in 2007 , significant part of our activities have been focused on thermo energy
DESCRIPTION
Via Ocel ltd was founded in the year 2000 as enterprise for manufacturing, engineering, sales, export and import Via Ocel took part in realization of significant international projects of modernization, reconstruction and development of district heating system in Belgrade - PowerPoint PPT PresentationTRANSCRIPT
Via Ocel ltd was founded in the year 2000 as enterprise for manufacturing, engineering, sales, export and import
Via Ocel took part in realization of significant international projects of modernization, reconstruction and development of district heating system in
Belgrade
So far enterprise done many miles of hot water pipe systems, hundreds of district heating system connections
and almost 30% of total substations reconstructed in Belgrade
In 2007, significant part of our activities have been focused on thermo energy.
Beside manufacture and delivering parts for substantial overhaul in power plants , services have been provided in a field of basic, detailed and reversed engineering such as:
• pressure parts• fossil fuel firing equipment• boiler pipe systems and steam lines • transport and handling systems for coal, slug and ash
…all in order to increase energy efficacy, reliability and extend life of coal mill equipment and FD and ID fans; above all, to reduce pollution and emission of environment unfriendly gases.
Certificates
Wholesale of metal products, engineering and mounting
Certificates
Material and welding technology
Pressure equipment 97/23/EG
OSNOVNE DELATNOSTI
MAIN ACTIVITIES
MAIN ACTIVITIES
HEATING AND DISTRICT HEATINGInternal hot water pipe systems, substations
POWER PLANTS AND FACILITIESSteam and hot water boilers, heating services for boilers, mills and combustiondevices
EXPORT AND IMPORT / TRADEFerrous and non ferrous products
ENGINEERINGDesign, construction and maintenance
TERMOTEHNIČKA POSTROJENJA
THERMOTECHNICAL FACILITIES
• Heating substations for district heating and domestic hot water
• Monitoring and control of function from the distribution centers
• Equipment made by leading world producers
HEATING SUBSTATIONS
• Compact design, reliable and easy to maintain
• Fully automated operation in accordance with clients requires
• Significant saving of energy consumption
TERMOENERGETSKE INSTALACIJETHERMOENERGETIC FACILITIES
• Energy boilers piping system• Steam and pipelines• Combustion systems of solid
fuel• Coal mills• Energetic ventilators• Ash and coal transport
systems
FANS
Designing, production, erection, commissioning, inspection and maintenance and upgrading radial i axial fans diameter up to 4250 mm.
Flow rate up to 3.000.000 m3/h
Pressure up to 18.000 Pa
Fans type AVS are designed to extract flue gases from power boilers with dust concentration up to 10 g/m³ and temperature up to 300°C. Regulation of parameters is carried out by means of axial guide vanes controlled by a pneumatic or electric actuator.
Material used for producing fan elements:o Vanes steel grade S355NHo Shaft steel grade 16Mo3o Inner bearing housing steel casting S355J2G3
Designing of fans Inspection and designing the nature frequency of fan’s blades
Calotte produced in one piece is the main advantage of our construction
and production
TRADE
Sales of ferrous products
Sales of non ferrous products
ENGINEERING
Basic and detailed engineering of thermo technical and thermo energetic facilities
Reverse engineering in production of spare parts for IO subsystems
Project of rehabilitation and improvement of the facilities in order to:
• Increase efficiency and reliability • Extension of the life span• Reduction of the harmful particles emission
Errection, reparation and maintenance
Welding technology
PROJECTS
2004-2006
Construction and reconstruction works on heating substations in Belgrade - projects sponsored by KfW Bank, EBRD and World Bank
2007
PCE “ Beogradske elektrane“ Reconstruction and modernization of heating substations
PCE “Beogradske elektrane” Works on pipe systems as a part of major reconstruction of 232 MW heating plant Konjarnik
PE EPS, TPP “Nikola Tesla” Supply of parts for boiler pipe system for TPP “Nikola Tesla”
2008
PE EPS, TPP “Nikola Tesla” Works on pressure parts major overhaul of steam boiler capacitty 1000 t/h TPP “Nikola Tesla” unit A6
