INDUSTRIAL BOILER MACT INDUSTRIAL BOILER MACT RULERULE
(Title 40 CFR 63 Subpart DDDDD)(Title 40 CFR 63 Subpart DDDDD)
Annual Annual DoDDoD ConferenceConferenceEnvironmental Air Quality WorkshopEnvironmental Air Quality Workshop
June 29, 2005June 29, 2005
22
IMPORTANT DATESIMPORTANT DATESProposal Date Proposal Date –– January 13, 2003January 13, 2003
Promulgation Date Promulgation Date –– September 13, 2004September 13, 2004
Effective Date Effective Date –– November 12, 2004November 12, 2004Additional CommentAdditional Comment
Period NoticePeriod Notice -- June 27, 2004June 27, 2004-- August 11, 2005August 11, 2005
Initial Notification DatesInitial Notification Dates•• March 12, 2005March 12, 2005 –– Existing unitsExisting units
•• 15 days after startup 15 days after startup –– New unitsNew units
Compliance DateCompliance Date
•• Existing units Existing units -- September 13, 2007September 13, 2007
•• New units New units –– SStartup tartup
33
INDUSTRIAL BOILER MACTINDUSTRIAL BOILER MACT
Source categories covered:Source categories covered:
•• Industrial BoilersIndustrial Boilers
•• Institutional/Commercial BoilersInstitutional/Commercial Boilers
•• Process HeatersProcess HeatersIndirectIndirect--fired fired –– combustion gases do not combustion gases do not come in contact with process materials. come in contact with process materials.
Major source MACT onlyMajor source MACT only
44
SUBCATEGORIESSUBCATEGORIESThree main subcategories:Three main subcategories:•• Solid fuel unitsSolid fuel units•• Liquid fuel unitsLiquid fuel units
•• Gaseous fuel unitsGaseous fuel units
Further subcategorized on size and useFurther subcategorized on size and use•• Large (> 10 MM Btu/hr heat input)Large (> 10 MM Btu/hr heat input)•• Small (all Small (all firetubesfiretubes and others < 10 MM Btu/hr)and others < 10 MM Btu/hr)•• LimitedLimited--use (< 10% capacity factor)use (< 10% capacity factor)
Total of 9 subcategoriesTotal of 9 subcategories
55
WHAT UNITS ARE NOT COVERED?WHAT UNITS ARE NOT COVERED?Any boiler and process heater listed as an Any boiler and process heater listed as an affected source under another MACTaffected source under another MACT•• For example,For example,
Fossil fuelFossil fuel--fired electric utility boilersfired electric utility boilers
Boilers burning municipal wasteBoilers burning municipal waste
Boilers burning hazardous wasteBoilers burning hazardous waste
Boilers burning medical wasteBoilers burning medical waste
Black liquor recovery boilersBlack liquor recovery boilers
Temporary/rental gas or liquid fuel boilers (<180 days)Temporary/rental gas or liquid fuel boilers (<180 days)
Hot water heatersHot water heaters
Waste heat boilersWaste heat boilers
Synthetic minors Synthetic minors ––becomes an area sourcebecomes an area source
66
EMISSIONS LIMITSEMISSIONS LIMITSExisting UnitsExisting Units
Existing large solid fuel unitsExisting large solid fuel unitsPM PM ---- 0.07 lb/million Btu, 0.07 lb/million Btu, OROR TSM TSM –– 0.001 lb/million Btu0.001 lb/million BtuHCl HCl ---- 0.09 lb/million Btu (~ 90 0.09 lb/million Btu (~ 90 ppmppm))Hg Hg –– 9 lb/trillion Btu9 lb/trillion Btu
Existing limited use solid fuel unitsExisting limited use solid fuel unitsPM PM ---- 0.21 lb/million Btu, 0.21 lb/million Btu, OROR TSM TSM –– 0.004 lb/million Btu0.004 lb/million Btu
No emissions standards for:No emissions standards for:•• existing small solid fuel units existing small solid fuel units •• existing liquid fuel unitsexisting liquid fuel units•• existing gaseous fuel unitsexisting gaseous fuel units
77
EMISSION LIMITSEMISSION LIMITSand WORK PRACTICE STANDARDSand WORK PRACTICE STANDARDS
