index of drawings - ct.gov-connecticut's official …_9-18-17.pdf · 2017-09-22 · number...

50
FINAL DESIGN REVIEW DESIGNER/DRAFTER: CHECKED BY: PROJECT TITLE: TOWN: DRAWING TITLE: PROJECT NO. DRAWING NO. SHEET NO. Filename: SHEET NO. REVISION DESCRIPTION DATE REV. DEPARTMENT OF TRANSPORTATION STATE OF CONNECTICUT OF WORK WHICH WILL BE REQUIRED. THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND IS SHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED 9/18/2017 BLOCK: SIGNATURE/ ...\SB_MSH_0094_0256_TSH-07.dgn Plotted Date: C O N N E C T I C U T D E P A R T M E N T O F T R A N S P O R T A T I O N - - - - - - - - - - - - - - - - - - - - - - - - 094-256 NEW LONDON GROTON GOLD STAR MEMORIAL BRIDGE R. MORESI & LOCAL ROADS - BRIDGE #03819 B. MAHALINGAM/M. NAFIS NUMBER DRAWING NUMBER DRAWING INDEX OF DRAWINGS DRAWING TITLE DRAWING TITLE ROCKY HILL, CT 06067 55 CAPITAL BOULEVARD, 2ND FLOOR PRIME AE GROUP, INC. DESIGNED BY: INDEX OF DRAWINGS NUMBER DRAWING DRAWING TITLE S-7.1 07 - BEARINGS REHABILITATION S-BR19 S-BR18 S-BR17 S-BR16 S-BR15 S-BR14 S-BR13 S-BR12 S-BR11 S-BR10 S-BR09 S-BR08 S-BR07 S-BR06 S-BR05 S-BR04 S-BR03 S-BR02 S-BR01 S-BP03 S-BP02 S-BP01 S-7.1 S-BR42 S-BR41 S-BR40 S-BR39 S-BR38 S-BR37 S-BR36 S-BR35 S-BR34 S-BR33 S-BR32 S-BR31 S-BR30 S-BR29 S-BR28 S-BR27 S-BR26 S-BR25 S-BR24 S-BR23 S-BR22 S-BR21 S-BR20 BEARINGS REHABILITATION S-BD2 S-BD1 S-BR44 S-BR43 BEARING DETAILS 2 BEARING DETAILS 1 BEARING REHABILITATION ABUTMENT NO. 5 BEARING REHABILITATION ABUTMENT NO. 5 BEARING REHABILITATION ABUTMENT NO. 5 BEARING REHABILITATION PIER. NO. 35B BEARING REHABILITATION PIER. NO. 35B BEARING REHABILITATION PIER. NO. 34B BEARING REHABILITATION PIER. NO. 34B BEARING REHABILITATION PIER. NO. 33B BEARING REHABILITATION PIER. NO. 33B BEARING REHABILITATION PIER. NO. 35 BEARING REHABILITATION PIER. NO. 35 BEARING REHABILITATION PIER. NO. 34 BEARING REHABILITATION PIER. NO. 34 BEARING REHABILITATION PIER. NO. 34 BEARING REHABILITATION PIER. NO. 33 BEARING REHABILITATION PIER. NO. 33 BEARING REHABILITATION PIER. NO. 26 BEARING REHABILITATION PIER. NO. 26 BEARING REHABILITATION PIER. NO. 25 BEARING REHABILITATION PIER. NO. 25 BEARING REHABILITATION PIER. NO. 23 BEARING REHABILITATION PIER. NO. 23 BEARING REHABILITATION PIER. NO. 22 BEARING REHABILITATION PIER. NO. 22 BEARING REHABILITATION PIER. NO. 21 I-95 NB OVER THAMES RIVER, RAILROADS, BEARING REHABILITATION PIER. NO. 21 BEARING REHABILITATION PIER. NO. 16 BEARING REHABILITATION PIER. NO. 16 BEARING REHABILITATION PIER. NO. 15 BEARING REHABILITATION PIER. NO. 15 BEARING REHABILITATION PIER. NO. 13 BEARING REHABILITATION PIER. NO. 13 BEARING REHABILITATION PIER. NO. 11 BEARING REHABILITATION PIER. NO. 11 BEARING REHABILITATION PIER. NO. 11 BEARING REHABILITATION PIER. NO. 10 BEARING REHABILITATION PIER. NO. 10 BEARING REHABILITATION PIER. NO. 9 BEARING REHABILITATION PIER. NO. 9 BEARING REHABILITATION PIER. NO. 9 BEARING REHABILITATION PIER. NO. 7 BEARING REHABILITATION PIER. NO. 7 BEARING REHABILITATION ABUTMENT NO. 4 BEARING REHABILITATION ABUTMENT NO. 4 BEARING REHABILITATION INDEX PLAN - 3 BEARING REHABILITATION INDEX PLAN - 2 BEARING REHABILITATION INDEX PLAN - 1 BEARINGS REHABILITATION INDEX OF DRAWINGS

Upload: trinhtuyen

Post on 21-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_TSH-07.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

NUMBER

DRAWING

NUMBER

DRAWING

INDEX OF DRAWINGS

DRAWING TITLE DRAWING TITLE

ROCKY HILL, CT 0606755 CAPITAL BOULEVARD, 2ND FLOORPRIME AE GROUP, INC.

DESIGNED BY:

INDEX OF DRAWINGS

NUMBER

DRAWINGDRAWING TITLE

S-7.1

07 - BEARINGS REHABILITATION

S-BR19

S-BR18

S-BR17

S-BR16

S-BR15

S-BR14

S-BR13

S-BR12

S-BR11

S-BR10

S-BR09

S-BR08

S-BR07

S-BR06

S-BR05

S-BR04

S-BR03

S-BR02

S-BR01

S-BP03

S-BP02

S-BP01

S-7.1

S-BR42

S-BR41

S-BR40

S-BR39

S-BR38

S-BR37

S-BR36

S-BR35

S-BR34

S-BR33

S-BR32

S-BR31

S-BR30

S-BR29

S-BR28

S-BR27

S-BR26

S-BR25

S-BR24

S-BR23

S-BR22

S-BR21

S-BR20

BEARINGS REHABILITATION

S-BD2

S-BD1

S-BR44

S-BR43

BEARING DETAILS 2

BEARING DETAILS 1

BEARING REHABILITATION ABUTMENT NO. 5

BEARING REHABILITATION ABUTMENT NO. 5

BEARING REHABILITATION ABUTMENT NO. 5

BEARING REHABILITATION PIER. NO. 35B

BEARING REHABILITATION PIER. NO. 35B

BEARING REHABILITATION PIER. NO. 34B

BEARING REHABILITATION PIER. NO. 34B

BEARING REHABILITATION PIER. NO. 33B

BEARING REHABILITATION PIER. NO. 33B

BEARING REHABILITATION PIER. NO. 35

BEARING REHABILITATION PIER. NO. 35

BEARING REHABILITATION PIER. NO. 34

BEARING REHABILITATION PIER. NO. 34

BEARING REHABILITATION PIER. NO. 34

BEARING REHABILITATION PIER. NO. 33

BEARING REHABILITATION PIER. NO. 33

BEARING REHABILITATION PIER. NO. 26

BEARING REHABILITATION PIER. NO. 26

BEARING REHABILITATION PIER. NO. 25

BEARING REHABILITATION PIER. NO. 25

BEARING REHABILITATION PIER. NO. 23

BEARING REHABILITATION PIER. NO. 23

BEARING REHABILITATION PIER. NO. 22

BEARING REHABILITATION PIER. NO. 22

BEARING REHABILITATION PIER. NO. 21

I-95 NB OVER THAMES RIVER, RAILROADS,

BEARING REHABILITATION PIER. NO. 21

BEARING REHABILITATION PIER. NO. 16

BEARING REHABILITATION PIER. NO. 16

BEARING REHABILITATION PIER. NO. 15

BEARING REHABILITATION PIER. NO. 15

BEARING REHABILITATION PIER. NO. 13

BEARING REHABILITATION PIER. NO. 13

BEARING REHABILITATION PIER. NO. 11

BEARING REHABILITATION PIER. NO. 11

BEARING REHABILITATION PIER. NO. 11

BEARING REHABILITATION PIER. NO. 10

BEARING REHABILITATION PIER. NO. 10

BEARING REHABILITATION PIER. NO. 9

BEARING REHABILITATION PIER. NO. 9

BEARING REHABILITATION PIER. NO. 9

BEARING REHABILITATION PIER. NO. 7

BEARING REHABILITATION PIER. NO. 7

BEARING REHABILITATION ABUTMENT NO. 4

BEARING REHABILITATION ABUTMENT NO. 4

BEARING REHABILITATION INDEX PLAN - 3

BEARING REHABILITATION INDEX PLAN - 2

BEARING REHABILITATION INDEX PLAN - 1

BEARINGS REHABILITATION INDEX OF DRAWINGS

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRGPLN-01.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

SCALE: 1" = 50’

MA

TC

HLIN

E

A-A

INDEX PLAN - 1

S-BP1

NOTE:

LEGEND:

SG

BS

BP

- SOLE PLATE TO GIRDER

- BEARING TO SOLE PLATE

- BEARING TO PIER

BEARING REHABILITATION

E-6N

E-6S

E-9N

E-9SE-10S

E-10N

E-11N

E-12N

E-11S

E-12S

E-15N

E-15S

ALL EXPANSION BEARINGS TO BE REPALCED UNLESS OTHERWISE NOTED.2.

STRUT COLUMNS ARE CONSIDERED TO REACT VERTICAL LOAD ONLY.1.

E-16

E-16

E-17 E-18

E-18E-17

BEARING INDEX PLAN

I-95 NB OVER THAMES RIVER, RAILROADS,

E 1178237.7

0

N 693899.6

0

288+

24.3

5

PO

E

101+00100+00

N 86°21’ 53.77" E

89+00

88+00

91+00

90+00

87+00

97+0096+00 99+0098+00

93+00

92+00

95+00

94+00

287+00

288+24

288+00

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRGPLN-02.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

MA

TC

HLIN

E

A-A

SCALE: 1" = 50’

MA

TC

HLIN

E

TO

SH

EE

T 5.B

RP.2

INDEX PLAN - 2

MA

TC

HLIN

E

A-A

MA

TC

HLIN

E

TO

SH

EE

T 5.B

RP.2

SCALE: 1" = 50’

S-BP2

SG

BS

BP

- SOLE PLATE TO GIRDER

- BEARING TO SOLE PLATE

- BEARING TO PIER

LEGEND:

NOTE:

BEARING REHABILITATION

500’ R TO FALCON NEST

500’ R TO FALCON NEST

ALL EXPANSION BEARINGS TO BE REPLACED UNLESS OTHERWISE NOTED.2.

STRUT COLUMNS ARE CONSIDERED TO REACT VERTICAL LOAD ONLY.1.

E-20

E-20E-19

E-19 E-22

E-22

E-21 (TO REMAIN)

E-21 (TO REMAIN)

E-23 (TO REMAIN) E-24 (TO REMAIN)

E-24 (TO REMAIN)E-23 (TO REMAIN)

E-25 E-26 (TO REMAIN)

E-26 (TO REMAIN)E-25

E-28 (TO REMAIN)

E-28 (TO REMAIN)

E-29

E-29

BEARING INDEX PLAN

BEARING INDEX PLAN

I-95 NB OVER THAMES RIVER, RAILROADS,

116+00105+00104+00 107+00106+00103+00102+00 113+00112+00 115+00114+00109+00108+00 111+00110+00

N 86°21’ 53.77" EN 86°21’ 53.77" E

121+00120+00 123+00122+00117+00 119+00118+00 129+00128+00 131+00130+00125+00124+00 127+00126+00

N 86°21’ 53.77" E N 86°21’ 53.77" E

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRGPLN-03.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

INDEX PLAN - 3

SCALE: 1" = 50’

MA

TC

HLIN

E

TO

SH

EE

T 5.B

RP.2

S-BP3

NOTE:

LEGEND:

SG

BS

BP

- SOLE PLATE TO GIRDER

- BEARING TO SOLE PLATE

- BEARING TO PIER

BEARING REHABILITATION

E-34N E-35N

E-36N

E-36S

E-34S

E-35S

E-34BS

E-34BN

E-35BN

E-35BS

E-36BN

E-36BS

ALL EXPANSION BEARINGS TO BE REPLACED UNLESS OTHERWISE NOTED/2.

