RAG.AUSTRIA.ENERGIE
Improving the Up-time of Oil Lifting & Production Facilities in Brown Fields – a RAG Field Case
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 1
11
Society of Petroleum EngineersSociety of Petroleum Engineers
SPE Workshop - How to maximize the value of mature HC fields?
Budapest, 18. November 2010.
Facilities in Brown Fields – a RAG Field Case
RAG.AUSTRIA.ENERGIE
DI Alan ReinguberT +43 (0) 50 724 5413RAG, Schwarzenbergplatz 16, A-1015 Wien www.rag-austria.at
Improving the Up-time of Oil Lifting & Production Facilities in Brown Fields – a RAG Field Case
RAG.AUSTRIA.ENERGIE
Agenda
• Introduction
• Initial Situation
• Measures taken
• Results
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 3
• Results
• Summary
RAG.AUSTRIA.ENERGIE
Tail-End Production Challenges
Field lifeextended
Assumption:50 wells operated
1 EUR = 1.38 USD
Trea
tmen
t cos
ts /
Turn
over
[US
D/d
ay]
Revenue from Oil Sale
UOC 2006: 100%
Improved Operations: UOC 2009: 76%
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 4
extended
Water-oil ratio / Lifetime
Trea
tmen
t cos
ts /
Turn
over
[US
D/d
ay]
RAG.AUSTRIA.ENERGIE
How to maximize the value of mature HC fields?
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 5
• Extending field life by• Cost Reduction
• Production Increase (IOR/EOR)
RAG.AUSTRIA.ENERGIE
Introduction
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 6
RAG.AUSTRIA.ENERGIE
Facts & Figures about the relevant oil field
• Gaiselberg, Zistersdorf / Lower Austria• First Oil in 1937
• Gaiselberg-Field (2,5 km²)• RAG-Field (2,5 km²)
• Complex Geology bounded by major ‚Steinberg‘ Fault
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 7
• Complex Geology bounded by major ‚Steinberg‘ Fault• 40 stratigraphic units oil bearing (Sarmatian & Badenian age)• 15 fault blocks -> ~ 600 compartments
• HC height > 1000m in neogen basin fill• 62 wells (33 producer, 18 injector, 11 shut in)• field water cut: ~ 92%• unconsolidated sandstone formations
RAG.AUSTRIA.ENERGIEOverview – Geologic 3D Model
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 8
RAG.AUSTRIA.ENERGIE
Failure Statistics 1996 - 2005
40
50
60
# F
AIL
UR
ES
???
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 9
0
10
20
30
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
# F
AIL
UR
ES
Rod Failure Tubing leak Pump failure TOTAL
RAG.AUSTRIA.ENERGIE
Results after analysing the Initial Situation
• Main failure categories• Tubing leak
• Rod failure
• Pump failure
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 10
• Deferred Production
• Significant Workover Costs
• No spare capacity for • Well Stimulation
• Re-development of abandoned horizons
RAG.AUSTRIA.ENERGIERod Failure – severe wear & corrosion
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 11
RAG.AUSTRIA.ENERGIEParaffinic Tubing
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 12
RAG.AUSTRIA.ENERGIETubing Leak
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 13
RAG.AUSTRIA.ENERGIETremendous Corrosion
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 14
RAG.AUSTRIA.ENERGIE
Identified Areas for Improvement
• Improved tubing & rod design + operation parameters
• Improved Materials• Rod Pumps
• Rods with spray-metal couplings and protectors
• Tubing Specs
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 15
• Tubing Specs
• Line Pipe Specs
• Implementation of Production Chemicals• Corrosion inhibitor
• Paraffin inhibitor
RAG.AUSTRIA.ENERGIE
Improved Rod Sting Design and Operation Parameters
• Design & analysis with software tools like
• Theta‘s Rodstar, CBalance, XDiag
• Electronic dynamometer
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 16
• Electronic dynamometer
• Target/Actual comparison
• Optimization parameters• reduced wear (min. load, min.