New UnitsNew UnitsNew solid fuel unitsNew solid fuel unitsPM PM ---- 0.025 lb/million Btu, 0.025 lb/million Btu, OROR TSM 0.0003 lb/million BtuTSM 0.0003 lb/million BtuHCl HCl ---- 0.02 lb/million Btu (20 0.02 lb/million Btu (20 ppmppm))Hg Hg ---- 3 lb/trillion Btu3 lb/trillion BtuCO CO ---- 400 400 ppmppm @ 7% oxygen (NOT FOR SMALL UNITS)@ 7% oxygen (NOT FOR SMALL UNITS)
New liquid fuel unitsNew liquid fuel unitsPM PM ---- 0.03 lb/million Btu0.03 lb/million BtuHCl HCl ---- 0.0005 lb/million Btu (large units)0.0005 lb/million Btu (large units)
0.0009 lb/million Btu (small and limited use units)0.0009 lb/million Btu (small and limited use units)CO CO –– 400 400 ppmppm @ 3% oxygen (NOT FOR SMALL UNITS)@ 3% oxygen (NOT FOR SMALL UNITS)
New gaseous fuelNew gaseous fuel--fired unitsfired unitsCO CO –– 400 400 ppmppm @ 3% oxygen (NOT FOR SMALL UNITS)@ 3% oxygen (NOT FOR SMALL UNITS)
88
CONTROL TECHNOLOGY BASISCONTROL TECHNOLOGY BASIS
Existing Solid Fuel BoilersExisting Solid Fuel Boilers
•• Large Units Large Units -- Baghouse (PM/metals/Hg)/ Scrubber (HCl)Baghouse (PM/metals/Hg)/ Scrubber (HCl)
•• LimitedLimited--Use Units Use Units –– ESP (PM/metals)ESP (PM/metals)
New UnitsNew Units•• Based on NSPS and State RegulationsBased on NSPS and State Regulations•• BaghouseBaghouse/ Scrubber / CO Limit/ Scrubber / CO Limit
99
COMPLIANCE OPTIONSCOMPLIANCE OPTIONS
Conduct stack emission testsConduct stack emission tests
Conduct fuel analysisConduct fuel analysis
Emissions averagingEmissions averaging
•• (large solid fuel units only)(large solid fuel units only)
HealthHealth--based compliance alternatives for based compliance alternatives for HCl and TSM HCl and TSM
1010
COMPLIANCE TESTINGCOMPLIANCE TESTING
Performance tests (stacks tests)Performance tests (stacks tests)•• Annual performance testsAnnual performance tests•• Based on average of 3 test runsBased on average of 3 test runs
OROR
Fuel analysesFuel analyses•• Initial and every 5 yearsInitial and every 5 years•• Each new fuel typeEach new fuel type•• Based 90% confidence level of minimum 3 Based 90% confidence level of minimum 3
fuel samplesfuel samples
1111
COMPLIANCE MONITORING COMPLIANCE MONITORING Continuous compliance based on monitoring and Continuous compliance based on monitoring and maintaining operating limitsmaintaining operating limitsOperating limitsOperating limits•• For PM, TSM and mercury limits For PM, TSM and mercury limits
Opacity (for dry systems)Opacity (for dry systems)•• Existing units Existing units –– 20% opacity (6 minute average)20% opacity (6 minute average)•• New units New units –– 10% opacity (1 hour block average)10% opacity (1 hour block average)
Control device parameters (for wet systems)Control device parameters (for wet systems)•• Established during initial compliance testEstablished during initial compliance test
Fuel (type or mixture)Fuel (type or mixture)•• When compliance based on fuel analysisWhen compliance based on fuel analysis
•• For HClFor HClScrubber parameters (pH, pressure drop, liquid flow, Scrubber parameters (pH, pressure drop, liquid flow, sorbentsorbent injection rate)injection rate)
•• Established during initial compliance testEstablished during initial compliance test
Fuel (type or mixture)Fuel (type or mixture)•• When compliance based on fuel analysisWhen compliance based on fuel analysis
1212
COMPLIANCE MONITORING (cont.)COMPLIANCE MONITORING (cont.)
MonitoringMonitoring
•• Opacity (by COM) Opacity (by COM) –– dry control systemsdry control systems
•• Fuel (monthly records)Fuel (monthly records)
•• Scrubber parametersScrubber parameters
•• CO (new units only)CO (new units only)
CEM for large units > 100 million Btu/hrCEM for large units > 100 million Btu/hrAnnual CO tests for other new units Annual CO tests for other new units Exempt data from <50% load and based on 30Exempt data from <50% load and based on 30--day average.day average.
1313
What Subcategories Have Limited What Subcategories Have Limited Requirements?Requirements?