STRUT COLUMNS ARE CONSIDERED TO REACT VERTICAL LOAD ONLY.1.

E-31 (TO REMAIN)

E-31 (TO REMAIN)E-30 (TO REMAIN)

E-30 (TO REMAIN)

(TO REMAIN)

E-33

(TO REMAIN)

E-33E-32

E-32

BEARING INDEX PLAN

I-95 NB OVER THAMES RIVER, RAILROADS,

N 86°21’ 53.77" E N 86°21’ 53.77" E

137+00136+00 139+00138+00133+00132+00 135+00134+00 145+00144+00 146+00141+00140+00 143+00142+00

344+00

343+00

346+00

345+00

340+82340+82

342+00341+00

110.58’

159’

96.58’51.43’

7.58’

173.35’189’

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-01.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PLAN VIEW

EAST ELEVATION

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

83

COORDINATE

GRID

AD

CONNECTICUT

83

COORDINATE

GRID

AD

CONNECTICUT

SPAN 6 SPAN 6

SPAN 6 SPAN 6

ABUTMENT NO. 4

S-BR01

B-B

-

A-A

-

A-A

- ELEVATION

SOUTH GIRDER B-B

- ELEVATION

NORTH GIRDER

B

-

A

-

(8 PLACES)

REMOVE EXISTING

(8 PLACES)

REMOVE EXISTING

2’-8" 2’-0"

1’-0"

1’-8"

4"

1’-6�"

4"

2’-2�"*

ABUTMENT NO. 4 EXISTING BEARINGS

SCALE: 1" = 1’-0"

* TO BE FIELD VERIFIED BY CONTRACTOR

SPAN 6

3" (TYP.)

(8 PLACES) (TYP.)

BEARING REHABILITATION

2’-2�"* 2’-2�"*

ABUTMENT NO. 4

BRIDGE SEAT

40’-0" (TYP.)

BACK WALL

END DIAPHRAGM

PEDESTAL

PEDESTALEND DIAPHRAGM

SUGGESTED POSSIBLE JACKING METHOD

BEVELED LOAD PLATE

STIFFENER

PROPOSED JACKING BEARING

STIFFENER

PROPOSED JACKING BEARING

BEVELED LOAD PLATE

METHOD

SUGGESTED POSSIBLE JACKING

EXISTING ABUTMENT NO. 4 - PLAN VIEWGIRDER

GIRDER

(TYP.)

MASONRY PLATES

SOLE PLATE AND

ROCKER BEARING,

REMOVE EXISTING

(TYP.)

MASONRY PLATES

SOLE PLATE AND

ROCKER BEARING,

REMOVE EXISTING

(TYP.)

(TO REMAIN)

ANCHOR BOLTS

BOTTOM OF

FLOOR BEAM{ BEARING { BEARING

A

-

EXISTING BEARING SOUTH GIRDER B

-

EXISTING BEARING NORTH GIRDER

7" 7"

1" 1"

1" 1"

7�"

3" 3"

NORTH GIRDER HOLE PATTERN

SOUTH GIRDER HOLE PATTERN

SCALE: 1�" = 1’-0"

ANCHOR BOLT

{ BEARINGS { BEARING

I-95 NB OVER THAMES RIVER, RAILROADS,

8’-4�

"

4’-2�

"

189.271’

133.142’114.271’

200.271’173.142’90.258’

94.312’

107.271’73.069’

83.465’

55.312’

62.258’ 195.271’

121.271’98.146’86.258’70.258’49.146’

16.5’ 73.069’ 104.27’ 197.57’

117.27’

119.27’

193.27’

182.52’

184.516’

121.27’

45.15’

51.31’

58.26’

66.23’

109.56’

110.27’

126.38’

128.38’

131.27’ 177’

173.27’

175’

196.27’

8’-4�

"

4’-2�

"�

"

8’-4�

"

89.333’16.99’

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-02.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

S-BR02

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

83

COORDINATE

GRID

AD

CONNECTICUT

ABUTMENT NO. 4

SPAN 6

83

COORDINATE

GRID

AD

CONNECTICUT

A

-

A-A

-

PROPOSED ABUTMENT NO 4 PLAN

SCALE: 1" = 1’-0"

SCALE: �" = 1’-0"

STIFFENER

PROPOSED JACKING BEARING

PROPOSED JACKING BEARING STIFFENER

SUGGESTED POSSIBLE JACKING METHOD

BEVELED LOAD PLATE

SCALE: 1" = 1’-0"

SCALE: 1" = 1’-0"

SCALE: 1" = 1’-0"

BEARING REHABILITATION

A

-

PLAN DETAIL - SOUTH BEARING

SCALE: �" = 1’-0"

PEDESTAL REBAR REINFORCEMENT

(TO REMAIN)

EXISTING PEDESTAL

(TO REMAIN)

EXISTING PEDESTAL

PROPOSED PEDESTAL EXTENSION

BEVELED SOLE PLATE

BEVELED SOLE PLATE

1" CHAMFER

BACK WALL

1’-0"

1’-0"

(TO REMAIN)

EXISTING PEDESTAL

(TO REMAIN)

EXISTING PEDESTAL

STAINLESS STEEL SHIM

BEVELED SOLE PLATE

A-A

-

PROPOSED BEARING SOUTH GIRDER

SEAT

EXISTING BRIDGE

STAINLESS STEEL SHIM

PEDESTAL

EXISTING

PROPOSED PEDESTAL

PROPOSED BEARING NORTH GIRDER

FRONT VIEW

PROPOSED BEARING NORTH GIRDER

SIDE VIEW

PROPOSED BEARING SOUTH GIRDER

SIDE VIEW

PROPOSED BEARING SOUTH GIRDER

FRONT VIEW

NOTES:

NOTED.

ALL PROPOSED REBAR TO BE #6 UNLESS OTHERWISE 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

BACK WALL

BACK WALL

BACK WALL

STEEL KEEPER

STEEL KEEPER

STEEL KEEPER

STEEL KEEPER

I-95 NB OVER THAMES RIVER, RAILROADS,

PROPOSED ELASTOMERIC BEARING

�"SEAL WELD

NORTH PLAN SIMILAR

EXTEND PEDESTAL

EXTEND PEDESTAL

3" (TYP.)

3" (TYP.)

PROPOSED BEARING NORTH GIRDER SIMILAR

3

EQ.

SP

AC

ES

�"SEAL WELD

DRILL AND GROUT REBAR

DRILL AND GROUT REBAR

2" MIN

12.08’ 30.147’

12.08’ 36.16’

31.952’

47.13’

75.16’ 84.16’

70.167’ 95.208’

172.556’

169.16’

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-03.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 7

WEST ELEVATION

SPAN 7

PIER 7

SPAN 7

CONNECTICUT

COORDINATE

GRID

SPAN 8

SPAN 8 SPAN 7 SPAN 8

SCALE: 1" = 1’-0"

PIER 7 EXISTING BEARING

2’-8" 2’-0"

1’-0"

1’-8"

�"�"

1"

1"

1"

2�"

7�"10"

SPAN 7SPAN 8

4"

1’-3�"

3�"

SCALE: �" = 1’-0" SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

S-BR03

B

-

A

-

C

-

NORTH ELEVATION SOUTH ELEVATION

CONNECTICUT

COORDINATE

GRID

B

-SIMILAR TO

* TO BE FIELD VERIFIED BY CONTRACTOR

1’-11"*

A

-

PLAN DETAIL - NORTH COLUMN C

-

PLAN DETAIL - SOUTH COLUMN

6’-0"

8’-0"

6’-0"

8’-0"

SPAN 7

{ PIER 7

BEARINGS (TO REMAIN)

TOWARDS { OF ROADWAY

SPAN 8

3" (TYP.)

REMOVE WELDED PLATE

REMOVE WELDED PLATE

BEARING REHABILITATION

EXISTING CROSS BRACE (TO REMAIN) (TYP.)

40’-0"

END DIAPHRAGMBOTTOM OF

FLOOR BEAM

B

-

EXISTING BEARING NORTH GIRDER

EXISTING BEARING SOUTH GIRDER SIMILAR

PIER 7

SEE SUBSET #6

EXISTING DRAIN PIPE

I-95 NB OVER THAMES RIVER, RAILROADS,

2" (TYP.)

12" (TYP.)

�"

GIRDER END

BEARING

EXISTING SPAN 9

W8x40

GUSSET PLATE

W8x40

(4)-L4x3�x�

PIER COLUMN

TOP OF PIER

REINFORCING BAR

DRILL AND GROUT

2" (TYP.)

12" (TYP.)

GIRDER END

BEARING

EXISTING SPAN 9

PIER COLUMN

REINFORCING BAR

DRILL AND GROUT

TOP OF PIER

W8x40 (TYP.)

EQUAL SPACES

(5) #6 BARS

EQUAL SPACES

(5) #6 BARS

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-04.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 7

CONNECTICUT

COORDINATE

GRID

SCALE: �" = 1’-0"SCALE: �" = 1’-0"

S-BR04

SCALE: 3" = 1’-0"

SCALE: 1�" = 1’-0"

PIER 7

SPAN 7

SPAN 8

A

-

B

-

PROPOSED PIER CAP PLAN

F

-

RESTRAINER DETAIL

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

G-G

-

G-G

-

CROSS BRACE SECTION

A

-

PLAN DETAIL - NORTH COLUMN B

-

PLAN DETAIL - SOUTH COLUMN

�"

�"

PROVIDE KEEPERPROVIDE KEEPER

SOLE PLATE (TYP.)SOLE PLATE

{ GIRDER, SPAN 7

{ GIRDER, SPAN 8

{ GIRDER, SPAN 8

{ GIRDER, SPAN 7

BAR "A"

SPACES

2 EQUAL

SPACES

2 EQUAL

SEE PLAN VIEW

#6 BARS

LAP "A"

LAP "A"

LAP "A"

SPAN 7

SPAN 8

{ PIER 7

CONNECTICUT

COORDINATE

GRID

BEARING REHABILITATION

SCALE: �" = 1’-0"

G-G

-SEE PLAN VIEW

#6 BARS

LAP "A"

FRONT ELEVATION NORTH KEEPER FRONT ELEVATION SOUTH KEEPER

2" (TYP.)

FOR ANGLE, SEE FRAMING PLANS (TYP.)

ALL REBAR SHALL HAVE 2" COVER

4’-8"

2’-4"

2" (TYP.)

7�"

�"

TOP OF CONCRETE KEEPER

SEE DETAIL DRAWING NO S-BD2

STEEL KEEPER

40’-0" (TYP.)

I-95 NB OVER THAMES RIVER, RAILROADS,

DRILLED HOLE PATTERN

SCALE: �" = 1’-0"

CONCRETE KEEPER EDGE

1�"

1�"

1�"

1�"

(SOUTH KEEPER SIMILAR)

NORTH KEEPER SHOWN

{ PIER CAP4"

1’-10"

4’-4" AT { PIER

4’-4" AT { PIER

1’-5�"

2 EQ. SP.

2’-6�"

4 EQ. SPACES

(TYP.)

F

-

�"

F

-

(5) #6 BARS (LENGTH VARIES)

(6) #6 BAR (LENGTH VARIES)

(5) #6 BARS (LENGTH VARIES)

(6) #6 BAR (LENGTH VARIES)

172.556’

169.16’

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-05.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 9

WEST ELEVATION

SPAN 9SPAN 10 SPAN 9 SPAN 10

PIER 9

SPAN 9

SPAN 10

CONNECTICUT

COORDINATE GRID

5’-10"

7’-2"

5’-10"

7’-2"

CONNECTICUTCOORDINATE G

RID

SCALE: 1" = 1’-0"

PIER 9 EXISTING BEARINGS

2’-6"1’-8�"

1’-0"

1’-8"

3�"

1’-3�"

EXISTING DRAIN PIPE TO BE REMOVED AND RESET

SPAN 9SPAN 10

6"5�"

S-BR05

C

-

A

-

B

-

NORTH ELEVATION SOUTH ELEVATION

SOLE AND MASONRY PLATES (TYP.)

