Accomplished or In Progress Industrial Estates W&WW Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012 ـــــــــــــــــــــــPars AB Tadbir Consulting Engineers Co. ــــــــــــــــــــــــ1 Ro w Project Name Project Specifications City Employer Start Date End Date Progress Project Costs Estimation (Million IRR) Industrial EstatesWater and Wastewater Projects 1 Studies of the first and second phases of Bam Industrial Estate sewage collection network 100 ha (+ 100 ha development) Bam Industrial Estate Kerman Industrial Estates Company 2005/06/10 2006/03/11 1 st :100% 2 nd : 100% 7,000 2 Studies of the first and second phases of Shams Abad Industrial Estates irrigation network and landscape, reappraisal of second phase studies of water network and high supervision 500 ha Shams Abad Industrial Estate Tehran Industrial Estates Company 2007/05/28 2007/07/29 1 st :100% 2 nd : 100% 20,000 3 Studies of the second phase of Shams Abad Industrial Estates pumping station One station Shams Abad Industrial Estate Tehran Industrial Estates Company 2006/03/06 2006/04/04 1 st :100% 2 nd : 100% 3,000 4 Studies of the first and second phases of Shams Abad Industrial Estates wastewater network collection and transmission facilities Pumping station and transmission line and design of balancing basin and wastewater network collection Shams Abad Industrial Estate Tehran Industrial Estates Company 2007/05/28 2008/07/29 1 st :100% 2 nd : 100% 15,000 5 Design of transmission line of Charmshahr Industrial Estate Approximately 3,620 meters transmission line and the capacity of 300 l/s Charmshahr Industrial Estate Tehran Industrial Estates Company 2004/06/06 2004/07/28 100% 5,000 Studies of wastewater transmission of Abbas Abad Industrial Estate Transmission of 20 l/s treated wastewater for irrigation of green space Abbas Abad Industrial Estate Tehran Industrial Estates Company 2004/06/06 2004/07/28 100% 3,000

Upload: others

Post on 11-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Industrial Estate’s W&WW Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

.Pars AB Tadbir Consulting Engineers Co ـــــــــــــــــــــــ ــــــــــــــــــــــــ 1

Row Project Name Project Specifications City Employer Start Date End Date Progress

Project Costs Estimation

(Million IRR)

Industrial Estates’ Water and Wastewater Projects

1 Studies of the first and second

phases of Bam Industrial Estate sewage collection network

100 ha (+ 100 ha development)

Bam Industrial

Estate

Kerman Industrial Estates

Company 2005/06/10 2006/03/11

1st:100%

2nd: 100%

7,000

2

Studies of the first and second phases of Shams Abad

Industrial Estate’s irrigation network and landscape,

reappraisal of second phase studies of water network and

high supervision

500 ha Shams Abad

Industrial Estate

Tehran Industrial Estates

Company

2007/05/28 2007/07/29 1st:100%

2nd: 100%

20,000

3 Studies of the second phase of Shams Abad Industrial Estate’s

pumping station One station

Shams Abad Industrial

Estate

Tehran Industrial Estates

Company

2006/03/06 2006/04/04 1st:100%

2nd: 100%

3,000

4

Studies of the first and second phases of Shams Abad

Industrial Estate’s wastewater network collection and transmission facilities

Pumping station and transmission line and

design of balancing basin and wastewater network

collection

Shams Abad Industrial

Estate

Tehran Industrial Estates

Company 2007/05/28 2008/07/29

1st:100%

2nd: 100%

15,000

5

Design of transmission line of Charmshahr Industrial Estate

Approximately 3,620 meters transmission line and the capacity of 300

l/s

Charmshahr Industrial

Estate

Tehran Industrial Estates

Company

2004/06/06 2004/07/28 100% 5,000

Studies of wastewater transmission of Abbas Abad

Industrial Estate

Transmission of 20 l/s treated wastewater for

irrigation of green space

Abbas Abad Industrial

Estate

Tehran Industrial Estates

Company

2004/06/06 2004/07/28 100% 3,000

Page 2: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Urban Sewage Collection Network Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 1

