industrial advisory board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 cbe...

33
Industrial Advisory Board Spring 2012

Upload: others

Post on 14-Sep-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Industrial Advisory Board Spring 2012

Page 2: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Welcome

New members:

• Matt Bold, Lockheed Martin

• John Diubaldo, Raytheon

• Bob Heesemann, Boeing

Page 3: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Agenda • Department Update

• Curriculum Update

• Break

• Breakout Session: Identifying Technical Electives for Specific Industry Sectors

• Discuss Results of Breakout Session

• Irwin Jacobs Lecture

• Lunch

• Senior Design Presentations

• Elections

Page 4: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Department Update Tony Maciejewski, ECE Department Head

Page 5: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Recognition of Service

• IAB members with 10 years of service (or more):

– Grant Miller

Page 6: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Faculty News • Prof. Rocca Receives Two Prestigious

Honors

– 2011 Arthur L. Schawlow Prize in Laser Science by American Physical Society

– Willis E. Lamb Award for Contributions in X-Ray Laser Physics

• Prof. Marconi Named IEEE Fellow

Page 7: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

• Prof. Biedron Named SPIE Fellow

• Prof. Bringi Wins American Meteorological Society Remote Sensing Award

• Two CSU Awards for Prof. Chandra – 2011 College of Engineering Alumni

Award Winner

– CSU Ventures’ Award for Innovative Excellence

Page 8: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

• Biedron and Milton Secure Big Grants – Office of Naval Research ($2M)

– Boeing

– Accelerator gift • Duo also appointed to DOE Fact-Finding Committee for

Particle Accelerator Science and Technology

• Prof. Bartels Attends Unprecedented Arab-American Symposium

Page 9: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Student News • Graduate Student Organization Created

• PSOC n’ Pizza events – student ambassador

workshops featured in IEEE (ask Olivera for details)

• Sergio Carbajo Named Recipient of 2011 Frontiers in Optics Hilbert Memorial Student Travel Grant

Page 10: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Three new certificates available:

• Computer Engineering

• Embedded Systems

• Power & Energy Engineering

M.E. degree in ECE also available online. Please help promote within your companies.

ECE to Launch Online Program in FA12

Page 11: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

• The 122,000 sq ft Engineering II is being constructed

• Move‐in and final equipment installation scheduled for June-August 2013.

• College plans to occupy the building in FA13

Engineering Building Update

Page 12: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

COE Research Expenditures

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011

CBE

ME

CEE

ECE

Page 13: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

COE Research Expenditures

ATS 26%

CIRA 27%

ECE 20%

CEE 14%

ME 8%

CBE 5%

College of Engineering 46%

2010-2011

ATS

CIRA

ECE

CEE

ME

CBE

Page 14: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

ECE Research Expenditures

$0

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,000

$12,000,000

$14,000,000

1999-2000

2000-2001

2001-2002

2002-2003

2003-2004

2004-2005

2005-2006

2006-2007

2007-2008

2008-2009

2009-2010

2010-2011

Page 15: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

National Enrollment Trends

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

0

20,000

40,000

60,000

80,000

100,000

120,000

2005 2006 2007 2008 2009 2010

Biomedical Engineering

Electrical & ComputerEngineeringMechanical Engineering

Chemical Engineering

Engineering Science

Civil Engineering

Environmental Engineering

Total Engineering

Page 16: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

ECE Spring Enrollment

363 356

330

315

355

407 418

0

50

100

150

200

250

300

350

400

450

500

SP06 SP07 SP08 SP09 SP10 SP11 SP12

PhD-Systems (on-campus)

ME-Systems (on-campus)

PhD

Masters

Undergraduate

Page 17: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Undergraduate Degrees Awarded

0

10

20

30

40

50

60

2006 2007 2008 2009 2010 2011

Nu

mb

er

Calendar Year

BSCpE

BSEE

Page 18: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Graduate Degrees Awarded

0

5

10

15

20

25

30

35

40

2006 2007 2008 2009 2010 2011

Nu

mb

er

Calendar Year

ME-Systems

MS

Ph.D.

Page 19: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

% of International Degrees Awarded

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2006 2007 2008 2009 2010 2011

Calendar Year

MS

Ph.D.

Total

Page 20: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Fall Action Items • Action item: Report back on the grad placement rate

for mechanical engineering. – Status: 2011 placement rates for College of

Engineering*

• Action item: Follow-up on discussions with Math Department on ideas to improve learning in courses for engineering students.

– Status: First math course specifically for ECE students under way this semester.

CpE EE ME CE CBE

100% 93% 72% 61% 64%

*COE Placement Survey

Page 21: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

• Action item: Take a poll by email to see if IAB members like the idea of hosting a meeting off-campus, e.g., Denver. – Status: The board voted to try an offsite location,

preferably near Denver. We will consider this for a future meeting.

• Action item: Share details of online ME in ECE degree program. Ask for help with marketing, company visits, etc. – Status: Shared details earlier. Contact Carl Melle for

more info: (970)391-1992.

Page 22: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

• Action item: Determine ways to spark interest in electrical and computer engineering early in the undergraduate program, possibly by adding a new freshman course. – Status: Dr. Notaros will provide an update on

important curriculum changes later today.

• Action item: Work with the College of Engineering to see if they will accept field trips as PLI credit. – Status: Memo submitted to College Curriculum

Committee in February. Thanks for your support. We’ll keep you posted.

Page 23: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

• Action item: Modernize teaching methods by using current techniques such as blogs, podcasts, Google, Facebook, Twitter, Youtube, etc. – Status: Taking advantage of online learning tools

through CSU OnlinePlus. Some faculty are incorporating social media, blogs, etc.

• Action item: Consider adding robotics opportunities earlier in the curriculum as a way to bring engineering concepts to life. – Status: We do not yet have a class designed, but it is

an option under consideration as part of future curriculum changes.

Page 24: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

• Action item: Within CSU, advertise seminars across disciplines. – Status: ISTeC is a great example of successful advertising

across disciplines. We also share ECE seminars with other departments.

• Action item: Work on K-12 outreach strategies to help engineering students enter the university better prepared, possibly in partnership with industry or IEEE. – Status: Karen Ungerer has been working with industry and

schools to promote engineering in K-12. She has been visiting local high schools and elementary schools, as well as recruitment events geared toward this audience. Members of HKN have helped with these efforts.

Page 25: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Curriculum Update

Professor Branislav Notaros

Page 26: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Break

Page 27: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Breakout Session Facilitators: Jim Greener, Scott Makinen

Page 28: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Discuss Results of Breakout Session

Facilitators: Jim Greener, Scott Makinen

Page 29: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Irwin Jacobs Lecture

Page 30: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Lunch

Page 31: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Senior Design Presentations

Page 32: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Elections

Page 33: Industrial Advisory Board€¦ · 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 CBE ME CEE ECE. COE Research Expenditures ATS 26% CIRA 27% ECE 20% CEE 14% ME 8% CBE

Closing Remarks