REMOVE EXISTING BEARING,

PIER 9 SPAN 10 SCALE: �" = 1’-0"

SCALE: �" = 1’-0"SCALE: �" = 1’-0"

A

-

PLAN DETAIL NORTH COLUMN C

-

PLAN DETAIL SOUTH COLUMN

BOLTS (8 PLACES)

1’-11"*

* TO BE FIELD VERIFIED BY CONTRACTOR

2’-8" 2’-0"

1’-0"

1’-8"

4"

1’-6�"

4"

2’-2�"*

PIER 9 SPAN 9

SPAN 9

SPAN 10

{ PIER 9

1�" (TYP.)

(8 PLACES) (TYP.)

(8 PLACES) (TYP.)

3" (TYP.)

BEARING REHABILITATION

GIRDER

GIRDER

GIRDER

GIRDER

BEVELED LOAD PLATE (TYP.)

2’-2�"*1’-11"*

PIER 11 SIMILAR

END DIAPHRAGM

BOTTOM OF

FLOOR BEAM

PROPOSED BEARING STIFFENER (TYP.)

SUGGESTED POSSIBLE JACKING METHOD (TYP.)

B

-

EXISTING BEARING NORTH GIRDER

END DIAPHRAGM

7�"

1"

3" 3"

7"

1"

GIRDER HOLE PATTERN

SCALE: 1�" = 1’-0"

PIER 9

EXISTING BEARING SOUTH GIRDER SIMILAR

I-95 NB OVER THAMES RIVER, RAILROADS,

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 9

S-BR06

PROPOSED BEARING STIFFENER

BEARING REHABILITATION

SPAN 9 SOUTH BEARING SIMILAR SPAN 10 SOUTH BEARING SIMILAR

1"| TYP. 1"| TYP.

BEVELED LOAD PLATE (TYP.)

PROPOSED BEARING

PROPOSED BEARING

TYPICAL TOP VIEW OF GIRDERS

EXTEND PEDESTAL

INSTALL STEEL KEEPERS (TYP.)

INSTALL STEEL KEEPERS (TYP.)

FRONT VIEWFRONT VIEW

SEE SUBSET #09

STRENGTHENING

FOR GIRDER

EXTEND PEDESTAL

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-06.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

SCALE: �" = 1’-0" SCALE: �" = 1’-0"

SPAN 10 SPAN 9

PROPOSED PIER CAP PLAN

A

-

B

-

SCALE: �" = 1’-0"

CONNECTICUT

COORDINATE GRID

PIER 9

SPAN 10

SPAN 9

SPAN 10

SPAN 9

{ BEARING

{ BEARING

{ BEARING

{ BEARING

PROPOSED BEARING STIFFENER

A

-

PLAN DETAIL - NORTH COLUMN B

-

PLAN DETAIL - SOUTH COLUMN

{ PIER 9

PROPOSED BEARINGS NORTH GIRDER

SCALE: 1" = 1’-0"

END DIAPHRAGM

STAINLESS STEEL SHIM

SCALE: 1" = 1’-0"

BEVELED SOLE PLATE

PROPOSED JACKING BEARING STIFFENER (TYP.)

PROPOSED JACKING BEARING STIFFENER

NOTES:

PROPOSED BEARINGS SOUTH GIRDER SIMILAR

{ PIER

SUGGESTED POSSIBLE JACKING METHOD

GIRDER

GIRDER

GIRDERGIRDER

BEVELED SOLE PLATE

STAINLESS STEEL SHIM

A-A

-

B-B

-

A-A

-

PROPOSED SPAN 9 NORTH BEARING B-B

-

PROPOSED SPAN 10 NORTH BEARING

AS NEEDED

EXTEND PEDESTAL

INSTALL STEEL KEEPERS (TYP.)

REINFORCEMENT.

SEE DRAWING NO. S-BR07 FOR TYPICAL PEDESTAL 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

�"SEAL WELD

�"SEAL WELD

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 9

S-BR07

BEARING REHABILITATION

�"SEAL WELD

�"SEAL WELD

GIRDER LAYOUT VARIES

TYP. (4 PLACES)

TYP. (4 PLACES)

ELEVATION

TYPICAL PEDESTAL REINFORCEMENT

PLAN VIEW

TYPICAL PEDESTAL REINFORCEMENT

SOUTH ELEVATION SIMILAR

NORTH ELEVATION SHOWN

PROPOSED BEARINGS INSTALLATIONS

4" (TYP.) UNLESS OTHERWISE NOTED

EXISTING ANCHOR BOLT (TYP.)

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-07.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SCALE: 1" = 1’-0"

SCALE: 1�" = 1’-0"

�"SEAL WELD

�"SEAL WELD

BEVELED SOLE PLATE

STAINLESS STEEL SHIMSTAINLESS STEEL SHIM

NOTES:

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.SCALE: 1�" = 1’-0"

1’-0"

1" CHAMFER (TYP.)

DRILL AND GROUT REBAR (TYP.)

BEVELED SOLE PLATE

GIRDER LAYOUT VARIES

(8) #5 BARS

(8) #5 BARS

(8) #5 BARS

(8) #5 BARS

(8) #6 BARS

(8) #6 BARS

TYP. 4 PLACES

TYP. 4 PLACES

4" (TYP.)

(8) #5 BARS(8) #5 BARS

(8) #6 BARS(8) #6 BARS

VARIES

EXISTING ANCHOR BOLT (TYP.)

VARIES

LENGTH

WIDTH VARIES

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-08.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 10

WEST ELEVATION

SPAN 11

SPAN 11

CONNECTICUT

COORDINATE GRID

CONNECTICUT

COORDINATE GRID

SPAN 10 SPAN 10 SPAN 11

PIER 10

SPAN 10

1’-6"2’-4"

4’-2" 2’-6"

7"

1’-5�"1’-3�"

4"

SCALE: 1" = 1’-0"

PIER 10 EXISTING BEARINGS

3" 3"3"3"

8"

SPAN 11 SPAN 10

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

S-BR08

NORTH ELEVATION SOUTH ELEVATION

A

-

B

-

A

-

PLAN DETAIL - NORTH COLUMN

2’-�"*

* TO BE FIELD VERIFIED BY CONTRACTOR

7’-2"

5’-10"

EXISTING BEARING (TO REMAIN)

TOWARDS { OF ROADWAY

REMOVE WELDED PLATE

REMOVE WELDED PLATE

BEARING REHABILITATION

END DIAPHRAGMBOTTOM OF

FLOOR BEAM

PIER 10

B

-

EXISTING BEARING NORTH GIRDEREXISTING BEARING SOUTH GIRDER SIMILAR

SOUTH COLUMN SIMILAR

5"

2�"

�"

I-95 NB OVER THAMES RIVER, RAILROADS,

5’-10"

GUSSET PLATE

W8x40

(4)-L4x3�x�

6 #6 BARS

REINFORCING BAR

DRILL AND GROUT

�"

56.2

5"

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-09.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 10

SCALE: �" = 1’-0"

S-BR09

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

SCALE: 3" = 1’-0"

PIER COLUMN

TOP OF PIER

F

-

SCALE: 1�" = 1’-0"

12" (TYP.)

2" (TYP.)

PROVIDE KEEPER (TYP.)

FRONT ELEVATION KEEPER

FIXED BEARING

E

-

RESTRAINER DETAIL

F

-

SECTION OF CROSS BRACE

A

-

SPAN 11

PIER 10

SPAN 10

SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

A

-

PLAN DETAIL - NORTH COLUMN

STEEL KEEPER

�"

�"

{ GIRDER

�"

DRILL AND GROUT

4 #6 BARS

BEARING REHABILITATION

SOUTH COLUMN SIMILAR

GIRDER

EXISTING SOLE PLATE

(8) #

6

U-B

AR

S

2"

4’-6"

4’-2"

2�"

1’-1�"

�"

TOP OF CONCRETE KEEPER

LENGTH VARIES

U-BAR

(2) #6

(4) #6 U-BARS

(1) #6 U-BAR

DRILL AND GROUT

LENGTH VARIES

1’-2"

I-95 NB OVER THAMES RIVER, RAILROADS,

4’-6"

1’-5"

11�"

1’-11"

11�"

CONCRETE KEEPER EDGE

DRILLED HOLE PATTERN

SCALE: �" = 1’-0"

NORTH KEEPER SHOWN, SOUTH KEEPER SIMILAR

1�"

(TYP.)

1’-11�"

3’-�"

7 EQ. SPACES

3’-10"{ PIER CAP

3 EQ. SPACES

4 EQ. SPACES 2 EQ. SP.

E

-

172.556’

169.16’

FACEE/WFACEN/SFACEE/W

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-10.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 11

WEST ELEVATION

SPAN 12

SPAN 12

CONNECTICUT

COORDINATE GRID

5’-10"

7’-2"

5’-10"

7’-2"

CONNECTICUTCOORDINATE G

RID

SCALE: 1" = 1’-0"

2’-6"1’-8�"

1’-0"

1’-8"

3�"

1’-3�"

SPAN 12

5�"6"

S-BR10

C

-

A

-

B

-

NORTH ELEVATION SOUTH ELEVATION

SOLE AND MASONRY PLATES (TYP.)

REMOVE EXISTING BEARING,

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"SCALE: �" = 1’-0"

A

-

PLAN DETAIL NORTH COLUMN C

-

PLAN DETAIL SOUTH COLUMN

BOLTS (8 PLACES)

1’-11"*

* TO BE FIELD VERIFIED BY CONTRACTOR

2’-8" 2’-0"

1’-0"

1’-8"

4"

1’-6�"

4"

2’-2�"*

SPAN 12

1�" (TYP.)

(8 PLACES) (TYP.)

(8 PLACES) (TYP.)

3" (TYP.)

BEARING REHABILITATION

GIRDER

GIRDER

GIRDER

GIRDER

BEVELED LOAD PLATE (TYP.)

1’-11"*2’-2�"*

END DIAPHRAGM

BOTTOM OF

FLOOR BEAM

PROPOSED BEARING STIFFENER (TYP.)

SUGGESTED POSSIBLE JACKING METHOD (TYP.)

B

-

EXISTING BEARING NORTH GIRDER

END DIAPHRAGM

7�"

1"

3" 3"

7"

1"

GIRDER HOLE PATTERN

SCALE: 1�" = 1’-0"

SPAN 11

PIER 11

SPAN 11 SPAN 12SPAN 11

PIER 11

PIER 11 SPAN 11

PIER 11 SPAN 12

PIER 11 EXISTING BEARINGS

{ PIER 11

SPAN 11

SPAN 11

EXISTING BEARING SOUTH GIRDER SIMILAR

4"

SEE SUBSET #06

EXISTING DRAIN PIPE TO BE REMOVED AND RESET

I-95 NB OVER THAMES RIVER, RAILROADS,

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 11

S-BR11

TYPICAL TOP VIEW OF GIRDER

BEVELED LOAD PLATE (TYP.)

BEARING REHABILITATION

PROPOSED BEARING

PROPOSED BEARING

SPAN 12 SOUTH BEARING SIMILARSPAN 11 SOUTH BEARING SIMILAR

1"|

STEEL KEEPER (TYP.)

STEEL KEEPER (TYP.)

STEEL KEEPER (TYP.)

STEEL KEEPER (TYP.)

FRONT VIEW FRONT VIEW

STIFFENER

BEARING

JACKING

PROPOSED

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-11.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SCALE: �" = 1’-0"

SCALE: �" = 1’-0" SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

A

-

B

-

SCALE: �" = 1’-0"

CONNECTICUT

COORDINATE GRID

SPAN 12

SPAN 12

{ BEARING

{ BEARING

{ BEARING

{ BEARING

A

-

PLAN DETAIL - NORTH COLUMN B

-

PLAN DETAIL - SOUTH COLUMN

SUGGESTED POSSIBLE JACKING METHOD

GIRDER

GIRDER

GIRDERGIRDER

BEVELED SOLE PLATE

STAINLESS STEEL SHIM

SCALE: 1" = 1’-0"

END DIAPHRAGM

STAINLESS STEEL SHIM

SCALE: 1" = 1’-0"

BEVELED SOLE PLATE

PROPOSED JACKING BEARING STIFFENER (TYP.)