Row Project Name Project

Specifications City Employer Start Date End Date Progress Project Costs

Estimation (Million IRR)

Urban Sewage Projects

1 Studies of the second phase of East of Tehran Sewage Project

Approximately 10,000 ha surface area and 1,200 km

tubing Tehran

Tehran Wastewater Company

2002/08/18 2003/08/18 100% 1,000,000

2 Studies of the second phase of Northeast of Tehran Sewage Project and its addendums

Approximately 2,500 ha surface area and 300 km

tubing Tehran

Tehran Wastewater Company

2003/08/06 2004/08/06 100% 300,000

3 Studies of the second phase of Doulat Abad and Kiyanshahr- Tehran wastewater network

approximately 1,600 ha surface area and 80 km

tubing Tehran

Tehran Wastewater Company

2004/10/31 2005/01/29 100% 80,000

4 Studies of the second phase of

Ghaem town(Tehran) wastewater network

approximately 60 ha surface area with the scale of 1:1000

Tehran Tehran

Wastewater Company

2004/08/24 2004/10/24 100% 10,000

5 Complementary studies for the

second phase of Torbat-e-Heydariyeh sewerage system

Approximately 2400 ha surface area and

population of 210,000

Torbat-e-Heydariyeh

Khorasan Province Water and Wastewater

Company 2007/10/07 2008/08/05 100% 200,000

6 Complementary studies for the

second phase of Nishabour sewerage system

approximately 200 km tubing Nishabour

Khorasan Province Water and Wastewater

Company 2008/02/13 2008/12/14 100% 150,000

7 Studies of the second phase of Andisheh New Town sewerage

system

Approximately 500 ha surface area and

population of 125,000

Shahryar, Andisheh

New Town

Town and Cities of West of Tehran

Water and Wastewater Company

2008/03/18 2009/01/17 100% 125,000

Page 3: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Urban Sewage Collection Network Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 2

Row Project Name Project

Specifications City Employer Start Date End Date Progress Project Costs

Estimation (Million IRR)

Urban Sewage Projects

8

Review of studies of the first phase and conducting studies of

the second phase for sewage collection network of southern

zone of Qazvin

Approximately 600 ha surface area Qazvin

Qazvin Province Water and

Wastewater Company

2008/09/28 2008/09/22 100% 70,000

9 Studies of the second phase of Gouchan sewerage system

Approximately 1,600 ha surface

area and population of 137,380

Ghouchan Khorasan

Province Water and Wastewater

Company 2008/10/22 2009/08/23 100% 150,000

10 Complementary second phase

studies of collection netork and transmission line of Roodan

Approximately 900 ha surface area and

population of 52,000 Roodan

Hormozgan Province Water and Wastewater

Company

2008/12/29 2009/04/29 100% 50,000

11

Feasibility studies and operate of some parts of network and

preparation of tender documents (B.O.T) for East of Tehran wastewater collection and

treatment plant

Approximately 10,000 ha surface

area and pipe-laying of 1,200 km

Tehran Tehran

Wastewater Company

2010/04/21 2011/01/21 100% 1,000,000

12

Second phase studies of sewage collection network

and transmission line of northern and southern sites and extension areas surrounding Mehr housing

project in Birjand

Approximately 10 km Birjand

Southern Khorasan

Province Water and Wastewater

Company

2011/06/26 2012/07/21 90% 10,000

Page 4: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 1

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs

Estimation (Million

IRR) Urban Sewage Projects

1 Studies of the first and second phases of Amol wastewater project (financed by Islamic

Development Bank)

Approximately 3,600 ha surface area and

population of 310,000

Amol

Mazandaran Province Water and Wastewater

Company

2006/04/30 2007/04/30 1st:100% 2nd: 80% 700,000

2

Studies of the first and second phases of Ghaemshahr

wastewater treatment plant (financed by Islamic Development Bank)

