incremental high speed rail equipment for existing corridorsuichighspeed.com › img › pdf ›...

12
Incremental High Speed Rail Equipment for Existing Corridors George, MEKOSH Product Manager, Bombardier Transportation, USA July 11, 2012, Rolling Stock 1 Design & Manufacturing

Upload: others

Post on 28-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

Incremental High Speed Rail Equipment for Existing Corridors

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Page 2: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Designated High Speed Rail Corridors

2

Page 3: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Intercity Bi-Level Car

Maximum Clearance required

• 85’ long, 10’ 6” wide, 16’ 2” high

• 25.9 m long, 3.2 m wide, 4.93 m high

Low-Level Boarding only

Pass through at upper-level

Car types for medium to long

distance intercity service

• Coach, Cab/Baggage, Lounge

• Sleepers, Diners, Crew Dorm

125 mph operating speed

3

Page 4: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Bombardier BiLevel Car

Maximum Clearance required

• 85’ long, 9’ 10” wide, 15’ 11” high

• 25.9 m long, 3.0 m wide, 4.85 m high

Low-Level Boarding only

Pass through at single-level height

with stairs to upper and lower level

Car types for short to medium

distance corridor service

110 mph operating speed

4

Page 5: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Bombardier Multi-Level Car

Minimum Clearance – NEC

• 85’ long, 10’ wide, 14’ 6” high

• 25.9 m long, 3.05 m wide, 4.42 m high

High and Low-Level Boarding

Pass through at single-level height

with stairs to upper and lower level

Car types for short to medium

distance corridor service

125 mph

operating speed

5

Page 6: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Intercity Single-level Car

Minimum Clearance – NEC

• 85’ long, 10’ 6” wide, 13’ 11” high

• 25.9 m long, 3.2 m wide, 4.24 m high

High and Low-Level Boarding

Pass through at single-level height

Car types for medium distance

corridor service

• Coach, Business Class, Café/Lounge

125 mph operating speed

6

Page 7: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Intercity Trainsets

Can adapt the four car types into

fixed trainsets for specific service

with various interior arrangements.

Advantages include lower cost

drawbars, more reliable electrical

connections car-to-car, possibility

of shared equipment between cars.

Maintenance tailored to a fixed train.

Limited flexibility in train

configuration changes.

Need spare trainsets available vs.

spare cars.

7

Page 8: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Top Level Requirements Summary

8

Intercity

Bi-Level

Bombardier

BiLevel

Bombardier

Multi-Level

Intercity

Single-

Level

Clearance Envelope Max Max Min-NEC Min-NEC

Platform Boarding Level Low-Level Low-Level Low and

High-Level

Low and

High-Level

Walk through train w/o stairs with stairs with stairs w/o stairs

Coach Seating 2X2 90 110 to 154 102 to 142 65

ADA Compliance Lower

Level

Lower

Level

Intermediate

Level

Single

Level

Luggage storage on all

levels

Overhead

& towers

Overhead

& towers

Overhead

& towers

Overhead

& towers

Various arrangements with

food /beverage service

Yes Yes Yes Yes

Page 9: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Electric and Dual-Powered Locomotives

Electric Locomotive, ALP- 46

Operates on all three catenary voltages

of the North-East Corridor

125 mph max. operating speed

Push-pull operation

Dual-Powered Locomotive, ALP- 45DP

Operates on all three catenary voltages

of the NEC as well as with diesel

traction on non-electrified routes

Replaces two locomotives and provides

for passengers a “one-seat ride” without

changing trains

Fulfills the Tier 3 exhaust emission

standards and can be adapted to Tier 4

9

Page 10: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Diesel-Electric Locomotive

Diesel-Electric Locomotive, ALP- 45DE

125 mph max. operating speed

Push-pull operation

Low weight to minimize track load

and fuel consumption

Low unsprung mass to minimize

track loads (P2 forces)

Technologies

Light weight monocoque carbody

Fabricated bogie with fully

suspended drive and disc brakes

Multi-engine diesel propulsion

with high speed engines, Tier 4,

with intelligent engine control for

high fuel economy

10

Page 11: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

George, MEKOSH

Product Manager, Bombardier Transportation, USA

July 11, 2012, Rolling Stock 1 – Design & Manufacturing

Summary

Wide range of passenger rail cars for existing corridors.

Various interior configurations available;

• Medium distance; Coach, First Class, Café/Lounge, Cab/Baggage

• Long distance; Sleepers, Diners, Sightseer Lounge, Crew Dorm.

Locomotives for electrified and non-electrified corridors using latest

technology for high performance and low LCC.

Manufacturing footprint to maximize US content.

Supply chain in place with focus on standardization, reliability and low

Life Cycle Cost.

11

Four passenger rail car types and three locomotives for

incremental high speed rail corridor service.

Page 12: Incremental High Speed Rail Equipment for Existing Corridorsuichighspeed.com › IMG › pdf › d2_02_mekosh.pdf · • 85’ long, 10’ 6” wide, 13’ 11” high • 25.9 m long,

...Thank youfor your kind attention

Bombardier Transportation