SPAN 11

PIER 11

CONNECTICUT

COORDINATE GRID

SPAN 12 SPAN 11

{ PIER 11

SPAN 11

NOTES:

A-A

-

B-B

-

PROPOSED BEARINGS SOUTH GIRDERS SIMILAR

PROPOSED BEARINGS NORTH GIRDERS

A-A

-

PROPOSED SPAN 11 NORTH BEARING B-B

-

PROPOSED SPAN 12 NORTH BEARING

REINFORCEMENT.

SEE DRAWING S-BR07 FOR TYPICAL PEDESTAL 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

STIFFENER

BEARING

JACKING

PROPOSED

STIFFENER

BEARING

JACKING

PROPOSED

�"SEAL WELD

�"SEAL WELD

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 11

S-BR12

BEARING REHABILITATION

�"SEAL WELD

�"SEAL WELD

EXISTING ANCHOR BOLT (TYP.)

SOUTH ELEVATION SIMILAR

NORTH ELEVATION SHOWN

PROPOSED BEARING INSTALLATION

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-12.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SCALE: 1�" = 1’-0"

�"SEAL WELD

�"SEAL WELD

BEVELED SOLE PLATE

STAINLESS STEEL SHIMSTAINLESS STEEL SHIM

NOTES:

REINFORCEMENT.

SEE DRAWING NO. S-BR07 FOR TYPICAL PEDESTAL 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

BEVELED SOLE PLATE

13

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-13.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 13

WEST ELEVATION

SPAN 15

SPAN 14

CONNECTICUT

COORDINATE GRID

SPAN 13 SPAN 13 SPAN 15

PIER 13

SPAN 13

S-BR13

8" 7�"

SPAN 15 SPAN 13

SCALE: �" = 1’-0" SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

A

-

C

-

B

-

SOUTH ELEVATIONNORTH ELEVATION

B

-SIMILAR TO

CONNECTICUT

COORDINATE GRID

C

-

PLAN DETAIL - SOUTH COLUMNA

-

PLAN DETAIL - NORTH COLUMN

EXISTING BEARINGS TO REMAIN

SCALE: 1" = 1’-0"

PIER 13 EXISTING BEARING

2’-8" 2’-0"

1’-0"

1’-8"

�"�"

2�"

5"

4"

1’-3�"

3�"

* TO BE FIELD VERIFIED BY CONTRACTOR

1’-11"*

TOWARDS { OF ROADWAY

SPAN 14

SPAN 13

{ PIER 13

3" (TYP.)

1" (TYP.)

8’-0"

6’-0"

6’-0"

8’-0"

REMOVE WELDED PLATE

REMOVE WELDED PLATE

BEARING REHABILITATION

END DIAPHRAGM

BOTTOM OF

FLOOR BEAM

PIER 13

B

-

EXISTING BEARINGS NORTH GIRDER

EXISTING BEARINGS SOUTH GIRDER SIMILAR

SEE SUBSET 6

EXISTING DRAIN PIPE (NORTH COLUMN ONLY)

I-95 NB OVER THAMES RIVER, RAILROADS,

13

GUSSET PLATE

W8x40

(4)-L4x3�x�

6 #6 BARS

REINFORCING BAR

DRILL AND GROUT

�"

6 #6 BARS

REINFORCING BAR

DRILL AND GROUT

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-14.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 13

S-BR14

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

TOP OF PIER

PIER COLUMN

F

-

SCALE: 3" = 1’-0"

SCALE: 1�" = 1’-0"

SPAN 15 BEARING

6 #6 BARS

8 #6 BARS

8 #6 BARS

GIRDER END

12" (TYP.)

2" (TYP.)

PROVIDE KEEPER (TYP.)

PROVIDE KEEPER (TYP.)

A

-

B

-

E

-

RESTRAINER DETAIL

F

-

SECTION OF CROSS BRACE

CONNECTICUT

COORDINATE GRID

PIER 13

SPAN 14

SPAN 13

PROPOSED PIER CAP PLANSCALE: �" = 1’-0"

B

-

PLAN DETAIL - SOUTH COLUMNA

-

PLAN DETAIL - NORTH COLUMN

SPAN 14

SPAN 13

{ PIER 13

STEEL KEEPER

SOLE PLATE

�"

�"

INSTALL KEEPER SYSTEM (TYP.)

INSTALL KEEPER SYSTEM (TYP.)

{ GIRDER, SPAN 13

{ GIRDER, SPAN 13

{ GIRDER, SPAN 14 { GIRDER, SPAN 14

EXISTING SOLE PLATE (TYP.)

�"

BEARING REHABILITATION

SCALE: �" = 1’-0"

TOP OF PIER

PIER COLUMN

F

-

SPAN 15 BEARING

GIRDER END

12" (TYP.)

2" (TYP.)

FRONT ELEVATION NORTH KEEPER FRONT ELEVATION SOUTH KEEPER

7�"

�"

I-95 NB OVER THAMES RIVER, RAILROADS,

6 #6 BARS

4’-6"4’-6"

3’-7" 3’-7"

DRILLED HOLE PATTERN

SCALE: �" = 1’-0"

SOUTH KEEPER SHOWN, NORTH KEEPER SIMILAR

E

-

E

-

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-15.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 15

WEST ELEVATION

SPAN 16

SPAN 16

CONNECTICUT

COORDINATE GRID

SPAN 15 SPAN 15 SPAN 16

PIER 15

SPAN 15

S-BR15

SCALE: 1" = 1’-0"

PIER 15 EXISTING BEARINGS

5�"

6�"

3’-2" 1’-8"

4"

4�"

1’-0"1’-8"

�"

�"

2�"

1’-7�"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SPAN 16 SPAN 15

A

-

B

-

NORTH ELEVATION SOUTH ELEVATIONA

-

PLAN DETAIL - NORTH COLUMN

7’-8"

5’-8"

B

-SIMILAR TO

A

-SIMILAR TO

CONNECTICUT

COORDINATE GRID

SOLE AND MASONRY PLATES (TYP.)

REMOVE EXISTING BEARING,

{ PIER

PIERS 17 & 19 SIMILAR

PIER 15 SHOWN

2’-8" 2’-0"

1’-0"

1’-8"

4"

1’-6�"

4"

2’-2�"*

PIER 15 SPAN 15

PIER 15 SPAN 16

(8 PLACES) (TYP.)

3" (TYP.)

1" (TYP.)2’-0"*

* DIMENSION TO BE FIELD VERIFIED BY CONTRACTOR

BEARING REHABILITATION

END DIAPHRAGMBOTTOM OF

FLOOR BEAM

SUGGESTED POSSIBLE JACKING METHOD

GIRDER

GIRDER

7"

1"

1"

7�"

3" 3"

7�"

3" 3"

1"

7"

1"

SPAN 15 GIRDER BOLT HOLE PATTERN

SPAN 16 GIRDER BOLT HOLE PATTERNSCALE: 1�" = 1’-0"

SCALE: 1�" = 1’-0"

SOUTH PLAN SIMILAR

B

-

EXISTING BEARINGS NORTH GIRDERSEXISTING BEARING SOUTH GIRDERS SIMILAR

PIER 15

PROPOSED JACKING BEARING STIFFENER (TYP.)

BEVELED LOAD PLATE (TYP.)

2’-2�"*

2’-0"*

SEE SUBSET 06

EXISTING DRAIN PIPE TO BE REMOVED AND RESET

I-95 NB OVER THAMES RIVER, RAILROADS,

SPAN 16 SOUTH BEARING SIMILARSPAN 15 SOUTH BEARING SIMILAR

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-16.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 15

S-BR16

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SPAN 16 SPAN 15

PROPOSED PIER CAP PLAN

A

-

SCALE: �" = 1’-0"

STIFFENER

BEARING

JACKING

PROPOSED

STIFFENER

BEARING

JACKING

PROPOSED

A

-

PLAN DETAIL - NORTH COLUMN

{ BEARING

{ BEARING

{ GIRDER

{ GIRDER

PIERS 17 & 19 SIMILAR

PIER 15 SHOWN

BEVELED LOAD PLATE

PROPOSED JACKING BEARING STIFFENER (TYP.)

BEARING REHABILITATION

PROPOSED BEARINGS NORTH GIRDERPROPOSED BEARING SOUTH GIRDER SIMILAR

SOUTH COLUMN SIMILAR

STAINLESS STEEL SHIM

SCALE: 1" = 1’-0"

BEVELED SOLE PLATE

SCALE: 1�" = 1’-0"AND WASHERS (8 PLACES)

(8 PLACES)

BOLTS AND WASHERS

STAINLESS STEEL SHIM

SCALE: 1" = 1’-0"

BEVELED SOLE PLATE

�"SEAL WELD

�"SEAL WELD

LOAD PLATE

BEVELED

NOTES:

PROPOSED BEARING

�"SEAL WELD

STIFFENER

BEARING

JACKING

PROPOSED

STIFFENER

BEARING

JACKING

PROPOSED

PROPOSED BEARING

B-B

-

SPAN 15

{ BEARING

SPAN 16

{ BEARING

STEEL KEEPER (TYP.)

STEEL KEEPERSTEEL KEEPER

PROPOSED BEARINGS NORTH GIRDERS ELEVATION

B-B

-

PROPOSED SPAN 16 NORTH BEARING

FRONT VIEW A-A

-

PROPOSED SPAN 15 NORTH BEARING

FRONT VIEW

A-A

-

REINFORCEMENT.

SEE DRAWING NO. S-BR07 FOR TYPICAL PEDESTAL 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

I-95 NB OVER THAMES RIVER, RAILROADS,

�"SEAL WELD

�"SEAL WELD

BEVELED SOLE PLATE

BEVELED SOLE PLATE

STAINLESS STEEL SHIM

STAINLESS STEEL SHIM

(8 PLACES)

PROPOSED BEARINGS SOUTH GIRDERS SIMILAR

16

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-17.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 16

WEST ELEVATION

SPAN 17

SPAN 17

CONNECTICUT

COORDINATE GRID

SPAN 16 SPAN 16 SPAN 17

PIER 16

SPAN 16

S-BR17

SCALE: 1" = 1’-0"

PIER 16 EXISTING BEARING

6"

1’-8"

6"

2’-8"

3’-6"4’-2"

1’-6"

2’-4"

9�"

4�"

�"

10�"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

B

-

A

-

NORTH ELEVATION SOUTH ELEVATION

PIER 18 & 20 SIMILAR

PIER 16 SHOWN

CONNECTICUT

COORDINATE GRID

A

-

PLAN DETAIL - NORTH COLUMN

7’-8"

5’-8"

TOWARDS { OF ROADWAY

{ GIRDER

1�" (TYP.)

3" (TYP.)

REMOVE WELDED PLATE

REMOVE WELDED PLATE

BEARING REHABILITATION

END DIAPHRAGMBOTTOM OF

FLOOR BEAM

PIER 16

B

-

EXISTING BEARING NORTH GIRDER

SOUTH COLUMN SIMILAR

EXISTING BEARING SOUTH GIRDER SIMILAR

9"

EXISTING DRAIN (TO REMAIN)

I-95 NB OVER THAMES RIVER, RAILROADS,

GUSSET PLATE

W8x40

(4)-L4x3�x�

6 #6 BARS

REINFORCING BAR

DRILL AND GROUT

�"

6 #6 BARS

REINFORCING BAR

DRILL AND GROUT

{ PIER 16

SPAN 16

SPAN 17

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-18.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 16

S-BR18

CONNECTICUT

COORDINATE GRID

SCALE:�" = 1’-0" SCALE:�" = 1’-0"

SCALE: 3" = 1’-0"

SCALE: 1�" = 1’-0"

TOP OF PIER

PIER COLUMN

F

-

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.)

PROVIDE KEEPER (TYP.)

PROVIDE KEEPER (TYP.)