Approximately 3,000 ha surface area and

population of 250,000

Ghaemshahr

Mazandaran Province Water and Wastewater

Company

2008/02/07 2008/06/06 1st:100% 2nd: 80% 600,000

3

Studies of the first and second phases of Pakdasht, Ghiam

Dasht and Froun Abad sewage system and

wastewater treatment plant

Pakdasht, with approximately 3,000 ha surface area and

population of 491,000

Pakdasht

Southeast of Tehran Province

Water and Wastewater Company

2003/06/07 2011/04/23

2004/06/06 2011/06/23

1st:100% 2nd: 50% 1,000,000

4 Studies of first and second phases of Varamin network and wastewater treatment

plant

Varamin, with approximately 4,000 ha surface area and

population of 493,000

Varamin

Southeast of Tehran Province

Water and Wastewater Company

2002/10/27 2009/09/24

2003/04/25 2010/07/22

1st:100% 2nd:

100% 1,100,000

5 Reappraisal studies of the first and second phases of Malard

and Shahriar

Malard, a city with approximately 1,300 ha surface area and

population of 469,000

Shahriar, a city with approximately 1,000 ha surface area and

population of 250,000

Malard and Shahriar

West of Tehran Province Water and Wastewater

Company

2006/02/22 2009/07/22 100% 1,700,000

Page 5: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 2

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs

Estimation (Million

IRR) Urban Sewage Projects

6 Studies of the first phase of Ghouchan wastewater

Approximately 1,600 ha surface area and

population of 137,380

Ghouchan

Khorasan Province Water and

Wastewater Company

2006/10/23 2007/08/23 100% 330,000

7 Studies of the first and second

phases of Mahdasht wastewater project

approximately 2,800 ha surface area and

population of 101,000

Mahdasht

West of Tehran Province Water and Wastewater

Company

2005/02/14 -

2007/12/21 -

1st:100% 2nd: 0% 240,000

8 Studies of the first and second

phases of Eshtehard wastewater project

Approximately 1,000 ha surface area and

population of 65,000 Eshtehard

West of Tehran Province Water and Wastewater

Company

2005/02/14 2007/12/21 1st:100%

2nd: 100%

155,000

9 Studies of the first phase of Jask sewerage system

Approximately 250 ha surface area Jask

Hormozgan Province Water and Wastewater

Company

2006/04/22 2006/12/23 100% 130,000

10 Studies of the second phase of

Jask sewerage system and wastewater treatment plant

and surveying

Approximately 250 ha surface area Jask

Hormozgan Province Water and Wastewater

Company

2008/10/07 2009/10/08 100% 140,000

11

Studies of the first and second phases of Shahrak-e-Valiasr (Khoui) sewerage collection