side wall forces)
• maximized stroke length
• minimized rod dynamics
RAG.AUSTRIA.ENERGIE
Improved Materials I
• Use superior grade material• Rod String Grade D acc. to API
• Pump parts in special alloy acc. to RAG specification
• Spray-metal applications for couplings, spiral centralizers and sinker bars
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 17
• Rod protectors with modified Polyamid
spray metal applications
RAG.AUSTRIA.ENERGIE
Improved Materials II
• Tubing Grade J 55• with plastic liner (PE or PP)
- above pump seat to avoid rod buckling
- high deviated wells
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 18
- avoid paraffin & wax deposition due to insulation effects
• Line Pipes• C-steel with epoxy resin (or PE)
coating on the inside
RAG.AUSTRIA.ENERGIE
Increased Application of Production Chemistry
• Corrosion inhibitor selection• laboratory screening
• 20 products tested
• Pilot test in the field• 4 + 5 wells
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 19
• Simple wireline connected beam driven dosing pump
• Gradual field implementation• Developed module type dosing units
- Optimizing dosing and metering of inhibitors
- High inhibitor volume available for high volume producers
- Possibility to extend the module with second inhibitor barrel (paraffin/scaling…)
RAG.AUSTRIA.ENERGIE
Monitoring – Key Factor in Production Chemistry
Most critical factor for success!
• Use of test coupons (material C 1020)
• Mounted in pipe lines close to the well head
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 20
• Mounted in pipe lines close to the well head
• Period of application about 6 – 12 weeks
• Dismount and directly analyse in lab
• Optimize dosing rate according to lab results
RAG.AUSTRIA.ENERGIE
3
4
5C
OR
RO
SIO
N [m
m/y
r]Corrosion Inhibitor – Single Well GA-083
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 21
0
1
2
0 1 2 3 4 5 6 7 8 9 10 11
# CORROSION COUPON INSTALLATIONS
CO
RR
OS
ION
[mm
/yr]
Jan-
2007
Jan-
2008
Jan-
2009
Jan-
2010
RAG.AUSTRIA.ENERGIE
Corrosion Inhibitor – Corr. Rate Survey Results
3
4
5C
OR
RO
SIO
N [m
m/y
r]
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 22
0
1
2
0 1 2 3 4 5 6 7 8 9 10 11
# CORROSION COUPON INSTALLATIONS
CO
RR
OS
ION
[mm
/yr]
Corrosion Rate < 0.05 mm/yr
RAG.AUSTRIA.ENERGIE
40
50
60#
FA
ILU
RE
S
Failure Statistics I
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 23
0
10
20
30
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
# F
AIL
UR
ES
Rod Failure Tubing leak Pump failure TOTAL
RAG.AUSTRIA.ENERGIE
1,20
1,40
1,60
1,80
2,00
# W
OR
KO
VE
R /
WE
LL /
YR
Factor 10
Failure Statistics II
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 24
0,00
0,20
0,40
0,60
0,80
1,00
1,20
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
# W
OR
KO
VE
R /
WE
LL /
YR
Up-time: 1 Yr
Up-time: 2 Yr
Up-time: 5 Yr
RAG.AUSTRIA.ENERGIE
Ölproduktion (Tonnen)
41.512
33.265
38.101
28.89931.376
30.000
40.000
50.000
Ton
nen
tons
/ yr
Oil Production Statistics
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 25
21.955 22.296 22.30224.373
22.850
24.906
10.000
20.000
30.000
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Ton
nen
tons
/ yr
RAG.AUSTRIA.ENERGIE
Summary
• Up-Time of Lifting and Production equipment significantly improved (factor 10 !)
• Production Decline could be stopped
• Unit Cost savings about 25%
• No experiments in the field – structured approach from lab scale to
SPE Hungarian Section - Workshop | DI A. Reingruber | Budapest, Nov.18th 2010 26
• No experiments in the field – structured approach from lab scale to field scale.
• Know How and technology can be applied in other oil fields too.