Info Tech Corporation of Goa Ltd
(A Government of Goa undertaking)
(An ISO 9001-2008 Certified Company)
Above Alcon Hyundai Showroom, 3rd
floor, NH 17, Porvorim – Bardez, Goa.
NOTICE INVITING TENDER
(Electronic Mode Only)
RFP No : ITG-IT/RFP/e-District/2013/01 dated : 7th
January 2014
Info Tech Corporation of Goa Ltd (ITG), ( A Government of Goa Undertaking) , on behalf of
Department of Information Technology, Government of Goa , invites e-tenders from well
established and reputed bidders for “IMPLEMENTATION E-DISTRICT MMP IN THE
STATE OF GOA”
RFP details consisting of three volumes namely VOL I , VOL II and VOL III and terms and
conditions and tender form containing all the details can be obtained (downloaded) from the e-
tender site.
Other Important Details
Sr No
Item
Particulars
1 Description of the work IMPLEMENTATION OF E-DISTRICT MMP
IN THE STATE OF GOA
2 Mode of Tendering E-Tendering
3 E-Tendering Website www.etender.goa.gov.in or
www.tenderwizard.com/GOA
4 Tender Document Fee Rs 8000/- Rupees Eight thousand only (Non-
Refundable)
5 Tender Processing Fee Rs 2000/- Rupees Two thousand only (Non-
Refundable)
6 Mode of Tender Document
& Processing Fees
Demand Draft drawn in favour of Info Tech
Corporation of Goa Limited, payable at Panaji
7 Earnest Money Deposit
(E.M.D.)
Rs. 25 Lakhs (Rupees Twenty Five Lakhs) in
the form of Demand draft from nationalized or
scheduled bank payable to Info Tech Corporation
of Goa Ltd at Panaji OR in the form of Bank
Guarantee from the nationalized or scheduled bank
in appropriate format.
8 Date and Time for request
of Online Tender
Document
Upto 31-01-2014 upto 3pm
9 Last Date and Time for
Online submission of bids
31-01-2014 upto 4 pm
10 Last date of submission of
pre bid queries
15-01-2014 upto 4 pm
Email : [email protected]
11 Reply to pre bid queries 17-01-2014 by 4 pm through email
12 Date , time and venue of
pre bid meeting
16-01-2014 at 3 pm
Venue: Department of Information Technology,
2nd
floor, Above Alcon Hyundai showroom,
Porvorim – Bardez – Goa
13 Date and Time for opening
of Eligibility & Technical
bids and Venue
31-01-2014 at 4.30 pm
Venue: Department of Information Technology,
2nd
floor, Above Alcon Hyundai showroom,
Porvorim – Bardez – Goa.
14 Date and Time for opening
of commercial bids
Shall be intimated to the successful technical
bidders in due course of time.
15 Contact details Address
Managing Director
Info Tech Corporation of Goa Ltd
Above Alcon Hyundai Showroom,
3rd
Floor, NH 17, Porvorim, Bardez
Goa –403 501
Telephone : (0832) 2416024 / 2415192
Tenders not conforming to the requirements mentioned above and as laid down in the terms and
conditions or not accompanied by EMD in the form prescribed at the time of opening of the
technical bid are liable to be summarily rejected. The decision of The Managing Director, Info
Tech Corporation of Goa Ltd, for purpose of Eligibility & Technical Qualification / Commercial
Bid shall be final and binding to all the tenderers / bidders.
Bidders who wishes to participate in this RFP should have valid digital signature ( Class III) and
should register on the e-tendering portal for participation in the RFP if not registered yet.
For any of the assistance regarding participation in the e-Tender contact on 8888636107 ,
8975223717, 8600651553, 8554878738, 9657381294, 9096891274, 9686115323 , 9890693964
and 9049600090 or email: [email protected]
For and on behalf of Info Tech Corporation of Goa Ltd
Sd/-
Managing Director
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 1 | P a g e
Info Tech Corporation of Goa Ltd
On behalf
Of
Department of Information Technology
Government of Goa
REQUEST FOR PROPOSAL
FOR
SELECTION OF SYSTEM INTEGRATOR
FOR
ROLL-OUT OF e- DISTRICT MMP - GOA
VOLUME I
Ref No: ITG-IT/RFP/e-District/2013/01 dated 7th January 2014
Info Tech Corporation of Goa Ltd
A Govt. of Goa Undertaking
(An ISO 9001:2008 certified company)
4th Floor, Above Alcon Hyundai Showroom,
Porvorim, Bardez, Goa – 403501
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 2 | P a g e
Table of Contents 1 Introduction .......................................................................................................................................... 6
2 Schedule of Bid Process ....................................................................................................................... 7
3 Structure of the RFP ........................................................................................................................... 10
4 Background Information ................................................................................................................... 11
4.1 Project Background ......................................................................................................................... 11
4.2 State Information ............................................................................................................................. 11
4.3 Key Information .............................................................................................................................. 16
4.4 About Info Tech Corporation of Goa (ITG) ................................................................................. 18
5 Instructions to the Bidders ................................................................................................................ 20
5.1 General .............................................................................................................................................. 20
5.2 Compliant Proposals / Completeness of Response ................................................................... 20
5.3 Pre-Bid Meeting & Clarifications .................................................................................................. 20
5.4 Key Requirements of the Bid ......................................................................................................... 22
5.5 Preparation and Submission of Proposal .................................................................................... 23
5.6 Evaluation Process .......................................................................................................................... 24
6 Criteria for Evaluation ....................................................................................................................... 25
6.1 Pre-Qualification Criteria ............................................................................................................... 26
6.2 Technical Qualification Criteria .................................................................................................... 30
6.3 Commercial Bid Evaluation ........................................................................................................... 38
7 Appointment of System Integrator .................................................................................................. 39
7.1 Award Criteria ................................................................................................................................. 39
7.2 Right to Accept Any Proposal and To Reject Any or All Proposal(s) ..................................... 39
7.3 Notification of Award .................................................................................................................... 39
7.4 Contract Finalization and Award ................................................................................................. 39
7.5 Performance Guarantee .................................................................................................................. 39
7.6 Signing of Contract ......................................................................................................................... 40
7.7 Failure to Agree with the Terms and Conditions of the RFP .................................................... 40
8 Project Plan.......................................................................................................................................... 40
9 Payment Schedule .............................................................................................................................. 40
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 3 | P a g e
10 Annexure ............................................................................................................................................. 41
Annexure I: TECHNICAL BID TEMPLATES ......................................................................................... 41
Form 1: Undertaking on Total Responsibility ......................................................................................... 42
Form 2: Particulars of the Bidder .............................................................................................................. 43
Form 3: Bank Guarantee for Earnest Money Deposit ........................................................................... 44
Form 4A: Compliance Sheet for Pre-Qualification Proposal ................................................................ 46
Form 4B: Compliance Sheet for Technical Proposal ............................................................................... 50
Form 5: Letter of Proposal .......................................................................................................................... 54
Form 6: Project Citation Format ................................................................................................................ 55
Form 7: Proposed Solution ......................................................................................................................... 56
Form 8: Proposed Work Plan ..................................................................................................................... 57
Form 9: Team Composition ....................................................................................................................... 57
Form 10: Curriculum Vitae (CV) of Key Personnel ................................................................................ 58
Form 11: Deployment of Personnel .......................................................................................................... 60
Form 12: Manufacturers'/Producers‟ Authorization Form .................................................................. 61
Form 13: Declaration on Source Code and Intellectual Property Rights ............................................. 63
Form 14: Undertaking on Patent Rights ................................................................................................... 64
Form 15: Undertaking on Compliance and Sizing of Infrastructure ................................................... 65
Form 16: Undertaking on Service Level Compliance ............................................................................. 66
Form 17: Undertaking on Deliverables .................................................................................................... 67
Form 18: Undertaking on Support to Third Party Solution acceptance and certification ................ 68
Form 19: Declaration of activities sub-contracted .................................................................................. 69
Form 20: Undertaking on Exit Management and Transition ................................................................ 70
Form 21: Declaration that the bidder has not been blacklisted............................................................. 71
Form 22: Particulars of the Bid Cover Letter ........................................................................................... 72
Form 23: Undertaking on Conflict of Interest ......................................................................................... 74
Form 24: Non-Malicious Code Certificate ............................................................................................... 75
Form 25: Undertaking on Clarifications sent to ITG .............................................................................. 76
Form 26: Undertaking on Training the Users .......................................................................................... 77
Form 27: Undertaking on Support to Certification ................................................................................ 78
Form 28: Undertaking on Changes to the contract clauses ................................................................... 79
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 4 | P a g e
Form 29: Self Declaration ........................................................................................................................... 80
ANNEXURE II: FINANCIAL PROPOSAL TEMPLATE ....................................................................... 81
Form 1: Covering Letter ............................................................................................................................. 81
Financial Proposal to be submitted through online mode only ........................................................... 83
Details of Financial Bid ............................................................................................................................... 84
ANNEXURE III: TEMPLATE FOR PBG .................................................................................................. 89
Form 1: Performance Bank Guarantee ..................................................................................................... 89
ANNEXURE IV: TEMPLATE FOR CCN ................................................................................................. 91
Form 1: Change Control Notice (CCN) Format ...................................................................................... 91
ANNEXURE V: Details of horizontal connectivity through GBBN. .................................................... 93
ANNEXURE VI: Functional Requirement Specifications...................................................................... 99
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 5 | P a g e
List of Abbreviation
Abbreviation Description
AMC Annual Maintenance Contract
CDAC Centre for Development of Advanced Computing
CFC Citizen facilitation Centers
CMS Content Management System
CSP Content Service Provider
DD Demand Draft
DeitY Department of Electronics and Information Technology
DoIT/DOIT Department of Information Technology, Goa
DOP Directorate of Panchayat
EC Empowered Committee
EMD Earnest Money Deposit
ESO Extended Service outlets
GBBN Goa Broad Band Network
GoI/GOI Government of India
ITG Info Tech Corporation of Goa Limited
MCIT Ministry of Communication and Information Technology
MMP Mission Mode Project
NeGP National e-Governance Plan
NIC National Informatics Centre
NPI National Portal of India
PoP Point of Presence
RFP Request for Proposal
SDC State Data Centre
SeMT State e-Governance Mission Team
SI System Integrator
SLA Service Level Agreement
SPF State Portal Framework
SSDG State Services Delivery Gateway
SWAN State Wide Area Network
UT Union Territory
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 6 | P a g e
1 Introduction
I. Under the eDistrict MMP National Roll-out, System Integrator will be responsible
for providing a comprehensive solution towards Supply, Installation,
Development, Integration, Commissioning, Management & Maintenance of
Application and Computing Infrastructure pertaining to eDistrict in various States
as per DeitY Guidelines.
II. Info Tech Corporation of Goa Ltd (ITG) is appointed as SDA for this project and
ITG on behalf of Department of Information Technology, Goa invites the eligible
parties (hereafter referred as “Bidder / SI”) for appointment as System Integrator
for Goa and provide the comprehensive solutions for implementation of eDistrict
MMP.
III. Bidders are advised to study this RFP document carefully before submitting their
proposals in response to this notice. Submission of a proposal in response to this
notice shall be deemed to have been done after careful study and examination of
this document with full understanding of its terms, conditions and implications.
Failure to furnish all information required as mentioned in the RFP documents or
submission of a proposal not substantially responsive to the RFP documents in
every respect will be at the bidder's risk and may result in rejection of the proposal.
IV. All proposals submitted in response to the RFP document must be accompanied by
an EMD of Rs. 25 Lakhs only in the form of a bank guarantee/Demand draft from
nationalized or scheduled banks
V. Bids submitted without adequate EMD will be rejected summarily.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 7 | P a g e
2 Schedule of Bid Process
S. No Information Details
1. RFP No. and Date RFP No.: ITG-IT/RFP/eDistrict/2013/01 Date: 7th January 2013
2. Last date & time for
submission of written queries
for clarifications through email
Date: 15-01-2014
Time: upto 4 pm
Email : [email protected]
3. Date, place & time of pre-bid
conference
Date: 16-01-2014
Time: 3 pm
Place: Conference hall, 2nd floor Dept. of
Information Technology, Above Alcon Hyundai ,
Porvorim, Bardez, Goa
4. Release of response to
clarifications by email
Date: 17-01-2014
Time: by 4 pm through email
5. Bid validity period 180 days from the date of submission of the tender
6. Last date, time & place for
submission of bids
Date: 31-01-2014
Time: before 4 pm
Place: Info Tech Corporation of Goa Ltd. , 4nd floor, Above Alcon Hyundai , Porvorim, Bardez, Goa
7. Date, time & place of opening
of technical bid
Date: 31-01-2014
Time: 4.30 pm
Place: Conference hall, 2nd floor Dept. of Information Technology, Above Alcon Hyundai , Porvorim, Bardez, Goa
8. Date, time & place of technical
presentation by the bidder
Shall be intimated to the bidders satisfying the
prequalification criterias.
Place: Conference hall, 2nd floor Dept. of
Information Technology, Above Alcon Hyundai ,
Porvorim, Bardez, Goa
9. Place, Time and Date of
opening of Financial bid
Shall be intimated to technically qualified bidder
10. Contact person for queries Umakant S Naik
Manager ( IT)
Phone: 0832- 2416024
Email: [email protected]
11. Addressee and address at
which proposal in response to
RFP notice is to be submitted:
Mr. Nilesh Fal Dessai
Managing Director
Info Tech Corporation of Goa Ltd. , 4nd floor,
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 8 | P a g e
Above Alcon Hyundai , Porvorim, Bardez, Goa
12. Tender document fees
Rs 8000/- (eight thousand only) in the form of
demand draft from nationalized/ scheduled banks
in favour of Info Tech Corporation of Goa Ltd.
Payable at Panaji , Goa
13. Tender processing fees Rs 2000/- (two thousand only) in the form of
demand draft from nationalized/ scheduled banks
in favour of Info Tech Corporation of Goa Ltd.
Payable at Panaji, Goa
14. Availability of Tender Documents
Tender documents can be downloaded from For the detailed tender notice, please visit our website
http://www.etender.goa.gov.in or http://www.tenderwizard.com/goa
The bidders are expected to examine all instructions, forms, terms, project requirements and other information in the RFP documents. Failure to furnish all information required as mentioned in the RFP documents or submission of a proposal not substantially responsive to the RFP documents in every respect will be at the bidder's risk and may result in rejection of the proposal and forfeiture of the bid
15. Registration of vendors The bidders are required to get registered with
http://www.etender.goa.gov.in (if not registered). The intending bidder must have valid digital signature to submit the bid.
16. EMD Earnest money deposit of Rs. 25,00,000/- (Twenty
Five Lakhs Only) in the form of Demand Draft OR Bank Guarantee (in the format specified in Form 3 issued by any scheduled bank/ nationalized bank in favour of the Info Tech Corporation of Goa Ltd payable at Panaji, Goa
Copies of DD or bank guarantee shall be scanned and uploaded to the e-tendering website within the period of tender application submission and the originals to be deposited in the office of the Info tech Corporation of Goa Ltd on or before the tender submission date along with technical bid in a sealed envelope.
Note :
All the three demand drafts towards EMD, Cost of Tender Document and the Tender processing fee
shall be placed in single envelope superscripted as ‘Earnest Money cost of tender documents and cost
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 9 | P a g e
of tender processing fee’ with the name of Project and the due date of opening of the bid mentioned
and to be submitted to the office of Info Tech Corporation of Goa Ltd, Porvorim on or before the
tender submission date along with hard copy of technical bid.
Note : The training on e-tender software shall be held on 20/01/2014 at 3pm at the conference hall of Department of Information Technology , 2nd floor, Above Alcon Hyundai showroom, Porvorim, Bardez – Goa. Interested bidders should submit their names through email to [email protected] before 17/01/2014 for the e-tendering training.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 10 | P a g e
3 Structure of RFP
I. Info Tech Corporation of Goa Ltd. (ITG), Goa (hereafter referred as “ITG”) invites
bids from eligible parties (hereafter referred as “Bidder”) for appointment as System
Integrator for Goa on behalf of Dept. of Information Technology for implementation
of eDistrict MMP for Govt. of Goa.
RFP Consists of 3 Volumes
A. Volume I: Instructions on the Bid process for the purpose of responding to
this RFP. This broadly covers:
General instructions for bidding process
Bid evaluation process including the parameters for Technical
evaluation and commercial evaluation to facilitate ITG in
determining bidder‟s suitability as the implementation partner
Payment schedule
Commercial bid and other formats
B. Volume II: Functional and Technical Requirements of the project. The
contents of the document broadly cover the following areas:
About the project and its objectives
Scope of work for the SI
Functional and Technical requirements
The bidder is expected to respond to the requirements as completely and in
as much relevant detail as possible, and focus on demonstrating bidder‟s
suitability to become the SI of ITG.
C. Volume III: Master Service Agreement (MSA), Service Level Agreement
(SLA) and Non-Disclosure Agreement (NDA).
Project Plan /Schedule
Service levels for the implementation partner
The bidders are expected to examine all instructions, forms, terms, Project requirements
and other information in the RFP documents. Failure to furnish all information required as
mentioned in the RFP documents or submission of a proposal not substantially responsive
to the RFP documents in every respect will be at the bidder's risk and may result in
rejection of the proposal.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 11 | P a g e
4 Background Information
4.1 Project Background
I. NeGP was approved by the Government of India in May 2006, with the following
vision:
“Make all Government Services accessible to the common man in his locality,
through common service delivery outlets and ensure efficiency, transparency
and reliability of such services at affordable costs to realise the basic needs of the
common man”.
II. To realize this vision, 31 Central, State and Integrated Mission Mode projects
(MMPs) along with 8 support components were identified and approved under
NeGP. States have been given flexibility to identify up to 5 additional state-specific
projects, which are particularly relevant for the economic development of the State.
NeGP also envisages creation of the core IT infrastructure in the form of SWAN,
SDC and one lakh front ends namely CSCs in rural areas across the country to
deliver public services electronically.
III. EDistrict is one of the 31 MMPs under NeGP, with the Department of Electronics
and Information Technology (DeitY), Government of India (GoI) as the nodal
department, to be implemented by State Government or their designated agencies.
This MMP aims at electronic delivery of identified high volume citizen centric
services, at district and sub-district level. To achieve these objectives service levels
and outcomes for each of these services will be clearly laid down by the State
concerned, with a view to improving the efficiency and effectiveness of the service
delivery. The MMP envisages leveraging and utilizing the four pillars of e-
infrastructure namely, State Data Centers (SDCs), State Wide Area Network
(SWANs), State Service Delivery Gateways (SSDGs) and Common Service Centers
(CSCs), optimally to deliver public services electronically to citizens at their door
steps. Initially only those high volume citizen-centric services will be taken up for
implementation which have high priority for the State. New services will be added
to the portfolio subsequently, once the demand for the initial set of e-enabled
services increases.
IV. Detailed scope of work is provided in volume II of this RFP.
4.2 State Information
Goa, a tiny emerald land on the west coast of India, and the 25th State in the Union of India,
was liberated from Portuguese rule in 1961. It was part of the Union Territory of Goa, Daman &
Diu till 30th May 1987 when it was carved out to form a separate State. Goa, for the purpose of
revenue administration is divided into two districts viz. North and South Goa with
headquarters at Panaji and Margao respectively.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 12 | P a g e
The State comprises of 12 Talukas and for the purpose of implementation of development
programmes the State is divided into 12 community development blocks. The district of North
Goa comprising six Talukas has a total area of 1,736 sq. km., and South Goa comprising six
Talukas has an area of 1,966 sq. km. In all, there are 383 villages of which 233 are in North Goa
and 150 in South Goa. There are also a total of 14 Municipalities and 190 Panchayats in Goa.
There are 86 Government departments in Goa and e-Governance projects have been initiated in
most of these departments with application software hosted centrally in the State Data Centre.
IT infrastructure has been setup in most departmental offices and connected through the Goa
Broad Band Network (GBBN) to the State Data Centre (SDC). Department of IT has also
initiated multiple e-Governance projects and MMPs in the State to further strengthen its
commitment to take Goa ahead in the path of e-Governance.
The Government of Goa envisages the eDistrict project as an important milestone in the State‟s
e-Governance implementation programme, in which majority of the G2C and G2G services
would be delivered by the District Administration leveraging Information & Communication
Technology through a single service delivery window. It is proposed that the Extended Service
Outlets/Common Service Centres (ESO/CSC) in Goa would deliver the eDistrict services
integrated with the State portal and SSDG project which is operational in the State.
The State Government has identified 26 services for implementation across two districts viz.,
South Goa and North Goa for eDistrict rollout. The project shall be implemented under the
supervision of ITG, the State Designated Agency in coordination with the DeGS constituted in
both districts and DoIT.
4.2.1 Stakeholder identification
The key stakeholders identified who would be having direct as well as indirect influence in the
State wide roll out and subsequent O&M of the eDistrict project in Goa has been presented here.
S.No Stakeholder Group Level of Influence
1. Department of Information Technology ,
Govt. of Goa
High
2. Government of Goa High
3. ITG - State Designated Agency High
4. District Administrations Medium
5. District e-Governance Societies (DeGS) Medium
6. National Informatics Centre (NIC) Medium
7. State PMU High
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 13 | P a g e
S.No Stakeholder Group Level of Influence
8. STQC Medium
9. National PMU Medium
10. Line departments Medium
11. Extended Service Outlet (ESO/CSC) Medium
12. Citizens / Beneficiaries Medium
4.2.2 Following are the services selected by the State in Phase –I of eDistrict rollout:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 14 | P a g e
Sr.
No
.
Category Name of Service Remark
1 Certificates Issuance of Income certificate
Issuance of Domicile certificate
Issuance of Residence certificate
Issuance of Divergence certificate
Issuance of Caste/Community certificate
Issuance of Matriz certificate
Issuance of Form I & XIV (Record of Right)
Issuance of Birth/Death certificate
Application for Marriage Registration certificate & Issuuance of Marriage Registration certificate.
Covered under DC Suite Dir. of Settlement & Land records Panchayat/Municipality Registration Dept.
2 Relief – Natural calamity
Application for Relief for victims of Natural Calamity Covered under DC Suite
3 Revenue Court
Revenue court cases-Case listing/adjournment/stay/ Final/Status
Covered under DC Suite
4 RTI Services RTI filing and status services Goa State Info. Commission
5 Arms License Application/Renewal of Arms License Covered under DC Suite
6 Sound permission
Application for Sound permission Covered under DC Suite
7 Transport
Application for grant of subsidy for Yellow/ Black Motor Cycle, Auto Rickshaw, Taxi scheme 2003
Application for grant of subsidy for replacement of Buses/Mini Buses above 15 years old
Transport Dept.
8 Fisheries Application for Registration /Renewal of Fishing Nets Fisheries Dept.
9 Certificate Registration of New water sports activities Tourism Dept.
10 Registration/Renewal of Inland Vessels
Registration/Renewal of Water Sports
Captain of Ports Dept.
11 Registration of Schools for participation in Games
Application for Sportsmen certificate
Registration/Application for entry into State Youth Festival
Application for grant-in-aid for various Educational Institutes
Sports Dept.
12 Generic forms
Recruitment form for non-gazette post of various Depts. across State
Form for Scheme management
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 15 | P a g e
4.2.3 State Specific e-Governance Initiatives
4.2.3.1 SDC: Location of SDC (State Data Centre)
A State Data Centre has been setup in Goa which is commissioned at the Department of
Information Technology premises in Porvorim, North Goa as a State funded initiative and
caters to the needs of all the State Government departments. However, a state of the art SDC
under NeGP is also proposed for implementation in Goa which has been approved by DeitY,
GOI.
The State Data Centre is located at 2nd floor, Department of Information Technology, Alcon
Construction, Above Alcon Hyundai Showroom, Porvorim, Bardez, Goa, India. The Current
dimension area of State data Centre is 10.96m X 9.81m with Server Farm Area, Manager Cabin,
NOC/ Console Room, Reception area, Staging area and UPS/ Electrical Room , etc.
The table below provides further details about the existing State Data Centre in Goa:
Status of SDC Adequate space and IT Resources for eDistrict
project
Operational Available
4.2.3.2 ESO/CSC (Extended Service Outlets)
Directorate of Panchayats (DOP) will establish and identify the site for ESO/CSC in
Panchayats in coordination with Department of Information Technology, Goa. Further,
the Panchayats will in-turn identifies the staff to run ESO/CSC. The necessary training
to the Staff will be provided by the System Integrator for the eDistrict services.
Currently, various services of Departments are available online and can be rolled out
through ESO/CSC. Based on the nature of the services, they are divided into various
types, such as Information Service, Transaction Service, Certificate Service and Payment
Service, etc.
4.2.3.3 GBBN (Goa Broad Band Network)
The SWAN project in Goa is called the Goa Broad Band Network (GBBN) and henceforth would
be called GBBN. The GBBN project has been designed to build a converged Wide Area Network
that connects the State Headquarters and District Headquarters with all 12 Talukas, Village
Panchayats, Households and institutions across the State. The details of GBBN connectivity is
provided in Annexure V.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 16 | P a g e
4.2.3.4 SSDG (State Service Delivery Gateway), State Portal & eForms - Goa
Status of SSDG in the State Operational
Status of State Portal Operational - www.goa.gov.in
Services under e-Forms for each
district
Services already
implemented by
SI(SSDG)
Services still to
be implemented
by SI(eDistrict)
Services
implemented by
NIC
Status of SSDG 46 14* 12
* There are a total of 26 services considered as part of the initial eDistrict Goa initiative.
It is to be noted that 12 services out of 26 are already developed and managed by NIC. SI
(eDistrict) has to develop end to end solutions for 14 services and has to develop web services
for the 12 services implemented by NIC of the 26 services. All the services shall be accessed
through SSDG.
However the system integrator has to develop the web services to interface the e-Services
provided through DC suite deployed by NIC
4.3 Key Information
The objectives of the eDistrict Mission Mode Project are to ensure the following:
I. Providing easy, anywhere and anytime access to government services (both
information & transactional) to ensure reliability, efficiency, transparency and
accountability.
II. Delivery of all public services at district/ sub district level in electronic form
through state portals through SSDG.
III. Reducing number of visits of citizens to a government office / department for
availing the services and thereby eliminating harassment.
IV. Reducing administrative burden and service fulfillment time and costs for the
government, citizens & businesses.
V. Reducing direct interaction of citizen with the government and encourage „e‟-
interaction and efficient communication through portal.
VI. Enhancing perception & image of the Government and its constituent Departments.
VII. Undertake backend computerization of District and Taluka level offices to ensure
electronic delivery of high volume citizen centric services at the district level.
VIII. Efficient delivery of services with improved service levels by undertaking extensive
Business Process Re-engineering (BPR) of identified services.
IX. Delivery of services through Extended Service Outlets (ESO/CSC) and Citizen
Facilitation Centers (CFC) by leveraging the common infrastructure of GBBN, SDC,
and SSDG.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 17 | P a g e
X. Development of applications to be hosted at SDC for delivery of services.
XI. Extensive capacity building and training of field level functionaries to ensure
smooth migration to electronic delivery of eDistrict services and phasing out
manual delivery of services.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 18 | P a g e
The key stakeholders of the project are illustrated below:
4.4 About Info Tech Corporation of Goa (ITG)
Info Tech Corporation of Goa Limited (ITG) formerly known as the Electronics Corporation of
Goa Ltd. (ECGL) has been set up by the Government of Goa to promote overall growth of the
state's economy through the use of Information Technology. ITG is state designated agency for
the eDistrict MMP and in the administrative control of Dept. of Information technology
Objectives
Creation of IT Infrastructure for promotion of IT Industry in the state of Goa by establishing, IT / Cyber Cities, Parks, Townships, including infrastructure and communication faculties such as development of Land, Plots, Construction of Roads, Water supply facility, Electricity supply, Drainage, Telephone etc.
To support and assist the Government in development of e-Governance applications required to be developed to serve citizens and business.
To undertake software development projects selected by the Government.
To undertake the activities of providing required hardware to various Government departments as directed by the Government.
To undertake the activities of local area network and UPS connectivity required to connect IT hardware and UPS etc. in various Government departments as directed by the Government.
Help and promote IT and IT Enabled Service Industries in the state of Goa. Key Functions
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 19 | P a g e
As a State agency monitoring the project, role of ITG in the successful implementation of the
proposed system includes discharging the following responsibilities:
To identify and nominate the District e-Governance teams/societies (IT/ revenue
department) at the District level and ensuring complete involvement of the project
champion from start to finish of the project
To ensure that all the participating districts take active part in project
To identify key points of contacts who would be able to dedicate quality time with the
Implementation Partner throughout the roll out
To review the installation, commissioning and maintenance activities
To conduct review meetings at regular intervals to monitor the overall progress of the
project
Workforce and Location
ITG Resources serves the state of Goa and is located at 4th Floor, Alcon Construction, Above
Alcon Hyundai Showroom, Porvorim, Bardez, Goa-403501.
Organization structure
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 20 | P a g e
5 Instructions to the Bidders
5.1 General
I. While every effort has been made to provide comprehensive and accurate background
information and requirements and specifications, bidders must form their own
conclusions about the solution needed to meet the requirements. Bidders and recipients
of this RFP may wish to consult their own legal advisers in relation to this RFP.
All information supplied by Bidders may be treated as contractually binding on the
Bidders, on successful award of the assignment by the ITG on the basis of this RFP.
II. No commitment of any kind, contractual or otherwise shall exist unless and until a
formal written contract has been executed by or on behalf of the ITG. Any notification of
preferred bidder status by the ITG shall not give rise to any enforceable rights by the
bidder. The ITG may cancel this public procurement at any time prior to a formal
written contract being executed by or on behalf of the ITG.
III. This RFP supersedes and replaces any previous public documentation &
communications, and Bidders should place no reliance on such communications.
IV. SDA shall constitute technical evaluation committee to evaluate progress of the work
and for the recommendation of the payment to the bidder
5.2 Compliant Proposals / Completeness of Response
I. Bidders are advised to study all instructions, forms, terms, requirements and other
information in the RFP documents carefully. Submission of the bid shall be deemed to
have been done after careful study and examination of the RFP document with full
understanding of its implications.
II. Failure to comply with the requirements of this paragraph may render the Proposal non-
compliant and the Proposal may be rejected. Bidders must:
A. Include all documentation specified in this RFP;
B. Follow the format of this RFP and respond to each element in the order as set out
in this RFP
C. Comply with all requirements as set out within this RFP.
5.3 Pre-Bid Meeting & Clarifications
5.3.1 Pre-bid Conference
I. ITG shall hold a pre-bid meeting with the prospective bidders on 16-01-2014 at 3:00 PM
at conference hall of Dept. of Information Technology. 2nd floor, Above Alcon Hyundai
Showroom, Porvorim, Bardez, Goa - 403501
II. The bidders should ensure that their queries for Pre-Bid queries should be sent by e-mail
on or before the due date & time as said in this RFP in word format only.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 21 | P a g e
III. ITG shall not be responsible for ensuring that the bidders‟ queries have been received by
them. Any requests for clarifications after the indicated date and time may not be
entertained by the ITG.
IV. The queries should necessarily be submitted in the following format (in word 2010
format only ):
Name of the bidder:
Address:
Name of the contact person:
Contact No:
e-mail Id:
5.3.2 Responses to Pre-Bid Queries and Issue of Corrigendum
I. The Nodal Officer notified by the ITG will endeavor to provide timely response to all
queries. However, ITG makes no representation or warranty as to the completeness or
accuracy of any response; neither response nor does ITG undertake to answer all the
queries that have been posed by the bidders. The responses to the queries from all
bidders will be distributed to all.
II. At any time prior to the last date for receipt of bids, ITG may, for any reason, whether at
its own initiative or in response to a clarification requested by a prospective Bidder,
modify the RFP Document by a corrigendum.
III. The corrigendum (if any) will be posted at www.etender.goa.gov.in or
www.tenderwizard.com/GOA & clarifications shall be emailed to respective bidders
IV. Any such corrigendum shall be deemed to be incorporated into this RFP.
V. In order to provide prospective bidders reasonable time for taking the corrigendum into
account, ITG may, at its discretion, extend the last date for the receipt of Proposals.
S.
No.
Vol. No. RFP Document
Reference(s) (Section &
Page Number(s))
Content of RFP requiring
Clarification(s)
Points of
clarification
1.
2.
3.
4.
5.
6.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 22 | P a g e
5.4 Key Requirements of the Bid
5.4.1 Right to Terminate the Process
I. ITG may terminate the RFP process at any time and without assigning any reason. ITG
makes no commitments, express or implied, that this process will result in a business
transaction with anyone.
II. This RFP does not constitute an offer by ITG. The bidder's participation in this process
may result ITG selecting the bidder to engage towards execution of the contract.
5.4.2 RFP Document Fees
a) RFP document can be downloaded from www.etender.goa.gov.in or
www.tenderwizard.com/GOA
In such case, the demand draft of RFP document fees and tender processing fees should be
submitted along with proposal in a technical bid. Proposals received without or with
inadequate RFP Document fees and tender processing fees shall be rejected.
Earnest Money Deposit (EMD)
a) Bidders shall submit, along with their Bids, EMD of Rs 25 lakhs only, in the form of a
Demand Draft OR Bank Guarantee (in the format specified in Form 3) issued by any
scheduled bank/ nationalized bank in favor of Info Tech Corporation of Goa Limited
payable at Panaji, Goa and should be valid for 6 months from the date of issue of the
RFP.
b) EMD of all unsuccessful bidders would be refunded by ITG within 120 days on
finalization of the System Integrator. The EMD, for the amount mentioned above, of
successful bidder would be returned upon submission of Performance Bank Guarantee.
c) The EMD amount is interest free and will be refundable to the unsuccessful bidders
without any accrued interest on it.
d) The bid / proposal submitted without EMD, mentioned above, will be summarily
rejected.
e) The EMD may be forfeited:
A. If a bidder withdraws its bid during the period of bid validity.
B. In case of a successful bidder, if the bidder fails to sign the contract in accordance
with this RFP.
5.4.3 Submission of Proposals
a) The bidders should submit their responses as per the format given in this RFP in the
following manner
A. Pre-Qualification Proposal - ( Original + CD) in first envelope
B. Technical Proposal - (Original + CD) in second envelope
C. Commercial Proposal through online mode only
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 23 | P a g e
b) The response to Pre-Qualification Proposal, Technical Proposal (as mentioned above)
should be covered in separate sealed envelopes super-scribing, ”Pre-Qualification
Proposal” and “Technical Proposal” respectively. Each copy of each bid should also be
marked as "Original”.
c) Please note that prices should not be indicated in the Technical Proposal but should only
be indicated in the Commercial Proposal.
d) The two envelopes containing copies of Pre-Qualification Proposal and Technical
Proposal should be put in another single larger sealed envelope clearly marked
“Response to RFP for e-District Goa < RFP Reference Number> and the wordings NOT
OPEN BEFORE <Date and Time>”.
e) The outer envelope thus prepared should also indicate clearly the name, address,
telephone number, E-mail ID and fax number of the bidder to enable the bid to be
returned unopened in case it is declared "Late".
f) All the pages of the proposal must be sequentially numbered & signed by the authorized
person and must contain the list of contents with page numbers. Any deficiency in the
documentation may result in the rejection of the bid.
g) The original proposal/bid shall be prepared in indelible ink. It shall contain no
interlineations or overwriting, except as necessary to correct errors made by the bidder
itself. Any such corrections must be initialed by the person (or persons) who sign(s) the
proposals.
h) All pages of the bid shall be initialed and stamped by the person or persons who is
authorized to sign the bid.
i) In case of any discrepancy observed by ITG in the contents of the submitted original
paper bid documents with respective copies, the information furnished on original
paper bid document will prevail over others.
j) Bidder must ensure that the information furnished by bidders in respective CDs is
identical to that submitted in the original paper bid document. In case of any
discrepancy observed by ITG in the contents of the CDs and original paper bid
documents, the information furnished on original paper bid document will prevail over
the soft copy. CD should be submitted in technical bid envelop .
5.4.4 Authentication of Bids
The Proposal should be accompanied by a power-of-attorney in the name of the signatory of the
Proposal.
5.5 Preparation and Submission of Proposal
5.5.1 Proposal Preparation Costs
a) The bidder shall be responsible for all costs incurred in connection with participation in
the RFP process, including, but not limited to, costs incurred in conduct of informative
and other diligence activities, participation in meetings/discussions/presentations,
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 24 | P a g e
preparation of proposal, in providing any additional information required by ITG to
facilitate the evaluation process, and in negotiating a definitive contract or all such
activities related to the bid process.
b) ITG will in no case be responsible or liable for those costs, regardless of the conduct or
outcome of the bidding process.
5.5.2 Language
a) The Proposal should be filled by the bidder in English language only. If any supporting
documents submitted are in any language other than English, translation of the same in
English language is to be duly attested by the Bidders. For purposes of interpretation of
the proposal, the English translation shall govern.
5.5.3 Venue & Deadline for Submission of Proposals
a) Proposals, in its complete form in all respects as specified in the RFP, must be submitted
to Managing Director, Info Tech Corporation of Goa Limited, 4th floor, Above Alcon
Hyundai Showroom, Porvorim, Bardez, Goa.
5.5.4 Late Bids
a) Bids received after the due date and the specified time (including the extended period if
any) for any reason whatsoever, shall not be entertained and shall be returned
unopened.
b) The bids submitted by telex/telegram/fax/e-mail etc. shall not be considered. No
correspondence will be entertained on this matter.
c) ITG shall not be responsible for any postal delay or non-receipt/ non-delivery of the
documents. No further correspondence on the subject will be entertained.
d) ITG reserves the right to modify and amend any of the above-stipulated
condition/criterion depending upon project priorities vis-à-vis urgent commitments.
5.6 Evaluation Process
a) ITG will constitute a Technical Evaluation Committee to evaluate the responses of the
bidders
b) The Technical Evaluation Committee constituted by the ITG shall evaluate the
responses to the RFP and all supporting documents / documentary evidence. Inability
to submit requisite supporting documents / documentary evidence, may lead to
rejection of the bidder.
c) The decision of the Technical Evaluation Committee in the evaluation of responses to
the RFP shall be final. No correspondence will be entertained outside the process of
negotiation/ discussion with the Committee.
d) The Technical Evaluation Committee may invite for meetings with the bidders to seek
clarifications on their proposals
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 25 | P a g e
e) The Technical Evaluation Committee reserves the right to reject any or all proposals on
the basis of any deviations.
f) Each of the responses shall be evaluated as per the criterions and requirements specified
in this RFP.
5.6.1 Tender Opening
I. The proposals submitted by the bidder shall be opened in the presence of the
representative of the bidder who may be present at the time of the opening of the bid
II. The representatives of the bidders should be advised to carry the identity card or a letter
of authority from the tendering firms to identify their bonafides for attending the
opening of the proposal.
5.6.2 Tender Validity
The offer submitted by the bidders should be valid for minimum period of 180 days from the
date of submission of tender.
5.6.3 Tender Evaluation
I. Initial bid scrutiny will be held and incomplete details as given below will be treated as
non-responsive, if proposals :
1. Are not submitted in as specified in the RFP document
2. Received without the Letter of Authorization (Power of Attorney)
3. Are found with suppression of details
4. With incomplete information, subjective, conditional offers and partial offers
submitted
5. Submitted without the documents requested in the checklist
6. Have non-compliance of any of the clauses stipulated in the RFP
7. With lesser validity period
II. All responsive bids will be considered for further processing as below.
1. ITG will prepare a list of responsive bidders, who comply with all the Terms and
Conditions of the RFP. All eligible bids will be considered for further evaluation by a
Committee according to the evaluation process defines in this RFP document. The
decision of the Committee will be final in this regard.
6 Criteria for Evaluation
I. The overall objective of this evaluation process is to select a capable and qualified firm in
the business domain of developing and rolling out a Portal, e-District Application,
related hardware and other infrastructure, providing associated capacity building,
training & handholding support as well as associated managed services and who will
provide a comprehensive solution towards Supply, Installation, Integration,
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 26 | P a g e
Commissioning, Development, Deployment, Operation & Management of e-District
Application and hardware provisioning in the Goa state.
II. First the Pre-Qualification Proposal will be evaluated and only those bidders who
qualify the requirements will be eligible for next set of evaluations. Technical Proposal
of bidders who does not meet the Pre-Qualification criteria will be returned without
opening.
III. ITG shall call the pre-qualified bidders for technical presentation.
IV. The technical score of all the bidders would be calculated as per the criteria mentioned
below. All the bidders who achieve at least 70 marks in the technical evaluation would
be eligible for the next stage, i.e. Financial bid opening.
V. Proposals of Companies would be evaluated as per Technical Evaluation Criteria.
Agencies / firms should clearly indicate, giving explicit supporting documentary
evidence, with respect to the above, in absence of which their proposals will be rejected
summarily at the qualification stage itself.
VI. ITG shall negotiate with L1 bidder if required
VII. L1 shall be considered for the award of contract.
6.1 Pre-Qualification Criteria
Sr.
No
Qualification Criteria Documents/Information to be provided
in the submitted proposal
1. The responding firm / agency
(a) Should have made a payment of Tender
document fees of Rs. 8000.00 (eight
thousand only) In the form of demand draft
from nationalized/ scheduled banks in
favour of Info Tech Corporation of Goa Ltd.
Payable at Panaji , Goa
Tender processing fees of Rs. 2000.00 (two
thousand only) In the form of demand draft
from nationalized/ scheduled banks in
favour of Info Tech Corporation of Goa Ltd.
Payable at Panaji , Goa for the RFP document
(b) Should have submitted a EMD of Rs.
25,00,000.00 (Twenty five lakhs only)
a. (DD or bank guarantee for Rs.
25,00,000.0 ( Twenty five lakhs
only)
b. (DD for Rs. 8,000.00 ( eight
thousand lacks only)
c. (DD for Rs. 2,000.00 ( Two thousand
only)
d. The original bank guarantee must
be furnished in the format
prescribed
2. Legal Entity
Company should be registered under
Companies Act, 1956
Should have been operating for the last
five years
Certificate of Incorporation
Registration Certificate
Article of association or
Memorandum & Articles of Association
and the any other document indicating
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 27 | P a g e
Sr.
No
Qualification Criteria Documents/Information to be provided
in the submitted proposal
that the company is in operation for the
last 5 years as on date of issue of this
RFP
3. The Firm / Company should be in the
business as System Integrator for at least 3
years as of as on date of issue of this RFP
Work orders confirming year and Area
of activity should be attached
4. The bidder must have a positive net worth as
on 31st March 2013
Certificate by Chartered accountant or
Certificate from the statutory auditor of
the bidder
5. Bidder must be an Information Technology
company
Article of association & its registration
details
6. The responding firm shall not be under a
declaration of ineligibility for corrupt or
fraudulent practices.
A self-certified letter by the designated
official of the responding firm
7. The responding firm should be minimum
CMMi Level 3.
Relevant certificate needs to be attached
which is valid on date of submission.
8. Average Annual Sales Turnover generated
from services related to System Integration
(SI) during the last three (3) financial years
(FY 12-13, FY 11-12 and FY 10-11) as per the
last published balance sheets should be
minimum of Rs. 50 Crore or more
Extracts from the audited Balance sheet
and Profit & Loss; OR
Certificate from the statutory auditor.
9. Company experience in implementation of
integrated turnkey projects around
application development as a System
Integrator in India.
One Project worth 7.5 Crore
OR
Two Project of 5 Crore each.
OR
Three project of 4 Crore each.
(Specifically each project should have
Work order/ agreement and Project
completion certificates from client to be
enclosed
Other details of the project experience
may be provided as per Form 6.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 28 | P a g e
Sr.
No
Qualification Criteria Documents/Information to be provided
in the submitted proposal
components of Hardware, Networking,
Software development, Helpdesk and
Application related training necessarily for
this project).
Number of such Assignments of value (as
specified for tiers) which have gone live in
the past 5 years (FY 12-13, FY 11-12, FY 10-11,
FY 09-10, and FY 08-09)
10. The responding firm must have a minimum
number of 50 technically qualified IT
professionals as on 31st Aug 2013 on its own
pay roll.
Certificate from HR Department for
number of technically qualified
professionals employed by the company
to be furnished.
11. The bidder must have company registration
certificate, Valid sales tax/ VAT registration
certificate, valid service tax registration
certificate and PAN card.
Copies of the certificates to be attached
12. The bidder should submit undertaking
stating that the bidder is not black listed by
central Govt./any state or UT
Gov./PSU/Organized sector and there
should not be any black listing pending case
against the bidder
Undertaking by the bidder
13. Bidder needs to have an office in Goa or
provide a undertaking to open an office in
Goa within 30 days of receiving of letter of
intent
Supporting Documents/ Undertaking
by the bidder
14. OEM for Hardware
a. In the last five financial years, the OEM must have supplied similar kind of enterprise level products in at least two projects of similar nature in Government / PSU in India
b. The OEM of offered products must have their own Technical Assistance Center (TAC) support in India
a. Relevant documentary evidences like PO Copy etc.
b. Relevant documentary evidence c. Relevant documentary evidence d. Audited financial statements or
auditors certification e. Relevant documentary evidence
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 29 | P a g e
Sr.
No
Qualification Criteria Documents/Information to be provided
in the submitted proposal
c. The OEM (s) should be an established industry player in offered technology product and should form a part of the Industry standard leader /challenger‟s quadrant on the likes of Gartner, Forrester, and IDC etc.
d. The OEM of offered products should have a turnover of at least Rs. 100 Crores from the sale of its own manufactured ICT products in India, in each of the last three financial years.
e. The OEM of offered products should have the ISO 9001:2000, ISO 14001 and ISO 17001 certification
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 30 | P a g e
6.2 Technical Qualification Criteria
I. Technical proposal of the bidders will be opened and evaluated who meets all the prequalification criteria.
II. The evaluation committee will evaluate the Technical Proposals on the basis of the technical evaluation criterion as provided
below.
III. Value of each project is in Indian Rupees.
S. No Criteria Max Criteria/ Sub Criteria Marks
1 Past Experience of the bidder 30
2 Solution proposed for the e-District Project by the bidder 40
3 Work Plan approach and proposed methodology 10
4 Adequacy and Quality of Resources proposed for Deployment 20
Total Points 100
Sr.
No.
Criteria/Sub
Criteria
Description Point System Max Criteria/
Sub Criteria
Points
Supporting
Documents
1 Past Experience of the bidder 30
a. System
Integration
projects
At least two projects with client
references for implementation of
an integrated turnkey project
around a) network solution and
b) software development c)
Hardware commissioning and
d) O&M phase for maintaining
For each project the marks
would be based on the
following :
>INR 7.5 Crore = 10 points;
>INR 6 Crore but less than
10
Enclosed
corresponding
work orders,
Agreements &
completion
Certifications
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 31 | P a g e
Sr.
No.
Criteria/Sub
Criteria
Description Point System Max Criteria/
Sub Criteria
Points
Supporting
Documents
all of the above.
INR 7.5 Crore=7 points;
>INR 5 Crore but less than
INR 6 Crore=5 points;
>INR 4 Crore but less than
INR 5 Crore=3 points,
Else 0
b. Software
Solutions
At least two projects completed
/ ongoing software development
projects each having a minimum
value of INR 1.50 Crore – for
software development
component only). The project
should have some or all of the
following components :
– Portal
– Web based Application
Server
– Electronic Forms
5 Projects – 10 points;
4 Projects - 8 points;
3 Projects - 5 points;
Else 0.
10 Enclosed
corresponding
work orders,
Agreements &
completion
Certifications, or
certificate from
client indicating
the on going
project details
c. Maintenance
Services and
Helpdesk in any
State/UT
Providing Maintenance Services
/ Helpdesk services in the field
of IT services with a minimum
order size of INR 2 Crore in the
State for any of the project
In case of any one project
done for the following
locations :
a) covers <provide nos.
which covers more than 80%
of the districts in any
State/UT> districts – 5
5 Supporting documentary evidence to be
provided by the
bidder
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 32 | P a g e
Sr.
No.
Criteria/Sub
Criteria
Description Point System Max Criteria/
Sub Criteria
Points
Supporting
Documents
points
b) covers <provide nos.
which are more than 50% of
the districts in any
State/UT> districts – 3
points
c) covers <provide nos.
which covers are more than
25% of the districts in any
State/UT> districts – 1
points
else; 0
d. Other Projects
SI Projects involving in at least 6
different locations with a value
of more than INR 2 Crore per
project
> =3 Projects – 5 points;
2 projects - 3 point
1 Project - 1 points;
else 0
However if any one of the
projects undertaken has a
value more than INR 20
Crore – 5 points
5 Enclosed
corresponding
work orders,
Agreements &
completion
Certifications
along with the
details of the
locations where
the project is
executed
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 33 | P a g e
Sr.
No.
Criteria/Sub
Criteria
Description Point System Max Criteria/
Sub Criteria
Points
Supporting
Documents
Note : For all the above, kindly provide work orders / agreements and the Completion Certificate of the projects completed from the client indicating also the value of the project
2 Solution proposed 40
a. Proposed
solution
Requirements addressed as
mentioned in different parts of
the RFP and the quality of the
solution
Evaluation Committee will
evaluate whether all the
points/ requirements
mentioned in the RFQ are
addressed well and award
points accordingly, the
important parameters
being:-
– Solution architecture
conceptualized for this
project. This should
include integration of e-
District application with
legacy application (NIC
etc.), Also integration with
the SSDG framework. – 2
points
– Security architecture- 1
points
– Detailed plan for using
GBBN as connectivity - 1
10 To be
provided
by the
bidder in
Form 7
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 34 | P a g e
Sr.
No.
Criteria/Sub
Criteria
Description Point System Max Criteria/
Sub Criteria
Points
Supporting
Documents
points
– Application deployment
and testing Strategy -2
points
– Quality Control
Procedures suggested by
responding firm - 2 points
– Comprehensiveness of Bill
of material of all the
components (e.g. software,
hardware, etc.) along with
their quantities – 2 points
b. Proposed
Approach and
methodology
Evaluation Committee will
evaluate whether the
implementation methodology is
in line with the requirement. The
important parameters being:-
- Plan for meeting the SLA
norms.
- Redundancy and failover
options.
- Spare equipment availability
plans
In this section, the
responding firm should:
– Explain the understanding
of the project
requirements, highlight the
expected support from the
State, approach to the
services, SLA management
methodology,
methodology for carrying
out the activities for
expected output - 2 points
– Highlight the associated
risks / problems and plans
10 To be
provided
by the
bidder
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 35 | P a g e
Sr.
No.
Criteria/Sub
Criteria
Description Point System Max Criteria/
Sub Criteria
Points
Supporting
Documents
for mitigation and explain
the technical approach it
would adopt to address
them – 2 points
– Explain the plan to create
BPR for creating SRS for
the services under e-
District(FRS has already
been created) -3 points
– Explain the methodologies
the responding firm
proposes to adopt and
highlight the compatibility
of those methodologies
with the proposed
approach - 1 points
– Planning and Building
Infrastructure (assessment,
design, integration /
migration of existing
Portal infrastructure) – 2
points
c Training Proposed Training and Change
Management plan description to
be looked into
The Evaluation will be
based on:
– Proposed Training
Schedule – 1 point
10 To be
provided
by the
bidder as
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 36 | P a g e
Sr.
No.
Criteria/Sub
Criteria
Description Point System Max Criteria/
Sub Criteria
Points
Supporting
Documents
– Plan to develop Training
Manuals – 1 point
– Areas/domains covered –
1 point
– Number & Quality of
personnel to be deployed
for training at the site of
Implementation of the
Project.- 2 points
– Certificate from client that
bidder has trained more
than 100 employees-5
points
the part
of the
proposal
d Formation/Locati
on of Helpdesk
& other
manpower
support
Proposed methodology of
formation of the manpower
support team.
Operating and Maintaining
Infrastructure
The Evaluation will be
based on
– Proposed Staff details
– Areas/domains covered
10 As a part of the
proposal
3 Proposed Approach & Methodology 10
a. Project
Management
The overall approach to be
looked into
The overall project
management approach
adopted by the responding
firm to implement the
project to meet the timelines.
5 To be provided
by the bidder
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 37 | P a g e
Sr.
No.
Criteria/Sub
Criteria
Description Point System Max Criteria/
Sub Criteria
Points
Supporting
Documents
b. Detailed Work
Plan
The description and quality of
the work plan to be looked into.
Evaluation will be based on
the detailed Project Plan
including day wise, week
wise activities with Work
Breakdown Structures,
Project estimates, milestones
etc.
5 To be provided
by the bidder in
Form 8
4 Resource Deployment 20
A Quality of CV
for the full time
Project Manager
proposed for the
project
Minimum of 5 CVs who would
be working full time on project
along with deployment plan
Qualification/relevant
certification of the People
Involved
10 To be provided
by the bidder in
Form 10 & Form
11
B Quality of CV for
the Technical
Managers
proposed at
District level
Maximum of 10 illustrative CVs
who would be working at
District level as Technical
eDistrict manager along with
deployment plan
Education Qualification/
relevant certification of the
people involved
10 To be provided
by the bidder in
Forms 10 &
Form 11
Total Points 100
Bidder is expected to provide details of the project cited as per form six
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 38 | P a g e
6.3 Commercial Bid Evaluation
I. The Financial bids of technically qualified bidders (i.e. 70 and above marks) will be opened
on the prescribed date in the presence of bidder representatives if any.
II. The bid price will include all taxes and levies and shall be in Indian Rupees and mentioned
separately as indicated in the financial bid.
III. Any conditional bid would be rejected without assigning any reasons.
IV. Errors & Rectification: Arithmetical errors will be rectified on the following basis: “If there
is a discrepancy between the unit price and the total price that is obtained by multiplying
the unit price and quantity, the unit price shall prevail and the total price shall be
corrected. If there is a discrepancy between words and figures, the amount in words will
prevail”.
V. If there is no price quoted for certain material or service, the bid shall be declared as
disqualified.
VI. In the event that there are 2 or more bidders having the same value in the financial bid, the
bidder securing the highest technical score will be adjudicated as the “Best responsive bid”
for award of the Project.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 39 | P a g e
7 Appointment of System Integrator
7.1 Award Criteria
ITG will award the Contract to the successful bidder whose financial proposal is the lowest (L1) and
would consider it as substantially responsive as per the process outlined above.
7.2 Right to Accept Any Proposal and To Reject Any or All Proposal(s)
ITG reserves the right to accept or reject any proposal, and to annul the tendering process / Public
procurement process and reject all proposals at any time prior to award of contract, without thereby
incurring any liability to the affected bidder or bidders or any obligation to inform the affected bidder
or bidders of the grounds for ITG action.
7.3 Notification of Award
I. Prior to the expiration of the validity period, ITG will notify the successful bidder in writing or
by fax or email, that its proposal has been accepted. In case the tendering process / public
procurement process has not been completed within the stipulated period, ITG may like to
request the bidders to extend the validity period of the bid.
II. The notification of award will constitute the formation of the contract. Upon the successful
bidder's furnishing of Performance Bank Guarantee, ITG will notify each unsuccessful bidder
and return their EMD.
7.4 Contract Finalization and Award
I. The ITG shall reserve the right to negotiate with the L1 bidder whose proposal has been most
responsive. On this basis the draft contract agreement would be finalized for award & signing.
II. ITG may reduce or increase the quantity of any item in the Scope of Work defined in the RFP.
Accordingly total contract value may change on the basis of the rates defined in the financial
proposal.
7.5 Performance Guarantee
I. The selected bidder shall provide a Performance Bank Guarantee, within 15 days from the
Notification of award, for a value equivalent to 10% of the total cost of the project to ITG. The
Performance Guarantee shall be kept valid till completion of the project and Warranty period.
The Performance Guarantee shall contain a claim period of three months from the last date of
validity. The selected bidder shall be responsible for extending the validity date and claim
period of the Performance Guarantee as and when it is due on account of non-completion of
the project and Warranty period. In case the selected bidder fails to submit performance
guarantee within the time stipulated, the ITG at its discretion may cancel the order placed on
the selected bidder without giving any notice. ITG shall invoke the performance guarantee in
case the selected bidder fails to discharge their contractual obligations during the period or
ITG incurs any loss due to bidder‟s negligence in carrying out the project implementation as
per the agreed terms & conditions.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 40 | P a g e
7.6 Signing of Contract
I. After the ITG notifies the successful bidder that its proposal has been accepted, ITG shall enter
into a contract, incorporating all clauses, pre-bid clarifications and the proposal of the bidder
etc. between ITG and the successful bidder. The Draft Legal Agreement is provided as a
separate document as a template.
7.7 Failure to Agree with the Terms and Conditions of the RFP
I. Failure of the successful bidder to agree with the Draft Legal Agreement and Terms &
Conditions of the RFP shall constitute sufficient grounds for the annulment of the award, in
which event ITG may award the contract to the next best value bidder or call for new
proposals from the interested bidders.
II. In such a case, the ITG shall forfeit the EMD of the most responsive bidder.
8 Project Plan
Refer to RFP Volume III
Definition of Go-Live
Refer to Volume III
9 Payment Schedule
Refer to Volume III
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 41 | P a g e
10 Annexure
Annexure I: TECHNICAL BID TEMPLATES
The bidders are expected to respond to the RFP using the forms given in this section and all
documents supporting Technical Evaluation Criteria.
Technical Proposal shall comprise of following forms:
Forms to be used in Technical Proposal
Form 1: Undertaking on Total Responsibility
Form 2: Particulars of the Bidder
Form 3: Bank Guarantee for Earnest Money Deposit
Form 4: Compliance Sheet for Technical Proposal
Form 5: Letter of Proposal
Form 6: Project Citation Format
Form 7: Proposed Solution
Form 8: Proposed Work Plan
Form 9: Team Composition
Form 10: Curriculum Vitae (CV) of Key Personnel
Form 11: Deployment of Personnel
Form 12: Manufacturers Authorisation Form
Form 13: Declaration on Source Code and Intellectual Property Rights
Form 14: Undertaking on Patent Rights
Form 15: Undertaking on Compliance and Sizing of Infrastructure
Form 16: Undertaking on Service Level Compliance
Form 17: Undertaking on Deliverables
Form 18: Undertaking on Support to Third Party Solution acceptance and certification
Form 19: Declaration of Activities sub-contracted
Form 20: Undertaking on Exit Management and Transition
Form 21: Declaration that the bidder has not been blacklisted
Form 22: Particulars of the Bid Cover Letter
Form 23: Undertaking on Conflict of Interest
Form 24: Non-Malicious Code Certificate
Form 25: Undertaking on Clarifications sent to ITG
Form 26: Undertaking on Training the Users
Form 27: Undertaking on Support to Certification
Form 28: Undertaking on Changes to the contract clauses
Form 29: Self-declaration
All the above and undertakings has to be uploaded on e-tendering portal along with technical & commercial bid.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 42 | P a g e
Form 1: Undertaking on Total Responsibility
Ref. No. Date:
To:
Dear Sir,
Sub: Self certificate regarding Total Responsibility
This is to certify that we undertake total responsibility for the successful and defect free operation of
the proposed Project solution, as per the requirements of this RFP for e-District Project.
Thanking you,
Yours faithfully
(Signature of the Authorized signatory of the Bidding Organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 43 | P a g e
Form 2: Particulars of the Bidder
S.No. Information Sought Details to be Furnished
1. Name and address of the
bidding Company
2. Incorporation status of the firm
(public limited / private
limited, etc.)
3. Year of Establishment
4. Date of registration
5. Registration certificate
reference No.
6. Details of company registration
7. Details of registration with
appropriate authorities for
service tax
8. Name, Address, email, Phone
nos. and Mobile Number of
Contact Person
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 44 | P a g e
Form 3: Bank Guarantee for Earnest Money Deposit
To,
<Name>
<Designation>
<Address>
<Phone Nos.>
<Fax Nos.>
<Email id>
Whereas <Name of the bidder> (hereinafter called 'the Bidder') has submitted the bid for Submission
of RFP # <RFP Number> dated <Date> for <Name of the assignment> (hereinafter called "the Bid") to
ITG
Know all Men by these presents that we < > having our office at <Address> (hereinafter called "the
Bank") are bound unto the ITG (hereinafter called "the Purchaser") in the sum of Rs. <Amount in
figures> (Rupees <Amount in words> only) for which payment well and truly to be made to the said
Purchaser, the Bank binds itself, its successors and assigns by these presents. Sealed with the Common
Seal of the said Bank this <Date>
The conditions of this obligation are:
1. If the Bidder having its bid withdrawn during the period of bid validity specified by the Bidder on
the Bid Form; or
2. If the Bidder, having been notified of the acceptance of its bid by the Purchaser during the period
of validity of bid
(a) Withdraws his participation from the bid during the period of validity of bid document; or
(b) Fails or refuses to participate in the subsequent Tender process after having been short
listed;
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written
demand, without the Purchaser having to substantiate its demand, provided that in its demand the
Purchaser will note that the amount claimed by it is due to it owing to the occurrence of one or both of
the two conditions, specifying the occurred condition or conditions.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 45 | P a g e
This guarantee will remain in force up to <insert date> and including <extra time over and above
mandated in the RFP> from the last date of submission and any demand in respect thereof should
reach the Bank not later than the above date.
NOTHWITHSTANDING ANYTHING CONTAINED HEREIN:
I. Our liability under this Bank Guarantee shall not exceed Rs. <Amount in figures> (Rupees
<Amount in words> only)
II. This Bank Guarantee shall be valid up to <insert date>)
III. It is condition of our liability for payment of the guaranteed amount or any part thereof arising
under this Bank Guarantee that we receive a valid written claim or demand for payment under
this Bank Guarantee on or before <insert date>) failing which our liability under the guarantee
will automatically cease.
(Authorized Signatory of the Bank)
Seal:
Date:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 46 | P a g e
Form 4A: Compliance Sheet for Pre-Qualification Proposal
Sr.
No
Qualification Criteria Documents/Information to
be provided in the
submitted proposal
Compliance Reference & Page
Number
1. The responding firm /
agency
(a) Should have made a
payment of Tender document
fees of Rs. 8000.00 (eight
thousand only) In the form
of demand draft from
nationalized/ scheduled
banks in favour of Info Tech
Corporation of Goa Ltd.
Payable at Panaji , Goa
Tender processing fees of Rs.