DRILL AND GROUT

3 #6 BARS

6 #6 BARS

8 #6 BARS

DRILL AND GROUT

3 #6 BARS

8 #6 BARS

FIXED BEARING

E

-

RESTRAINER DETAIL

F

-

SECTION OF CROSS BRACE

PROPOSED PIER CAP PLAN

SCALE: �" = 1’-0"

A

-

B

-

PIER 18 & 20 SIMILAR

PIER 16 SHOWN

STEEL KEEPER

SOLE PLATE

�"

1’-1�"|

�"A

-

PLAN DETAIL - NORTH COLUMN B

-

PLAN DETAIL - SOUTH COLUMN

{ GIRDER{ GIRDER

�"

BEARING REHABILITATION

PIER COLUMN

F

-

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.)

FIXED BEARING

TOP OF PIER

FRONT ELEVATION SOUTH KEEPERFRONT ELEVATION NORTH KEEPER

I-95 NB OVER THAMES RIVER, RAILROADS,

6 #6 BARS

4’-6" 4’-6"

4’-2"4’-2"

(TYP.)

FOR HOLE DRILL PATTERN, SEE DRAWIGN NO. S-BR09

E

-

E

-

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-19.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 21

WEST ELEVATION

SPAN 22

SPAN 22

CONNECTICUT

COORDINATE GRID

SPAN 21 SPAN 21 SPAN 22

PIER 21

SPAN 21

S-BR19

7’-10"

6’-8"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SPAN 22 SPAN 21

NORTH ELEVATION SOUTH ELEVATION

B

-

A

-

A

-

PLAN DETAIL - NORTH COLUMN

PIER 21 EXISTING TRUSS BEARING

SCALE: 1" = 1’-0"

3’-10"

2’-9"

2"

2"

2"

2’-1�" 4"4"

5’-0"

BEARING REHABILITATION

END DIAPHRAGM

PIER 21

SOUTH COLUMN SIMILAR

B

-

EXISTING BEARINGS NORTH GIRDER AND TRUSS

EXISTING BEARINGS SOUTH GIRDER AND TRUSS SIMILAR

3’-0"*

1’-11�"*

5"

6"*

10�"*

9"*

11"*

5"*

10"*10"*

* TO BE FIELD VERIFIED BY THE CONTRACTOR

5"

SEE SUBSET #06

FOR DETAILS OF PIER 21 GIRDER BRACE

I-95 NB OVER THAMES RIVER, RAILROADS,

10 PANELS @ 31.1’ = 311’

21

REINFORCING BAR

DRILL AND GROUT

(6) #6 BARS

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-20.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 21

S-BR20

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

�"

1’-1�"

SCALE: 3" = 1’-0"

TOP OF PIER

PIER COLUMN

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.)FRONT ELEVATION KEEPER

DRILL AND GROUT

(6) #6 BARS

PROVIDE KEEPER (TYP.)

PIER 21 SHOWN, PIER 32 SIMILAR

SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

A

-

�"

4�"

SCALE: 3" = 1’-0"

F

-

LOWER RESTRAINER DETAIL

E

-

UPPER RESTRAINER DETAIL

A

-

PLAN DETAIL - NORTH COLUMN

BEARING REHABILITATION

SOUTH COLUMN SIMILAR

6’-0"

5�"

{ BEARING1’-10"

2’-9�"

2�"

(4) #6 BARS

1’-4�"

I-95 NB OVER THAMES RIVER, RAILROADS,

{ BEARING

3�"

9"

18 EQ. SP. =4’-7�"

LENGTH VARIES

(12) #6 BARS, EQ. SPACED

3 EQ. SP. =1’-3�"

DRILL HOLE PATTERN

SCALE: �" = 1’-0"

(SOUTH KEEPER SIMILAR)

NORTH KEEPER SHOWN

9�"

E

-

F

-

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-21.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 22

WEST ELEVATION

SPAN 23

SPAN 23

CONNECTICUT

COORDINATE GRID

SPAN 22 SPAN 22 SPAN 23

PIER 22

SPAN 22

S-BR21

CONNECTICUT

COORDINATE GRID

8’-0"

9’-6"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

A

-

B

-

NORTH ELEVATION SOUTH ELEVATION

PIERS 24, 29, & 31 SIMILAR

EXISTING PIER POST TENSIONING (TO REMAIN)

EXISTING BEARING (TO REMAIN)

SCALE: �" = 1’-0"

PIERS 24, 29, & 31 SIMILAR

PIER 22 EXISTING BEARINGS

6’-8" 6’-0"

A

-

PLAN DETAIL - NORTH COLUMN

BEARING REHABILITATION

END DIAPHRAGM

PIER 22

B

-

EXISTING BEARING NORTH TRUSSEXISTING BEARING SOUTH TRUSS SIMILAR

SOUTH COLUMN SIMILAR

PIERS 24, 29, AND 31 SIMILAR

PIER 22 SHOWN* TO BE FIELD VERIFIED BY CONTRACTOR

4’-0"*

4’-10"1’-11�"

3"

8"

2’-1�"

1’-3"

11"*

2’-7�"

EXISTING DRAIN (TO REMAIN)

1’-8�"*

I-95 NB OVER THAMES RIVER, RAILROADS,

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 22

S-BR22

CONNECTICUT

COORDINATE GRID

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-22.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SCALE: �" = 1’-0"

A

-

SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

PIERS 24, 29, & 31 SIMILAR

PIER 22 SHOWN

A

-

PLAN DETAIL - NORTH COLUMN

BEARING REHABILITATION

SOUTH COLUMN SIMILAR

PROPOSED KEEPER ELEVATIONPROPOSED SOUTH KEEPER SIMILAR

SCALE: �" = 1’-0"

(6) EQ. SPACED #6 U-BARS

(5) EQ. SPACED #6 U-BARS

3 EQ. SPACED #6 U-BARS

2" MIN COVER (TYP.)

DRILL AND GROUTED

6 EQ. SPACED #5 U-BARS

DRILLED AND GROUTED

3 EQ. SPACED #7 U-BARS

DRILLED AND GROUTED

3 EQ. SPACED #7 U-BARS

1’-0"

DRILL AND GROUT (TYP.)

�"

1’-5"

4’-2"

1’-5"

6’-1�"

6’-�"

3�"

2" MIN. COVER (TYP.)

5’-�"1’-1"

1’-6" 45° CHAMFER

LENGTH VARIES

3 EQ. SPACED #6 U-BARS

AT CENTER OF DRILLED HOLE

REBAR TO BE 1’-0" INTO CONCRETE

CROWNED FOR DRAINAGE

TOP OF CONCRETE PIER

I-95 NB OVER THAMES RIVER, RAILROADS,

SEE DETAIL E, DRAWING NO. S-BR20

SEE DETAIL F, DRAWING NO. S-BR20

SEE DRAWING NO. S-BR09 FOR HOLL DRILL PATTERN

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-23.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 23

WEST ELEVATION

SPAN 24

SPAN 24

SCALE: �" = 1’-0"

CONNECTICUT

COORDINATE GRID

SPAN 23 SPAN 23 SPAN 24

PIER 23

SPAN 23

S-BR23

CONNECTICUT

COORDINATE GRID8’-0"

SPAN 24 SPAN 23

SCALE: �" = 1’-0"

A

-

B

-

NORTH ELEVATION SOUTH ELEVATION

PIER 30 SIMILAR

PIER 23 SHOWN

A

-

PLAN DETAIL - NORTH COLUMN

BEARING REHABILITATION

END DIAPHRAGM

PIER 23

B

-

EXISTING BEARINGS NORTH TRUSSEXISTING BEARINGS SOUTH TRUSS SIMILAR

SOUTH COLUMN SIMILAR

9’-6"

I-95 NB OVER THAMES RIVER, RAILROADS,

23

10 PANELS @ 31.1’ = 311’

23

6 #6 BARS

REINFORCING BAR

DRILL AND GROUT

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-24.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 23

S-BR24

CONNECTICUT

COORDINATE GRID

�"

1’-5�"

SCALE: 3" = 1’-0"

PIER COLUMN

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.)

FRONT ELEVATION KEEPER

TOP OF PIER

SIMILARPIER 23 SHOWN, PIER 30

SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

A

-

A

-SIMILAR TO

SPAN 24

SPAN 23

PIER 23

E

-

RESTRAINER DETAIL

BEARING REHABILITATION

DRAWING NO. S-BR20

"LOWER RESTRAINER DETAIL"

LOWER RESTRAINER SIMILAR TO

SCALE: �" = 1’-0"

A

-

PLAN DETAIL - NORTH COLUMN

PROVIDE KEEPER (TYP.)

6’-0"

1’-2�"

5’-9�"

1’-2�"

5�"

1’-10"

5�"

5�"

1’-10"

5�"

2’-10�"

4�"

I-95 NB OVER THAMES RIVER, RAILROADS,

SEE DRAWING NO. S-BR20 FOR REBAR REINFORCEMENT AND DRILL HOLE PATTERN

E

-

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-25.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

SCALE: �" = 1’-0"

PIER NO. 25

WEST ELEVATION

SPAN 26

SPAN 26

SCALE: �" = 1’-0"

CONNECTICUT

COORDINATE GRID

SPAN 25 SPAN 25 SPAN 26

PIER 25

SPAN 25

S-BR25

8" 8"

8’-6"

10’-6"

SCALE: �" = 1’-0"

NORTH ELEVATION SOUTH ELEVATION

PIER 28 SIMILAR

EXISTING PIER CAP PLAN

A

-

PLAN DETAIL

BEARING REHABILITATION

END DIAPHRAGM

PIER 25

B

-

EXISTING BEARINGS NORTH TRUSSEXISTING BEARINGS SOUTH TRUSS

3’-10"

3’-0"*

2’-4�"*

6"*

10�"*

5"*10"*10"*5"*

A

-

B

-

5’-0" 2’-9"

5’-6" 2’-11"

11"*

3’-�"*

3"

4"

3" 3" 3"

CONNECTICUT

COORDINATE GRID

3"

4’-�"

4"

3"

9"

1’-6�"*

SCALE: 1" = 1’-0"

PIER 28 SIMILAR

PIER 25 EXISTING BEARINGS

SPAN 24 BEARING

SPAN 25 BEARING

4�"*8"*

I-95 NB OVER THAMES RIVER, RAILROADS,

PIERS 21E, 25W, 28E, 32W

23

7 #6 BARS

REINFORCING BAR

DRILL AND GROUT

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-26.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 25

S-BR26

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

SPAN 26

PIER 25

SPAN 25

SIMILAR TO

TOP OF PIER

PIER COLUMN

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.)FRONT ELEVATION KEEPER

PROVIDE KEEPER (TYP.)

PIER 25 SHOWN; PIER 28 SIMILAR

�"

10"

SCALE: 3" = 1’-0"

SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

A

-

A

-

E

-

RESTRAINER DETAIL

BEARING REHABILITATION

SOUTH KEEPER SIMILAR

A

-

PLAN DETAIL - NORTH COLUMN

I-95 NB OVER THAMES RIVER, RAILROADS,

SIMILAR TO DRAWING NO. S-BR20

6’-0"

1’-10"

5’-9�"

5�"

5�"

2�"

PATTERN AND REBAR REINFORCEMENT.

SEE DRAWING NO. S-BR20 FOR DRILLED HOLE 1.