Subject to ONLY Initial NotificationSubject to ONLY Initial Notification•• Existing large and limited use gaseous fuel unitsExisting large and limited use gaseous fuel units•• Existing large and limited use liquid fuel unitsExisting large and limited use liquid fuel units•• New small liquid fuel units that do not burn residual oilNew small liquid fuel units that do not burn residual oil
NOT subject to Initial Notification or any other NOT subject to Initial Notification or any other requirements in General Provisionsrequirements in General Provisions•• Existing small solid fuel unitsExisting small solid fuel units•• Existing small liquid fuel unitsExisting small liquid fuel units•• Existing small gaseous fuel unitsExisting small gaseous fuel units•• New small gaseous fuel unitsNew small gaseous fuel units
1414
Additional Compliance Additional Compliance Provisions Provisions
Emission AveragingEmission Averaging•• Only existing large solid fuel unitsOnly existing large solid fuel units
•• Initial compliance based on maximum capacity Initial compliance based on maximum capacity
•• Continuous compliance on a 12Continuous compliance on a 12--month rolling month rolling
average basisaverage basis
Each monthly calculation based on monthly fuel use Each monthly calculation based on monthly fuel use
and previous compliance test results for each boilerand previous compliance test results for each boiler
•• Must submit emission averaging planMust submit emission averaging plan
•• Must maintain, at a minimum, the emission Must maintain, at a minimum, the emission
controls employed on the effective datecontrols employed on the effective date
1515
Additional Compliance Provisions Additional Compliance Provisions HealthHealth--based HCl compliance alternativebased HCl compliance alternative
•• Alternative to complying with HCl MACT limit Alternative to complying with HCl MACT limit
Must include appropriate units covered by subpart DDDDDMust include appropriate units covered by subpart DDDDD
•• Those that emit HCl and/or Cl2Those that emit HCl and/or Cl2
Must conduct HCl and chlorine emission tests or fuel analysesMust conduct HCl and chlorine emission tests or fuel analyses
•• When conducting fuel analysis must assume any chlorine When conducting fuel analysis must assume any chlorine is emitted as CL2is emitted as CL2
Must calculate total maximum hourly mass HClMust calculate total maximum hourly mass HCl--equivalent equivalent emission rateemission rate
•• Compliance determine by using:Compliance determine by using:
Lookup table Lookup table
•• Average stack height of appropriate subpart DDDDD unitsAverage stack height of appropriate subpart DDDDD units
•• Minimum distance of any appropriate subpart DDDDD unit Minimum distance of any appropriate subpart DDDDD unit to property boundaryto property boundary
SiteSite--specific compliance demonstrationspecific compliance demonstration
•• Hazard Index (HI) can not exceed 1.0Hazard Index (HI) can not exceed 1.0
1616
Additional Compliance ProvisionsAdditional Compliance ProvisionsHealthHealth--based TSM compliance alternativebased TSM compliance alternative
•• As alternative to complying with TSM limit based on 8 As alternative to complying with TSM limit based on 8
metals, may demonstrate compliance with TSM limit metals, may demonstrate compliance with TSM limit
based on 7 metals by excluding manganese based on 7 metals by excluding manganese Must include appropriate units covered by subpart DDDDDMust include appropriate units covered by subpart DDDDD
Must conduct manganese emission tests or fuel analysesMust conduct manganese emission tests or fuel analyses
Must calculate the total maximum hourly mass manganese Must calculate the total maximum hourly mass manganese emission rateemission rate
•• Eligible for demonstrating compliance based on 7 metals Eligible for demonstrating compliance based on 7 metals
excluding manganese by using:excluding manganese by using:Lookup table Lookup table
•• Average stack height of appropriate subpart DDDDD unitsAverage stack height of appropriate subpart DDDDD units
•• Minimum distance to property boundaryMinimum distance to property boundary
SiteSite--specific compliance demonstrationspecific compliance demonstration
•• Hazard Quotient (HQ) can not exceed 1.0Hazard Quotient (HQ) can not exceed 1.0
1717
Additional Details of HealthAdditional Details of Health--Based Based Compliance AlternativesCompliance Alternatives
Demonstrations filed with permitting Demonstrations filed with permitting authority and EPA along with certification authority and EPA along with certification of authenticity and accuracyof authenticity and accuracy•• No review or approval required; EPA, No review or approval required; EPA,
permitting authority may audit a percentagepermitting authority may audit a percentage
Facility must apply for Title V permit modification Facility must apply for Title V permit modification to include parameters that defined the source to include parameters that defined the source (fuel type, control devices, stack parameters)(fuel type, control devices, stack parameters)
Facilities must submit demos within 2 Facilities must submit demos within 2 years, one year prior to compliance dateyears, one year prior to compliance date