2000.00 (two thousand only)
In the form of demand draft
from nationalized/
scheduled banks in favour of
Info Tech Corporation of Goa
Ltd. Payable at Panaji , Goa
for the RFP document
(b) Should have submitted a
EMD of Rs. 25,00,000.00
(Twenty five lakhs only)
e. (DD or bank guarantee
for Rs. 25,00,000.0 (
Twenty five lakhs only)
f. (DD for Rs. 8,000.00 (
eight thousand lacks
only)
g. (DD for Rs. 2,000.00 (
Two thousand only)
h. The original bank
guarantee must be
furnished in the format
prescribed
Yes/No
2. Legal Entity
- Company should be
registered under Companies
Act, 1956
- Registered with the Service
Tax Authorities
- Should have been operating
for the last five years
Certificate of Incorporation
Registration Certificate
Yes/No
3. The Firm / Company should
be in the business as System
Integrator for at least 3 years
as of 31st Aug 2013
Details of Responding Firm
&
Memorandum & Articles of
Association should be
attached, and Work orders
Yes/No
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 47 | P a g e
Sr.
No
Qualification Criteria Documents/Information to
be provided in the
submitted proposal
Compliance Reference & Page
Number
confirming year and Area of
activity must be furnished
4. The responding firm shall not
be under a declaration of
ineligibility for corrupt or
fraudulent practices.
A self-certified letter by the
designated official of the
responding firm
Yes/No
5. The Net Worth of the
responding firm must be
positive as per the last
audited Balance Sheet.
Chartered Accountant
Certificate for Net worth
Yes/No
6. The responding firm should
be minimum CMMi Level 3.
Relevant certificate needs to
be attached which is valid on
date of submission.
Yes/No
7. Average Annual Sales
Turnover generated from
services related to System
Integration (SI) during the
last three (3) financial years
(FY 12-13, FY 11-12 and FY
10-11) as per the last
published balance sheets
Extracts from the audited
Balance sheet and Profit &
Loss; OR
Certificate from the statutory
auditor.
Yes/No
8. Company experience in
implementation of integrated
turnkey projects around
application development as a
System Integrator in India.
(Specifically each project
should have components of
Hardware, Networking,
Helpdesk and Application
related training necessarily
for this project). Refer to the
Important Note below for
more details.
Number of such Assignments
of value (as specified for
tiers) which have gone live in
the past 5 years (FY 12-13, FY
Details of Experience of
responding firm/Project
Citation for 2 projects
supported with Work order
Yes/No
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 48 | P a g e
Sr.
No
Qualification Criteria Documents/Information to
be provided in the
submitted proposal
Compliance Reference & Page
Number
11-12, FY 10-11, FY 09-10, and
FY 08-09)
9. The responding firm must
have a minimum number of
IT Staff of technically
qualified personnel in the
domain of systems
integration, as on 31st Aug,
2013 on its roll.
Certificate from HR
Department for number of
technically qualified
professionals employed by
the company
Yes/No
10. The bidder must have
company registration
certificate, Valid sales tax/
VAT registration certificate,
valid service tax registration
certificate and PAN card.
Copies of the certificates to
be attached
Yes/No
11. The bidder should submit
undertaking stating that the
bidder is not black listed by
central Govt./any state or
UT Gov./PSU/Organized
sector and there should not
be any black listing pending
case against the bidder
Undertaking by the bidder Yes/No
12. Bidder needs to have an
office in Goa or provide a
undertaking to open an office
in Goa within 30 days of
receiving of letter of intent
Supporting Documents/
Undertaking by the bidder
Yes/No
13. The bidder must have
company registration
certificate, Valid sales tax/
VAT registration certificate,
valid service tax registration
certificate and PAN card.
Copies of the certificates to
be attached
Yes/No
14. OEM for Hardware a. In the last five financial
years, the OEM must have supplied similar kind of
a. Relevant documentary evidences like PO Copy etc.
b. Relevant documentary
Yes/No
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 49 | P a g e
Sr.
No
Qualification Criteria Documents/Information to
be provided in the
submitted proposal
Compliance Reference & Page
Number
enterprise level products in at least two projects of similar nature in Government / PSU in India
b. The OEM of offered products must have their own Technical Assistance Center (TAC) support in India
c. The OEM (s) should be an established industry player in offered technology product and should form a part of the Industry standard leader /challenger‟s quadrant on the likes of Gartner, Forrester, and IDC etc.
d. The OEM of offered products should have a turnover of at least Rs. 100 Crores from the sale of its own manufactured ICT products in India, in each of the last three financial years.
e. The OEM of offered products should have the ISO 9001:2000, ISO 14001 and ISO 17001 certification
evidence c. Relevant documentary
evidence d. Audited financial
statements or auditors certification
e. Relevant documentary evidence
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 50 | P a g e
Form 4B: Compliance Sheet for Technical Proposal
(The Technical proposal should comprise of the following basic requirements. The documents
mentioned in this compliance sheet along with this form, needs to be a part of the Technical proposal)
For Technical Evaluation
S.
No.
Specific Requirements Documents Required Compliance
(Yes/ No)
Reference &
Page Number
1 Covering Letter for Technical
Proposal
To be provided by the
bidder
2 Proposed Solution
– Solution architecture
conceptualized for this project.
This should include integration
of e-District application with
legacy application (NIC etc.),
Also integration with the SSDG
framework
– Security architecture
– Detailed plan for using GBBN
as connectivity
– Application deployment and
testing Strategy
– Quality Control Procedures
suggested by responding firm
Comprehensiveness of Bill of
material of all the components
(e.g. software, hardware, etc.)
along with their quantities
To be provided by the
bidder
3 Proposed Approach and
methodology
– Explain the understanding of
the project requirements,
highlight the expected support
from the State, approach to the
services, SLA management
methodology, methodology for
carrying out the activities for
expected output
– Highlight the associated risks /
To be provided by the
bidder
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 51 | P a g e
S.
No.
Specific Requirements Documents Required Compliance
(Yes/ No)
Reference &
Page Number
problems and plans for
mitigation and explain the
technical approach it would
adopt to address them
– Explain the plan to create BPR
for creating SRS for the services
under e-District(FRS has
already been created)
– Explain the methodologies the
responding firm proposes to
adopt and highlight the
compatibility of those
methodologies with the
proposed approach
Planning and Building
Infrastructure (assessment,
design, integration / migration
of existing Portal infrastructure)
4 Training
– Proposed Training Schedule
– Plan to develop Training
Manuals
– Areas/domains covered
– Number & Quality of
personnel to be deployed for
training at the site of
Implementation of the Project.
To be provided by the
bidder
5 Formation/Location of
Helpdesk & other manpower
support
-Proposed Staff details
-Areas/ Domain Covered
To be provided by the
bidder
6 Project Management
The overall project management
approach by the responding firm
to be implemented for the project
to meet the timelines
To be provided by the
bidder
7 Detailed work plan
The description and quality of
the work plan to be looked into
To be provided by the
bidder
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 52 | P a g e
S.
No.
Specific Requirements Documents Required Compliance
(Yes/ No)
Reference &
Page Number
8 Profile of proposed team
members:
( Quality of CV for the full time
project manager proposed for the
project)
CVs who would be working full
time on project along with
deployment plan
To be provided by the
bidder
9 Quality of technical managers
to be deployed at district level
CVs who would be working full
time on project as a technical
manager
To be provided by the
bidder
10 System Integration Projects At least two projects with client
references for implementation of
an integrated turnkey project
around
a) network solution and
b) software development
c) Hardware commissioning
d) O&M phase for maintaining
Supporting documents to
be provided by the bidder
11 Software Solutions At least two projects completed / on-going software development projects each having a minimum value of INR 1.50 Crore – for software development component only). The project should have some or all of the following components : – Portal – Web based Application Server – Electronic Forms
Supporting documents to
be provided by the bidder
12 Maintenance Services and Helpdesk in the State Providing Maintenance Services / Helpdesk services in the field of IT services with a minimum order size of INR 2 Crore in the State for any of the project
Supporting documents to
be provided by the bidder
13 Other Projects Supporting documents to Yes/No
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 53 | P a g e
S.
No.
Specific Requirements Documents Required Compliance
(Yes/ No)
Reference &
Page Number
SI Projects involving at least 6 different locations with a value of more than INR 2 Crore per project
be provided by the bidder
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 54 | P a g e
Form 5: Letter of Proposal
Ref. No
To:
<Location, Date>
<Name>
<Designation>
<Address>
<Phone Nos.>
<Fax Nos.>
<Email id>
Subject: Submission of the Technical bid for <Name of the Systems Implementation assignment>
Dear Sir/Madam,
We, the undersigned, offer to provide Systems Implementation solutions to the ITG on <Name of the
Systems Implementation engagement> with your Request for Proposal dated <insert date> and our
Proposal. We are hereby submitting our Proposal, which includes this Technical bid and the Financial
bid.
We hereby declare that all the information and statements made in this Technical bid are true and
accept that any misinterpretation contained in it may lead to our disqualification.
We undertake, if our Proposal is accepted, to initiate the Implementation services related to the
assignment not later than the date indicated in Fact Sheet.
We agree to abide by all the terms and conditions of the RFP document. We would hold the terms of
our bid valid for 180 days as stipulated in the RFP document.
We hereby declare that we are not insolvent, in receivership, bankrupt or being wound up, our affairs
are not being administered by a court or a judicial officer, our business activities have not been
suspended and we are not the subject of legal proceedings for any of the foregoing.
We understand you are not bound to accept any Proposal you receive.
Yours sincerely,
Authorized Signature [In full and initials]:
Name and Title of Signatory:
Name of Firm:
Address:
Location: _____________________________________Date: ___________________________
_____________________________________________________________________________
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 55 | P a g e
Form 6: Project Citation Format
Relevant IT project experience
General Information
Name of the project
Client for which the project was executed
Name and contact details of the client
Project Details
Description of the project
Scope of services
Service levels being offered/ Quality of
service (QOS)
Technologies used
Outcomes of the project
Other Details
Total cost of the project
Total cost of the services provided by the
respondent
Duration of the project (no. of months, start
date, completion date, current status)
Other Relevant Information
Letter from the client to indicate the
successful completion of the projects
Copy of Work Order
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 56 | P a g e
Form 7: Proposed Solution
Technical approach, methodology and work plan are key components of the Technical Proposal. You
are suggested to present Approach and Methodology divided into the following sections:
a) Solution Proposed
b) Understanding of the project (how the solution proposed is relevant to the understanding)
c) Technical Approach and Methodology
Sr.No. Proposed Solution
(Provide the
Product Name or
fill Custom Built, in
case of a new
development)
Version & Year
of Release
OEM Features &
Functionalities
O&M Support
(Warranty/ATS/:
as required as per
RFP)
1.
2.
3.
4.
5.
6.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 57 | P a g e
Form 8: Proposed Work Plan
No Activity1 Calendar Months
1 2 3 4 5 6 7 8 9 10 11 12 N
1
2
3
4
5
N
Note: Indicate all main activities of the assignment for the completion of the project
Form 9: Team Composition
Name of Staff with
qualification and
experience
Area of Expertise Position
Assigned
Task
Assigned
Time
committed
for the
engagement
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 58 | P a g e
Form 10: Curriculum Vitae (CV) of Key Personnel
General Information
Name of the person
Current Designation / Job Title
Current job responsibilities
Proposed Role in the Project
Proposed Responsibilities in the Project
Academic Qualifications:
Degree
Academic institution graduated from
Year of graduation
Specialization (if any)
Key achievements and other relevant
information (if any)
Professional Certifications (if any)
Total number of years of experience
Number of years with the current company
Summary of the Professional / Domain
Experience
Number of complete life cycle
implementations carried out
The names of customers (Please provide the
relevant names)
Past assignment details (For each assignment
provide details regarding name of
organizations worked for, designation,
responsibilities, tenure)
Prior Professional Experience covering:
Organizations worked for in the past
o Organization name
o Duration and dates of entry and
exit
o Designation Location(s)
o Key responsibilities
Prior project experience
o Project name
o Client
o Key project features in brief
o Location of the project
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 59 | P a g e
o Designation
o Role
o Responsibilities and activities
o Duration of the project
Please provide only relevant projects.
Proficient in languages (Against each
language listed indicate if
speak/read/write)
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 60 | P a g e
Form 11: Deployment of Personnel
No Name of Staff Staff input in Months (in the form of a bar chart)2
Total staff
man-
months
proposed
1 2 3 4 5 6 7 8 9 10 11 12 n Total
1
2
3
N
Total
1. Professional Staff the input should be indicated individually; for Support Staff it should be
indicated by category
2 Months are counted from the start of the assignment.
Full time input Part time input
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 61 | P a g e
Form 12: Manufacturers'/Producers’ Authorization Form
(This form has to be provided by the OEMs of the products proposed)
No. Date:
To:
OEM Authorization Letter
Dear Sir:
Ref: Your RFP Ref: [*] dated [*]
We who are established and reputable manufacturers / producers of ________________________
having factories / development facilities at (address of factory / facility) do hereby authorize M/s
___________________ (Name and address of Agent) to submit a Bid, and sign the contract with you
against the above bid invitation.
We hereby extend our full guarantee and warranty for the Solution, Products and services offered by
the above firm against this Bid Invitation.
We hereby declare that we are not insolvent, in receivership, bankrupt or being wound up, our affairs
are not being administered by a court or a judicial officer, our business activities have not been
suspended and we are not the subject of legal proceedings for any of the foregoing.
We also undertake to provide any or all of the following materials, notifications, and information
pertaining to the Products manufactured or distributed by the Supplier:
a. Such Products as the SI may opt to purchase from the Supplier, provided, that this option shall
not relieve the Supplier of any warranty obligations under the Contract; and
b. in the event of termination of production of such Products:
i. advance notification to the SI of the pending termination, in sufficient time to permit
the SI to procure needed requirements; and
ii. Following such termination, furnishing at no cost to the SI, the blueprints, design
documents, operations manuals, standards, source codes and specifications of the
Products, if requested.
We duly authorize the said firm to act on our behalf in fulfilling all installations, Technical support
and maintenance obligations required by the contract.
Yours faithfully,
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 62 | P a g e
(Name)
(Name of Producers)
Note: This letter of authority should be on the letterhead of the manufacturer and should be signed by
a person competent and having the power of attorney to bind the manufacturer.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 63 | P a g e
Form 13: Declaration on Source Code and Intellectual Property Rights
Ref. No. Date:
To:
Dear Sir,
Sub: Self-certificate regarding the source code and Intellectual property rights under this Project
I, authorized representative of _________________________, hereby solemnly affirm to the IPR and
Source Code rights of this software shall be with the Department of Information Technology Goa.
In the event of any deviation from the factual information/ declaration, ITG reserves the right to
terminate the Contract without any compensation to the System Integrator.
Thanking you,
Yours faithfully
(Signature of the Authorized signatory of the bidding Organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 64 | P a g e
Form 14: Undertaking on Patent Rights
Ref. No. Date:
To:
Dear Sir,
Sub: Undertaking on Patent Rights
1. I/We as System Integrator (SI) do hereby undertake that none of the deliverables
being provided by us is infringing on any patent or intellectual and industrial property rights as
per the applicable laws of relevant jurisdictions having requisite competence.
2. I/We also confirm that there shall be no infringement of any patent or intellectual and
industrial property rights as per the applicable laws of relevant jurisdictions having requisite
competence, in respect of the equipment‟s, systems or any part thereof to be supplied by us. We
shall indemnify ITG against all cost/claims/legal claims/liabilities arising from third party claim in
this regard at any time on account of the infringement or unauthorized use of patent or
intellectual and industrial property rights of any such parties, whether such claims arise in
respect of manufacture or use. Without prejudice to the aforesaid indemnity, the SI shall be
responsible for the completion of the supplies including spares and uninterrupted use of the
equipment and/or system or any part thereof to ITG and persons authorized by ITG, irrespective
of the fact of claims of infringement of any or all the rights mentioned above.
3. If it is found that it does infringe on patent rights, I/We absolve ITG of any legal
action.
Yours faithfully,
(Signature of the Authorized signatory of the bidding Organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 65 | P a g e
Form 15: Undertaking on Compliance and Sizing of Infrastructure
Ref. No. Date:
To:
Dear Sir,
Sub: Undertaking on Compliance and Sizing of Infrastructure
1. I/We as System Integrator do hereby undertake that we have proposed and sized the
hardware and all software (including perennial and enterprise wide licenses, unless
stated otherwise) based on information provided by ITG in its RFP document and in
accordance with the service level requirements and minimum specifications provided
and assure ITG that the sizing is for all the functionality envisaged in the RFP document.
2. Any augmentation of the proposed solution or sizing of any of the proposed solutions
(including software and hardware) in order to meet the minimum RFP requirements
and/or the requisite service level requirements given by ITG will be carried out at
no additional cost to ITG during the entire period of Contract.
Yours faithfully,
(Signature of the Authorized signatory of the Bidding Organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 66 | P a g e
Form 16: Undertaking on Service Level Compliance
Ref. No. Date:
To:
Dear Sir,
Sub: Undertaking on Service Level Compliance
1. I/We as System Integrator do hereby undertake that we shall monitor, maintain, and
comply with the service levels stated in the RFP to provide quality service to ITG.
2. However, if the proposed Resources and infrastructure are found to be insufficient in
meeting the RFP and/or the service level requirements given by ITG, then we will
augment the same without any additional cost to ITG.
Yours faithfully,
(Signature of the Authorized signatory of the bidding organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 67 | P a g e
Form 17: Undertaking on Deliverables
Ref. No. Date:
To:
Dear Sir,
Sub: Undertaking on Deliverables
1. I/We as System Integrator do hereby undertake that processes, deliverables/artefacts
submitted to ITG will adhere to the quality and standards specified in this RFP.
2. We also recognize and undertake that the deliverables/artefacts shall be presented
and explained to ITG and other key stakeholders (identified by ITG), and also take the
responsibility to provide clarifications as requested by ITG .
3. We agree to abide by the procedures laid down for acceptance and review of deliverables /
artefacts by the Department as stated in this RFP or as communicated to us from time-to-time.
4. We also understand that the acceptance, approval and sign-off of the deliverables by ITG
will be done on the advice of Department and any other agency appointed by the Department
for the same. We understand that while all efforts shall be made to accept and convey the
acceptance of each deliverable in accordance with the Project schedule, no deliverable will be
considered accepted until a specific written communication to that effect is made by ITG.
Yours faithfully,
(Signature of the Authorized signatory of the bidding organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 68 | P a g e
Form 18: Undertaking on Support to Third Party Solution acceptance and certification
Ref. No. Date:
To:
Dear Sir,
Sub: Undertaking on Support to Third Party Solution Acceptance and Certification
1. I/We understand that the System (including the application and the
associated IT systems) may be assessed and certified by a 3rd party agency
(to be identified by ITG) before the system is commissioned.
2. I/We understand that while the certification expenses will be borne by
System Integrator
3. System Integrator is responsible for successful completion & acceptance of the
certification of the job completion
4. I/We hereby undertake that we shall do all that is required of the
System Integrator to ensure that system will meet all the conditions
required for successful acceptance and certification.
Yours faithfully,
(Signature of the Authorized signatory of the bidding organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 69 | P a g e
Form 19: Declaration of activities sub-contracted
Ref. No. Date:
To:
Dear Sir,
Sub: Declaration on Sub-contracting
I/ We hereby declare the following list of activities which we would be sub-contracted.
S. No. Activity
1
2
3
4
I/ We would be responsible for ensuring that the sub-contracted work meets the requirements of the
Department.
Thanking you,
Yours faithfully
(Signature of the Authorized signatory of the bidding organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 70 | P a g e
Form 20: Undertaking on Exit Management and Transition
Ref. No. Date:
To:
Dear Sir,
Sub: Undertaking on Exit Management and Transition
1. I/We hereby undertake that at the time of completion of o u r engagement with the ITG,
either at the End of Contract or termination of Contract before planned Contract Period for
any reason, we shall successfully carry out the exit management and transition of this Project
to the ITG or to an agency identified by ITG to the satisfaction of the Department. I/We
further undertake to complete the following as part of the Exit management and transition:
a. We undertake to complete the updating of all Project documents and other
artefacts and handover the same to ITG before transition.
b. We undertake to design standard operating procedures to manage system
(including application and IT systems), document the same and train ITG
personnel on the same.
c. If ITG decides to take over the operations and maintenance of the Project on its
own or identifies or selects any other agency for providing operations &
maintenance services on this Project, then we shall provide necessary
handholding and transition support, which shall include but not be limited to,
conducting detailed walkthrough and demonstrations for the IT Infrastructure,
handing over all relevant documentation, addressing the queries/clarifications
of the new agency with respect to the working / performance levels of the
infrastructure, conducting Training sessions etc.
3. I/We also understand that the Exit management and transition will be considered
complete on the basis of approval from ITG.
Yours faithfully,
(Signature of the authorized signatory of the bidding organisation)
Name :
Designation :
Date :
Time :
Seal :
Business Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 71 | P a g e
Form 21: Declaration that the bidder has not been blacklisted
(To be submitted on the Letterhead of the responding agency)
{Place}
{Date}
To,
Ref: RFP Notification no <xxxx> dated <dd/mm/yy>
Subject: Self Declaration of not been blacklisted in response to the RFP for Selection of System
Integrator for Statewide Roll-out of e-District MMP File No <xxx>>.
Dear Sir,
We confirm that our company, ____________, is not blacklisted in any manner whatsoever by any of
the State/UT and/or central government in India on any ground including but not limited to
indulgence in corrupt practice, fraudulent practice, coercive practice, undesirable practice or
restrictive practice.
Place:
Date:
Bidder‟s Company Seal:
Authorized Signatory‟s Signature:
Authorized Signatory‟s Name and Designation:
Note: The Bidder shall necessarily provide a copy of „Power of Attorney‟ authorizing the signatory for
signing the Bid on behalf of the Bidder in its Pre-Qualification Bid.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 72 | P a g e
Form 22: Particulars of the Bid Cover Letter
[Cover Letter]
To
[Date]
The Managing Director,
Info Tech Corporation of Goa Ltd,
Porvorim, Goa.
Dear Sir,
Ref: RFP for e-District MMP
Having examined the RFP, the receipt of which is hereby duly acknowledged, we, the
undersigned, offer to provide the professional services as required and outlined in the RFP for
the e-District MMP Project. We attach hereto the technical response as required by the RFP,
which constitutes our proposal. We confirm that the information contained in this response or
any part thereof, including its exhibits, and other documents and instruments delivered or to be
delivered to State is true, accurate, verifiable and complete. This response includes all
information necessary to ensure that the statements therein do not in whole or in part mislead
the department in its short-listing process.
We fully understand and agree to comply that on verification, if any of the information provided
here is found to be misleading the short listing process, we are liable to be dismissed from the
selection process or termination of the contract during the project, if selected to do so.
We agree for unconditional acceptance of all the terms and conditions set out in the RFP
document and also agree to abide by this tender response for a period of <<SIX MONTHS>>
from the date fixed for bid opening.
We hereby declare that in case the contract is awarded to us, we shall submit the contract
performance guarantee bond.
We agree that you are not bound to accept any tender response you may receive. We also agree
that you reserve the right in absolute sense to reject all or any of the products/ services specified
in the tender response.
It is hereby confirmed that I/We are entitled to act on behalf of our company/ corporation/ firm/
organization and empowered to sign this document as well as such other documents, which may
be required in this connection.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 73 | P a g e
Dated this Day of 2013
(Signature)
(In the capacity of)
(Name)
Duly authorized to sign the Tender Response for and on behalf of:
(Name and Address of Company) Seal/Stamp of bidder
Witness Signature:
Witness Name:
Witness Address:
CERTIFICATE AS TO AUTHORISED SIGNATORIES
I,,……………………………, the < Designation of the person> of …….…………………,
certify that ……………………………………………………………… who signed the above
bid is authorized to do so and bind the company by authority of its board/ governing body.
Date:
Signature:
(Company Seal)
(Name)
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 74 | P a g e
Form 23: Undertaking on Conflict of Interest
[Company letterhead]
[Date]
To,
The Managing Director,
Info Tech Corporation of Goa Ltd,
Porvorim, Goa.
Sub: Undertaking on Conflict of Interest
Sir,
I/We as Bidder do hereby undertake that there is absence of, actual or potential conflict of
interest on the part of the Bidder or any prospective subcontractor due to prior, current, or
proposed contracts, engagements, or affiliations with State.
I/We also confirm that there are no potential elements (time frame for service delivery,
Resource, financial or other) that would adversely impact the ability of the Bidder to complete
the requirements as given in the RFP.
We undertake and agree to indemnify and hold State harmless against all claims, losses,
damages, costs, expenses, proceeding fees of legal advisors (on a reimbursement basis) and fees
of other professionals incurred (in the case of legal fees & fees of professionals, reasonably) by
State and/or its representatives, if any such conflict arises later.
Yours faithfully,
Authorized Signatory
Designation
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 75 | P a g e
Form 24: Non-Malicious Code Certificate
[Company letterhead]
To, [Date]
The Managing Director,
Info Tech Corporation of Goa Ltd,
Porvorim, Goa.
Sub: Non-Malicious Code Certificate
Sir,
1. I/We hereby certify that the software being offered / developed as part of the contract does
not and will not contain any kind of malicious code that would activate procedures to:
A. Inhibit the desired and the designed function of the equipment / solution.
B. Cause damage to the user or his equipment / solution during the operational exploitation of
the equipment / solution.
C. Tap information regarding network, network users and information stored on the network
that is classified and / or relating to National Security, thereby contravening Official Secrets Act
1923. There are / will be no Trojans, Viruses, Worms, Spy wares or any malicious software on
the system and in the software offered or software that will be developed. Without prejudice to
any other rights and remedies available to State , we are liable under Information Technology
Act, 2000 and Indian Penal Code 1860 in case of physical damage, loss of information and
those relating to copyright and Intellectual Property rights (IPRs), caused due to activation of
any such malicious code in offered / developed software.
Yours faithfully,
Authorized Signatory
Designation
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 76 | P a g e
Form 25: Undertaking on Clarifications sent to ITG
[Company letterhead]
[Date]
To,
The Managing Director,
Info Tech Corporation of Goa Ltd,
Porvorim, Goa.
Sub: Undertaking on Clarifications sent to ITG
Sir,
I/We do hereby undertake that Commercial Proposal submitted by us is inclusive of all the
items in the technical proposal and is inclusive of all the clarifications provided/may be
provided by us on the technical proposal during the evaluation of the technical offer. We
understand and agree that our Commercial Proposal is firm and final and that any clarifications
sought by you and provided by us would not have any impact on the Commercial Proposal
submitted by us.
Yours faithfully,
Authorized Signatory
Designation
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 77 | P a g e
Form 26: Undertaking on Training the Users
[Company letterhead]
To [Date]
The Managing Director,
Info Tech Corporation of Goa Ltd,
Porvorim, Goa.
Sub: Undertaking on Training the Users
Sir,
1. I/We hereby undertake to train users (to be identified by State) as per State’s requirements
stated in the Request for Proposal (RFP). We further undertake that:
i. We shall carry out a comprehensive training needs analysis and accordingly design the
training program
ii. Our training program would include, at the minimum, classroom training followed by
supervised work sessions
iii. We shall prepare all necessary training materials and deliver the training.
Yours faithfully,
Authorized Signatory & Designation
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 78 | P a g e
Form 27: Undertaking on Support to Certification
[Company letterhead]
To, [Date]
The Managing Director,
Info Tech Corporation of Goa Ltd,
Porvorim, Goa.
Sub: Undertaking on Support to Certification
Sir,
1. I/We understand that application (including the application and the associated IT systems)
have to be certified by a 3rd party agency (to be identified by State) before the system is
commissioned.
2. I/We understand that the certification expenses will be borne by bidder and so also
responsibility to ensure successful certification lies with the bidder.
3. I/We hereby undertake that we shall do all that is required of the bidder to ensure that system
will meet all the conditions required for successful certification.
Yours faithfully,
Authorized Signatory
Designation
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 79 | P a g e
Form 28: Undertaking on Changes to the contract clauses
[Company letterhead]
To, [Date]
The Managing Director,
Info Tech Corporation of Goa Ltd,
Porvorim, Goa.
Undertaking on Changes to Contract Clauses
Sir,
1. I/We as bidder do hereby acknowledge that we understand that the request for changes to
contract clauses and any other terms and conditions in the RFP, submitted in our proposal as per
the RFP are just suggestions for change.
2. We understand that it is neither guaranteed that these requests for changes will be accepted in
the final contract nor this process will be construed as any commitment from State to consider
those suggestions.
Yours faithfully,
Authorized Signatory and Designation
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 80 | P a g e
Form 29: Self Declaration
[Company letterhead]
To, [Date]
The Managing Director,
Info Tech Corporation of Goa Ltd,
Porvorim, Goa.
Self Declaration
Sir,
I,,……………………………, the < Designation of the person> of …….…………………,
certify that ……………………………………………………………… who signed the above
bid is authorized to do so and bind the company by authority that the information furnished/
provided by me/us is true to my/our knowledge and are fully responsible for the same.
Date:
Signature:
(Company Seal)
(Name)
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 81 | P a g e
ANNEXURE II: FINANCIAL PROPOSAL TEMPLATE
Form 1: Covering Letter
To:
<Location, Date>
<Name>
<Designation>
<Address>
<Phone Nos.>
<Fax Nos.>
<Email id>
Subject: Submission of the Financial bid for <Provide Name of the Implementation Assignment>
Dear Sir/Madam,
We, the undersigned, offer to provide the Implementation services for <Title of Implementation
Services> in accordance with your Request for Proposal dated <Date> and our Proposal (Technical and
Financial Proposals). Our attached Financial Proposal is for the sum of <Amount in words and figures>.
This amount is inclusive of the local taxes.
1. PRICE AND Validity
All the prices mentioned in our Tender are in accordance with the terms as specified in the
RFP documents. All the prices and other terms and conditions of this Bid are valid for a period
of <days> calendar days from the date of opening of the Bid.
We hereby confirm that our prices include all taxes. However, all the taxes are quoted
separately under relevant sections.
We understand that the actual payment would be made as per the existing indirect tax rates
during the time of payment.
2. UNIT RATES
We have indicated in the relevant forms enclosed, the unit rates for the purpose of on account of
payment as well as for price adjustment in case of any increase to / decrease from the scope of work
under the contract.
3. DEVIATIONS
We declare that all the services shall be performed strictly in accordance with the Tender documents
except for the variations and deviations, all of which have been detailed out exhaustively in the
following statement, irrespective of whatever has been stated to the contrary anywhere else in our
bid.
Further we agree that additional conditions, if any, found in the Tender documents, other than those
stated in deviation schedule, shall not be given effect to.
4. TENDER PRICING
We further confirm that the prices stated in our bid are in accordance with your Instruction to
Bidders included in Tender documents.
5. QUALIFYING DATA
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 82 | P a g e
We confirm having submitted the information as required by you in your Instruction to Bidders. In
case you require any other further information/documentary proof in this regard before evaluation
of our Tender, we agree to furnish the same in time to your satisfaction.
6. BID PRICE
We declare that our Bid Price is for the entire scope of the work as specified in the <Refer Section
No.>. These prices are indicated Commercial Bid attached with our Tender as part of the Tender.
7. PERFORMANCE BANK GUARANTEE
We hereby declare that in case the contract is awarded to us, we shall submit the Performance Bank
Guarantee as specified in the <Annexure III> of this RFP document.
Our Financial Proposal shall be binding upon us subject to the modifications resulting from
Contract negotiations, up to expiration of the validity period of the Proposal, i.e., [Date].
We understand you are not bound to accept any Proposal you receive.
We hereby declare that our Tender is made in good faith, without collusion or fraud and the
information contained in the Tender is true and correct to the best of our knowledge and belief.
We understand that our Tender is binding on us and that you are not bound to accept a Tender you
receive.
Thanking you,
We remain,
Yours sincerely,
Authorized Signature:
Name and Title of Signatory:
Name of Firm:
Address:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 83 | P a g e
Financial Proposal to be submitted through online mode only
Rates quoted by SI/bidder shall be in Indian Rupees only
Summary
S.
No. Item
Total Price
inclusive of
all the taxes
4xcept VAT
and State
Entry taxes
VAT State Entry
Tax (If any) Total cost
a)
Hardware related costs with
onsite comprehensive warranty
for the period of 5 years from
the date of installation (A)
b) Networking related costs (B)
c)
Application Customization /
Development and database
creation cost (C)
d)
Operations and Maintenance
Costs (Quarterly Expenses
(software) for 3 years of
contract after „”Go-Live”) (D)
e) Data Digitization (E)
f)
Deployment and operation &
maintenance of requisite
infrastructure for period of 5
years from date of installation at
State Data centre & IT Disaster
Recovery(F)
Total Cost
Total cost in figures:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 84 | P a g e
Details of Financial Bid
S.
No. Category
Component No of
Compone
nts / Units
of Service
Rate per
unit
(including
all taxes
except VAT
& state
entry tax)
VAT
State
Entry Tax
(If any)
Total Cost
A. Hardware Related Costs with the Comprehensive onsite warranty of 5 years from date of
installation
1.
Infrastruc
ture /
Hardwar
e
Desktop/
Computer 369
Laptop 1
Digital Web
camera 10
Scanners (A4 size) 9
Scanners (A3 size) 3
Heavy Duty Laser
Printer (A4 size) 108
Laser Printer (A3
size) 2
Passbook Printers 2
UPS (1 KVA,
Online) 178
2.
Infrastruc
ture
Installatio
n and
Testing /
Miscellan
eous
Charges
Others
Total A:
B. Networking Related Costs
1.
Network
Related
Infrastruc
ture &
Routers
8 Port Switch 1
16 Port Switch 1
24 Port Switch 1
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 85 | P a g e
S.
No. Category
Component No of
Compone
nts / Units
of Service
Rate per
unit
(including
all taxes
except VAT
& state
entry tax)
VAT
State
Entry Tax
(If any)
Total Cost
Horizonta
l
connectiv
ity costs
LAN Cabling
(including
IO,CAT 6 cable ,
Casing Capping
Crimping)
400
network
points
2.
UPS
points &
electrical
cabling
15/5 AMP
socket with
switch and
wiring with
casing &
capping
500 UPS
electrical
points
Total B:
C. Application Development & Database Creation
1. e-District Application
a
Develop
ment of e-
District
Services
(as per
the scope
defined)
Including
training,
hand
holding
cost and
helpdesk
support
Total C:
D : Operations and Maintenance Costs (Quarterly Expenses (Software) for <3> years of contract after
„”Go-Live”) (D)
1.
Applicati
on
Maintena
nce &
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 86 | P a g e
S.
No. Category
Component No of
Compone
nts / Units
of Service
Rate per
unit
(including
all taxes
except VAT
& state
entry tax)
VAT
State
Entry Tax
(If any)
Total Cost
Operation
of e-
District
applicatio
ns
Total D:
E. Data Digitization
1. Scanning of A4 size For 100000
pages
2. Scanning of A3 size For 50000
pages
3. Scanning of legal size For 75000
pages
4. Cost of data entry
For 200000
records
(to be
quoted on
the basis
of 1000
characters
)
Total E:
Note: The figures indicated for data digitization are indicative only
F. Deployment and Operation & maintenance of requisite infrastructure for period of 5 years from
date of installation at State Data centre & IT Disaster Recovery
For Details of BOM. Please
refer volume II
1. Database Server 2
2. Application Server 2
3. Web Server 2
4. Backup and Reporting
Server
2
5. Development Server 2
6. Application Load Balancer 2
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 87 | P a g e
7. 10U Blade enclosure 1
8. KVM Switch 1
9. L3 network switch 1
10. Laptops 2
11. 5TB SAN Box 1
2 System Software
1. Server OS 10
2. RDBMS 2
3. Application server 2
4. Systems Management
software
2
5. Development environment 2
6. Virtualization software 1
7. Anti-Virus software 10
Total F:
Additional information to be provided by the bidder [ It is mandatory for bidder to provide this
information which will not be a part of financial bid evaluation. Failing to provide this information
will result into rejection of bid]
a. Cost of e-District Application software AMC for additional 2 years [after initial 3 years,
however it will be the State‟s call whether to give extended service contract for AMC to the e-
District SI or not, which will be informed to SI/bidder 3 months prior to completion of initial 3
years warranty . On award of AMC contract for next 2 years, the e-District SI/bidder must
provide AMC support. Any refusal/denial by SI/bidder for AMC support will be treated as
violation of the contract and will lead to blacklisting of the SI/bidder by the State and further
encashment of the performance bank guarantee]
b. Support Manpower
Support Manpower
S.No Support Manpower Rate/Month (inclusive of
service tax) Total
1. Project Manager
2. System/ Network Administrator
3. Solution Architect
4. Database Administrator
5. Software Programmer and Business Analyst
6. District Manager
7. District Technical Support
8. Helpdesk Executive
….
Total
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 88 | P a g e
c. Total Training Cost in Rs………
Training
Training Cost Per Person
Nos. Resources
to be trained
Rate (
Inclusive of
service tax)
Total
1. Basic computer skills 100
2. Advanced training on the Application modules 50
Total
d. Web Services
Web Services
Development of Web Services
Nos. Web
Services
Total Value
Inclusive of
service tax
1. Development of End to End Services 14
2. Development of Web Services (of NIC) 12
3. Development of interface for data from various departments
for selected services under e-District.
26
Total
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 89 | P a g e
ANNEXURE III: TEMPLATE FOR PBG
Form 1: Performance Bank Guarantee
PERFORMANCE SECURITY:
<Name>
<Designation>
<Address>
<Phone Nos.>
<Fax Nos.>
<Email id>
Whereas, <name of the supplier and address> (hereinafter called “the bidder”) has undertaken, in
pursuance of contract no. <Insert Contract No.> dated. <Date> to provide Implementation services for
<name of the assignment> to ITG (hereinafter called “the beneficiary”)
And whereas it has been stipulated by in the said contract that the bidder shall furnish you with a
bank guarantee by a recognized bank for the sum specified therein as security for compliance with its
obligations in accordance with the contract;
And whereas we, <Name of Bank> a banking company incorporated and having its head /registered
office at <Address of Registered Office> and having one of its office at <Address of Local Office> have
agreed to give the supplier such a bank guarantee.
Now, therefore, we hereby affirm that we are guarantors and responsible to you, on behalf of the
supplier, up to a total of Rs.<Insert Value> (Rupees <Insert Value in Words> only) and we
undertake to pay you, upon your first written demand declaring the supplier to be in default under
the contract and without cavil or argument, any sum or sums within the limits of Rs. <Insert Value>
(Rupees <Insert Value in Words> only) as aforesaid, without your needing to prove or to show
grounds or reasons for your demand or the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the bidder before presenting us
with the demand.
We further agree that no change or addition to or other modification of the terms of the contract to be
performed there under or of any of the contract documents which may be made between you and the
Bidder shall in any way release us from any liability under this guarantee and we hereby waive notice
of any such change, addition or modification.
This Guarantee shall be valid until <Insert Date>)
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 90 | P a g e
Notwithstanding anything contained herein:
I. Our liability under this bank guarantee shall not exceed Rs. <Insert Value> (Rupees <Insert
Value in Words> only).
II. This bank guarantee shall be valid up to <Insert Expiry Date>)
III. It is condition of our liability for payment of the guaranteed amount or any part thereof arising
under this bank guarantee that we receive a valid written claim or demand for payment under
this bank guarantee on or before <Insert Expiry Date>) failing which our liability under the
guarantee will automatically cease.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 91 | P a g e
ANNEXURE IV: TEMPLATE FOR CCN
Form 1: Change Control Notice (CCN) Format
Change Control Note CCN Number:
Part A: Initiation
Title:
Originator:
Sponsor:
Date of Initiation:
Details of Proposed Change
(To include reason for change and appropriate details/specifications. Identify any attachments as A1,
A2, and A3 etc.)
Authorized by : Date:
Name:
Signature:
Received by the IP
Date:
Name:
Signature:
Change Control Note
CCN Number:
Part B : Evaluation
(Identify any attachments as B1, B2, and B3 etc.)
Changes to Services, charging structure, payment profile, documentation, training, service levels and
component working arrangements and any other contractual issue.
Brief Description of Solution:
Impact:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 92 | P a g e
Deliverables:
Timetable:
Charges for Implementation:
(including a schedule of payments)
Other Relevant Information:
(including value-added and acceptance criteria)
Authorized by the Implementation
Partner
Date:
Name: -
Signature:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 93 | P a g e
ANNEXURE V: Details of horizontal connectivity through GBBN.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 94 | P a g e
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 95 | P a g e
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 96 | P a g e
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 97 | P a g e
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 98 | P a g e
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 99 | P a g e
e-District MMP - Goa
ANNEXURE VI: Functional Requirement Specifications
(High Level)
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 100 | P a g e
Table of Contents
Glossary ...................................................................................................................................................... 102
List of Services Covered ............................................................................................................................103
General Functional Requirements for all services .................................................................................104
I. Collectorate Office .........................................................................................................................119
1. Issuance of Income certificate ......................................................................................................119
2. Issuance of Domicile Certificate ..................................................................................................121
3. Issuance of cast community certificate .......................................................................................123
4. Issuance of residence certificate ...................................................................................................126
5. Issuance of divergence certificate ................................................................................................128
6. Issuance of matriz certificate ........................................................................................................131
7. Revenue Court- case listing/adjournment/stay/final/status ................................................133
8. Arms License - Application for New/ Renewal of License .....................................................135
9. Issuance of Sound Permission .....................................................................................................138
10. Application for relief for victims of natural calamity ...............................................................141
II. Department of Settlement & Land Records ...............................................................................144
11. Issuance of Form I & XIV (Record of Right) ..............................................................................144
III. Goa State Information Commission ............................................................................................147
1. RTI Filing & Status Services .........................................................................................................147
IV. Panchayat/Municipality ...............................................................................................................150
13. Issuance of Birth/Death Certificate ............................................................................................150
V. Transport Department ..................................................................................................................153
14. Application for grant of subsidy for Yellow/Black Motor Cycle/Auto Rickshaw, Taxi
Scheme 2003 ................................................................................................................................................153
15. Application for grant of subsidy for replacement of buses/mini buses above 15 years .....155
VI. Fisheries Department ....................................................................................................................158
16. Application for Registration/ Renewal of Fishing Nets ..........................................................158
VII. Tourism Department .....................................................................................................................161
17. Registration of New Water Sports Activities .............................................................................161
VIII. Registration Department ..............................................................................................................164
18. Application for marriage registration certificate .......................................................................164
IX. Captain of Ports .............................................................................................................................167
19. Registration/Renewal of Inland Vessels ....................................................................................167
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 101 | P a g e
20. Registration/Renewal of Water Sport Vessels ..........................................................................169
X. Department of Sports & Youth Affairs .......................................................................................172
21. Registration of schools for participation in games ....................................................................172
22. Application for sportsperson certificate .....................................................................................174
23. Registration/Application for entry into state youth festival ...................................................176
24. Application for grant in aid for various educational institutes ..............................................178
XI. All Departments in state of Goa ..................................................................................................181
25. Recruitment form for non-gazette post of various Depts. across State ..................................181
26. Form for scheme management ....................................................................................................184
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 102 | P a g e
Glossary
S. No. Term Definition
1. APEO Assistant Physical Education Officer
2. APIO Assistant Public Information Officer
3. APL Above Poverty Line
4. BPL Below Poverty Line
5. CFC Common Facilitation Counter
6. COP Captain of Ports
7. CSC Common Service Centres
8. ESO Extended Service Outlets
9. GBBN Goa Broad Band Network
10. LAN Local Area Network
11. LSK Lok Seva Kendra
12. MMP Mission Mode Project
13. NIC National Informatics Centre
14. PIO Public Information Officer
15. SDC State Data Centre
16. Service Request Id The number that uniquely identifies an applicant
17. SPIO State Public Information Officer
18. SSDG State Service Delivery Gateway
19. TAT Turn Around Time
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 103 | P a g e
List of Services Covered
Sr.No Department Category Services
1. Collectorate Office
Certificates Issuance of Income Certificate
2. Certificates Issuance of Domicile Certificate
3. Certificates Issuance of Caste/ Community Certificate
4. Certificates Issuance of Resident Certificate
5. Certificates Issuance of Divergence Certificate
6. Certificates Issuance of Maritz Certificate
7. Revenue Court
Revenue Court –Case listing/adjournment/stay/Final/Status
8. Arms License Application / Renewal of Arms License
9. Tourism Application of Sound Service
10. Relief – Natural calamity
Applications for relief for victims of Natural Calamity
11. Department of Settlement & Land Records
Certificates Issuance of Form I & XVI (Record of right)
12. Goa State Information Commission
RTI Services RTI filling and status services
13. Panchayat/ Municipality
Certificates Issuance of Birth/Death Certificate
14. Transport Department
Transport Application for grant of subsidy for Yellow/Black Motorcycle ,Auto Rickshaw, Taxi Scheme 2003
15. Transport Application for grant of subsidy for replacement of buses/mini buses above 15 years old
16. Fisheries Department
Fisheries Application for Registration/ Renewal of Fishing Nets
17. Tourism Department
Others Registration of New water sports activity
18. Registration Department
Certificate Application for Marriage Registration certificate
19. Captain of Ports
Certificate Registration/Renewal of Inland Vessel
20. Registration/Renewal of Water Sport Vessel
21. Department of Sports
Certificate Registration of Schools for participation in Games
22. Application for Sportsmen certificate
23. Registration/Application for entry into State Youth Festival
24. Application for grant-in-aid for various Educational Institutes
25. Generic Forms Generic Recruitment form for non-gazette post of various Depts. across State
26. Form for Scheme management
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 104 | P a g e
General Functional Requirements for all services
All services - General Requirements
Requirement ID
Description
GEN.1
Since the user base can include people with disabilities, system must ensure that standards with respect to accessibility and usability of websites for people with disabilities are adhered to. For e.g.
- Web Content Accessibility Guidelines ver. 2.0
- User Agent Accessibility Guidelines ver. 2.0
- Web Accessibility Initiative guidelines
- Other latest W3C guidelines etc.
GEN.2 System shall be designed for interoperability and ease of integration through use of web services.
GEN.3 System shall ensure that every transaction by service seeker is audit trailed. Audit trail shall have timestamp, user id/name and type of change.
GEN.4 All forms that are accessible from the public website shall be scanner capable.
GEN.5 The online web application and the state portal shall be available in English and the state local language (Marathi & Konkani) with the capability to switch between the two
GEN.6 Digital images and text extracted from digital images shall be saved in non-proprietary file formats, such as ASCII for text or TIFF for images
GEN.7 System shall provide compatible interfaces, metadata and indexing support for exchange of electronic documents with Scanner APIs, digital imaging Programs and document management software
GEN.8 All forms shall be created on standard A4 paper (as defined by standard ISO 216: 2007)
GEN.9 All kinds of notifications whether internal or external through channels such as email, SMS and letter shall be recorded.
GEN.10 All kinds of notifications shall be assigned a designated user to whom response will be communicated.
GEN.11 All documents scanned shall be indexed, identifier provided and stored for easy retrieval. Shall be linked to related service seeker record in database
GEN.12 System shall provide for expunging, redaction and encryption support for the scanned forms and documents.
GEN.13 All activities of user shall be logged in System. The log among other shall include the user id, access date and time, transaction and type of accesses made
GEN.14 System shall maintain a log of all user activities related to access. The log, among other details, shall include the user id, access date and time, and type of accesses made. The log shall be linked to the application record and available for access
GEN.15 System shall provide a facility to save the data provided in all kinds of forms available in the web application or the state web portal for a pre-defined interval even if the form in only partially complete. System shall allow filling of the form
GEN.16 All forms shall be accompanied by a well-written set of instructions - in English, Marathi & Konkani and the State official language - on how to fill up the form and the mode of submission
GEN.17 All notifications / alerts / reminders shall be as per as a standard format/ template that is configurable
GEN.18 System shall display the date and time of last login when the user logs in
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 105 | P a g e
GEN.19
System shall checks for duplicate numbers prior to accepting new e.g.:
-Application Number
-ESO/CSCs Center ID
-Service Request No
GEN.20
System shall have a fail-proof online modification submission process. System shall have performed the commit of the return data to the database only once if the transaction has gone through successfully. In case the transaction has not been fully com
GEN.21 System shall ensure virus check for all files that are uploaded in System e.g. detect malicious executable
GEN.22 For all kinds of online forms, system shall allow downloading of an electronic form and uploading of the filled-in form at a later stage
GEN.23 Where ever documents are involved, system shall allow the user to assign a note/annotation to a document image
GEN.24
Where ever workflow systems are involved, Workflow systems shall be designed in such a manner that introduction of additional workflow requirements or changes to existing workflow can be implemented without underlying architectural or programming changes
GEN.25 System shall allow all offices and sub offices of concerned department to be inter connected internally within departments through SSDG interface to work together
GEN.26 System shall allow all other concerned department offices and sub offices of to be connected through SSDG interface if required
GEN.27 System shall provide consistent look & feel to the users and the standards defined for content, structure and presentation of the portal shall be applied and followed throughout the portal
GEN.28 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
GEN.29 The solution shall provide Metadata directories or indexes of data related to the data available within the application to facilitate search
GEN.30
External Interface: System shall support external interface (interfaces outside application boundary). For e.g. sending, receiving, or exchanging data with other organizations or individuals, and does not include any processing beyond data exchange
GEN.31 Facility: System shall support facility requirements that describe physical aspects a particular system must have
GEN.32 Functional: System shall support functional requirements that for functioning of a software system or its component
GEN.33 General: System shall support general requirements that apply to all processes and sub-processes.
GEN.34 Internal Interface: System shall support internal interface requirements within the application boundary.
GEN.35 Manageability:
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 106 | P a g e
System shall support manageability requirements for ease of management of a system
GEN.36 Performance: System shall support performance requirements that constitute response time and throughput requirements
GEN.37 Reliability: System shall support reliability requirements for the consistency of an IT system
GEN.38 Standards: System shall support standards specified where the design or implementation is necessitated to follow a published standard
GEN.39 Usability: System shall support usability requirements that describe ease of use of system by end user
GEN.40 Security: System shall have adequate security features built in the architecture of the system to ensure that it cannot be hacked or manipulated
All services - General Login Requirements
Requirement ID
Description
LOG.1
Shall display the login page as the first page when the user / new user enters the e-District application with online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the login process
Shall allow only the authentic users (ESO/CSCs/CFC Centre Operators, Department Officials and citizen) to login to System through the use of: -Bio metric device using the thumb impression -User id and Password combination -Both
LOG.2
(Thumb Impression Based Biometric Device) -System shall map the thumb impression of all the users to the application database and only these users shall be allowed to enter the e District application. In case of any irregularities the combination of thumb impression and digital signature put on the document would be used to mark responsibility.
LOG.3 System shall allow new user to create log in Id. & Password
LOG.4 System shall give a welcome message once the user is able to successfully login to the e district application
LOG.5 System shall give an error message once the user provides wrong login Information and ask the user to re log in.
All services - General User Id. Requirements
Requirement ID
Description
UID.1
System shall allow registration of user to create user. Id for future login and ease (registration not mandatory) with online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data for user. Id/ retrieval of user Id
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 107 | P a g e
UID.2 System shall perform data validation checks on the input and in case of data being duplicated, System shall display the existing User Id for registered use.
UID.3 The user-name for Government employees must mandatorily to be the Permanent Employee Number (PEN) or any Unique Identification No. issued by Department or Govt. of Goa.
UID.4 The user name shall have a minimum set of characters
UID.5 System shall not create duplicate user ids and shall not allow same user id and password for a single entity in System.
UID.7 System shall not allow blank spaces while setting user id and shall notify the user in case the Caps Lock or Num. Lock is on while entering the Username.
UID.8 System shall allow a user who forgets the user id to access the user retrieval mechanism via e-mail/ sms.
UID.9 System shall support multilingual interface (minimum Konkani, Marathi and English) as per localization and language technology standards defined in e-District guidelines
Log-In User Id. For Govt. employees & ESO/CSC/CFC, operators shall be provided by DoIT, ITG & Concerned departments -which will expired/blocked on successful complete-ion or termination of working tenure of concerned employee in concerned department)
All services - General Password Requirements
Requirement ID
Description
PAS.1
System shall allow registration of user to create password for future login and ease (registration not mandatory ) with online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data for setting password/ retrieval of password )
PAS.2
System shall only allow user to choose the password which must be a combination of following: -Alphabets, Symbols & Numeric. -Weak Password shall not be allowed to be chosen by user
PAS.3 System shall allow password having a minimum of set of characters, preferably 8 and shall not allow the user to have the same password for more than 90 days
PAS.4 System shall generate alerts for password expiry at regular intervals five days prior to actual expiry and prompt user to change password
PAS.5 System shall not allow blank spaces while setting password
PAS.6 System shall notify the user in case the Caps Lock or Num. Lock is on
PAS.7 System shall allow a user who forgets the password to access the password retrieval mechanism., maybe via answering to a selected question or mailing the password to the given e-mail id provided at time of registering.
PAS.8 System shall allow user on Log-in failure to click on the “Forgot Username/ Password” link and request for a fresh username password from the Administrator
PAS.9 System shall allow a user who forgets the password to access the password retrieval mechanism via e-mail/ sms with a notification for the same to the user & administrator
PAS.10 System shall prompt the user to change the password in case of first login at the client side i.e. after imaging
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 108 | P a g e
PAS.11 System Shall prompt the user to change the password in case of first login at the client side i.e. after imaging
PAS.12 System Shall give an error message once the user provides wrong login information and ask the user to re log in.
PAS.13 System shall block the user to enter into the e district application if he puts in wrong login info continuously thrice.
PAS.14 System shall support multilingual interface (Marathi, Konkani and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
User Password for Govt. employees & ESO/CSC/CFC, operators shall be provided by DoIT, ITG & Concerned departments - Which has to be changed in within first 30 days of use with personal password -which will expired/blocked on successful complete-ion or termination of working tenure of concerned employee in concerned department
All services - Information Requirements
Requirement ID
Description
INF.1 System shall allow authorized user to update information obtained from department with online tutorials, "How To", FAQs, etc.
INF.2 System shall allow user to add/ update new/existing information document as required
INF.3 System shall allow only the department authorized official to make changes in the updated information hosted over the e district application on receiving his/her digital signature after each updating
INF.4
System shall provide detailed information on the following to the user as per requested service: e.g. Eligibility Criteria(if any),Nodes of obtaining service, Application Fees, Grievance filing procedure (if any), Authorities to contact, Forms and documents required, Service Levels ,other locations for obtaining detailed information etc.
INF.5 System shall allow citizens, department officials, other government officials, ESO/CSC/CFC operators etc. to access the information
INF.6 System shall not allow any un authorized user to upload information besides authorized officials/ user for related content
INF.7 System shall have different presentation layer for each set of users i.e. Information seekers, updaters, approvers etc.
INF.8 System shall notify the authorized administrator for any suspicious uploaded/published information
INF.9 System shall the concerned department head for any information updated over the state/ department portal
INF.10 System shall have a counter at the bottom of the page to record the number of people hitting the website, this would prove beneficial in capturing the usefulness of information
INF.11 System shall auto generate logs in case of authorized official for not performing against their set SLAs
INF.12 System shall support multi-lingual interface (Marathi, Konkani and English) as per localization and language technology standards (Unicode) for National e-Governance plan defined in the e-District guidelines
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 109 | P a g e
INF.13 System Shall prompt the user to change the password in case of first login at the client side i.e. after imaging
All services – Payment Requirements
Requirement ID
Description
PAY.1
System shall allow to trigger payment process when the applicant/ citizen requires to make a payment for the service delivery (with online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with the payment process)
PAY.2 System shall provide for and allow financial transaction functions and shall check for all details of the service request form before initiating the payment
PAY.3 (System shall enable the payment option only when all the fields of service request forms are filled and shall return back and highlight the field which have inconsistencies / error for user to rectify the error
PAY.4
System shall retain all the information of the service request form besides those having inconsistencies and Shall return back after successful checking of the fields with the prompt of confirmation to open the payment page
PAY.5
System shall open a new page for recording payment details against the service request and Shall allow payment to be registered on the service application request against the following –
a. Payment against the service b. Payment against the dues / payments as defined under service charter
of the specific service
PAY.6 System shall record and maintain all details of payment against a unique service application number and system shall be able to maintain all the payment records in a database and retrieve the same as and when required
PAY.7 System shall be able to open a page with declaration on successful payment output and system Shall able to record specific payment details on the service request form after successful payment has been made.
PAY.8
System shall be such that it Shall allow for part payment function and shall be able to retrieve information of first part payment during the final delivery of service output for final payment as per the overall payment specified for service request
a. Unique application number for requested service b. ESO/CSC centre details and unique number for these centres
PAY.9 System shall be able follow the payment cycle as mentioned above for the final payment also and system Shall be able to maintain all records of part payments as well as consolidated payment amount against the service request
PAY.10 System shall support multi-lingual interface (Marathi, Konkani and English) as per localization and language technology standards for National e-Governance plan defined in the e-District guidelines
PAY.11 System shall give a welcome message once the user is able to successfully login to the e district application
PAY.12 System shall give an error message once the user provides wrong login Information and ask the user to re log in.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 110 | P a g e
All services – Form Availability Requirements
Requirement ID
Description
FAR.1 System shall be able to make available service request form should be through -Online / website -ESO/CSC/CFC Centre
FAR.2 The system shall allow easy searching of the service request form and user friendly layout for locating the service request form
FAR.3 System shall allow authorized user to update forms obtained from department with online tutorials, "How To", FAQs, etc.
FAR.4 System shall be able to export forms in multiple formats so as to ensure compatibility of forms
FAR.5 System shall have a life counter feature to keep track of number of forms being downloaded from the state/department portal using e-District application
FAR.6 System shall allow user to add/ update new/existing forms as required and shall have provision of uploading new version of the forms as and when it is required to change the version
FAR.7 System shall have a security feature embedded for changing the version of the form and should allow only authorized process owners to change the form version
FAR.8 System shall allow only the department authorized official to make changes in the updated forms hosted over the e district application on receiving his/her digital signature after each updating
FAR.9
System shall provide detailed information on the following to the user as per requested service: e.g. Eligibility Criteria(if any),Nodes of obtaining service, Application Fees, Grievance filing procedure (if any), Authorities to contact, Forms and documents required, Service Levels ,other locations for obtaining detailed information etc.
FAR.10 System shall allow citizens, department officials, other government officials, ESO/CSC/CFC operators etc. to access the information
FAR.11 System shall store all the service request form at predefined location for the finalized services
FAR.12 System shall be able to retrieve service request form from the predefined location.
FAR.13 System shall allow user to download form as per service request easily downloadable both through .pdf, HTML and word format & provide printable version of the service request form
FAR.9 System shall give an error message in case it is not able to retrieve the application from the given location
FAR.10 System shall have a provision to maintain the version control for the service request form
FAR.11 System shall maintain log for all version change with the details of the process owner making version change
FAR.12 System shall not allow to change the content of the form and content should be in read only version
FAR.13 System shall support multi-lingual interface (Marathi, Konkani and English) as per localization and language technology standards (Unicode) for National e-Governance plan defined in the e-District guidelines
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 111 | P a g e
All services - Verification Requirements
Requirement ID
Description
VER.1 System shall allow the concerned authority / official or process owner in process to enter query to search in any Database connected with the System
VER.2 System shall query the specified database and return the result of the same to the concerned authority / official or process owner
VER.3 System shall be able to retrieve information from the individual databases and aggregate it before displaying it
VER.4 System shall display the details of the applicant in a table prompting the field/verifying officer “check” “OK” or “NOT OK” against each based on his/her verification.
VER.5 System shall prompt the field/verifying officer to enter the details of the means of verification and enter specifics of the same (like if physical verification: date etc. and in case online verification: database etc.)
VER.6 System shall allow the field/verifying officer to modify the database as per the access rights defined for every service (by department) and modification to the database will be based on field inputs to be keyed in by field/verifying officer
VER.7 System shall decode the digital signed data and display the details of the signatory (when required)
VER.8 System shall allow the field/verifying officer to electronically forward the application back to the concerned authority / official or process owner after the details in the database have been updated
VER.9 System shall notify the concerned authority / official or process owner after the field officer has marked the application back to him/her
VER.10 System shall allow the concerned authority / official or process owner to either approve or reject the application as per the approval or rejection component, using his/her digital signature.
VER.11 System shall ensure that a reason for rejection is entered by the concerned authority / official or process owner if he/she selects to reject an application before submitting the rejection.
VER.12 System shall log all the electronic movements of the application with date and time details along with the sender‟s and receiver‟s information
VER.13
System shall support digital signatures of any of the certifying authorities registered under the controller of certifying authorities, and must be modifiable as per the changes made by the respective Certifying Authorities on the structure of the Digital Signatures issued by them.
VER.14 The Digital Signatures used and the e-District Application must provide the Time Stamping of the act of Digitally Signing a document as mandated by the IT Act 2000.
