Improvements to High Street and Kingstown Road (Route 108) Main Street to North Road South Kingstown, RI

Upload: others

Post on 19-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Improvements to High Street and Kingstown Road (Route 108)

Main Street to North Road

South Kingstown, RI

Project Aerial View

Purpose of Project

• To revitalize the roadway corridor

• Mitigate flooding in several problem areas through replacement of the drainage system

• Improve pedestrian safety 

• Improve sidewalks and enhance ADA compliance

Project Scope

• Pavement Replacement• New Sidewalks, Wheelchair Ramps, and Granite Curbing

• Stamped Concrete Crosswalks• Improved Signing and Pavement Striping• Drainage System Replacement/Catchment• Coordination with municipal utilities for advance contracts– Gas– Water

Traffic Data

Existing Pavement

Existing Pavement

Proposed Typical Section(Main Street to Schaeffer St)

Proposed Typical Section(Schaeffer St to Route 108)

Proposed Typical Section(High Street to Railroad Street)

Proposed Typical Section(Railroad Street to North Road)

Existing Sidewalks

Existing Sidewalks

Proposed Sidewalks / Wheelchair Ramps and Crosswalks

• Installation of new ADA compliant concrete sidewalk throughout entire length of High Street

• Installation of ADA compliant concrete wheelchair ramps at every street corner and crossing

• Replacement of crosswalks

• Installation of granite curbing

Proposed Crosswalks

High Street Existing Structures/Pipes

Route 108 Flooding

Proposed Drainage 

• High Street– Entirely new closed system of pipes and structures– Improved collection on western side streets

• Route 108– Additional structures and pipes added to existing system to increase catchment and capacity

– Additional curbing added to more effectively define gutter lines and eliminate ponding

– Cleaning and flushing of existing pipes / structures to remain

Construction

• Construction anticipated to begin Spring 2014

• Traffic during construction will consist of a standard 1 lane closure with alternating traffic

• Work schedule to be coordinated with school calender