лв.  

    Ø  DuraBon  §  12  months  §  June  2013  –  September  2014                    (temporary  interrup.on  for  2  

    months)  

     

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

  • Special  working  clothes  

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    Ø  Water   resistance   suit:   jacket   with   hood  and   trouser   with   signaling   elements   for  becer  visibility.      

    Ø  The   general   purpose   of   the   suit   is  protec&on   of   the   employees   from   the  impact   of   different   weather   condi&ons  and   from   vehicles   moving   along   the  railway  line.  

     

  • Ø  Polyester  sapans  –  used  for  equipment  of  the  railways  cranes  working  for  recovering  of  the  railway  traffic  aoer  accidents  or  incidents;    

    Ø  Reducing   the   heavy   physical   labor   during   the   work   with   the  exis&ng   steel   sapans   (especially   when   is   necessary   their  movement  from  one  place  to  the  other);    

    Ø  The  polyester  sapans  are  not  so  heavy,  they  are  more  reliable,  required  significantly   less  number  of  employees  to  work  with  them  and  do  not   influence  the  health  and  the  abili&es  of  the  employees.    

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    Delivered  equipment  

  • Ø  Performed  training  for  safety  exploita&on  of  the  new  equipment  •  DuraBon  of  the  training:  45  hours  •  Form  of  the  training  –  every  day  lectures    

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    Training    

  • Theore&cal  part:        Module  1-‐  Introduc&on  and  horizontal  principles:    1.  General  requirements  for  safety  work  2.  Rights,  requirements  and  responsibili&es  of  the  employees,  related  with  safety  work.  3.  Circled  sapans  from  polyester  fibers:  3.1.  Defini&on,  construc&on,  terms  and  marking  3.2.  Color  codding.  3.3.  Table  for  hois&ng  capacity.  4.  Determina&on  of  working  angel  and  choice  of  sapans  

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    Training    

  • Theore&cal  part:  Module  2  –  Working  with  the  new  equipment:  1.  Safety  requirements  1.1.  Signs  and  signals  1.2.  Collec&ve  protec&ve  equipment.  1.3.  Personal  protec&ve  equipment    /PPE/    2.  Instruc&ons  for  exploita&on:  2.1.  Control  and  check-‐up  of  sapans.    2.2.  Way  of  exploita&on  and  types  of  catches.    2.3.  Exploita&on  in  extreme  working  and  weather  condi&ons.    3.  Keeping  and  condi&ons  for  discarding.    

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    Training    

  • Theore&cal  part:  Module  3-‐    Improvement  of  the  working  process  and  implementa&on  of  good  

    prac&ces    1.  Use  of  special  joint  elements.    2.  Dobри  практики  при  повдигане  и  монтаж            2.1.  Laser  leading  3.  Contemporary  technics  for  working  posi&oning.    

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    Training    

  • Ø  PracBcal  training  

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    Training    

  • Trainings   of   106   employees   and   issue   of   cerBficate   for   accomplishment  работещи  и  предоставено    

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    Training    

  • Results  Ø  Set  up  a  team  for  project  management;  Ø  Analyses  for  the  present  working  condi&ons  in  

    the  company;  Ø  Have  been  performed  2  tender  procedures;  Ø  On  &me  delivery  of  working  clothes  and  

    equipment  in  accordance  with  preliminary  prepared  specifica&on;  

    Ø  Training  of  the  employees  working  with  new  delivered  equipment;  

    Ø  Organiza&on  and  performance  of  two  press  conferences,  issued  200  brochures,  folders  and    ball-‐point  pens;  

    Ø  Prepara&on  and  installa&on  of  tree  informa&on  boards;  

    Ø  Forthcoming  prepara&on  of  audit  report.  

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

  • PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree

    The team

  • Take  care!  

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

  • What  should  not  be  done  in  electrified  secBons  with  tracBon  current  25  КV  :  

     

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!

    • Do not go up to the roof of the vehicles; do not open apertures of cisterns, freezing and other special wagons. • Do not go near and do not touch broken or hanging wires and ropes of the catenary and catenary’s elements, despite that they might touch the ground or grounded constructions.

  •      

    Thank  you  for  your  apenBon!  

    PROJECT BG051PO001-2.3.03-0758-C0001 „Improvement of the safety of the work in NRIC”

    Financed by the Operational program “Human resources development” and co-financed by the European Social Fund

    IInnvveessttiinngg iinn yyoouurr ffuuttuurree!!