VER.15 System shall support multi-lingual interface (Marathi, Konkani and English) as per localization and language technology standards (Unicode) for National e-Governance plan defined in the e-District guidelines
VER.16 System shall be able to provide date and time stamping for all transactions done with digital signature
VER.17 System shall be able escalate the application as per the process work flow hierarchy, by notifying the next level of authority and sending him a copy of the application and system shall also flag the database which was found inconsistent
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 112 | P a g e
based on his/her verifications and intimate the concerned database owner
All services - Status Requirements
Requirement ID
Description
STA.1 System shall display the link for requested service on state/department portal from where the applicant can retrieve the status information by entering the unique application reference id
STA.2 System shall also allow the applicant to retrieve update about his/her service request through the web portal by entering the reference id in the link provided on the portal
STA.3 System shall display the number from where the applicant can retrieve the status information by sending SMS along-with the unique application reference id
STA.4 System shall have Side Menu on each page so as to reflect the contents of the containing directory, making it easier to navigate the site and locate the link for retrieving update against a given reference id
STA.5 System shall have integrated auto status tracking features in the system that shall keep track of all the service requests from the citizens along with the respective unique application reference id generated at the time of the application receipt
STA.6 System shall be able to keep track of the status of all the service requests with the help of the respective unique application reference id (application id) and map the current status with the pre-defined service level against each process
STA.7 System shall be available in public and administrative view
STA.8
System shall be able to detect any change in the status of a given unique application reference id - In case there is a change in the status of a unique application reference id , the system shall update the status information in the database
STA.9 System shall have provisions for intimating the applicant about the current status of his/her application through SMS and/or Email especially if there is a change in the status with respect to the final delivery of the service
STA.10
System shall not provide details about the internal SLAs to the applicant and only provide update about the status with respect to the final delivery. -This feature should also allow the system to update the applicant if there is any change in the service level of the final delivery
STA.11 System shall allow the applicant to retrieve update about his/her service request by sending a SMS containing the unique application reference id
STA.12 System shall display an appropriate message if the system is unable to retrieve the details due to any reason like connectivity issues, maintenance issues, etc. and also provide contact details of the system administrator and alternate link (if available)
STA.13 System shall have adequate security features built in the architecture of the system to ensure that it cannot be hacked or manipulated
STA.14 System shall not allow the users to edit the details of the application upon retrieving the status update against a given reference id
STA.15 System shall allow the end user to print the status update information if the applicant is retrieving the status through the portal or email
STA.16 System should have provision for Calendar System, which displays the dates and time of schedule events on a page formatted as a standard monthly calendar
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 113 | P a g e
STA.17 System shall have provisions such that the System Administrator can add/remove/modify the hierarchy of the Government officials with adequate authentication mechanism
STA.18 If there is any modification in the hierarchy of the relevant authority against a given service (in the system), system shall automatically map the escalation levels with the new hierarchy of Government officials
STA.19 System shall have additional capability to integrate and extend portals to support a vast array of mobile devices in addition to PCs (WAP enabled)
STA.20 The points in process where status would be updated has to be marked in the service status process map as well system shall be able to generate MIS reports
STA.21 System shall allow the end user to print the status update information if the applicant is retrieving the status through the portal or email
STA.22 The System shall support provision for IVRS/ Call centre/SMS/online option for status checking
STA.23 System shall support multi-lingual interface (Marathi, Konkani and English) as per localization and language technology standards (Unicode) for National e-Governance plan defined in the e-District guidelines
All services – Approval Requirements
Requirement ID
Description
APRV.1
System shall show & intimate the users through predefined channels for pending approval on a daily basis as soon as service owner login to the system - The pending approvals should highlighted for the users on entering the Application - The pending approvals should be intimated to the users through SMS on predefined intervals until the same is addressed and closed by the respective process owner
APRV.2 System shall have a provision to mark the approval of service request and also allow the user to digitally sign the documents one by one
APRV.3 System shall allow the user the digitally sign all the selected approved service request at one go
APRV.4 Upon digitally signing the document, digitally signed document should be saved in the given repository for future references and a hard copy of the same document will be provided to the applicant
APRV.5 System shall open a page for all approved service request with a prompt of digital signature in form a button to initiate the process of digital signing
APRV.6 System shall reconfirm from the user for initiating the digital signing before actually initiating the process
APRV.7 System shall provide a link to the page where the user can enter the unique encrypted key/code printed on the hard copy of the document to check for the authenticity of the document
APRV.9 On clicking the link, system should display the fields as described in the section Document retrieval form such that the user can retrieve the required information
APRV.10
System shall print the unique encrypted key/code on the hard copy of the digitally signed document such that the same printed unique encrypted key/code can be used to check the authenticity of the document. The unique encrypted key/code will be information of the authority who digitally signed the document in the
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 114 | P a g e
encoded form
APRV.11 System shall retrieve and display the digitally signed document on the user screen once the user enters the unique encrypted key/code printed on the document
APRV.12 System shall not allow the user to make any alteration in the digitally signed document or access the database on entering the unique encrypted key/code
APRV.13 System shall display an appropriate message in case of retrieval failure or any other communication failure or in case the document could not be found due to any reason
APRV.14 System should allow the user to terminate the approval process at any point of time during approval
APRV.15 System shall keep and maintain the data in a data repository (database): -For all the approval made -All transaction performed and link it to the unique code of digital signature
APRV.16 System shall open a page informing the user of successful completion of approval
APRV.17 System shall open a page at any point of process in case the process termination with the request to restart the process
APRV.18 System shall not allow the user to initiate the process of digital signature in case of no selection of pending service request for approval
APRV.19 System shall not allow the user to modify the approval once it has been digitally signed
APRV.20 System shall not allow the user to delete any service request pending for approval at his end
APRV.21 System shall open a page at any point of process in case the process termination with the request to restart the process
APRV.22 System shall not allow the user to initiate the process of digital signature in case of no selection of pending service request for approval
APRV.23 System shall not allow the user to modify the approval once it has been digitally signed
APRV.24 System shall not allow the user to delete any service request pending for approval at his end
APRV.25 System shall support multi-lingual interface (minimum Marathi, Konkani and English) as per localization and language technology standards for National e-Governance plan defined in the e-District guidelines
All services – Rejection Requirements
Requirement ID
Description
RCJT.1
System shall highlight & intimate the users for pending service request application on a daily basis as soon as service owner login to the system - The pending approvals/rejections should be intimated to the users through SMS on predefined intervals until the same is addressed and closed by the respective process owner
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 115 | P a g e
RCJT.2 System shall have a provision to mark the approval/rejection of service request and system shall allow the user to digitally sign the documents one by one.
RCJT.3 System shall also allow the user the digitally sign all the rejected service request at one go
RCJT.4 System Shall be able to maintain the database of the all the service delivery output in a logical manner to ease the retrieval of the same as and when required
RCJT.5 System shall open a page with marked rejected application form and text entry provision against all the rejected application form
RCJT.6 System shall have allow process owner to state the reason for rejection of the service request
RCJT.7 system shall close the service request only and only once the reason text box is filled
RCJT.9 System shall allow downloading of the service delivery output only after matching the digital verification and system shall provide for the printable version of the service output
RCJT.10 System shall open a page for all rejected service request with a prompt of digital signature in form a button to initiate the process of digital signing & reconfirm from the user for initiating the digital signing before actually initiating the process
RCJT.11 Upon digitally signing the document, digitally signed document should be saved in the given repository for future references and a hard copy of the same document will be provided to the applicant
RCJT.12
System shall print the unique encrypted key/code on the hard copy of the digitally signed document such that the same printed unique encrypted key/code can be used to check the authenticity of the document. The unique encrypted key/code will be information of the authority who digitally signed the document in the encoded form
RCJT.13 System shall provide a link to the page where the user can enter the unique encrypted key/code printed on the hard copy of the document to check for the authenticity of the document
RCJT.14 On clicking the link, system shall display the fields as described in the section Document retrieval form such that the user can retrieve the required information
RCJT.15 System shall retrieve and display the digitally signed document on the user screen once the user enters the unique encrypted key/code printed on the document
RCJT.16 System shall not allow the user to make any alteration in the digitally signed document or access the database on entering the unique encrypted key/code
RCJT.17 System shall display an appropriate message in case of retrieval failure or any other communication failure or in case the document could not be found due to any reason
RCJT.18 System shall allow the user to terminate the rejection process at any point of time during rejection & system shall keep and maintain the data in a data repository (database) for all the rejection made
RCJT.19 System shall be able to keep the records of all transaction performed and link it to the unique code of digital signature & system shall open a page informing the user of successful completion of approval
RCJT.20 System shall open a page at any point of process in case the process termination with the request to restart the process
RCJT.21 System shall not allow the user to initiate the process of digital signature in case of no selection of pending service request for approval/rejection
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 116 | P a g e
RCJT.22 System shall not allow the user to modify the rejection once it has been digitally signed
RCJT.23 System shall not allow the user to delete any service request pending for rejection at his end
RCJT.24 System shall support multi-lingual interface (minimum Marathi, Konkani and English) as per localization and language technology standards for National e-Governance plan defined in the e-District guidelines
All services – Delivery Requirements
Requirement ID
Description
DLVR.1
System Shall be able to provide citizen/applicant/ESO/CSC Operator to select option of delivery for his her selected service against all service request made and system Shall be able to link delivery against specific service request through unique service application request number.
DLVR.2 System Shall be able to provide delivery against all service request made The system Shall be able to link delivery against specific service request through unique service application request number
DLVR.3
The system Shall allow delivery only when the service request has been either approved / rejected and also system Shall allow only validated predefined users to log into the e-District application for retrieving the delivery against the service request
DLVR.4 The system Shall ask for unique service request number / unique application number to retrieve specific service delivery
DLVR.5 The system Shall ask for the digital verification from the authenticated predefined users
DLVR.6
The system Shall support multi-lingual interface (minimum Marathi, Konkani and English) as per localization and language technology standards for National e- Governance plan defined in the e-District guidelines The output for all services from e-District Shall be uniform in fonts. For this pdf. output may be considered.
DLVR.8 The system Shall open new page specifying error in case of incorrect digital verification
DLVR.9 The system Shall be able to maintain the database of the all the service delivery output in a logical manner to ease the retrieval of the same as and when required
DLVR.10 The system Shall have a life counter to keep log of all delivery made with specific association of unique service application number and unique ESO/CSC centre number
DLVR.11 The system Shall allow downloading of the service delivery output only after matching the digital verification and system Shall provide for the printable version of the service output
DLVR.12 The system Shall send automated response to applicant via SMS, e-Mail etc. regarding final output being ready for a particular service request.
All services – Monitoring Requirements
Requirement ID
Description
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 117 | P a g e
MNT.1
System shall display the link for requested service on state/department portal
from where the applicant can retrieve the information by entering the unique
application reference id
MNT.2
System shall have side menu on each page so as to reflect the contents of the
containing directory, making it easier to navigate the site and locate the link for
retrieving update against a given reference id
MNT.3 System shall allow process owner to use the e-District Application (eDA) to query
the departmental databases using the name or other details of the applicant.
MNT.4 System shall allow service owner to retrieve display information with the unique
application reference id from the individual databases and aggregate it.
MNT.5 System shall support the monitoring in both the occurrence, when an event or time driven activity is triggered.
MNT.6 System shall be able to retrieve all information about the status of the application form of the citizen.
MNT.7 System shall be able to keep track of the status of all the service requests with the help of the respective unique application reference id (application id) and map the current status with the pre-defined service level against each process
MNT.8 System shall be able to automatically generate the MIS reports to the concerned
authorities at regular time interval. (as required by department)
MNT.9 System shall allow generating Service Report on a regular time interval; these reports should include the no of application received, no of application processed, no of application rejected and the no of application under process.
MNT.10 System shall allow generating SLA Report on regular time interval; these reports should give information related to centre wise details of no of SLA met and centre wise details of no of SLA breached.
MNT.11 System shall allow generating Performance Report on regular time interval; this report should give information related to centre wise details of no of application processed against the no of application received.
MNT.12
System should be able to generate Payment Report (as commanded by process
owner) on regular time interval, this report should give information related to
centre wise transaction, money collected and money deposited along with date
and time.
MNT.13
System shall allow to generate Inventory Report on regular time interval, this
report should give information related to pre-printed stationary used and issued to
each centre
MNT.14 System shall be able to generate Attendance Report on regular time interval; this report should give information related to centre wise attendance.
MNT.15
System shall provide a search option to the authorized stakeholder so that he can
search the information which should be sorted according to Date, Department,
Service, District, Taluka and Village
MNT.16 Should allow the stakeholder to review the progress report and give his/her
comments online
MNT.17 System shall provide the facility to print and e-mail the report.
- For printing – System shall provide friendly version automatically for all pages.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 118 | P a g e
MNT.18 System should have provision for Calendar System, which displays the dates and time of schedule events on a page formatted as a standard monthly calendar
MNT.19 System shall support multi-lingual interface (Marathi, Konkani and English) as per localization and language technology standards (Unicode) for National e-Governance plan defined in the e-District guidelines
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 119 | P a g e
I. Collectorate Office
Requirement Specifications
Collectorate Office
1. Issuance of Income certificate
Requirement ID
Description
CER.IIC.1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
CER.IIC.2 System shall allow registration of applicant for future login and ease (registration not mandatory)
CER.IIC.3 System shall allow applicant to select application for Income certificate on the Collectorate office page of the state portal
CER.IIC. 4 System shall accept application of new applicants
CER.IIC.5
System shall be able to capture the applicants details through an electronic form such as: 1)Name 2)Contact Details 3)PIN 4)Age 5)Details as required in application form used 6)Unique Identification (UID) 7)E-mail id (if any) 8)Mobile No. (if any)
CER.IIC.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
CER.IIC.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
CER.IIC.8 System shall allow the applicant to preview the application form
CER.IIC.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IIC.10 System Shall allow add/ delete/ editing before submission
CER.IIC.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
CER.IIC.12 System Shall allow save and print facility of the acknowledgement slip
CER.IIC.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
CER.IIC.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
CER.IIC.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
CER.IIC.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 120 | P a g e
CER.IIC.17 System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
CER.IIC.18 System shall time out the session if it is idle for more than fifteen minutes.
CER.IIC.19 The system should return to main menu after print out of the receipt has been taken
CER.IIC.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IIC.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
CER.IIC.22 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
CER.IIC.23 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
CER.IIC.24 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
CER.IIC.25
System shall allow user to track the status of the application request along with remarks to the user such as: 1. Pending confirmation 2. Application accepted 3. Application declined
CER.IIC.26 User shall be able to print and save the notification for easy retrieval of information for future reference
CER.IIC.27 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
CER.IIC.28 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
CER.IIC.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
CER.IIC.30 System shall send an activation URL to the email id of the respective official responsible to accept the application
CER.IIC.31 System shall allow the concerned authority to enter query parameters for the Database and then display the results for the query to the respective authority
CER.IIC.32 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
CER.IIC.33 System shall save the digitally signed copy of the Certificate issued as a softcopy in a Database
CER.IIC.34 System shall log the details of who accessed the online soft copy and took a printout of the same.
CER.IIC.35 System shall allow the Village Officer to create or update the certificate details in Database.
CER.IIC.36 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 121 | P a g e
CER.IIC.37 System shall allow and accept the digital signature from respective officials for processing the application and issue of certificate for the users
CER.IIC.38 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
CER.IIC.39 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
CER.IIC.40 System shall allow to intimate citizen for issuance of income certificate or rejection of income certificate (with reason/remark)
CER.IIC.41 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
CER.IIC.42 System shall be PKI enabled to accept digital signatures certificate for digital signing of the documents.
CER.IIC.43 System shall consider the list of holidays for tracking the timelines of various
CER.IIC.44 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
CER.IIC.45
Income Certificate module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
2. Issuance of Domicile Certificate
Requirement ID
Description
CER.IDC.1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
CER.IDC.2 System shall allow applicant to select application for Domicile certificate on the Collectorate office page of the state portal
CER.IDC.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
CER.IDC.4 System shall accept application of new applicants
CER.IDC.5
System shall be able to capture the applicants details through an electronic form such as: 1)Name 2)Contact Details 3)PIN 4)Age 5)Details as required in application form used 6)Unique Identification (UID) 7)E-mail id (if any) 8)Mobile No. (if any)
CER.IDC.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
CER.IDC.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
CER.IDC.8 System shall allow the applicant to preview the application form
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 122 | P a g e
CER.IDC.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IDC.10 System Shall allow add/ delete/ editing before submission
CER.IDC.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
CER.IDC.12 System Shall allow save and print facility of the acknowledgement slip
CER.IDC.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
CER.IDC.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
CER.IDC.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
CER.IDC.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
CER.IDC.17 System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
CER.IDC.18 System shall time out the session if it is idle for more than fifteen minutes.
CER.IDC.19 The system should return to main menu after print out of the receipt has been taken
CER.IDC.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IDC.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
CER.IDC.22 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque.
CER.IDC.23
System shall allow user to track the status of the application request along with remarks to the user such as: -Application accepted -Application declined -Pending confirmation
CER.IDC.24 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
CER.IDC.25 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
CER.IDC.26 User shall be able to print and save the notification for easy retrieval of information for future reference
CER.IDC.27 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
CER.IDC.28 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 123 | P a g e
CER.IDC.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
CER.IDC.30 System shall send an activation URL to the email id of the respective official responsible to accept the application
CER.IDC.31 System shall allow the concerned authority to enter query parameters for the database and then display the results for the query to the respective authority
CER.IDC.32 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
CER.IDC.33 System shall save the digitally signed copy of the domicile certificate issued as a softcopy in a database
CER.IDC.34 System shall log the details of who accessed the online soft copy and took a printout of the same.
CER.IDC.35 System shall allow the authorized official to create or update the certificate details in Database.
CER.IDC.36 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
CER.IDC.37 System shall allow and accept the digital signature from respective officials for processing the application and issue of certificate for the users
CER.IDC.38 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
CER.IDC.39 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
CER.IDC.40 System shall allow to intimate citizen for issuance of Domicile certificate or rejection of Domicile certificate (with reason/remark)
CER.IDC.41 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
CER.IDC.42 System shall be PKI enabled to accept digital signatures certificate for digital signing of the documents.
CER.IDC.43 System shall consider the list of holidays for tracking the timelines of various
CER.IDC.44 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
CER.IDC.45
Domicile Certificate module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
3. Issuance of cast community certificate
Requirement ID
Description
CER.ICC.1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
CER.ICC.2 System shall allow applicant to select application for Cast community certificate on the Collectorate office page of the state portal
CER.ICC.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
CER.ICC.4 System shall accept application of new applicants
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 124 | P a g e
CER.ICC.5
System shall be able to capture the applicants details through an electronic form such as: 1. Name 2. Contact Details 3. PIN 4. Age 5. Details as required in application form used 6. Certificate from Samaj concerned 7. Father‟s Caste Certificate issued by the prescribed Authority. 8. An affidavit in the prescribed form. 9. Applicant‟s Birth Certificate 10. Migration proof on or before19th feb 1968 with father‟s or/and grandfathers
birth certificate as required by department 11. Unique Identification (UID) 12. E-mail id (if any) 13. Mobile No. (if any)
CER.ICC.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
CER.ICC.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
CER.ICC.8 System shall allow the applicant to preview the application form
CER.ICC.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.ICC.10 System Shall allow add/ delete/ editing before submission
CER.ICC.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
CER.ICC.12 System Shall allow save and print facility of the acknowledgement slip
CER.ICC.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
CER.ICC.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
CER.ICC.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
CER.ICC.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
CER.ICC.17 System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
CER.ICC.18 System shall time out the session if it is idle for more than fifteen minutes.
CER.ICC.19 The system should return to main menu after print out of the receipt has been taken
CER.ICC.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 125 | P a g e
non-humans
CER.ICC.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
CER.ICC.22 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque.
CER.ICC.23
System shall allow user to track the status of the application request along with remarks to the user such as: -Application accepted -Application declined -Pending confirmation
CER.ICC.24 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
CER.ICC.25 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
CER.ICC.26 User shall be able to print and save the notification for easy retrieval of information for future reference
CER.ICC.27 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
CER.ICC.28 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
CER.ICC.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
CER.ICC.30 System shall send an activation URL to the email id of the respective official responsible to accept the application
CER.ICC.31 System shall allow the concerned authority to enter query parameters for the database and then display the results for the query to the respective authority
CER.ICC.32 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
CER.ICC.33 System shall save the digitally signed copy of the cast community certificate issued as a softcopy in a database
CER.ICC.34 System shall log the details of who accessed the online soft copy and took a printout of the same.
CER.ICC.35 System shall allow the authorized official to create or update the certificate details in Database.
CER.ICC.36 System shall allow the authorized official to create or update the certificate details in Database for issuance of provisional cast community certificate. (if required)
CER.ICC.37 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
CER.ICC.38 System shall allow and accept the digital signature from respective officials for processing the application and issue of certificate for the users
CER.ICC.39 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
CER.ICC.40 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 126 | P a g e
CER.ICC.41 System shall allow to intimate citizen for issuance of Cast community certificate or rejection of Cast community certificate (with reason/remark)
CER.ICC.42 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
CER.ICC.43 System shall be PKI enabled to accept digital signatures certificate for digital signing of the documents.
CER.ICC.44 System shall consider the list of holidays for tracking the timelines of various
CER.ICC.45
Cast community Certificate module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
CER.ICC.46 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
CER.ICC.47 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
4. Issuance of residence certificate
Requirement ID
Description
CER.IRC.1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
CER.IRC.2 System shall allow applicant to select application for Residence certificate on the Collectorate office page of the state portal
CER.IRC.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
CER.IRC.4 System shall accept application of new applicants
CER.IRC.5
System shall be able to capture the applicants details through an electronic form such as: 1. Attested Photocopy of Birth Certificate 2. Ration Card 3. Any other proof of residence. 4. 2 passport size photographs 5. Affidavit for civil registration (marriage) 6. Other details as per used format and required by department
CER.IRC.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
CER.IRC.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
CER.IRC.8 System shall allow the applicant to preview the application form
CER.IRC.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IRC.10 System Shall allow add/ delete/ editing before submission
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 127 | P a g e
CER.IRC.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
CER.IRC.12 System Shall allow save and print facility of the acknowledgement slip
CER.IRC.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
CER.IRC.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
CER.IRC.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
CER.IRC.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
CER.IRC.17 System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
CER.IRC.18 System shall time out the session if it is idle for more than fifteen minutes.
CER.IRC.19 The system should return to main menu after print out of the receipt has been taken
CER.IRC.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IRC.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
CER.IRC.22 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque.
CER.IRC.23
System shall allow user to track the status of the application request along with remarks to the user such as: -Application accepted -Application declined -Pending confirmation
CER.IRC.24 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
CER.IRC.25 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
CER.IRC.26 User shall be able to print and save the notification for easy retrieval of information for future reference
CER.IRC.27 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
CER.IRC.28 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
CER.IRC.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
CER.IRC.30 System shall send an activation URL to the email id of the respective official responsible to accept the application
CER.IRC.31 System shall allow the concerned authority to enter query parameters for the
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 128 | P a g e
database and then display the results for the query to the respective authority
CER.IRC.32 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
CER.IRC.33 System shall save the digitally signed copy of the residence certificate issued as a softcopy in a database
CER.IRC.34 System shall log the details of who accessed the online soft copy and took a printout of the same.
CER.IRC.35 System shall allow the authorized official to create or update the certificate details in Database.
CER.IRC.36 System shall allow the authorized official to create or update the certificate details in Database for issuance of provisional residence certificate. (if required)
CER.IRC.37 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
CER.IRC.38 System shall allow and accept the digital signature from respective officials for processing the application and issue of certificate for the users
CER.IRC.39 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
CER.IRC.40 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
CER.IRC.41 System shall allow to intimate citizen for issuance of Residence certificate or rejection of Residence certificate (with reason/remark)
CER.IRC.42 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
CER.IRC.43 System shall be PKI enabled to accept digital signatures certificate for digital signing of the documents.
CER.IRC.44 System shall consider the list of holidays for tracking the timelines of various
CER.IRC.45 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
CER.IRC.46
Residence Certificate module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
5. Issuance of divergence certificate
Requirement ID
Description
CER.IDC.1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
CER.IDC.2 System shall allow applicant to select application for Divergence certificate on the Collectorate office page of the state portal
CER.IDC.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
CER.IDC.4 System shall accept application of new applicants
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 129 | P a g e
CER.IDC.5
System shall be able to capture the applicants details through an electronic form such as:
1. Affidavit in prescribed form 2. Birth Certificate 3. Documentary evidence where Divergence have been occurred
CER.IDC.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
CER.IDC.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
CER.IDC.8 System shall allow the applicant to preview the application form
CER.IDC.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IDC.10 System Shall allow add/ delete/ editing before submission
CER.IDC.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
CER.IDC.12 System Shall allow save and print facility of the acknowledgement slip
CER.IDC.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
CER.IDC.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
CER.IDC.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
CER.IDC.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
CER.IDC.17 System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
CER.IDC.18 System shall time out the session if it is idle for more than fifteen minutes.
CER.IDC.19 The system should return to main menu after print out of the receipt has been taken
CER.IDC.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IDC.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
CER.IDC.22 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque.
CER.IDC.23
System shall allow user to track the status of the application request along with remarks to the user such as: -Application accepted -Application declined
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 130 | P a g e
-Pending confirmation
CER.IDC.24 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
CER.IDC.25 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
CER.IDC.26 User shall be able to print and save the notification for easy retrieval of information for future reference
CER.IDC.27 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
CER.IDC.28 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
CER.IDC.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
CER.IDC.30 System shall send an activation URL to the email id of the respective official responsible to accept the application
CER.IDC.31 System shall allow the concerned authority to enter query parameters for the database and then display the results for the query to the respective authority
CER.IDC.32 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
CER.IDC.33 System shall save the digitally signed copy of the divergence certificate issued as a softcopy in a database
CER.IDC.34 System shall log the details of who accessed the online soft copy and took a printout of the same.
CER.IDC.35 System shall allow the authorized official to create or update the certificate details in Database.
CER.IDC.36 System shall allow the authorized official to create or update the certificate details in Database for issuance of provisional divergence certificate. (if required)
CER.IDC.37 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
CER.IDC.38 System shall allow and accept the digital signature from respective officials for processing the application and issue of certificate for the users
CER.IDC.39 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
CER.IDC.40 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
CER.IDC.41 System shall allow to intimate citizen for issuance of Divergence certificate or rejection of Divergence certificate (with reason/remark)
CER.IDC.42 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
CER.IDC.43 System shall be PKI enabled to accept digital signatures certificate for digital signing of the documents.
CER.IDC.44 System shall consider the list of holidays for tracking the timelines of various
CER.IDC.45 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
CER.IDC.46 Divergence Certificate module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 131 | P a g e
requirement – e.g. Information component, Form availability component etc.
6. Issuance of matriz certificate
Requirement ID
Description
CER.IMC.1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
CER.IMC.2 System shall allow applicant to select application for Matriz certificate on the Collectorate office page of the state portal
CER.IMC.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
CER.IMC.4 System shall accept application of new applicants
CER.IMC.5
System shall be able to capture the applicants details through an electronic form such as: 1. Application to be addressed to the Mamlatdar and Head of Taluka Revenue
Office. 2. Details of land (as required by department)
3. Other supporting documents required by department
CER.IMC.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
CER.IMC.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
CER.IMC.8 System shall allow the applicant to preview the application form
CER.IMC.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IMC.10 System Shall allow add/ delete/ editing before submission
CER.IMC.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
CER.IMC.12 System Shall allow save and print facility of the acknowledgement slip
CER.IMC.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
CER.IMC.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
CER.IMC.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
CER.IMC.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
CER.IMC.17 System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 132 | P a g e
CER.IMC.18 System shall time out the session if it is idle for more than fifteen minutes.
CER.IMC.19 The system should return to main menu after print out of the receipt has been taken
CER.IMC.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.IMC.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
CER.IMC.22 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque.
CER.IMC.23
System shall allow user to track the status of the application request along with remarks to the user such as: -Application accepted -Application declined -Pending confirmation
CER.IMC.24 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
CER.IMC.25 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
CER.IMC.26 User shall be able to print and save the notification for easy retrieval of information for future reference
CER.IMC.27 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
CER.IMC.28 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
CER.IMC.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
CER.IMC.30 System shall send an activation URL to the email id of the respective official responsible to accept the application
CER.IMC.31 System shall allow the concerned authority to enter query parameters for the database and then display the results for the query to the respective authority
CER.IMC.32 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
CER.IMC.33 System shall save the digitally signed copy of the matriz certificate issued as a softcopy in a database
CER.IMC.34 System shall log the details of who accessed the online soft copy and took a printout of the same.
CER.IMC.35 System shall allow the authorized official to create or update the certificate details in Database.
CER.IMC.36 System shall allow the authorized official to create or update the certificate details in Database for issuance of provisional matriz certificate. (if required)
CER.IMC.37 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
CER.IMC.38 System shall allow and accept the digital signature from respective officials for processing the application and issue of matriz certificate for the users
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 133 | P a g e
CER.IMC.39 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
CER.IMC.40 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
CER.IMC.41 System shall allow to intimate citizen for issuance of Matriz certificate or rejection of Matriz certificate (with reason/remark)
CER.IMC.42 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
CER.IMC.43 System shall be PKI enabled to accept digital signatures certificate for digital signing of the documents.
CER.IMC.44 System shall consider the list of holidays for tracking the timelines of various
CER.IMC.45 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
CER.IMC.46
Matriz Certificate module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
7. Revenue Court- case listing/adjournment/stay/final/status
Requirement ID
Description
RCC.LASFS.1
System shall allow Applicant/ESO/CSC/CFC operator to select revenue case related page (Collectorate office) from the Home page of the state/department portal or through multiple routes e.g. Service links, Information links, District links, etc.
RCC.LASFS.2 System shall allow applicant to select Revenue Court Application from the above listed sources
RCC.LASFS.3 System shall provide Information on Revenue Cases as per the Information Dissemination component defined previously
RCC.LASFS.4 System shall make Application Form for filing and application of a case available online as per the Form Availability component defined previously.
RCC.LASFS.5 System shall allow the Collector, Dy. Collector, Mamlatdar, SDO, BDM , ,Talathi ,Village Officer and the section clerks to Log into the Application and access the Revenue Case section.
RCC.LASFS.6 System shall enable Collector, Dy. Collector, Mamlatdar, SDO, BDM , ,Talathi ,Village Officer and the section clerks to enter the case details as per the Form details given in the Service Request Form section.
RCC.LASFS.7 System shall allow to accept Case number with year and party details ( non-mandatory) which can be verified internally within departments through e-District interface
RCC.LASFS.8 System shall be able to generate & display daily case lists & status
RCC.LASFS.9 System shall display next date of case listing or the status of case (if not listed)
RCC.LASFS.10 System shall allow uploading the scanned/ PDF copy of Application in
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 134 | P a g e
the State portal where citizen can take the print of it.
RCC.LASFS.11 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
RCC.LASFS.12 System shall enable a printer-friendly version automatically for all pages so that applicant/citizen or the Dealing/Section Clerks of the revenue case can take a Printout of the specified date‟s Case List.
RCC.LASFS.13 System shall have provision for calendar system, which displays the dates and time of schedule revenue cases on a standard monthly calendar.
RCC.LASFS.14 System shall be able to generate a reminder for a case before seven days from the hearing date. It should also be able to send the reminder to the concerned officials and the respondent.
RCC.LASFS.15 System shall be able to generate notification to the concerned official whenever any action from that person is asked for.
RCC.LASFS.12
For court Case Status System: a. Select Court from Multilayered Menu (District Name -> List of
Revenue Cases) b. Provision for accepting Case number from user c. Retrieval of case status with summary d. Option for searching case
RCC.LASFS.11
For copy of Final Order system shall provide the following information: a. Select of Court from Multilayered Menu (District Name -> List of
Revenue Courts) b. Provision for accepting Case number from user c. Retrieval and Downloading of Copy of final Order of Court Case d. Option for uploading scanned/Digitally signed soft copy of Final
Order of court case. e. The Copy of the Final Order must be Non-Editable.
System shall support multilingual interface ( Konkani, Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines.
RCC.LASFS.12 System shall facilitate the ESO/CSC/CFC center operator to enter the necessary details mentioned in the Record view or as prescribed by department for the logged in officer table.
RCC.LASFS.13
System shall also be able to generate MIS related to case summary w.r.t. the cases handled by a particular post of the government official. E.g. System shall give the option of viewing all the cases handled by a Mamlatdar/BDO/SDO and their respective status should also be reflected in the MIS report.
RCC.LASFS.14 System shall allow the section clerks and the Ordering authority to upload the pdf format of the final order.
RCC.LASFS.15 System shall allow proper interface with Taluka Suite, DC Suite and eDA so that these applications could exchange necessary information among themselves
RCC.LASFS.16 System shall be able to generate reminders for the appellate authority every day after seven days of application regarding issuance of first hearing Notice within fifteen days of application.
RCC.LASFS.17 System shall allow the authorized officials to put remarks for all the actions taken by them.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 135 | P a g e
RCC.LASFS.18 System shall allow to upload the scanned/ PDF copy of judgments & actions taken in the requested process.
RCC.LASFS.19 System shall be PKI enabled to accept digital signatures for digital signing of the documents of revenue court.
RCC.LASFS.20 System shall consider the list of holidays for tracking the timelines of various activities.
RCC.LASFS.21
Revenue court module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
RCC.LASFS.21 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
It is desired to understand if any party(s) can be registered against any case or not. Same facility is not available in regular courts. Hence, Leaving the registration module for revenue courts
It is desired to understand how system will display the documents required by court is to be submitted by litigants
8. Arms License - Application for New/ Renewal of License
Requirement ID
Description
ARM.NRL.1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
ARM.NRL.2 System shall allow applicant to select application for Arms license on the Collectorate office page of the state portal
ARM.NRL.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
ARM.NRL.4 System shall accept application of new applicants
ARM.NRL.5
System shall be able to capture the applicants details through an electronic form such as:
1. Passport size photograph 2. Copy of Ration Card 3. Unique Identification No. (Aadhaar) 4. Crop Cultivation Document, if any, i.e. Form I and XIV 5. Information to be furnished as per current form. 6. Supporting documents/details as per department requirement.
ARM.NRL.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
ARM.NRL.7
System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
ARM.NRL.8 System shall allow the applicant to preview the application form
ARM.NRL.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 136 | P a g e
submitted by non-humans
ARM.NRL.10 System Shall allow add/ delete/ editing before submission
ARM.NRL.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
ARM.NRL.12 System Shall allow save and print facility of the acknowledgement slip
ARM.NRL.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
ARM.NRL.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
ARM.NRL.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
ARM.NRL.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
ARM.NRL.17
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
ARM.NRL.18 System shall time out the session if it is idle for more than fifteen minutes.
ARM.NRL.19 The system should return to main menu after print out of the receipt has been taken
ARM.NRL.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
ARM.NRL.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
ARM.NRL.22 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque.
ARM.NRL.23
System shall allow user to track the status of the application request along with remarks to the user such as: -Application accepted -Application declined -Pending confirmation
ARM.NRL.24 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
ARM.NRL.25 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
ARM.NRL.26 User shall be able to print and save the notification for easy retrieval of information for future reference
ARM.NRL.27 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
ARM.NRL.28 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 137 | P a g e
ARM.NRL.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
ARM.NRL.30 System shall send an activation URL to the email id of the respective official responsible to accept the application
ARM.NRL.31 System shall allow the concerned authority to enter query parameters for the database and then display the results for the query to the respective authority
ARM.NRL.32 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
ARM.NRL.33 System shall save the digitally signed copy of the arms license issued as a softcopy in a database
ARM.NRL.34 System shall log the details of who accessed the online soft copy and took a printout of the same.
ARM.NRL.35 System shall allow the authorized official to create or update the arms license details in Database.
ARM.NRL.36 System shall allow authorized official to crosscheck/verify report of enquiry done by the Superintendent of Police Office (if required)
ARM.NRL.37 System shall allow authorized official to crosscheck/verify report of medical done by the Authorized Govt. Hospital‟s (if required)
ARM.NRL.38 System shall allow the authorized official to create or update the arm license details in database for issuance/renewal of arms license
ARM.NRL.39 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
ARM.NRL.40 System shall allow and accept the digital signature from respective officials for processing the application and issue of arms license for the users
ARM.NRL.41 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
ARM.NRL.42 For Any change to the application record system shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
ARM.NRL.43 System shall allow to intimate citizen for issuance of Arms license or rejection of Arms license (with reason/remark)
ARM.NRL.44 System shall allow to upload the scanned/ PDF copy of arms license in the State portal where citizen can take the print of it
ARM.NRL.45 System shall be PKI enabled to accept digital signatures for arms license for digital signing of the documents.
ARM.NRL.46 System shall consider the list of holidays for tracking the timelines of various activities.
ARM.NRL.47 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
ARM.NRL.48 Arms license module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 138 | P a g e
9. Issuance of Sound Permission
Requirement ID
Description
PRM.SND.1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
PRM. SND.2 System shall allow applicant to select application for sound permission on the collectorate office page of the state/department portal
PRM.SND.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
PRM.SND.4 System shall accept application of new applicants
PRM.SND.5
System shall be able to capture the applicants details through an electronic form such as:
1. Place 2. Timing 3. Period 4. Permission upto 10:00 PM or beyond 10:00 PM 5. Other details as required by department
PRM.SND.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
PRM.SND.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
PRM.SND.8 System shall allow the applicant to preview the application form
PRM.SND.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
PRM.SND.10 System Shall allow add/ delete/ editing before submission
PRM.SND.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
PRM.SND.12 System Shall allow save and print facility of the acknowledgement slip
PRM.SND.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
PRM.SND.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
PRM.SND.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
PRM.SND.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
PRM.SND.17
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
PRM.SND.18 System shall time out the session if it is idle for more than fifteen minutes.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 139 | P a g e
PRM.SND.19 The system should return to main menu after print out of the receipt has been taken
PRM.SND.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
PRM.SND.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card (if required)
PRM.SND.22 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque. (if required)
PRM.SND.23
System shall allow user to track the status of the application request along with remarks to the user such as: -Application accepted -Application declined -Pending confirmation
PRM.SND.24 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
PRM.SND.25 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
PRM.SND.26 User shall be able to print and save the notification for easy retrieval of information for future reference
PRM.SND.27 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
PRM.SND.28 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments ( if required )
PRM.SND.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
PRM.SND.30 System shall send an activation URL to the email id of the respective official responsible to accept the application
PRM.SND.31 System shall allow the concerned authority to enter query parameters for the database and then display the results for the query to the respective authority
PRM.SND.32 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
PRM.SND.33 System shall save the digitally signed copy of the sound permission issued as a softcopy in a database
PRM.SND.34 System shall log the details of who accessed the online soft copy and took a printout of the same.
PRM.SND.35 System shall allow the authorized official to create or update the sound permission details in database.
PRM.SND.36 System shall allow authorized official to crosscheck/verify report of enquiry done by the Superintendent of Police Office (if required)
PRM.SND.37 System shall allow the authorized official to create or update the sound permission details in database for approval / rejection of sound permission
PRM.SND.38 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 140 | P a g e
PRM.SND.39 System shall allow and accept the digital signature from respective officials for processing the application and issue of sound permission for the users
PRM.SND.40 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
PRM.SND.41 For Any change to the application record system shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
PRM.SND.42 System shall allow to intimate citizen for issuance of Sound permission or rejection of Sound permission(with reason/remark)
PRM.SND.43 System shall allow to upload the scanned/ PDF copy of sound permission in the State portal where citizen can take the print of it
PRM.SND.44 System shall be PKI enabled to accept digital signatures for sound permission for digital signing of the documents.
PRM.SND.45 System shall consider the list of holidays for tracking the timelines of various activities.
PRM.SND.46 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
PRM.SND.47 Sound permission module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 141 | P a g e
10. Application for relief for victims of natural calamity
Requirement ID
Description
RFV.NC1 System shall allow applicant/ESO/CSC/CFC operator to select Collectorate Office from the Home page of the State Portal
RFV.NC.2 System shall allow applicant to select application for relief for victims of natural calamity on the collectorate office page of the state/department portal
RFV.NC.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
RFV.NC.4 System shall accept application of new applicants
RFV.NC.5
System shall be able to capture the applicants details through an electronic form such as:
1. Name 2. Place/Address 3. Details ad prescribed in form available (as per department
requirement) 4. Unique Identification No. e.g. Aadhaar
RFV.NC.6
System shall require entries from the user for certain important information items entered twice. For example email id/mobile no. needs to be captured correctly if email / mobile no. is the preferred mode of communication
RFV.NC.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
RFV.NC.8 System shall allow the applicant to preview the application form
RFV.NC.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
RFV.NC.10 System Shall allow add/ delete/ editing before submission
RFV.NC.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
RFV.NC.12 System Shall allow save and print facility of the acknowledgement slip
RFV.NC.13 Validation for file type that shall be allowed to be uploaded, include only formats such as .pdf/.doc.tiff/.rtf. It Shall not allow .executable files.
RFV.NC.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
RFV.NC.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
RFV.NC.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
RFV.NC.17
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 142 | P a g e
RFV.NC.18 System shall time out the session if it is idle for more than fifteen minutes.
RFV.NC.19 The system should return to main menu after print out of the receipt has been taken
RFV.NC.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
RFV.NC.21 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque. (if required)
RFV.NC.22
System shall allow user to track the status of the application request along with remarks to the user such as: -Application accepted -Application declined -Pending confirmation
RFV.NC.23 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
RFV.NC.24 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
RFV.NC.25 User shall be able to print and save the notification for easy retrieval of information for future reference
RFV.NC.26 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
RFV.NC.27 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments ( if required )
RFV.NC.28 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
RFV.NC.29 System shall send an activation URL to the email id of the respective official responsible to accept the application
RFV.NC.30 System shall allow the concerned authority to enter query parameters for the database and then display the results for the query to the respective authority
RFV.NC.31 System shall log all changes to the document (Forwarding, approval, rejection) with date and time of the action.
RFV.NC.32 System shall save the digitally signed copy of the natural calamity issued as a softcopy in a database
RFV.NC.33 System shall log the details of who accessed the online soft copy and took a printout of the same.
RFV.NC.34 System shall allow the authorized official to create or update the natural calamity details in database. e.g. verification/inspecting details etc.
RFV.NC.35 System shall allow authorized official to crosscheck/verify report of enquiry done by the authorized verifying/inspecting officer e.g. talathi (if required)
RFV.NC.36 System shall allow the authorized official to create or update the natural calamity details in database for approval / rejection of natural calamity
RFV.NC.37 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 143 | P a g e
RFV.NC.38 System shall allow and accept the digital signature from respective officials for processing the application and issue of natural calamity for the users
RFV.NC.39 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
RFV.NC.40 For Any change to the application record system shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
RFV.NC.41 System shall allow to intimate citizen for issuance of support for relief from natural calamity or rejection of relief benefits for natural calamity(with reason/remark)
RFV.NC.42
System shall allow the authorized user to credit/deposit relief amount (if any ) through the secured payment gateway in account of victim/ applicant in case department selects the option to make the payment through net banking/on-line transfer (if required)
RFV.NC.43 System shall allow to upload the details of dispersed amount or report of support provided for the victims of natural calamity on the state portal where citizen can take the print of it
RFV.NC.44
System shall allow senior most authorized official to check & verify the status report for support provided to victims of natural calamity and verify the same with facts & figures with the department or other concerned offices (if any)
RFV.NC.45 System shall be PKI enabled to accept digital signatures for natural calamity for digital signing of the documents.
RFV.NC.46 System shall consider the list of holidays for tracking the timelines of various activities.
RFV.NC.47 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
RFV.NC.48
Relief for victims of natural calamity module of DC Suite/ Taluka Suite/e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 144 | P a g e
II. Department of Settlement & Land Records
Requirement Specifications
Certificate
11. Issuance of Form I & XIV (Record of Right)
Requirement ID
Description
CER.ROR.1 System shall allow applicant/ESO/CSC/CFC operator to select Department of Settlement & Land records from the home page of the State/department Portal
CER.ROR.2 System shall allow service seeker to select Issuance of form I & XIV form the department page of the State/e-District portal
CER.ROR.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
CER.ROR.4 System shall allow applicant to fill/edit e-Form/Application online and accept the same
CER.ROR.5
System shall be able to capture the applicants details through an electronic form such as: 1. Name 2. Contact Details 3. Taluka Name 4. Village Name 5. Survey Number 6. Sub Divisional. 7. Unique Identification (UID) 8. E-mail id (if any) 9. Mobile No. (if any)
CER.ROR.6
System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
CER.ROR.7
System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
CER.ROR.8 System shall allow the applicant to preview the application form
CER.ROR.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted
CER.ROR.10 System shall allow add/ delete/ editing before submission
CER.ROR.11 System shall allow uploading of scanned copies of supporting documents/ attachments as required (if any)
CER.ROR.12 Validations for file type that shall be allowed to be uploaded include only formats such as .pdf/.doc.tiff/.rtf. It shall not allow .executable files.
CER.ROR.13 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface (if required)
CER.ROR.14 System shall display the respective communication address and turnaround time required for processing of application
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 145 | P a g e
CER.ROR.15 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
CER.ROR.16 System shall allow save and print facility of the acknowledgement slip
CER.ROR.17 System shall display the respective communication address and turnaround time required for processing of application.
CER.ROR.18 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
CER.ROR.19
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, and shall display an appropriate error message.
CER.ROR.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted
CER.ROR.21 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card (if required)
CER.ROR.22
System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer Cheque or cash at (ESO/CSC/CFC)
CER.ROR.23
System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
CER.ROR.24 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
CER.ROR.25 System shall allow user to track the status of the application request along with remarks to the user such as: 1. Pending confirmation 2. Application accepted 3. Application declined
CER.ROR.26 System shall allow user be able to print and save the notification for easy retrieval of information for future reference
CER.ROR.27
System shall allow the user to rectify the error (in case of application declined) and notify applicant/citizen/ESO/CSC/CFC operator re-submit the same application
CER.ROR.28 System shall allow only authorized users to access the requested service & scanned supporting documentation (if any) and verify with other departments (if required)
CER.ROR.29 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
CER.ROR.30 System shall send an activation link to the email id of the respective official responsible to accept the application
CER.ROR.31 System shall allow official to select make changes as per the application selected by applicant for Issuance of Form I & XIV
CER.ROR.32 System shall allow officials to work as per mandatory workflow set by the concerned department to be followed to complete the selected service for a valid output.
CER.ROR.33 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 146 | P a g e
link within TAT
CER.ROR.34 System shall allow and accept the digital signature from respective officials for processing the application and issue a valid Form I & XIV for the users
CER.ROR.35 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks and shall allow generating MIS reports as required by authorized user.
CER.ROR.36 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
CER.ROR.37 System shall allow official to intimate citizen/applicant for rejection / approval for Issuance of Form I & XIV on his/her request through sms, email etc.
CER.ROR.38 System shall allow citizen through State/department portal to confirm status of his/her application/service request for Issuance of Form I & XIV
CER.ROR.39 System shall allow to generate Form I & XIV in pdf, tiff ,etc. format from state/department portal where citizen can take the print of it
CER.ROR.40 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
CER.ROR.41 System shall be PKI enabled to accept digital signatures for digitally signing documents for Issuance of form I & XIV
CER.ROR.42 System shall consider the list of holidays for tracking the timelines of various activities.
CER.ROR.43
System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
CER.ROR.44
Issuance of Form I & XIV module of e-District application should be linked to general all service component appropriately as per department requirement – e.g. Information component, Form availability component etc.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 147 | P a g e
III. Goa State Information Commission
Requirement Specifications
RTI Services
1. RTI Filing & Status Services
Requirement ID
Description
RTI.FSS1 System shall allow Applicant/ESO/CSC/CFC operator to select State Information commission records from the home page of the State/department portal
RTI.FSS2 System shall allow service seeker to select RTI filing & status provided on the department page of the State/department portal
RTI.FSS3 System shall allow registration of applicant for future login and ease (registration mandatory)
RTI.FSS4 System shall be able to identify user login into System as defined by the security guidelines
RTI.FSS5
System shall be able to provide information to the citizens about RTI related services both in public as well as restricted domain as per the Information component 1. Web access to information content in public domain 2. e-District application access to information content
RTI.FSS6
System shall prompt the user to mention whether it is a fresh RTI filing/status or an escalation of the existing RTI filing / status. If it is an escalation of the existing RTI filing & status it shall prompt the user to mention the old RTI filing & status registration number along the RTI filing & status details. As soon as applicant/ESO/CSC/CFC operator provides the registration number of the old RTI filing & status all the related fields in the RTI filing & status registration form shall be auto filled with the help of entries made in the database.
RTI.FSS7 System shall provide all services under RTI filing & status
RTI.FSS8 System shall be able to retrieve relevant service request
RTI.FSS10 System shall allow the applicant to fill in the online application and if required allow operator to fill application form on behalf of citizen availing the service as per the application receipt component
RTI.FSS11 System shall be able to generate a unique registration number during registering an applicant
RTI.FSS12 System shall be able to issue an acknowledgement receipt once the applicant is registered with System as per application receipt component
RTI.FSS13 System shall be able to identify the applicant uniquely based on this registration number for all future references
RTI.FSS14 System shall be able to come up with final confirmation screen indicating successful submission of service request
RTI.FSS15 System shall be able to allow service fees payments for the RTI service as per the Payment Component
RTI.FSS16 System shall be able to route the service request to concerned officer (State
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 148 | P a g e
Public Information Officer – SPIO, Public Information Officer – PIO & APIO) at the following levels 1. Block 2. Sub-division 3. District 4. Department
RTI.FSS18 System shall have the functionality to accept service request even if the service request is not directed to block, sub-division or department under others categories
RTI.FSS19 System shall be able to route such application to State Information office for further re-routing
RTI.FSS20 System shall allow state information officer to allocate service request to concerned PIO for service request under other categories
RTI.FSS21 System shall be allow state public information officer-SPIO to allocate service request to concerned PIO/APIO for service request under other categories
RTI.FSS22 System shall auto generate notification of pending service delivery request to concerned PIO on successful submission of service request
RTI.FSS23 System shall allow the concerned PIO to accept / reject the service request as per the guidelines of the RTI act
RTI.FSS24 In case of rejection, System shall allow the concerned PIO to state the reason of rejection
RTI.FSS25 In case of acceptance, System shall open a new page with all the accepted service request by the concerned PIO
RTI.FSS26 System shall allow the PIO to allocate service request to APIO for required information
RTI.FSS27 System shall save the acceptance / rejection only on digital signature of the PIO
RTI.FSS28 System shall auto generate notification to concerned department/ information officer about service request allocation by the PIO
RTI.FSS29 System shall allow concerned department/ information officer to view service request as assigned by the PIO
RTI.FSS30 System shall allow concerned department/ information officer to print the individual service request 1. System shall be allow printer friendly version of service request
RTI.FSS31 System shall allow the concerned department/ information officer to submit report on the service request on defined values as given in the process description
RTI.FSS32 System shall submit the report only when it is digitally signed by the concerned department/ information officer
RTI.FSS33 System shall auto generate email to concerned PIO about the report submission against the service request by the concerned department/ information officer
RTI.FSS34 System shall open a page for PIO to fill in specific details on documents pertaining to the service request as defined in the process description
RTI.FSS35 System shall ask for digital signature of PIO for submission of the final delivery against the service request
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 149 | P a g e
RTI.FSS36 System shall ask for re-confirmation of PIO before actually submitting final delivery
RTI.FSS37 System shall show a successful submission screen on completion of the submission
RTI.FSS38 System shall be able to support the status tracking component as defined in the process map for status tracking
RTI.FSS39 System shall be able to generate notification to applicant for any payment to be deposited for requested service
RTI.FSS40 System shall be able to generate notification to concerned department / information officer for any payment received from applicant for requested service
RTI.FSS41 System shall allow concerned department / information officer to deliver requested service output after received payment is updated in system
RTI.FSS42 System shall be able to support the monitoring and reporting component as defined in the process map for monitoring and reporting
RTI.FSS43 System shall be able to auto escalate the service request to higher authority in state information commission if the service request is not processed
RTI.FSS44 System shall allow to intimate citizen through State portal to collect requested service output downloading online, collecting personally from dept. office, ESO/CSC or by post
RTI.FSS45 System shall send delivery report to the respective official whenever the citizen collects service output through state portal
RTI.FSS46 System shall be able to maintain all records for the login sessions with date and time
RTI.FSS47 System shall be able to provide date and time stamping for all transactions done with digital signature
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 150 | P a g e
IV. Panchayat/Municipality
Requirement Specifications
Certificate
13. Issuance of Birth/Death Certificate
Requirement ID
Description
CER.BDC.1 The system shall be able to display birth/death certificate related page through multiple routes e.g. state portal, information link etc.
CER.BDC.2 System shall allow applicant/ESO/CSC operator to select Panchayat /Municipality from the Home page of the State Portal
CER.BDC.3 System shall allow applicant to select application for birth/death certificate on Panchayat or Municipality office page of the state portal
CER.BDC.4 System shall allow registration of applicant for future login and ease (registration mandatory) and shall be able to identify the user logging into the system using the login component
CER.BDC.5 System shall accept application of new applicants
CER.BDC.6
System shall be able to capture the applicants details through an electronic form such as: Name Contact Details Date of Birth/ Death Place of Birth/ Death Age (for Death) Details as required in application form used Unique Identification (UID) E-mail id (if any) Mobile No. (if any)
CER.BDC.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
CER.BDC.8 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
CER.BDC.9 System shall allow the applicant to preview the application form
CER.BDC.10 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
CER.BDC.11 System shall allow add/ delete/ editing before submission
CER.BDC.12 System shall perform data validation checks on the input. In case of data being duplicated System shall display the existing service request id and other records if any.
CER.BDC.13 System shall allow save and print facility of the acknowledgement slip
CER.BDC.14 The system should be able to channel as per the process map or as defined by the department and description for the service
CER.BDC.15 The System should make available the latest copy of the Application Form online (24x7) as per the Form Availability component.
CER.BDC.16 The system should allow the operator to fill in the online application on behalf
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 151 | P a g e
of citizen availing the service as per the „application receipt‟ component
CER.BDC.17 The System should be able to generate a unique registration number during registering an applicant with the application
CER.BDC.18 The System should be able to identify the applicant uniquely based on this registration number.
CER.BDC.19 The System should be able to record the payment made by the applicant against the Application as per the Payment Component
CER.BDC.20
The System should be able to notify the Registrar/Sub-registrar and Village panchayat secretary about the new application and this date and time must be logged.– through e-District application through SMS or through e-mail
CER.BDC.21 Should be able to route the application to the Registrar/Sub-registrar and Village panchayat secretary
CER.BDC.22 The system should allow concerned authorized officials to view the service request on authenticated login
CER.BDC.23
The system should allow Registrar/Sub-registrar and Village panchayat secretary to accept or reject any service request application
CER.BDC.24 The system should request Registrar/Sub-registrar and Village panchayat secretary to provide comments in case of rejection
CER.BDC.25 The system should save the acceptance / rejection only after digital signature of the Registrar/Sub-registrar and Village panchayat secretary
CER.BDC.26
The system should show service request to concerned Registrar/Sub-registrar and Village panchayat secretary as pending for approval till it is marked for further action - by default the system should be able to auto escalate within the service level as per the escalation matrix defined by department
CER.BDC.27 The system should load a page to enable Registrar/Sub-registrar and Village panchayat secretary to assign verification responsibility to concerned authority urban service request
CER.BDC.28 The system should allow the concerned officer to view the service request after authentication of username and password
CER.BDC.29 The system should allow officer to print the details of service request application form to have a hard copy of the same
CER.BDC.30 The System should allow the officer to update the verification details in relevant database (Birth Certificate Database).
CER.BDC.31 The System should allow the officer to electronically forward the application to the Registrar/Sub-registrar and Village panchayat secretary using his digital signature
CER.BDC.32 The system should allow concerned Registrar/Sub-registrar and Village panchayat secretary to view changes made in the database by the officer
CER.BDC.33
The system should be able to auto generate MIS reports for the following officials -District Registrar -Registrar/Sub-Registrar -Village Panchayat Secretary
CER.BDC.34 The system should be able to support the status tracking component as defined in the process map for status tracking
CER.BDC.35 The system should be able to support the monitoring and reporting component
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 152 | P a g e
as defined in the process map for monitoring and reporting
CER.BDC.36 The System should be able to detect changes in status and send status updates to the citizen as per the Status Tracking component.
CER.BDC.37 The System should be able escalate the application as per the Auto Escalation matrix defined in Auto Escalation Matrix table or by department, by notifying the next level of authority and sending him a copy of the application
CER.BDC.38 The system should be able to maintain all records for the login sessions with date and time
CER.BDC.39 The system should be able to provide date and time stamping for all transactions done with digital signature
CER.BDC.40 The System should have a facility for forwarding of the application, with remarks and digital sign of the sender, to any person in District administration registered with the System.
CER.BDC.41 The system should support multilingual interface (minimum Konkani, Marathi and English) as per Localization and Language Technology Standards for National e- Governance Plan defined in e-District guidelines.
CER.BDC.42
The e-District Application must support Digital Signatures of any of the Certifying Authorities authorized by the state/department and, and must be modifiable as per the changes made by the respective Certifying Authorities on the structure of the Digital Signatures issued by them.
CER.BDC.43 The Digital Signatures used and the e-District Application must provide the Time Stamping of the act of Digitally Signing a document
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 153 | P a g e
V. Transport Department
Requirement Specifications
Transport
14. Application for grant of subsidy for Yellow/Black Motor Cycle/Auto Rickshaw, Taxi
Scheme 2003
Requirement ID
Description
TRS.SUB.1 System shall allow applicant/ESO/CSC/CFC operator to select Transport Department from the Home page of the State Portal
TRS.SUB.2 System shall allow applicant to select application for grant of subsidy for yellow/black motorcycle/auto rickshaw, Taxi Scheme 2003 on the department page of the state portal
TRS.SUB.3 System shall allow registration of applicant for future login and ease (registration mandatory)
TRS.SUB.4 System shall accept application of new applicants
TRS.SUB.5 System shall allow the applicant to opt for a suitable choice of subsidy before filling in the application for grant
TRS.SUB.6
System shall be able to capture the applicants details through an electronic form such as:
1)Name
2)Contact Details
3)PIN
4)Age
5)Area of residence
6) Type of Vehicle
7)Details as required in application form used at present
8)Unique Identification (UID)
9)E-mail id (if any)
10) Mobile No. (if any)
TRS.SUB.14 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
TRS.SUB.15 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
TRS.SUB.16 System shall allow the applicant to preview the registration
TRS.SUB.17 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
TRS.SUB.18 System shall allow editing before submission
TRS.SUB.19
System shall allow upload of passport size photographs(high resolution) in addition to :
1) Income Certificate
2)Age Proof
3)Vehicle Information
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 154 | P a g e
4)Documents required at present
TRS.SUB.20 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
TRS.SUB.21 System shall allow save and print facility of the acknowledgement slip
TRS.SUB.22 Validations for file type that shall be allowed to be uploaded include only formats such as .pdf/.doc/.tiff/.rtf. It shall not allow .executable files.
TRS.SUB.23 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
TRS.SUB.24 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
TRS.SUB.25 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
TRS.SUB.26
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
TRS.SUB.27 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
TRS.SUB.28 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
TRS.SUB.29 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
TRS.SUB.30 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
TRS.SUB.31 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
TRS.SUB.32 System shall allow user to track the status of the application request along with remarks to the user such as:
TRS.SUB.33 1. Pending confirmation
TRS.SUB.34 2. Application accepted
TRS.SUB.35 3. Application declined
TRS.SUB.36 User shall be able to print and save the notification for easy retrieval of information for future reference
TRS.SUB.37 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
TRS.SUB.38 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
TRS.SUB.39 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
TRS.SUB.40 System shall send an activation URL to the email id of the respective official responsible to accept the application
TRS.SUB.41 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 155 | P a g e
TRS.SUB.42 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
TRS.SUB.43 System shall allow and accept the digital signature from respective officials for processing the application and issue of certificate for the users
TRS.SUB.44 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
TRS.SUB.45 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
TRS.SUB.46 System shall allow to intimate citizen through State portal to collect certificate of approval/rejection manually or by post
TRS.SUB.47 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
TRS.SUB.48 System shall send delivery report to the respective official whenever the citizen collects the certificate of approval/rejection through state portal
Requirement Specifications
Transport
15. Application for grant of subsidy for replacement of buses/mini buses above 15 years
Requirement ID
Description
TRS.OLD.1 System shall allow applicant/ESO/CSC/CFC operator to select Transport Department from the Home page of the State Portal
TRS.OLD.2 System shall allow applicant to select application for grant of subsidy for yellow/black motorcycle/auto rickshaw, Taxi Scheme 2003 on the department page of the state portal
TRS.OLD.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
TRS.OLD.4 System shall accept application of new applicants
TRS.OLD.5 System shall allow the applicant to opt for a suitable choice of subsidy before filling in the application for grant
TRS.OLD.6
System shall be able to capture the applicants details through an electronic form such as:
1)Name
2)Contact Details
3)PIN
4)Age
5)Area of residence
6) Type of Vehicle
7)Details as required in application form used at present
8)Unique Identification (UID)
9)E-mail id (if any)
10) Mobile No. (if any)
TRS.OLD.14 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
TRS.OLD.15 System shall provide adequate aid to the user in the form of online tutorials,
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 156 | P a g e
"How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
TRS.OLD.16 System shall allow the applicant to preview the registration
TRS.OLD.17 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
TRS.OLD.18 System shall allow editing before submission
TRS.OLD.19
System shall allow upload of passport size photographs(high resolution) in addition to :
1) Income Certificate
2)Age Proof
3) Vehicle Information
4)Documents required at present
TRS.OLD.20 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
TRS.OLD.21 System shall allow save and print facility of the acknowledgement slip
TRS.OLD.22 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
TRS.OLD.23 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
TRS.OLD.24 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
TRS.OLD.25 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
TRS.OLD.26
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
TRS.OLD.27 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
TRS.OLD.28 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
TRS.OLD.29 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
TRS.OLD.30 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
TRS.OLD.31 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
TRS.OLD.32 System shall allow user to track the status of the application request along with remarks to the user such as:
TRS.OLD.33 1. Pending confirmation
TRS.OLD.34 2. Application accepted
TRS.OLD.35 3. Application declined
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 157 | P a g e
TRS.OLD.36 User shall be able to print and save the notification for easy retrieval of information for future reference
TRS.OLD.37 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
TRS.OLD.38 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
TRS.OLD.39 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
TRS.OLD.40 System shall send an activation URL to the email id of the respective official responsible to accept the application
TRS.OLD.41 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
TRS.OLD.42 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
TRS.OLD.43 System shall allow and accept the digital signature from respective officials for processing the application and issue of certificate for the users
TRS.OLD.44 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
TRS.OLD.45 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
TRS.OLD.46 System shall allow to intimate citizen through State portal to collect certificate of approval/rejection manually or by post
TRS.OLD.47 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
TRS.OLD.48 System shall send delivery report to the respective official whenever the citizen collects the certificate of approval/rejection through state portal
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 158 | P a g e
VI. Fisheries Department
Requirement Specifications
Fisheries
16. Application for Registration/ Renewal of Fishing Nets
Requirement ID
Description
FSH.RFN.1 System shall allow applicant to select Fisheries Department from the Home page of the Portal
FSH.RFN.2 System shall allow applicant to select registration/renewal of fishing net application provided on the department page of the portal
FSH.RFN.3 System shall allow registration of applicant for future login and ease (registration mandatory)
FSH.RFN.4 System shall accept application of new and registered applicants
FSH.RFN.5 System shall be able to capture the applicants details through an electronic form such as: 1. Name 2. Contact Details 3. PIN 4. Age 5. Details as required in application form used 6. Formal declaration on the accuracy and responsibility of the information
provided in the form etc. 7. Unique Identification (UID) 8. E-mail id (if any) 9. Mobile No. (if any) 10. If registered then existing registration Id
FSH.RFN.6 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
FSH.RFN.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
FSH.RFN.8 System shall allow the applicant to preview the registration
FSH.RFN.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
FSH.RFN.10 System shall allow editing before submission
FSH.RFN.11 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id.