network and wastewater treatment plant

Current population of 25,000 Khoui

West Azarbaijan Water and

Wastewater Company

2009/07/02 2012/09/21 1st:100% 2nd: 60% 60,000

12

Studies of first phase of Kahrizak, Bagher-Shahr,

Khalij va Sina, Ahmad Abad Mostoufi and Chahar Dangeh

network and wastewater

approximately 1,150 ha surface area and

population of 400,000

Newly constructed

Cities

Southwest of Tehran Province

Water and Wastewater

2002/07/23 2003/05/21 100% 900,000

Page 6: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 3

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs

Estimation (Million

IRR) Urban Sewage Projects

treatment plant Company

13

Studies of second phase of Kahrizak, Bagher-Shahr,

Khalij va Sina, Ahmad Abad Mostoufi and Chahar Dangeh

network and wastewater treatment plant

approximately 1,150 ha surface area and

population of 400,000

Newly constructed

Cities

Southwest of Tehran Province

Water and Wastewater Company

2003/08/12 2004/06/10 100% 900,000

14 Studies of the first and second phases of North of Sanandaj

network and wastewater treatment plant

With the design of approximately

50,000 meters pipes requirement in 200-500 mm diameters

Sanandaj Kordestan Province

Water and Wastewater Company

2003/11/05 2007/03/20 100% 100,000

15 Studies of the first phase of

Faradanbeh, Ardal and Sorashjan network and

wastewater treatment plant

With the population of 30,000

Faradanbeh, Ardal and Sorashjan

CharMahal -va- Bakhtiyari

Province Water and Wastewater

Company

2004/06/13 2005/08/15 100% 75,000

16 Studies of the second phase of Faradanbeh sewerage system

and wastewater treatment plant and surveying

Approximately 300 ha surface area and

population of 15,000 Faradanbeh

CharMahal -va- Bakhtiyari

Province Water and Wastewater

Company

2008/09/23 2009/06/23 100% 36,000

17 Studies of the first and second

phases of Lavan Island sewerage system and

wastewater treatment plant

With the population of 2,000 Lavan Island

Hormozgan Province Water and Wastewater

Company

2007/10/31 2008/02/14 1st:100%

2nd: 100%

5,000

Page 7: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 4

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs

Estimation (Million

IRR) Urban Sewage Projects

18

Complementary studies for the first and second phase of

Lavan island sewerage system and wastewater treatment

plant

Current population of 10,000 Lavan Island

Hormozgan Province Water and Wastewater

Company 2008/12/29 2009/03/29

1st:100% 2nd:

100% 30,000

19 Studies of the first phase of

Shahed-Shahr and Saba Shahr wastewater project

Shahed-Shahr, a city with approximately 360 ha surface area and population of

73,000 Saba Shahr , a city with approximately 830 ha surface area and population of