1818
Petitions For ReconsiderationPetitions For ReconsiderationThree petitions for reconsideration were Three petitions for reconsideration were receivedreceived•• General Electric CompanyGeneral Electric Company•• Joint petitionJoint petition
NRDCNRDCEIP (Environmental Integrity Project)EIP (Environmental Integrity Project)
•• EIPEIPTwo petitions for judicial reviewTwo petitions for judicial review•• Jointly filed by NRDC, Sierra Club, and EIPJointly filed by NRDC, Sierra Club, and EIP
Issues same as in reconsideration petition Issues same as in reconsideration petition •• American Public PowerAmerican Public Power--Ohio (and 6 Ohio (and 6
municipalities)municipalities)EPA exceeded its authority in imposing standards on EPA exceeded its authority in imposing standards on small municipal utility boilerssmall municipal utility boilers
1919
GE PetitionGE PetitionIssueIssue•• Requests clarification that the rule allows for Requests clarification that the rule allows for
testing at the common stack rather than each testing at the common stack rather than each duct to the stackduct to the stack
•• No opportunity to provide comments since the No opportunity to provide comments since the proposed rule did not contain regulatory text proposed rule did not contain regulatory text for the emissions averaging provisionfor the emissions averaging provision
•• Common stack testing is handled on a caseCommon stack testing is handled on a case--byby--case basis by OECA/Regionscase basis by OECA/Regions
OECA’sOECA’s general policy is that each duct to a common stack general policy is that each duct to a common stack must be testedmust be tested
2020
NRDC NRDC –– EIP PetitionEIP Petition
Seeking reconsideration on:Seeking reconsideration on:•• Lack of standards for all HAP emitted Lack of standards for all HAP emitted
on all subcategorieson all subcategories•• HealthHealth--based compliance alternativesbased compliance alternatives
CAA does not authorize plantCAA does not authorize plant--byby--plant plant riskrisk--based exemptionsbased exemptionsBasis for development of healthBasis for development of health--based based compliance alternativescompliance alternativesProcedures for demonstrating compliance Procedures for demonstrating compliance (Appendix A) (Appendix A)
2121
Recent Federal Register NoticeRecent Federal Register NoticeFR June 27, 2005, Vol. 70, Num. 122, pg 36907FR June 27, 2005, Vol. 70, Num. 122, pg 36907--3691536915
Request for comments on:Request for comments on:•• Tiered Risk assessment Methodology (appendix A)Tiered Risk assessment Methodology (appendix A)
LookLook--up tables and Methodology (HCL, up tables and Methodology (HCL, MnMn, appendix A), appendix A)Site Specific Risk Assessment Process (section 7, appendix A)Site Specific Risk Assessment Process (section 7, appendix A)HI or HQ of 1.0 for HCL, HI or HQ of 1.0 for HCL, ClCl, , MnMn (applicability cut off for RA’s)(applicability cut off for RA’s)
•• Background concentrations (were not considered) Background concentrations (were not considered) •• Overall Adoption of Health based compliance alternative for Overall Adoption of Health based compliance alternative for MnMn•• Exclusion of Exclusion of MnMn from the TSM limit in table 1from the TSM limit in table 1
CorrectionCorrection•• Health based compliance alternatives for HCL & TSM are Health based compliance alternatives for HCL & TSM are
applicable to any affected source (not only large solid fuel applicable to any affected source (not only large solid fuel subcategory)subcategory)
2222
Questions Received Questions Received What does “Equivalent” mean in Table 6 ? What does “Equivalent” mean in Table 6 ? (Fuel Analysis Requirements) (Fuel Analysis Requirements)
Are “hybrid boilers” considered Are “hybrid boilers” considered firetubefiretube or or watertubewatertube boilers?boilers?
Can a common stack be tested instead of Can a common stack be tested instead of the individual ducts?the individual ducts?
Are auxiliary boilers at power plants Are auxiliary boilers at power plants covered by subpart DDDDD?covered by subpart DDDDD?
2323
INFORMATION SITESINFORMATION SITES
Implementation tools (timelines, initial notification, Implementation tools (timelines, initial notification, state/local contacts, Q/A) and information on the state/local contacts, Q/A) and information on the MACT rulemaking for DDDDD is available on EPA’s MACT rulemaking for DDDDD is available on EPA’s web site at:web site at:
•• www.epa.gov/ttn/atw/boiler/boilerpg.htmlwww.epa.gov/ttn/atw/boiler/boilerpg.html
An electronic version of public docket An electronic version of public docket (including public comments) is available at:(including public comments) is available at:•• www.epa.gov/edocket/www.epa.gov/edocket/•• Search for docket ID No. OARSearch for docket ID No. OAR--20022002--00580058
ContactsContactsRule DevelopmentRule Development ComplianceComplianceJim Jim EddingerEddinger Greg Fried (OECA)Greg Fried (OECA)919919--541541--5426 5426 202202--564564--70167016eddingereddinger..jimjim@@epaepa..govgov fried.fried.greggreg@@epaepa..govgov
Region 4Region 4Leonardo Leonardo CeronCeron404404--562562--91299129ceronceron..leonardoleonardo@@epaepa..govgov