FSH.RFN.12 System shall allow save and print facility of the acknowledgement slip
FSH.RFN.13 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
FSH.RFN.14 System shall allow to accept unique ID as proof of document which can be verified internally within departments through e-District interface
FSH.RFN.15 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 159 | P a g e
documents
FSH.RFN.16 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
FSH.RFN.17 System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
FSH.RFN.18 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
FSH.RFN.19 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
FSH.RFN.20 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
FSH.RFN.21 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
FSH.RFN.22 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
FSH.RFN.23 System shall allow user to track the status of the application request along with remarks to the user such as: 1. Pending confirmation 2. Application declined 3. Application accepted
FSH.RFN.24 User shall be able to print and save the notification for easy retrieval of information for future reference
FSH.RFN.25 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
FSH.RFN.26 System shall allow only authorized users to access the scanned supporting documents and verify the same with concerned departments (if required)
FSH.RFN.27 System shall allow only authorized users to add verification report/appropriate remark (if required) to the application for processing
FSH.RFN.28 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
FSH.RFN.29 System shall send an activation URL to the email id of the respective official responsible to accept the application
FSH.RFN.30 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
FSH.RFN.31 System shall be PKI enabled to accept digital signatures for digitally signing documents for registration/renewal of fishing nets
FSH.RFN.32 System shall allow and accept the digital signature from authorized/concerned officials for processing the application and approval /rejection of registration / renewal of fishing net for the users
FSH.RFN.33 System shall allow the authorized/concerned official to update the status of the application request as per proceedings along with the remarks
FSH.RFN.34 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 160 | P a g e
FSH.RFN.35 System shall allow to intimate citizen to collect registration/renewal of fishing net approval/rejection
FSH.RFN.36 System shall allow to authorized authority to generate or upload scanned / PDF approved/rejected copy of registration/renewal of fishing net to be available through state/department portal where citizen/ESO/CSC operator can take the print of it
FSH.RFN.37 System shall allow citizen/ESO/CSC operator to download approved/rejected copy of registration/renewal of fishing net available through state/department portal with unique document no.
FSH.RFN.38 System shall consider the list of holidays for tracking the timelines of various activities.
FSH.RFN.39 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
FSH.RFN.40 Registration/Renewal of fishing nets module of e-District application should be linked to general all service component appropriately as per department requirement –e.g. Information component, Form availability component etc.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 161 | P a g e
VII. Tourism Department
Requirement Specifications
Others
17. Registration of New Water Sports Activities
Requirement ID
Description
NWS.TD.1 System shall allow applicant/ESO/CSC/CFC operator to select Tourism Department from the Home page of the State Portal
NWS.TD 2 System shall allow applicant to select application for registration of new water sport activity on the department page of the state portal
NWS.TD.3 System shall allow registration of applicant for future login and ease (registration not mandatory)
NWS.TD.4 System shall allow applicant to fill/edit e-Form/Application online
NWS.TD.5 System shall accept filled e-Form/application of new applicants
NWS.TD.6
System shall be able to capture the applicants details through an electronic form such as:
1)Name
2)Contact Details
3)PIN
4)Age
5)Area of residence
6) Type of water activity
7)Details as required in application form used at present
8)Unique Identification (UID)
9)E-mail id (if any)
10) Mobile No. (if any)
NWS.TD.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
NWS.TD.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
NWS.TD.8 System shall allow the applicant to preview the registration
NWS.TD.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
NWS.TD.10 System shall allow editing before submission
NWS.TD.11
System shall allow upload of passport size photographs(high resolution) in addition to :
1) Income Certificate
2)Age Proof
3) Water Sport Activity Information
4)Documents required at present
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 162 | P a g e
NWS.TD.12 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
NWS.TD.13 System shall allow save and print facility of the acknowledgement slip
NWS.TD.14 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
NWS.TD.15 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
NWS.TD.16 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
NWS.TD.17 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
NWS.TD.18 System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
NWS.TD.19 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
NWS.TD.20 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
NWS.TD.21 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
NWS.TD.22 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
NWS.TD.23 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
NWS.TD.24 System shall allow user to track the status of the application request along with remarks to the user such as:
NWS.TD.26 1. Pending confirmation
NWS.TD.27 2. Application accepted
NWS.TD.28 3. Application declined
NWS.TD.29 User shall be able to print and save the notification for easy retrieval of information for future reference
NWS.TD.30 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
NWS.TD.31 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
NWS.TD.32 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
NWS.TD.33 System shall send an activation URL to the email id of the respective official responsible to accept the application
NWS.TD.34 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
NWS.TD.35 System shall allow only authorized users to access the scanned supporting documentation and verify with other departments if required
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 163 | P a g e
NWS.TD.36 System shall allow and accept the digital signature from respective officials for processing the application and issue of certificate for the users
NWS.TD.37 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
NWS.TD.38 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
NWS.TD.39 System shall allow to intimate citizen through State portal to collect certificate of approval/rejection manually or by post
NWS.TD.40 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
NWS.TD.41 System shall send delivery report to the respective official whenever the citizen collects the new water sport activity certificate.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 164 | P a g e
VIII. Registration Department
Requirement Specifications
Certificate
18. Application for marriage registration certificate
Requirement ID
Description
MRC.RED.1 System shall allow applicant/ESO/CSC/CFC operator to select Registration Department from the Home page of the State Portal
MRC.RED.2 System shall allow applicant to select application for Application for marriage registration certificate on the department page of the state portal
MRC.RED.3 System shall allow registration of applicant for future login and ease
MRC.RED.4 System shall allow applicant to fill/edit e-Form/Application online
MRC.RED.5 System shall accept filled e-Form/application of new applicants
MRC.RED.6
System shall be able to capture the applicants details through an electronic form such as:
1. Name (Bride & Groom)
2. Contact Details
3. PIN
4. Age
5. Area of residence
6. Details as required in application form used at present
7. Unique Identification (UID)
8. E-mail id (if any)
9. Mobile No. (if any)
MRC.RED.7 System is able to identify the user logging into System using the login component.
MRC.RED.7
System shall be able to provide information to the citizens about Marriage services both in public as well as private domain as per the „Information component‟ -Web access to information content in public domain - E-District application access to information content
MRC.RED.8 System shall be able to channel as per the process map and description for the service
MRC.RED.9 System shall make available the latest copy of the Application Form online (24x7) as per the Form Availability component.
MRC.RED.10 System shall allow the operator to fill in the online application on behalf of citizen availing the service as per the „application receipt‟ component
MRC.RED.11 System shall be able to generate a unique registration number during registering an applicant with the application.
MRC.RED.12 System shall be able to identify the applicant uniquely based on this registration number.
MRC.RED.13 System shall be able to record the payment made by the applicant against the Application as per the Payment Component
MRC.RED.14 System shall display a message regarding successful or unsuccessful
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 165 | P a g e
completion of any transaction.
MRC.RED.15 System shall refresh the page in case of failure in submission of service request
MRC.RED.16 System shall be able to notify the Registrar/Sub Registrar about the new application and the date and time must be logged & Should be able to route the application to the Registrar/Sub Registrar.
MRC.RED.17 System shall allow concerned officials to view the service request on authenticated login
MRC.RED.18 System shall allow Registrar/Sub Registrar to accept or reject any service request application
MRC.RED.19 System shall request Registrar/Sub Registrar to provide comments in case of rejection
MRC.RED.20 System shall save the acceptance / rejection only after digital signature of the Registrar/Sub Registrar
MRC.RED.21
System shall show service request to concerned Registrar/Sub Registrar as pending for approval till it is marked for further action -by default System shall be able to auto escalate within the service level as per the escalation matrix defined
MRC.RED.22 System shall load a page to enable Registrar/Sub Registrar to assign verification responsibility to concerned authority
MRC.RED.23 System shall auto generate notification to concerned official once the Registrar/Sub Registrar has assigned officer for physical verification
MRC.RED.24 System shall allow the concerned officer to view the service request after authentication of username and password
MRC.RED.26 System shall allow officer to print the details of service request application form to have a hard copy of the same
MRC.RED.27 System shall allow the officer to update the verification details in relevant database (Marriage Database).
MRC.RED.28
System shall be able to auto generate MIS reports for the following officials -State Registrar -District Registrar - Civil Registrar/Sub Registrar
MRC.RED.29 System shall allow the officer to electronically forward the application to the Registrar/Sub Registrar using his digital signature
MRC.RED.30 System shall allow concerned Registrar/Sub Registrar to view changes made in the database by the officer
MRC.RED.31 System shall be able to support the status tracking component as defined in the process map for status tracking
MRC.RED.32 System shall be able to support the monitoring and reporting component as defined in the process map for monitoring and reporting
MRC.RED.33 System shall be able to detect changes in status and send status updates to the citizen as per the Status Tracking component
MRC.RED.34 System shall be able escalate the application as per the Auto Escalation matrix defined in Auto Escalation Matrix table, by notifying the next level of authority and sending him a copy of the application
MRC.RED.35 System shall be able to maintain all records for the login sessions with date and time
MRC.RED.36 System shall be PKI enabled to accept digital signatures for digitally signing
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 166 | P a g e
documents for marriage registration certificate.
MRC.RED.37 System shall have a facility for forwarding of the application, with remarks and digital sign of the sender, to any person in District administration registered with System
MRC.RED.38 System shall be able to provide date and time stamping for all transactions done with digital signature
MRC.RED.39 System shall consider the list of holidays for tracking the timelines of various activities.
MRC.RED.40 System shall support multilingual interface (minimum Konkani , Marathi and English as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
MRC.RED.41 Registration/Renewal of fishing nets module of e-District application should be linked to general all service component appropriately as per department requirement –e.g. Information component, Form availability component etc.
MRC.RED.42 System shall save the acceptance / rejection only after digital signature of the Registrar/Sub Registrar
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 167 | P a g e
IX. Captain of Ports
Requirement Specifications
Certificate
19. Registration/Renewal of Inland Vessels
Requirement ID
Description
RIV.COP.1 System shall allow applicant/ESO/CSC/CFC operator to select Captain of Ports from the Home page of the State Portal
RIV.COP 2 System shall allow applicant to select application for registration/renewal of Inland vessel on the Captain of ports department page of the state portal
RIV.COP.3 System shall allow registration of applicant for future login and ease
RIV.COP.4 System shall allow applicant to fill/edit e-Form/Application online
RIV.COP.5 System shall accept filled e-Form/application of new applicants
RIV.COP.6
System shall be able to capture the applicants details through an electronic form such as:
1. Name
2. Contact Details
3. PIN
4. Age
5. Area of residence
6. Type of vessel
7. Details as required in application form used at present
8. Unique Identification (UID)
9. E-mail id (if any)
10. Mobile No. (if any)
RIV.COP.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
RIV.COP.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
RIV.COP.8 System shall allow the applicant to preview the registration
TRS.OLD.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
RIV.COP.10 System shall allow editing before submission
RIV.COP.11
System shall allow upload of passport size photographs(high resolution) in addition to :
1. Copy of registration of vessel if registered
2. Valid Id. Proof
3. Other supporting documents if required at present
RIV.COP.12 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
RIV.COP.13 System shall allow save and print facility of the acknowledgement slip
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 168 | P a g e
RIV.COP.14 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
RIV.COP.15 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
RIV.COP.16 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
RIV.COP.17 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
RIV.COP.18
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
RIV.COP.19 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
RIV.COP.20 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
RIV.COP.21 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
RIV.COP.22 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
RIV.COP.23 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
RIV.COP.24 System shall allow user to track the status of the application request along with remarks to the user such as:
RIV.COP.26 1. Pending confirmation
RIV.COP.27 2. Application accepted
RIV.COP.28 3. Application declined
RIV.COP.29 User shall be able to print and save the notification for easy retrieval of information for future reference
RIV.COP.30 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
RIV.COP.31 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
RIV.COP.32 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
RIV.COP.33 System shall send an activation URL to the email id of the respective official responsible to accept the application
RIV.COP.34 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
RIV.COP.35 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct with other departments
RIV.COP.36 System shall allow and accept the digital signature from respective officials for processing the application for registration / renewal of Inland vessel for the users
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 169 | P a g e
RIV.COP.37 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
RIV.COP.38 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
RIV.COP.39 System shall allow to intimate citizen through State portal to collect certificate of approval/rejection manually or by post
RIV.COP.40 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
RIV.COP.41 System shall send delivery report to the respective official whenever the citizen collects valid registration/renewal certificate for Inland Vessel
20. Registration/Renewal of Water Sport Vessels
Requirement ID
Description
WSV.COP.1 System shall allow applicant/ESO/CSC/CFC operator to select Captain of Ports from the Home page of the State Portal
WSV.COP 2 System shall allow applicant to select application for registration/ renewal of water sport vessel on the Captain of ports department page of the state portal
WSV.COP.3 System shall allow registration of applicant for future login and ease
WSV.COP.4 System shall allow applicant to fill/edit e-Form/Application online
WSV.COP.5 System shall accept filled e-Form/application of new applicants
WSV.COP.6
System shall be able to capture the applicants details through an electronic form such as:
1. Name
2. Contact Details
3. PIN
4. Age
5. Area of residence
6. Type of vessel
7. Details as required in application form used at present
8. Unique Identification (UID)
9. E-mail id (if any)
10. Mobile No. (if any)
WSV.COP.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
WSV.COP.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
WSV.COP.8 System shall allow the applicant to preview the registration
WSV.COP.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
WSV.COP.10 System shall allow editing before submission
WSV.COP.11 System shall allow upload of passport size photographs(high resolution) in addition to :
1. Copy of registration of vessel if registered
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 170 | P a g e
2. Valid Id. Proof
3. Other supporting documents if required at present
WSV.COP.12 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
WSV.COP.13 System shall allow save and print facility of the acknowledgement slip
WSV.COP.14 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow executable files.
WSV.COP.15 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
WSV.COP.16 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
WSV.COP.17 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
WSV.COP.18
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
WSV.COP.19 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
WSV.COP.20 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
WSV.COP.21 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
WSV.COP.22 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
WSV.COP.23 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
WSV.COP.24 System shall allow user to track the status of the application request along with remarks to the user such as:
WSV.COP.26 1. Pending confirmation
WSV.COP.27 2. Application accepted
WSV.COP.28 3. Application declined
WSV.COP.29 User shall be able to print and save the notification for easy retrieval of information for future reference
WSV.COP.30 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
WSV.COP.31 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
WSV.COP.32 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
WSV.COP.33 System shall send an activation URL to the email id of the respective official responsible to accept the application
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 171 | P a g e
WSV.COP.34 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
WSV.COP.35 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct with other departments
WSV.COP.36 System shall allow and accept the digital signature from respective officials for processing the application of registration & renewal of water sports vessel for the users
WSV.COP.37 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
WSV.COP.38 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
WSV.COP.39 System shall allow to intimate citizen through State portal to collect certificate of approval/rejection manually or by post
WSV.COP.40 System shall allow to upload the scanned/ PDF copy of certificate in the State portal where citizen can take the print of it
WSV.COP.41 System shall send delivery report to the respective official whenever the citizen collects valid registration/renewal certificate for water sport vessel
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 172 | P a g e
X. Department of Sports & Youth Affairs
Requirement Specifications
Certificate
21. Registration of schools for participation in games
Requirement ID
Description
SYA.SPG.1 System shall allow applicant/ESO/CSC/CFC operator to select Department of sports & youth affairs from the home page of the State Portal
SYA.SPG 2 System shall allow applicant to select application for registration of schools for participation in games on the Department of sports & youth affairs page of the state portal
SYA.SPG.3 System shall allow registration of applicant/school for future login and ease
SYA.SPG.4 System shall allow applicant to fill/edit e-Form/Application online
SYA.SPG.5 System shall accept filled e-Form/application of new applicants
SYA.SPG.6
System shall be able to capture the applicants details through an electronic form such as:
1. Name
2. Contact Details
3. PIN
4. Age
5. Area of residence
6. Type of School (Girls/Boys)
7. Details as required in application form used at present
8. School Registration No. (Re. No.))
9. E-mail id (if any)
10. Contact No. if any
SYA.SPG.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
SYA.SPG.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
SYA.SPG.8 System shall allow the applicant/school to preview the registration
TRS.OLD.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
SYA.SPG.10 System shall allow editing before submission
SYA.SPG.11
System shall allow upload:
1. Copy of registration of school
2. Valid Id. Proof of user
3. Other supporting documents if required at present
SYA.SPG.12 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
SYA.SPG.13 System shall allow save and print facility of the acknowledgement slip
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 173 | P a g e
SYA.SPG.14 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
SYA.SPG.15 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
SYA.SPG.16 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
SYA.SPG.17 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
SYA.SPG.18
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
SYA.SPG.19 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
SYA.SPG.20 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
SYA.SPG.21 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
SYA.SPG.22 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
SYA.SPG.23 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
SYA.SPG.24 System shall allow user to track the status of the application request along with remarks to the user such as:
SYA.SPG.26 1. Pending confirmation
SYA.SPG.27 2. Application accepted
SYA.SPG.28 3. Application declined
SYA.SPG.29 User shall be able to print and save the notification for easy retrieval of information for future reference
SYA.SPG.30 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
SYA.SPG.31 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
SYA.SPG.32 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
SYA.SPG.33 System shall send an activation URL to the email id of the respective official responsible to accept the application
SYA.SPG.34 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
SYA.SPG.35 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct with other departments
SYA.SPG.36 System shall allow and accept the digital signature from respective officials for processing the application of registration of schools for participation in games for the users/schools
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 174 | P a g e
SYA.SPG.37 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
SYA.SPG.38 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
SYA.SPG.39 System shall allow to intimate schools through State portal to collect final fixture for sports activates with registration of approval/rejection manually or by post
SYA.SPG.40 System shall allow to upload the scanned/ PDF copy of final fixture for games in the State portal where applicant/ school can take the print of it
SYA.SPG.41 System shall send delivery report to the respective official whenever the applicant /school staff collects valid registration for games with final fixture
22. Application for sportsperson certificate
Requirement ID
Description
SYA.SPC.1 System shall allow applicant/ESO/CSC/CFC operator to select Department of sports & youth affairs from the home page of the State Portal
SYA.SPC 2 System shall allow applicant to select application for sportsperson certificate on the department of sports & youth affairs department page of the state portal
SYA.SPC.3 System shall allow registration of applicant for future login and ease
SYA.SPC.4 System shall allow applicant to fill/edit e-Form/Application online
SYA.SPC.5 System shall accept filled e-Form/application of new applicants
SYA.SPC.6
System shall be able to capture the applicants details through an electronic form such as:
1. Name
2. Contact Details
3. PIN
4. Age
5. Area of residence
6. Participation Certificate /Form 2 (SAG)
7. Details as required in application form used at present
8. Unique Identification (UID)
9. E-mail id (if any)
10. Mobile No. (if any)
SYA.SPC.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
SYA.SPC.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
SYA.SPC.8 System shall allow the applicant to preview the registration
TRS.OLD.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
SYA.SPC.10 System shall allow editing before submission
SYA.SPC.11 System shall allow upload of passport size photographs(high resolution) in
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 175 | P a g e
addition to :
4. Copy of games merit/participation certificate / Form 2 ( from SAG)
5. Valid Id. Proof
6. Other supporting documents if required at present
SYA.SPC.12 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
SYA.SPC.13 System shall allow save and print facility of the acknowledgement slip
SYA.SPC.14 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
SYA.SPC.15 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
SYA.SPC.16 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
SYA.SPC.17 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
SYA.SPC.18
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
SYA.SPC.19 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
SYA.SPC.20 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
SYA.SPC.21 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
SYA.SPC.22 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
SYA.SPC.23 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
SYA.SPC.24 System shall allow user to track the status of the application request along with remarks to the user such as:
SYA.SPC.26 1. Pending confirmation
SYA.SPC.27 2. Application accepted
SYA.SPC.28 3. Application declined
SYA.SPC.29 User shall be able to print and save the notification for easy retrieval of information for future reference
SYA.SPC.30 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
SYA.SPC.31 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
SYA.SPC.32 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
SYA.SPC.33 System shall send an activation URL to the email id of the respective official
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 176 | P a g e
responsible to accept the application
SYA.SPC.34 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
SYA.SPC.35 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct with other departments
SYA.SPC.36 System shall allow and accept the digital signature from respective officials for processing the application of sportsperson certificate for the users
SYA.SPC.37 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
SYA.SPC.38 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
SYA.SPC.39 System shall allow to intimate applicant/citizen through State portal to collect sports person certificate of approval/rejection manually or by post
SYA.SPC.40 System shall allow to upload the scanned/ PDF copy of sports person certificate in the State portal where applicant/citizen can take the print of it
SYA.SPC.41 System shall send delivery report to the respective official whenever the citizen collects valid sports person certificate
Requirement Specifications
Certificate
23. Registration/Application for entry into state youth festival
Requirement ID
Description
SYA.PYF.1 System shall allow applicant/ESO/CSC/CFC operator to select Department of sports & youth affairs from the home page of the State Portal
SYA.PYF 2 System shall allow applicant to select application for registration/application for entry into state youth festival on the department of sports & youth affairs page of the state portal
SYA.PYF.3 System shall allow registration of applicant/school for future login and ease
SYA.PYF.4 System shall allow applicant to fill/edit e-Form/Application online
SYA.PYF.5 System shall accept filled e-Form/application of new applicants
SYA.PYF.6
System shall be able to capture the applicants details through an electronic form such as:
1. Name
2. Contact Details
3. PIN
4. Age
5. Area of residence
6. Type of School (Girls/Boys)
7. School/College Registration No. (Re. No.))
8. Details as required in application form used at present
9. If individual then any UID (Unique Identification)
10. E-mail id (if any)
11. Contact No. if any
SYA.PYF.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 177 | P a g e
SYA.PYF.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
SYA.PYF.8 System shall allow the applicant/school to preview the registration
TRS.OLD.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
SYA.PYF.10 System shall allow editing before submission
SYA.PYF.11
System shall allow upload:
1. Copy of registration of school/ college
2. Valid Id/Age. Proof of user
3. Other supporting documents if required at present
SYA.PYF.12 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
SYA.PYF.13 System shall allow save and print facility of the acknowledgement slip
SYA.PYF.14 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
SYA.PYF.15 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
SYA.PYF.16 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
SYA.PYF.17 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
SYA.PYF.18
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
SYA.PYF.19 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
SYA.PYF.20 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
SYA.PYF.21 System shall display the respective communication address/ drop box and turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
SYA.PYF.22 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
SYA.PYF.23 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
SYA.PYF.24 System shall allow user to track the status of the application request along with remarks to the user such as:
SYA.PYF.26 1. Pending confirmation
SYA.PYF.27 2. Application accepted
SYA.PYF.28 3. Application declined
SYA.PYF.29 User shall be able to print and save the notification for easy retrieval of
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 178 | P a g e
information for future reference
SYA.PYF.30 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
SYA.PYF.31 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
SYA.PYF.32 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
SYA.PYF.33 System shall send an activation URL to the email id of the respective official responsible to accept the application
SYA.PYF.34 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
SYA.PYF.35 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct with other departments
SYA.PYF.36 System shall allow and accept the digital signature from respective officials for processing the application of registration/application for entry into state youth festival
SYA.PYF.37 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
SYA.PYF.38 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
SYA.PYF.39 System shall allow to intimate individual/schools/college through State portal to collect registration for entry into state youth festival of approval/rejection with event venue & schedule manually or by post
SYA.PYF.40 System shall allow to upload the scanned/ PDF copy of registration for entry into state youth festival of approval/rejection with event venue & schedule in the state portal where applicant/ school/college can take the print of it
SYA.PYF.41 System shall send delivery report to the respective official whenever the applicant /school /college staff collects valid registration for participation in youth festival
Requirement Specifications
Certificate
24. Application for grant in aid for various educational institutes
Requirement ID
Description
SYA.EGA.1 System shall allow applicant/ESO/CSC/CFC operator to select Department of sports & youth affairs from the home page of the State Portal
SYA.EGA 2 System shall allow applicant to select application for grant in aid for various educational institutes on the department of sports & youth affairs page of the state portal
SYA.EGA.3 System shall allow registration of applicant/registered educational institutes for future login and ease
SYA.EGA.4 System shall allow applicant to fill/edit e-Form/Application online
SYA.EGA.5 System shall accept filled e-Form/application of new applicants
SYA.EGA.6 System shall be able to capture the applicants details through an electronic form such as:
1. Name
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 179 | P a g e
2. Contact Details
3. PIN
4. Age
5. Area of residence
6. Registration No. of educational institute
7. Details as required in application form used at present
8. E-mail id (if any)
9. Contact No. if any
SYA.EGA.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
SYA.EGA.7 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
SYA.EGA.8 System shall allow the applicant/school to preview the registration
SYA.EGA.9 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
SYA.EGA.10 System shall allow editing before submission
SYA.EGA.11
System shall allow upload:
4. Copy of registration of education institute
5. Valid Id. Proof of user
6. Other supporting documents if required at present
SYA.EGA.12 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
SYA.EGA.13 System shall allow save and print facility of the acknowledgement slip
SYA.EGA.14 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
SYA.EGA.15 System shall allow to accept unique ID as proof of document which can be verified internally within departments through SSDG interface
SYA.EGA.16 System shall display the respective communication address and turnaround time to submit documents in case the applicant selects the option to submit physical documents
SYA.EGA.17 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
SYA.EGA.18
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
SYA.EGA.19 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
SYA.EGA.20 System shall allow the user to visit the secured payment gateway in case the user selects the option to make the payment through net banking, debit card or credit card
SYA.EGA.21 System shall display the respective communication address/ drop box and
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 180 | P a g e
turnaround time to make payment in case the applicant selects the option to make payment through bearer cheque
SYA.EGA.22 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with expected TAT
SYA.EGA.23 System shall allow user to save and print the acknowledgement for enquiry and grievance purposes
SYA.EGA.24 System shall allow user to track the status of the application request along with remarks to the user such as:
SYA.EGA.26 1. Pending confirmation
SYA.EGA.27 2. Application accepted
SYA.EGA.28 3. Application declined
SYA.EGA.29 User shall be able to print and save the notification for easy retrieval of information for future reference
SYA.EGA.30 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
SYA.EGA.31 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
SYA.EGA.32 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
SYA.EGA.33 System shall send an activation URL to the email id of the respective official responsible to accept the application
SYA.EGA.34 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
SYA.EGA.35 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct with other departments
SYA.EGA.36 System shall allow and accept the digital signature from respective officials for processing the application of grant aid for registered educational institutes
SYA.EGA.37 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
SYA.EGA.38 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
SYA.EGA.39 System shall allow to intimate educational institutes through State portal to collect approval/rejection of grant aid manually or by post
SYA.EGA.40 System shall allow to upload the scanned/ PDF copy of final approval/rejection in state portal where educational institutes can take the print of it
SYA.EGA.41 System shall send delivery report to the respective official whenever the education institutes collect valid grant aid.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 181 | P a g e
XI. All Departments in state of Goa
Requirement Specifications
Generic Form
25. Recruitment form for non-gazette post of various Depts. across State
Requirement ID
Description
GEN.NGP.1 System shall allow concerned department authorized authority to select new requirement form available in e-District application for concerned department internal use from the home page of the concerned department web Portal
GEN.NGP 2 System shall allow concerned department authorized authority to select application form for recruitment of non- gazette post
GEN.NGP.3 System shall allow registration of concerned department authorized authority for future login and ease
GEN.NGP.4 System shall allow concerned department authorized authority to create/fill/edit e-Form/Application as required by department
GEN.NGP.5 System shall accept addition / updating /creation filled e-Form/application of concerned department authorized
GEN.NGP.6
System shall be able to capture concerned department authorized authorities details through an electronic form before giving authorized access/login for first time for the service such as:
1. Name 2. Contact Details 3. PIN 4. Age 5. Employee Id 6. Name of Department/ Section 7. Details as to be required in application form suggested by concerned
department 8. Approval from authorized senior authority official for service 9. Official E-mail id (if any)
10. Contact No. if any 11. Other documents/details required by department.
GEN.NGP.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
GEN.NGP.8 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
GEN.NGP.9 System shall allow the concerned department authorized authority to preview the registration
GEN.NGP.10 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
GEN.NGP.11 System shall allow editing before submission
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 182 | P a g e
GEN.NGP.12
System shall allow upload: 7. Copy of department approval for service 8. Valid Employee Id. Proof with office & working section details 9. Other supporting documents if required (to be decided by concerned
official)
GEN.NGP.13 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
GEN.NGP.14 System shall allow save and print facility of the acknowledgement slip
GEN.NGP.15 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
GEN.NGP.16 System shall allow to accept unique ID as proof of document which can be verified internally within concerned departments through SSDG interface
GEN.NGP.17
System shall allow authorized department official to help build, manage, simulate, change or create human to human workflows in a graphical manner by drag and drop without having to write program code. Just simply by dragging and dropping objects
GEN.NGP.18 System shall display the standard templates to be used with options to edit same as per requirement as authorized by senior authority
GEN.NGP.19 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
GEN.NGP.20
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
GEN.NGP.21 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
GEN.NGP.22
System shall allow the user to visit the secured fields setting up dates of enabling & disabling of accepting online applications & payment gateway in case of there is option to given for submitting fee through net banking, debit card or credit card using payment gateway
GEN.NGP.23
System shall display the all respective fields to be added such as Applicant name ,educational qualification communication address , etc as required and last date & time to apply and make payment in case the concerned department authorized authority selects the option to make new form or edit existing as required
GEN.NGP.24 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with notification message to concerned department officials for any access or work done on form application
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 183 | P a g e
GEN.NGP.25
System shall be able to capture the applicants details through an electronic form such as: 1. Name 2. Contact Details 3. PIN 4. Age 5. Gender 6. Permanent/Temporary Address 7. Educational qualification details 8. Details required in application form as per post requirement 9. E-mail id (if any) 10. Contact No. if any 11. Name of non-gazette post applied for:
GEN.NGP.26 System shall allow user to save and print the acknowledgement for further use if required
GEN.NGP.27
System shall allow user to track the status of the online received filled application for the concerned request for non-gazette post along with remarks to the applicant : a. Pending confirmation b. Application accepted c. Application declined
GEN.NGP.28 Applicant applying for non-gazette post shall be able to print and save the notification for easy retrieval of information for future reference
GEN.NGP.29
System shall allow department people to sort applications with pre- defined criteria updated in e-District application with using pre- existing selections options as per all required actions from adding/editing of a form till final selection of a candidate for the selected post
GEN.NGP.30 User shall be able to print and save the notification for easy retrieval of information for future reference
GEN.NGP.31 System shall allow the user to rectify the error (in case of application declined) and re-submit the same application
GEN.NGP.32 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
GEN.NGP.33 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
GEN.NGP.34 System shall send an activation URL to the email id of the respective authorized official responsible to accept/reject updating of the application
GEN.NGP.35 System shall allow department authorized user to generate Reports, MIS and
dashboards: to manage the services in a timely fashion without having to write extensive programs
GEN.NGP.36 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
GEN.NGP.37 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct with other concerned departments
GEN.NGP.38 System shall allow and accept the digital signature from respective officials for processing the application of recruitment form for non-gazette post
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 184 | P a g e
GEN.NGP.39 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
GEN.NGP.40 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
GEN.NGP.41
System shall allow to update intimation on any such non-gazette position recruitment on State/department portal for citizens / applicants to apply for the same as soon as it gets approved and uploaded by department authorized officials with command to display/publish same on state/department portal or in any new papers
GEN.NGP.42 System shall allow to upload the scanned/ PDF copy of final filled copy application for non-gazette post in the State/department portal where concerned department authorized authority/ applicant can take the print of it
GEN.NGP.43 System shall send delivery report to the respective official whenever the concerned department authorized authority /applicants collects valid service requests or applications
GEN.NGP.44 System shall be able to maintain all records for the login sessions with date and time
GEN.NGP.45 System shall be PKI enabled to accept digital signatures for digitally signing documents for recruitment of non-gazetted post
GEN.NGP.46 System shall have a facility for forwarding of the application, with remarks and digital sign of the sender, to any person in District administration registered with System
GEN.NGP.47 System shall be able to provide date and time stamping for all transactions done with digital signature
GEN.NGP.48 System shall consider the list of holidays for tracking the timelines of various activities.
GEN.NGP.49 System shall support multilingual interface (minimum Konkani, Marathi and English as per Localization and Language Technology Standards for National e-Governance Plan defined in eDistrict guidelines
GEN.NGP.50 Recruitment for non-gazette post module of eDistrict application should be linked to general all service component appropriately as per department requirement –e.g. Information component, Form availability component etc.
Requirement Specifications
Generic Form
26. Form for scheme management
Requirement ID
Description
GEN.FSM.1 System shall allow concerned department authorized authority to select new requirement form available in eDistrict application for concerned department internal use from the home page of the concerned department web Portal
GEN.NGP 2 System shall allow concerned department authorized authority to select form for scheme management
GEN.FSM.3 System shall allow registration of concerned department authorized authority for future login and ease
GEN.FSM.4 System shall allow concerned department authorized authority to
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 185 | P a g e
create/fill/edit e-Form/Application as required by department
GEN.FSM.5 System shall accept addition / updating /creation filled e-Form/application of concerned department authorized
GEN.FSM.6
System shall be able to capture concerned department authorized authorities details through an electronic form before giving authorized access/login for first time for the service such as:
1. Name 2. Contact Details 3. PIN 4. Age 5. Employee Id 6. Name of Department/ Section 7. Details as to be required in application form suggested by concerned
department 8. Approval from authorized senior authority official for service 9. Official E-mail id (if any) 10. Contact No. if any
GEN.FSM.7 System shall require entries from the user for certain important information items entered twice. For example email id needs to be captured correctly if email is the preferred mode of communication
GEN.FSM.8 System shall provide adequate aid to the user in the form of online tutorials, "How To", FAQs, etc. that can be used on their own to familiarize themselves with keying-in the registration data and the registration process
GEN.FSM.9 System shall allow the concerned department authorized authority to preview the registration
GEN.FSM.10 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
GEN.FSM.11 System shall allow editing before submission
GEN.FSM.12
System shall allow upload: 1. Copy of department approval for service 2. Valid Employee Id. Proof with office & working section details 3. Other supporting documents if required (to be decided by concerned
official)
GEN.FSM.13 System shall perform data validation checks on the input. In case of data being duplicated, System shall display the existing service request id & existing record if any.
GEN.FSM.14 System shall allow save and print facility of the acknowledgement slip
GEN.FSM.15 Validations for file type that shall be allowed to be uploaded include only formats such as above. It shall not allow .executable files.
GEN.FSM.16 System shall allow to accept unique ID as proof of document which can be verified internally within concerned departments through SSDG interface
GEN.FSM.17 System shall display the standard templates to be used with options to edit same as per requirement as authorized by senior authority
GEN.FSM.18 System shall as a part of application establish challenge and responses mechanisms for session validation for future online sessions.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 186 | P a g e
GEN.FSM.19
System shall perform data validation checks on the completeness of the form in terms of mandatory fields, checking for file type and size of files uploaded, etc. In case of any validation failure, System shall display an appropriate error message.
GEN.FSM.20 System shall apply spam control measures during registration to avoid spurious details being automatically submitted and ensure that data is not submitted by non-humans
GEN.FSM.21
System shall allow the user to visit the secured fields setting up dates of enabling & disabling of accepting online applications & payment gateway in case of there is option to given for submitting fee through net banking, debit card or credit card using payment gateway
GEN.FSM.22
System shall display the all respective fields to be added such as Applicant name , communication address , etc. as required and last date & time to apply for scheme and make payment in case the concerned department authorized authority selects the option to make new form or edit existing as required
GEN.FSM.23 System shall be able to provide unique 'Service Id Request' acknowledgement to the user along with notification message to concerned department officials for any access or work done on form application
GEN.FSM.24
System shall be able to capture the applicants details through an electronic form such as: Name Contact Details PIN Age Area of residence Name of scheme applied for Details as required in application form used at present E-mail id (if any) Contact No. if any
GEN.FSM.25 System shall allow user to save and print the acknowledgement for further use if required
GEN.FSM.26
System shall allow user to track the status of the online received filled application for the concerned request for non-gazette post along with remarks to the applicant : 1. Pending confirmation 2. Application accepted 3. Application declined
GEN.FSM.27 Applicant applying for scheme shall be able to print and save the notification for easy retrieval of information for future reference
GEN.FSM.28
System shall allow department people to sort applications with pre-defined criteria updated in eDistrict application with using pre-existing selections options as per all required actions from adding/editing of a form till final selection of a candidate for the selected post
GEN.FSM.29 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
GEN.FSM.30 User shall be able to print and save the notification for easy retrieval of information for future reference
GEN.FSM.31 System shall allow the user to rectify the error (in case of application declined)
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP – Goa – Volume I
State-wide rollout of the eDistrict MMP 187 | P a g e
and re-submit the same application
GEN.FSM.32 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct
GEN.FSM.33 System shall allow the user to re- submit the application only after validating the authenticity of the user through challenges and response
GEN.FSM.34 System shall send an activation URL to the email id of the respective authorized official responsible to accept/reject the application
GEN.FSM.35 System shall send an automated escalation mail to the next level of authority in case the respective official does not attend the application URL within TAT
GEN.FSM.36 System shall allow only authorized users to access the scanned supporting documentation and verify if they are correct with other concerned departments
GEN.FSM.37 System shall allow and accept the digital signature from respective officials for processing the application of recruitment form for non-gazette post
GEN.FSM.38 System shall allow the respective official to update the status of the application request as per proceedings along with the remarks
GEN.FSM.39 Any change to the application record shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
GEN.FSM.40
System shall allow to update intimation on any such scheme on State/department portal for citizens / applicants to apply for the same as soon as it gets approved and uploaded by department authorized officials with command to display/publish same on state/department portal or in any new papers
GEN.FSM.41 System shall allow to upload the scanned/ PDF copy of final filled copy application for non-gazette post in the State/department portal where concerned department authorized authority/ applicant can take the print of it
GEN.FSM.42 For Any change to the application record system shall generate a change log with details like name of the user making the changes, timestamp of transaction, etc.
GEN.FSM.43
System shall allow the authorized user to credit/deposit money (if any) through the secured payment gateway in account of beneficiary in case department selects the option to make the payment through net banking/on-line transfer (if required)
GEN.FSM.44 System shall allow to upload the details of dispersed amount or report of scheme provided for the beneficiary/applicant on the state portal where citizen can take the print of it
GEN.FSM.45 System shall be PKI enabled to accept digital signatures for digital signing of the documents of scheme management.
GEN.FSM.46 System shall consider the list of holidays for tracking the timelines of various activities.
GEN.FSM.47 System shall support multilingual interface (minimum Konkani , Marathi and English) as per Localization and Language Technology Standards for National e-Governance Plan defined in eDistrict guidelines
GEN.FSM.48 Recruitment for non-gazette post module of eDistrict application should be linked to general all service component appropriately as per department requirement –e.g. Information component, Form availability component etc.
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP in Goa – Volume II
Info Tech Corporation of Goa Ltd
On behalf
Of
Department of Information Technology
Government of Goa
REQUEST FOR PROPOSAL
FOR
SELECTION OF SYSTEM INTEGRATOR
FOR
ROLL-OUT OF e-District MMP - GOA
VOLUME II
Ref No: ITG-IT/RFP/e-District/2013/01 dated 7th January 2014
Info Tech Corporation of Goa Ltd
A Govt. of Goa Undertaking
(An ISO 9001:2008 certified company)
4th Floor, Above Alcon Hyundai Showroom,
Porvorim, Bardez, Goa – 403501
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 2 | P a g e
Table of Contents
1 Introduction ........................................................................................................................................ 5
2 Implementation Framework ............................................................................................................. 6
3 Scope of the Project .......................................................................................................................... 10
3.1 Introduction ...................................................................................................................................... 10
4.1.1 State Specific Requirements ............................................................................................................. 11
I. Integration & Interfacing Requirement (Integration with NIC, portal and SSDG) ....................... 11
Responsibility Matrix ................................................................................................................................. 12
II. Customisation Requirement (Integration with NIC, portal and SSDG) ........................................ 13
III. Key Configuration Requirement (Integration with NIC, portal and SSDG) ................................ 13
IV. Additional Application Development ............................................................................................... 13
3.2 Solution & Technology Architecture ............................................................................................. 14
3.2.1 Overview ........................................................................................................................................... 14
3.2.2 eDistrict Application Structure ....................................................................................................... 15
3.3 Scope of Services – Project Implementation Phase ...................................................................... 17
3.3.1 Solution Design ................................................................................................................................. 17
3.3.2 Network Connectivity ..................................................................................................................... 46
3.3.3 Data Digitisation ............................................................................................................................... 47
3.3.4 Site Preparation ................................................................................................................................ 53
3.3.5 Supply / Procurement of IT Infrastructure at SDC ..................................................................... 54
3.3.6 Hardware Commissioning at Field Offices .................................................................................. 55
3.3.7 Migration to New Infrastructure Facility ...................................................................................... 56
3.3.8 Licenses .............................................................................................................................................. 57
3.3.9 Capacity Building / Training ......................................................................................................... 57
3.3.10 Manpower requirements ................................................................................................................. 60
3.3.11 Business Continuity Planning ........................................................................................................ 60
3.3.12 Others.. ............................................................................................................................................... 61
3.3.13 Project Management ........................................................................................................................ 65
3.4 Scope of Services - Operation and Maintenance Phase .............................................................. 67
3.4.1 Overview of Post Implementation Services ................................................................................. 67
3.4.2 Warranty Support ............................................................................................................................ 68
3.4.3 Technical Support (TS) .................................................................................................................... 69
3.4.4 Help Desk and Trouble ticket management system.................................................................... 70
3.5 General Requirements ..................................................................................................................... 72
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 3 | P a g e
3.6 Exit Management.............................................................................................................................. 74
4 Detailed Implementation and Roll-out Plan ................................................................................ 78
5 Annexures ......................................................................................................................................... 79
5.1 Template for Capturing Office Wise Requirements .................................................................... 79
5.2 Template for Capturing Network Connectivity Requirement .................................................. 82
5.3 Tentative Hardware Requirement ................................................................................................. 84
5.4 Template for Capturing Site Preparation Requirement (If Any) ............................................... 84
5.5 Template for Data Entry .................................................................................................................. 85
5.6 Template for Preparing FRS and Process Maps (with illustrative data) .................................. 92
Tracking Status of Marriage registration certificate .............................................................................. 95
5.7 Template for Bill of Material ......................................................................................................... 103
Form A: Bill of Material (Software at SDC)........................................................................................... 103
Form B: Bill of Material (Hardware at SDC) ......................................................................................... 103
Form C: Bill of Material (Infrastructure at Field Offices) .................................................................... 109
6 Annexure: ........................................................................................................................................ 127
6.1 List of existing Hardware components, SLA management tool and licences at SDC, Goa . 127
6.2 Non-Functional Requirements ..................................................................................................... 128
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 4 | P a g e
GLOSSARY OF TERMS
The definitions of various terms that have been used in this RFP are as follows:
“Request for Proposal (RFP)” means all three Volumes and its annexures and any other
documents provided along with this RFP or issued during the course of the selection of
bidder, seeking a set of solution(s), services(s), materials and/or any combination of them.
“Contract / Agreement / Contract Agreement / Master Service Agreement” means the
Agreement to be signed between the successful bidder and SDA, including all attachments,
appendices, all documents incorporated by reference thereto together with any subsequent
modifications, the RFP, the bid offer, the acceptance and all related correspondences,
clarifications, presentations.
“Bidder” means any firm offering the solution(s), service(s) and /or materials as required in
the RFP. The word bidder when used in the pre-award period shall be synonymous with
parties bidding against this RFP, and when used after award of the Contract shall mean the
successful party with whom the agreement is signed for rendering of services for
implementation of this project.
“Proposal / Bid” means the Pre-Qualification, Technical and Commercial bids including
clarifications, submitted for this project against this RFP.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 5 | P a g e
1 Introduction
NeGP was approved by the Government of India in May 2006, with the following vision:
“Make all Government Services accessible to the common man in his locality, through
common service delivery outlets and ensure efficiency, transparency and reliability of such
services at affordable costs to realise the basic needs of the common man”
To realize this vision, 31 Central, State and Integrated Mission Mode projects (MMPs) along
with 8 support components were identified and approved under NeGP. States have been
given flexibility to identify up to 5 additional state-specific projects, which are particularly
relevant for the economic development of the State. NeGP also envisages creation of the core
IT infrastructure in the form of SWANs, SDCs and CSC‟s in rural areas across the country to
deliver public services electronically in local language.
eDistrict is one of the 31 MMPs under NeGP, with the Department of Information Technology
(DoIT), Government of India (GoI) as the nodal department, to be implemented by State
Government or their designated agencies. This MMP aims at electronic delivery of identified
high volume citizen centric services, at district and sub-district level, those are not part of any
other MMP. To achieve these objectives service levels and outcomes for each of these services
will be clearly laid down by the State concerned, with a view to improving the efficiency and
effectiveness of the service delivery. The MMP envisages leveraging and utilizing the four
pillars of e-infrastructure namely, State Data Centres (SDCs), State Wide Area Network
(SWANs), State Service Delivery Gateways (SSDGs) and Common Service Centres (CSCs),
optimally to deliver public services electronically to citizens at their door steps. Initially only
those high volume citizen-centric services will be taken up for implementation which have
high priority for the State. New services will be added to the portfolio subsequently, once the
demand for the initial set of e-enabled services increases.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 6 | P a g e
2 Implementation Framework
I. eDistrict project shall be implemented in a way where the districts will play a major role.
eDistrict shall be implemented in alignment with the NeGP principle of “centralized
planning and decentralized implementation”. State IT Department/ Nodal Agency shall play
a key role in planning and implementation of the program in collaboration with the district.
II. The role of the DeitY, GoI focuses primarily in planning of national level roll out, issuing
guidelines, funding support to the states, monitor and support the state in implementation of
the project. States shall drive the implementation at the state/district level. The diagram
illustrating the key stakeholders and their role in implementation and for managing the
eDistrict MMP is shown below:
III. eDistrict MMP aims at electronic delivery of all public services at district / sub district level,
progressively. Initially 26 services of identified high volume citizen centric public services at
district and sub-district level will be taken up for implementation.
Services are classified into 3 basic categories:
Type 1 services are typically those services for which an accurate digital database is
available. For e.g. Land Records have been digitized and several land-related
services are now available across the counter. Similarly, once birth and death are
registered, stored in secured database and digitally signed; birth and death
certificate (bilingual) can be issued on demand across the counter.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 7 | P a g e
Type 2 services are those services which can migrate to Type 1 services with due
data digitization and onetime physical verification. For e.g. Issue of Caste
Certificate. Till such time as the centralized, digitally signed databases are created,
Type 2 services are delivered within a pre-defined period, say 2 weeks.
Type 3 services require physical presence / verification and cannot be delivered
across the counter, like Issue of Arms Licenses.
Prioritization of Services shall be done on the basis of categories under which the Services
shall fall.
IV. An Integrated Service Delivery Framework has been designed by DeitY in July 2012, and
communicated to all the States. It can be accessed at (URL:
http://deity.gov.in/content/eDistrict-guidelines). This framework envisages a centralized
architecture for each major e-Governance application at the State level. The application
software will be hosted in the State Data Centre. Integration across States shall be enabled,
through mandatory adherence to technical specifications and e-Governance standards,
besides use of the SSDG. Compliance to latest Unicode standard (current version is 6.0) for
local language content/data encoding is also mandatory. The Integrated Framework shall be
treated as part of this RFP and shall be followed with appropriate modifications, required by
the State.
V. Two key aspects of the Scheme are Business Process Re-engineering (BPR) and creation of
databases based on e-Governance standards for the purposes of ensuring interoperability.
BPR is intended to enable process simplification and significant value addition to citizens.
VI. The solution architecture of the eDistrict project envisages a centralised application and
database and will leverage the core e-infrastructure of State Wide Area Network, State Data
Centre and State Service Delivery Gateway.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 8 | P a g e
ESO/CSCS – Extended Service Outlet are service delivery centres which are proposed to be
established in Goa at the Panchayats to provide various G2C and G2B services including
services included in the eDistrict Project.
CFC – Citizen Facilitation Centre are delivery centres which are established in Goa at
Collectorate offices to deliver services.
SDC - State Data Centre is the central Data centre of Goa which houses the infrastructure to
host eDistrict project.
e-Forms – Electronic Forms are forms which are available on Goa state portal for citizens to
apply for various services.
Payment Gateway – A payment gateway facilitates and performs variety of tasks between a
payment portal and eDistrict Project to process payment related transactions.
SSDG: SSDG (State e-Governance Services Delivery Gateway) is a messaging services
initiative taken by the Department of Information & Technology, Government of India at the
State level. At the central level it is referred to as the NSDG (National e-Governance Services
Delivery Gateway).
VII. SSDG is standard based Messaging and routing switch which provides seamless
interoperability and exchange of data across multiple government departments.
VIII. Further eDistrict service will be integrated with a mobile service delivery gateway and
Aadhaar numbers of the Unique Identification Authority of India. Localisation of the
application will be carried out as per the requirement of the state in terms of local language
and other needs. According to this, States selects System Integrator (bidder) who shall be
responsible to implement the project in the state as per the DeitY, GoI guidelines. Integration
of existing applications being used in the state shall not be possible unless the legacy data in
Service Delivery
ESO
ESO
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 9 | P a g e
the local language is compliant to Unicode version 6.0 or above. In some cases, this legacy
data therefore will need to be converted to Unicode 6.0 (or latest version).
The eDistrict MMP envisages centralised architecture at the state level with common
application software for each of the identified services for the 2 districts of the state. The
application software will be hosted in the SDC. In Goa however, 12 services developed and
managed by NIC will be hosted in NIC data centre which are part of the „DC Suite, Info-
Gram & Dharni. All the 26 services envisioned in the eDistrict will be accessed through a
state portal. All future services added to the eDistrict will be accessed through this portal.
Citizen accesses the services by directly going to the state portal which is available on the
internet or through CFC‟s/ESO/CSCS‟s. CFC‟s (Citizen Facilitation centres) are at
Collectorate and ESO/CSCS‟S (Extended service outlets) are at Panchayat level. In addition
they can also go directly to line departments and their sub-offices to avail these services.
IX. Integration shall be enabled, through mandatory adherence to technical specifications, e-
Governance and localisation standards. The detailed guidelines in this regard have been
issued by Department of Electronics and Information Technology (DeitY) Government of
India.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 10 | P a g e
3 Scope of the Project
3.1 Introduction
The eDistrict MMP is to be implemented in State of Goa. The implementation of the scheme
will be completed in ONE year commencing from the date of award to the bidder and will be
followed by 3 years for software from date of Go live and 5 years for hardware (including
comprehensive warranty) .
South Goa
Note: Total No. of talukas: 6
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 11 | P a g e
North Goa
4.1.1 State Specific Requirements
I. Integration & Interfacing Requirement (Integration with NIC, portal and SSDG)
1. There are a total of 26 services considered as part of the initial eDistrict Goa initiative.
2. It is to be noted that 12 services out of 26 are available and managed by NIC. eDistrict
application should be integrated with application developed by NIC through SSDG
3. End to End applications need to be developed for 14 services .
4. SSDG acts like a switching gateway. Currently SSDG and State portal are maintained by a
single vendor. Integration is one of the key elements in the Goa eDistrict initiative.
5. Integration needs to be done from state portal to SSDG and then from SSDG to the
applications managed & developed by NIC and newly developed application (for 14
services).
6. Payment gateway and Mobile gateway also need to be connected through SSDG.
Integration and other responsibilities for bidder (eDistrict), bidder (SSDG) and NIC are tabulated
below:
Note: Total No. of talukas: 6
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 12 | P a g e
Responsibility Matrix
Sr. No Responsibility bidder
(eDistrict) bidder (SSDG) NIC
1. Service Development Ownership 14 of 26 Services NA 12 of 26 Services
2. State portal & SSDG Maintenance NA YES NA
3.
Development & deployment of connectors at both ends, i.e. from eDistrict services to SSDG and SSDG to backend applications
YES (in consultation & support with NIC & SSDG)
NA NA
4. Applications links on the state portal remain active and live at all times
NA YES NA
5. Payment Gateway Integration YES YES YES
6. Knowledge transfer to the eDistrict bidder regarding the technology of the SSDG layer being implemented
NA YES NA
7. Sharing of concept for mobile gateway connectors for SSDG services with eDistrict bidder
NA YES NA
8.
Design, development and maintenance of the e-Forms, using X-form based technology (configurable tool)
YES NA NA
9. Display of data for 12 NIC services NA NA YES
10. Testing for integration in conjunction with bidder (SSDG) and NIC
YES YES YES
11. Application enhancements of 12 services under NIC
NA NA YES
12. Maintenance of eDistrict servers hosted at SDC
YES NA NA
13. Maintenance of eDistrict servers hosted at NIC Data centre
NA NA YES (12 of 26
Services)
14.
Localization of the data is in the purview of eDistrict initiative complaint to Unicode Version 6.0 (in consultation with DeitY)
YES YES YES
15. Training /capacity building
Yes (Training to be conducted for e- District)
NA
Knowledge transfer for 12
services will be done to bidder
(eDistrict)
16. Procurement of digital signature for service delivery
Yes NA NA
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 13 | P a g e
17. Implementation of digital signatures
Yes (14 of 26 services)
NA Yes (12 of 26
services)
18. Development of Verification & Validation module of DSC
YES NA NA
19. Integration with eTaal YES NA NA
20. Single sign on (SSO) management NIC will enable single sign on for the services
YES Will enable single sign on services
NIC will enable single sign on for the 12 of 26
services
21. Status w.r.t to services provided to bidder eDistrict to be displayed in frontend
Yes (14 of 26 services),
updated by bidder eDistrict
in frontend
NA
Yes (12 of 26 services),
updated by NIC eDistrict in
frontend
22. Notify regarding the maximum transactions that can be executed on SSDG and gaps if any
NA YES NA
23. Handling of generic services posting done on the State portal
YES ( In consultation to
DoIT Nodal officers)
YES NA
24. UID/ Aadhaar integration
Yes (14 of 26 services)
NA Yes (12 of 26
services)
25. FAQ/Manual related to the service on the portal.
Yes (26 services in consultation with SSDG and
NIC)
Provide support to enable it on the
portal.
Yes (12 of 26 services)
Note: NIC developed & managed applications include DC suite, Taluka suite, Info-gram, Municipality Administrative Software & Dharni
II. Customisation Requirement (Integration with NIC, portal and SSDG)
Refer to above responsibility matrix
III. Key Configuration Requirement (Integration with NIC, portal and SSDG)
Refer to above responsibility matrix
IV. Additional Application Development
Sr.
No
Application Layer Description
1. UI layer Refer 4.3.2.2 –Point IV
2. Application layer Refer 4.3.2.2 –Point II
3. Business Process / Service Layer Refer 4.3.2.2 –Point V
4. Database layer Open Source & Portable Database Software
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 14 | P a g e
3.2 Solution & Technology Architecture
3.2.1 Overview
I. A centralized architecture (servers and processing at single and central location) has
been proposed for the e-District project. All requests from internal and external
users will be sent to this system, located in a central place for processing. All users
will access the application through local or remote terminals using a browser
(through internet for external users and through intranet for internal department
users).
II. The overall technology solution shall be based upon most relevant and suitable
architecture standards including standards for Service Oriented Architecture (SOA),
XML services & necessary protocols for internet applications, Data Centre
standards, Localization (Unicode, Inscript, etc.) standards, W3C (WCAG for
accessibility, etc.) standards & GIGW guidelines, etc. etc.
III. The design should include integration with existing IT infrastructure created under
SDC, GBBN, ESO/CSCS‟S & CFC‟S, State Portal, SSDG and any other MMP for the
implementation of e-District Project.
IV. e-District Application developed should be integrated with all the 5 mandated
modules as described by DietY [ the details should be updated in the FRS, SRS and
design by SI/bidder ]
V. Currently SDC is located at the DoIT office at Povorim, Bardez. Goa intends to take
up an alternate infrastructure facility to locate the current SDC. If the location and
site preparation for the new infrastructure facility is finalized during the course of
the implementation of e-District project, selected bidder shall be responsible for
server migration and related services to the new infrastructure facility.
VI. The indicative structure is as below :
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 15 | P a g e
3.2.2 e-District Application Structure
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 16 | P a g e
VII. In Goa, State Portal/SSDG has been developed. The e-District architecture should
be compatible with it and should get integrated with SSDG.
VIII. Centralized architecture is suggested for states so that in case the central servers,
storage, link or due to any reason go down despite building redundancy/high
availability capabilities. The selected bidder shall ensure an uptime of 99.95% for e-
District application on a quarterly basis.
IX. Bidders should clearly understand that the desire of the department is not to create
a mere IT Solution but an information infrastructure that will expand, integrate and
enhance the functional needs of the department concerned, citizens and other
stakeholders. It is in this spirit that the core design and functional requirements are
elaborated in the forthcoming sections.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 17 | P a g e
X. The reference architectures provided in the Integrated Framework for Delivery of e-
Services (URL: http://deity.gov.in/content/e-District-guidelines) shall be necessarily
followed.
XI. The bidder shall be responsible for shifting all the e-District hardware from existing
SDC to New SDC that shall be made available in future course
3.3 Scope of Services – Project Implementation Phase
The Selected bidder (System Integrator) will implement the project by bundling the entire
scope of services. The Selected bidder shall roll out e-District first at South Goa and
subsequently in North Goa. Primarily scope of services will include:
The following will be the activities to be carried out by the selected Bidder:
1. Project Planning and Management
2. System Study and Design
3. Updating of Business Process Reengineering (To Be Process & FRS) for the
selected applications/ services
4. Development of e-District Application
5. Network Connectivity
6. Digitization of data in English and the local language
7. Site Preparation
8. Hardware Procurement & Commissioning
9. STQC Certification and C-DAC/TDIL Certification (for localization).
10. UAT & Go live
11. Capacity Building / Training
12. Operation & Maintenance (O&M) of e-District Application and SDC
13. Help Desk Support
3.3.1 Solution Design
4.3.2.1 System Study and Design
I. The FRS (High Level) developed by the SPMU (Consultant) and is available along with
this RFP. The selected bidder shall carry out a detailed systems study to prepare/ refine
the Functional Requirements Specifications and formulate the System and Software
Requirements Specifications documents incorporating the functional specifications and
standards provided by the DeitY, GoI and the DoIT requirements.
II. The selected bidder should prepare a detailed document on the implementation of e-
District Application with respect to configuration, customization, extension and
integration as per the requirement of State. The selected bidder shall also prepare a
change/reference document based on changes or deviations from the base version of
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 18 | P a g e
the e-District Application with appropriate references to all the artefacts /documents
provided by DeitY, GoI / DoIT, Government of Goa.
III. As part of the System Study, the selected bidder shall be responsible for Preparation of
a comprehensive System Study document by studying the legislation, business
processes and organization design of the Goa.
IV. The selected bidder shall perform the detailed assessment of the functional
requirements and MIS requirements including localisation framework and prepare a
new FRS report, as part of the System Study document incorporating list of additional
features that shall result in further improvement in the overall application performance
for consideration of the SDA.
V. In case an existing pilot application is being customized / configured to meet the needs
of the state, the selected bidder will provide a comparative report as part of System
Study document, on the extent of functionality currently available in the pilot
application and the final FRS.
A. Requirements Traceability Matrix: The selected bidder shall ensure that developed e-
District application is fully compliant with the requirements and specifications
provided in the RFP such as functional, non-functional and technical requirements. For
ensuring this, the bidder shall prepare a Requirements Traceability Matrix on the basis
of Functional Requirements Specifications (FRS), Non Functional Requirements
Specification, and Technical Requirements provided by State (updated, expanded and
fine-tuned by the bidder).
B. Project Documentation: The selected bidder shall create and maintain all project
documents that shall be passed on to the State as deliverables as per the agreed project
timelines. The documents created by the selected bidder will be reviewed and
approved by the SPMU & Info Tech Corporation of Goa Ltd. (ITG).
Project documents include but are not limited to the following:
1. Detailed Project Plan
a. Detailed System Study Report
b. List of services, Service Definitions, Service Levels
c. Updated/vetted FRS
d. SRS document
e. HLD documents
2. e-District Application architecture documents.
3. ER diagrams and other data modelling documents.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 19 | P a g e
4. Logical and physical database design.
5. Data dictionary and data definitions.
6. Application component design including component deployment views, control
flows, etc.
a. LLD documents
7. Application flows and logic.
8. GUI design (screen design, navigation, etc.).
a. All Test Plans
9. Requirements Traceability Matrix
10. Change Management and Capacity Building Plans.
11. SLA and Performance Monitoring Plan.
12. Design of real-time tools for monitoring e-Transaction volumes and for
generating real-time MIS
13. Training and Knowledge Transfer Plans.
14. Issue Logs.
The selected bidder shall submit a list of deliverables that they shall be based on the
methodology they propose. The selected bidder shall prepare the formats/templates for
each of the deliverables upfront based upon industry standards and the same will be
approved by Info Tech Corporation of Goa Ltd. (ITG) prior to its use for deliverables.
All project documents are to be kept up-to-date during the course of the project. The
selected bidder shall maintain a log of the internal review of all the deliverables
submitted. Soft copy of logs shall be submitted to State Nodal Officer on regular basis.
4.3.2.1.1 Preparation of Software Requirements Specifications (SRS)
As part of the preparation of SRS the selected bidder shall be responsible for preparing and
submitting detailed requirement specification documents as per IEEE or equivalent standards
which meets all the Business, Functional and Technical including localization requirements of the
departments concerned. The selected bidder shall prepare the SRS documents and have it
reviewed and approved by the Info Tech Corporation of Goa Ltd. (ITG). The State Nodal Agency
will sign off on the SRS documents on the advice of SPMU.
The indicative details to be incorporated in the SRS are:
System Overview
Domain Model
Use Case Requirements
Business Rules
Non-Functional Requirements
Interface Requirements
Data Conversion Requirements
Load Requirements
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 20 | P a g e
Development Efforts
The selected bidder is required to update the FRS / SRS as and when any enhancements /
modifications are made to the e-District application till the duration of the Contract
4.3.2.1.2 Preparation of e-District Project Plan
The selected bidder shall prepare a comprehensive e-District implementation and deployment
plan in consultation with Info Tech Corporation of Goa Ltd. (ITG). This implementation document
shall also comprise of
I. Current State Assessment Plan & Methodology
II. e-District Application Development Methodology
III. Provisioning of network connectivity both for GBBN and LAN where-ever
required.
IV. Site preparation, etc.
V. Data Digitization
VI. Procurement, Deployment and commissioning of required hardware and software
VII. Trainings to be provided to the departmental officials at different stages of the
project
VIII. Roll-out of e-District Application
IX. Handholding of officials to facilitate smooth transition from manual workflows to
automated workflows through e-District Application
Further, selected bidder will also prepare detailed work plan and estimate the timelines and
resources required for configuration, customization, extension, integration, and commissioning of
the e-District software as per the DeitY, GoI / State requirements. During the duration of the
contract bidder shall seek approvals from Info Tech Corporation of Goa Ltd. (ITG) on all the plans
and frameworks prepared by them.
