"in the name of allah, most gracious, most compassionate"

23
"In the name of ALLAH, most Gracious, most Compassionate".

Upload: phillip-lyons

Post on 24-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

"In the name of ALLAH, most Gracious, most Compassionate".

Computer Studies

(Project)7010/2

Action Plan

Action Plan CIE Project 2010-11 By Kamran Ansari

Action Plan

ByMr. Kamran Ahmed Ansari

The City School PAF Chapter, Karachi

Pakistan

Action Plan CIE Project 2010-11 By Kamran Ansari

Computer Studies 7010/2 – CIE ProjectImportance:

Total Maximum Marks 50 = 100 % , 25 % marks will be included in Final Result.

Submission by April 15, 2010

Action Plan CIE Project 2010-11 By Kamran Ansari

Computer Studies 7010/2 – CIE Project

www.cie.org.ukPage 4 Syllabus Computer Studies 7010 year 2011

Action Plan CIE Project 2010-11 By Kamran Ansari

Road to Target

Students have to follow all phases of SDLC

To complete the Project work.

SDLC stands for System Development Life Cycle.

Action Plan CIE Project 2010-11 By Kamran Ansari

Stages of Project work:

• Problem Definition

• Analysis

• Design

• Implementation

• Testing

• Documentation

• Evaluation and Future Development

Action Plan CIE Project 2010-11 By Kamran Ansari

Marks Distribution for Project work

Action Plan CIE Project 2010-11 By Kamran Ansari

1. Problem Definition & Analysis Phase

• Students have to Choose a topic for CIE Project for Example Stock Control System, Inventory Control System, Flight Reservation System etc.

• To select the topic Students may use Internet, Sample Projects of previous years from campus library.

• Soft Copies are also available to view in computer Lab.

• I as project coordinator will always be available for support and guidance.

Action Plan CIE Project 2010-11 By Kamran Ansari

2. Design Phase

• In design phase students have to write overall plan for the system design.

• Description of method of solution

• Hardware requirements

• Software requirements

• System Flowcharts

Action Plan CIE Project 2010-11 By Kamran Ansari

3. Implementation Phase

• In Implementation phase students have to implement the designed plan practically using computer languages, Database & Reporting Software etc.

• Method of Solution related to problem

• Program Coding

• Accurate method of solution.

Action Plan CIE Project 2010-11 By Kamran Ansari

4. Testing

• Students have to test the system thoroughly with great details to minimize the errors

• Test Strategy must be very clear and each aspect of testing checked.

• Test results must be shown

• Testing plays very important role to run a software efficiently in the organization.

Action Plan CIE Project 2010-11 By Kamran Ansari

5. Documentation

• Documentation is the compilation of your Project work in form of hard copy.

• It must be organized in a sequence which provides an easy way to understand your product.

• Color print outs can only be used for Section separator (Project stage’s main heading) of the project.

• Binding must of same pattern for all students.

• Two types of Documentation have to be produced

1. Technical Documentation2. User Guide

Action Plan CIE Project 2010-11 By Kamran Ansari

6. Evaluation

• Evaluation of the software should be written in such a way that it can be implemented in future.

• Evaluation should include future enhancement of the software too.

Action Plan CIE Project 2010-11 By Kamran Ansari

Timeline : Final Submission Date - FEBRUARY 15, 2011

TOPICS

Months

1 2 3 4 5 6 7

WEEK1

WEEK2

WEEK3

WEEK4

WEEK1

WEEK2

WEEK3

WEEK4

WEEK1

WEEK2

WEEK3

WEEK4

WEEK1

WEEK2

WEEK3

WEEK4

WEEK1

WEEK2

WEEK3

WEEK4

WEEK1

WEEK2

WEEK3

WEEK4

WEEK1

WEEK2

WEEK3

WEEK4

Investigation

Analysis

Output & Input Designing

Coding & Troubleshooting

Testing

Implementation & Installing

Testing & Debugging

User Training

Documentation

Action Plan CIE Project 2010-11 By Kamran Ansari

Project Assessment scheme

Individual Candidate’s assessment record sheet. Student’s work is finally assessed in accordance with the following points mentioned in the table below.

Action Plan CIE Project 2010-11 By Kamran Ansari

Project Assessment scheme

Action Plan CIE Project 2010-11 By Kamran Ansari

Project Assessment scheme

Action Plan CIE Project 2010-11 By Kamran Ansari

Project Assessment scheme

Action Plan CIE Project 2010-11 By Kamran Ansari

Project Assessment scheme

Action Plan CIE Project 2010-11 By Kamran Ansari

Resources:

1. Sample Projects of previous years

2. Soft copies of previous year projects

3. www.cie.org.uk

4. www.pbworks.com\Kamran

5. Search engines like www.google.com

Action Plan CIE Project 2010-11 By Kamran Ansari

Conclusion:

• The purpose of this presentation is to enable students complete their CIE Project on time following the standards of CIE.

• Students should be independent learners.

• They should have enough confidence to have innovative ideas and successfully implement the same ideas.

• Try to utilize all resources for the assistance to your project.

• Very important thing that students can consult any time for their project work with the teacher.

Action Plan CIE Project 2010-11 By Kamran Ansari

“Happiness is normally, a rebound from hard

work”

Thank you