107,000

Shahed-Shahr and Saba Shahr

Town and Cities of West of Tehran

Water and Wastewater Company

2005/11/12 2009/06/21 100% 400,000

20

Studies of the first and second phases of Moochesh

groundwater collection network and wastewater

network

approximately 276 ha surface area and

population of 15,000 Moochesh

Kordestan Province Water and

Wastewater Company

2002/07/03 2007/03/20 100% 30,000

21 Studies of the first and second

phases of Zarineh network and wastewater treatment

plant

Approximately 86 ha surface area and

population of 5,000 Zarineh

Khorasan Province Water and

Wastewater Company

2003/01/05 2007/03/20 100% 30,000

22

Review of studies of the first phase and conducting second

phase studies of Golbahar sewage project

Approximately 2,700 ha surface area and

population of 100,000

Golbahar

Khorasan Razavi Province Water and Wastewater

Company 2009/12/02 2010/12/02 100% 250,000

Page 8: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 5

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs

Estimation (Million

IRR) Urban Sewage Projects

23

Feasibility studies and preparation of tender

documents (B.O.T) for Lengeh & Kang wastewater

collection and treatment plant

150 km sewage network, 4 pumping and lifting stations,

Treatment plant with the capacity of 8400

m3/day

Lengeh and Kong

Hormazgan Province Water and Wastewater

Company

2010/01/19 2010/06/19 95% 320,000

24

Engineering services of preparing bidding documents

of modules no. 7 & 8 of southern WWTP and

collection network of Tehran Sewage Project

For 350 km of collection network

and modules no. 7 & 8

Tehran Tehran Sewage Company 2010/10/06 2011/06/06 100% 350,000

25 Conducting first and second

phase studies of sewage project of New Town of Safadasht Mehr Housing

With surface area of 200 ha and covered

population of 50,000 persons

Safadasht

Town and Cities of West of Tehran

Water and Wastewater Company

2010/10/23 2011/09/22 1st:100% 2nd: 85% 60,000

26 Conducting first and second

phase studies of sewage project of Pakdasht Mehr

Housing

With surface area of 200 ha and covered

population of 40,000 persons

Pakdasht

Southeast of Tehran Province

Water and Wastewater Company

2011/03/02 2001/09/02 100% 100,000

27 Conducting first and second

phase studies of sewage project of Parsian

With surface area of 200 ha and covered

population of 20,000 persons

Parsian

Hormozgan Province Water and Wastewater

Company

2011/05/30 2012/09/21 1st:100% 2nd: 85% 50,000

Page 9: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 6

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs

Estimation (Million

IRR) Urban Sewage Projects

28 Document preparation and conducting tender by BOT Method for treatment plant

and sewer network of Ferdous

8500 cubic meters per day and 100 km of

network Ferdous

Southern Khorasan Province Water and

Wastewater Company

2012/01/21 2012/05/21 70% 160 000

29

Document preparation and conducting tender for

implementation of some parts of sewage system of Varamin

by domestic financing and construction of wastewater treatment plant of Varamin

using BOT method

For about 100 km of collection network and

one module of treatment plant for

about 160,000 people and 30,000 cubic meters per day

Varamin

Southeast of Tehran Province

Water and Wastewater Company

2012/01/23 2012/05/23 60% 200 000

30

Engineering services of preparing bidding documents of sewage collection network and WWTP of Safadasht by

EPC method through financing

With surface area of 324 ha and covered

population of 40,000 persons

Safadasht

Town and Cities of West of Tehran

Water and Wastewater Company

To be notified 60,000

Page 10: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 7

Row Project Name Project Specifications City Employer Start Date End Date Progress

Project Costs Estimation

(Million IRR) Re-Engineering

1 Re-engineering studies for Bandar Abbass sewerage

system, collecting and treatment facilities

Approximately 500 km sewerage system, 15

pumping stations and a unit of treatment plant

Bandar Abbass

Hormozgan Province Water and Wastewater

Company

2006/11/13 2007/05/12 100% 600,000

2

Complementary re-engineering studies for

Bandar Abbass sewerage system, collecting and

treatment facilities

Approximately 500 km sewerage system, 15

pumping stations and a unit of treatment plant and monitoring operations

Bandar Abbass

Hormozgan Province Water and Wastewater

Company

2011/03/03 2012/01/03 70% 600,000

Row Project Name Project

Specifications City Employer Start Date End Date Progress Project Costs

Estimation (Million IRR)

Rural Sewage Projects

1

Studies for the first and second phases of villages of Gheshlagh Dam upstream network and wastewater

treatment plant

Including 32 villages and

population of 15,000

villages of Gheshlagh

Dam upstream

Kordestan Province Rural Water and

Wastewater Company

2004/03/03 2004/09/03 1st:100%

2nd: 100%

40,000

2 Studies for the second phase

of villages of Baneh Dam upstream network and

wastewater treatment plant Including 5 villages

villages of Baneh Dam

upstream

Kordestan Province Rural Water and

Wastewater Company

2004/06/26 2004/12/26 100% 20,000

Page 11: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 8

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs Estimation

(Million IRR) Water and Wastewater Projects for Sport and Educational Complex Projects

1

Providing consultant services of first and second phases, supreme

and site supervision for water supply and distribution plans,

sewerage system and treatment plant for Ab’ali Sport and

Educational Complex

Including 75 ha Ab’ali, Firoozkooh

Iranian National Oil Company – Social

and Welfare Services and Official Management departments

2007/01/21 In progress

1st : 100% 2nd :100%

3rd : 100%

50,000

2

Providing complementary consultant services and supreme

and site supervision for water supply and distribution plans,

sewerage system and treatment plant for Ab’ali Sport and

Educational Complex

Including 75 ha Ab’ali, Firoozkooh

Iranian National Oil Company – Social

and Welfare Services and Official Management departments

2011/08/07 In progress 80% 50,000

Page 12: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Collection Network and WWTP Study Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 9

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs Estimation

(Million IRR) Water and Wastewater Projects for Sport and Educational Complex Projects