4.3.2.1.3 Preparation of e-District Application Design
Detailed Design documents shall include:
I. Technical Architecture Document (Application, Network, and Security)
II. The available IT infrastructure available at state shall be a part of the document.
III. Gap infrastructure
IV. High Level and Low Level Design.
V. Database architecture, including defining data structure, data dictionary as per
requirements of data storage in English and the local language with compliance to
standards defined by DeitY, GoI/ Goa Government.
VI. Use Case Diagram
4.3.2.1.4 Sign off Deliverable/ Exit Criteria
I. Detailed Project Plan
II. Detailed System Study Report
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 21 | P a g e
III. Updated/vetted FRS
IV. SRS document
V. HLD documents
VI. e-District Application architecture documents.
VII. ER diagrams and other data modelling documents.
VIII. Logical and physical database design.
IX. Data dictionary and data definitions.
X. Application component design including component deployment views, control
flows, etc.
a) LLD documents (including but not limited to)
XI. Application flows and logic.
XII. GUI design (screen design, navigation, etc.).
a) All Test Plans ( including test case documents)
XIII. Requirements Traceability Matrix
XIV. Change Management and Capacity Building Plans.
XV. Design of real-time tools for monitoring e-Transaction volumes and for generating
real-time MIS
XVI. SLA and Performance Monitoring Plan.
XVII. Training and Knowledge Transfer Plans.
XVIII. Issue Logs.
4.3.2.1.5 Software development/Customization
e-District Application
ITG, Goa has decided to develop an integrated solution for e-District considering the scope
and requirements to be covered. The proposed solution should conform to the following
requirements:-
I. The application should be developed on a Service Oriented Architecture with
centralized databases
II. The application to be developed should support customization and configuration of
application modules as per service requirements.
III. The application to be developed should conform to inter-operability standards for e-
Governance applications, be multi-tenant and cloud ready.
IV. The application to be developed shall be integrated with State Portal and Legacy
application (12 services developed by NIC) using SSDG.
V. The application is certified from the localization perspective.
VI. Each service offered through the e-District application will have a hyperlink on the
state Portal. Each service should also have a FAQ/Manual related to the service on
the portal which should include details on eligibility, cost of availing the service,
documents required etc.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 22 | P a g e
VII. UID integration and validation will be part of the application. This will be done in
consultation with NIC.
VIII. E-Forms should be available offline for Form-filling & submission with ability for
replication.
IX. The following points may be noted while designing the Application Architecture
a. It is absolutely essential to take the appropriate decision in consultation with the concerned line department of the State and Central Govt. as the case may be.
b. Despite the facility of borrowing the application, the spadework relating to creation of master data and of data digitization, training etc. rests with State, before the services can be launched.
X. The IPR of the application developed rests with the State Government.
4.3.2.2 e-District Functional Modules
e-District MMP aims at electronic delivery of all public services at district / sub district
level, progressively. Initially 26 services of identified high volume citizen centric public
services at district and sub-district level will be taken up for implementation. While doing
so, the four pillars of e-infrastructure i.e. GBBN, SDC, SSDG and CFCs/ ESO/CSCSs ( will
be leveraged ) and no new infrastructure would be created. Later on, new services could be
added depending on the requirements and the felt needs. It is to be noted that 12 services
out of 26 are available and managed by NIC. e-District application should be integrated
with application developed by NIC through SSDG by developing suitable web services.
Services are classified into 3 basic categories:
a. Type 1 services are typically those services for which an accurate digital database is available and data stored in secured database and digitally signed which can be issued on demand across the counter.
b. Type 2 services are those services which can migrate to Type 1 services with due data digitization and onetime physical verification. For e.g. issue of Caste Certificate. Till such time as the centralized, digitally signed databases are created, Type 2 services are delivered within a pre-defined period, say 2 weeks.
c. Type 3 services require physical presence / verification and cannot be delivered across counter, like issues of arm license.
Category of Service
Name of the Service
Type of Service
Department
End to End Development / Developed by
NIC
Integration to be done with NIC
application (Yes/ No)
Data Migration
from legacy
Application
(Yes/ No)
Certificates
1. Issuance of Income
certificate
Type 2
Collectorate Developed by
NIC Yes No
2. Issuance of Domicile certificate
Type 2
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 23 | P a g e
3. Issuance of Residence certificate
Type 2
4. Issuance of Divergence certificate
Type 2
5. Issuance of Caste/Com
munity certificate
Type 2
6. Issuance of
Matriz
certificate
Type 2
7. A) Issuance of
Birth/Death certificate
Type 2 Panchayat
Developed by
NIC Yes No
8. B) Issuance of
Birth/Death certificate
Type 2 Municipality Developed by
NIC Yes No
Linking with other
e-government projects
9. Issuance of Form I &
XIV
Type 3 Dir. of
Settlement & Land records
Developed by NIC
Yes No
Revenue Court
10. Revenue court cases-
Case listing/adjournment/stay
/ Final/Status
Type 3
Collectorate Developed by
NIC Yes No
License
11. Application/Renewal of
Arms License
Type 3
Collectorate Developed by
NIC Yes No
Subsidy/ Social Welfare
Schemes
12. Application and
Disbursement of Relief for
victims of Natural
Calamity
Type 3
Collectorate Developed by
NIC Yes No
Miscellaneous 13. Application
for Sound permission
Type 2 Collectorate
Developed by NIC
Yes No
RTI Services 14. RTI filling
and status services
Type 2 Goa state information commission
End to End Development
No No
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 24 | P a g e
and all other concerned
departments
Transport
15. Application for grant of subsidy for
Yellow/Black Motorcycle
,Auto Rickshaw,
Taxi Scheme 2003
Type 3
Transport Department
End to End Development
No No
16. Application for grant of subsidy for replacement
of buses/mini buses above 15 years old
Type 3
No No
Fisheries
17. Application for
Registration/ Renewal of Fishing Nets
Type 3
Fisheries Department
End to End Development
No No
Certificates
18. Registration of New
water sports activity
Type 2 Tourism
Department End to End
Development No No
19. Application for Marriage Registration
certificate
Type 3 Registration Department
End to End Development
No No
Certificates
20. Registration/Renewal of
Inland Vessel
Type 3
Captain of Ports
End to End Development
No
No 21. Registration
/Renewal of Water Sport
Vessel
Type 3
No
Certificates
22. Registration of Schools
for participation
in Games
Type 2
Department of Sports
End to End Development
No
No
23. Application for
Sportsmen certificate
Type 2
24. Registration/Application
Type 2
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 25 | P a g e
for entry into State Youth
Festival
25. Application for grant-in-
aid for various
Educational Institutes
Type 3
No No
Generic
26. Recruitment form for
non-gazette post of various
Depts. across State
Type 2
Generic Forms
End to End Development
No No
27. Form for Scheme
management
Type 2 No No
The application for e-District is the most critical component for e-District project. The Integrated
Service Delivery Framework released by DeitY shall be leveraged for developing the application
architecture for the State. The details on final reference architecture for the state have been
provided in this section in addition to generic requirements.
I. Design and development of the e-District Application as per the FRS and SRS
finalized by all stakeholders (SDA, State DoIT, SPMU, etc.).
II. e-District Application should ensure availability of all services, mandatory and
optional, in accordance with the BPR done by the SPMU and shall have the following
components
a. Develop the UI for processing of applications received in electronic form
b. All the forms will be initiated and integrated via State Portal and routed to
e-District Application through SSDG.
c. Development of a role based departmental workflow management system to
process the application received from the citizens. The said workflow shall
be a detailed one with focus on the specific requirements of departmental
processing.
d. Back end for the printing, status update and centralized MIS application.
e. Providing automatic acknowledgement with automated date and time
stamping to confirm acceptance of application in e-District Application and
share unique acknowledgement ID to applicant through State Portal.
f. Enabling tracking of the status of the application from any authorized office
through a unique application ID
III. Development of Role based, workflow driven Web based Content Management
System (CMS) for contribution of any type of Content to the e-District Application
including the metadata as specified in SRS.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 26 | P a g e
IV. The user should be given a choice to interact with the system in Konkani & Marathi in
addition to English. The application should provision for uniform user experience
across the multi lingual functionality covering following aspects:
a. Front end web portal in Konkani, Marathi & English.
b. E-forms (Labels & Data entry in Marathi, Konkani, & English).Data entry
should be provided preferably using the Enhanced Inscript standard (based
on Unicode version 6.0 or later) keyboard layout with option for floating
keyboard.
c. Storage of entered data in English, Konkani & Marathi using UNICODE
(version 6.0 or later) encoding standard.
d. Retrieval & display in English, Konkani & Marathi across all user interfaces,
forms and reports with all browsers compliant with Unicode version 6.0 and
above.
e. Sakal Bharti font (compliant to UNICODE version 6.0) to be used for local
language data and content. Latest version of the font is available on
www.ildc.in
V. Application should have a generic workflow engine. This generic workflow engine
will allow easy creation of workflow for new services with minimum technical
programming support and thus enable the State government to create new services as
and when required by the various Departments without creating a change request. At
the minimum, the workflow engine should have the following features :
a. Feature to use the master data for the auto-populating the forms and
dropdowns specifically with reference to :
i. Name of District, Talukas, Blocks & Villages
ii. Designation of officials involved in the processing of the application
b. Creation of application form, by “drag & drop” feature using meta data
standards
c. Defining the workflow for the approval of the form, by providing various
options like :
i. First in First out
ii. Defining a citizen charter/delivery of service in a time bound manner
d. Creation of the “output” of the service, i.e. Certificate, Order etc.
e. Automatic reports
i. of compliance to citizen charter on delivery of services
ii. delay reports
VI. The application should have a module for management of digital signature including
issuance, renewal and suspension of digital signatures based on the administrative
decisions taken by the State. In case of any change (transfer, promotion, leave,
suspension, termination, superannuation etc.) of the officials under e-District Project,
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 27 | P a g e
a copy of order should be marked to the State Level digital signature management
team for assigning and revoking of the access rights.
VII. Using Digital signatures to authenticate existing databases: The e-District project
plans to use digitally signed databases and verification reports based upon field
visits. Hence, there needs to be a clearly defined mechanism to undertake cleaning of
existing databases and digitally signing the entire database to enable delivery of
across the counter services. It is also possible that the data in such digitally signed
databases would undergo periodic revision and updating. Hence, selected bidder in
consultation with ITG must provision for designing an appropriate set of tools for:
Digitally signing different databases used in different applications by
appropriate authorities,
Effecting changes in digitally signed documents
Tracking of database records which are digitally signed and which are not so
signed
Posting of appropriate notifications to the users in case of demand for
service in respect of which the relevant data record has not been digitally
signed by the competent authority
Verification of digital certificates (e.g. a website to authenticate a particular
certificate on the basis of certificate details or barcode)
Integration of Digital Signatures with e-District Application: The e-District
portal should be made accessible to government official users / registered
users over internet and to ESO/CSCS‟S & CFC‟S users through secure user
id and password. The biometric/digital signatures need to be integrated for
enabling authenticity of the approving authority.
VIII. Capacity Building and Institutional strengthening to manage Digital Signature:
As it is envisaged that the users of digital signatures will be significant in
numbers, the selected bidder in consultation with SDA should plan the
process and the agency for institutionalizing the management (issuance/
renewal/ revocation) of digital certificates.
Identification of Officials authorized for delivering services/ authenticating
the electronic records.
Designing policies and procedures for management of digital signatures.
Procurement of Digital Certificates for the authorized officials.
IX. Training on use of Digital Signatures:
As the e-District project would entail significant amount of field verification and relevant updating of records, digital signatures have to be used by various levels of officials. These officials may also keep on changing due to transfers/ superannuation, etc., hence the RFP should entail:
A one-time training to all the concerned officials in the usage of digital
signatures
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 28 | P a g e
As and when required training / on-demand web based training for the new
officials taking charge of e-District service provisioning.
X. Preparatory steps for digital signing of databases
a. Identification & planning
Identifying registers and data to be digitized
Fixing cut-off date for data digitization
Determining logistics of data digitization (whether at office level, district
level or State level)
Selecting database to be used for data digitization
Assessment of volume of data to be digitized for delivering the services
Codifying process for continuous verification and correction of the digitized
data
b. Plan to establishing ownership of digitized data with State Government
Fixing the ownership of the department and timeline for completion of
digitization
Instituting logical checks for checking the accuracy of data
c. Selection of Agencies for data digitization
Identification of appropriate organization for data digitization
d. Digitization of data (Data entry of existing records) and digitally signing
Digitization of data
Defining process for quality check of data and ownership transfer of data
Verifying and correcting the digitized data
Porting of the digitized data to State Data Centre (SDC) and making it
available for e-District and other MMPs.
Application for bulk data signing
Digitally signing of the digitized data by the authorized official
e. Ensuring dynamic updating of data during processing of each service request
Process for continuous addition, verification and correction of the digitized
data - Service / Solution workflow should ensure dynamic updating of data.
XI. Asset Management:: There is a requirement to have an asset management module
to be implemented under e-District project, to monitor the assets used for e-District
project at various offices.
XII. e-Transaction & SLA Monitoring Tools
(1) The Info Tech Corporation of Goa Ltd. (ITG) should be able to measure and monitor
the performance of the deployed infrastructure at SDC and at Department offices
and all SLAs set out in this RFP. More importantly, the SDA should be able to
monitor in REALTIME, the number of citizens touched through e-Services each day,
month and year, through appropriate tools and MIS reports.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 29 | P a g e
(2) The Enterprise Monitoring System available at SDC may be used by the bidder to
monitor the infrastructure hosted at the SDC. The details of the SDC will be
provided to the bidder.
(3) For monitoring of uptime and performance of infrastructure deployed at
Department Offices, the selected bidder shall have to provision for monitoring and
measurement tools, licenses, etc. required for this purpose.
X. e-District application should have roadmap to integrate with key initiatives of DeitY
namely Portal Services, Citizen Contact Centre, Mobile Platform/ Gateway Services /
State Service Delivery Gateway (SSDG), e-Taal [ for transactions monitoring ] ,
National Service Directory, Payment Gateway, Language Switch, Open Data, E-
authentication including Aadhaar, Geographical Information System/ Global
Positioning System, E-Gov. Application Store, Document Repository, Certifying
Authority etc.
XI. Complete mobile enablement of the e-District applications and services including all
appropriate channels such as SMS / USSD / IVRS and development of corresponding
mobile applications to the e-District applications and services leveraging the Mobile
Service Delivery Gateway (MSDG) and the Mobile App Store developed by DeitY
XII. The status delivery should be through email if appropriate email available.
XIII. Operation and Maintenance of e-District Application including the suggested changes
as for 3 years from the date of Go-Live.
XIV. The bidder is expected to handover the well documented source code to ITG as and
when demanded by ITG, and after project GO LIVE and at the end of the project
operation and maintenance state . ITG shall verify the authenticity of this source code.
XV. Implement / add any additional forms of State Departments as and when the
departments are ready for delivering.
XVI. The IPR and the Source Code of this e-District Application shall be with the State
Government.
XVII. The bidder shall indicate the type of services to be made available using IVRS, SMS,
and Helpdesk.
XVIII. Detailed User and Operational Manual to be provided to each department, whose
services will be hosted on e-District Application.
XIX. The application should have a web interface and should publish online transaction
volume data for each service for each district & ESO/CSCS‟S & CFC‟S.
XX. Bidder can outsource work of data digitization & site preparation only.
Bidder shall develop following modules for delivery of identified service under e-District project.
I. Workflow Module:
Application should have a detailed workflow engine to cater to the complex workflow
requirements including cross departmental workflows also. This workflow engine will
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 30 | P a g e
allow easy creation of workflow for new services with minimum technical
programming support and thus enable the State government to create new services as
and when required by the various Departments without creating a change request. At
the minimum, the workflow engine should have the following features:
1. Feature to use the master data for the auto-populating the forms and dropdowns
specifically with reference to :
a. Name of District, Talukas & Villages
b. Office and officer in receipt of the application based on user location
c. Designation of officials involved in the processing of the application
d. Any other details for which a database is already available with the
department or database created by digitization of physical records.
2. Creation of application form, by “drag & drop” feature using meta-data standards
3. Defining the workflow for the approval of the form, by providing various options
like:
a. First in First out
b. Defining a citizen charter/delivery of service in a time bound manner
c. Creation of the “output” of the service, i.e. Certificate, Order etc.
d. Automatic reports of compliance to citizen charter on delivery of services
delay reports
II. MIS Reports
III. Transaction Report & Accounting module:
1. The e-District services are proposed to be delivered through Online State Portal,
ESO/CSCSs, CFCs or any other physical delivery outlet.
2. The proposed module shall account for managing count of
transactions/application made through each individual source along with
varied options to generate reports:
a. Service-wise
b. District/Taluka/Village-wise
c. Physical Delivery Outlet-wise (ESO/CSCSs/CFCs)
d. Any other as may be required
3. The said module should also account for managing the payment receipts with
respect to each of the individual physical delivery centres and reconciliation of
same with the respective department
4. Given requirement of revenue sharing the said module should also account for
calculating the revenue share between Government and Service Delivery Outlet
Operator as per prescribed rates which may be subject to modification on
regular intervals.
IV. Digital Signature Management Module
1. The application should have a module for management of digital signature
where in all the processes related to issuance, renewal and suspension of digital
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 31 | P a g e
signatures based on the administrative decisions taken by the State are
monitored.
2. All the new requisitions for digital signature shall be routed through this
module.
3. In case of any change (transfer, promotion, leave, suspension, termination,
superannuation etc.) of the officials under e-District Project, a copy of order
should be marked to the State Level digital signature management team for
assigning and revoking of the access rights.
4. Using Digital signatures to authenticate existing databases: The e-District project
plans to use digitally signed databases and verification reports based upon field
visits. Hence, there needs to be a clearly defined mechanism to undertake
cleaning of existing databases and digitally signing the entire database to enable
delivery of across the counter services. It is also possible that the data in such
digitally signed databases would undergo periodic revision and updating.
Hence, the software module should also provision for:
a. digitally signing different databases used in different applications by
appropriate authorities,
b. effecting changes in digitally signed documents,
c. tracking of database records which are digitally signed and which are
not signed
d. posting of appropriate notifications to the users in case of demand for
service in respect of which the relevant data record has not been digitally
signed by the competent authority
e. verification of digital certificates (e.g. a website to authenticate a
particular certificate on the basis of certificate details)
5. Integration of Digital Signatures with e-District Application:
The digital signatures shall be used to enable the authenticity of approving
authority as well as digitally signing of documents approved and databases
generated through the e-District Application.
V. Management System for Digitized Databases and Documents
1. The application should have a module for management of digitized databases and
documents which have been validated for its authenticity and accuracy by
authorized officials.
2. It should account for details of the data being digitized, details of authorizing
authority, tracking of any changes/Updating being made to the digitized data and
documents.
3. Appropriate indexing mechanism for effectively retrieving and managing the same.
VI. User and Role Management System: The permissions to perform certain operations
are assigned to specific roles. Members or other system users are assigned particular
roles, and through those role assignments acquire the permissions to perform particular
system functions. Since users are not assigned permissions directly, but only acquire
them through their role (or roles), management of individual user rights becomes a
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 32 | P a g e
matter of simply assigning appropriate roles to the user's account; this simplifies
common operations, such as adding a user, or changing a user's department.
Three primary rules are:
Role assignment: A subject can exercise permission only if the subject has selected
or been assigned a role.
Role authorization: A subject's active role must be authorized for the subject. With
above rule, this rule ensures that users can take on only roles for which they are
authorized.
Permission authorization: A subject can exercise permission only if the permission
is authorized for the subject's active role. With above rule this rule ensures that
users can exercise only permissions for which they are authorized.
Additional constraints may be applied as well, and roles can be combined in a
hierarchy where higher-level roles subsume permissions owned by sub-roles.
VII. Service Delivery Centre Management Module:
This module shall account to register all the service delivery centres i.e. CFC and
ESO/CSCS and any other service delivery outlets. It shall keep a track of the services
being delivered across departments through these centres. All MIS reports and
accounting of fees being charged from the citizens
VIII. Queuing System for Service Delivery Centres
This module shall account for a system generated token number based on FIFO to the
citizens at highly crowded centres to facilitate service delivery to the citizens. It shall
also provide MIS reports defining average waiting time per citizen, average time to
service one request etc.
IX. Data Export & Import Facility to heterogeneous platforms
The bidder shall have to develop a data interchange utility for heterogeneous platforms
which shall enable the administrator exchange data on request of specific departments.
X. Printed Stationary Management & Docket Management Module
This module shall account for the inventory of pre-printed stationary at each of the
service delivery centre. It shall also provide for an option for raising demand for
additional stationary and payments if any for the same.
XI. Citizen Document Repository: The bidder would need to create an application
that will act as a repository for all the documents uploaded by the citizen while
applying for any services on the state portal.
It will have the following properties:
1) The document repository application will be a module of e-District
application.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 33 | P a g e
2) It will be built on SOA architecture and present all its services via SSDG.
Any existing or future applications including e-District application may
utilize the dr.
3) Document Repository needs to be integrated with the state portal using
SSDG to provide the following services:
a. Automatic saving of all documents uploaded by the citizen in the
Document Repository.
b. While applying for any services, the citizen should be able to retrieve a
list of all documents uploaded by him before and select the ones required
for application
4) The bidder would need to create a comprehensive analysis and
documentation as follows:
a. Standardization of all certificates, etc. issued by any the department that
decided to use the Document Repository.
b. Mapping of specific documents as inputs to a service/outputs to a
service.
c. Metadata definitions that is required for the Document Repository to
function. Standards defined by deity should be followed strictly.
XII. Certificate Repository
All the certificates issued through e-District Application shall be stored in a centralized
certificate repository which shall than be used by various departments/services as
authentic source to validate information provided by the citizen when availing other
services. This repository shall facilitate Across the Counter Service Delivery for the
citizen.
XIII. Asset Management Module
1. The proposed module shall have the provision to manage all the information
related to all the assets including hardware, software, data – digitized content,
documents, and people both internal and external.
2. The said module will be managed at the District level by DeGS/ e-District
Project Manager and account for monitoring of the assets used for e-District
project at various offices and procured under various Schemes.
XIV. e-Transaction & SLA Monitoring Tools
1. ITG should be able to measure and monitor the performance of the deployed
infrastructure at SDC and at Department offices and all SLAs set out in this RFP.
More importantly, ITG should be able to monitor in REALTIME, the number of
citizens touched through e-Services each day, month and year, through
appropriate tools and MIS reports.
2. The bidder is expected to use Enterprise Monitoring System (EMS) deployed at
SDC for e-District Project.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 34 | P a g e
3. For monitoring of uptime and performance of infrastructure deployed at
Department Offices, the selected bidder shall have to provision for monitoring
and measurement tools, licenses, etc. required for this purpose.
4. The application should have a web interface and should publish online
transaction volume data for each service for each district & ESO/CSCS‟S &
CFC‟S.
5. Applications of all 26 services provided under e-District should be integrated
with the e-taal portal for central monitoring by Diety
XV. It is also further envisaged that the e-District application to be deployed should have
roadmap to integrate with key initiatives of DeitY namely Portal Services, Citizen
Contact Centre, Mobile Platform/ Gateway Services / State Service Delivery Gateway
(SSDG), National Service Directory, Payment Gateway, Language Switch, Open Data,
E-authentication including Aadhaar, Geographical Information System/ Global
Positioning System, E-Gov. Application Store, Document Repository, Certifying
Authority etc.
XVI. Complete mobile enablement of the e-District applications and services including all
appropriate channels such as SMS / USSD / IVRS and development of corresponding
mobile applications to the e-District applications and services leveraging the Mobile
Service Delivery Gateway (MSDG) and the Mobile App Store developed by DeitY
XVII. Operation and Maintenance of e-District Application including the suggested changes
as indicated by the states for 3 years for software from date of Go live and 5 years for
hardware from date of installation
XVIII. Implement / add any additional forms of State Departments as and when the
departments are ready for delivering.
XIX. The IPR and the Source Code of the e-District Application shall be with the State
Government.
XX. The bidder shall indicate the type of services to be made available using IVRS, SMS,
and Helpdesk.
XXI. Detailed User and Operational Manual to be provided to each department, whose
services will be hosted on e-District Application.
XXII. The application should have a web interface and should publish online transaction
volume data for each service for each district & ESO/CSCS‟S & CFC‟S.
Offline Service Capabilities:
XXIII. It is suggested that offline server capabilities on one Counter at each Block/Taluka
should be built and used judiciously so that during failures, the services can be
provided to citizens from here.
XXIV. When the services at SDC get resumed, the work done at offline server machine should
be synchronized with central servers immediately and the offline server machines start
functioning under the control of central server.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 35 | P a g e
XXV. As long as the services are running from state data centre, the offline server machine
will not function independently; these will run under control of state servers like any
other browser based client.
4.2.2.2 Single-Sign On
The application should enable single-sign-on so that any user once authenticated and authorized
by system is not required to be re-authorized for completing any of the services in the same
session. These services would be both developed by bidder e-District and that developed by NIC.
For employees of the department concerned, the browser based application accessed on the
intranet, through single-sign-on mechanism, will provide access to all the services of the
departments concerned (based on their roles and responsibilities), Help module, basic and
advanced reporting etc. Similarly, for external users (citizens, etc.), based on their profile and
registration, the system shall enable single-sign on facility to apply for various services, make
payments, submit queries /complaints and check status of their applications. LDAP could be used
to achieve Single Sign On which allows a user to access multiple applications after logging in once.
4.2.2.3 Support for PKI based Authentication and Authorization
The solution shall support PKI based Authentication and Authorization, in accordance with IT Act
2000, using the Digital Certificates issued by the Certifying Authorities (CA) such as MTNL or
NIC. In particular, 3 factor authentications (login id & password, biometric and digital signature)
shall be implemented by the selected Bidder for officials/employees involved in processing citizen
services as per the Functional requirement specification of the e-District services.
4.2.2.4 Interoperability Standards
Keeping in view the evolving needs of interoperability, especially the possibility that the solution
shall become the focal point of delivery of services, and may also involve cross-functionality with
the e-Government projects of other departments/businesses in future, the solution should be built
on Open Standards. The bidder shall ensure that the application developed is easily integrated
with the existing applications.
Every care shall be taken to ensure that the code does not build a dependency on any proprietary
software, particularly, through the use of proprietary „stored procedures‟ belonging to a specific
database product.
4.2.2.5 Scalability
One of the fundamental requirements of the proposed application is its scalability. The architecture
should be proven to be scalable (cater to increasing load of internal and external users and their
transactions) and capable of delivering high performance for at-least four years from the date of
deployment. In this context, it is required that the application and deployment architecture should
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 36 | P a g e
provide for Scale-Up and Scale out on the Application and Web Servers, Database Servers and all
other solution components.
4.2.2.6 Security
The systems implemented for project should be highly secure, considering that it is intended to
handle sensitive data relating to the citizens of the state. The overarching security considerations
are described below.
I. The security services used to protect the solution shall include: Identification,
Authentication, Access Control, Administration and Audit and support for industry
standard protocols.
II. The solution shall support advanced user authentication mechanisms including digital
certificates and biometric authentication.
III. Security design should provide for a well-designed identity management system,
security of physical and digital assets, data and network security, backup and recovery
and disaster recovery system.
IV. The solution should provide for maintaining an audit trail of all the transactions and
should also ensure the non-repudiation of audit trail without impacting the overall
performance of the system.
V. The overarching requirement is the need to comply with ISO 27001 standards of
security.
VI. The application design and development should comply with OWASP top 10 principles
4.2.2.7 Application Architecture
I. It has been proposed that the applications designed and developed for the departments
concerned must follow some best practice and industry standards. In order to achieve
the high level of stability and robustness of the application, the system development life
cycle must be carried out using the industry standard best practices and adopting the
security constraints for access and control rights. The various modules / application
should have a common Exception Manager to handle any kind of exception arising due
to internal/ external factors.
II. Similarly the modules of the application are to be supported by the Session and
Transaction Manager for the completeness of the request and response of the client
request. The system should have a module exclusively to record the activities/ create
the log of activities happening within the system / application to avoid any kind of
irregularities within the system by any User / Application.
4.2.2.8 Proposed Application Architecture
A centralized architecture (servers and processing at single and central location) has
been proposed for the e-District project. All requests from internal and external users
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 37 | P a g e
will be sent to this system, located at SDC. All users will access the application through
local or remote terminals using a browser (through internet for external users and
through intranet).
The overall technology solution shall be based upon most relevant and suitable
architecture standards including standards for Service Oriented Architecture (SOA),
XML services & necessary protocols for internet applications, Data Centre standards etc.
and it should be compliant to Central & State IT policy, Cert-In and e-Gov standards.
The design should include integration with existing IT infrastructure created under
SDC, GBBN, ESO/CSCS‟S & CFC‟S, State Portal, SSDG and any other MMP for the
implementation of e-District Project. e-District Application developed should be
integrated with State Portal and SSDG. Requirement for these should be included in the
FRS, SRS and Design. Though selected citizen services are being provided by various
department of GoG and further these departments have been working in silo, but State
has envisaged providing single interface through a Service Oriented Architecture (SOA)
to simplify the complexity and reduce associated costs.
An indicative 3-tier architecture (also referred to as multi-tier or N-tier architecture) has
been proposed for the Application Solution.
The entire processing should take place in N-tier architecture:
Front-end software (client tier) - responsible for the presentation of information
This Web portal – Goa state portal has already been implemented and is
managed by bidder (SSDG). All services developed under the e-District solution
will be hosted on the state portal. It will be in the scope of work of bidder to
integrate services developed under the e-District solution from state portal to
SSDG.
Business Process / Service Layer - In the long SSDG may be used, as specified in
the Integrated Framework for delivery of Services for the e-District MMP.
Application Layer - The Business logic for all the services pertaining to e-District
application should be strictly part of the application layer.[Business object
framework]
Database Layer – Database for the services developed by bidder will be hosted in
SDC and the database for services managed by NIC will be hosted at NIC‟s own
data centre.
The proposed application will use components for security, operational management,
and communication to authorize users to perform certain tasks, and to communicate
with other services and applications. The application should have integration with SMS
Gateway for status reporting/tracking and other queries of the citizens. SMS Gateway
will be utilized by the government departments for sending service delivery related
status updates to the citizens.
4.2.2.9 High Level Design (HLD)
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 38 | P a g e
Once the SRS are approved, the bidder shall complete the High Level Designing and all HLD
documents of all the functionalities, integration with existing application and external application.
The bidder shall prepare the HLD and have it reviewed and approved by the DoIT, Goa. DoIT,
Goa will sign off on the HLD documents based on the advice of SPMU.
4.2.2.10 Detailed (Low Level) Design (LLD)
The LLD shall interpret the approved HLD to help application development and shall include
detailed service descriptions and specifications, application logic (including “pseudo code”) and
UI design (screen design and navigation). The preparation of test cases will also be completed
during this stage. The bidder shall have the design documents reviewed and approved by the state
IT. ITG and DoIT will sign off on the LLD documents based on the advice of SPMU.
4.2.2.11 Test Plan
Once the SRS is approved and design is started, the bidder shall prepare all necessary Test Plans
(including test cases), i.e., plans for Acceptance Testing. Test cases for Initial and Final User
Acceptance Testing shall be developed in collaboration with domain experts identified at the DoIT.
Initial and Final User Acceptance Testing shall involve Test Case development, Unit Testing,
Integration and System Testing, Functional testing of Application, Performance testing of the
Application including measurement of all Service Levels as mentioned in this RFP and finally
bidder shall also carryout Load/ Stress testing. The bidder will submit the test plans, test cases
and test result reports to the DoIT for comprehensive verification and approval.
4.2.2.12 Requirement on Adherence to Standards
e-District application must be designed following open standards, to the extent feasible and in line
with overall system requirements set out in this RFP, in order to provide for good inter-operability
with multiple platforms and avoid any technology or technology provider lock-in.
4.2.2.13 Compliance with Industry Standards
In addition to above, the proposed solution has to be based on and compliant with industry
standards (their latest versions as on date) wherever applicable. This will apply to all the aspects of
solution including but not limited to design, development, security, installation, and testing. There
are many standards that are summarised below. However the list below is just for reference and is
not to be treated as exhaustive.
I. Portal development W3C specifications
II. Information access/transfer protocols SOAP, HTTP/HTTPS
III. e-District ,DeitY, GoI guidelines.
IV. Photograph JPEG (minimum resolution of 640 x 480 pixels)
V. Scanned documents TIFF (Resolution of 600 X 600 dpi)
VI. Biometric framework Bio API 2.0 (ISO/IEC 19784-1:2005)
VII. Latest HTML standards
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 39 | P a g e
VIII. Technical Standards for Interoperability Framework for e-Governance (IFEG) in India
Version 1.0 and any other relevant egov standards
IX. Egovstandards (http://egovstandards.gov.in/)
X. Guidelines for Indian Government Websites (http://web.guidelines.gov.in/#&panel1-
2)
4.2.2.14 Specification
I. Finger print scanning IAFIS specifications
II. Digital signature RSA standards
III. Document encryption PKCS specifications
IV. Information Security to be ISO 27001 compliant
V. Operational integrity & security management to be ISO 17799 compliant
VI. IT Infrastructure management ITIL / EITM specifications
VII. Service Management ISO 20000 specifications
VIII. Project Documentation IEEE/ISO specifications for documentation
IX. The bidder shall adhere to all the standards published by the Department of Electronics
and Information Technology, Government of India.
4.2.2.15 Sign-off Deliverables / Exit Criteria
I. System Requirement Specification (SRS)
II. Functional Requirement Specification (FRS) (if, updated)
III. High Level and Low Level Design
IV. Functional and non-functional testing
V. Fully functional e-District Application
VI. User and Operational Manual for e-District Application
VII. Final Source Code
VIII. Data Dictionary
IX. Test Cases
X. Test Plans
4.3.2.3 Obtain STQC and C-DAC/ TDIL (for localization) Certification for e-District Application
The bidder will be responsible for engaging STQC and C-DAC/ TDIL (for localization) to conduct
the assessment / review for the system before “Go Live”. The SPMU shall have the right to audit
and inspect all the procedures and systems relating to the provisioning of the services. If there is
any change / addition in the application‟s functionality then the bidder will have to obtain the
STQC Certification for the changes / additions. (As per Advisory for STQC Certification of
Application for e-District Pilot/ National Rollout Scheme prepared by DeitY)
[For reference on STQC Testing procedures, a Standard Operating (SoP)) has been published by
STQC, DietY. on 5th July]
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 40 | P a g e
C-DAC/TDIL testing shall include functionality w.r.t. user interface, input/output, storage and
printing of local language data and compliance to localization standards.
Bidder shall ensure the following points are duly addressed for successful completion of STQC
Certification:
I. Successful completion of Application Audit. Application audit will include:
A. Functionality audit that will map the functionality delivered to the FRS agreed upon
during development phase.
B. Identify the nature and type of transactions being processed by the application
systems.
C. Determine systematic measures implemented to control and secure access to the
application programs and data including password controls, user authentications,
roles and responsibilities, audit trails and reporting, configuration and interface
controls, etc.
D. Review of database structure including:
1. Classification of data in terms of sensitivity & levels of access
2. Security measures over database installation, password policies and
user roles and privileges
3. Access control on database objects – tables, views, triggers,
synonyms, etc.
4. Database restoration and recoverability
5. Audit trails configuration and monitoring process
6. Network connections to database
E. Review of Network and Website will include:
1. Penetration and vulnerability testing
2. Security exposures to internal and external stakeholders
F. Definition and Implementation of Security Policies and Controls will include:
1. Define and implement backup process, including schedule, storage,
archival and decommissioning of media
2. Define physical access controls review (over DC and other critical
area)
3. Define IT Change Management process, Incident Management
process – covering identification, response, escalation mechanisms
4. Define and implement Anti-virus (malware) controls – patching,
virus definition file update
4.3.3.2.1 Sign-off Deliverables / Exit Criteria
I. Sign off from Info Tech Corporation of Goa Ltd. (ITG).
II. STQC and C-DAC/ TDIL (for localization) Certification
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 41 | P a g e
4.3.2.4 Alignment with Integrated Framework
The e-District application should integrate with SSDG and provide access to citizens for e-District
services through State Portal. It is envisaged that over a period of time all the existing state
applications which have their own independent database and workflow and are identical to e-
District should be made available on State Portal through the SSDG.
The key functionalities required are as follows.
• The SAP and SP Connectors will need to connect the e-District Business Layer. This would
help in routing requests and responses to back-end departments within a stipulated time
period.
• Design and implement an accounting module to keep track of all the transactions service
category wise, department wise and break down of transactions SCA, VLE, DeGS wise.
• MIS of number of transactions including name of service and category of service on time and
geographical scale should be published on e-District portal.
• Use e-authentication (including Aadhaar for citizens), e-payment, Digital signature and
Mobile gateway.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 42 | P a g e
• The bidder is expected to coordinate with the agencies like CDAC for localization and
requirement of connectors.
4.3.3.3.1 SSDG
I. The Integrated Service Delivery Framework envisages centralized architecture for each MMP
at the State level. The application software will be hosted in the State Data Centre. Integration
across States shall be enabled, through mandatory adherence to technical specifications and e
Governance standards.
II. The solution architecture of the e-District project envisages a centralised application and
database and will leverage the core e-infrastructure of State Wide Area Network, State Data
Centre and State Service Delivery Gateway.
III. The e-District MMP envisages centralized architecture at the state level with common
application software for each of the identified services for all the districts of the state. The
application software will be hosted in the SDC.
IV. Integration across states shall be enabled, through mandatory adherence to technical
specifications and e Governance standards. The detailed guidelines in this regard will be
issued by Department of Electronics and Information Technology (DeitY) Government of
India separately.
SSDG Architecture
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 43 | P a g e
4.3.3.3.2 Payment and SMS Gateway
V. Provisioning of a payment gateway, SMS gateway and any other components required to
meet the functional and Quality-of-Service requirements of the RFP is also within the scope
of work of the bidder.
VI. Payment Gateway should allow net banking and debit card payments through at least 20
banks in the country (including all leading banks), besides payments through credit cards
(VISA, MasterCard).
VII. Any one-time charges such as those for tie-ups, development of interfaces, registration,
commissioning etc. of the gateway and any fixed recurring charges such as monthly rentals,
etc. will have to be borne by the selected bidder for the Contract period and may be budgeted
for in the Total Contract Value of this Project.
VIII. Any applicable transaction charges for making electronic payments or using SMS based
services shall however be payable by the citizen and SDA respectively and need not be
accounted for in the Total Contract value of this Project. Any transaction charges should be
payable in Indian Rupees only.
IX. The contracts that the selected bidder does with the Payment Gateway provider and SMS
gateway provider should be structured in a manner to allow the transaction charges to be
paid directly by the citizen / SDA. However if the contract with payment gateway / SMS
gateway provider require any transactional charges to be paid by the selected bidder , the
same will be reimbursed to the bidder by the SDA every month on an actual basis. The
systems deployed by the bidder should be able to provide logs of the transactions done and
charges paid. The SDA will however reserve the right to negotiate and examine the rate
contracts of the selected bidder with the gateway providers.
X. Payment gateway should enable receipt of all payments such as Tax, interest, penalty, arrear
and fee etc. and crediting the same to the SDA/ Department account. The payment gateway
should also allow credit of any refund amount to Kiosk/ESO/CSCS‟S & CFC‟S‟s account. It
should be possible to make electronic payments through a 3G / GPRS enabled mobile phone
as well.
4.3.3.4 Application Support for Existing Services
The selected bidder is required to provide minimum 15 resource persons as mentioned below for
the same:
Sr. No Position Number of Resources
1 Project Manager 1
2 System/ Network Administrator 1
3 Solution Architect 1
4 Database Administrator 1
5 Software Programmer and Business Analyst 7
6 District Manager 1
7 District Technical Support 1
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 44 | P a g e
8 Helpdesk Executive 2
An indicative list of activities to be performed by the deployed resources for existing system support is:
I. Project Manager shall be the Source point of contact (SPoC ) to the SDA/SPMU/
Department for the implementation of the project.
II. The other staff shall function based on the scope of work of the RFP and contract
signed between bidder and SDA.
III. If required bidder shall provide additional manpower to complete the work/task
within timelines. While during the tenure of the project the SDA can instruct bidder
to change the manpower at any location as per the requirements of
SDA/Department.
IV. Bidder will provide the list of actual deployed manpower on monthly basis.
V. The resources will be deployed based on the phase of the project as and when
required.
VI. The qualification and experience requirements of these resource persons are
mentioned below-
S.No Name of Resource
State Data Centre/ District for which proposed
Qualification (Minimum)
No. of Years of Experience
No. of Years with responding firm
Certification Domain Knowledge
1. Project Manager
State Level B.E.(Computer /E&C)/ MCA + MBA
7 Years 3 Years PMP/Prince 2 Working in projects related to implementation of IT with an experience of 5 years or more in at least two software implementation projects in project management role leading a team of 10 or more members. Should have overall experience of 2 or more years in Government projects
2. Database Administrator
State Headquarter
B.E.(Computer /E&C)/ MCA
5 years 1 Year Technical certification in Data Base Administration in SQL Server or Oracle.
Experience in administering production data bases and worked in Oracle 9i, 10g, DB2, MS-SQL etc. Knowledge in PL/SQL Programming with experience in handling standby databases preferred.
3. Software Programmer
State Headquarter
B.E.(Computer /E&C)/ MCA
5 Years 1 Year Any Professional Software Development Certification
Experience in the following packages: Visual Studio 2012, ASP.Net (2.0 - 4.5), C#, SQL Server 2008/2012 etc.
4. Solution Architect
State Headquarter
B.E.(Computer /E&C)/ MCA
7 Years 1 Year Any Professional Software Development Certification
Experience in the following packages: Visual Studio 2012, ASP.Net (2.0 - 4.5), C#, SQL Server 2008/2012 etc. Experience designing an enterprise application, database design, contract management, enterprise workflow, business process integration, and perhaps asset management components Experience with Service
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 45 | P a g e
S.No Name of Resource
State Data Centre/ District for which proposed
Qualification (Minimum)
No. of Years of Experience
No. of Years with responding firm
Certification Domain Knowledge
Oriented Architecture (SOA) 5. System
Administrator/ Network Support Staff
State Headquarter
B.E. (Computer/E&C)/MCA
5 years 1 Year Technical certifications on Microsoft products etc. are must. Certification like CCNA/CCNP/PIX/CCSA
Experience in sys admin of RDMB data (MS-SQL, Oracle etc.), sysadmin windows-2008/2012 etc. server, programmer of .NET, SQL,PL/SQL, etc. Candidate should be well versed with Routing and Switching devices and technologies like ATM, Frame Relay, MPLS, Wireless, Broadband and Protocol Analysis Tools. Must have beginner to intermediate skills in Information Security technologies like Anti-virus, Firewalls, 2 & 3 factor Authentication, IDS, IPS, Content Filtering, Encryption, VPN, Threat Management and be familiar with Information Security Audit parameters.
6. District Technical Support
District Diploma/B.E. (Computer/E&C)
2-3 years Technical certification like CCNA etc.
Experience in technical support services/ operations, IT Infrastructure, managing & updating customer database with pleasing personality and good communication skills.
7. Helpdesk Executive
State Level Graduate 1 Year - Good communication skills and knowledge of local language
VII. The selected bidder will ensure that all the resources deployed at any location are
easily approachable over mobile phones. Selected bidder will provide the contact
details of the manpower at the time of commencement of operations. Selected
bidder will also ensure that the proposed resources will not be changed during
project implementation without explicit approval of the SDA.
VIII. The SDA reserves the right to evaluate the performance of the resource persons
deployed on the project by bidder and ask for a suitable replacement in case of
unsatisfactory performance by any of the resource persons deployed to support the
project.
4.3.2.5 UAT and Go-Live Report
I. Selected bidder will assist in successful completion of User Acceptance Testing (UAT)
and audit of the system on the completion of the roll out of e-District and will submit a
Go-Live Report.
II. The State IT Department may decide to carry out the pilot in 1 district before carrying
out the state wide roll-out. In such a case, the SPMU and selected bidder has to co-
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 46 | P a g e
ordinate the phasing of training, data digitisation, hardware procurement, site
preparation, etc. in such a manner which synchronises with such a plan.
4.3.3.5.1 Sign-off Deliverables / Exit Criteria
I. Go-Live report for state and district level
II. UAT Report signed off from Info Tech Corporation of Goa Ltd. (ITG) and SPMU
3.3.2 Network Connectivity
The SWAN project in Goa is called the Goa Broad Band Network (GBBN). The GBBN project has
been designed to build a converged Wide Area Network (OFC) that connects the State
Headquarters and District Headquarters with all 12 Talukas, Village Panchayat, Households and
institutions across the State.
Status Name of
District
Name of
Taluka
Total
Number of
PoPs
No of POPs
not found
feasible
No of POPs
already
connected
Operational North Goa Tiswadi 78 - All
Bardez 64 - All
Pernem 28 - All
Bicholim 30 - All
Sattari 20 - All
Ponda 39 - All
Operational South Goa Salcette 62 - All
Quepem 28 - All
Sanguem 23 - All
Vasco 27 - All
Canacona 15 - All
Dharbandora 2 - All
NA – Not Available
4.3.2.1 Status of Horizontal Connectivity
S.No Name of
District
No. of offices
(approx.)
No. of offices
Connected (approx.)
No. of offices To Be
Connected (approx.)
1. North Goa &
South Goa
297 282 15
For Goa, the selected Bidder will undertake the following: I. With implementation of GBBN across all the States with 2 Mbps vertical connectivity
up to block level, PoPs (Point of Presence) are operational; the district administration is
connected to the nearest GBBN PoPs. The selected Bidder shall ensure last mile
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 47 | P a g e
connectivity from the nearest GBBN PoP to the Department offices processing the
services requests.
II. In cases where GBBN is not available, the DoIT shall procure the connectivity from a
service provider and the selected Bidder is expected to setup the last mile connectivity
to the Department offices processing the services requests.
III. LAN within all department offices including but not limited to IP addressing scheme,
physical cabling, router/switch configuration, V-LAN configuration, load balancing
configuration, and fail over mechanism. The selected bidder should coordinate with the
local department offices while designing and installing the LAN.
IV. All networking equipment required providing the LAN / WAN connectivity to meet
the requirements of the Project is also to be provided by the selected Bidder as part of
this RFP.
4.3.2.2 Sign-off Deliverables / Exit Criteria
Network Connectivity report signed off by SPMU / ITG stating SDC, Line departments and sub
offices, Collectorate and sub-offices and all ESO/CSCSs have been connected and GBBN, wherever
applicable, has been leveraged to provide connectivity.
3.3.3 Data Digitisation
4.3.2.1 Introduction
The vendor will be required to digitize the data at district. The rates for backlog data entry must be
quoted separately in the commercial bid. The volume of data to be digitized will be assessed /
analysed by bidder which would be verified by e-District manager & approved by DeGS. The
digitization of backlog data of the entire State must be completed within 1 Year of signing the
contract.
All the equipment‟s like computer hardware, printer, scanners, UPS etc. required for the data entry
and digitalization will be the sole responsibility of the vendor. The vendor will be responsible for
the LAN connectivity at the location of the data entry. The vendor would be responsible to provide
all necessary consumables including stationery for print outs for verification. The Government
through its district administration will only provide space (premises) with appropriate ventilation,
normal electricity and water connections for the data entry purpose. However, the successful
agency would require arranging for back-up power including generator to avoid work disruptions
due to power shortage. It should be noted that the successful porting of verified data will be the
responsibility of the bidder and the data entry task will be deemed to be completed only after the
authorized official certifies that the backlog data that has been entered is successfully brought
online.
The agencies undertaking the digitization work may need to be trained on local language data
entry through use of applications/tools that have full compliance to the latest Unicode (version 6.0
or above) for character encoding and use of enhanced Inscript keyboard layout.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 48 | P a g e
4.3.2.2 Under e-District project, “across the counter” services would be provided using
digitally signed records. Workflow for data entry
I. At each district/block/department, the Mamlatdar/Talati/SDO/Authorized authority
would prepare physical copy of the data in the format provided by the SPMU.
II. This form along with the records will be handed over to the data entry and scanning
operator.
III. Using these forms, the data entry operator would upload the data and scanned
documents into the software. Upon completion of digitization, the respective
Mamlatdar/Talati/SDO/HOD/ Authorized Authority would verify and digitally sign
the data.
4.3.2.3 Summarized Scope of Digitization:
The Scope of work has been primarily divided into the following main stages:
I. Digitization and Computerization of Legacy Records, bidder shall digitize all
historical data at the implementation sites of States (covering the last 5 years) and
may vary from case to case.
II. Bidder shall formulate the Data Digitization Strategy which will also include
internal quality assurance mechanism. This will be reviewed and signed-off by
SDA and SPMU prior to commencement of data digitization.
III. Bidder may coordinate with pilot states for getting the learning with the help from
SPMU and Nodal Officer.
IV. Bidder shall incorporate all comments and suggestions of SDA and SPMU in the
Data Digitization Strategy.
V. Bidder shall ensure complete data cleaning and validation for all data digitized and
loaded on to e-District Application.
VI. Bidder shall enter the readable/available data into the database in Multilanguage
i.e. in English, Konkani and Marathi.
VII. Bidder shall incorporate the amendments/corrections into the database suggested
by the Officials.
VIII. Bidder shall incorporate the final corrections into the database and replace the
pages bearing incorrect records.
IX. Bidder shall deliver the final registers and soft copy of the data to the department.
X. Bidder will use his own infrastructure like Hardware, Manpower etc., However
office space and electricity can be provided, if required.
XI. The bidder will also ensure safety and safe return of the documents. Any leakage of
the secret data of the department in general public may result in strict department
action by the authority against the bidder.
XII. Bidder shall validate the data before uploading the same to the production
environment.
XIII. Bidder shall generate appropriate control reports before and after digitisation to
ensure accuracy and completeness of the data.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 49 | P a g e
XIV. Bidder shall conduct the acceptance testing and verify the completeness and
accuracy of the data Digitized to e-District Application.
XV. SDA and SPMU may, at its will, verify the test results provided by bidder.
XVI. Bidder can outsource data digitization work.
4.3.2.4 Software for data entry
I. Data Digitization does not refer to performing scan/ OCR of the records and
storing them in the database. It refers to data entry of citizen records in specified
formats for a defined period of time. The bidder has to develop the data entry
software keeping in mind the above workflow for digitally signing the data.
II. The software should have features to count number of key strokes used by data
entry operator for each login session user wise. This count will be used for payment
of data entry work. Payment of data entry should be based on 1000 characters
including enter key & excluding “delete” & “backspace” keys.
III. Each record will be verified by the Mamlatdar / Talathi / Department official and
then digitally signed by him/her.
4.3.2.5 The bidder would be responsible for the following activities
I. Preparation of the data entry software according to the above specification.
II. The data should be stored in the database in the same language in which it already
exists.
III. quality check
a. The bidder should ensure 98% data accuracy.
b. Complete checking will be conducted before digitally signing the data.
IV. location of work
a. Centralized – All district administrations/departments will provide space
for setting up temporary working office in districts/departments for project
duration. Bidder has to arrange all necessary facilities not limited to
electricity, power back up, water, cleaner, computers & other hardware at
his own.
V. loss of data
b. Bidder should take good care of all government records and will be
responsible for security of the record from time of receipt to time of
delivery.
c. Penalty for per record will be charged against the loss or damage of record.
d. The bidder should not accept illegible record. Non-readable record at the
time of returning of the data will be considered as damaged record.
VI. The bidder shall work during office hrs.
VII. Bidder shall do the pagination of each file before starting scanning. It shall be part
of scanning work. No extra charge for the same will be given to the bidder.
VIII. Unbinding of bounded volumes will not be permitted.
IX. Bidder shall have to scan documents and upload the same.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 50 | P a g e
X. The bidder will be handed over the documents in a batch and he will cross-check
this information and will prepare a list containing discrepancies, if any.
XI. The bidder shall scan all the documents and will carry out quality checks in order
to ensure that the scanning quality is good and the pages are perfectly scanned.
XII. The bidder should not be allowed to unstapled/untie for the purpose of scanning.
XIII. Bidder shall not allow for using camera for scanning of records. only scanners shall
be used for scanning of documents.
XIV. The pages shall be scanned with minimum resolution300 dpi.
XV. Scanned images (preferably in .jpg, .gif, .tiff format) of these documents will have to
be converted into .pdf files.
XVI. All the documents are very important. The documents may have different size.
Proper care should also be taken while scanning for every document. the bidder
have to provide security measures while preparing CDs that no one can change the
content of the documents.
4.3.2.6 Sign off Deliverables / Exit Criteria
I. Data Digitisation Strategy Document
II. Approval by SDA / SPMU and concerned line department on successful
digitisation of data
4.3.2.7 Document Management System (DMS)
3.3.3.7.1 Scope of Work
I. Bidder shall prepare Document Management System (DMS). This system should be
able to store scanned documents, index these documents (by attaching multilingual
metadata tags to each of them), retrieve and display the stored scanned documents
upon searching for the relevant metadata tags.
II. A full maintenance for the DMS, software and hardware components supplied
would be required during the implementation period and also for a period of 5
years beginning from the time the entire scanning and indexing has been
completed and the system is up for use for the District users.
III. The clearance of application security Audit & Vulnerability audit of the application
through STQC will be carried out by the bidder.
IV. The scope pertaining to the Document Management System can be found below:
a. General
i. The bidder shall add/replace poor quality scanned
images/documents on its own, for which it shall not be entitled to
get any extra payment.
ii. It is the absolute responsibility of the bidder to ensure that the
contents of the digitized documents shall be an exact replica of the
original paper document maintained as part of the records in the
books. This will be a mandatory condition for the bidder.
iii. The files / documents will not be allowed to be removed from
premises allocated to bidder.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 51 | P a g e
iv. Under no circumstances shall the documents be changed, mutilated,
destroyed or replaced by some other documents.
v. The DMS proposed will be part of e-District application & should be
able to integrate with any other department specific application or
other e-Governance initiatives.
vi. The firm shall at its own cost provide the necessary consumables,
including paper, ink and spares required for maintaining and
operating its machinery/equipment smooth execution of
scanning/digitization of records. The firm shall make its own
arrangements for safety/security of the equipment‟s and also keep
them incurred against theft, fire and damages.
b. Pre-scanning
i. Documents are kept at various locations in District including the
individual departments and record store rooms. The selected bidder
is required to collect these documents carefully. While collection, the
following details are to be entered into the log register.
a. No. of documents collected
b. No. of pages collected
c. Date of collection
d. Expected date of return
e. Actual date of return
f. Collected from
g. Collected by and Signature
h. Returned to and Signature
i. Returned by
ii. The log register would have to be maintained by the selected bidder.
iii. Documents that are very old and are not in good physical condition
would have to be repaired and prepared before they can be scanned.
iv. The selected bidder is required to take necessary precautions while
handling the documents.
v. The documents are to be maintained in an orderly manner without
disturbing the chronology of the documents and without mixing
pages between different documents.
c. Scanning
i. The documents shall be scanned on a minimum 600 DPI resolution,
black and white.
ii. The scanned documents shall be converted into PDF/TIFF files for
storage.
iii. The selected bidder shall perform the following Image
Enhancement Activities
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 52 | P a g e
a. Bidder should ensure that quality of scanned imaged are
enhanced up to the optimum level and required image
enhancement activities like De-skew (to make the images
straight), contrast ratio setting etc. have to be done on the
documents.
b. The bidder must carry out cropping and cleaning of images like
removing black noises around the text, de-spackle (removing
small dots between the texts) and provide equal margins all
around the text.
c. In case the documents are not legible, it will be the bidder‟s
responsibility to scan the documents on high resolution i.e. 600
dpi or higher.
d. In case the content of the documents are not visible then
document scanning shall be done in Grey Scale. No extra
payment shall be made for the same.
e. Documents/pages identified by the competent authority of
individual department of District or which are either torn or not
in a proper condition or illegible should be converted in to
machine readable text format (ASCII or Text mode) by OCR
(Optical Character Reorganization) Process.
iv. The bidder will ensure that all documents are digitized.
v. No page/document shall be digitized more than once.
d. Retrieval
i. The scanned documents should be retrievable through search. The
documents would be searched for the metadata tags that were used
to index the document.
ii. These metadata tags should include (at the least)
a. Subject of the document
b. File No.
c. Date of document
d. Department
e. Authority
iii. More metadata tags shall be required to be added to the above list.
The same shall be discussed and finalized with the bidder before the
commencement of work.
iv. The metadata tags should be alphanumeric, in Unicode and should
also include provision for typing in English and Konkani & Marathi
v. The document should be retrievable by searching for any of the
metadata tags mentioned above.
vi. Retrieval through search criteria in English, Konkani & Marathi
should also be possible
vii. Access Control - There shall be an access control that shall be
imposed on each of the scanned documents. The access control
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 53 | P a g e
would be at the document level. Only users at a particular level on
the hierarchy should have access to certain documents.
e. Post scanning
i. After scanning, the physical document would have to be pinned
together/tagged in the same form as it was given for scanning by the
individual departments.
ii. The scanned data shall be stored on the server.
iii. The backup of incremental data shall be taken on a Hard Disk Drive
daily at the end of the day.
iv. Each page of a document shall be serially numbered and shall be
counted while giving the documents back.
f. Reports
i. The selected bidder shall also provide tools for checking the
scanning progress. This shall include the daily, weekly, monthly and
overall progress (number of images/pages scanned, percentage
scanned etc.). The tool should also display department-wise and
record room wise progress. The tool should be able to provide
reports on the status of scanning on a periodic basis.
ii. The selected bidder will maintain a register that will serve a purpose
of evidence for the number of documents and pages entered by the
bidder on each day. The details of this register would have to be
entered into the tool mentioned on a daily basis.
iii. The format, content, periodicity and other information related to
reports shall be discussed and finalized with selected the bidder
before the commencement of the project.
4.3.4.2.1 Sign off Deliverables / Exit Criteria
I. Data Digitisation Strategy Document
II. Approval by SDA / SPMU and concerned line department on successful digitisation of
data
III. District-wise Monthly Digitization report authorized by e-District Project Management and DeGS
3.3.4 Site Preparation
I. The selected bidder is expected to prepare the client sites for setting up the necessary client site infrastructure.
II. Site preparation at all required client offices will include electrical fittings and LAN cabling along with conduit.
III. The selected bidder will have to ensure that Collectorate and sub offices, line departments and their sub offices are equipped to offer services through e-District Application.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 54 | P a g e
IV. Any gap in infrastructure required for providing services using e-District Application shall be provided by the selected bidder.
V. The details of number of offices for site preparation prepared by bidder will be confirmed by SDA.
VI. Maintenance of the computing and connectivity infrastructure for 5 years and training support to be imparted to the end user.
A sample template for scope of work for Networking is provided in this .
4.3.2.1 Sign-off Deliverables / Exit Criteria
I. List of offices for site preparation. II. Site Preparation Completion Report.
3.3.5 Supply / Procurement of IT Infrastructure at SDC
The bidders are required to carefully assess the requirements of this RFP and size the
infrastructure accordingly. Bidders are free to propose any higher / additional infrastructure that
may be required as per their proposed solution to meet the project requirements, its scope of work
and SLAs as listed in this RFP.
I. Bids / proposals which do not meet the minimum IT infrastructure specifications given in
this RFP will be summarily rejected. The minimum technical specifications for the IT
Infrastructure are provided in Bill of Material (Infrastructure at SDC) in this volume and
note that these are the minimum requirements only. The Bill of Material (BoM) is indicative
for the project and shall be changed based on the BPR study done by the selected bidder.
II. The Bidder will be responsible for sizing the hardware to support the scalability and
performance requirements of the e-District application. The Bidder shall ensure that the
servers are sized adequately and redundancy is built into the architecture required to meet
the service levels mentioned in the RFP.
III. None of the IT Infrastructure proposed is declared “End-of-Sale” by the respective OEM in
next 3 years as on date of submission of Bid.
IV. The IT Infrastructure proposed should be purchased within last 2 months from the date of
deployment and documentary proof for warranty and proof of purchase should be
produced at the time of deployment of infrastructure.
V. The IT Infrastructure proposed should be compatible with infrastructure at SDC, SSDG,
GBBN, State Portal, etc.
VI. The bidder should provide requisite licenses for all the system software required for
servers including, but not limited to industry standard operating system, enterprise class
database software, application server software, web server software, OS hardening, and all
other required software with sufficient number of licenses.
VII. The Bidder will be responsible for providing all the details of the Bill of Material (BoM) and
specifications of the IT Infrastructure proposed, licenses of the system software, all other
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 55 | P a g e
equipment proposed as part of its Technical Proposal. The financial quote submitted by the
Bidder should include costs for these.
3.3.6 Hardware Commissioning at Field Offices
4.3.2.1 Design, Supply, Installation, Commissioning, Operations & Maintenance of IT
Infrastructure
This shall consist of
I. Supply / Procurement of IT Infrastructure at Department Offices (DHQ, Taluka, Block)
II. Installation and Commissioning of IT Infrastructure will be done by bidder.
III. The steps to be followed for assessment, review, approval, and procurement of IT
infrastructure at Department Offices (DHQ, Taluka, Block) will be the following:
a. The bidder shall analyse the gap in requirements of the IT infrastructure at
the Taluka offices and corresponding District Office based upon the total
requirements calculated for the field office and the existing infrastructure.
b. The bidder is required to perform a final verification study of gap
infrastructure at various department offices (DHQ, and Block) in each
District based upon the gaps identified in all the Taluka offices and the
corresponding District office. (Ref. Vol. I Annexure)
c. The gap in requirements will be validated by each e-District Project
Manager after verifying the entire available infrastructure in the various sub
offices, etc.
d. The actual requirements of new IT infrastructure will then be approved by
the District e-Governance Society.
e. The DeGS will send this gap in IT infrastructure to the SDA.
f. The SDA will consolidate the requirements for the state.
g. The SDA will then place the final order.
4.3.2.2 Supply / Procurement of IT Infrastructure at Department Offices (DHQ, Taluka
and Block)
The bidders are required to carefully assess the requirements of this RFP and propose the IT
Infrastructure required at Department Offices. The following hardware and peripherals need to be
installed in different districts, blocks and Talukas offices spread across the State processing the
service requests submitted by the citizens:
I. PC / Desktop
II. Laptop
III. Digital Web Camera
IV. Scanners
V. Network Printers
VI. Laser Printers
VII. Other Printers
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 56 | P a g e
VIII. UPS (1 KVA)
Bidders are free to propose any higher / additional infrastructure that may be required as per their
proposed solution to meet the project requirements, its scope of work and SLAs as listed in this
RFP.