NOTES:

SEE DRAWING NO. S-BR20 FOR REBAR REINFORCEMENT AND DRILL HOLE PATTERN

E

-

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-27.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 26

WEST ELEVATION

A

3.XX

SPAN 27

SPAN 27

CONNECTICUT

COORDINATE GRID

SPAN 26 SPAN 26 SPAN 27PIER 26

SPAN 26

S-BR27

CONNECTICUT

COORDINATE GRID

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

12’-0"

14’-0"

SOUTH ELEVATIONNORTH ELEVATION

B

-

BEARING REHABILITATION

END DIAPHRAGM

PIER 26

(TO REMAIN)

EXISTING PIER TENSIONING

B

-

EXISTING BEARING NORTH TRUSS

EXISTING BEARING SOUTH TRUSS SIMILAR

PIER 27 SIMILAR

PIER 26 SHOWN

EXISTING BEARING (TO REMAIN)

A

-

PLAN DETAIL - NORTH COLUMN

SCALE: �" = 1’-0"

PIER 26 EXISTING BEARINGS

6’-5"

4’-11"*

* TO BE FIELD VERIFEID BY CONTRACTOR

8’-0"8’-0"

2’-9" 3’-10"

4’-1"

8"

1’-4"

I-95 NB OVER THAMES RIVER, RAILROADS,

REINFORCING BAR

DRILL AND GROUT

12 #6 BARS

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-28.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 26

S-BR28

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

SIMILAR TOA

-

A

-

6 #6 REBAR

�"

3’-5�"

SCALE: 1�" = 1’-0"

TOP OF PIERPIER COLUMN

SCALE: �" = 1’-0"

12" (TYP.)FRONT ELEVATION KEEPER

E

-

RESTRAINER DETAIL

2" (TYP.)

BEARING REHABILITATION

8 #6 REBAR

PIER 27 SIMILAR

PIER 26 SHOWN

A

-

PLAN DETAIL - NORTH COLUMN

I-95 NB OVER THAMES RIVER, RAILROADS,

DRILL AND GROUT

8 #6 REBAR

1’-0"

7’-0"

1’-0"

9’-5�"

1’-6"

1’-6"

4’-0"

1’-6"

1’-6"

DRILL HOLE PATTERN

SCALE: �" = 1’-0"

(SOUTH KEEPER SIMILAR)

NORTH KEEPER SHOWN

7 EQ. SP. =7’-2�"10�"

1’-1�"

1’-1�"

1’-10�"

7 EQ. SP. =8’-6�"

3’-9�" 3 EQ. SP.

E

-

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-29.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

PIER NO. 33

WEST ELEVATION

SPAN 34

SPAN 34

CONNECTICUT

COORDINATE GRID

SPAN 33 SPAN 33 SPAN 34

PIER 33

SPAN 33

S-BR29

CONNECTICUT

COORDINATE GRID

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

5’-8"

6’-2"

5’-8"

6’-2"

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

SPAN 34 SOUTH

SPAN 33 NORTH & SOUTH AND SPAN 34 NORTH

SCALE: 1" = 1’-0"

PIER 33 EXISTING BEARINGS

1’-10"

4" 4"

1’-0"

3"

1’-2�"

3�"

2’-8"

3" 3"

1’-0"

4"

1’-2�"

3�"

1’-10"

5" 5"

1’-10�"

4’-0"

3" 3"

B

-

D

-

C

-

A

-

NORTH ELEVATION SOUTH ELEVATION

BEARING REHABILITATION

END DIAPHRAGM

BOTTOM OF

FLOOR BEAM

D

-

EXISTING BEARING SOUTH GIRDER

SCALE: �" = 1’-0"

PIER 33

EXISTING BEARINGS (TO REMAIN) EXISTING BEARINGS (TO REMAIN)

1’-8�"*

1’-10"*

* TO BE FIELD VERIFIED BY CONTRACTOR

B

-

EXISTING BERING NORTH GIRDER

TOWARDS PIER CENTER

TOWARDS PIER CENTER

2�"

�"

PLATE

WELDED

EXISTING

REMOVE

PLATE

WELDED

EXISTING

REMOVE

A

-

PLAN DETAIL - NORTH COLUMN C

-

PLAN DETAIL - SOUTH COLUMN

PLATE

WELDED

EXISTING

REMOVE

PLATE

WELDED

EXISTING

REMOVE

{ PIER 33

SPAN 34

SPAN 33

40’-0" (TYP.)

(TO REMAIN)

DRAIN PIPE

EXISTING

(TO REMAIN)

DRAIN PIPE

EXISTING

I-95 NB OVER THAMES RIVER, RAILROADS,

1’-8�"

33

13

33

13

REINFORCING BAR

DRILL AND GROUT

�"

REINFORCING BAR

DRILL AND GROUT

10 #6 BARS10 #6 BARS

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-30.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 33

S-BR30

PROVIDE KEEPER (TYP.)

SCALE: �" = 1’-0"

SCALE: 3" = 1’-0"

2" (TYP.)

12" (TYP.)

TOP OF PIER

PIER COLUMN

SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

CONNECTICUT

COORDINATE GRID

A

-

B

-

STEEL KEEPER

SOLE PLATE

�"

1’-6"|

�"

BEARING REHABILITATION

E

-

RESTRAINER DETAIL

�"

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.)

TOP OF PIER

PIER COLUMN

SCALE: �" = 1’-0"

B

-

PLAN DETAIL - SOUTH COLUMN

SCALE: �" = 1’-0"

A

-

PLAN DETAIL - NORTH COLUMN

FRONT ELEVATION SOUTH KEEPERFRONT ELEVATION NORTH KEEPER

{ PIER 33

SPAN 34

SPAN 33

SPAN 34

SPAN 33

PIER 33

I-95 NB OVER THAMES RIVER, RAILROADS,

4’-4"

2’-2"

2’-2"

6’-4�"

3’-9�

"

(TYP.)

FOR REBAR AND HOLE DRILL LAYOUT, SEE DRAWING NO. S-BR14

E

-

E

-

(8 PLACES)

REMOVE EXISTING BOLTS

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-31.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 34

WEST ELEVATION

SPAN 35

SPAN 35

CONNECTICUT

COORDINATE GRID

SPAN 34 SPAN 34 SPAN 35

PIER 34

SPAN 34

S-BR31

CONNECTICUT

COORDINATE GRID

SCALE:�" = 1’-0"

SCALE: 1" = 1’-0"

PIER 34 EXISTING BEARINGS

1’-0"

4"

1’-10"4’-0"

7�"4"

1’-5�"

4"

3"3"

1’-10�"

1’-10"

1"1�"

1"

�"�"2�"

1’-9"

4�"

4"

1’-6"

3"

4"

1’-10"3’-2"

6�"

1’-8�"

1’-8"

1’-0"

1’-8�"

2�"R

2�"R

NORTH PIER

SOUTH PIER

5" 5"

SCALE:�" = 1’-0"

B

-

D

-

C

-

A

-

NORTH ELEVATION SOUTH ELEVATION

BEARING REHABILITATION

END DIAPHRAGM

BOTTOM OF

FLOOR BEAM

PIER 34

8" 8"

9" 9"

2’-1�"* 2’-1�"*

2’-1"*2’-1"*

6’-2" 6’-2"

2’-1"*

2’-1�"*

* TO BE FIELD VERIFIED BY CONTRACTOR

A

-

PLAN DETAIL - NORTH COLUMN B

-

PLAN DETAIL - SOUTH COLUMN

SCALE: �" = 1’-0" SCALE: �" = 1’-0"

B

-

EXISTING BEARINGS NORTH GIRDER D

-

EXISTING BEARINGS SOUTH GIRDER

EXISTING BEARINGS TO BE REMOVED

EXISTING BEARINGS TO BE REMOVED

DRAIN PIPE TO BE REMOVED AND RESET

PROPOSED JACKING BEARING STIFFENER

PROPOSED JACKING BEARING STIFFENER

PROPOSED JACKING BEARING STIFFENERPROPOSED JACKING BEARING STIFFENER

BEVELED LOAD PLATE

BEVELED LOAD PLATE BEVELED LOAD PLATEBEVELED LOAD PLATE

(8 PLACES)

REMOVE EXISTING BOLTS

(8 PLACES)

REMOVE EXISTING BOLTS

(8 PLACES)

REMOVE EXISTING BOLTS

I-95 NB OVER THAMES RIVER, RAILROADS,

5’-8"5’-8"

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-32.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

PROPOSED PIER CAP PLANSCALE: �" = 1’-0"

A

-

B

-

SPAN 35

PIER 34

SPAN 34

STIFFENER

BEARING

JACKING

PROPOSED

STIFFENER

BEARING

JACKING

PROPOSED

A

-

PLAN DETAIL - NORTH COLUMN

PROPOSED BEARINGS NORTH GIRDER

CONNECTICUT

COORDINATE GRID

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SCALE: 1" = 1’-0"

SCALE: 1" = 1’-0"

BEVELED SOLE PLATE

SCALE: 1" = 1’-0"

�"SEAL WELD

�"SEAL WELD

�"SEAL WELD

BEVELED SOLE PLATE

�"SEAL WELD

STAINLESS STEEL SHIM STAINLESS STEEL SHIM

1" CHAMFER (TYP.) 1" CHAMFER (TYP.)

NOTES:

STIFFENER

BEARING

JACKING

PROPOSED

STIFFENER

BEARING

JACKING

PROPOSED

B-B

-

A-A

-

B-B

-

PROPOSED SPAN 34 NORTH BEARING A-A

-

PROPOSED SPAN 35 NORTH BEARING

S-BR07.

FOR TYPICAL PEDESTAL REINFORCEMENT, SEE DRAWING NO 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 34

S-BR32

BEARING REHABILITATION

�"SEAL WELD

SIDE VIEW

PIER 34 NORTH

PROPOSED BEARING

1"| MIN (TYP.)

PROPOPSED BEARING

PROPOPSED BEARING

EXTEND PEDESTAL

STEEL KEEPER

STEEL KEEPER

STEEL KEEPER

STEEL KEEPER

FRONT VIEW FRONT VIEW

1’-0"

1"

EXISTING PEDESTAL

DRILL AND GROUT REBAR

2’-1"* 2’-1"*

(8) #5 BARS (8) #5 BARS

(8) #6 BARS(8) #6 BARS

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-33.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

CONNECTICUT

COORDINATE GRID

PROPOSED PIER CAP PLANSCALE: �" = 1’-0"

B

-

SPAN 35

PIER 34

SPAN 34

B

-

PLAN DETAIL - SOUTH COLUMN

STIFFENER

BEARING

JACKING

PROPOSED

STIFFENER

BEARING

JACKING

PROPOSED

PROPOSED BEARINGS SOUTH GIRDER

CONNECTICUT

COORDINATE GRID

PLATE

LOAD

BEVELED

PLATE

LOAD

BEVELED

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SCALE: 1" = 1’-0"

1" CHAMFER (TYP.)

SCALE: 1" = 1’-0"

BEVELED SOLE PLATE

�"SEAL WELD

A-A

-

PROPOSED SPAN 34 SOUTH BEARING

SCALE: 1" = 1’-0"

�"SEAL WELD

STAINLESS STEEL SHIM

BEVELED SOLE PLATE

STAINLESS STEEL SHIM

1" CHAMFER (TYP.)

NOTES:

BEARING

PROPOSED

BEARING

PROPOSED

B-B

-

PROPOSED SPAN 35 SOUTH BEARING

B-B

-

A-A

-

NO. S-BR07.

FOR TYPICAL PEDESTALL REINFORCEMENT, SEE DRAWING 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 34

S-BR33

BEARING REHABILITATION

SIDE VIEW

PIER 34 SOUTH

PROPOSED BEARING

1"| MIN (TYP.)

�"SEAL WELD

�"SEAL WELD

�"SEAL WELD

STIFFENER

BEARING

JACKING

PROPOSED

STIFFENER

BEARING

JACKING

PROPOSED

FRONT VIEWFRONT VIEW

STEEL KEEPERS

STEEL KEEPERS

STEEL KEEPERS STEEL KEEPERS

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-34.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

PIER NO. 35

WEST ELEVATION

SPAN 36

SPAN 36

CONNECTICUT

COORDINATE GRID

SPAN 35 SPAN 35 SPAN 36

PIER 35

SPAN 35

S-BR34

CONNECTICUT

COORDINATE GRID

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

5’-8"

6’-2"

SCALE: 1" = 1’-0"

PIER 35 EXISTING BEARINGS

2’-8"

5"

1’-9�"

5"

1’-1"2’-�"

1’-9�"

�"�"

2�"

1"

1�"

1"

4"4"

4’-2"

4" 4"

A

-

NORTH ELEVATION SOUTH ELEVATION

BEARING REHABILITATION

END DIAPHRAGMBOTTOM OF

FLOOR BEAM

PIER 35

2’-7�"*

* TO BE FIELD VERIFIED BY CONTRACTOR

EXISTING BEARING (TO REMAIN)

A

-

PLAN DETAIL - NORTH COLUMN

SOUTH COLUMN SIMILAR

EXISTING BEARING NORTH/SOUTH ELEVATION

TOWARDS PIER CENTER

PLATE

WELDED

EXISTING

REMOVE

I-95 NB OVER THAMES RIVER, RAILROADS,

35

REINFORCING BAR

DRILL AND GROUT

�"

16 #6 BARS

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-35.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER NO. 35

S-BR35

CONNECTICUT

COORDINATE GRID

SCALE: 3" = 1’-0"

TOP OF PIER

PIER COLUMN

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.)