3

Providing consultant services of first and second phases, supreme

and site supervision for water supply and distribution plans for

Mahmood Abad Sport and Educational Complex

Including 200 ha Mahmood Abad

Iranian National Oil Company – Social

and Welfare Services and Official Management departments

2007/01/05 In progress

1st : 100% 2nd :100% 3rd : 80%

60,000

Page 13: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress WWTP Effluent Usage Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ـــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ـــــــــــــــــــــــ1

Row Project Name Project

Specifications City Employer Start Date End Date Progress Project Costs

Estimation (Million IRR)

Wastewater Treatment Plant Effluent Usage Projects

1 Conducting studies of using

effluent of Baneh and Marivan wastewater treatment plant

- Baneh and Marivan

Kordestan Province

Regional Water Company

2008/11/04 2009/09/22 100% 80,000

2 Studies of transmission of effluent of Abbass Abad

Industrial estate

Transmission of treated effluent (20 l/s) for irrigating

green space

Abbass Abad Industrial

estate (Varamin)

Tehran Industrial Estates Company 2004/06/06 2004/08/07 100% 3,000

3

Reappraisal studies of the second phase of Islamshahr water network renewal, and

first and second phases of water supply network for Islamshahr

and Vavan green space

Approximately 1,820 ha surface area and

population of 527,000

Islamshahr and Vavan

Southwest of Tehran Province

Water and Wastewater Company

2002/08/08 2003/06/07 100% 10,000

Page 14: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Industrial Estates’ WWTP Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــــ.Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ1

Row Project Name Project

Specifications City Employer Start Date End Date Progress Project Costs

Estimation (Million IRR)

Wastewater Treatment Plant Projects of Industrial Estates

1 Studies of the first and second

phases of Nazar Abad Industrial Estate wastewater project

300 ha Nazar Abad Industrial

Estate

Tehran Industrial Estates Company 2003/11/30 2004/02/28

1st:100% 2nd:

100% 10,000

2 Studies of the first and second phases of Ghorveh Industrial Estate wastewater treatment

plant 26 ha

Ghorveh Industrial

Estate

Kordestan Industrial Estates

Company 2005/03/01 2006/02/19

1st:100% 2nd:

100% 10,000

3 Studies of the first and second phases of Looshan Industrial Estate wastewater treatment

plant 100 ha

Looshan Industrial

Estate

Gilan Industrial Estates Company 2005/06/06 2006/09/21

1st:100% 2nd:

100% 10,000

4 Studies of the first and second phases of Abadeh Industrial Estate wastewater treatment

plant

76 ha (+ 187 ha development)

Abadeh Industrial

Estate

Fars Industrial Estates Company 2005/07/05 2006/07/11

1st:100% 2nd:

100% 7,000

5 Studies of the first and second phases of Borazjan Industrial Estate wastewater treatment

plant 65 ha

Borazjan Industrial

Estate

Boushehr Industrial Estates

Company 2006/01/21 2006/11/22

1st:100% 2nd:

100% 7,000

6 Studies of the first and second phases of Gonbad Industrial Estate wastewater treatment

plant

Approximately 100 ha

Gonbad Industrial

Estate

Golestan Industrial Estates

Company 2006/11/30 2007/06/10

1st:100% 2nd:

100% 8,000

7 Studies of the first and second

phases of Bam Industrial Estate sewage collection network

100 ha (+ 100 ha development)

Bam Industrial

Estate

Kerman Industrial Estates

Company 2005/06/10 2006/03/11

1st:100% 2nd:

100% 6,000

Page 15: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Supervision Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ـــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــ 1

Row Project Name Project Specifications City Employer Start

Date End Date Progress Project Costs

Estimation (Million IRR)

