industry update 2016 - nzgeothermal.org.nz · sustaining capital and expansion works chevron...
TRANSCRIPT
![Page 1: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/1.jpg)
www.jacobs.com | worldwide
Industry Update 2016 Jacobs
New Zealand Geothermal Workshop 2016
![Page 2: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/2.jpg)
Important
The material in this presentation has been prepared by Jacobs®.
Copyright and other intellectual property rights in this presentation
vest exclusively with Jacobs. Apart from any use permitted under
applicable copyright legislation, no part of this work may in any form or
by any means (electronic, graphic, mechanical, photocopying, recording
or otherwise) be reproduced, copied, stored in a retrieval system or
transmitted without prior written permission.
Jacobs is a trademark of Jacobs Engineering Group Inc.
2015 2015 Jacobs Engineering Group Inc. All rights reserved.
Disclaimer
© Copyright
2
![Page 3: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/3.jpg)
Jacobs in the Philippines - 2016
• 180 Staff, 10 geothermal. Strong ties to New Zealand.
Key Clients:
• Aboitiz
– Technical Advisory
– Engineering Design
– Due Diligence
• PGPCI / Chevron
– Master Planning
– Engineering Design
• EDC
– Master Planning
– Risk Assessment
3
![Page 4: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/4.jpg)
Industry Involvement – NZTE/NGAP Day
4
![Page 5: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/5.jpg)
Sustaining Capital and Expansion Works
Chevron Indonesia
5
Salak Awi 9 Project:
• Connection of two high performance
(>15MW) wells
• Complex brownfield piping network
• New separation facilities
Darajat Pad 20/S4 Project:
• Connection of nine new wells at green
and brownfields wellpads
• Design of steam delivery cross country
piping
![Page 6: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/6.jpg)
Karaha Bodas Piping and Road Alignment
GE Indonesia
6
• Widening of an existing road corridor to allow for piping
and PP access
• Steep terrain with unstable slopes
• Use of drone LiDAR survey backed up by ground based
equipment to quickly and effectively identify problem
areas
• Staggered implementation to minimise interruption to
plant construction and operation
![Page 7: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/7.jpg)
Caribbean – NZ TA
7
• Support provided to five countries (SIDS) in
Eastern Caribbean.
• Technical studies
• Peer review and Advisory
• Capacity Building
• Caribbean Geothermal Advisor in country since
Nov 2014.
![Page 8: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/8.jpg)
Comoros
• On-going technical assistance
• MFAT, Govt of Comoros, UNDP
8
![Page 9: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/9.jpg)
Latin America
Nicaragua - San Jacinto
During 2016 Jacobs assisted PENSA with further enhancements to the San Jacinto Project, including:
• Design and implementation of a make up production well programme
• Design and implementation of injection well remediation works including mechanical cleanout and acid stimulation
• Well site geology and drilling engineering supervision
• Technical advice relating to the trial and implementation of silica inhibition options
• Assistance with the interpretation of changes in well performance and general resource characteristics
• Preliminary assessment of new binary plant project
9
![Page 10: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/10.jpg)
Cosiguina – remote drilling engineering and
geoscience support
Casita – exploration drilling and development
program
10
![Page 11: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/11.jpg)
Mexico – Domo San Pedro
Grupo Dragon – drilling supervision, geoscience
11
![Page 12: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/12.jpg)
Malaysia – Apas Kiri, Sabah Province
Tawau Green Energy (TGE)
First geothermal development in Malaysia
12
![Page 13: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/13.jpg)
New Zealand
• TAOM – drilling supervision and wellsite
geological support
“The drilling was successful – we located the high-temperature fluid that will ultimately fuel
the geothermal power plant, and the injection capacity necessary to manage the cooler
fluids that have passed through geothermal power plant.” – Ben Gibson
http://www.eastland.nz/2016/09/19/drilling-completed-at-te-ahi-o-maui/
• Mercury – well integrity review
13
![Page 14: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/14.jpg)
14
ARGeo-C6
![Page 15: Industry Update 2016 - nzgeothermal.org.nz · Sustaining Capital and Expansion Works Chevron Indonesia 5 Salak Awi 9 Project: • Connection of two high performance (>15MW) wells](https://reader030.vdocument.in/reader030/viewer/2022041206/5d5e505288c99394548bb90a/html5/thumbnails/15.jpg)
www.jacobs.com | worldwide 3 May 2017 Jacobs © Copyright