INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLab E. Cisbani 1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M. Lucentini, F. Mammoliti, F. Noto, S. Minutoli, P. Musico, R. Perrino, F. Santavenere ... INFN / Bari-Lecce, Catania, Genova, Roma- Sanità SBS Collaboration Meeting Oct 18-19 2012 JLab Readout Electronics development will be presented by Paolo Musico

Upload: megara

Post on 22-Feb-2016

51 views

Category:

Documents


0 download

DESCRIPTION

INFN GEM Front Tracker. V . Bellini , M. Capogni, E. Cisbani, S . Colilli, F . Giuliani, M. Gricia, F . Librizzi, M . Lucentini, F. Mammoliti, F . Noto, S. Minutoli, P . Musico, R . Perrino, F . Santavenere ... INFN / Bari-Lecce, Catania, Genova, Roma-Sanità - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: INFN GEM Front Tracker

INFN GEM Front Tracker

2012 Oct 18 / SBS Coll. / JLab E. Cisbani 1

V. Bellini, M. Capogni, E. Cisbani,S. Colilli, F. Giuliani, M. Gricia,

F. Librizzi, M. Lucentini, F. Mammoliti,F. Noto, S. Minutoli, P. Musico,R. Perrino, F. Santavenere ...

INFN / Bari-Lecce, Catania, Genova, Roma-Sanità

SBS Collaboration MeetingOct 18-19 2012

JLabReadout Electronics development will be presented by Paolo Musico

Page 2: INFN GEM Front Tracker

Front Chamber reqs and design• Hit spatial resolution ~ 70 mm• Stand large background (g ~ 250 MHz/cm2, e/p 160 kHz/cm2)• Transverse area at least 40x120 cm2

• Event rate at the level of 20 kevents/s• Reuse in different configurations

2012 Oct 18 / SBS Coll. / JLab E. Cisbani 2

Page 3: INFN GEM Front Tracker

GEM base module 2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

3

40x50 cm2

• Large GEM module with small dead area • Low material budget/Light Structure• Modular design• Flexible configuration• Balanced weight

• Segmented HVs and individual protection resistors

• Spacers to keep gap• Thin PERMAGLAS frame

Page 4: INFN GEM Front Tracker

E. Cisbani 4

Service Frame / Detail

2012 Oct 18 / SBS Coll. / JLab

• External service frame made of smaller segments in carbon fiber

• Rigid structure, can correct small GEM module bending

• Prototyping under production

Page 5: INFN GEM Front Tracker

5

Beam test @ DESY / Full Module Size 40x50 cm22012 O

ct 18 / SB

S C

oll. / JLabE

. Cisbani

DGEM = 400, 390, 350 V

3 mm drift gap Ar:CO2 70:304 GeV electron ionization: 28 pairsGain: 17600

charge: 500 ke / 2000 ADC ch

Page 6: INFN GEM Front Tracker

6

Parassitic beam test of new electronics/Jul-Aug 2012 2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

Page 7: INFN GEM Front Tracker

7

2012/CERN Test – Event display 2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

Event

Strip Plane

HV=3750 VSignal > 1000RMS ~ 50

Page 8: INFN GEM Front Tracker

8

2012/CERN Test – Signal development

• Signal saturated, and wrong clock phase both fixed• However, position information are available

2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

Page 9: INFN GEM Front Tracker

9

Calibration pulse development

• Left: normal signal• Bottom: «saturated»• «Saturation» depends

on the baseline level

2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

Page 10: INFN GEM Front Tracker

10

Gas Component / Radiation test• We would like to use differential pressure transmitters at

gas inlet and outlet to evaluate pressure drop in the chamber and any potential problem

• Negative Rad Hard Test

2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

Page 11: INFN GEM Front Tracker

11

HV divider and Spark counter

• In lab test we use LNF/GEM-HV module with 7 independent HV levels and current feedback.

• In operation we intend to use a voltage divider (based on Olympus/Abruzzio design);

• Working on asimple sparkcounter based onstandard preamcomponents(CREMAT CR110) +some standardmodules

2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

CREMAT amp. is probably not RAD HARD

Page 12: INFN GEM Front Tracker

12

E. C

isbani

DAQ

Bus Interface

Generic Model(virtual class)

MPDLibrary

Low Level

I2C

Trigger

ADC

Other

High Level

Initialize

Configure

Discovery

Read

WrapperDB

Module

Structured text file for

configuration

Based on libconfig++

Main

Implemented on C++

• Run on Linux

• MPD as independent library• One configuration file (text

format)

• Use open source libconfig++

• Self consistent output binary

raw data

DAQ Software 2012 Oct 18 / S

BS

Coll. / JLab

Still some work on event readout library

Tested on 3 VME platforms (Struck, CAEN USB and Optical)bug fixed: clock phase was not set properly.

Page 13: INFN GEM Front Tracker

13

Catania Tools for assembling / READY to go

• Clean room with gas system• HV probe box and

accessories• GEM foil Stretcher• Fiducial pin extractors• Consumables ...

2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

Page 14: INFN GEM Front Tracker

14

Catania Assembling Test and Training• Used spare/damaged

parts of the previous design to get experience in gluing/assembling gems modules (2 dummy modules assembled)

2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

Page 15: INFN GEM Front Tracker

15

Material for 6 chambers (18 GEM modules)Frames

Drift foils

GEM foils

Readout

Honeycomb

Service frame

Required 18 18 54 18 18 6

Spare 4 4 14 22 22 (1)

Procured 18 14 5 7 7 -Ordered 4 3 10 3 1 1Budget 2012

1 42 8 10 3

Budget 2013

9 4 4 2 (+1)

2012 Oct 18 / S

BS

Coll. / JLab

E. C

isbani

1. We have to put a large foils production order before end of Italian

fiscal year, production can be delayed some months (if needed) – in

addition to the CERN «natural» delay

2. We still have some margin for improvements, which will be

considered after assembling and characterization

Page 16: INFN GEM Front Tracker

Short term plan● GEM Chamber:

– Assembling of the first 40x50 cm2 module will start the 22° of October (due to people previous committments)

– Assembling expected to last 2 full weeks (at least)– characterize the module in lab (with rad. Sources)

● Mechanics:

– Service frame prototype in production– Test service frame on three modules (first proto, training module and

first final module) ● Test

– November: Chance to access the RD51 test beam (second week of November)or RICH-CLAS12 at the end of November – most likely

● Electronics

Paolo Talk

Expected to go into «mass» assembling

early next year