Urban Sewage Supervision Projects

1

Third phase studies (supreme and site

supervision) of Torbat-e-Heydariyeh Sewage

Approximately 1600 ha surface area and

population of 210,000

Torbat-e-Heydariyeh

Khorasan Province Water and Wastewater

Company

2004/04/06 2007/11/09 100% 210,000

2 Third phase studies

(supervision) of East of Tehran Sewage

Supervision over 1,400 km tubing Tehran

Tehran Wastewater Company

2003/04/09 In progress 80% 1,400,000

3

Third phase studies (supreme and site

supervision) of Roodan Sewage

Approximately 300 ha surface area and

population of 20,000 Roodan

Hormozgan Province Water and Wastewater

Company

2007/05/01 In progress 80% 50,000

4

Third phase studies of network, transmission line, and wastewater treatment

plant of Kahrizak

Approximately 25 km network and transmission

line, and a treatment plant with the capacity of

4000 m3/day

Kahrizak

Southwest of Tehran Province

Water and Wastewater Company

2005/02/15 2005/03/22 100% 60,000

5

Third phase studies (supreme and site

supervision) of Shahriar sewerage system and

treatment plant

Shahriar, with approximately 1,000 ha

surface area and population of 545,000

Shahriar

Town and Cities of West of

Tehran Water and Wastewater

Company

2008/05/14 In progress 50% 60,000

6

Third phase studies (supreme and site

supervision) of Alteymoor (Olang) and Khin Arab Mashhad’s wastewater treatment plant project

Alteymoor (Olang) with the capacity of 75000 m3 and Khin Arab with the capacity of 83,000 m3

Mashhad Mashhad Water and Wastewater

Company 2008/07/05 In progress 30% 1,100,000

Page 16: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Supervision Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ـــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــ 2

Row Project Name Project Specifications City Employer Start

Date End Date Progress Project Costs

Estimation (Million IRR)

Urban Sewage Supervision Projects

7

Third phase studies (supreme and site

supervision) of Lavan Island’s sewage network

and treatment plant

approximately 80 ha surface area and

population of 2,000

Lavan Island

Hormozgan Province Water and Wastewater

Company

2008/07/27 In progress 90% 50,000

8

Third phase studies (supreme and site

supervision) of Torbat-e-Heydariyeh Sewage

Approximately 1,600 ha surface area and

population of 210,000

Torbat-e-Heydariyeh

Khorasan Province Water and Wastewater

Company

2004/04/06 In progress 100% 150,000

9

Third phase studies (supreme and site

supervision) of Malard sewage collection network and wastewater treatment

plant

Malard with surface area of 1300 ha and covered

population of approximately 706,000

persons

Malard

West of Tehran Cities and

Towns’ Water and Wastewater

Company

2009/05/06 In progress 40% 1,120,000

10

Third phase studies (supreme and site

supervision) of Jask sewage collection network and

wastewater treatment plant

Surface area of about 250 ha and covered population of

approximately 80,000 persons

Jask

Hormozgan Province Water and Wastewater

Company

2010/03/08 In progress 40% 140,000

11

Third phase studies (supreme and site

supervision) of Varamin sewage project including

collection network, transmission line and

wastewater treatment plant

Varamin with surface area of about 4000 ha

and covered population of 675,000 persons

Varamin

Southeast of Tehran Water

and Wastewater Company

2010/04/17 In progress 15% 1,100,000

Page 17: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Supervision Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ـــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــ 3

Row Project Name Project Specifications City Employer Start

Date End Date Progress Project Costs

Estimation (Million IRR)