FRONT ELEVATION KEEPER

DRILL AND GROUT

4 #6 BARS

4 #6 BARS

PROVIDE KEEPER (TYP.)

SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

SCALE: �" = 1’-0"

E

-

RESTRAINER DETAIL

A

-

STEEL KEEPER

SOLE PLATE

�"

1’-5"|

�"

BEARING REHABILITATION

A

-

PLAN DETAIL - NORTH COLUMN

SOUTH COLUMN SIMILAR

�"

I-95 NB OVER THAMES RIVER, RAILROADS,

8’-3"

10�"

2’-�"

10�"

7’-4�"

20 #6 BARS

DRILL HOLE LAYOUT SIMILAR TO DRAWING NO. S-BR20

E

-

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-36.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

WEST ELEVATION

SPAN 34B

SPAN 34B

CONNECTICUT

COORDINATE GRID

SPAN 33 SPAN 33 SPAN 34B

PIER 33B

SPAN 33

S-BR36

CONNECTICUT

COORDINATE GRID

PIER NO. 33B

PIER 33

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

6’-0"

4’-6�"

3’-0"

4’-6�"

3’-0"

6’-0"

C

-

A

-

B

-

D

-

C

-

PLAN DETAIL

A

-

PLAN DETAIL

NORTH ELEVATION SOUTH ELEVATION

PIER 33B EXISTING BEARINGS

1’-10"

4" 4"

1’-0"

3"

1’-2�"

3�"

1’-8"

2’-8"3" 3"

�"

1�"

1" 1"

2�" 4"4"

�"�"

�"

2�"R

1’-4�"

�"4"

SCALE: 1" = 1’-0"

BEARING REHABILITATION

1’-8�"*EXISTING BEARINGS TO REMAIN

EXISTING BEARINGS TO REMAIN

B

-

EXISTING BEARING NORTH GIRDER D

-

EXISTING BEARING SOUTH GIRDER

PIER 33B

TOWARDS PIER CENTER

PLATE

WELDED

EXISTING

REMOVE

* TO BE FIELD VERIFIED BY CONTRACTOR

I-95 NB OVER THAMES RIVER, RAILROADS,

1’-8�"

3 #6 BARS

REINFORCING BAR

DRILL AND GROUT

�"

3 #6 BARS

REINFORCING BAR

DRILL AND GROUT

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-37.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

S-BR37

CO

NN

EC

TIC

UT

CO

OR

DIN

AT

E

GRID

PIER NO. 33B

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

PROVIDE KEEPER (TYP.)

DRILL AND GROUT

3 #6 BARS

4 #6 BARS

DRILL AND GROUT

3 #6 BARS

PROVIDE KEEPER (TYP.)

4 #6 BARS

TOP OF PIER

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.)

FRONT ELEVATION KEEPER

SCALE: 3" = 1’-0"

SCALE: �" = 1’-0"

PROPOSED PIER CAP PLAN

A

-

B

-

E

-

RESTRAINER DETAIL

STEEL KEEPER

SOLE PLATE

�"

8�"|

�"

BEARING REHABILITATION

�" B

-

PLAN DETAIL - SOUTH BEARING

A

-

PLAN DETAIL - NORTH BEARING

TOP OF PIER

2" (TYP.)

12" (TYP.)

FRONT ELEVATION KEEPER

SCALE: �" = 1’-0"

I-95 NB OVER THAMES RIVER, RAILROADS,

4’-8�"

4’-4�"

2’-11"

10 #6 BARS10 #6 BARS

4’-4�"

2’-11"

4’-8�"

DRILL HOLE PATTERN

SCALE: �" = 1’-0"

(SOUTH KEEPER SIMILAR)

NORTH KEEPER SHOWN

4’-�"

9 EQ. SPACES

9 EQ. SPACES

4’-4�"

2’-7"

6�"

1’-7�"1’-2"

E

-E

-

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-38.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

WEST ELEVATION

SPAN 35B

SPAN 35B

CONNECTICUT

COORDINATE GRID

SPAN 34B SPAN 34B SPAN 35B

PIER 34B

SPAN 34B

S-BR38

CONNECTICUT

COORDINATE GRID

PIER NO. 34B

PIER 34

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

SCALE:�" = 1’-0"

6’-0"

4’-2"

A

-

C

-

D

-

B

-

NORTH ELEVATION SOUTH ELEVATION

PIER 34B EXISTING BEARINGS

SCALE: 1" = 1’-0"

4"

1’-6"

3"

4"

1’-10"3’-2"

6�"

1’-8�"

1’-8"

1’-0"

1’-8�"

2�"R

BEARING REHABILITATION

4’-2"

4’-3�"

6’-0"

PIER 34B

B

-

EXISTING BEARINGS NORTH GIRDER D

-

EXISTING BEARINGS SOUTH GIRDER

EXISTING ANCHOR BOLTS TO REMAIN

EXISTING DRAIN TO REMAIN

2’-1"*

* TO BE FIELD VERIFIED BY CONTRACTOR

SUGGESTED JACKING METHOD

PROPOSED JACKING BEARING STIFFENER

PROPOSED JACKING BEARING STIFFENER

PROPOSED JACKING BEARING STIFFENER

PROPOSED JACKING BEARING STIFFENER

MASONRY PLATE

SOLE PLATE AND

REMOVE EXISTING BEARINGS,

MASONRY PLATE

SOLE PLATE AND

REMOVE EXISTING BEARINGS,

2’-1"* 2’-1"* 2’-1"* 2’-1"*

A

-

PLAN DETAIL - NORTH BEARINGSC

-

PLAN DETAIL - SOUTH BEARINGS

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=80’

800

SCALE IN FEET

160

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-39.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

S-BR39

PIER NO. 34B

SCALE:�" = 1’-0"

SCALE:�" = 1’-0" SCALE:�" = 1’-0"

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

B

-

A

-

BEARING REHABILITATION

A

-

PLAN DETAIL - NORTH BEARINGS B

-

PLAN DETAIL - SOUTH BEARINGS

PROPOSED NORTH BEARINGSPROPOSED SOUTH BEARINGS SIMILAR

BEVELED LOAD PLATEPLATE

LOAD

BEVELED

STIFFENER

BEARING

JACKING

PROPOSED

SCALE: 1" = 1’-0"

BEVELED SOLE PLATE

1" CHAMFER (TYP.)

PROPOSED SOUTH BEARINGS SIMILAR

SCALE: 1" = 1’-0"

�"SEAL WELD

�"SEAL WELD

�"SEAL WELD

STAINLESS STEEL SHIM

NOTES:

PROPOSED BEARING PROPOSED BEARING

STIFFENER

BEARING

JACKING

PROPOSED

SEE DRAWING NO. S-BR07 FOR PEDESTAL REINFORCEMNT.2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

STIFFENER

BEARING

JACKING

PROPOSED

STIFFENER

BEARING

JACKING

PROPOSED

EXISTING PEDESTAL

PROPOSED PEDESTAL

PROPOSED PEDESTAL

EXISTING PEDESTAL

PROPOSED PIER 34B CAP PLAN

PIER 34B

SPAN 35B

SPAN 34B

{

PIER 34B

SPAN 34BSPAN 35B

SPAN 34B

SPAN 35B

PIER 34B {

I-95 NB OVER THAMES RIVER, RAILROADS,

�"SEAL WELD

SIDE VIEW

PIER 34B

PROPOSED NORTH BEARING

PIER 34B

TYPICAL PROPOSED BEARING

FRONT VIEW

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-40.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

PIER CAP PLAN

SCALE: �" = 1’-0"

WEST ELEVATION

SPAN 36B

SPAN 36B

CONNECTICUT

COORDINATE GRID

SPAN 35B SPAN 35B SPAN 36B

PIER 35B

SPAN 35B

S-BR40

CONNECTICUT

COORDINATE GRID

PIER NO. 35B

PIER 35

5’-0"

4’-0"

2’-6"

4’-0"

4’-0"

5’-0"

SPAN 35B SPAN 36BSPAN 36B SPAN 35B

SCALE: �" = 1’-0" SCALE: �" = 1’-0"

SCALE: �" = 1’-0" SCALE: �" = 1’-0"

B

-

D

-

C

-

A

-

NORTH ELEVATION SOUTH ELEVATION

1’-10"

4" 4"

1’-0"

3"

1’-2�"

3�"

1’-8�"

1’-8"

2’-8"3" 3"

�"

1�"

1" 1"

2�" 4"4"

�"�"

�"

2�"R

1’-4�"

�"4"

PIER 35B EXISTING BEARINGS

SCALE: 1" = 1’-0"

BEARING REHABILITATION

2’-6"

PIER 35B

EXISTING BEARINGS TO REMAIN

EXISTING BEARINGS TO REMAIN

B

-

EXISTING BEARINGS NORTH GIRDER D

-

EXISTING BEARINGS SOUTH GIRDER

1’-8�"*

* TO BE FIELD VERIFIED BY CONTRACTOR

TOWARDS PIER CENTER

PLATE

WELDED

EXISTING

REMOVE

C

-

PLAN DETAIL - SOUTH BEARINGSA

-

PLAN DETAIL - NORTH BEARINGS

I-95 NB OVER THAMES RIVER, RAILROADS,

3 #6 BARS

REINFORCING BAR

DRILL AND GROUT

�"

REINFORCING BAR

DRILL AND GROUT

3 #6 BARS

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-41.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

S-BR41

PIER NO. 35B

CONNECTICUT

COORDINATE GRID

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

TOP OF PIER

SCALE: �" = 1’-0"

2" (TYP.)

12" (TYP.) FRONT ELEVATION KEEPER

CONNECTICUT

COORDINATE GRID

SCALE: 3" = 1’-0"

DRILL & GROUT

3 #6 REBAR

4 #6 REBAR

4 #6 REBAR

10 #6 REBAR

DRILL & GROUT

3 #6 REBARDRILL & GROUT

3 #6 REBAR

4 #6 REBAR

DRILL & GROUT

3 #6 REBAR

10 #6 REBAR

4 #6 REBAR

E

-

RESTRAINER DETAIL

PROPOSED PIER CAP PLAN

SCALE: �" = 1’-0"

A

-

B

-

CONNECTICUT

COORDINATE GRID

STEEL KEEPERSOLE PLATE

�"

7�"|

�"

BEARING REHABILITATION

�"

A

-

PLAN DETAIL - NORTH BEARINGS

B

-

PLAN DETAIL - SOUTH BEARINGS

FRONT ELEVATION KEEPER

SCALE: �" = 1’-0"

12" (TYP.)

TOP OF PIER

2" (TYP.)

SPAN 36B

SPAN 35B

PIER 35B

SPAN 36B KEEPER (BEHIND)

I-95 NB OVER THAMES RIVER, RAILROADS,

4’-6"

4’-10"

4’-6"

2’-5"

2’-5"

4’-6"

10 #6 REBAR

10 #6 REBAR

1’-6�"

(TYP.)