I. Bids / proposals which do not meet the minimum IT infrastructure specifications given in
this RFP will be summarily rejected. The minimum technical specifications for the IT
Infrastructure are provided in Bill of Material (Infrastructure at Field Offices) and note
that these are the minimum requirements only.
II. None of the IT Infrastructure proposed is declared “End-of-Sale” by the respective OEM in
next 3 years as on date of submission of Bid.
III. The IT Infrastructure proposed should be purchased within last 2 months from the date of
deployment and documentary proof for warranty and proof of purchase should be
produced at the time of deployment of infrastructure.
IV. The IT Infrastructure proposed should be compatible with infrastructure at SDC, SSDG,
GBBN, State Portal, etc.
V. The bidder will be responsible for providing all the details of the Bill of Material (BoM) and
specifications of the IT Infrastructure proposed, licenses of the system software, all other
equipment proposed as part of its Technical Proposal. The financial quote submitted by the
Bidder should include costs for these.
4.3.4.4.4 Installation and Commissioning of IT Infrastructure
The selected Bidder is responsible for installation and configuration of the entire infrastructure set-
up, including but not limited to the following:
I. All IT Infrastructure including operating systems and any other system software required
for making the infrastructure operational and tuned for satisfactory performance.
II. The IT Infrastructure will be installed and configured in accordance with the IT Policies of
the Goa.
The selected Bidder will ensure that the reports for monitoring of SLAs such as system uptime,
performance, etc. are generated automatically from the system and the applicable penalties are
calculated as indicated in the RFP.
3.3.7 Migration to New Infrastructure Facility
A state of the art SDC under NeGP is also proposed for implementation in Goa which has been
approved by DoIT, GOI. The Department of Information Technology, Goa intends to take up an
alternate infrastructure facility to locate the current SDC. If the location and site preparation for the
new infrastructure facility is finalized during the course of the implementation of e-District project,
selected bidder shall be responsible for server migration and related services to the new
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 57 | P a g e
infrastructure facility. The Selected bidder will also be responsible to connect the new SDC location
to SDC disaster recovery (DR) site in based in Hyderabad.
Selected Bidder shall give various types of services depending upon the requirements. These
services would contain application / database migration, application enhancement, database
tuning, database / application administration, etc.
Following are the services shall be given by the Selected Bidder in case of migration of servers in
future:
I. Migration Assessment:
Develop migration strategy and migration roadmap and discuss with the department to finalize it.
o Prepare application porting plan to port the application to a new Infrastructure Facility.
II. Carry out Data Migration: Schema translation, data migration, data cleansing.
III. Carry out Technology Migration: Language migration, OS migration, database migration, user interface migration
IV. Maintain all the documentation such as project plan for migration, migration roadmap, SRS, SDD, migration documents and testing related documents.
3.3.8 Licenses
I. The system software licenses mentioned in the Bill of Materials shall be genuine, perpetual,
full use and should provide upgrades, patches, fixes, security patches and updates directly
from the OEM. All the licenses and support (updates, patches, bug fixes, etc.) should be in
the name of DoIT.
II. The bidder shall provide with a full use database license. All the licenses and support
(updates, patches, bug fixes, etc.) should be in the name of DoIT. Bidder shall provide a
comprehensive warranty that covers all components after the issuance of the final
acceptance by DoIT & Info Tech Corporation of Goa Ltd. (ITG). The warranty should cover
all materials, licenses, services, and support for both hardware and software. Bidder shall
administer warranties with serial number and warranty period. Bidder shall transfer all the
warranties to DoIT at no additional charge at the time of termination of the project. All
warranty documentation (no expiry) will be delivered to DoIT.
III. The selected bidder shall review the licenses requirements with the SPMU and Nodal
Officer. The SPMU with the help of Nodal Officer shall clarify on the licenses requirements
to be brought by the selected bidder and availability at SDC.
3.3.9 Capacity Building / Training
Capacity building will include the following:
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 58 | P a g e
I. Imparting training in Information Technology (IT), Business Process Reengineering (BPR)
and Change Management.
a. Such trainings and skills will be imparted to all levels of government
employees involved in the processes pertaining to the selected services.
b. These would range from senior officers such as the State Department
Secretaries up to the officials working in the districts and sub districts such
as Gram-Sevak/Talati/Panchayat Secretaries etc.
II. DoIT shall act as the nodal department to oversee the training and capacity building
requirements for the e-District Project and District e-Governance Societies (DeGS) shall be
responsible for facilitating the rollout of trainings proposed for each district.
III. DeGS shall identify the list of personnel in various departmental offices across State,
Districts, Talukas/ Blocks and Gram Panchayat who are responsible for ensuring service
delivery under the e-District Project for training and ensure that all the stakeholders
become efficiently trained on the system and processes which shall form the basis of service
delivery under the e-District Project.
IV. The bidder would be responsible to define and prepare a state-wide e-District Project
rollout and training plan along with the training content e.g. presentation, user manual and
operational manual and submit the same to DoIT/ITG for approval.
V. The bidder would be required to prepare a detailed training plan covering the training
approach, details of the target audience, location, dates for training, duration and training
content. The bidder would be responsible to coordinate with the DeGS and e-District
Project Manager for finalization of the training plan.
VI. Selected bidder shall prepare and organize training programs to facilitate the service
delivery departments/offices in the efficient usage of the new system.
VII. Selected bidder shall provide district level classroom training using audio-visual
equipment and material at the trainer‟s disposal with mandatory hands on through live
example. The bidder would have to arrive at a training program which at the minimum
should contain the following:
a. Computer Basics
b. Business Process/ Application based Training
c. Specialized Technology Training (for System administration and troubleshooting)
d. Project management (for District Project Managers on general project management
and on usage of PMIS)
e. Digital Certificate Usage Training (including refresher course)
VIII. The proposed training module is expected to help the Government functionary to
undertake their revised roles and responsibilities with ease and without any difficulty and
apprehension. The training modules will impart the required skill set and capacity for
performance of defined roles and responsibilities.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 59 | P a g e
IX. Training shall also encompass orientation & the knowledge of basic functionalities of e-
District Application, Guidelines and other revised backend processes.
X. Selected bidder shall provide training to 20% of department‟s manpower or to 4 officials
per service per Taluka (whichever is less) through “Train the trainer methodology”. There
would be also one more round of training iteration for all these “Trainers” 3 months later
first training. Rest 80% of department manpower would be trained by the “Trainers”
where-in bidder ‟s role would be limited to supporting user department in identifying
“Trainer” & ensuring resolution of queries/challenges faced by the “Trainers”.
XI. Selected bidder will have to bear the expenses related to training such as training material,
trainer, laptop, projector & logistics arrangement of the trainer. However, bidder shall not
be responsible for training infrastructure such as Training Rooms, Sitting arrangement,
food for trainees, lodging and boarding expenses for trainees.
XII. Bidder shall coordinate with pilot states for getting the learning with the help from SPMU
and Nodal Officer. Selected bidder shall include the learning from pilot states and update
the necessary changes in the training.
XIII. Training shall also be provided for teaching the basic trouble shooting activities in case of
problems. The bidder should also cover the general problems and its resolution
mechanism in the operational manual
XIV. The Selected bidder provides training to officials in batches with a recommended batch size
of 30 participants. Moreover minimum 20 participants are required for conducting the
training session and the same should not exceed 40 participants.
XV. The trainers imparting the training should be well versed in Local language and English
language.
XVI. Training shall be imparted in Local language and English language as per the requirement
of the trainees. The printed manuals and training manuals should also be available in Local
language and English Language.
XVII. The selected bidder shall provide multimedia resources (Video, PPTs, e-Leaning
modules/simulations & e-Quiz) permanently accessible for all govt. officials through
GBBN. All the training content created out of this project shall be the copyright of
DoIT/Government of Goa.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 60 | P a g e
XVIII. State has the flexibility of engaging more than one training partner for providing the
training programs in case performance of bidder training program is not satisfactory. In
such case, bidder would be charged 5% penalty directly of the total project cost. SPMU will
define the criteria of training effectiveness criteria once application is ready to roll-out.
XIX. Trainings shall be provided to all the new employees as and when joining the department
through “train the trainer” methodology.
4.3.6.2.1 Sign off Deliverables / Exit Criteria
I. Capacity Building Plan
II. Change Management Plan
III. Training Plan
IV. Training Content including user manual, operational Manuals and computer based
tool kits, PPTs and videos to promote self-learning
V. Completion report of training and change management activities
3.3.10 Manpower requirements
Bidder shall provide dedicated centralized helpdesk team of 2 resources post deployment
to resolve any operational issues in application through phone/e-mail/live chat.
S.No. Name of Resource
State Data Centre/ District for which proposed
Qualification (Minimum)
No. of Years of Experience
No. of Years with responding firm
Certification Domain Knowledge
North Goa
South Goa
1.
2.
3.3.11 Business Continuity Planning
The selected bidder is expected to develop a Business Continuity Plan (BCP) and Disaster
Recovery Plan (DRP) for the operations carried out by the selected Bidder. An indicative list of
activities to be performed by the selected Bidder is mentioned below:
I. Designing and implementing adequate data backup, business continuity and
restoration procedures for the e-District application data (including but not limited to
the database, attachments and all other data elements created in and generated by the
system and users)
II. Ensuring data backup till the last transaction occurring in the system to ensure
enhanced service levels and following RPO and RTO objectives:
A. Peak hours: Zero RPO and Zero RTO
B. Non-Peak Hours: Zero RPO and RTO <= 60 minutes
III. Any storage space / media required to maintain backups and other requirements of the
RFP should be provisioned for by the selected bidder in his Bid.
IV. Designing and implementing data synchronization procedures for the DR Site. Periodic
testing may be done to ensure that all replication and data synchronization procedures
are in place all the time. Replication between Data Centre and DR Site as well as
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 61 | P a g e
change-over during disaster should be automatic and real-time for minimal impact on
user experience.
3.3.12 Others
4.3.2.1 Information Security Management
Security of Application and the data contained therein is paramount for the success of this Project.
Hence, the selected Bidder should take adequate security measures to ensure confidentiality,
integrity and availability of the information.
Security Requirements
Overall Solution
1. The proposed solution should include design and implementation of a comprehensive IS
security policy in line with ISO 27001 standards to comply with the security requirements
mentioned in this section. All the necessary procedures / infrastructure / technology
required to ensure compliance with IS security policy should be established by the selected
Bidder and should be approved by the Info Tech Corporation of Goa Ltd. (ITG) before they
are implemented. The IS Policy shall include all aspects such as physical and
environmental security, human resources security, backup and recovery, access control,
incident management, business continuity management etc.
2. The designed IS policy is not in conflict with the security policy of the State Data Centre
where the infrastructure would be hosted.
3. The proposed solution should ensure proper logical access security of all the information
Assets
4. The proposed solution should be able to classify information assets according to criticality
of the information asset.
5. The proposed solution should provide security including identification, authentication,
authorization, access control, administration and audit and support for industry standard
protocols
6. The proposed solution should have a security architecture which adheres to the security
standards and guidelines such as
ISO 27001
Information security standards framework and guidelines standards under e-
Governance standards (http://egovstandards.gov.in)
Information security guidelines as published by Data Security Council of India
(DSCI)
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 62 | P a g e
Security Requirements
Guidelines for Web Server Security, Security IIS 6.00 Web-Server, Auditing and
Logging as recommended by CERT-In (www.cert-in.org.in)
System shall comply with IT (Amendment) Act 2008.
7. The proposed solution should support the below Integration security standards:
Authentication
Authorization
Encryption
Secure Conversation
Non-repudiation
XML Firewalls
Security standards support
WS-Security 1.0
WS-Trust 1.2
WS-Secure Conversations 1.2
WS-Basic Security Profile
8. The proposed solution should a multi-layered detailed security system covering the overall
solution needs having the following features:
i. Layers of firewall
ii. Network IPS
iii. Enterprise-wide Antivirus solution
iv. Information and incident management solution for complete DoIT or Info Tech
Corporation of Goa Ltd. (ITG) landscape
v. Two factor authentication for all administrators i.e. system administrators, network
administrators, database administrators.
vi. Audit Log Analysis
Selected Bidder must ensure that the security solution provided must integrate with
the overall system architecture proposed
9. The proposed solution should be monitored by periodic information security audits /
assessments performed by DoIT or Info Tech Corporation of Goa Ltd. (ITG). The scope of
these audits / assessments may include, but are not limited to, a review of: access and
authorization procedures, physical security controls, backup and recovery procedures, and
program change controls.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 63 | P a g e
Security Requirements
To the extent that the Info Tech Corporation of Goa Ltd. (ITG) deems it necessary to carry
out a program of inspection and audit / assessment to safeguard against threats and
hazards to the confidentiality, integrity, and availability of data, the Selected Bidder shall
provide the DoIT or Info Tech Corporation of Goa Ltd. (ITG) representatives access to its
facilities, installations, technical resources, operations, documentation, records, databases
and personnel. The Selected Bidder must provide DoIT or Info Tech Corporation of Goa
Ltd. (ITG) access to various monitoring and performance measurement systems (both
manual and automated). DoIT or Info Tech Corporation of Goa Ltd. (ITG)has the right to
get the monitoring and performance measurement systems (both manual and automated)
audited / assessed without prior approval / notice to the Selected Bidder
10. The proposed solution should facilitate system audit for all the information assets to
establish detective controls. The selected Bidder is required to facilitate this by producing
and maintaining system audit logs for a period agreed to with Info Tech Corporation of
Goa Ltd. (ITG).
11. The proposed solution should ensure that data, especially those to pertaining to
registration process, transaction process as well as the data that is stored at various points
is appropriately secured as per minimum standard 128 Bit AES/3DES encryption.
12. The proposed solution should provide database security mechanism at core level of the
database, so that the options and additions to the database confirm the security policy of
the DoIT or Info Tech Corporation of Goa Ltd. (ITG) without changing the application
code.
13. The proposed solution should support native optional database level encryption on the
table columns, table spaces or backups.
14. The database of the proposed solution should provide option for secured data storage for
historic data changes for compliance and tracking the changes.
15. The proposed solution should be able to ensure the integrity of the system from accidental
or malicious damage to data
16. The proposed solution should be able to check the authenticity of the data entering the
system
17. The proposed solution should be able to generate a report on all “Authorization Failure”
messages per user ID
18. The proposed solution should be able to monitor the IP address of the system from where
a request is received.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 64 | P a g e
Security Requirements
19. The proposed solution should be able to differentiate between the systems of the DoIT or
Info Tech Corporation of Goa Ltd. (ITG) network and other external systems
20. Retention periods, archival policies and read-only restrictions must be strictly enforceable
on all logs maintained in the system
21. The proposed solution should provide ability to monitor, proactively identify and
shutdown the following types of incidents through different modes of communication
(email, SMS, phone call, dashboard etc.):
i. Pharming
ii. Trojan
iii. Domains (old/new) similar to “DoIT / Info Tech
Corporation of Goa Ltd. (ITG), Government of Goa”
22. The proposed solution should be able to monitor security and intrusions into the system
and take necessary preventive and corrective actions.
23. The proposed solution should have the option to be configured to generate audit-trails in
and detailed auditing reports
24. The proposed solution must provide ACL objects and a security model that can be
configured for enforcement of user rights
25. The proposed solution should be designed to provide for a well-designed security of
physical and digital assets, data and network security, backup and recovery and disaster
recovery system.
26. The proposed solution should have tamper proof data storage to prevent unauthorised
data tampering
27. The proposed solution should have a Business Continuity Plan and a Disaster Recovery
Plan prepared and implemented by the selected Bidder before commencement of the
operations. Robust backup procedures to be established for the same.
Password Requirement
1. The proposed solution should allow DoIT & Info Tech Corporation of Goa Ltd. (ITG) to
define password policies. The minimum password policies to be defined are:
i. Minimum/ Maximum password length
ii. Alpha numeric combination of password
iii. Compulsory use of special characters
iv. Minimum password age
v. Password expiry period
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 65 | P a g e
Security Requirements
vi. Repeat passwords etc.
2. The proposed solution should be able to automatically check the passwords with the
password policy, which can be customized by the DoIT or Info Tech Corporation of Goa
Ltd. (ITG)
3. The proposed solution should enforce changing of the default password set by the system
(at the time of creation of user ID) when the user first logs on to the system. The proposed
solution should enforce all password policies as defined at the time of first change and
thereafter.
4. The proposed solution should store User ID's and passwords in an encrypted format.
Passwords must be encrypted using MD5 hash algorithm or equivalent(selected Bidder
must provide details)
5. The proposed solution should be capable of encrypting the password / other sensitive data
during data transmission
6. The proposed solution should ensure that the user web access shall be through SSL (https)
only for all level of communication for providing higher level of security.
3.3.13 Project Management
4.3.2.1 Project Planning and Management
e-District Mission Mode Project is a geographically spread initiative involving multiple
stakeholders. Successful implementation and national roll out of the project ultimately depends on
all its stakeholders, the role of bidder is very critical. Hence bidder is required to design and
implement a comprehensive and effective project planning and management methodology
together with efficient and reliable tools.
Project planning exercise shall essentially commence with the start of the project, however, project
management exercise shall commence at the start of the project and shall continue till the O&M
Phase of the project.
To have an effective project management system in place, it is necessary for the selected bidder to
use a Project Management Information System (PMIS) to monitor the Project Progress. The bidder
shall address at the minimum the following using PMIS:
I. Create an organized set of activities for the project.
II. Coordinate and collaborate with various stakeholders including the Departments
concerned.
III. Nodal Agency, State IT Department, NIC, SPMU, NPMU, DeitY, GoI.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 66 | P a g e
IV. Establish and measure resource assignments and responsibilities.
V. Construct a project plan schedule including milestones.
VI. Measure project deadlines, budget figures, and performance objectives.
VII. Communicate the project plan to stakeholders with meaningful reports.
VIII. Provide facility for detecting problems and inconsistencies in the plan
During the project implementation the bidder shall report to the State Nodal Officer/SPMU, on
following items:
I. Results accomplished during the period;
II. Cumulative deviations to date from schedule of progress on milestones as specified in
this RFP read with the agreed and finalized Project Plan;
III. Corrective actions to be taken to return to planned schedule of progress;
IV. Proposed revision to planned schedule provided such revision is necessitated by
reasons beyond the control of the bidder ;
V. Other issues and outstanding problems, and actions proposed to be taken;
VI. Interventions which the bidder expects to be made by the State Nodal Officer and / or
actions to be taken by the State Nodal Officer before the next reporting period. Progress
reports would be prepared by bidder on a fortnightly basis. These reports may be
required to be shared with either the SDA or the SPMU, as the case may be.
VII. Project quality Assurance
VIII. Change Control mechanism
IX. Project Management activities
X. Issue Management to help identify and track the issues that need attention and
resolution from the State.
XI. Scope Management to manage the scope and changes through a formal management
and approval process.
XII. Risk Management to identify and manage the risks that can hinder the project progress.
Bidder will closely work with SPMU and send the reports to the SPMU. SPMU will assist Nodal
Officer in acceptance of the report/ document and suggest the action plan to the Nodal Officer.
The Project plan prepared by the bidder at the initial stage of the project shall be reviewed by the
SDA on the advice of the State Mission Team and SPMU and then submit it to the Apex /
Empowered Committee for approval.
The bidder shall update and maintain the Project Plan throughout the duration of the engagement.
All changes are to be reviewed and approved by the SDA or SPMU.
4.3.2.1 Sign off Deliverable/ Exit Criteria
I. PMIS data update & functioning.
II. Periodic Reports on on-going basis
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 67 | P a g e
3.4 Scope of Services - Operation and Maintenance Phase
The selected bidder is responsible for the day to day maintenance of the software system for the
entire period of Contract (This includes 3 years for software from date of Go live and 5 years for
hardware from date of installation). For the IT Infrastructure procured as part of this RFP, the
selected Bidder will be responsible for smooth Operations and Maintenance Services for the period
covering onsite support for 5 year of comprehensive warranty from the date of commissioning of
the IT Infrastructure covering the following:
I. Onsite comprehensive warranty support for 5 years
II. Technical Support for all the licensed software (in hardware) for 5 years from date of
installation and 3 years of O&M for e-District application software.
III. Providing help desk support with Escalation matrix for registration of complaints
related to the IT Infrastructure, system software, networking, UPS points & e-District
software maintenance & up-gradation.
IV. Helpdesk support has to be provided by the bidder from the date of Go-Live from post
of 1st 10 services till the end of project
3.4.1 Overview of Post Implementation Services
An indicative list of activities and nature of support to be provided is mentioned below:
I. System Administration and Trouble Shooting
A. Overall monitoring and management of all IT and Non-IT infrastructure deployed
by the selected Bidder for the Project including Server Infrastructure at SDC,
Departmental locations, networking equipment‟s & connectivity, system software,
application, database, and all other services associated with these facilities to ensure
service levels, performance and availability requirements as prescribed in the RFP
are met.
B. Repair or replace infrastructure deployed for this Project, either directly or through
a third party warranty provider depending on the case
C. Replace component due to technical, functional, manufacturing or any other
problem with a component of the same make and configuration. In case the
component of same make and configuration is not available, the replacement shall
conform to open standards and shall be of a higher configuration and shall be
approved by the Department
D. Perform system administration tasks such as managing the user access, creating and
managing users, taking backups etc.
E. Performance tuning of the system to ensure adherence to SLAs and performance
requirements as indicated in the RFP.
II. Network Administration and Trouble Shooting
A. Coordinate with the network service providers to maintain smooth network
operations and ensure uptime and performance requirements of the IT
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 68 | P a g e
infrastructure as indicated in the RFP are met. The selected Bidder will be totally
responsible for all networking equipment‟s installed by him.
III. Database Administration and Trouble Shooting
A. Undertake end-to-end management of database on an on-going basis to facilitate
smooth functioning and optimum utilization including regular database backup
and periodical testing of backup data, conducting configuration review to tune
database, maintaining the necessary documentation and managing schemes to
database schema, disk space, user roles, and storage.
IV. Overall
A. Undertake preventive maintenance (any maintenance activity that is required
before the occurrence of an incident with an attempt to prevent any incidents) and
carry out the necessary repairs and replacement of parts wherever needed to keep
the performance levels of the hardware and equipment in tune with the
requirements of the SLA. Such preventive maintenance shall not be attended during
working hours of the State Departments, unless inevitable and approved by the Info
Tech Corporation of Goa Ltd. (ITG).
B. Undertake reactive maintenance (any corrective action, maintenance activity that is
required post the occurrence of an incident) that is intended to troubleshoot the
system with sufficient teams
C. Escalate and co-ordinate with its OEMs for problem resolution wherever required
D. The selected bidder will be required to comply with various policies relating to
monitoring and management of infrastructure such as IS Policy, backup and
archival policy, system software update policy etc. of the Goa.
3.4.2 Warranty Support
As part of the warranty services bidder shall provide:
I. Selected bidder shall provide on-site comprehensive warranty for 5 years from the date
of commissioning of all IT infrastructures and other equipment (if any) for providing
warranty support to SDA.
II. Selected bidder shall provide the comprehensive manufacturer's warranty and support
in respect of proper design, quality and workmanship of all hardware, equipment,
accessories etc. covered by the RFP.
III. Selected bidder must warrant all hardware, equipment, accessories, spare parts,
software, etc. procured and implemented as per this RFP against any manufacturing
defects during the warranty period.
IV. Selected bidder shall provide the performance warranty in respect of performance of
the installed hardware and software to meet the performance requirements and service
levels in the RFP.
V. Selected bidder is responsible for sizing and procuring the necessary hardware and
software licenses as per the performance requirements provided in the RFP. During the
warranty period bidder shall replace or augment or procure higher-level new
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 69 | P a g e
equipment or additional licenses at no additional cost to the DoIT or Info Tech
Corporation of Goa Ltd. (ITG) in case the procured hardware or software is not
adequate to meet the service levels.
VI. Mean Time between Failures (MTBF): If during contract period, any equipment has a
hardware failure on four or more occasions in a period of less than three months; it
shall be replaced by equivalent or higher-level new equipment by the bidder at no cost
to Info Tech Corporation of Goa Ltd. (ITG).
VII. However, if the new equipment supplied is priced lower than the price at which the
original support services for all system software, DBMS (Database Management
System), EMS (Enterprise Management System), other products deployed as part of this
project will require proper arrangements of bidder with OEM.
VIII. During the warranty period bidder shall maintain the systems and repair / replace at
the installed site, at no charge to Info Tech Corporation of Goa Ltd. (ITG), all defective
components that are brought to the bidder‟s notice.
IX. Warranty should not become void, if Info Tech Corporation of Goa Ltd. (ITG) buys, any
other supplemental hardware from a third party and installs it within these machines
under intimation to the bidder. However, the warranty will not apply to such
supplemental hardware items installed.
X. The bidder shall carry out Preventive Maintenance (PM), including cleaning of interior
and exterior, of all hardware and testing for virus, if any, and should maintain proper
records at each site for such PM. Failure to carry out such PM will be a breach of
warranty and the warranty period will be extended by the period of delay in PM.
XI. Bidder shall use the antivirus which is available at state. However in case there is a
requirement to procure the license for anti-virus, bidder shall in consultation with
SPMU and Nodal Officer procures the anti-virus Licenses and maintains the service
part.
XII. Bidder shall monitor warranties to check adherence to preventive and repair
maintenance terms and conditions.
XIII. The bidder shall ensure that the warranty complies with the agreed Technical
Standards, Security Requirements, Operating Procedures, and Recovery Procedures.
XIV. Any component that is reported to be down on a given date should be either fully
repaired or replaced by temporary substitute (of equivalent configuration) within the
time frame indicated in the Service Level Agreement (SLA).
XV. The bidder shall develop and maintain an inventory database to include the registered
hardware warranties.
3.4.3 Technical Support (TS)
As part of the TS services bidder shall provide:
I. Bidder shall maintain data regarding entitlement for software upgrades, enhancements,
refreshes, replacements and maintenance.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 70 | P a g e
II. If the Operating System or additional copies of Operating System are required to be
installed / reinstalled / de-installed, the same should be done as part of TS.
III. Bidder should carry out any requisite adjustments / changes in the configuration for
implementing different versions of Application Software.
IV. Updates / Upgrades / New releases / new versions / Patches / Bug fixes: The bidder
shall provide from time to time the Updates / Upgrades / New releases / new versions
/ Patches / Bug fixes of the software, operating systems, etc. as required. The bidder
should provide free Updates / Upgrades / New releases / new versions / Patches /
Bug fixes of the software and tools to SDA as and when released by OEM.
V. Software License Management. The bidder shall provide software license management
and control. Bidder shall maintain data regarding entitlement for software upgrades,
enhancements, refreshes, replacements, and maintenance.
VI. Bidder shall have complete manufacturer‟s technical support for all the licensed
software problems and/or questions, technical guidance, defect and non-defect related
issues. Bidder shall provide a single-point-of-contact for software support and provide
licensed software support including but not limited to problem tracking, problem
source identification, problem impact (severity) determination, bypass and recovery
support, problem resolution, and management reporting.
3.4.4 Help Desk and Trouble ticket management system
I. The selected Bidder as part of provisioning support for Department users at each
location and the SDC will setup centralized helpdesk and coordinate with the
respective OEMs of the IT Infrastructure deployed at SDC and the Department offices.
For the Goa, the selected Bidder will undertake the following:
a. Provide Help Desk services to track and route requests for service and to assist
department users in answering questions and resolving problems related to the
IT Infrastructure installed at Data Centre and at all the Department Offices .
b. Become the central collection point for contact and control of the problem,
change, and service management processes (This includes both incident
management and service request management)
c. Shall provide a first level of support for application and technical support at e-
District implementation locations across the State where the software,
hardware, and other infrastructure will be rolled out.
d. Provide the following integrated customer support by establishing 12 hrs. X 6
Days (8 AM to 8 PM) Help Desk facility for reporting issues/ problems with
the software, hardware and other infrastructure.
II. This shall be an online system deployed centrally and shall be used by the selected
Bidder extensively for management of network support activity and handling calls
from citizen, departmental staff, any other stakeholders. Service desk is an application
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 71 | P a g e
that facilitates the end-to-end service support. The proposed system should include
required hardware and software.
III. This proposed software system is expected to facilitate the following:
A. User Interface: - The proposed system should have an easy to use user interface
(preferably a browser based), so that users across the State can lodge any
complaints and service requests. The solution shall have a reporting interface with a
consolidated view of the network status. All users (departmental and external) of
the system should be able to log a request in the system using any of the following
channels:
1. Telephonic call on the Toll-free Helpline
2. email
3. Online chat on the departmental web-portal
4. Through intranet for departmental users or web-portal for external users
B. Complete incident and problem management: - Service desk should address both
Incident Management and Problem Management. The application should maintain
a classification system that will distinguish the single occurrence trouble tickets or
incidents needing immediate resolution from in-depth root cause analyses that may
require longer term to resolve a problem.
The flow of events at the call centre should be:
1. Event is triggered and forwarded to service desk.
2. Service desk submits and updates the trouble ticket.
Tasks expected:
1. Ticket mapping and allocation: According to the severity, the ticket
should be given the priority level. Also it should map the ticket to the
appropriate personnel for the resolution.
2. Updating the status: Update the status of ticket.
3. It should be able to log and escalate user interactions and requests.
4. It should have an updateable knowledge base for technical analysis
and further help end-users to search solutions for previously solved
issues.
5. Status of registered calls with interface for Call centre, using which call
centre can inform the status to users over phone.
6. Historical report indicating number of calls, time to resolve, status etc.
for a specified period of time.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 72 | P a g e
All relevant infrastructure and supporting system software required for the
deployment and operation of the help desk is to be provided by the selected Bidder.
The system deployed by the bidder shall be complied with ITIL and ISO 20000
service specifications.
3.5 General Requirements
I. Licensing Requirements
A. All system software, licenses, etc. have to be procured in the name of the DoIT, Goa.
B. The licenses should be perpetual and enterprise wide for the core application and
other software unless otherwise stated. The software licenses shall not be restricted
based on location and the DoIT should have the flexibility to use the software
licenses for other requirements, if required
C. All system software licenses have to be for 5 years.
II. Asset Management
The selected Bidder will perform the following asset management functions with respect to
the infrastructure deployed at various locations:
A. Take periodic stock of, review physical inventory and maintain stock registers of
hardware at all locations covered under this Project. The selected Bidder would
maintain stock registers as per format agreed with the Info Tech Corporation of Goa
Ltd. (ITG).
B. Maintain documentation of the hardware assets, maintain asset Information for all
Project locations, on parameters to be mutually agreed between the Info Tech
Corporation of Goa Ltd. (ITG) and the selected Bidder, which shall include details like
1. Product type, model number, version number
2. Manufacturer
3. Office location
4. Maintenance status, etc.
C. Update or correct the asset information following any new installations, movement,
addition, or change performed by the selected Bidder.
D. Produce periodic reports and machine readable files in agreed upon format
pertaining to some or all of the asset information.
E. Restrict movement of server/equipment/items in or out of SDC or any other
location under the Project without prior permission from the Info Tech Corporation of
Goa Ltd. (ITG).
III. Warranty and Support
a. The selected Bidder shall warrant that the IT Infrastructure supplied to the Goa for
this Project shall have no defects arising from design or workmanship or any act or
omission of the selected Bidder. The warranty shall remain valid for the Contract
period on all the items supplied as per the Contract.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 73 | P a g e
b. The selected Bidder shall replace any parts/ components of the IT infrastructure
supplied for the Project if the components are defective and during the entire
warranty period the selected Bidder shall apply latest upgrades for all the hardware
components after appropriate testing. The Info Tech Corporation of Goa Ltd. (ITG) will
not pay any additional costs separately for warranty and the overall IT
infrastructure cost quoted by the selected Bidder shall include the same.
IV. Since the Project aims to reuse the common infrastructure created under SDC, GBBN,
ESO/CSCS‟S & CFC‟S ; the selected Bidder will also be required to coordinate with SDC,
GBBN, SSDG, ESO/CSCS‟S & CFC‟S teams to ensure that uptime and performance
requirements of the RFP are met. However, the selected Bidder shall be held solely
responsible for performance and service levels of any infrastructure deployed by the
selected Bidder as part of this Contract.
V. Knowledge Transfer
a. At the end of the Contract period, the selected Bidder will be required to provide
necessary handholding and transition support to designated staff or any other
agency that is selected for maintaining the system post the Contract with the
selected Bidder. The handholding support will include but not be limited to,
conducting detailed walkthrough and demonstrations for the IT Infrastructure,
handing over all relevant documentation, addressing the queries/clarifications of
the new agency with respect to the working / performance levels of the
infrastructure, conducting training sessions etc.
b. Knowledge Transfer is an integral part of the scope of work of the selected Bidder.
This will have to be done even in case the Contract with the Bidder ends or is
terminated before the planned timelines.
Please note that this is only an indicative list. Any other activity, over and above these, as may be
deemed necessary by the selected Bidder to meet the service levels and requirements specified in
this Contract are also required to be performed by the selected Bidder at no additional cost.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 74 | P a g e
3.6 Exit Management
4.6.1 Purpose
I. This sets out the provisions, which will apply on expiry or termination of the MSA, the
Project Implementation, Operation and Management SLA.
II. In the case of termination of the Project Implementation and/or Operation and
Management, the Parties shall agree at that time whether, and if so during what period, the
provisions of this Schedule shall apply.
III. The Parties shall ensure that their respective associated entities carry out their respective
obligations set out in this Exit Management Schedule.
4.6.2 Transfer of Assets
I. Info Tech Corporation of Goa Ltd. (ITG) shall be entitled to serve notice in writing on the
bidder at any time during the exit management period as detailed hereinabove requiring
the bidder and/or its sub-contractors to provide the Info Tech Corporation of Goa Ltd. (ITG)
with a complete and up to date list of the Assets within 30 days of such notice. Info Tech
Corporation of Goa Ltd. (ITG) shall then be entitled to serve notice in writing on the bidder at
any time prior to the date that is 30 days prior to the end of the exit management period
requiring the bidder to sell the Assets, if any, to be transferred to Info Tech Corporation of
Goa Ltd. (ITG) or its nominated agencies at book value as determined as of the date of such
notice in accordance with the provisions of relevant laws.
II. In case of contract being terminated by Info Tech Corporation of Goa Ltd. (ITG), Info Tech
Corporation of Goa Ltd. (ITG) reserves the right to ask bidder to continue running the project
operations for a period of 6 months after termination orders are issued.
III. Upon service of a notice under this Article the following provisions shall apply:
A. in the event, if the Assets to be transferred are mortgaged to any financial
institutions by the bidder , the bidder shall ensure that all such liens and liabilities
have been cleared beyond doubt, prior to such transfer. All documents regarding
the discharge of such lien and liabilities shall be furnished to the Info Tech Corporation of
Goa Ltd. (ITG).
B. All risk in and title to the Assets to be transferred / to be purchased by the Info Tech
Corporation of Goa Ltd. (ITG) pursuant to this Article shall be transferred to Info Tech
Corporation of Goa Ltd. (ITG), on the last day of the exit management period.
C. Info Tech Corporation of Goa Ltd. (ITG) shall pay to the bidder on the last day of the
exit management period such sum representing the Net Block (procurement price
less depreciation as per provisions of Companies Act) of the Assets to be transferred
as stated in the Terms of Payment Schedule.
D. Payment to the outgoing bidder shall be made to the tune of last set of completed
services / deliverables, subject to SLA requirements.
E. The outgoing bidder will pass on to Info Tech Corporation of Goa Ltd. (ITG) and/or to
the Replacement bidder , the subsisting rights in any leased properties/ licensed
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 75 | P a g e
products on terms not less favourable to Info Tech Corporation of Goa Ltd. (ITG)/
Replacement bidder , than that enjoyed by the outgoing bidder .
4.6.3 Cooperation and Provision of Information
During the exit management period:
I. The bidder will allow the Info Tech Corporation of Goa Ltd. (ITG) or its nominated
agency access to information reasonably required to define the then current mode of
operation associated with the provision of the services to enable the Info Tech
Corporation of Goa Ltd. (ITG) to assess the existing services being delivered;
II. promptly on reasonable request by the Info Tech Corporation of Goa Ltd. (ITG), the
bidder shall provide access to and copies of all information held or controlled by
them which they have prepared or maintained in accordance with this agreement
relating to any material aspect of the services (whether provided by the bidder or
sub-contractors appointed by the bidder). The Info Tech Corporation of Goa Ltd. (ITG)
shall be entitled to copy of all such information. Such information shall include
details pertaining to the services rendered and other performance data. The bidder
shall permit the Info Tech Corporation of Goa Ltd. (ITG) or its nominated agencies to
have reasonable access to its employees and facilities as reasonably required by the
Chairman, PIU to understand the methods of delivery of the services employed by the
bidder and to assist appropriate knowledge transfer.
4.6.4 Confidential Information, Security and Data
I. The System integrator will promptly on the commencement of the exit
management period supply to the Info Tech Corporation of Goa Ltd. (ITG) or its
nominated agency the following:
A. information relating to the current services rendered and customer and
performance data relating to the performance of sub-contractors in relation to
the services;
B. documentation relating to Computerization Project‟s Intellectual Property Rights;
C. documentation relating to sub-contractors;
D. all current and updated data as is reasonably required for purposes of Info
Tech Corporation of Goa Ltd. (ITG) or its nominated agencies transitioning the
services to its Replacement bidder in a readily available format nominated by
the Info Tech Corporation of Goa Ltd. (ITG), its nominated agency;
E. all other information (including but not limited to documents, records and
agreements) relating to the services reasonably necessary to enable Info Tech
Corporation of Goa Ltd. (ITG) or its nominated agencies, or its Replacement
bidder to carry out due diligence in order to transition the provision of the
Services to Info Tech Corporation of Goa Ltd. (ITG) or its nominated agencies, or
its Replacement bidder (as the case may be).
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 76 | P a g e
II. Before the expiry of the exit management period, the bidder shall deliver to the Info
Tech Corporation of Goa Ltd. (ITG) or its nominated agency all new or up-dated
materials from the categories set out in Schedule above and shall not retain any
copies thereof, except that the bidder shall be permitted to retain one copy of such
materials for archival purposes only.
III. Before the expiry of the exit management period, unless otherwise provided under
the MSA, the Info Tech Corporation of Goa Ltd. (ITG) or its nominated agency shall
deliver to the bidder all forms of bidder confidential information, which is in the
possession or control of Chairperson, PIU or its users.
4.6.5 Employees
I. Promptly on reasonable request at any time during the exit management period, the
bidder shall, subject to applicable laws, restraints and regulations (including in
particular those relating to privacy) provide to the Info Tech Corporation of Goa Ltd.
(ITG) or its nominated agency a list of all employees (with job titles) of the bidder
dedicated to providing the services at the commencement of the exit management
period.
II. Where any national, regional law or regulation relating to the mandatory or
automatic transfer of the contracts of employment from the bidder to the Info Tech
Corporation of Goa Ltd. (ITG) or its nominated agency, or a Replacement bidder
("Transfer Regulation") applies to any or all of the employees of the bidder, then the
Parties shall comply with their respective obligations under such Transfer
Regulations.
III. To the extent that any Transfer Regulation does not apply to any employee of the bidder,
department, or its Replacement bidder may make an offer of employment or contract for
services to such employee of the bidder and the bidder shall not enforce or impose any
contractual provision that would prevent any such employee from being hired by the
Chairperson, PIU or any Replacement bidder.
4.6.6 Transfer of Certain Agreements
On request by the Info Tech Corporation of Goa Ltd. (ITG) or its nominated agency the bidder shall
effect such assignments, transfers, licences and sub-licences as the Chairperson, PIU may require in
favour of the Chairperson, PIU, or its Replacement bidder in relation to any equipment lease,
maintenance or service provision agreement between bidder and third party lessors, vendors, and
which are related to the services and reasonably necessary for the carrying out of replacement services by
the Info Tech Corporation of Goa Ltd. (ITG) or its nominated agency or its Replacement bidder.
4.6.7 Rights of Access to Premises
I. At any time during the exit management period, where Assets are located at the bidder's
premises, the bidder will be obliged to give reasonable rights of access to (or, in the case of
Assets located on a third party's premises, procure reasonable rights of access to) the Info
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 77 | P a g e
Tech Corporation of Goa Ltd. (ITG) or its nominated agency and/or any Replacement bidder
in order to make an inventory of the Assets.
II. The bidder shall also give the Info Tech Corporation of Goa Ltd. (ITG) or its nominated agency
or its nominated agencies, or any Replacement bidder right of reasonable access to the
Implementation Partner's premises and shall procure the Info Tech Corporation of Goa
Ltd. (ITG) or its nominated agency or its nominated agencies and any Replacement bidder
rights of access to relevant third party premises during the exit management period and for
such period of time following termination or expiry of the MSA as is reasonably necessary
to migrate the services to the Info Tech Corporation of Goa Ltd. (ITG) or its nominated agency,
or a Replacement bidder.
4.6.8 General Obligations of the bidder
I. The bidder shall provide all such information as may reasonably be necessary to effect as
seamless a handover as practicable in the circumstances to the Info Tech Corporation of Goa
Ltd. (ITG) or its nominated agency or its Replacement bidder and which the bidder has in its
possession or control at any time during the exit management period.
II. For the purposes of this Schedule, anything in the possession or control of any bidder,
associated entity, or sub-contractor is deemed to be in the possession or control of the
bidder.
III. The bidder shall commit adequate resources to comply with its obligations under this Exit
Management Schedule.
4.6.9 Exit Management Plan
I. The bidder shall provide the Info Tech Corporation of Goa Ltd. (ITG) or its nominated agency
with a recommended exit management plan ("Exit Management Plan") which shall deal with at
least the following aspects of exit management in relation to the MSA as a whole and in relation to
the Project Implementation, and the Operation and Management SLA.
A. A detailed program of the transfer process that could be used in conjunction with a
Replacement bidder including details of the means to be used to ensure continuing
provision of the services throughout the transfer process or until the cessation of the
services and of the management structure to be used during the transfer;
B. plans for the communication with such of the bidder's sub-contractors, staff,
suppliers, customers and any related third party as are necessary to avoid any
material detrimental impact on the Info Tech Corporation of Goa Ltd. (ITG)‟s
operations as a result of undertaking the transfer;
C. (if applicable) proposed arrangements for the segregation of the bidder's networks
from the networks employed by Info Tech Corporation of Goa Ltd. (ITG) and
identification of specific security tasks necessary at termination;
D. Plans for provision of contingent support to Info Tech Corporation of Goa Ltd. (ITG),
and Replacement bidder for a reasonable period after transfer.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 78 | P a g e
II. The bidder shall re-draft the Exit Management Plan annually thereafter to ensure that it is
kept relevant and up to date.
III. Each Exit Management Plan shall be presented by the bidder to and approved by the Info
Tech Corporation of Goa Ltd. (ITG) or its nominated agencies.
IV. The terms of payment as stated in the Terms of Payment Schedule include the costs of the
bidder complying with its obligations under this Schedule.
V. In the event of termination or expiry of MSA, and Project Implementation, each Party shall
comply with the Exit Management Plan.
VI. During the exit management period, the bidder shall use its best efforts to deliver the
services.
VII. Payments during the Exit Management period shall be made in accordance with the Terms
of Payment Schedule.
VIII. This Exit Management plan shall be furnished in writing to the Info Tech Corporation of Goa
Ltd. (ITG) or its nominated agencies within 90 days from the Effective Date of this
Agreement.
4 Detailed Implementation and Roll-out Plan
I. Bidder shall prepare a detailed roll-out plan for each of the districts in the phase and get the
same approved by the Info Tech Corporation of Goa Ltd. (ITG). Bidder is also responsible for
conducting workshops for the key officers (Info Tech Corporation of Goa Ltd. (ITG), DoIT,
District Core Team, NIC, SPMU, SeMT and NPMU) of the Districts / State for presenting
the District-Wise roll-out plan and gets the approval of the same.
II. Before getting the final approval of the State Nodal Officer, the bidder shall also provide
the necessary assistance for the key stakeholder of the Districts / State during the design
and implementation of e-District project in the Goa. A detailed rollout checklist should be
maintained for migrating application to production as well as for location readiness.
III. One of the important factors that would determine the success of the e-District
implementation in the state of Goa is the continuous availability of domain experts like
Project Manager, Database Administrator, Change Management Expert, Technical
Assistance, to the implementation team which would be selected with the approval of SDA.
Bidder shall put together a team of domain experts with a minimum of 10 years of
experience in the State Departments who will work on this project on a full time basis
during the entire duration of the project.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 79 | P a g e
5 Annexures
5.1 Template for Capturing Office Wise Requirements
S.
No
District Office Name Office ID Office Address e-District
Service
being
delivered
from this
office
Approx
. No. of
Users
Level of
Office
(Distric
t / Block
/
Taluka/
Others)
Network
Availability
?
(Yes/ No)
Additional
H/W
Required?
(Yes/ No)
Site
Preparation
Required?
(Yes/ No)
1. NORTH
GOA
/SOUTH
GOA
Collectorate
Office
(North/South
)
COLLECT
ORATE
South Collectorate,
Margao, Goa
North Collectorate
Panaji,Goa
10 84 26 YES YES NO
2. NORTH
GOA
/SOUTH
GOA
Dept. of
settlement
and land
records
DSLR Collectorate
Building, Swami
Vivekanand Road,
Panaji. 403001
1 24 6 YES YES NO
3. NORTH
GOA
/SOUTH
GOA
State
Information
Commission
SIC SIC, Shrama Shakti
Bhavan, Ground
Floor, Patto,
Panaji, Goa -
403001.
1 7 1 YES YES YES (1
Office)
4. NORTH
GOA
/SOUTH
Municipality MUN North Goa:- H.NO.
238, Salcho wado
Assonora Bardez
1 36 13 YES YES NO
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 80 | P a g e
GOA Goa;
South Goa:-
Curchorem-Cacora
Municipal Council,
Curchorem, Goa
5. NORTH
GOA
/SOUTH
GOA
Directorate of
Panchayat
PYT Directorate of
Panchayats, Junta
House, 3rd Floor,
Panaji, Tiswadi,
Goa-4o3001
1 210 205 YES YES NO
6. NORTH
GOA
/SOUTH
GOA
Dept. of
Transport
TRANS Directorate of
Transport, Junta
House, 1st Floor,
Panaji-Goa
2 40 13 YES YES NO
7. NORTH
GOA
/SOUTH
GOA
Dept. of
Fisheries
FISH Directorate of
Fisheries, Govt.of
Goa,Dayanand
Bandokar Marg
Panaji - Goa.
1 15 6 YES
(Required in
4 sub offices)
YES YES ( 4
offices)
8. NORTH
GOA
/SOUTH
GOA
Dept. of
Tourism
TOUR Department of
Tourism
Government of Goa
Purshottam
Bhagwan Building
Dr. Atmaram
Borkar Road, Opp.
Hotel Nova Goa,
1 13 7 YES
(Required in
1 sub offices)
YES YES (2
offices)
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 81 | P a g e
Panaji, Goa- 403 001
9. NORTH
GOA
/SOUTH
GOA
Captain of
Ports
COP Captain of Ports,
Dayanand
Bandodkar Road,
Near Old
Secretariat,
Panaji, Goa –
403001
2 9 2 YES YES NO
10. NORTH
GOA
/SOUTH
GOA
Registration
Dept.
REGMR Shrama Shakti
Bhavan,, Patto,
Panaji, Goa -
403001.
1 24 15 YES YES YES (1
office)
11. NORTH
GOA
/SOUTH
GOA
Dept. of
Sports
SPORT Directorate of
Sports and Youth
Affairs,
Campal, Panaji -
Goa
4 20 13 YES
(required in
10 offices)
YES YES (10
offices)
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 82 | P a g e
5.2 Template for Capturing Network Connectivity Requirement
S.
No
Office ID GBBN
Available?
(Yes / No)
GBBN Available GBBN Not Available
Type of
connectivity
Existing
service
provider
Service level
/ baseline
(Up to PoP)
Distance
from
nearest
GBBN
POP
Bandwidth
required
Type of
Technology
to be used
Equipment
(Router,
Switches,
OFC, etc.)
required
1. COLL. OFF YES Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
- - -
2. DSLR YES Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
- - -
3. SIC YES Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
2 Mbps - -
4. MUN YES Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
- - -
5. PYT YES Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
- - -
6. TRANS YES Optical Fibre UTL (United 2 Mbps 500 mtr. - - -
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 83 | P a g e
Cable Technologies
Limited)
Approx.
7. FISH YES
(Required in
4 Sub Offices)
Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
2 Mbps - -
8. TOUR YES
(Required in
1 office)
Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
2 Mbps - -
9. COP YES Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
- - -
10. REGMR YES Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
- - -
11. SPORT YES
(required in
10 offices)
Optical Fibre
Cable
UTL (United
Technologies
Limited)
2 Mbps 500 mtr.
Approx.
2 Mbps - -
Note: This is a sample table – to be modified based on the actual requirements of the proposed solution by SI’
Type of Technology to be used has to be updated based upon proposed solution by bidder and approved by DoIT & ITG.
Equipment (Router, Switches, OFC, etc.) required has to be updated based upon proposed solution by bidder/SI and approved by DoIT & ITG
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 84 | P a g e
5.3 Tentative Hardware Requirement
e-District Goa
S. No Hardware Type Hardware to be procured
1. Desktop/ Computer 369
2. Laptop 1
3. Digital Web camera 10
4. Heavy Duty Scanners (A4 size) 9
5. Heavy Duty Scanners (A3 size) 3
6. Heavy Duty Laser Printer (A4 size) 108
7. Heavy Duty Laser Printer (A3 size) 2
8. Passbook Printers 2
9. UPS (1 KVA, Online) 178
10. Networking Points 400
11. UPS Electrical Points 500 Note: This is a reference table – to be modified based on the actual requirements of the proposed solution by the bidder
5.4 Template for Capturing Site Preparation Requirement (If Any)
S. No Office ID Site Preparation Required to
be done?
(Yes / No)
If Yes, then details of Site Preparation requirement
1. GOA. COLLECTORATE NORTH NO
2. GOA. COLLECTORATE SOUTH NO
3. GOA.DSLR NO
4. GOA.SIC YES (1 Office) LAN, Networking & Electrical work (if any)
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 85 | P a g e
5. GOA.MUN NO
6. GOA.PYT NO
7. GOA.TRANS YES ( 4 offices) LAN, Networking & Electrical work (if any)
8. GOA.FISH YES (2 offices) LAN, Networking & Electrical work (if any)
9. GOA.TOUR NO
10. GOA.COP NO
11. GOA.REGMR NO
12. GOA.SPORT YES (10 offices) LAN, Networking & Electrical work (if any)
Note: This is a reference table – to be modified based on the actual requirements of the proposed solution by the bidder
Details of site preparation requirement has to be updated based upon proposed solution by bidder and approved by DoIT & ITG
5.5 Template for Data Entry
I. The bidder has to deploy suitable sets of workable set of computers and data entry operator for completing the data entry
assigned to them with in timeline.
II. Among all system there should be one server system.
III. The data entry will be done on the provided software.
IV. Quality Check
o The bidder should ensure 98% data accuracy.
o Random checking will be conducted by the officer/agency appointed by the data digitization committee.
V. Location of work
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 86 | P a g e
o Centralized – District Administration North & South District and other line departments will provide space for setting
up temporary working office in District for project duration.
VI. Loss of data
o Bidder should take good care of all Government records and will be responsible for security of the record from time of
receipt to time of delivery.
o Penalty for per record will be charged against the loss or damage of record.
o The bidder should not accept illegible record. Non-readable record at the time of returning of the data will be
considered as damaged record.
VII. Selected bidder/SI shall conduct a ground study service wise to bring out the exact Data Digitization Requirement for the
services selected for e-District Roll-Out. The approximate nos. of records for Data Entry is already specified table below.
S.No Department
Name
Service Name Job description Estimated Quantity (approx.) Location of
the database
where it is
placed
Approx.
Transactions
(Approx.) / per
office (Monthly)
No Of
offices
Total Units
(Approx.)
1
Collectorate
Office (North
Goa /South
Goa)
Issuance of Income
certificate
Digitization of
filled
application form
& Output 400
26
10400
Refer to
Annexure of
RFP Vol. I for
office details
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 87 | P a g e
2
Issuance of Domicile
certificate
Digitization of
filled
application form
& Output 100 2600
3
Issuance of Residence
certificate
Digitization of
filled
application form
& Output 7355 191230
4
Issuance of Divergence
certificate
Digitization of
filled
application form
& Output 415 10790
5
Issuance of
Caste/Community
certificate
Digitization of
filled
application form
& Output 1933 50258
6
Issuance of Matriz
certificate - 50 1300
7
Revenue court cases-Case
listing/adjournment/stay/
Final/Status
Digitization of
filled
application form
& Output 846 21996
8
Application/Renewal of
Arms License
Digitization of
filled
application form
& Output 40 1040
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 88 | P a g e
9
Application for Sound
permission
Digitization of
filled
application form
& Output 23 598
10
Application and
Disbursement of Relief for
victims of Natural
Calamity
Digitization of
filled
application form
& Output 15 390
11
Dept. of
settlement
and land
records Issuance of Form I & XIV - -
6
-
12
State
Information
Commission RTI filling and status
services
Digitization of
filled
application form
& Output NA
1 + 8 ( other
concerned
departments
covered
under e-
District) NA
13
Municipality Issuance of Birth/Death
certificate
Digitization of
filled
application form
& Output 50000
3
150000
14
Directorate of
Panchayat Issuance of Birth/Death
certificate
Digitization of
filled
application form 487
205
99835
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 89 | P a g e
& Output
15 Dept. of
Transport
Application for grant of
subsidy for replacement of
buses/mini buses above 15
years old
Digitization of
filled
application form
& Output TBD
13
TBD
16
Application for grant of
subsidy for Yellow/Black
Motorcycle ,Auto
Rickshaw, Taxi Scheme
2003
Digitization of
filled
application form
& Output TBD TBD
17
Dept. of
Fisheries Application for
Registration/ Renewal of
Fishing Nets
Digitization of
filled
application form
& Output 200
6
1200
18
Dept. of
Tourism Registration of New water
sports activity
Digitization of
filled
application form
& Output TBD
7
TBD
19
Captain of
Ports Registration/Renewal of
Inland Vessel
Digitization of
filled
application form
& Output 20
2
40
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 90 | P a g e
20
Registration/Renewal of
Water Sport Vessel
Digitization of
filled
application form
& Output 900 1800
21
Registration
Dept. Application for Marriage
Registration certificate
Digitization of
filled
application form
& Output 4500
15
67500
22
Dept. of
Sports
Registration of Schools for
participation in Games
Digitization of
filled
application form
& Output 400
13
4800
23
Application for Sportsmen
certificate
Digitization of
filled
application form
& Output 60 720
24
Registration/Application
for entry into State Youth
Festival
Digitization of
filled
application form
& Output 100 1200
25
Application for grant-in-
aid for various Educational
Institutes
Digitization of
filled
application form
& Output 150 1800
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 91 | P a g e
26 All
Departments
Recruitment form for non-
gazette post of various
Depts. across State
Digitization of
filled
application form
& Output
-
27
Form for Scheme
management
Digitization of
filled
application form
& Output
-
Total 633897 Refer to Annexure in As Is Process for sample of form & fields to be digitized.
Digitization & Scanning has to be done in consultation with concerned department as per requirement and may vary from case to case.
The figures in this table are for reference purpose only and need to be modified on the actual requirement.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 92 | P a g e
5.6 Template for Preparing FRS and Process Maps (with illustrative data)
Sample Process and FRS
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 93 | P a g e
Registration DepartmentR
egis
trar
/Su
b R
egis
trar
Dea
ling
/Reg
istr
atio
n
Cle
rkE
-Dis
tric
t A
pp
licat
ion
Ap
plic
ant
(E
SO
)
Marriage registration certificate
Yes
On receiving
signature from
applicant marks
dealing/
registration clerk
for publication of
notice
Conducts
verification (if
required) & finvites
bride & groom for
signature
Start
Form Availability
Component
System update
database &
notifies
Registrar/Sub
registrar &
applicant
Receives
application
Verifies bride &
groom and witness
Identification
Applicant apply
online or in ESO
Updates marriage
registration
certificate &
Notifies
Signs to
validate
Payment
Component
System updates
database &
notifies
concerned
officials &
applicant for
publication & 10
day date as per
notice
Application Receipt
Component
System
Updates
database
Receives notification &
copy of marriage
registration certificate
(hard or soft copy)
with unique no
System logs the application
assigns unique number &
Notifies registrar/Sub registrar
END
Verifies
documents &
application
No
Invites bride &
groom for signature
& marks copy to
dealing/registration
clerk for
verification ( if
required)
Information
Availability
Component
System Gives
service related
information/
Notification
System Updates
database
Applicants comes
to Registrar Office
and signs marriage
register in person
Bride & groom with
two witnesses
appears in registrar
office after 10 days
of notice
Take signature from
applicant & witnesses on
edistrict application with
biometric identifications
& registers the marriage
marks dealing/
registration clerk for
Issue of marriage
registration certificate
Receives
intimation
Uploads /
publishes on
state/department
portal with FAQ
Yes
No
Generates
online
marriage
registration
certificate
with unique
No.
after
collecting
fee if any
Updates data
base with issue
of certificate to
applicant
(printed copy or
soft copy by
mail)
Receives
intimation
RFP for Selection of System Integrator for State-wide roll-out of eDistrict MMP in Goa – Volume II
To-Be Process for Marriage registration certificate
S.No. Responsibility Process Details
1. Citizen Apply for issue of Marriage registration certificate at ESO/CSCS Centre or Login to state/e-District portal and on successful submission of requested service receives the application receipt/ acknowledgement no.
2. ESO/CSCS Operator
ESO/CSCS operator logs into the e-District application through user name and password security. ESO/CSCS operator authenticates the system login through the same. Biometrics feature can be used for log In
3. After getting satisfied ESO/CSCS operator submits the service request and provides applicant a unique service request number/acknowledgement and prospective date of delivery.
4. Registrar/Sub Registrar
Receive a notification from the e-District application for Marriage registration certificate Verifies received application and documents And forwards to dealing /registration clerk for processes-sing of the application and to conduct verification (if required)
5. Dealing Registration/Clerk
Conducts verification (if required)
6. Invites Bride & Groom for signature
7. Applicant Visits registration department on the date as mentioned in the notice for appearance from registration department online through email, SMS, and through ESO/CSCS
8. ESO/CSCS Operator
Intimates applicant to appear on the date as mentioned on appearance notice
9. Civil registrar/ Sub registrar
Sends notification (through e-District Application) to applicant to be present on the date as mentioned or suggest if applicant require some other date (with reason)
10. Marks application for publication of notice after obtaing the signatures of Bride & Groom and forwards to dealing/ registration clerk
11. Dealing/ Section Clerk
Publishes notice as required through e-District application for a period of 10 working days
12. Citizen/ Applicant
Bride-groom, Bride and 2 witnesses [ (Parents ( if required) , additional witnesses of Interpreter, etc., if advised) ] appears in registration office after 10 working days
13. Civil Registrar Captures signatures and biometric identifications of bride & groom and of 2 witnesses on the marriage registration certificate e-District application and registers marriage. Forwards application to the concerned Dealing/Registration clerk for processing & verification of marriage registration certificate
14. Dealing/ Section Clerk
Provides a printed or a soft PDF copy of the marriage certificate with unique Certificate no. digitally signed by the Registrar to the applicant and updates e-District application for the same after collecting fee (if any)
15. Citizen/ Applicant
Receives printed or a soft PDF copy of the marriage certificate and a notification through email or sms or through ESO/CSCS
16. e-District Notifies & Generate a predefined standard text message of
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 95 | P a g e
application confirmation on successful registration of service request and information on the department where the application file has been sent Intimates citizen through SMS or email to collect service related output/notice whenever available with FAQ
17. -District application checks the application request and does the following. Does not accept application submission if the application does not fill mandatory fields for eligibility Sorts & scrutinize application as per different categories set by department (if any). Generates unique acknowledgement no. for every submitted application Perform data validation checks on the input. In case of data being duplicated, display the existing service request id & existing record if any
18. Notifies to authorized authority and concerned official for every activity performed regarding service request on e-District application
Tracking Status of Marriage registration certificate
The Status tracking component is the new feature which is being proposed through e-District application to the applicant. This feature would provide a „Window‟ to applicant to know the status of their application during execution of orders. The status tracking component allows the following medium to provide the information – ESO/CSCS Centre - Applicant visits any ESO/CSCs centre and provides the acknowledgement number. The operator would retrieve the information from the e- District application and provide the information to applicant Mobile Service – If applicant have provided the mobile number during registration process of the service, then the system generated SMS would be send to the applicant updating the status of the service. E-mail Service – If applicant has provided the email Id. during registration process of the service, then the system generated e-mail would be send to the applicant updating the status of the service. State/Department Web Portal: The applicant can also know the status of the application through logging onto the e-District web portal. By entering the acknowledgement number the applicant would be provided with the status details of the application Call Center: The applicant can dial in to a call center and know the status of the application by quoting his application number.
Tracking Status
S.No. Responsibility Process Details
1. e-District Application
e-District application would generate a predefined standard text message or updated of confirmation on successful registration of service request and information on the department where the file has been sent.
2. e-District Application
e-District application would generate a predefined/customized standard text message or message updated by department regarding the rejection of the application
3. e-District Application
e-District application would generate a predefined standard text message mentioning the application is undergoing official
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 96 | P a g e
verification. Applicant can also make request through SMS / ESO/CSCS center/ Call center for status
4. e-District Application
e-District application would generate a predefined/customized standard text message or message updated by department of the physical verification date of the application and the availability of the notice. Applicant can also make request through SMS / ESO/CSCS/ Call center for status
5. e-District Application
e-District application would generate a predefined/customized standard text message or message updated by department mentioning the rejection and the reason for rejection. Applicant can also make request through SMS / ESO/CSCS/ Call center for status
6. e-District Application
e-District application would generate a predefined/customized standard text message of the availability of Marriage registration certificate that can be either downloaded from e-District Application. Applicant can also make request through SMS / ESO/CSCS/ Call center for status
Data Base Required (Marriage registration certificate) Marriage registration certificate database will contain details like: 1. Name of Bride & Groom 2. Application Number 3. Birth Certificate of Bride and groom 4. Domicile/residence Cert. (Continuous residence) issued by Mamlatdar/ Sarpanch of
Taluka/Village 5. NOC from the Civil Registrar of other taluka if one of the party resides in that taluka (for final
registration) 6. Fee (as prescribed by department) 7. Age 8. Address 9. Requested information details 10. Details of witness 11. Declaration of Marriage form with supporting documents
The database would also maintain an application summary, Information report from Concerned department official and copy of initial permission if any (if required) The database for Marriage registration certificate of all the running applications after go live will be maintained incrementally. This digitized database would be referred to as authenticated database for issuing digitized copy of Marriage registration certificate to applicant. All the data in the e-District database would be archived every six month The following are the indicative fields of the proposed database: S. No. Databases Needed for Online Validation
1. Name of Bride-groom & Bride
2. Address of Bride-groom & Bride Village Taluka District
3. Information of Marriage registration certificate application
4. Parents name of bride & groom
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 97 | P a g e
5. Office filed at
6. Approval/Rejecting Authority
7. Validation Concerned department official
8. Allotted application number
9. Contact details (e.g. mobile no. , email Id, etc.)
10. Date & Time of filling the marriage registration application
11. Date & Time of issue of marriage registration certificate
12. Date & Time of issuing/rejecting for Issuance of marriage registration certificate
13. Status of Application
14. Details of witness
15. Remarks
16. Any other records ( as required by department)
Digital Record e-District Application All transactional records pertaining to the issuance of marriage registration certificate applications service request should be maintained in the State/e-District database. Date and time stamping on all the action taken on any given service request by the involved actors should be maintained. State/e-District database should maintain the approved and closed service request separately tagged with the unique „Document Serial Number‟ generated for the documents.
