imt-2020 (fifth generation) - base station · 2020. 7. 23. · i. pvc insulated - flexible cord =...

25
Public Engagement on Draft Technical Code MTSFB2004R0 IMT-2020 (Fifth Generation) - BASE STATION 22 July 2020, Wednesday 10.55 am Presentation by Ms Khairunnisa Ab Halim

Upload: others

Post on 15-Mar-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Public Engagement on Draft

Technical Code

MTSFB2004R0

IMT-2020 (Fifth Generation)

- BASE STATION

22 July 2020, Wednesday

10.55 am

Presentation by Ms Khairunnisa Ab Halim

Page 2: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

Outlines

1

2

3

Background

Objective & Benefit

Scope

2

4 Requirements

5 Technical Code Development Progress

6 Acknowledgement

Page 3: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

1 BACKGROUND

3

Page 4: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!4

Fixed and Wireless Terminal Working Group

(FWT)

STRUCTURE OF WORKING GROUP

5G UE Sub-Working Group (5G UE SWG)

Technical Code for 5G User Equipment

Technical Code for 5G Base Station

tasked to develop

Page 5: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

2 OBJECTIVE & BENEFIT

5

Page 6: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

OBJECTIVE OF TECHNICAL CODE DEVELOPMENT

• Communications and Multimedia Act1998, section 185 Act 588

• Communications and Multimedia (Technical Standards)

Regulations 2000

Pursuant to Act & Regulations

• General and technical specification for certifying IMT-2020 Base

Station (5G BS) to be used in Malaysia

Certification of Equipment

Page 7: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

https://www.sciencealert.com/why-are-people-so-scared-of-5g

https://spectrum.ieee.org/news-from-around-ieee/the-institute/ieee-member-news/will-5g-

be-bad-for-our-health

Page 8: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

BENEFIT OF TECHNICAL CODE

• Provide specification and guideline to importers and users on BS compliance to regulations and standards

• Ensure compliance of BS to standards and safety limits

• Protect mass public from health and safety hazards

• Assure mass public of compliance and safety of 5G BS

Stakeholders

• MCMC

• Public and end user of mobile systems• Manufacturer and importer of BS

• Telecommunications service provider

• Certifying agency

Benefits

Page 9: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

3 SCOPE

10

Page 10: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

SCOPE (1/3)

11

IMT-2020 (FIFTH GENERATION) – BASE STATION

This technical code specifies the minimum requirement for

Base Station (BS) that is intended for use in IMT-2020 mobile

telecommunications systems in Malaysia.

This Technical Code applies to IMT-2020 (Fifth Generation) 5G

Base Station based on the technologies as specified in

MTSFB2002R0. Document had completed Public

Comment & ready for Reference Panel

approval prior to MCMC submission

Page 11: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

SCOPE (2/3)Examples of 5G Base Station on Existing Structures

• Ground based tower (GBT)

• Rooftop

Tower

Monopole Tree

Centralized

• Special Structure

Billboard

Centralized

Page 12: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

SCOPE (3/3)Examples of 5G Base Station on Improvised Structures

• Traffic Pole• Advertisement Signage

• Street Pole

Page 13: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

4 REQUIREMENTS

14

Page 14: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

CONTENT OF TECHNICAL CODE

SCOPE, NORMATIVE REFERENCES & ABBREVIATION

GENERAL REQUIREMENTS • Power Supply

• Power Supply Cord &

Mains Plug

• Marking

TECHNICAL REQUIREMENTS

• Radio Frequency (RF)

• Electromagnetic Compatibility (EMC)

• Safety & Health

• Electrical Safety and Health

• Electromagnetic Field (EMF)

Exposure

Page 15: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

GENERAL REQUIREMENTS (1/2)

• Power Supply

• Operating voltage:i. Single phase = 240V +5% -10% and frequency 50Hz ± 1%

ii. Three phase = 415V +5% -10% and frequency 50Hz ± 1%

• In accordance to MS 406 or MS IEC 60038

• Adaptor shall be pre-approved by relevant Regulatory Body

Specify the requirements for the following items:

• Power Supply Cord & Mains Plug

• In line with requirements by Suruhanjaya Tenaga

• Power supply cord conformance:

i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5

ii. Rubber insulated – flexible cord = MS 2127-4 or IEC 60245-1

• Mains plug conformance:

i. 13A fused plug = MS 589-1 or BS 1363

ii. 15A fused plug = MS 1577

iii. Flat non-rewireable 2-pole plug = MS 1578 or BS EN 50075

Refer Information Booklet on Approval

of Electrical Equipment by ST

Page 16: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

GENERAL REQUIREMENTS (2/2)Specify the requirements for the following items:

• Marking

• Marking on equipment shall contain the following information:

i. Supplier/manufacturer’s name or identification mark,

ii. Supplier/manufacturer’s model or type reference, and

iii. Other markings as required by relevant standard

• Shall be legible, indelible and readily visible

• Shall have marking in either Bahasa Melayu or English

Page 17: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

TECHNICAL REQUIREMENTS (1/4)

• RADIO FREQUENCY• 5G BS shall operate within the following frequency bands:

• In addition, 5G BS may operate in other existing bands identified

in Malaysian IMT systems

Specify the requirements for the following scopes:

Refer MCMC’s

Spectrum Plan !

Page 18: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

TECHNICAL REQUIREMENTS (2/4)

• RADIO FREQUENCY (CONTINUED)

• Standard conformance to item (A) AND items (B) OR (C).

(A) All 5G BS shall comply to (one or more):

i. 3GPP TS 38.104 Version 15.5.0 Release 15;

ii. 3GPP TS 38.141-1 Version 15.2.0 Release 15;

iii. 3GPP TS 38.141-2 Version 15.3.0 Release 15;

iv. ETSI TS 138 104;

v. ETSI TS 138.141-1; and/or

vi. ETSI TS 138 141-2

Specify the requirements for the following scopes:

Page 19: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

TECHNICAL REQUIREMENTS (2/4)

• RADIO FREQUENCY (CONTINUED)

(B) 5G BS with Active Antenna System (AAS) shall comply to (one or

more):

i. 3GPP TS 37.145-1 Version 15.3.0 Release 15;

ii. 3GPP TS 37.145-2 Version15.3.0 Release 15;

iii. ETSI TS 137 145-1; and/or

iv. ETSI TS 137 145-2

(C) Multi-Standard Radio (MSR) BS shall comply to (one or more):

i. 3GPP TS 37.141 Version 15.6.0 Release 15; and/or

ii. ETSI TS 137 141

• If the 5G BS support other technologies, shall meet the respective

Technical Codes or Class Assignments

Specify the requirements for the following scopes:

Page 20: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

TECHNICAL REQUIREMENTS (3/4)

• EMC• Standard conformance:

i. ETSI TS 138 113; or

ii. Any equivalent

standard

Specify the requirements for the following scopes:

• SAFETY

AND HEALTH

ELECTRICAL SAFETY

ELECTROMAGNETIC FIELD

(EMF) EXPOSURE

• Standard conformance:

i. MC IEC 60950-1; or

ii. IEC 60950-22; or

iii. IEC 62368-1; or

iv. Any equivalent standards

• Shall comply to ICNIRP and

the measurement standard

for Specific Absorption Rate

(SAR) and incident Power

Density (PD):

i. IEC 62232; or

ii. Any equivalent

standards

Page 21: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

5 TECHNICAL CODE DEVELOPMENT PROGRESS

22

Page 22: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!23

REGISTRATION OF

NEW PROPOSAL

25/02/2020

DELIBERATION(6 SWG MEETINGS)

18/03/2020 – 18/06/2020

PUBLIC COMMENT (PC)06/07/2020 - 05/08/2020

Public Engagement:

22/07/2020

PC REVIEW11/08/2020

SUBMISSION TO

MCMC28/08/2020

We are here

TECHNICAL CODE DEVELOPMENT PROGRESS

Page 23: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!

6 ACKNOWLEDGEMENT

24

Page 24: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

Let’s collaborate @ MTSFB!25

• Digi Telecommunications Sdn Bhd

• edotco Malaysia Sdn Bhd

• Huawei Technologies (Malaysia) Sdn Bhd

• Maxis Broadband Sdn Bhd

• Nokia Services and Solutions Sdn Bhd

• Redsun Engineering Sdn Bhd

• Rohde & Schwarz Malaysia Sdn Bhd

• SIRIM Berhad

• Sony EMCS Malaysia Sdn Bhd

• Telekom Malaysia Bhd

• U Mobile Sdn Bhd

• webe digital sdn bhd

• Wideminds Pte Ltd

• YTL Communications Sdn Bhd

• Hansway Solution Sdn Bhd

• ITS Testing Services (M) Sdn Bhd

THANK YOU FOR YOUR CONTRIBUTION!

Page 25: IMT-2020 (Fifth Generation) - BASE STATION · 2020. 7. 23. · i. PVC insulated - flexible cord = MS 2112-5 or BS 50525-2-11 or IEC 60227-5 ii. Rubber insulated –flexible cord =

26