ind: green energy corridor and grid strengthening project ......initial environmental examination...

52
Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC power transmission lines between Pugalur, Tamil Nadu and North Trichur, Kerala) Annexures 910 Prepared by Power Grid Corporation of India Limited for the Asian Development Bank.

Upload: others

Post on 10-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

Initial Environmental Examination

June 2017

IND: Green Energy Corridor and Grid Strengthening

Project

(320 kV VSC-HVDC power transmission lines

between Pugalur, Tamil Nadu and North Trichur,

Kerala)

Annexures 9–10

Prepared by Power Grid Corporation of India Limited for the Asian Development Bank.

Page 2: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

ANNEXURE – 9

ESTIMATED BUDGET

Page 4: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

Budget Estimate

Total line length (Overhead Portion) - 127.4 km Total line length (Underground Portion) - 26.5 km

A. Compensation

1 Forest Involvement (5 km in UG portion with RoW @ 4 meter) - 2.0 ha.

- Forest compensation - Rs. 20.00 lakhs

2. Crop & Trees

- Line length in Private /Revenue land - 127.4 km. - Crop/tree compensation (@Rs.5 lakhs/km) - Rs. 637.00 lakhs 3. Land Compensation for Tower Base & RoW corridor - 153.9 km (Considering line corridor as ' mostly agricultural land in rural - Rs 4228.00 lakhs

setting' with compensation @ 15 lakhs/acre) Sub Total A – 1+2+3 - Rs. 4885.00 lakhs B. Implementation Monitoring & Audit

i) Man-power involved for EMP implementation & Monitoring in entire route of Transmission lines (Rs.10,000/-x 153.9 km) - Rs. 15.39 lakhs

ii) Independent Audit (LS) if needed - Rs. 10.00 lakhs

Sub Total B- - Rs. 25.39 lakhs Grand Total (A+B) = Rs. 4910.39 lakhs

Page 5: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

EXHIBIT – 1

SCHEMATIC MAP SHOWING PROPOSED

SUBPROJECTS

Page 6: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

EXHIBIT -1

Page 7: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

EXHIBIT – 2

ORGANISATIONAL SUPPORT STRUCTURE

FOR EMP & ESPP IMPLEMENTATION

Page 8: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

(EXHIBIT -2)

ORGANISATIONAL SUPPORT STRUCTURE FOR ESPP IMPLEMENTATION & MONITORING

CORPORATE LEVEL

REGIONAL LEVEL

SITE LEVEL

Chairman & Managing Director

Company Secretary

Chief vigilance officer Vigilance

Director

(Finance)

Director (Operation)

Director (Personnel)

Director (Projects)

Executive Director (ESMD, CSR & LA)

AGM

(Env & Soc.)

DGM

(Env. & Soc)

Sr. Env.

Officer

ENVIRONMENT AND SOCIAL SPECIALIST BEING

PLACED ON CONTRACT IF NEEDED.

Sr. Engg.

Engg.

Sr. Env.

Officer

Executive Director (Regional)

AGM/DGM (PESM)

Chief Mgr./.Mgr T/L (Sites)

Env . Officer (Regional)

Soc. Officer (Regional)

Ch. Mgr (Soc.)

Chief Mgr./.Mgr S/S (Sites)

Sr. Soc.

Officer

AGM

(Land Acquisition)

Sr. Soc.

Officer

Page 9: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

FIGURE – 1

TYPICAL PLAN OF TRANS. LINE TOWER

FOOTINGS SHOWING ACTUAL GROUND

POSITION AND EXTENT OF IMPACT

Page 10: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

X

Y

T

R

A

N

S

M

I

S

S

I

O

N

L

I

N

E

INDICATIVE MEASURES

X & Y = 10-15 METERS

a = 300- 450 mm

a

a

ACTUAL POSITION ON GROUND

Fig.-1

TYPICAL PLAN OF TRANSMISSION LINE TOWER FOOTINGS

SHOWING ACTUAL GOUND POSITION AND EXTENT OF IMPACT

Page 11: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

FIGURE – 1 a

SCHEMATIC DIAGRAM INDICATING AREA

OF INFLUENCE/IMPACT OF ±320 KV

TRANSMISSION LINE

Page 12: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

85m

200m

85m

10M

44 m

TREE FELLING AREA FOR ±320 KV TRANS. LINE

ELECTRICAL

CLEARANCE

= 5.3 m

7M

8.6 m 8.0 m

SWING LINE OF

CONDUCTOR.

TOWER ERECTION

AREA 35X35m

TOWER ERECTION

AREA 35X35m

3 m

TREE FELLING

AREA FOR CONST.

LOPPING / PRUNNING /

FELLING AREA

FOR CHARGING OF LINE

Fig.-1a

Page 13: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

MAP – 1

FOREST COVER MAP OF KERALA

Page 14: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

Map-1 : Forest Cover Map of Kerala

Subprojects Area

Page 15: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

MAP – 2

FOREST COVER MAP OF TAMIL NADU

Page 16: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

Map-2 : Forest Cover Map of Tamil Nadu

Subprojects

Area

Subproject Areas

Page 17: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

MAP – 3

ALTERNATIVES ROUTE ALIGNMENT OF

±320 KV HVDC BIPOLE LINK BETWEEN

NORTH THRISSUR AND PUGALUR

Page 18: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 19: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

MAP – 4

SECTION WISE DRAWING OF PROPOSED

UNDERGROUND CABLE ROUTE

Page 20: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 21: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 22: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 23: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 24: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 25: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 26: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 27: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 28: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 29: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 30: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 31: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 32: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 33: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 34: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 35: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 36: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 37: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 38: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 39: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 40: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 41: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 42: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 43: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 44: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 45: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 46: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 47: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC
Page 48: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

PLATE – 1

PROPOSED TRANSITION STATION

LOCATION

Page 49: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

Transition Station at Vadakancheri

Proposed Site

Page 50: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

Environmental Safeguard Monitoring Report

Reporting Period {From Month, Year to Month, Year} Date {Month, Year}

IND: Green Energy Corridor and Grid Strengthening Project Prepared by Power Grid Corporation of India Limited for the Asian Development Bank

Annexure 10

Page 51: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 52: IND: Green Energy Corridor and Grid Strengthening Project ......Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kV VSC-HVDC

TABLE OF CONTENTS

Page

1.0 Introduction

1.1 Brief Project Description 1.2 Project Progress Status and Implementation Schedule

2.0 Compliance to Applicable Statuary Requirements /National Regulations

3.0 Compliance to Environmental Covenants from the ADB Loan Agreement 3.1 Schedule 5 Environment (prepare a matrix to show how compliance was

achieved) 4.0 Compliance to Environmental Management Plan (Refer to the EMP of the Project) 5.0 Safeguards Monitoring Results and Unanticipated Impacts (Refer to the Environmental Monitoring Plan and document any exceedence to

environmental standards (if any), or any unanticipated impact not included in the EMP and any correction action/measures taken)

6.0 Implementation of Grievance Redress Mechanism and Complaints Received from

Stakeholders (Summary of any complaint/grievance and the status of action taken) 7.0 Conclusion 8.0 Recommendations (if applicable)