Designation Create Read Update Delete
Registrar Yes Yes Yes No
Sub- Registrar Yes Yes Yes No
Dealing/ Registration Clerk Yes Yes Yes No
General Anonymous Access
No Yes No No
Record View for Logged In User Login View would be made for all the users of the application would be common Records view for a Logged in Civil Registrar/Sub Registrar, Dealing/Registration Clerk and any Department official in the e-District application
Sr.No Fields Description of the view
1. Marriage registration certificate section of Registration Department Details
2. Application Number
3. File No:
4. Date of applying for Marriage registration certificate
5. Date of service summaries or date of intimation of application
6. Name of the Bride & Groom (s)
7. Name of validating Civil Registrar/Sub Registrar
8. Name of the Dealing /Registration Clerk(s)
9. Issuance of Marriage registration certificate Sought for
10. Section(s) under Issuance of Marriage registration certificate is issued
11. Name of witnesses
12. Whether Marriage registration certificate issued or not?
13. Specify if the reason for rejection (if rejected)
14. Date of Issue of Marriage registration certificate
15. Remarks / Summary of the application
16. Status of the Application (Registered, under progress/Approved/Rejected)
17. Supporting documents
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 98 | P a g e
The fields required in uploading a Final copy of Marriage registration certificates are as follows:
Sr.No Fields Description of the view
1. Issuance of Marriage registration certificate fields
2. Option to add remarks & uploads
3. Date of application request
4. Application request no.
5. Proposed date of delivery
6. Option to verify from Database
7. Action option to lead to next Record View
Concerned department official Record View Concerned department official view related service request allocated
Sr.No Fields Description of the view
1. Marriage registration certificate fields
2. Remarks (if any)
3. Option to add remarks & update
4. Option to verify from database
5. System generated application no.
6. Date of service request
7. Proposed date of delivery
8. Approval option / Rejection option
9. Save / Submit option
Digital Signature Requirement The following table specifies the designations that need to receive the Digital Signatures or the number of digital signatures required: Digital Signatures Required: Certificate
Sr.No Designation Digital Signature Requirement (Nos.) for both Districts
1. Civil Registrar ...(South Goa) + ……(North Goa)
2. Sub Registrar …(South Goa) + ………(North Goa)
3. Other authorized department official ( if any)
…(South Goa) + ………(North Goa)
Management Information System (MIS) The e-District application should meet the information requirement of district administration and should be able to generate required reports on a defined frequency. The e-District application should generate the following reports – Standard Reports MIS Report 1: Overall Marriage registration certificate Data – Daily/Weekly/Monthly/Yearly Reports
S. No Name of the Registration Department Office , Dept. / Issuing section
Number of Applications received
Number of Marriage registration certificate Issued
Number of Applications Pending
Amount of application fees collected
1.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 99 | P a g e
2.
3.
4.
5.
Customized Reports The e-District application should be able to generate customized report on demand of the user. The authority to generate customized report would be with the State Registrar, District Registrar, and Registrar/Sub Registrar, Dealing /Registration clerk and Concerned department official Any officer senior to Civil Registrar of Registration Department would also have the rights to generate customized report. The e-District application should be able to generate the customized report on the following parameters – 1. Between defined periods - “From- date” to “To-Date” 2. Pendency report - Date wise MIS Report 2: Between defined periods - “From- date” to “To-Date”
Sr.No.
Date (descending order)
Unique Service Request number
DSN Number
Sub service requested (Marriage registration certificate)
Applicant Name Status
1
MIS Report 3: Pendency Report – Date Wise
Sr.No
Date (descending order)
Unique Service Request number
Sub service requested (Certificate)
Application Status
Proposed date of service delivery
Actual date of delivery/ Status
1
MIS Report 4
Sr.No.
Name / Designation of the Officer
Applications Completed within defined SLAs
Number of Application exceeding SLAs
Current owner of the application after escalation
1
2 3 4
MIS Report 5
Sr. No.
Name of the Registration Department office & Issuing Section
Application requiring Concerned department official validation
Total number of Application received
%age of the application requiring Concerned department official validation
1
2
3
4
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 100 | P a g e
Service Level
S. No Activity
Service Level in
days
Service Level
from day of
Application
1. Application Receipt and Forward to
Registrar/Sub Registrar.
1 day 1st day
2. Registrar/Sub Registrar checks details in
the Database
1 day 2nd day
3. Registrar/ Sub Registrar Approves or
Rejects the application using his digital sign:
- If approves then order for publication of notice (10 days statutory waiting period) after taking signature of applicant
- Orders for verification if required
1 day
2nd day
4. Registrar/Sub Registrar officially takes
signature of bride & groom supporting two
witness
1 day 12th day
5. Issues Marriage Registration Certificate to
bride & groom
1 day 12th day
Auto Escalation Matrix
Auto Escalation Matrix: Marriage Registration Certificate
S.No Activity Activity
Owner
Service
Level
L1 L2 L3
Design
ation
Tim
e
Design
ation
Tim
e
Design
ation
Time
1. Registrar checks details in the Database and either approves/rejects the application or forwards for verification
Registrar/Sub Registrar
1 day Registrar/Sub Registrar
2days
District Registrar
2 days
State Registrar
2day
2. Processing of Marriage registration certificate for publication
Dealing/ Registration Clerk
1day Registrar/Sub Registrar
2day Registrar/Sub Registrar
1 day
District registrar
1day
3. Validation & Issuance of Marriage registration certificate
Registrar/Sub Registrar
1 day Registrar/Sub Registrar
1days
District registrar
2days
State registrar
1day
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 101 | P a g e
Functional Requirement Specification – (Marriage Registration)
Sr. No Description
1. System shall allow applicant/ESO/CSCS/CFC operator to select Registration Department from the Home page of the State Portal
2. System shall allow applicant to select application for Application for marriage registration certificate on the department page of the state portal
3. System shall allow registration of applicant for future login and ease
4. System shall allow applicant to fill/edit e-Form/Application online & offline
5. System shall accept filled e-Form/application of new applicants
6.
System shall be able to capture the applicants details through an electronic form such as:
1. Name (Bride & Groom) 2. Contact Details 3. PIN 4. Age 5. Area of residence 6. Details as required in application form used at present 7. Unique Identification (UID) 8. E-mail id (if any) 9. Mobile No. (if any)
7. System shall be able to identify the user logging into system using the login component.
8.
System shall be able to provide information to the citizens about Marriage services both in public as well as private domain as per the „Information component‟ -Web access to information content in public domain - e-District application access to information content
9. System shall be able to channel as per the process map and description for the service
10. System shall make available the latest copy of the Application Form online (24x7) as per the Form Availability component.
11. System shall allow the operator to fill in the online application on behalf of citizen availing the service as per the „application receipt‟ component
12. System shall be able to generate a unique registration number during registering an applicant with the application.
13. System shall be able to identify the applicant uniquely based on this registration number.
14. System shall be able to record the payment made by the applicant against the Application as per the Payment Component
15. System shall display a message regarding successful or unsuccessful completion of any transaction.
16. System shall refresh the page in case of failure in submission of service request
17. System shall be able to notify the Registrar/Sub Registrar about the new application and the date and time must be logged & Should be able to route the application to the Registrar/Sub Registrar.
18. System shall allow concerned officials to view the service request on authenticated login
19. System shall allow Registrar/Sub Registrar to accept or reject any service request application
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 102 | P a g e
20. System shall request Registrar/Sub Registrar to provide comments in case of rejection
21. System shall save the acceptance / rejection only after digital signature of the Registrar/Sub Registrar
22.
System shall show service request to concerned Registrar/Sub Registrar as pending for approval till it is marked for further action -by default System shall be able to auto escalate within the service level as per the escalation matrix defined
23. System shall load a page to enable Registrar/Sub Registrar to assign verification responsibility to concerned authority
24. System shall auto generate notification to concerned official once the Registrar/Sub Registrar has assigned officer for physical verification
25. System shall allow the concerned officer to view the service request after authentication of username and password
26. System shall allow officer to print the details of service request application form to have a hard copy of the same
27. System shall allow the officer to update the verification details in relevant database (Marriage Database).
28.
System shall be able to auto generate MIS reports for the following officials -State Registrar -District Registrar - Civil Registrar/Sub Registrar
29. System shall allow the officer to electronically forward the application to the Registrar/Sub Registrar using his digital signature
30. System shall allow concerned Registrar/Sub Registrar to view changes made in the database by the officer
31. System shall be able to support the status tracking component as defined in the process map for status tracking
32. System shall be able to support the monitoring and reporting component as defined in the process map for monitoring and reporting
33. System shall be able to detect changes in status and send status updates to the citizen as per the Status Tracking component
34. System shall be able escalate the application as per the Auto Escalation matrix defined in Auto Escalation Matrix table, by notifying the next level of authority and sending him a copy of the application
35. System shall be able to maintain all records for the login sessions with date and time
36. System shall be PKI enabled to accept digital signatures for digitally signing documents for marriage registration certificate.
37. System shall have a facility for forwarding of the application, with remarks and digital sign of the sender, to any person in District administration registered with System
38. System shall be able to provide date and time stamping for all transactions done with digital signature
39. System shall consider the list of holidays for tracking the timelines of various activities.
40. System shall support multilingual interface (minimum Konkani, Marathi and English as per Localization and Language Technology Standards for National e-Governance Plan defined in e-District guidelines
41. Registration/Renewal of fishing nets module of e-District application should be linked to general all service component appropriately as per department requirement –e.g. Information component, Form availability component etc.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 103 | P a g e
5.7 Template for Bill of Material
Form A: Bill of Material (Software at SDC)
System Software
Server OS 10
RDBMS 2
Virtualization software 1
Anti-Virus software 10
Form B: Bill of Material (Hardware at SDC)
Sl.
No
Description of Item Quantity (DC Site) Quantity (DR Site)
1. Database Server 2 1
2. Application Server 2 1
3. Web Server 2 1
4. Backup and Reporting Server
2 1
5. Development Server 2 1
6. Application Load Balancer 2 1
7. 10U Blade enclosure(Chassis)
1 1
8. L3 networking switch 1 NA
9. Tape Library 1 NA
10. Laptops 2 NA
11. 5TB SAN Box 1 NA
Note: 1. Procurement for DR site shall be done as and when required 2. SI is free to suggest alternate number of systems and their usability which best suits their proposed
application.
For hardware mentioned above, provide the following information in a table
(i) Reference of the server/storage information in the Submitted Proposal (Please provide
page number/section number/ volume)
(ii) Services proposed to be hosted on the Server
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 104 | P a g e
(iii) Quantity
(iv) Make and Model
(v) Year of Introduction
(vi) Operating System along with version (if applicable)
(vii) Processor and Number of Cores Offered (if applicable)
(viii) Architecture (RISC/EPIC/CISC) (if applicable)
(ix) RAM/HDD/LAN Ports/ HBA (as relevant)
(x) Additional Information as required to indicate the compliance to the requirements in the
RFP (ex, Capacity, Disk Space) (if applicable)
1 Web Servers
S.No. Item Description of Requirement ( Minimum)
Specifications offered
Compliance (Yes / No)
Deviations, if any
1
Processor Latest Generation x86-64
Bit Minimum Hexa-Core
Processor with Minimum
1.86Ghz Clock Speed and
12MB Cache with QPI
Technology or above
2
Number of
Processors
Offered Server should be
configured with 4 (Four)
Processors
3
Memory 64 GB DDR3 Memory Per
Server
4
Memory
Scalability
Memory Should be
Scalable up to 256 GB
5
PCI-Express Slots Server Should Have
Minimum 4 * PCI Express
Slots
6
Network
Interface Ports
Minimum 2, 10 gbps sfp
card
The NIC Ports should
support FCoE & iSCbidder
7
FC-HBA Ports Minimum 2, 8 Gb/s FC-
HBA Cards
8
Internal RAID Internal RAID Controller
should be able to do RAID
1,0
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 105 | P a g e
9
Internal /
External HDD
(For OS only)
Minimum 2* 50 GB SSD
10
Pre-Failure
Warranty
Critical Components like
CPU, Memory, SSD & PCI
Slots should be covered
under Pre-Failure
Warranty
11
Warranty
Coverage
Comprehensive onsite
warranty for 5 years.
12
OS &
Virtualization
Infrastructure
Support
MS Windows, RHEL,
SLES, OEL, Oracle Solaris,
VMWare Vsphere &
Microsoft HyperV
13
I/O & Power
Supply
Redundancy
Server Should have
redundant power supply
and redundant I/O
14 From Factor Blade
Database Servers
S.No. Item Description of Requirement ( Minimum)
Specifications offered
Compliance (Yes / No)
Deviations, if any
1
Processor Latest Generation x86-64
Bit Minimum Hexa-Core
Processor with Minimum
1.86Ghz Clock Speed and
12MB Cache with QPI
Technology or above
2
Number of
Processors
Offered Server should be
configured with 4 (Four)
Processors
3
Memory 64 GB DDR3 Memory Per
Server
4
Memory
Scalability
Memory Should be
Scalable up to 256 GB
5
PCI-Express Slots Server Should Have
Minimum 4 * PCI Express
Slots
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 106 | P a g e
6
Network
Interface Ports
Minimum 2, 10 gbps sfp
card
The NIC Ports should
support FCoE & iSCbidder
7
FC-HBA Ports Minimum 2, 8 Gb/s FC-
HBA Cards
8
Internal RAID Internal RAID Controller
should be able to do RAID
1,0
9
Internal /
External HDD
(For OS only)
Minimum 4 * 50 GB SSD
10
Pre-Failure
Warranty
Critical Components like
CPU, Memory, SSD & PCI
Slots should be covered
under Pre-Failure
Warranty
11
Warranty
Coverage
Comprehensive onsite
warranty for 5 years.
12
OS &
Virtualization
Infrastructure
Support
Should support the
following - MS Windows,
RHEL, SLES, OEL, Oracle
Solaris, VMWare Vsphere
& Microsoft HyperV
13
I/O & Power
Supply
Redundancy
Server Should have
redundant power supply
and redundant I/O
14 From Factor Blade
Blade Chassis
S.No. Item Description of Requirement Specifications offered
Compliance (Yes / No)
Deviations, if any
1
Blade Chassis Solution to house the
required number of blade
servers in smallest number
of enclosure
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 107 | P a g e
Same enclosure should
support Intel Xeon, AMD
Opteron or RISC/EPIC
blades. Enclosure should
also support Unix, Linux
and Windows Operating
environment.
Should have Hot Pluggable
& Redundant Management
Modules.
Should provide a highly
reliable and high
performance redundant
mid-plane/back-plane
design in the blade
enclosure. Should provide
detailed technical
information.
Should be able to
accommodate and
compatible with the OEM
blade servers specified.
Support simultaneous
remote access for different
servers in the enclosure.
2
LAN
Interconnect
Two or Four network ports
from each of the servers in
the enclosure should be
available on 10 Gigabit
LAN switch / Link
Aggregation Module / Pass-
through to connect to
external network devices...
3
Fibre Channel
Interconnects
Redundant 8GB Fibre
Channel Pass thru
Interconnect modules to
direct HBA cards to SAN
Switch/Storage.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 108 | P a g e
4
MAC Address &
WWN
Management
Blade Enclosure should
preferably support
management & deployment
of MAC Addresses of NIC
Adapters and WWN No of
FC adapters at the chassis
level so that replacement of
a server blade does not
involve Network & SAN
configuration effort at the
blade level
5
Power Supply The enclosure should be
populated fully with power
supplies of the highest
capacity & energy
efficiency available with
the vendor. Power supplies
should support N+N as
well as N+1 redundancy
configuration, where N is
greater than 1.
Guaranteeing complete
availability even on failure
of any 2 power supplies
across the enclosure
6
Cooling Each blade enclosure
should have a cooling
subsystem consisting of
redundant hot pluggable
fans or blowers enabled
with technologies for
improved power
consumption and acoustics
7
Redundancy The Midplane/Backplane,
all interconnect switches
the power bus running
across the chassis should be
in redundant configuration
8
System Software Management/controlling
software have to be from
the same OEM
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 109 | P a g e
9
Remote
Management
Must provide a remote
management functionality
to operate the server in both
in-band and out-of-band.
Must be part of the server
without the need to install
any additional hardware or
software
Must have Real-time
Virtual KVM functionality
and be able to perform a
remote Power sequence.
Must provide both Java &
Java-free browsing options.
10
Power
Management
Must be able to show the
actual power usage and
actual thermal
measurement data of the
servers.
Form C: Bill of Material (Infrastructure at Field Offices)
S.
No
Description of Item Total Quantity
1. Desktop/ Computer 369
2. Laptop 1
3. Digital Web camera 10
4. Scanners (A4 size) 9
5. Scanner (A3 size) 3
6. Heavy Duty Laser Printer (A4 size) 108
7. Heavy Duty Laser Printer (A3 size) 2
8. Passbook Printers 2
9. UPS (1 KVA, Online) 178
10. Networking Points 400
11. UPS Electrical Points 500
Important Note for bidders:
(i) It is mandatory to furnish complete technical specifications of the hardware & peripherals
being offered, strictly as per the format, provided here. Correct technical information of
the product being offered must be filled in.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 110 | P a g e
(ii) Filling the technical specifications/ information in the format using terms such as „OK‟,
„Accepted‟, „Noted‟, „As given in Brochure/ Manual‟, „Complied‟ is not acceptable. The
offers not adhering to these guidelines are liable to be rejected.
(iii) All relevant product information such as user manuals, technical specifications sheet etc.
should be submitted along with the offer. Failure to submit this information along with
the offer could result in disqualification of the bid.
(iv) In case any technical variance is offered, the same must be specified under the "Deviation, if
any" column.
(v) For each item listed below, the bidders should propose only one product.
(vi) These specifications should be considered as the minimum to be fulfilled.
1 A. Desktops /Personal Computer
S. No.
Items Specifications Specifications offered
Compliance (Yes /
No) if any
Deviations, if any
1.
Processor Intel core I5 3rd
generation or AMD
equivalent, 64bit x86
Processor @ 3.2 GHz or
more, 4MB L3 cache or
better, Memory support
DDR3 or better
specifications
2.
Motherboard
& Chipset
OEM Motherboard
3.
Video Integrated Graphic
controller
4.
Network Integrated 10/100/1000
Gigabit Ethernet
controller
5.
Ports 1 HDMI port
(Preferable), 2x USB 2.0
and 2 x USB 3.0
(Preferable) , 1xKeyboard
port, 1xMouse port , 4 in 1
Media Card Reader
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 111 | P a g e
(Preferable), Built in
microphone ,Stereo jack
6.
HDD
Controller
Integrated dual port
SATA-II controller
7.
Memory 4 GB DDR III 1333MHz
or higher expandable up
to 8 GB or more
8.
Storage 500GB sata II HDD 7200
RPM
9.
Optical Drive 22X DVD writer or
higher
10.
Monitor 18.5” TFT or more (4:3
aspect ratio) LCD
Monitor 1280 x 1024
resolution with 5 ms
response time or better
specifications, TCO 05
certified
11.
Keyboard Spill-resistant keyboard
(minimum 86 keys) with
bi-lingual keys ( English ,
Konkani and Marathi)
compliant to Enhanced
Inscript Keyboard based
on Unicode version 6.0 or
later.
12.
Mouse USB Optical Scroll
Mouse with anti-static
mouse pad resolution of
Optical 1000 cpi,
Complying to CE and
FCC norms
13.
Out Of Band
Management
Out-of-band management
preferable
14.
Power
Management
and DMI
System with Power
management features &
Desktop Management
Interface implementation
15. System Desktop with wired
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 112 | P a g e
Chassis keyboard and wired
mouse
16.
OS Support &
Certification
Windows 7
17.
Preloaded
Software
Above configuration
preloaded with Operating
system with English,
Konkani and Marathi
language packs, Business
productivity suit with
English, Konkani and
Marathi unicode fonts ,
Antivirus with all
necessary Plugns/ utilities
and driver software
including bundled in
DVD Media [ Antivirus
licence for 5 years
support and upgradation]
18.
Warranty
Coverage
Comprehensive warranty
for 5 years .( Onsite)
19. Power input 100 -240V AC
20.
- All in one PC preferable
for Field offices
1 A. LAPTOPS
S. No.
Features Specifications Specifications offered
Compliance (Yes / No) if
any
Deviations, if
any
1
Processor Intel Core i5 or higher or
AMD equivalent
2 Speed 3.0 GHz or Higher
3 Cache 3 MB Smart Cache or more
4 System Bus/QPI 2.0 GT/sec or higher
5 Mother Board Original OEM manufactured
6 Memory 4 GB DDR-III RAM (1066
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 113 | P a g e
MHz) or higher expandable
upto 8GB
7
Hard disk Drive 500 GB SATA (7200 RPM) or
higher capacity
8
Display 14.0" or above LED Wide
Screen Display
9 Resolution 1280 x 768 WXGA or higher
10 Video Graphics Integrated HD Graphics
11 Web Camera Integrated Web Camera
12
Wireless
Connectivity
Integrated Wireless 802.11
a/b/g/n, Integrated Bluetooth
2.0 or higher
13
Optical Drive Integrated 8X or higher DVD
Writer
14 Sound System Integrated Stereo Speaker
15
Keyboard Standard Keyboard with
Touchpad
16
Ports Minimum 3 USB Ports 3.0 or
higher, 10/100/1000 Ethernet
Card, RGB/S-Video/VGA,
HDMI, Microphone, Stereo
Head Phone, Media Card
Reader and other Standard
Ports
17
Battery Backup 6 cell Li-ion battery with re-
chargeable pack for around 6
hrs.
18
Certification Laptop manufactured in ISO
9001:2000, ISO 14001 plant
and DMI, FCC, UL, CE
compliance
19 Weight Less than 3 kg
20 Carry Case Good quality Carry Case
21
Warranty Minimum 5 Years on-site
Comprehensive on Laptop
and 3 year on battery
22
OS Support &
Certification
Windows 7
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 114 | P a g e
2 Scanner( A4 Size)
S.No. Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
1 Make Must be specified NA
2 Model All the relevant
product brochures
and manuals must
be submitted.
NA
3 Scanner type Legal Size Flatbed
4 Scan
technology
Charge Coupled
Device (CCD)
5 scan speed min 20 PPM
6 ADF capacity 50 sheets
7 Duty cycle Min 800 pages per
day
8 Scan
resolution:
Min 600 dpi
9 Output
resolution
dpi settings
300, 600
10 Color bit
depth
24-bit
11 Grayscale
levels
256
12 Double-feed
detection
Yes
13 File formats BMP, JPG, TIFF,
TIFF (compressed),
multi-page TIFF,
PNG, PDF, RTF,
TXT, UNICODE,
HTM, DOC
14 Connectivity Hi-Speed USB 2.0
15 Software Ibidder S and
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 115 | P a g e
S.No. Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
Twain drivers
16 Compatible
operating
systems
Windows XP,
Windows Vista,
Windows 7, MAC
OS 9.0, MAC OS X,
Linux Kernel 2.4 or
later
3 Laser Printers (A4 size, heavy duty & network)
S.
No
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
1 Make Must be specified NA
2 Model All the relevant
product brochures
and manuals must be
submitted.
NA
3 Speed (min.) min 20 PPM (A4)
4 Memory(min.) min 8 MB
5 Resolution 600x600 dpi
6 Interface
USB, Ethernet (UTP)
with respective cables
7 Monthly Duty
Cycle
min 10000 Pages
8 Drivers Windows XP,
Windows Vista,
Windows 7, MAC OS
9.0, MAC OS X,
Linux Kernel 2.4 or
later
9 Duplex Automatic Duplex
4 Other Printers (A3, heavy duty & network)
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 116 | P a g e
S.
No
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
1 Make Must be specified NA
2 Model All the relevant
product brochures
and manuals must be
submitted.
NA
3 Speed (min.) ISO / IEC 24734
min 12 PPM - Black
(A4)
4 Memory(min.) min 8 MB
5 Resolution 600x600 dpi
6 Interface
USB, Ethernet (UTP)
with respective cables
7 Monthly Duty
Cycle
min 10000 Pages
8 Drivers Windows XP,
Windows Vista,
Windows 7, MAC OS
X, Linux Kernel 2.4
or later
9 Duplex Automatic Duplex
5 UPS – 1 KVA online UPS
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
1 Make Must be specified NA
2 Model All the relevant
product brochures
and manuals must
be submitted.
NA
3 Power Rating 1 kVA/ 700 W with
30 min backup
4 Technology True On-Line
Double Conversion
Architecture
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 117 | P a g e
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
5 Nominal input
voltage (VAC)
220/230/240 VAC
6 Input voltage
Range
160-300 VAC
7 Operating
Frequency
50Hz
8 Nominal output
Voltage
230 VAC
9 Output voltage
Regulation
+/-1.5%
10 Overload
Capacity
Up to 110 % for 30
sec, 111-150% for
200ms
11 Efficiency Min. 85% (On-Line
mode)
12 Load Crest Factor 3 : 1
13 LED LCD Display having
complete
information about
the Input and
Output data
14 Standard
Communication
ports
RS232
15 Form Factor Floor Mounted type
16 Battery Type Sealed Maintenance
Free
17 Battery Runtime For 30 Min. backup
minimum VAH
should be 900.
Total number of
batteries offered
should be clearly
mentioned.
Voltage of each
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 118 | P a g e
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
battery offered
should be clearly
mentioned Ampere-
Hour rating of each
battery offered
should be clearly
mentioned. Total
Volt-Ampere-Hour
rating of the Battery
Bank Offered should
be clearly
mentioned
18 Start-On-Battery Should allow
startup of UPS
without utility input
19 Operating Temp. 0°C - +40°C
20 Storage Temp Recommended 0°C -
+40°C
21 Audible Noise <50 dB battery mode
22 RoHS
Compliance
Should be EU RoHS
/ WEEE Compliant
23 Markings CE
24 Safety IEC 60950
25 EMC EN 50091-2
/equivalent
6 As an when required the bidder is expected to procure 8, 16 & 24 Port Switch with the
following specifications
8, 16 & 24 Port Switch
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations
, if any
1 Make Must be specified NA
2 Model All the relevant
product brochures and
manuals must be
submitted.
NA
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 119 | P a g e
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations
, if any
3 Standards 1. IEEE 802.1D
2. IEEE 802.1p
3. IEEE 802.1Q
4. IEEE 802.1s
5. IEEE 802.1w
6. IEEE 802.1x
7. IEEE 802.1ab
8. IEEE 802.1ad
9. IEEE 802.3
10.IEEE 802.3u
11.IEEE 802.3ab
12.IEEE 802.3z
13.RFC 854
14.RFC 951
15.RFC 1305 / RFC2030
4 Protocol CSMA/CD
5 Throughput Min 8 Gbps
6 Data Transfer
Rates
Non-Blocking
Architecture
7 Network
Cables
10BASE-T: UTP Cat. 3,
4, 5 (100 m) EIA/TIA-
586 100-ohm STP (100
m)
100BASE-TX: UTP Cat.
5 (100 m) EIA/TIA-568
100-ohm STP (100m
max.)
8 Number of
Ports
10/100Mbps port x 24
9 Twisted-pair
Rx
Reverse
Polarity
Auto-correction for
each port
10 MAC
Address
Automatic update
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 120 | P a g e
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations
, if any
Learning
11 RAM 64 MB
12 Power
Supply
100 - 240 VAC, 50/60
Hz
13 Security Should support
a) 802.1x
b) AAA
c) SSH v1, v2
d) SSL
e) Host to Host and
Switch to Switch
authentication
14 Management Should have
a. IPv6 management
capability
b. SNMP v1, v2, v3
c. RMON
d. RADIUS
e. CLI via console
f. Web interface
g. Provision of
software and firmware
upgrades with latest
version releases
through admin login
15 Uplink Ports Switch should have 2
dual-purpose uplink
ports (10/100/1000 or
SFP)
7 A3 Scanner Heavy Duty
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations, if
any
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 121 | P a g e
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations, if
any
1. Make Must be specified NA
2. Model Must be specified NA
3. Scanner type:
Sheet-fed
4. Scan resolution, optical
Up to 600 dpi
5. Duty cycle (daily):
1000 pages
6. Bit depth 48-bit (internal), 24-bit
(external)
7. Levels of grayscale
256
8. Multi-feed detection
Yes, ultrasonic
9. Task speed A4, colour scan in 3
seconds
10. Media types
Paper (plain, inkjet),
envelopes, labels,
checks, cards
(business, plastic ID)
11. Scan file format
PDF Searchable, PDF
Image Only, PDF/A,
JPEG, TIF single page,
TIF multi page,
DOCX, RTF, TXT,
BMP
12. Scanner advanced features
Duplex scanning;
ultrasonic double feed
detection, auto colour
detection, page size
detection, crop, desk-
ew, rotation, blank
page removal, scan to
Share-point and scan
to cloud features
among many other
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 122 | P a g e
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations, if
any
scan-to destinations.
13. Power AC 200 – 240V
8 L3 Switch
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations, if
any
1. Make Must be specified NA
2. Model Must be specified NA
3. Port density in each switch
Minimum of 48 ports
of 10/100/1000 Base-T
RJ45 with auto polarity
& auto speed support
with 2 combo
10/100/1000-T or
1000Base-X ports
Should have dedicated
stacking ports of 40
GBPS or more
bandwidth
Switch should have 2
or more 10 G ports
All Ports should
support 802.3atPoE+
standard
4. Memory and processor Module
ARM @ 333 MHz, 128
MB flash, 128 MB
RAM; packet buffer
size: 512 KB
5. Mounting Mounts in an EIA-
standard 19 in. telco
rack or equipment
cabinet (hardware
included)
6. Performance 100 Mb Latency < 5 µs
1000 Mb Latency < 5
µs
Throughput up to 77.4
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 123 | P a g e
S.
No.
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations, if
any
million pps
Routing/Switching
capacity 104 Gbps
Routing table size 32
entries
7. Electrical characteristics
Voltage 100-240 VAC
Maximum power rating
59.8 W
Frequency 50/60 Hz
8. Safety UL 60950; IEC 60950-
1; EN 60950-1;
CAN/CSA-C22.2 No.
60950-1-03
9. Management IMC - Intelligent Management Center; limited command-line interface; Web browser; SNMP Manager; IEEE 802.3 Ethernet MIB
9 Tape Library
Description Specification
Tape drives 4 x LTO 4 FC drives scalable to 10
Interface Fiber Channel Interface
Should have sufficient speed backup to Tape Library in High Availability for backing up
data from the SAN without any user intervention.
Should be able to back up the entire production landscape in 8 hours window.
Should support LTO-4 or latest technology based library with at least 4 LTO-4 tape drives
(>=4), rack mountable with redundant power supplies.
Cartridges should have physical capacity up to 200 GB per cartridge compressed; 100 GB
native.
At least 50 LTO 4 Media Cartridges with 2 Cleaning Cartridges, Barcode labels shall also be
provided
10 Passbook Printer
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 124 | P a g e
S.
No
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
1 Make Must be specified NA
2 Model All the relevant
product brochures
and manuals must be
submitted.
NA
3 Speed (min.) a. V.H.S.D : 480 cps
or better
b. H.S.D. : 400 cps
or better
c. Draft : 300 cps or
better @10cpi
d. N.L.Q. : 150 cps
or better
e. L.Q. : 100 cps or
bette
4 Input Buffer Min 64 Kb
5 Passbook
handling
Horizontal & Vertical
6 Interface
IEEE 1284 parallel +
RS 232 Serial + USB
2.0
7 Print head life 400 million strokes/
wire
8 MSRW head 1.6 million strokes
9 Drivers Windows XP,
Windows Vista,
Windows 7, MAC OS
9.0, MAC OS X,
Linux Kernel 2.4 or
later
10 Type 24 pin dot matrix
11 Paper Path Manual Insertion;
Front in, Front out /
Front in, Rear out
12 Bar code
printing
PR2: EAN-13, EAN-8,
Interleaved 2 of 5,
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 125 | P a g e
S.
No
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
UPC-A, Code 39,
Coda bar (NW-
7),Industrial 2 of 5,
UPC-E ESC/P: EAN-
13, EAN-8,
Interleaved 2 of 5,
UPC-A, UPC-E, Code
39, Code 128,
POSTNET
11 Digital Web Camera
S.
No
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
1 Make Must be specified NA
2 Model All the relevant
product brochures
and manuals must be
submitted.
NA
3 Connectivity
Technology
Wired
4 Optical sensor
type
CMOS
5 Interface USB 2.0 compatibility ,
Skype compatible
6 Type Color
7 Max Digital
Video
Resolution
640 x 480
8 Video Capture 640 x 480
9 Drivers Microsoft Windows 8,
Microsoft Windows 7,
Microsoft Windows
Vista,
Microsoft Windows XP
SP2 or later
10 Min Processor
Type
1GHz, 1 GHz
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 126 | P a g e
S.
No
Feature Specification Specifications
offered
Compliance
(Yes / No)
Deviations,
if any
11 Peripheral /
Interface
Devices
Sound card,
USB port,
Speakers,
CD-ROM,
Internet connection
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 127 | P a g e
6 Annexure:
6.1 List of existing Hardware components, SLA management tool and licences at SDC,
Goa
List of existing hardware components at SDC Goa
State Portal Servers
Sr.No.
Server Purpose
Make / Model
Rack / Slot No OS
SP/SSDG Installed S/W
1 Load Balancer Dell / M610 1/1
RHEL 5.6 x86_64 SP
Apache-2.2.3, JDK-1.6u23
2 Load Balancer Dell / M610 1/2
RHEL 5.6 x86_64 SP
Apache-2.2.3, JDK-1.6u23
3 Web Server Dell / M610 1/5
RHEL 5.6 x86_64 SP
Apache-2.2.14, JDK-1.6u23
4 Web Server Dell / M610 1/6
RHEL 5.6 x86_64 SP
Apache-2.2.14, JDK-1.6u23
5 App Server Dell / M610 1/7
RHEL 5.6 x86_64 SP
JDK 1.6 u23, JBoss SOA, Eclipse-3.6 Helios
6 App Server Dell / M610 1/8
RHEL 5.6 x86_64 SP
JDK 1.6 u23, JBoss SOA
7 Database Server
Dell / R910
1/ Rack Mount
RHEL 5.6 x86_64 SP PostgreSQL-8.4.5
8 Database Server
Dell / R910
1/ Rack Mount
RHEL 5.6 x86_64 SP PostgreSQL-8.4.5
9 Staging Server Dell / M610 1/3
RHEL 5.6 x86_64 SP
Apache-2.2.14, JDK 1.6 u23, JBoss SOA, PostgreSQL-8.4.5, Alfresco-3.4.0 JMeter-2.4, VNC is configured, Ant-1.8.2, soapui-3.6-beta1 (by CDAC on 7th Jul)
10 Dev/CMS Server
Dell / M610 1/4
RHEL 5.6 x86_64 SP
Apache-2.2.14, JDK 1.6 u23, JBoss SOA, PostgreSQL-8.4.5, Alfresco-3.4.0, JMeter-2.4, Eclipse-3.6 Helios, Ant-1.8.2, VNC is configured
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 128 | P a g e
SSDG Servers
1 Web Server Dell / M610 2/7 Cent OS 5.5 SSDG
Website component
2 Web Server Dell / M610 2/8 Cent OS 5.5 SSDG
Website component
3 Messaging Part-1
Dell / M610 2/3 Cent OS 5.5 SSDG Messaging Part-1
4 Messaging Part-2
Dell / M610 2/5 Cent OS 5.5 SSDG Messaging Part-2
5 Database Component
Dell / M610 2/1 Cent OS 5.5 SSDG
Database Component
6 Database Component
Dell / M610 2/2 Cent OS 5.5 SSDG
Database Component
7 Monitoring server
Dell / M610 2/6 Cent OS 5.5 SSDG
Monitoring server
8 App Server Dell / M610 2/4 Cent OS 5.5 SSDG Messaging Part-1
9 App Server Dell / R710
2/Rack Mount Cent OS 5.5 SSDG Java and Postgres
6.2 Non-Functional Requirements
The non-functional requirements relating to performance, availability, deployment,
implementation, operations and others are listed in the subsequent subsection. Based on the
assessment of the requirements listed below, bidder shall prepare System Requirement
Specifications (SRS) and obtain a formal sign-off before proceeding with the design and
implementation of the solution.
# Non-functional Requirements
a) Technical Solution Architecture Requirements
1. The e-District solution needs to be architected using robust and proven software and hardware technologies like Service-Oriented Architecture (SOA) and open industry standards.
2. The solution architecture should be built on sound architectural principles enabling fault-tolerance, high-performance, and scalability both on the software and hardware levels.
b) Software Architecture Requirements
1. Software architecture must support web services standards including XML, SOAP, UDDI and WSDL
2. Software architecture must support appropriate load balancing for scalability and performance
3. Software architecture must support flexibility in adding functionalities or applications.
4. Software architecture components should utilize the high availability, clustering, and load balancing features available in the proposed hardware architecture to increase system performance and scalability features.
5. Software architecture must support trace logging, error notification, issue resolutionand exception handling.
c) Hardware Architecture Requirements
1. Hardware architecture at SDC must provide redundancy and high availability capabilities at the hardware level; this includes servers, etc. However, the hardware infrastructure for the DRC can be as per the SDC specifications.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 129 | P a g e
2. All servers and systems must be configured with no single point of failure.
3. Hardware architecture should be capable of consolidating several applications / workloads in a number of servers as required.
4. Servers must be placed within proper security infrastructure for the Solution.
5. Hardware architecture must support existing Storage Area Network (SAN) if available & backup solution (at SDC)
6. The technical solution architecture for e-District should be sound and complete with high performance, redundancy, and scalability.
d) Development, Testing, Staging, and Production Requirements
1. Appropriate development, test, and staging hardware environments should be provided and explained how they are related to production environment. This must be supported by explanations on how the development, test, and staging environment support the implementation activities of e-District Solution.
2. Development and test environment should include configuration management capabilities and tools for system configuration, versioning scheme, documentation, change control processes and procedures to manage deployment of solution deployment.
3. The test, development, and staging environment should include required workstations, desktops, and tools appropriate to support development, testing, and staging, and deployment tasks.
4. The development, test, and staging hardware environments must include similar operating systems, software components, products, and tools to those of production environment.
5. The development, test, and staging environments should be independent logically and physically from the production environment and of each other.
6. The development environment should be used for development and should be configured to allow access for developers‟ workstations.
7. The staging environment should be used for functional and user acceptance testing, stress testing, and performance benchmarking.
The test environment should be used as a testing environment of e-District Solution and its software components and products. The test environment should be a scaled-down configuration of the production environment.
e) Security Requirements
1.1.1. A secure solution should be provided at the hardware infrastructure level, software level, and access level.
1. Authentication, Authorization & Access Control 3 factors (User ID & Password, Biometric, and Digital Signature) security mechanisms should be implemented to enable secure login and authorized access to portal information and services.
2. Encryption Confidentiality of sensitive information and data of users and portal information should be ensured.
3. Appropriate mechanisms, protocols, and algorithms necessary to protect sensitive and confirmation data and information both during communication and storage should be implemented.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 130 | P a g e
f) Monitoring and Management Requirements
4. The e-District Solution should provide monitoring and management of the entire Solution including all software components and application.
5. The monitoring and management should monitor health of software and hardware infrastructure running the e-District Solution covering operating system, database, software components, applications, servers, and other related software and hardware components. It should provide proactive monitoring, alerting and reporting.
g) Performance and Scalability Requirements
1. The design of the e-District Solution should be scalable to handle increasing number of users.
2. e-District Solution should provide measurable and acceptable performance requirements for users, for different connectivity bandwidths.
3. The e-District solution should provide optimal and high performance Portal Solution satisfying response time for slow Internet connections and different browsers.
h) Implementation Requirements
1. The bidder will be required to deploy manpower and other project resources as per the terms & conditions of the Contract
2. The bidder will be required to work closely with the SDA and perform detailed functional requirements and analysis of e-District Solution to confirm and document functional / system requirement specifications for the portal and its applications to fulfil its objectives.
3. The bidder will be expected to carry the complete implementation and deployment of the e-District within the timelines specified in the RFP.
4. The bidder is expected to develop, test, stage, and deploy all functional modules of the e-District software and any hardware components of technical & functional requirements
i) Project Management
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 131 | P a g e
1. Selected bidder is required to provide an implementation plan illustrating all functional analysis, development, testing, staging, and deployment activities.
2. Selected bidder is required to specify and describe the different phases and activities of the project. It is very important for the SDA that the Selected bidder provide a quality implementation plan covering all aspects of the project. The plan shall clearly specify the start and end dates (relative to contract signing) of each of the project phases specifying key milestones allowing visibility of project progress.
3. Selected bidder is required to use standard project management tools such as precedence diagrams, critical path charts, etc. to create and manage implementation plan and schedule. The table below shows the minimum stages and deliverables:
Stage Activities Deliverables
Functional & Requirements Analysis
Define Functional Requirements
Requirements management
Prototyping
Documentation
Data Migration Preparation
Software Requirements and Specifications Document
Detailed Scope of Work
Work Breakdown Structure
Detailed Project Schedule
Data Migration Plan
Design
Detailed Software Solution Architecture design
Detailed Hardware Solution Architecture Design
Data Schema design
User Interface Design
Integration & Interfaces Design
Prototyping design Validation
Documentation
Design Specifications Documents of Software solutions
Design Specifications Documents of Hardware solutions
User Interface Design Specifications
Integration Design Specifications
Data design and migration
Development Software installation, configuration, and customization
Hardware installation and configuration
Development
Unit Testing
Documentation
Development Plan
Updated Design Document
Installed software and hardware
Functional modules & Portal Solution
Problem reporting
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 132 | P a g e
Testing System Testing
Integration Testing
Stress Testing
User Acceptance Test Results
Completed Test Cases
Data Migration tests
Documentation
Complete Test Cases
Test Plan
User Acceptance Criteria
Problem reporting
Problem resolutiontesting
Data Migration Testing
Deployment Training courses and sessions
Operations Planning
User Manual
Operations Manuals
Knowledge Transfer and training plan
Operations Plan
Operations Policies and Procedures
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 133 | P a g e
4. Selected bidder is required to describe in detail project management processes, methodologies and procedures.
5. Describe what SDA resources will be necessary for the project to succeed.
6. Describe how SDA management will receive up-to-date reports on project status.
7. Describe the change management procedures to handle such things as “out-of-scope” requests or changing business needs of SDA while the project is underway.
8. Describe what procedures will be used to keep the project on track, and what escalation procedures will be employed to address any problems with project progress.
9. Describe what quality assurance processes, procedures, formal reviews, etc. will be in place.
10. Describe the proposed conflict resolution/ escalation process between the Bidder and SDA to handle project or contractual disputes.
11. Selected bidder is required to describe the proposed project structure identifying all project individuals including project manager, business analysts, software developers, QA engineers, hardware / network engineers, administrators, Change Management experts, and others.
12. Selected bidder shall provide a comprehensive warranty that covers all components after the issuance of the final acceptance of e-District. The warranty should cover all materials, licenses, services, and support for both hardware and software. Selected bidder shall administer warranties with serial number and warranty period. Upon final acceptance of the SDA, all OEM warranties will be transferred to the SDA at no additional charge. All warranty documentation (whether expired or not) will be delivered to SDA at the issuance of the final acceptance certificate.
13. Selected bidder is required to provide Premium Level warranty and support through the vendor for all hardware and software used for e-District. Selected bidder‟ warranty must cover all equipment and work activities contained in the contract against all design, manufacturing, and environment faults until the issuance of the final acceptance.
14. Selected bidder is required to commit to the following warranty terms:
SI/bidder shall provide on-site comprehensive warranty for 5 years from the date of commissioning of all IT infrastructures and other equipment (if any) for providing warranty support to SDA
The warranty shall include the repair or replacement of the products / components / parts during the warranty period by the bidder. The replacement products / components shall meet the related specifications
In case of off the shelf software warranty and license, the SI is responsible to update latest patches and renewal of licenses whenever applicable with no extra cost to the State
Selected bidder shall be liable for all costs including, but not limited to, the costs of material, labour, travel, transport and living expenses associated with the collection and return of the units covered by the warranty.
The date of manufacture or assembly of any equipment, parts or consumables, shall not be more than six months before delivery.
Selected bidder shall state the location of his repair Centre(s) for all items not being repaired onsite.
SDA has the right to require a replacement if the repair is deemed to be impractical.
Selected bidder ensures that replacement components shall be available for any failed component during the warranty period.
Selected bidder shall guarantee the availability of spare parts and technical assistance for all components (or appropriate alternatives) to ensure the equipment would run for at least five (5) years, without major changes, at the completion of final acceptance. Six months advance notice is required on any discontinued part(s) with a suggestion for alternatives.
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 134 | P a g e
Selected bidder need to define the process & methodology in their proposal, for achieving the response time of engineers to respond to an incident and also for resolving such incidents as per the SLA.
Selected bidder is required to provide additional training if the satisfaction levels/ learning does not reach 80% in evaluation/feedback from trainees, and expected to provide additional training, if required.
The e-District application & infrastructure being provisioned by the bidder shall be insured. The Goods supplied under the Contract shall be fully insured against loss or damage incidental to manufacture or acquisition, transportation, storage and delivery for the entire project term.
Selected bidder is required to explain their warranty, maintenance procedures, and support to meet the terms and requirements outlined above.
j) Operations Requirements
15. The selected bidder is expected to provide the following in support of e-District operations:
Selected bidder shall provide procedure documentation for all operations procedures, and SLA‟s (based on ITIL best practices) for all the hardware and applications provided including backup procedures, system update procedures, security procedures, failure recovery procedures, upgrade procedures, remote access procedures, user manual, SOP‟s, etc.
All such procedures and documents must be submitted for review and approval by the SDA prior to adoption. Such documentation shall be updated by the during the project term by the bidder as and when required along with the necessary approval.
Selected bidder will be required to provide SDA with weekly statistics reports on the various services provided to users a mechanism as well as track and log all related statistical reports on the various delivery channels and access patterns.
Selected bidder will be required to provide SDA with weekly portal performance reports showing health of system operations.
Selected bidder will be required to provide SDA with Helpdesk for recording all the day to day problems and other technical incidents occur during the O&M phase. This shall also record the resolution of such incidents & problems.
Selected bidder will be required to commit to Service Level Agreements (SLAs) that show, among other metrics, appropriate escalation procedures and guarantee corrective actions within a pre-determined time. Selected bidder is required to respond to required levels of accuracy, quality, completeness, timeliness, responsiveness, cost-effectiveness, productivity and user satisfaction that are equal to or higher than the SLA system requirements.
k) Quality Assurance & Acceptance Requirements
RFP for Selection of System Integrator for State-wide Roll-out of eDistrict MMP in Goa – Volume II
State-wide rollout of the eDistrict MMP in Goa 135 | P a g e
16. Selected bidder is required to develop and implement quality assurance processes and procedures
to ensure that the e-District development and operations are performed to meet the quality
standards that are relevant to each area in all project phases.
17. Selected bidder is required to use various tools and techniques that can make tests run easily and
the results are automatically measured. In this way, testing tools provide a more cost-effective
and efficient solution than their manual counterparts. Plus, they minimize the risk of human
error during testing.
18. In order to ensure that such a QA mechanism is effective and acceptance of e-District, the
following tests are required for acceptance:
Unit Testing: Basic validation of developed components by developers.
Functional / Internal Integration Testing: Validation of developed components against functional
requirements and design specifications.
System Testing: Validation of both functional and technical requirements for the integrated
Solution. This could include external integration if required or it can be separated into testing
phases.
UAT: User Acceptance Testing (UAT) validation of the Portal Solution and assurance that it
meets both functional and technical requirements
Stress and Performance Testing: Load testing enabling understanding of performance and
behaviour of Portal Solution under large number of users and high-load conditions.
19. Selected bidder is required to describe their QA and testing approaches and procedures as well as
testing tools for conducting various tests in support of the acceptance of the Portal Solution.
20. Furthermore, Selected bidder to describe their documentation standards e.g. Documentation
description, documentation identification, content, nomenclature etc. as well.
Sample documents to be enclosed as part of the technical proposal.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 1 | P a g e
Info Tech Corporation of Goa Ltd
On behalf
Of
Department of Information Technology
Government of Goa
REQUEST FOR PROPOSAL
FOR
SELECTION OF SYSTEM INTEGRATOR
FOR
ROLL-OUT OF e-DISTRICT MMP - GOA
VOLUME III
Ref No: ITG-IT/RFP/e-District/2013/01 dated 7th January 2014
Info Tech Corporation of Goa Ltd
A Govt. of Goa Undertaking
(An ISO 9001:2008 certified company)
4th Floor,Above Alcon Hyundai Showroom,
Porvorim, Bardez, Goa – 403501
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 2 | P a g e
CONTRACT AGREEMENT FOR SELECTION OF <<‟SYSTEM INTEGRATORS’/’ IMPLEMENTATION AGENCIES’>>
MASTER SERVICES AGREEMENT ............................................................................................................. 4 1 Definitions and Interpretation ................................................................................................................... 4 2 Scope of the Project .................................................................................................................................. 6 4 Conditions Precedent & Effective Date .................................................................................................... 7 5 Obligations under the SLA ....................................................................................................................... 8 6 Representations and Warranties ................................................................................................................ 9 7 Obligations of ITG or its Nominated Agencies ...................................................................................... 12 8 Obligations of the Implentation Partner .................................................................................................. 12 9 Approvals and required consents ............................................................................................................ 12 10 Use of assets by the Bidder ..................................................................................................................... 13 11 Access to ITG or its Nominated Agencies Locations ............................................................................. 13 12 Management Phase ................................................................................................................................. 15 13 Financial Matters .................................................................................................................................... 16 14 Termination ............................................................................................................................................. 18 15 Indemnification & Limitation of Liability .............................................................................................. 20 16 Force Majeure ......................................................................................................................................... 22 17 Confidentiality ........................................................................................................................................ 25 18 Audit, Access and Reporting .................................................................................................................. 26 19 Intellectual Property Rights .................................................................................................................... 26 20 Warranty ................................................................................................................................................. 27 21 Liquidated Damages ............................................................................................................................... 28 22 Escrow Agreement .................................................................................................................................. 28 23 Insurance Cover ...................................................................................................................................... 29 24 Miscellaneous ......................................................................................................................................... 30 25 Governing Law and Dispute Resolution ................................................................................................. 34 26 Schedules ................................................................................................................................................ 36 27 Annexures ............................................................................................................................................... 55 NON-DISCLOSURE AGREEMENT ............................................................................................................. 67 1 Definitions and Interpretation ................................................................................................................. 68 2 Term ........................................................................................................................................................ 69 3 Scope of the Agreement .......................................................................................................................... 69 4 Obligations of the Receiving Party ......................................................................................................... 69 5 Exceptions to Confidential Information.................................................................................................. 70 6 Ownership of the Confidential Information ............................................................................................ 71 7 Dispute Resolution .................................................................................................................................. 71 8 Variation ................................................................................................................................................. 72 9 Waiver ..................................................................................................................................................... 72 10 Exclusion of Implied Warranties ............................................................................................................ 73 11 Entire Agreement .................................................................................................................................... 73 12 Severability ............................................................................................................................................. 73 13 No Partnership ........................................................................................................................................ 73 14 Third Parties ............................................................................................................................................ 73 15 Successors and Assigns .......................................................................................................................... 73 16 Notices .................................................................................................................................................... 73 17 Language ................................................................................................................................................. 74 18 Counterparts ............................................................................................................................................ 74 19 Mitigation ............................................................................................................................................... 74 20 Removal of Difficulties .......................................................................................................................... 74 SERVICE LEVEL AGREEMENT ................................................................................................................. 76 1 Definitions and Interpretation ................................................................................................................. 76 2 Structure .................................................................................................................................................. 77 3 Objectives of this SLA ............................................................................................................................ 78
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 3 | P a g e
4 Scope of SLA .......................................................................................................................................... 78 5 Agreement Owners ................................................................................................................................. 79 6 Contact List ............................................................................................................................................. 79 7 Principal Contacts ................................................................................................................................... 79 8 Commencement and Duration of this Agreement................................................................................... 79 9 Exclusions to the Agreement .................................................................................................................. 79 10 Terms of Payment and Penalties ............................................................................................................. 80 11 Updating of this Agreement .................................................................................................................... 80 12 Document History ................................................................................................................................... 81 13 Scope of Services .................................................................................................................................... 81 14 Performance Review ............................................................................................................................... 81 15 Representations and Warranties of Buyer ............................................................................................... 81 16 Representations and Warranties of the Bidder ........................................................................................ 82 17 Indemnities ............................................................................................................................................. 83 18 Dispute Resolution .................................................................................................................................. 83 19 Miscellaneous ......................................................................................................................................... 84 20 ANNEXURE A – Definitions ................................................................................................................. 89 21 ANNEXURE B – Service Levels ........................................................................................................... 90 1 Purpose: .................................................................................................................................................. 90 2 Definitions: ............................................................................................................................................. 90 3 Interpretations: ........................................................................................................................................ 91 4 Service Level Agreements (SLAs) ......................................................................................................... 92
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 4 | P a g e
MASTER SERVICES AGREEMENT
THIS MASTER SERVICE AGREEMENT (“Agreement”) is made on this the <<‟Day‟>> day of
<<Month>> 2013 at Porvorim, Bardez, Goa, India.
BETWEEN
Info Tech Corporation of Goa Ltd., Government of Goa having its office at 4th Floor, Alcon
Construction, Above Alcon Hyundai Showroom, Porvorim, Bardez, Goa, India hereinafter
referred to as Info Tech Corporation of Goa Ltd (hereinafter called ITG, which expression shall,
unless the context otherwise requires, include its permitted successors and assigns);
AND
<<‟Implementing Agency full name‟>>, a Company incorporated under the Companies Act, 1956,
having its registered office at <<‟Regd Location‟>> (hereinafter referred to as <<„the System
integrator/SI’>> which expression shall, unless the context otherwise requires, include its permitted
successors and assigns).
Each of the parties mentioned above are collectively referred to as the „Parties‟ and individually as
a „Party‟.
WHEREAS:
1. ITG is desirous to implement the project of e-District for Goa.
2. In furtherance of the same, ITG undertook the selection of a suitable System integrator
through a competitive bidding process for implementing the Project and in this behalf
issued Request for Proposal (RFP) dated <<‟Date‟>> .
3. The successful bidder has been selected as the System integrator on the basis of the bid
response set out as Annexure D of this Agreement, to undertake the Project of the
development and implementation of the solution, its roll out and sustained operations.
NOW THEREFORE, in consideration of the mutual covenants, promises, assurances,
representations and provisions set forth herein, the Parties hereto agree as follows:
1 Definitions and Interpretation
1.1 Definitions
[Terms and expressions used in this Agreement (including the Introduction) shall have the
meanings set out in Schedule I.]
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 5 | P a g e
1.2 Interpretation
[In this Agreement, unless otherwise specified:]
I. references to Clauses, Sub-Clauses, Paragraphs, Schedules and Annexures are to
clauses, sub-clauses, paragraphs, schedules and annexures to this Agreement;
II. use of any gender includes the other genders;
III. references to a „company‟ shall be construed so as to include any company,
corporation or other body corporate, wherever and however incorporated or
established;
IV. references to a „person‟ shall be construed so as to include any individual, firm,
company, government, state or agency of a state, local or municipal authority or
government body or any joint venture, association or partnership (whether or not
having separate legal personality);
V. a reference to any statute or statutory provision shall be construed as a reference to
the same as it may have been, or may from time to time be, amended, modified or
re-enacted;
VI. any reference to a „day‟ (including within the phrase „business day‟) shall mean a
period of 24 hours running from midnight to midnight;
VII. references to a „business day‟ shall be construed as a reference to a day (other than
a sunday) on which banks in the State of Goa are generally open for business;
VIII. references to times are to Indian Standard Time;
IX. a reference to any other document referred to in this Agreement is a reference to
that other document as amended, varied, novated or supplemented at any time; and
X. all headings and titles are inserted for convenience only. They are to be ignored in
the interpretation of this Agreement.
XI. “System integrator (SI)” or “System integrator (SI)” has been used for the same entity
i.e. bidder selected for the project.
1.3 Measurements and Arithmetic Conventions
[All measurements and calculations shall be in the metric system and calculations done to 2 (two)
decimal places, with the third digit of 5 (five) or above being rounded up and below 5 (five) being
rounded down except in money calculations where such amounts shall be rounded off to the
nearest INR.]
1.4 Ambiguities within Agreement
[In case of ambiguities or discrepancies within this Agreement, the following principles shall
apply:]
I. as between two Clauses of this Agreement, the provisions of a specific Clause
relevant to the issue under consideration shall prevail over those in a general
Clause;
II. as between the provisions of this Agreement and the Schedules/Annexures, the
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 6 | P a g e
Agreement shall prevail, save and except as expressly provided otherwise in the
Agreement or the Schedules/Annexures; and
III. as between any value written in numerals and that in words, the value in words
shall prevail.
1.5 Priority of documents
[This Agreement, including its Schedules and Annexures, represents the entire agreement between
the Parties as noted in this Clause. If in the event of a dispute as to the interpretation or meaning of
this Agreement it should be necessary for the Parties to refer to documents forming part of the
bidding process leading to this Agreement, then such documents shall be relied upon and
interpreted in the following descending order of priority: ]
I. This Agreement along with the SLA agreement, NDA agreement, Schedules and
Annexures;
II. Request for Proposal and Addendum / Corrigendum to the Request for Proposal (if
any).
For the avoidance of doubt, it is expressly clarified that in the event of a conflict between this
Agreement, Annexures / Schedules or the contents of the RFP, the terms of this Agreement shall
prevail over the Annexures / Schedules and Annexures / Schedules shall prevail over the contents
and specifications of the RFP.
2 Scope of the Project
The scope of work for the SI will be as per the scope defined in the Volume II of the RFP.
Scope will include following activities to be carried out by the selected Bidder:
1. Project Planning and Management
2. System Study and Design
3. Business Process Reengineering for the selected applications/ services
4. Development of e-District Application
5. Network Connectivity
6. Digitization of data in English and the local language
7. Site Preparation
8. Hardware Procurement & Commissioning
9. STQC Certification and C-DAC/TDIL Certification (for localization).
10. UAT & Go live
11. Capacity Building / Training
12. Operation & Maintenance (O&M) of e-District Application and SDC
The roles and responsibilities of the Parties under this Agreement have been set out in detail as
Annexure F of this Agreement. – To be put from Volume 1 after the same has been finalized and
approved at the time of signing the agreement.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 7 | P a g e
For the avoidance of doubt, it is expressly clarified that this Agreement shall govern the provision
of the contracted professional services under the SLA to ITG and its nominated agencies. It is
anticipated that new or renewal agreements may be undertaken by creating a separate SLA, with
schedules and annexures as required, under this Agreement for each additional engagement.
3 Term and Duration of the Agreement
This Agreement shall come into effect on <<‟Date‟>> 20--- (hereinafter the „Effective Date‟) and
shall continue till operation and maintenance completion date which shall be the date of the
completion of the operation and maintenance to ITG or its nominated agencies.
4 Conditions Precedent & Effective Date
4.1 Provisions to take effect upon fulfillment of Conditions Precedent
Subject to express terms to the contrary, the rights and obligations under this Agreement shall take
effect only upon fulfillment of all the Conditions Precedent set out below. However, ITG or its
nominated agencies may at any time at its sole discretion waive fully or partially any of the
Conditions Precedent for the bidder
4.2 a. Conditions Precedent of the Bidder
The bidder shall be required to fulfill the Conditions Precedent in which is as follows:
I. to provide a Performance Security/Guarantee and other guarantees/ payments as
and when required to ITG or its nominated agencies; and
II. to provide ITG or its nominated agencies certified true copies of its constitutional
documents and board resolutions authorizing the execution, delivery and
performance of this Agreement by the bidder
4.2 b. Conditions Precedent of ITG
ITG shall be required to fulfill the Conditions Precedent which is as follows:
I. Allocation of space at the SDC, District Level and Taluka Level for hardware
installation.
II. Necessary clearances from DeITy for proceeding with the project and its financial
implications.
III. Approval of the Project by a Competent Authority, etc.
For the avoidance of doubt, it is expressly clarified that the obligations of the Parties except the
financial obligations of ITG or its nominated agencies under this Agreement shall commence from
the fulfillment of the Conditions Precedent as set forth above.
4.3 Extension of time for fulfillment of Conditions Precedent
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 8 | P a g e
[The Parties may, by mutual agreement extend the time for fulfilling the Conditions Precedent and
the Term of this Agreement.
For the avoidance of doubt, it is expressly clarified that any such extension of time shall be subject
to imposition of penalties on the bidder linked to the delay in fulfilling the Conditions Precedent.]
4.4 Non-fulfillment of the bidder‟s Conditions Precedent
I. In the event that any of the Conditions Precedent of the bidder have not been
fulfilled within 15 days of signing of this Agreement and the same have not been
waived fully or partially by ITG or its nominated agencies, this Agreement shall
cease to exist;
II. In the event that the Agreement fails to come into effect on account of non
fulfillment of the bidder‟s Conditions Precedent, ITG or its nominated agencies
shall not be liable in any manner whatsoever to the bidder and ITG shall forthwith
forfeit the Performance Guarantee.
III. In the event that possession of any of ITG‟s or its nominated agencies facilities has
been delivered to the bidder prior to the fulfillment of the Conditions Precedent,
upon the termination of this Agreement such shall immediately revert to ITG or its
nominated agencies, free and clear from any encumbrances or claims.