PE EPS, TPP “Nikola Tesla” Production and delivery convective heating surfaces of the boiler for the A6 steam boiler whose capacity is 1000 t/h
PCE “Beogradske elektrane“ Indirect heat transfer station TO “Novi Beograd”
2009
PCE“ Beogradske elektrane” Production and delivery of 340 heating substations
PE EPS, TPP “Nikola Tesla” Production and delivery of feed water heater for 1000 t/h capacity steam boiler in TPP “Nikola Tesla”
PE EPS, TPP “Nikola Tesla” Production and delivery of inlet and outlet reheater collector for steam boiler capacity 400 t/h TPP “Morava”
PE EPS, TPP “Nikola Tesla” Production and delivery of three beater wheels fon coal mills type N 400.42, capacity 130t/h row coal
2010
PE EPS,TPP “Nikola Tesla” Design,production and delivery of main steam,hot reheat and cold reheat steam pipeline for unit 6 320 MW electric in TPP “Nikola Tesla” in the Consortium with Kraftanlagen Muenchen
TPP “Isalnita”Krajova Romania Design,upgrading,production and delivery of four impellers of FD fan for steam boilers capacity 1000t/h
PE EPS, TPP “Nikola Tesla” Production and delivery of superheater 6, material X10CrMoVNb9-1 for 1000 t/h capacity steam boiler in TPP “Nikola Tesla” Unit A3
2011
PE EPS,TPP “Nikola Tesla” Design,production and delivery of reheater 3 and superheater 1 for unit B2 capacity 620 MW electric in TPP “Nikola Tesla” B
PE EPS,TPP “Nikola Tesla” Upgrading (Design,production and delivery) of Ash handling system unit B capacity 2x620 MW electric in TPP “Nikola Tesla” B
2012
PE EPS,TPP “Nikola Tesla” Design,production and delivery of reheater 2 reheater 3 and superheater 1 for unit B1 capacity 620 MW electric in TPP “Nikola Tesla” B
PE EPS,TPP “Nikola Tesla” Design,production and delivery of feed water heater, reheater 2 and superheaters 2,3 and 5 for unit A5 capacity 308 MW electric in TPP “Nikola Tesla” A
PE EPCG,TPP “Plevlja” Design,production and delivery of superheater 4 for unit capacity 210 MW electric in TPP “Plevlja”
Babcock Borsig Steinmüller ,TPP “Bitola” Design,production and delivery of low radiation parts including openings and superheater for unit 3 capacity 210 MW electric in TPP “Bitola”
2008. 2009. 2010. 2011. 2012.
10,327,990
5,729,000
8,917,407
6,358,746
9,830,781
Anual Turnover (eur)
DEVELOPMENT
Production and erection of thermo technical facilities
Production and assembly pressure
for steam boilers capacity greater than
500t/h
Basic and detailed engineeringon thermo technical and thermo energetic
facilities
Design and deliverySteam pipe lines for steam boilers capacity greater
than 500 t/h
Engineering and production developmentRehabilitation and
upgrading projects Design and production of pressure Parts,coal mills and ID/FD fans
2000 -2002.
2004.
2006.
2007.
2008.
2009 -2015.
Our development is based on modern direction which anticipates increasing the efficiency, reliability and environmental-friendly design of utilities.
Development and research are reflected in the following fields:
• development of new manufacturing and technological procedures,
• development of ecological technologies,
• development of new technologies and products
Mentioned settings are fulfilled in the following utilities:
• boilers with supercritical parameters where increased steam parameters result in increased efficiency in electric generation in coal fired power plants,
• combined generation of electric energy and heat in co-generating power plants,
• utilization of waste heat used for steam or heat generation,
• modern waste incinerating plants as one of possible solution of waste disposal,
• biomass, agricultural and wood waste, firing boilers (other prospective possibility to generate heat) using combustible waste of farm and wood processing products.
National and international promotions, fairs and symposiums
National economy exhibition in Krasnodar 2008
Symposium Power Plants 2008
Via Ocel has established itself as a reliable partner and has reached leading position in its scope of services
thanks to high quality of conducted projects
In addition to partnership with major Serbian public enterprises, Via Ocel is established partner with international companies such as:
“Kraftanlagen Munchen”
“Doosan Babcock Energy”