Urban Sewage Supervision Projects

12

Engineering Services of third phase studies (supreme and site

supervision) for Karaj wastewater treatment plant

With the population of 560,000 Karaj

West of Tehran Province Water and Wastewater

Company

2010/09/25 2013/09/25 30% 500,000

13 Studies of the first phase of Ghouchan wastewater

Approximately 1,600 ha surface area and

population of 137,380 Ghouchan

Khorasan Razavi Province

Water and Wastewater Company

2010/11/02 2012/11/02 50% 330,000

14

Third phase studies (supreme and site

supervision) of sewage network of Mehr housing

project, Torbat

Approximately 6 km Torbat-e- Heydariyeh

Khorasan Razavi Province

Water and Wastewater Company

2011/06/13 2012/01/20 100% 10,000

15

Engineering Services of third phase studies (supreme and site supervision) for

transmission line and wastewater collection

network project in Birjand

Approximately 20,000 ha in area Birjand

Southern Khorasan

Province Water and Wastewater

Company

2011/08/23 2014/07/22 15% 200,000

16

Third phase studies (supreme and site

supervision) of sewage network of Mehr housing

project and Eshtehard

sewage network of 100 km in length with a

population of 75,000 and the capacity of treatment

plant as 15,000 cubic meters per day

Eshtehard

Alborz Province Water and Wastewater

Company

2011/09/23 2013/03/19 20%

treatment plant

140,000

Page 18: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Supervision Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ـــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــ 4

Row Project Name Project Specifications City Employer Start

Date End Date Progress Project Costs

Estimation (Million IRR)

Urban Sewage Supervision Projects

17

Third phase studies (supreme and site

supervision) of Torbat-e-Heydariyeh Sewage

Approximately 1,600 ha surface area and

population of 210,000

Torbat-e-Heydariyeh

Khorasan Razavi Province Water and Wastewater

Company

2011/11/11 In progress 30% 100,000

18

Third phase studies (supreme and site

supervision) of Faradanbeh Sewage Project

Approximately 300 ha surface area and

population of 15,000 Fradanbeh

Chahar Mahal va Bakhtiari Water and Wastewater

Company

2011/12/22 In progress 5%

treatment plant

120,000

Row Project Name Project Specifications City Employer Start

Date End Date Progress

Project Costs Estimation

(Million IRR) Water and Wastewater Projects for Sport and Educational Complex Projects

1

Providing consultant services of first and second phases, supreme

and site supervision for water supply and distribution plans,

sewerage system and treatment plant for Ab’ali Sport and

Educational Complex

Including 75 ha Ab’ali, Firoozkooh

Iranian National Oil Company – Social and Welfare Services and Official Management

departments

2007/01/21 In progress

1st : 100% 2nd :100% 3rd : 10%

50,000

Page 19: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Sewage Supervision Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ـــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــ 5

Row Project Name Project Specifications City Employer Start

Date End Date Progress

Project Costs Estimation

(Million IRR) Water and Wastewater Projects for Sport and Educational Complex Projects

2

Providing consultant services of first and second phases, supreme

and site supervision for water supply and distribution plans for

Mahmood Abad Sport and Educational Complex

Including 200 ha Mahmood Abad

Iranian National Oil Company – Social and Welfare Services and Official Management

departments

2007/01/05 In progress

1st : 100% 2nd :100% 3rd : 80%

60,000

Page 20: Industrial Estates Water and Wastewater Projectsparsabtadbir.com/english/introduce/working/pdf/2/Binder1.pdf · 2013-01-20 · ـــــــــــــــــــــــPars AB

Accomplished or In Progress Industrial States’ Sewage Projects, Pars AB Tadbir Consulting Engineers Co. August 2012

ــــــــــــــــــــــــ .Pars AB Tadbir Consulting Engineers Co ــــــــــــــــــــــــ 1

Row Project Name Project

Specifications City Employer Start Date End Date Progress

Project Costs Estimation

(Million IRR) Sewage Projects of Industrial Estates

1 Third phase studies (supreme and

site supervision) of Ghorveh Industrial Estate wastewater

treatment plant 26 ha

Ghorveh Industrial

Estate

Kordestan Industrial Estates

Company

2006/08/12 2009/03/20 100% 10,000

2 Third phase studies (supreme and

site supervision) of Looshan Industrial Estate wastewater

treatment plant 100 ha

Looshan Industrial

Estate

Gilan Industrial Estates

Company 2007/07/05 2009/06/21 100% 10,000

3

Engineering services of third phase studies (supreme and site supervision) for Shams-Abad

Industrial Estate executive projects

500 ha Shams-Abad

Industrial Estate

Tehran Industrial Estates

Company

2005/04/23 2006/08/21 100% 40,000