DRILL HOLE LAYOUT SIMILAR TO DRAWING NO. S-BR37

E

-

E

-

SPANS 6-15 SOUTH GIRDERS -

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-42.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

S-BR42

PLAN VIEW

WEST ELEVATION

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0" SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

83

COORDINATE GRID

AD

CONNECTICUT

83

COORDINATE GRID

AD

CONNECTICUT

83

COORDINATE GRID

AD

CONNECTICUT

SPAN 34

SPAN 34B

SPAN 34 SPAN 34

SPAN 34SPAN 34

SCALE: 1" = 1’-0"

ABUTMENT NO. 5 EXISTING BEARINGS

4�"

2’-2�"

9�"

1’-0"1’-8�"

2’-6"

2’-0"

1’-11�"

1�"

4�"

2’-4"

1’-0"

4"

A

-

PLAN DETAILC

-

PLAN DETAIL

D

-

B

-

A-A

-

A

-

B-B

-

C

-

BEARING REHABILITATIONABUTMENT NO. 5

A-A

- ELEVATION

MAINLINE NORTH GIRDER

B-B

- ELEVATION

MAINLINE SOUTH GIRDER

ABUTMENT NO. 5

{ BEARING{ BEARING

{ BEARING { BEARING

B

-

EXISTING BEARING NORTH GIRDER D

-

EXISTING BEARING SOUTH GIRDER

2’-6�"*

* TO BE FIELD VERIFIED BY CONTRACTOR

2’-6�"*2’-6�"*

I-95 NB OVER THAMES RIVER, RAILROADS,

EXISTING DRIAN OUTLETS

DISCONNECT AND RECONNECT

EXISTING DRIAN OUTLETS

DISCONNECT AND RECONNECT

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-43.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

83

COORDINATE GRID

AD

CONNECTICUT

83

COORDINATE GRID

AD

CONNECTICUT

SPAN 34

A

-

A-A

-

B-B

-

B

-

PROPOSED ABUTMENT NO. 5 PLAN

SCALE: �" = 1’-0"

BEVELED SOLE PLATE

A

-

PLAN DETAIL - NORTH BEARING

B

-

PLAN DETAIL - SOUTH BEARING

{ BEARING

PLAN VIEW

PROPOSED PEDESTAL REINFORCEMENT

SCALE: 1" = 1’-0"

SCALE: 1" = 1’-0"

FRONT VIEW

REINFORCEMENT

PROPOSED NORTH PEDESTAL

BEVELED SOLE PLATE

1" CHAMFER (TYP.)

SCALE: 1" = 1’-0"

SIDE VIEW

REINFORCEMENT

PROPOSED SOUTH PEDESTAL

1" CHAMFER (TYP.)

BEVELED SOLE PLATE

EXISTING PEDESTAL

EXISTING BACK WALL

SCALE: 1" = 1’-0"

�"SEAL WELD

BEARING STIFFENER

PROPOSED JACKING

SCALE: 1" = 1’-0"

�"SEAL WELD

�"SEAL WELD�"

SEAL WELD

�"SEAL WELD

A-A

-

PROPOSED BEARING

STAINLESS STEEL SHIM

PLATE

LOAD

BEVELED

STEEL SHIM

STAINLESS

83

COORDINATE GRID

AD

CONNECTICUT

EX

TE

ND

PE

DES

TA

L

S-B

D1 F

OR

SIZ

E)

(S

EE

DR

AWIN

G

NO.

EL

AS

TO

ME

RIC

BE

ARIN

G

SCALE: 1" = 1’-0"

ABUTMENT NO. 5 MAINLINE

PROPOSED STEEL KEEPERNOTES:

NOTED.

ALL PROPOSED REBAR TO BE #6 UNLESS OTHERWISE 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

S-BR43

BEARING REHABILITATIONABUTMENT NO. 5

�"SEAL WELD

DRILL AND GROUT REBAR

1’-0"

DRILL AND GROUT REBAR

1’-0"

1’-0"

DRILL AND GROUT REBARDRILL AND GROUT REBAR

1’-0"

PROPOSED STEEL KEEPER

�"

STEEL PLATE

FIELD MEASURED

�"|

�"

C 12x50

C 12x50

�"

�"

�"

VARIES

TOP OF CONCRETE

2" MIN

2�" MIN

PROPOSED PEDESTAL

PLATE 4"x�"

PLATE 4"x�"

�"

�"

8" (TYP.)

8" (TYP.)

5"

ANCHOR BOLT

SIDE VIEW

MAINLINE NORTH

PROPOSED BEARING

SIDE VIEW

MAINLINE SOUTH

PROPOSED BEARING

APPROXIMATE EXISTING GROUND

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-44.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

SCALE: �" = 1’-0"

83

COORDINATE GRID

AD

CONNECTICUT

83

COORDINATE GRID

AD

CONNECTICUT

SPAN 34B

A

-

A-A

-

B

-

PROPOSED ABUTMENT NO. 5 PLAN

SCALE: �" = 1’-0"

A

-

PLAN DETAIL - NORTH BEARING

B

-

PLAN DETAIL - SOUTH BEARING

{ BEARING

PLAN VIEW

PROPOSED PEDESTAL REINFORCEMENT

SCALE: 1" = 1’-0"

SCALE: 1" = 1’-0"

FRONT VIEW

REINFORCEMENT

PROPOSED NORTH PEDESTAL

SCALE: 1" = 1’-0"

FRONT VIEW

REINFORCEMENT

PROPOSED SOUTH PEDESTAL

1" CHAMFER (TYP.)

BEVELED SOLE PLATE

EXISTING PEDESTAL

EXISTING BACK WALL

PROPOSED PEDESTAL

SCALE: 1" = 1’-0"

�"SEAL WELD

BEARING STIFFENER

PROPOSED JACKING

SCALE: 1" = 1’-0"

�"SEAL WELD

�"SEAL WELD�"

SEAL WELD

�"SEAL WELD

A-A

-

PROPOSED BEARING

STAINLESS STEEL SHIM

STAINLESS STEEL SHIM

SCALE: 1" = 1’-0"

ABUTMENT NO. 5

PROPOSED KEEPER

NOTES:

NOTED.

ALL PROPOSED REBAR TO BE #6 UNLESS OTHERWISE 2.

SEE DRAWING S-BD1 FOR ALL BEARING INFORMATION.1.

PROPOSED BEARING

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

S-BR44

BEARING REHABILITATIONABUTMENT NO. 5

BEVELED SOLE PLATE

1" CHAMFER (TYP.)

�"SEAL WELD

DRILL AND GROUT REBARDRILL AND GROUT REBAR

1’-0"1’-0"

DRILL AND GROUT REBARDRILL AND GROUT REBAR

1’-0"1’-0"

�"

�"

C 12x50

C 12x50

PLATE 4x�"

PLATE 4x�"

�"

BOLTS

VARIES

2�" MIN

2"

TOP OF CONCRETE

�"

FIELD MEASURED

BEVELED PLATE

FIELD MEASURED

PLATE

BEVELED PLATE

* SEE FRAMING PLANS FOR ANGLE

8.5°*

�"

5"

SIDE VIEW

RAMP B SOUTH

PROPOSED BEARING

SIDE VIEW

RAMP B NORTH

PROPOSED BEARING

�"

�"

�"

LOAD PLATE

BEVELED

I-95 NB OVER THAMES RIVER, RAILROADS,

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-BD1.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

ELASTOMERIC BEARING PAD

VARIES

(TYP.)

S-BD1

BEARING DETAILS 1

W

L

H

N.T.S.

ELASTOMERIC PAD DETAIL

VARIES

SUGGESTED POSSIBLE JACKING METHOD

(TYP.)

BOLT

VARIES

SPACES

3 EQUAL

2" (TYP.)

N.T.S.

BEARING SOLE PLATE DETAIL

{ GIRDER

TOWARDS SPAN CENTER

{ ELASTOMERIC PAD

LOAD PLATE

L/2

SEE NOTE 1

NOTES:

�"SEAL WELD

�"SEAL WELD

LOAD PLATE

�"SEAL WELD

LOAD PLATE

H

�"

2�" (TYP.)

�"

�" (TYP.)

ELASTOMERIC PAD

{ SOLE PLATE AND

1�" �"

1�"

�"

ELASTOMERIC BEARING PAD

N.T.S.

{ LOAD PLATE AND ELASTOMERIC PAD

BEVELED SOLE PLATE

BEVELED SOLE PLATE

LOAD PLATE

PIER BOLTS

THROUGH

�"SEAL WELD

�" EXTERNAL ELASTOMERIC LAYER

�" EXTERNAL ELASTOMERIC LAYER

N= NUMBER OF INTERNAL ELASTOMERIC LAYERS

TOP OF PAD

�" INTERNAL ELASTOMERIC LAYER (TYP.)

1" (TYP.)

TOP VIEW

FRONT VIEW SIDE VIEW

SIDE VIEW

TOP VIEW

FRONT VIEW{ ELASTOMERIC PAD

BEVELED WASHER (8 PLACES)

{ GIRDER AND BEARING

2�"

1" 1"

ELASTOMERIC PAD

ELASTOMERIC PAD

ELASTOMERIC PAD

ELASTOMERIC PAD

JACK

(8 PLACES)

SOLE PLATE

BACK OF BEARING FRONT OF BEARING

EAST END

TYPICAL BEARING HOLE PATTERN

VARIES

VARIES

SOLE PLATE

8" 4�"

6"

4�"{ SOLE PLATE

{ GIRDER

4"*4"*

* EXCEPT AS NOTED

N.T.S.

2"(TYP.){ BOLT

N

TOP VIEW

SIDE VIEW

(TYP.)

RAMP "B" BEARINGS

6" (TYP.) AT ABUT NO. 5

FRONT VIEW

4"* 4"*

N.T.S.

SEE NOTE 2

BEVELED SOLE PLATE

REVIEW BY THE ENGINEER.

CONTRACTOR TO SUBMIT JACKING METHOD FOR 3.

SHOWN EXAGERATED FOR CLARITY.

PROVIDE HORIZONTAL BEARING INSTALLATION. BEVEL

BEVEL SOLE PLATE TO MATCH GIRDER SLOPE TO 2.

HOLE PATTERN - EAST END".

PATTERN, SEE DETAIL THIS SHEET "TYPICAL BEARING

CORRESPONDING PLAN SHEET, FOR EAST END HOLE

BOTTOM FLANGE. FOR WEST END HOLE LAYOUTS, SEE

MATCH EXISTING BEARING HOLE PATTERN IN GRIDER

NEW TAPPED AND DRILLED HOLES IN SOLE PLATE TO

1.

BEVELED WASHER (TYP.)

1" LOAD PLATE1" LOAD PLATE

SEE NOTE 3

JACKING BRACKET

I-95 NB OVER THAMES RIVER, RAILROADS,

STEEL SHIM PLATE L=0.063" QTY. N+2

FINAL DESIGN REVIEW

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

9/18/2017

BLOCK:

SIGNATURE/

...\SB_MSH_0094_0256_BRG-BD2.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - 094-256NEW LONDONGROTON

GOLD STAR MEMORIAL BRIDGER. MORESI

& LOCAL ROADS - BRIDGE #03819

B. MAHALINGAM/M. NAFIS

S-BD2

STEEL KEEPER

"TS"

STRUCTURAL STEEL TUBE

VARIES

SO

LE P

LA

TE

WID

TH

SOLE PLATEWELDED STUDS

PLAN VIEW

ELEVATION VIEW

VARIES

2" VARIES

STEEL PLATE

SOLE PLATE

STEEL PLATE

PLAN VIEW

STEEL PLATE FRONT ELEVATION

STEEL PLATE SIDE ELEVATION

VARIES

�" GAP

VARIES VARIES

BEARING DETAILS 2

2"

SCALE: 1�" = 1’-0"

PROPOSED SOLE PLATE

PROPOSED SOLE PLATE

PLATE �"

L 8x8x1

SHIM AS NEEDED

�"

VARIES�"

TYP.

{ ELASTOMERIC PAD

{ SOLE PLATE AND GIRDER

{ SOLE PLATE AND GIRDER

ELASTOMERIC BEARING STEEL KEEPERS

VARIES

�" MIN.

VARIESPLATE 6x6x�

TOP OF EXISTING CONCRETE1"| 1"|

TOP OF PROPOSED PEDESTAL

WELDED STUDS

�"

3"1"

L1

3"1"�"�"

1"

1"

�" �"�"

8"

4"

8"

4"

L2

�"

�"

SCALE: 3" = 1’-0" SCALE: 3" = 1’-0"

I-95 NB OVER THAMES RIVER, RAILROADS,

L2

�"