5 Obligations under the SLA
5.1 The SLA shall be a separate contract in respect of this Agreement and shall be entered into
concurrently with this Agreement between ITG and bidder
5.2 In relation to any future SLA entered into between the Parties; each of the Parties shall
observe and perform the obligations set out herein.
5.3 Change of Control
I. In the event of a change of control of the bidder during the Term, the bidder shall
promptly notify ITG and/or its nominated agencies of the same in the format set
out as Annexure A of this Agreement.
II. In the event that the net worth of the surviving entity is less than that of bidder
prior to the change of control, ITG or its nominated agencies may within 30 days of
becoming aware of such change in control, require a replacement of existing
Performance Guarantee furnished by the bidder from a guarantor acceptable to ITG
or its nominated agencies (which shall not be bidder or any of its associated
entities).
III. If such a guarantee is not furnished within 30 days of ITG or its nominated agencies
requiring the replacement, ITG may exercise its right to terminate the SLA and/ or
this Agreement within a further 30 days by written notice, to become effective as
specified in such notice.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 9 | P a g e
IV. Pursuant to termination, the effects of termination as set out in Clause 14.2 of this
Agreement shall follow.
For the avoidance of doubt, it is expressly clarified that the internal reorganization of the bidder
shall not be deemed an event of a change of control for purposes of this Clause unless the
surviving entity is of less net worth than the predecessor entity.
5.4 Final testing and certification
The Project shall be governed by the mechanism of final acceptance testing and certification to be
put into place by ITG and bidder as under:
I. Final testing and certification criteria will lay down a set of guidelines following
internationally accepted norms and standards for testing and certification for all
aspects of project development and implementation covering software, hardware
and networking including the processes relating to the design of solution
architecture, design of systems and sub-systems, systems requirements
specification, coding, testing, documentation, version control, change management,
security, service oriented architecture, performance in relation to compliance with
SLA metrics, interoperability, scalability, availability and compliance with all the
technical and functional requirements of the RFP and this Agreement;
II. Final testing and certification criteria will be finalized from the development stage
to ensure that the guidelines are being followed and to avoid large scale
modifications pursuant to testing done after the application is fully developed;
III. Final testing and certification criteria will consider conducting specific tests on the
software, hardware, networking, security and all other aspects;
IV. Final testing and certification criteria will establish appropriate processes for
notifying the bidder of any deviations from the norms, standards or guidelines at
the earliest instance after taking cognizance of the same to enable the bidder to take
corrective action; etc.
5.5 The Parties shall each ensure that the range of the Services under the SLA shall not be
varied, reduced or increased except with the prior written agreement between ITG and
„<<System integrator>>‟ in accordance with the Change Control Schedule set out in
Schedule II of this Agreement. Save for the express terms of the Terms of Payment
Schedule set out as Schedule VI of this Agreement, ITG or its nominated agencies and its
users may purchase any particular category of Services that may become necessary as per
the Change Control Schedule set out in Schedule II of this Agreement, without the need to
go for a separate procurement process.
6 Representations and Warranties
6.1 Representations and warranties of the bidder
The bidder represents and warrants to ITG or its nominated agencies that:
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 10 | P a g e
I. it is duly organized and validly existing under the laws of India, and has full power
and authority to execute and perform its obligations under this Agreement and
other agreements and to carry out the transactions contemplated hereby;
II. it is a competent provider of a variety of information technology and business
process management services;
III. it has taken all necessary corporate and other actions under laws applicable to its
business to authorize the execution and delivery of this Agreement and to validly
exercise its rights and perform its obligations under this Agreement;
IV. from the Effective Date, it will have the financial standing and capacity to undertake
the Project in accordance with the terms of this Agreement;
V. in providing the Services, it shall use reasonable endeavours not to cause any
unnecessary disruption to ITG‟s normal business operations
VI. this Agreement has been duly executed by it and constitutes a legal, valid and
binding obligation, enforceable against it in accordance with the terms hereof, and
its obligations under this Agreement shall be legally valid, binding and enforceable
against it in accordance with the terms hereof;
VII. the information furnished in the tender documents and as updated on or before the
date of this Agreement is to the best of its knowledge and belief true and accurate in
all material respects as at the date of this Agreement;
VIII. the execution, delivery and performance of this Agreement shall not conflict with,
result in the breach of, constitute a default by any of the terms of its Memorandum
and Articles of Association or any Applicable Laws or any covenant, contract,
agreement, arrangement, understanding, decree or order to which it is a party or by
which it or any of its properties or assets is bound or affected;
IX. there are no material actions, suits, proceedings, or investigations pending or, to its
knowledge, threatened against it at law or in equity before any court or before any
other judicial, quasi-judicial or other authority, the outcome of which may result in
the breach of this Agreement or which individually or in the aggregate may result
in any material impairment of its ability to perform any of its material obligations
under this Agreement;
X. it has no knowledge of any violation or default with respect to any order, writ,
injunction or decree of any court or any legally binding order of any Government
Instrumentality which may result in any Adverse Effect on its ability to perform its
obligations under this Agreement and no fact or circumstance exists which may
give rise to such proceedings that would adversely affect the performance of its
obligations under this Agreement;
XI. it has complied with Applicable Laws in all material respects and has not been
subject to any fines, penalties, injunctive relief or any other civil or criminal
liabilities which in the aggregate have or may have an Adverse Effect on its ability
to perform its obligations under this Agreement;
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 11 | P a g e
XII. no representation or warranty by it contained herein or in any other document
furnished by it to ITG or its nominated agencies in relation to the Required
Consents contains or shall contain any untrue or misleading statement of material
fact or omits or shall omit to state a material fact necessary to make such
representation or warranty not misleading; and
XIII. no sums, in cash or kind, have been paid or shall be paid, by it or on its behalf, to
any person by way of fees, commission or otherwise for entering into this
Agreement or for influencing or attempting to influence any officer or employee of
ITG or its nominated agencies in connection therewith.
6.2 Representations and warranties of ITG or its nominated agencies
I. it has full power and authority to execute, deliver and perform its obligations under
this Agreement and to carry out the transactions contemplated herein and that it
has taken all actions necessary to execute this Agreement, exercise its rights and
perform its obligations, under this Agreement and carry out the transactions
contemplated hereby;
II. it has taken all necessary actions under Applicable Laws to authorize the execution,
delivery and performance of this Agreement and to validly exercise its rights and
perform its obligations under this Agreement;
III. it has the financial standing and capacity to perform its obligations under the
Agreement;
IV. it is subject to the laws of India, and hereby expressly and irrevocably waives any
immunity in any jurisdiction in respect of this Agreement or matters arising
thereunder including any obligation, liability or responsibility hereunder;
V. this Agreement has been duly executed by it and constitutes a legal, valid and
binding obligation enforceable against it in accordance with the terms hereof and its
obligations under this Agreement shall be legally valid, binding and enforceable
against it in accordance with the terms thereof;
VI. the execution, delivery and performance of this Agreement shall not conflict with,
result in the breach of, constitute a default under, or accelerate performance
required by any of the Applicable Laws or any covenant, contract, agreement,
arrangement, understanding, decree or order to which it is a party or by which it or
any of its properties or assets is bound or affected;
VII. there are no actions, suits or proceedings pending or, to its knowledge, threatened
against it at law or in equity before any court or before any other judicial, quasi-
judicial or other authority, the outcome of which may result in the default or breach
of this Agreement or which individually or in the aggregate may result in any
material impairment of its ability to perform its material (including any payment)
obligations under this Agreement;
VIII. it has no knowledge of any violation or default with respect to any order, writ,
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 12 | P a g e
injunction or any decree of any court or any legally binding order of any
Government Instrumentality which may result in any Adverse Effect on ITG or its
nominated agencies ability to perform its obligations under this Agreement and no
fact or circumstance exists which may give rise to such proceedings that would
adversely affect the performance of its obligations under this Agreement;
IX. it has complied with Applicable Laws in all material respects;
X. all information provided by it in the RFP in connection with the Project is, to the
best of its knowledge and belief, true and accurate in all material respects; and
XI. upon the bidder performing the covenants herein, it shall not at any time during the
term hereof, interfere with peaceful exercise of the rights and discharge of the
obligations by the bidder , in accordance with this Agreement.
7 Obligations of ITG or its Nominated Agencies
I. To provide any support through personnel to test the system during the Term;
II. To provide any support through personnel and/or test data during development,
rollout, steady state operation, as well as, for any changes/enhancements in the
system whenever required due to scope change that may arise due to business,
delivery or statutory/regulatory reasons;
III. ITG shall provide the data (including in electronic form wherever available) to be
migrated.
IV. To authorize the bidder to interact for implementation of the Project with external
entities such as the state treasury, authorized banks, trademark database etc.
8 Obligations of the Implentation Partner
8.1 It shall provide to ITG or its nominated agencies, the Deliverables as set out in Annexure C
of this Agreement.
8.2 It shall perform the Services as set out in Section 2 of this Agreement and in a good and
workmanlike manner commensurate with industry and technical standards which are
generally in effect for international projects and innovations pursuant thereon similar to
those contemplated by this Agreement, and so as to comply with the applicable Service
Levels set out with this Agreement.
8.3 It shall ensure that the Services are being provided as per the Project Timelines set out as
Annexure C to this Agreement.
9 Approvals and required consents
9.1 The Parties shall cooperate to procure, maintain and observe all relevant and regulatory
and governmental licenses, clearances and applicable approvals (hereinafter the “Required
Consents”) necessary for the bidder to provide the Services. The costs of such Approvals
shall be borne by the Party normally responsible for such costs according to local custom
and practice in the locations where the Services are to be provided.[This responsibility of
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 13 | P a g e
taking Governmental licenses, clearances and applicable approvals requires to be explicitly worded in
the Scope of work in the RFP, only then this clause in its current shape would hold]
9.2 ITG or its nominated agencies shall use reasonable endeavours to assist bidder to obtain the
Required Consents [or vice versa, depending on the Scope of work defined in the RFP]. In the
event that any Required Consent is not obtained, the bidder and ITG or its nominated
agencies will co-operate with each other in achieving a reasonable alternative arrangement
as soon as reasonably practicable for ITG or its nominated agencies to continue to process
its work with as minimal interruption to its business operations as is commercially
reasonable until such Required Consent is obtained, provided that the bidder shall not be
relieved of its obligations to provide the Services and to achieve the Service Levels until the
Required Consents are obtained if and to the extent that the bidder’s obligations are not
dependent upon such Required Consents.
10 Use of assets by the Bidder
10.1 During the Term the bidder shall:
I. take all reasonable and proper care of the entire hardware and software, network or
any other information technology infrastructure components used for the Project
and other facilities leased / owned / operated by the bidder exclusively in terms of
ensuring their usability for the delivery of the Services as per this Agreement
(hereinafter the “Assets”) in proportion to their use and control of such Assets; and
II. keep all the tangible Assets in as good and serviceable condition (reasonable wear
and tear excepted) as at the date the bidder takes control of and/or first uses the
Assets and during the entire Term of the Agreement.
III. ensure that any instructions or manuals supplied by the manufacturer of the Assets
for use of the Assets and which are provided to the bidder will be followed by the
bidder and any person who will be responsible for the use of the Assets;
IV. take such steps as may be properly recommended by the manufacturer of the Assets
and notified to the bidder or as may, in the reasonable opinion of the System
integrator, be necessary to use the Assets in a safe manner;
V. ensure that the Assets that are under the control of the bidder , are kept suitably
housed and in conformity with Applicable Law;
VI. procure permission from ITG or its nominated agencies and any persons duly
authorized by them to enter any land or premises on which the Assets are for the
time being sited so as to inspect the same, subject to any reasonable third party
requirements;
VII. not, knowingly or negligently use or permit any of the Assets to be used in
contravention of any statutory provisions or regulation or in any way contrary to
Applicable Law.
11 Access to ITG or its Nominated Agencies Locations
11.1 For so long as the bidder provides services to ITG or its nominated agencies location, as the
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 14 | P a g e
case may be, on a non-permanent basis and to the extent necessary, ITG as the case may be
or its nominated agencies shall, subject to compliance by the bidder with any safety and
security guidelines which may be provided by the ITG as the case may be or its nominated
agencies and notified to the bidder in writing, provide the bidder with:
I. reasonable access, in the same manner granted to the ITG or its nominated agencies
employees, to the ITG location as the case may be, twenty-four hours a day, seven
days a week;
II. reasonable work space, access to office equipment as mutually agreed and other
related support services in such location and at such other ITG location as the case
may be, if any, as may be reasonably necessary for the bidder to perform its
obligations hereunder and under the SLA.
11.2 Access to locations, office equipments and services shall be made available to the bidder on
an “as is, where is” basis by ITG as the case may be or its nominated agencies. The bidder
agrees to ensure that its employees, agents and contractors shall not use the location,
services and equipment referred to in RFP for the following purposes:
I. for the transmission of any material which is defamatory, offensive or abusive or of
an obscene or menacing character; or
II. in a manner which constitutes a violation or infringement of the rights of any
person, firm or company (including but not limited to rights of copyright or
confidentiality).
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 15 | P a g e
12 Management Phase
12.1 Governance
The review and management process of this Agreement shall be carried out in accordance
with the Governance Schedule set out in Schedule V of this Agreement and shall cover all
the management aspects of the Project.
12.2 Use of Services
I. ITG as the case may be or its nominated agencies, will undertake and use the
Services in accordance with any instructions or procedures as per the acceptance
criteria as set out in the SLA or this Agreement or any agreement that may be
entered into between the Parties from time to time;
II. ITG as the case may be or its nominated agencies shall be responsible for the
operation and use of the Deliverables resulting from the Services.
12.3 Changes
Unless expressly dealt with elsewhere in this Agreement, any changes under or to this
Agreement or under or to the SLA shall be dealt with in accordance with the Change
Control Schedule set out in Schedule II of this Agreement.
12.4 Security and Safety
I. The bidder shall comply with the technical requirements of the relevant security,
safety and other requirements specified in the Information Technology Act or
Telegraph Act including the regulations issued by dept. of telecom (wherever
applicable), IT Security Manual of ITG as specifically stated in the RFP and follow
the industry standards related to safety and security (including those as stated in
the RFP), insofar as it applies to the provision of the Services.
II. Each Party to the SLA/Agreement shall also comply with ITG or the Government of
India, and Government of Goa security standards and policies in force from time to
time at each location of which ITG or its nominated agencies make the bidder aware
in writing insofar as the same apply to the provision of the Services.
III. The Parties to the SLA/Agreement shall use reasonable endeavours to report
forthwith in writing to each other all identified attempts (whether successful or not)
by unauthorized persons (including unauthorized persons who are employees of
any Party) either to gain access to or interfere with ITG as the case may be or any of
their nominees data, facilities or Confidential Information.
IV. The bidder shall upon reasonable request by ITG as the case may be or their
nominee(s) participate in regular meetings when safety and information technology
security matters are reviewed.
V. As per the provisions of the SLA or this Agreement, the bidder shall promptly report
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 16 | P a g e
in writing to ITG or its nominated agencies, any act or omission which they are
aware that could have an adverse effect on the proper conduct of safety and
information technology security at the facilities of ITG as the case may be.
12.5 Cooperation
Except as otherwise provided elsewhere in this Agreement or the SLA, each Party
(“Providing Party”) to this Agreement or to the SLA undertakes promptly to provide the
other Party (“Receiving Party”) with all such information and co-operation which the
Receiving Party reasonably requests, provided that such information and co-operation:
I. does not require material expenditure by the Providing Party to provide the same;
II. is reasonably required by the Receiving Party in order for it to comply with its
obligations under this Agreement or the SLA;
III. cannot be construed to be Confidential Information; and
IV. is capable of being provided by the Providing Party.
Further, each Party agrees to co-operate with the contractors and subcontractors of the
other Party as reasonably requested in order to accomplish the purposes of this Agreement.
13 Financial Matters
13.1 Terms of Payment and Service Credits and Debits
I. In consideration of the Services and subject to the provisions of this Agreement and
of the SLA, ITG shall pay the bidder for the Services rendered in pursuance of this
agreement, in accordance with the Terms of Payment Schedule set out as Schedule
VI of this Agreement.
II. All payments are subject to the application of service credits and debits as may be
provided for in the SLA. For the avoidance of doubt, it is expressly clarified that
ITG will pay the service credits as stated in accordance with the Schedule VI of this
Agreement and ITG may also calculate a financial sum and debit the same against
the terms of payment as set out in Schedule VI of this Agreement as a result of the
failure of the bidder to meet the Service Level as defined in SLA. ITG (on request
from successful bidders) can look at having a separate mechanism for settling
penalties/service credits rather than the set off against the invoice as this could
revenue recognition issues. However, the successful bidder has to ensure that such
settlement happens within a stipulated timeframe]
III. Save and except as otherwise provided for herein or as agreed between the Parties
in writing, ITG shall not be required to make any payments in respect of the
Services (or, without limitation to the foregoing, in respect of the bidder
performance of any obligations under this Agreement or the SLA) other than those
covered in Schedule VI of this Agreement. For the avoidance of doubt, it is
expressly clarified that the payments shall be deemed to include all ancillary and
incidental costs and charges arising in the course of delivery of the Services
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 17 | P a g e
including consultancy charges, infrastructure costs, project costs, implementation
and management charges and all other related costs including taxes which are
addressed in this Clause.
13.2 Invoicing and Settlement
I. Subject to the specific terms of the SLA, the bidder shall submit its invoices in
accordance with the following principles:
A. ITG shall be invoiced by the bidder for the Services. Generally and unless
otherwise agreed in writing between the Parties or expressly set out in the
SLA, the bidder shall raise an invoice as per Schedule VI of this Agreement;
and
B. Any invoice presented in accordance with this Article shall be in a form
agreed with ITG.
II. The bidder alone shall invoice all payments after receiving due approval from the
competent authority. Such invoices shall be accurate and all adjustments to or
changes in the terms of payment as stated in Schedule VI of this Agreement. The
bidder shall waive any charge for a Service that is not invoiced within six months
after the end of the month in which the change relating to such Service is (i)
authorized or (ii) incurred, whichever is later.
III. Payment shall be made within 30 working days of the receipt of invoice along with
supporting documents by ITG subject to penalties. The penalties are imposed on the
vendor as per the SLA criteria specified in the SLA.
IV. ITG shall be entitled to delay or withhold payment of any invoice or part of it
delivered by the bidder under Schedule VI of this Agreement where ITG
disputes/witholds such invoice or part of it provided that such dispute is bona fide.
The withheld amount shall be limited to that which is in dispute. The disputed /
witheld amount shall be settled in accordance with the escalation procedure as set
out in Schedule V of this Agreement. Any exercise by ITG under this Clause shall
not entitle the bidder to delay or withhold provision of the Services.
V. ITG shall be entitled to delay or withhold part of the payment of any invoice which
is under a dispute. The withheld amount shall be limited to that which is the
disputed amount. The disputed amount shall be referred to the escalation
procedure as set out in Schedule V of this Agreement. Any exercise by ITG under
this Clause shall not entitle the bidder to delay or withhold provision of the
Services.
VI. The bidder shall be solely responsible to make payment to its sub-contractors.
13.3 Tax
I. ITG or its nominated agencies shall be responsible for withholding taxes from the
amounts due and payable to the bidder wherever applicable. The bidder shall pay
for all other taxes in connection with this Agreement, SLA, scope of work and any
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 18 | P a g e
other engagement required to be undertaken as a part of this Agreement, including,
but not limited to, property, sales, use, excise, value-added, goods and services,
consumption and other similar taxes or duties.
II. ITG or its nominated agencies shall provide bidder with the original tax receipt of
any withholding taxes paid by ITG or its nominated agencies on payments under
this Agreement. The bidder agrees to reimburse and hold ITG or its nominated
agencies harmless from any deficiency including penalties and interest relating to
taxes that are its responsibility under this paragraph. For purposes of this
Agreement, taxes shall include taxes incurred on transactions between and among
ITG or its nominated agencies, the bidder and third party subcontractors.
III. If, after the date of this Agreement, there is any change of rate of levy under the
existing applicable laws of India with respect to taxes and duties, which are directly
payable by ITG for providing the services i.e. service tax or any such other
applicable tax from time to time, which increase or decreases the cost incurred by
the SI in performing the Services, then the remuneration and reimbursable expense
otherwise payable to ITG under this Agreement shall be increased or decreased
accordingly by correspondence between the Parties hereto, and corresponding
adjustments shall be made to the ceiling amounts specified in Schedule VI.
However, in case of any new or fresh tax or levy imposed after submission of the
proposal the bidder shall be entitled to reimbursement on submission of proof of
payment of such tax or levy.
IV. The Parties shall cooperate to enable each Party to accurately determine its own tax
liability and to minimize such liability to the extent legally permissible. In
connection therewith, the Parties shall provide each other with the following:
A. any resale certificates;
B. any relevant information regarding out-of-state or use of materials,
equipment or services; and
C. any direct pay permits, exemption certificates or information reasonably
requested by the other Party.
14 Termination
14.1 Material Breach
I. In the event that either Party believes that the other Party is in Material Breach of its
obligations under this Agreement, such aggrieved Party may terminate this
Agreement upon giving a one month‟s notice for curing the Material Breach to the
other Party. In case the Material Breach continues, after the notice period, ITG or
bidder , as the case may be will have the option to terminate the Agreement. Any
notice served pursuant to this Clause shall give reasonable details of the Material
Breach, which could include the following events and the termination will become
effective:
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 19 | P a g e
A. If the bidder is not able to deliver the services as per the SLAs defined in RFP
which translates into Material Breach, then ITG may serve a 30 days written
notice for curing this Material Breach. In case the Material Breach continues,
after the expiry of such notice period, ITG will have the option to terminate this
Agreement. Further, ITG may after affording a reasonable opportunity to the
bidder to explain the circumstances leading to such a breach.
B. If there is a Material Breach by ITG or its nominated agencies which results in
not providing support for effecting data migration or not providing the
certification of User Acceptance, and / or failing to make payment of
undisputed amount within 30 days from the date of submission of invoice, then
the bidder will give a one month‟s notice for curing the Material Breach to ITG.
After the expiry of such notice period, the bidder will have the option to
terminate the Agreement
II. ITG may, by giving a one month‟s written notice, terminate this Agreement if a
change of control of the bidder has taken place. For the purposes of this Clause, in
the case of bidder , change of control shall mean the events stated in Clause 5.3, and
such notice shall become effective at the end of the notice period as set out in Clause
5.3 (c).
III. In the event that bidder undergoes such a change of control, ITG may, as an
alternative to termination, require a full Performance Guarantee for the obligations
of bidder by a guarantor acceptable to ITG or its nominated agencies. If such a
guarantee is not furnished within 30 days of ITG‟s demand, ITG may exercise its
right to terminate this Agreement in accordance with this Clause by giving 15 days
further written notice to the bidder
IV. The termination provisions set out in this Clause shall apply mutatis mutandis to
the SLA.
14.2 Effects of termination
I. In the event that ITG terminates this Agreement pursuant to failure on the part of
the bidder to comply with the conditions as contained in this Clause and depending
on the event of default, Performance Guarantee furnished by bidder may be
forfeited.
II. Upon termination of this Agreement, the Parties will comply with the Exit
Management Schedule set out as Schedule III of this Agreement.
III. In the event that ITG or the bidder terminates this Agreement, the compensation will
be decided in accordance with the Terms of Payment Schedule set out as Schedule
VI of this Agreement.
IV. ITG agrees to pay bidder for i) all charges for Services bidder provides and any
Deliverables and/or system (or part thereof) bidder delivers through termination,
and ii) reimbursable expenses bidder incurs through termination. If ITG terminates
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 20 | P a g e
without cause, ITG also agrees to pay any applicable adjustment expenses bidder
incurs as a result of such termination (which bidder will take reasonable steps to
mitigate).
14.3 Termination of this Agreement due to bankruptcy of Bidder
ITG may serve written notice on bidder at any time to terminate this Agreement with
immediate effect in the event that the bidder reporting an apprehension of bankruptcy to
ITG or its nominated agencies
15 Indemnification & Limitation of Liability
15.1 Subject to Clause 15.2 below, bidder (the "Indemnifying Party") undertakes to indemnify
ITG (the "Indemnified Party") from and against all Losses on account of bodily injury, death or
damage to tangible personal property arising in favour of any person, corporation or other entity
(including the Indemnified Party) attributable to the Indemnifying Party's negligence or willful
default in performance or non-performance under this Agreement. If the Indemnified Party
promptly notifies Indemnifying Party in writing of a third party claim against Indemnified Party
that any Service provided by the Indemnifying Party infringes a copyright, trade secret or patents
incorporated in India of any third party, Indemnifying Party will defend such claim at its expense
and will pay any costs or damages that may be finally awarded against Indemnified Party.
Indemnifying Party will not indemnify the Indemnified Party, however, if the claim of
infringement is caused by (a) Indemnified Party‟s misuse or modification of the Service;
(b) Indemnified Party‟s failure to use corrections or enhancements made available by the
Indemnifying Party; (c) Indemnified Party‟s use of the Service in combination with any product or
information not owned or developed by Indemnifying Party; (d) Indemnified Party‟s distribution,
marketing or use for the benefit of third parties of the Service; or (e) information, direction,
specification or materials provided by Indemnified Party or any third party contracted to it. If any
Service is or likely to be held to be infringing, Indemnifying Party shall at its expense and option
either (i) procure the right for Indemnified Party to continue using it, (ii) replace it with a
noninfringing equivalent, (iii) modify it to make it noninfringing. The foregoing remedies
constitute Indemnified Party‟s sole and exclusive remedies and Indemnifying Party‟s entire
liability with respect to infringement.
15.2 The indemnities set out in Clause 15.1 shall be subject to the following conditions:
I. the Indemnified Party as promptly as practicable informs the Indemnifying
Party in writing of the claim or proceedings and provides all relevant
evidence, documentary or otherwise;
II. the Indemnified Party shall, at the cost of the Indemnifying Party, give the
Indemnifying Party all reasonable assistance in the Defense of such claim
including reasonable access to all relevant information, documentation and
personnel provided that the Indemnified Party may, at its sole cost and
expense, reasonably participate, through its attorneys or otherwise, in such
Defense;
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 21 | P a g e
III. if the Indemnifying Party does not assume full control over the Defense of a
claim as provided in this Article, the Indemnifying Party may participate in
such Defense at its sole cost and expense, and the Indemnified Party will
have the right to defend the claim in such manner as it may deem
appropriate, and the cost and expense of the Indemnified Party will be
included in Losses;
IV. the Indemnified Party shall not prejudice, pay or accept any proceedings or
claim, or compromise any proceedings or claim, without the written consent
of the Indemnifying Party;
V. all settlements of claims subject to indemnification under this Clause will:
A. be entered into only with the consent of the Indemnified Party,
which consent will not be unreasonably withheld and include an
unconditional release to the Indemnified Party from the claimant
or plaintiff for all liability in respect of such claim; and
B. include any appropriate confidentiality agreement prohibiting
disclosure of the terms of such settlement;
VI. the Indemnified Party shall account to the Indemnifying Party for all
awards, settlements, damages and costs (if any) finally awarded in favour of
the Indemnified Party which are to be paid to it in connection with any such
claim or proceedings;
VII. the Indemnified Party shall take steps that the Indemnifying Party may
reasonably require to mitigate or reduce its loss as a result of such a claim or
proceedings;
VIII. in the event that the Indemnifying Party is obligated to indemnify an
Indemnified Party pursuant to this Article, the Indemnifying Party will,
upon payment of such indemnity in full, be subrogated to all rights and
defenses of the Indemnified Party with respect to the claims to which such
indemnification relates; and
IX. if a Party makes a claim under the indemnity set out under Clause 15.1
above in respect of any particular Loss or Losses, then that Party shall not be
entitled to make any further claim in respect of that Loss or Losses
(including any claim for damages).
15.3 The liability of bidder (whether in contract, tort, negligence, strict liability in tort, by statute
or otherwise) for any claim in any manner related to this Agreement, including the work,
deliverables or Services covered by this Agreement, shall be the payment of direct damages only
which shall in no event in the aggregate exceed the amount specified in the contract. The liability
cap given under this Clause 15.3 shall not be applicable to the indemnification obligations set out
in Clause 15.1 and breach of Clause 12.4 and 17.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 22 | P a g e
15.4 In no event shall either party be liable for any consequential, incidental, indirect, special or
punitive damage, loss or expenses (including but not limited to business interruption, lost
business, lost profits, or lost savings) nor for any third party claims (other than those set-forth in
Clause 15.1) even if it has been advised of their possible existence.
15.5 The allocations of liability in this Section 15 represent the agreed and bargained-for
understanding of the parties and compensation for the Services reflects such allocations. Each
Party has a duty to mitigate the damages and any amounts payable under an indemnity that
would otherwise be recoverable from the other Party pursuant to this Agreement by taking
appropriate and commercially reasonable actions to reduce or limit the amount of such damages
or amounts.
16 Force Majeure
[16.1 Definition of Force Majeure
The bidder or ITG as the case may be, shall be entitled to suspend or excuse performance of its
respective obligations under this Agreement to the extent that such performance is impeded by an
event of force majeure („Force Majeure‟).]
16.2 Force Majeure events
[A Force Majeure event means any event or circumstance or a combination of events and
circumstances referred to in this Clause, which:]
I. is beyond the reasonable control of the affected Party;
II. such Party could not have prevented or reasonably overcome with the exercise of
reasonable skill and care;
III. does not result from the negligence of such Party or the failure of such Party to
perform its obligations under this Agreement;
IV. is of an incapacitating nature and prevents or causes a delay or impediment in
performance; and
V. may be classified as all or any of the following events:
Such events include:
Non-Political Events
(A) act of God, including earthquake, flood, inundation, landslide,
exceptionally adverse weather conditions, storm, tempest, hurricane,
cyclone, lightning, thunder, volcanic eruption, fire or other extreme
atmospheric conditions;
(B) radioactive contamination or ionizing radiation or biological
contamination except as may be attributable to the bidder’s use of
radiation or radio-activity or biologically contaminating material;
(C) strikes, lockouts, boycotts, labour disruptions or any other industrial
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 23 | P a g e
disturbances as the case may be not arising on account of the acts or
omissions of the bidder and which affect the timely implementation
and continued operation of the Project; or
(D) any event or circumstances of a nature analogous to any of the
foregoing.
Political Events
(E) Change in Law, other than any Change in Law for which relief is
provided under this Agreement;
(F) expropriation or compulsory acquisition by ITG or any of their
nominated agencies of any material assets or rights of the bidder
(G) unlawful or unauthorised revocation of, or refusal by ITG or any of
their nominated agencies, GoI or any of its agencies to renew or grant
any clearance or Required Consents required by the bidder to perform
its obligations without valid cause, provided that such delay,
modification, denial, refusal or revocation did not result from the
bidder’s inability or failure to comply with any condition relating to
grant, maintenance or renewal of such Required Consents applied on
a non-discriminatory basis;
(H) any judgment or order of any court of competent jurisdiction or
statutory authority in India made against the bidder in any
proceedings for reasons other than failure of the bidder to comply
with Applicable Laws or Required Consents or on account of breach
thereof, or of any contract, or enforcement of this Agreement or
exercise of any of its rights under this Agreement;
(I) expropriation or compulsory acquisition by ITG or any of their
nominated agencies of any material assets or rights of the bidder
(J) unlawful or unauthorized revocation of, or refusal by any authority
other than ITG or any of their nominated agencies to renew or grant
any Required Consents required by the bidder to perform its
obligations without valid cause, provided that such delay,
modification, denial, refusal or revocation did not result from the
bidder’s inability or failure to comply with any condition relating to
grant, maintenance or renewal of such Required Consents applied on
a non-discriminatory basis;
(K) any requisition of the Project by any other authority; or
(L) any requisition of the Project by ITG or any of their nominated
agencies.
(M) For the avoidance of doubt, suspension of the Project in accordance
with the provisions of this Agreement shall not be considered a
requisition for the purposes of Force Majeure event.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 24 | P a g e
Other Events
(N) an act of war (whether declared or undeclared), hostilities, invasion,
armed conflict or act of foreign enemy, blockade, embargo,
prolonged riot, insurrection, terrorist or military action, civil
commotion or politically motivated sabotage, for a continuous period
exceeding seven (7) days.
For the avoidance of doubt, it is expressly clarified that the failure on the part of the bidder under
this Agreement or the SLA to implement any disaster contingency planning and back-up and
other data safeguards in accordance with the terms of this Agreement or the SLA against natural
disaster, fire, sabotage or other similar occurrence shall not be deemed to be a Force Majeure event.
For the avoidance of doubt, it is further clarified that any negligence in performance of Services
which directly causes any breach of security like hacking aren‟t the forces of nature and hence
wouldn‟t be qualified under the definition of “Force Majeure”. In so far as applicable to the
performance of Services, Service Provider will be solely responsible to complete the risk assessment and
ensure implementation of adequate security hygiene, best practices, processes and technology to prevent
any breach of security and any resulting liability therefrom (wherever applicable).
16.3 Notification procedure for Force Majeure
(a) The affected Party shall notify the other Party of a Force Majeure event within seven
(7) days of occurrence of such event. If the other Party disputes the claim for relief
under Force Majeure it shall give the claiming Party written notice of such dispute
within thirty (30) days of such notice. Such dispute shall be dealt with in accordance
with the dispute resolution mechanism in accordance with Clause
(b) Upon cessation of the situation which led the Party claiming Force Majeure, the
claiming Party shall within seven (7) days hereof notify the other Party in writing of
the cessation and the Parties shall as soon as practicable thereafter continue
performance of all obligations under this Agreement.
16.4 Allocation of costs arising out of Force Majeure
(a) Upon the occurrence of any Force Majeure Event prior to the Effective Date, the
Parties shall bear their respective costs and no Party shall be required to pay to the
other Party any costs thereof.
Upon occurrence of a Force Majeure Event after the Effective Date, the costs incurred and
attributable to such event and directly relating to the Project („Force Majeure Costs‟) shall be
allocated and paid as follows:
upon occurrence of a Non-Political Event, the Parties shall bear their respective
Force Majeure Costs and neither Party shall be required to pay to the other Party
any costs thereof.
upon occurrence of an Other Event of Force Majeure, all Force Majeure Costs
attributable to such Other Event, and not exceeding the Insurance Cover for such
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 25 | P a g e
Other Event, shall be borne by the bidder and to the extent Force Majeure costs
exceed such Insurance Cover, one half of such excess amount shall be reimbursed
by ITG to the bidder (optional clause – to be used, if relevant.)
upon occurrence of a Political Event, all Force Majeure Costs attributable to such
Political Event shall be reimbursed by ITG to the bidder
For the avoidance of doubt, Force Majeure Costs may include interest payments on
debt, operation and maintenance expenses, any increase in the cost of the Services
on account of inflation and all other costs directly attributable to the Force Majeure
Event.
Save and except as expressly provided in this Clause, neither Party shall be liable in
any manner whatsoever to the other Party in respect of any loss, damage, costs,
expense, claims, demands and proceedings relating to or arising out of occurrence
or existence of any Force Majeure Event or exercise of any right pursuant hereof.
16.5 Consultation and duty to mitigate
I. Except as otherwise provided in this Clause, the affected Party shall, at its own cost,
take all steps reasonably required to remedy and mitigate the effects of the Force
Majeure event and restore its ability to perform its obligations under this
Agreement as soon as reasonably practicable. The Parties shall consult with each
other to determine the reasonable measures to be implemented to minimize the
losses of each Party resulting from the Force Majeure event. The affected Party shall
keep the other Parties informed of its efforts to remedy the effect of the Force
Majeure event and shall make reasonable efforts to mitigate such event on a
continuous basis and shall provide written notice of the resumption of performance
hereunder.
17 Confidentiality
17.1 ITG or its nominated agencies shall allow the bidder to review and utilize highly
confidential public records and the bidder shall maintain the highest level of secrecy,
confidentiality and privacy with regard thereto.
17.2 Additionally, the bidder shall keep confidential all the details and information with regard
to the Project, including systems, facilities, operations, management and maintenance of the
systems/facilities.
17.3 ITG or its nominated agencies shall retain all rights to prevent, stop and if required take the
necessary punitive action against the bidder regarding any forbidden disclosure.
17.4 The bidder shall ensure that all its employees, agents and sub-contractors execute individual
non disclosure agreements, which have been duly approved by ITG with respect to this
Project.(Optional)
For the avoidance of doubt, it is expressly clarified that the aforesaid provisions shall not
apply to the following information:
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 26 | P a g e
(a) information already available in the public domain;
(b) information which has been developed independently by the bidder
(c) information which has been received from a third party who had the right to
disclose the aforesaid information;
(d) Information which has been disclosed to the public pursuant to a court order.
17.5 To the extent the bidder shares its confidential or propriteray information with ITG for
effective performance of the Services, the provisions of the Clause 17.1 to 17.3 shall apply
mutatis mutandis on ITG or its nominated agencies.
18 Audit, Access and Reporting
The bidder shall allow access to ITG or its nominated agencies to all information which is in the
possession or control of the bidder and which relates to the provision of the Services as set out in
the Audit, Access and Reporting Schedule and which is reasonably required by ITG to comply
with the terms of the Audit, Access and Reporting Schedule set out as Schedule IV of this
Agreement.
19 Intellectual Property Rights
19.1 Products and fixes: All products and related solutions and fixes provided pursuant to this
work order shall be licensed according to the terms of the license agreement packaged with or
otherwise applicable to such product. bidder would be responsible for arranging any licenses
associated with products. “Product” means any computer code, web-based services, or materials
comprising commercially released, pre-release or beta products (whether licensed for a fee or no
charge) and any derivatives of the foregoing which are made available to ITG for license which is
published by product owner or its affiliates, or a third party. “Fixes” means product fixes that are
either released generally (such as commercial product service packs) or that are provided to you
when performing services (such as workarounds, patches, bug fixes, beta fixes and beta builds)
and any derivatives of the foregoing.
19.2 Bespoke development: Subject to the provisions of Clause 19.3 and 19.4 below, upon
payment, the IPR rights for any bespoke development done during the implementation of the
project will lie with ITG. Bidder shall be entitled to a broad license back in the bespoke
development for its internal usage and other e-governance projects.
19.3 Pre-existing work: All IPR including the source code and materials developed or otherwise
obtained independently of the efforts of a party under this Agreement (“pre-existing work”)
including any enhancement or mdofification thereto shall remain the sole property of that party.
During the performance of the services for this agreement, each party grants to the other party
(and their sub-contractors as necessary) a non-exclusive license to use, reproduce and modify any
of its pre-existing work provided to the other party solely for the performance of such services for
duration of the Term of this Agreement. Except as may be otherwise explicitly agreed to in a
statement of services, upon payment in full, the bidder should grant ITG a non-exclusive, perpetual,
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 27 | P a g e
fully paid-up license to use the pre-existing work in the form delivered to ITG as part of the service
or deliverables only for its internal business operations. Under such license, either of parties will
have no right to sell the pre-existing work of the other party to a Third Party. ITG‟s license to
pre-existing work is conditioned upon its compliance with the terms of this Agreement and the
perpetual license applies solely to the pre-existing work that bidder leaves with ITG at the
conclusion of performance of the services.
19.4 Residuals: In no event shall bidder be precluded from independently developing for itself, or
for others, anything, whether in tangible or non-tangible form, which is competitive with, or
similar to, the deliverables, set-out in this Agreement or Annexure. In addition, subject to the
confidentiality obligations, bidder shall be free to use its general knowledge, skills and experience,
and any ideas, concepts, know-how, and techniques that are acquired or used in the course of
providing the Services.
20 Warranty
20.1 Standard: The bidder warrants that the Project, including all the system(s) and other Services
provided, shall be free from any defect or deficiency in the material, design, engineering, and
performance/workmanship that prevent the Project and/or any of its systems(s) from fulfilling
the technical requirements or that limit in a material fashion the performance, reliability, or
extensibility of the Project and/or any of its system(s) as per the performance guarantee /
warranty period defined in the Schedule. If during the warranty period any defect or deficiency is
found in the material, design and performance/workmanship of the Project and other Services
provided by the bidder, the bidder shall promptly, in consultation and agreement with ITG, and at
the bidder’s sole cost repair, replace, or otherwise make good (as the bidder shall, at its discretion,
determine) such default, defect or deficiency as well as any damage to the Project caused by such
default, defect or deficiency. Any defective system that has been replaced by the bidder shall
remain the property of the bidder If the Project or any of its System cannot be used by reason of
such default, defect or deficiency and/or making good of such default, defect or deficiency, the
warranty period for the Project shall be extended by a period equal to the period during which the
Project or any of its system could not be used by ITG because of such defect and/or making good
of such default, defect or deficiency.
20.2 Implied Warranty: The warranties provided herein are in lieu of all other warranties, both
express and implied, and all other warranties, including without limitation that of merchantability
or fitness for intended purpose is specifically disclaimed.
20.3 The bidder shall have no liability in the case of breach of this warranty due to (i) use of the
deliverables on any environment (hardware or software) other than the environment
recommended or approved by the bidder , (ii) the combination, operation, or use of some or all of
the deliverables with information, software, specifications, instructions, data, or materials not
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 28 | P a g e
approved by the bidder (iii) the deliverables having been tampered with, altered or modified by
ITG without the written permission of the bidder , or (iv) use of the deliverables otherwise than in
terms of the relevant documentation.
21 Liquidated Damages
Time is the essence of the Agreement and the delivery dates are binding on the bidder In the event
of delay or any gross negligence, for causes attributable to the System integrator, in meeting the
deliverables, ITG shall be entitled at its option to recover from the bidder as agreed, liquidated
damages, a sum of 0.5% of the value of the deliverable which suffered delay or gross negligence
for each completed week or part thereof subject to a limit of 5% of the relevant deliverable value.
22 Software Escrow Agreement
22.1 The bidder shall comply with the provisions below for all Public Material and Proprietary
Vendor Material (including subcontractor-owned materials and other Third Party Material
incorporated in bidder’s Proprietary Material), except to the extent bidder demonstrates to the
satisfaction of ITG that compliance is not permitted by the nature of bidder’s limited rights in
such material.
22.2 Within ninety (90) days after ITG‟s acceptance of the Solution, the Parties shall enter into a
software escrow agreement (“Escrow Agreement”) with a reputable, independent, third party
that provides software escrow services among its principal business offerings (“Escrow
Agent”). The Escrow Agreement shall provide for the regular deposit into escrow of all source
code (including without limitation all make files, configurational files, data tables upon which
execution is dependent, and the like, collectively the “Source Code”), object code, and
documentation with respect to all Public Material and bidder’s Proprietary Material (and
cumulative updates thereof), together with (a) continually updated instructions as to the
compilation, installation, configuration, deployment, and use of the Source Code, and (b) a list
of all non-deposited third party software used in conjunction with the Source Code to provide
the full functionality of the deposited materials. In the event of the termination or expiration of
the initial Escrow Agreement or any successor agreement, with minimal delay the Parties shall
enter into a substantially equivalent agreement with a successor provider of software escrow
services (who shall then be known as the “Escrow Agent”). The bidder has to handover source
code to ITG on completion of the Go-Liveof the project and thereafter every 6 monts
depending on the changes made in the eDistrict application.
22.3 Bidder will make its initial deposit of Source Code within fifteen (15) days after the effective
date of the Escrow Agreement.
22.4 Bidder shall periodically update the escrow deposit as the Parties shall agree in the Escrow
Agreement. In addition to other usual and customary terms, the Escrow Agreement shall
provide that ITG shall be entitled to obtain the deposited materials from escrow upon ITG‟s
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 29 | P a g e
making a proper claim for release from escrow in the event that (c) proper written notice is
given to the Escrow Agent that release of the copy of the deposited materials is pursuant to
applicable Central or ITG bankruptcy, insolvency, reorganization, or liquidation statute; (d)
bidder files articles of dissolution (but not if bidder is consolidated or merged into another
entity); (e) the Contract expires or terminates for Material Breach of bidder
22.5 The release of deposited materials from escrow shall not confer upon ITG any right of
ownership in the deposited materials or the underlying intellectual property embodied therein.
In the event of the release of deposited materials to ITG from escrow, ITG shall use the
deposited materials solely for the benefit of ITG and its constituents, consistently with the
grants of license set forth in Clause 19.2 of this Agreement.
22.6 The release of materials from escrow, without more, shall not cause any further amounts to
accrue as payable to bidder by ITG, and the term of ITG‟s possessory and usage rights with
respect to the released materials shall be perpetual.
22.7 The Escrow Agreement shall provide for its automatic termination upon the earlier of five
(5) years after the expiration or termination of this Contract, or, release of all Source Code to
ITG and ITG‟s subsequent confirmation of compliance with the terms of the Escrow
Agreement. bidder shall pay the escrow costs, as well as all costs associated with causing its
subcontractors and other third parties to abide by the Escrow Agreement.
23 Insurance Cover
23.1 Obligation to maintain insurance
In connection with the provision of the Services, the Service Provider must have and
maintain:
(a) for the Agreement Period, valid and enforceable insurance coverage for:
(i) public liability;
(ii) either professional indemnity or errors and omissions;
(iii) product liability;
(iv) workers‟ compensation as required by law; and
(v) any additional types specified in Schedule I; and
(b) for <three> years following the expiry or termination of the Agreement, valid and
enforceable insurance policies (if relevant),
in the amount not less than the Insurance Cover specified in Schedule I.
23.2 Certificates of currency
The bidder must, on request by ITG, provide current relevant confirmation of insurance
documentation from its insurance brokers certifying that it has insurance as required by this
Clause 23.The Service Provider agrees to replace any coverage prior to the date of
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 30 | P a g e
expiry/cancellation.
23.3 Non-compliance
ITG or its nominated agencies may, at its election, terminate this Agreement upon the failure of
bidder , or notification of such failure, to maintain the required insurance coverage. Inadequate
insurance coverage for any reason shall not relieve bidder of its obligations under this Agreement.
24 Miscellaneous
[24.1 Personnel
(a) The personnel assigned by bidder to perform the Services shall be employees of bidder or
its subcontractor(s), and under no circumstances shall such personnel be considered employees of
ITG or its nominated agencies. The bidder shall have the sole responsibility for the supervision and
control of the personnel deployed in the Project and for payment of such personnel‟s
compensation, including salary, withholding of income taxes and social security taxes, worker‟s
compensation, employee and disability benefits and the like and shall be responsible for all
obligations of an employer subject to Applicable Law.
(b) The bidder shall use its best efforts to ensure that sufficient bidder personnel are assigned
to perform the Services and that such personnel have appropriate qualifications to perform the
Services. After discussion with bidder , ITG or its nominated agencies shall have the right to
require the removal or replacement of any bidder personnel performing work under this
Agreement based on bonafide reasons. In the event that ITG or its nominated agencies requests
that any bidder personnel be replaced, the substitution of such personnel shall be accomplished
pursuant to a mutually agreed upon schedule.
(d) In the event that ITG and bidder identify any personnel of bidder as “Key Personnel”, then
the bidder shall not remove such personnel from the Project without the prior written consent of
ITG or its nominated agencies unless such removal is the result of an unavoidable circumstance
including but not limited to resignation, termination, medical leave, etc.
(e) Except as stated in this Clause, nothing in this Agreement or the SLA will limit the ability
of bidder to freely assign or reassign its employees; provided that bidder shall be responsible, at its
expense, for transferring all appropriate knowledge from personnel being replaced to their
replacements. ITG or its nominated agencies shall have the right to review and approve bidder‟s
plan for any such knowledge transfer. bidder shall maintain the same or higher standards for skills
and professionalism among replacement personnel as in personnel being replaced.
(f) Each Party shall be responsible for the performance of all its obligations under this
Agreement or the SLA as the case may be and shall be liable for the acts and omissions of its
employees and agents in connection therewith.
(g) Neither Party will solicit for employment or knowingly hire an employee of the other Party
with whom such Party has contact pursuant to project engagements under this Agreement. This
restriction shall not apply to employees of either Party responding to advertisements in job fairs or
news media circulated to the general public.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 31 | P a g e
24.2 Independent Contractor
Nothing in this Agreement or the SLA shall be construed as establishing or implying any
partnership or joint venture between the Parties to this Agreement or the SLA and, except as
expressly stated in this Agreement or the SLA, nothing in this Agreement or the SLA shall be
deemed to constitute any Parties as the agent of any other Party or authorizes either Party to:
(a) incur any expenses on behalf of the other Party;
(b) enter into any engagement or make any representation or warranty on behalf of the other
Party;
(c) pledge the credit of or otherwise bind or oblige the other Party; or
(d) commit the other Party in any way whatsoever without in each case obtaining the other
Party‟s prior written consent.]
24.3 Sub-contractors
[bidder shall not subcontract any work except <site preparation > without ITG‟s prior written
consent. However the bidder shall provide the list of all the other services planned to be sub
contracted, within 15 days of signing the Agreement. It is clarified that the bidder shall be the
principal employer for all claims arising from the liabilities statutory or otherwise, concerning the
sub-contractors. The bidder undertakes to indemnify ITG or its nominated agencies from any
claims on the grounds stated hereinabove.]
24.4 Assignment
(a) All terms and provisions of this Agreement shall be binding on and shall inure to
the benefit of ITG and their respective successors and permitted assigns.
(b) Subject to Clause 5.3, the bidder shall not be permitted to assign its rights and
obligations under this Agreement to any third party.
(c) ITG may assign or novate all or any part of this Agreement and
Schedules/Annexures, and the bidder shall be a party to such novation, to any third
party contracted to provide outsourced services to ITG or any of its nominees.
24.5 Trademarks, Publicity
Neither Party may use the trademarks of the other Party without the prior written consent of the
other Party except that bidder may, upon completion, use the Project as a reference for credential
purpose. Except as required by law or the rules and regulations of each stock exchange upon
which the securities of one of the Parties is listed, neither Party shall publish or permit to be
published either along or in conjunction with any other person any press release, information,
article, photograph, illustration or any other material of whatever kind relating to this Agreement,
the SLA or the business of the Parties without prior reference to and approval in writing from the
other Party, such approval not to be unreasonably withheld or delayed provided however that
bidder may include ITG or its client lists for reference to third parties subject to the prior written
consent of ITG not to be unreasonably withheld or delayed. Such approval shall apply to each
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 32 | P a g e
specific case and relate only to that case.
24.6 Notices
(a) Any notice or other document which may be given by either Party under this
Agreement or under the SLA shall be given in writing in person or by pre-paid
recorded delivery post, email or by facsimile transmission.
(b) In relation to a notice given under this Agreement, any such notice or other
document shall be addressed to the other Party‟s principal or registered office
address as set out below:
<Insert Address>
Tel:
Fax:
Email:
Contact:
With a copy to:
Bidder
Tel:
Fax:
Email:
Contact:
[In relation to a notice given under the MSA / SLA, a Party shall specify the Parties‟ address for
service of notices, any such notice to be copied to the Parties at the addresses set out in this Clause]
(d) Any such notice or other document shall be deemed to have been given to the other Party
(or, if relevant, its relevant associated company) when delivered (if delivered in person) if
delivered between the hours of 9.00 am and 5.00 pm at the address of the other Party set forth
above or if sent by fax, provided the copy fax is accompanied by a confirmation of transmission, or
on the next working day thereafter if delivered outside such hours, and 7 days from the date of
posting (if by letter).
(e) Either Party to this Agreement or to the SLA may change its address, telephone number,
facsimile number and nominated contact for notification purposes by giving the other reasonable
prior written notice of the new information and its effective date.
24.7 Variations and Further Assurance
(a) No amendment, variation or other change to this Agreement or the SLA shall be valid
unless authorised in accordance with the change control procedure as set out in the Change
Control Schedule set out in Schedule II of this Agreement. Such amendment shall be made in
writing and signed by the duly authorised representatives of the Parties to this Agreement or the
SLA.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 33 | P a g e
(b) Each Party to this Agreement or the SLA agrees to enter into or execute, without limitation,
whatever other agreement, document, consent and waiver and to do all other things which shall or
may be reasonably required to complete and deliver the obligations set out in this Agreement or
the SLA.
24.8 Severability and Waiver
(a) If any provision of this Agreement or the SLA, or any part thereof, shall be found by any
court or administrative body of competent jurisdiction to be illegal, invalid or unenforceable the
illegality, invalidity or unenforceability of such provision or part provision shall not affect the
other provisions of this Agreement or the SLA or the remainder of the provisions in question
which shall remain in full force and effect. The relevant Parties shall negotiate in good faith in
order to agree to substitute for any illegal, invalid or unenforceable provision a valid and
enforceable provision which achieves to the greatest extent possible the economic, legal and
commercial objectives of the illegal, invalid or unenforceable provision or part provision.
(b) No failure to exercise or enforce and no delay in exercising or enforcing on the part of
either Party to this Agreement or the SLA of any right, remedy or provision of this Agreement or
the SLA shall operate as a waiver of such right, remedy or provision in any future application nor
shall any single or partial exercise or enforcement of any right, remedy or provision preclude any
other or further exercise or enforcement of such right, remedy or provision or the exercise or
enforcement of any other right, remedy or provision.
24.9 Compliance with Applicable Law
Each Party to this Agreement accepts that its individual conduct shall (to the extent applicable to
its business like the Implementtaion Agency as an information technology service provider) at all
times comply with all laws, rules and regulations of government and other bodies having
jurisdiction over the area in which the Services are undertaken provided that changes in such laws,
rules and regulations which result in a change to the Services shall be dealt with in accordance
with the Change Control Schedule set out in Schedule II of this Agreement.
24.10 Professional Fees
All expenses incurred by or on behalf of each Party to this Agreement and the SLA, including all
fees of agents, legal advisors, accountants and actuaries employed by either of the Parties in
connection with the negotiation, preparation and execution of this Agreement or the SLA shall be
borne solely by the Party which incurred them.
24.11 Ethics
The bidder represents, warrants and covenants that it has given no commitments, payments, gifts,
kickbacks, lavish or expensive entertainment, or other things of value to any employee or agent of
ITG or its nominated agencies in connection with this agreement and acknowledges that the giving
of any such payment, gifts, entertainment, or other things of value is strictly in violation of ITG
standard policies and may result in cancellation of this Agreement, or the SLA.
24.12 Entire Agreement
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 34 | P a g e
This Agreement and the SLA with all schedules & annexures appended thereto and the contents
and specifications of the RFP constitute the entire agreement between the Parties with respect to
their subject matter, and as to all other representations, understandings or agreements which are
not fully expressed herein, provided that nothing in this Clause shall be interpreted so as to
exclude any liability in respect of fraudulent misrepresentation.]
24.13 Amendment
Any amendment to this Agreement shall be made in accordance with the Change Control
Schedule set out in Schedule II of this Agreement by mutual written consent of all the Parties.
25 Governing Law and Dispute Resolution
25.1 This Agreement shall be governed by and construed in accordance with the laws of India,
without giving effect to conflict of law rules. The parties expressly agree to exclude the
application of the U.N. Convention on Contracts for the International Sale of Goods (1980)
to this Agreement and the performance of the parties contemplated under this Agreement,
to the extent that such convention might otherwise be applicable.
25.2 Any dispute arising out of or in connection with this Agreement or the SLA shall in the first
instance be dealt with in accordance with the escalation procedure as set out in the
Governance Schedule set out as Schedule V of this Agreement.
25.3 In case the escalations do not help in resolution of the problem within 3 weeks of
escalation, both the parties should agree on a mediator for communication between the two
parties. The process of the mediation would be as follows:
Aggrieved party should refer the dispute to the identified mediator in writing, with a copy
to the other party. Such a reference should contain a description of the nature of the
dispute, the quantum in dispute (if any) and the relief or remedy sought suitable.
The mediator shall use his best endeavours to conclude the mediation within a certain
number of days of his appointment.
If no resolution can be reached through mutual discussion or mediation within 30 days
then the matter should be referred to Experts for advising on the issue.
25.4 In case the mediation does not help in resolution and it requires expertise to understand an
issue, a neutral panel of 3 experts, agreeable to both parties should be consitituted. The
process of the expert advisory would be as follows:
Aggrieved party should write to the other party on the failure of previous alternate dispute
resolution processes within the timeframe and requesting for expert advisory. This is to be
sent with a copy to the mediator.
Both parties should thereafter agree on the panel of experts who are well conversant with
the issue under dispute
The expert panel shall use his best endeavours to provide a neutral position on the issue.
If no resolution can be reached through the above means within 30 days then the matter
should be referred to Arbitration.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 35 | P a g e
25.5 Any dispute or difference whatsoever arising between the parties to this Contract out of or
relating to the construction, meaning, scope, operation or effect of this Contract or the
validity of the breach thereof shall be referred to a sole Arbitrator to be appointed by
mutual consent of both the parties herein. If the parties cannot agree on the appointment of
the Arbitrator within a period of one month from the notification by one party to the other
of existence of such dispute, then the Arbitrator shall be appointed by the High Court
Bombay at Goa/Panji Goa , India. The provisions of the Arbitration and Conciliation Act,
1996 will be applicable and the award made there under shall be final and binding upon
the parties hereto, subject to legal remedies available under the law. Such differences shall
be deemed to be a submission to arbitration under the Indian Arbitration and Conciliation
Act, 1996, or of any modifications, Rules or re-enactments thereof. The Arbitration
proceedings will be held at Goa, India. Any legal dispute will come under the sole
jurisdicition of Panaji-Goa, India.
25.6 Compliance with laws: Each party will comply with all applicable export and import laws
and regulations.
25.7 Risk of Loss: For each hardware item, bidder bears the risk of loss or damage up to the time
it is delivered to the Implementation/ITG-designated carrier for shipment to ITG or ITG‟s
designated location.
25.8 Third party components: bidder will provide all third party components solely on a pass-
through basis in accordance with the relevant third party terms and conditions.
IN WITNESS WHEREOF the Parties have by duly authorized
Representatives set their respective hands and seal on the date first above
Written in the presence of:
WITNESSES:
Signed by:
(Name and designation) For and on behalf of ITG
(FIRST PARTY)
Signed by:
(Name and designation)
Bidder
(SECOND PARTY)
(Name and designation) For and on behalf of Bidder
Signed by:
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 36 | P a g e
26 Schedules
SCHEDULE – I – DEFINITIONS
Adverse Effect means material adverse effect on
(a) the ability of the bidder to exercise any of its rights or perform/discharge
any of its duties/obligations under and in accordance with the provisions
of this Agreement and/or
(b) the legal validity, binding nature or enforceability of this Agreement;
Agreement means this Master Services Agreement, Service Level Agreement and Non-
Disclosure Agreement together with all Articles, Annexures, Schedules and
the contents and specifications of the RFP;
Applicable Law(s) means any statute, law, ordinance, notification, rule, regulation, judgment,
order, decree, bye-law, approval, directive, guideline, policy, requirement
or other governmental restriction or any similar form of decision applicable
to the relevant party and as may be in effect on the date of the execution of
this Agreement and during the subsistence thereof, applicable to the
Project;
Assets shall have the same meaning ascribed to it in Clause 10.1 (a)
Software means the software designed, developed / customized, tested and
deployed by the bidder for the purposes of the Project and includes the
source code (in case of Bespoke development) along with associated
documentation, which is the work product of the development efforts
involved in the Project and the improvements and enhancements effected
during the term of the Project, but does not include the third party software
products (including the COTS products used for thr product), proprietary
software components and tools deployed by the bidder
Business Hours shall mean the working time for ITG users which is 9:30 AM to 6:30 PM.
Again for Web Server and other components which enable successful usage
of web portals of ITG the working time should be considered as 24 hours
for all the days of the week. It is desired that IT maintenance, other batch
processes (like backup) etc. should be planned so that such backend
activities have minimum effect on the performance;
Certificate(s) of
Compliance
shall have the same meaning ascribed to it in Clause 5.4.;
Confidential
Information
means all information including ITG Data (whether in written, oral,
electronic or other format) which relates to the technical, financial and
business affairs, dealers, suppliers, products, developments, operations,
processes, data, trade secrets, design rights, know-how, plans, budgets and
personnel of each Party and its affiliates which is disclosed to or otherwise
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 37 | P a g e
learned by the other Party in the course of or in connection with this
Agreement (including without limitation such information received during
negotiations, location visits and meetings in connection with this
Agreement);
Control means, in relation to any business entity, the power of a person to secure (i)
by means of the holding of shares or the possession of voting power in or
in relation to that or any other business entity, or
(ii) by virtue of any powers conferred by the articles of association or other
document regulating that or any other business entity, that the affairs of the
first mentioned business entity are conducted in accordance with that
person‟s wishes and in relation to a partnership, means the right to a share
of more than one half of the assets, or of more than one half of the income,
of the partnership;
Deliverables means the products, infrastructure and services agreed to be delivered by
the bidder in pursuance of the agreement as defined more elaborately in the
RFP, Implementation and the Maintenance phases and includes all
documents related to the user manual, technical manual, design, process
and operating manuals, service mechanisms, policies and guidelines (such
as security related, data migration related), inter alia payment and/or
process related etc., source code and all its modifications;
Proprietary
Information
shall have the same meaning ascribed to it in Clause 19.1
Effective Date shall have the same meaning ascribed to it in Clause 3.2;
ITG Data means all proprietary data of the department or its nominated agencies
generated out of operations and transactions, documents all taxpayers data
and related information including but not restricted to user data which the
bidder obtains, possesses or processes in the context of providing the
Services to the users pursuant to this Agreement;
Final Acceptance
Test
shall be conducted on completion of the following:
1) ITG Data Center operational,
2) Deployment & operational hardware and networking at requisite
locations,
3) UAT of the overall integrated solution and portal.
Final Testing and
Certification
Agency
shall have the same meaning ascribed to it in Clause 5.4;
Force Majeure shall have the same meaning ascribed to it in Clause 16.1;
Force Majeure Costs shall have the same meaning ascribed to it in Clause 16.4 (b);
GoI means the Government of India;
Indemnifying Party shall have the same meaning ascribed to it in Clause 15.1;
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 38 | P a g e
Indemnified Party shall have the same meaning ascribed to it in Clause 15.1;
Intellectual
Property Rights
means all rights in written designs and copyrights, moral rights, rights in
databases and Bespoke Software / Pre-existing work including its up-
gradation systems and compilation rights (whether or not any of these are
registered and including application for registration);
Escrow Agreement - An agreement that pursuant to Clause 22 provides for the
regular deposit into escrow of all source code, object code, and
documentation with respect to all public material and Service
Provider‟s proprietary material (and cumulative updates
thereof), together with (a) continually updated instructions as to
the compilation,installation, configuration, deployment and use
of the Source Code, and (b) a list of all non-deposited third party
software used in conjunction with the Source Code to provide
the full functionality of the deposited materials.
Insurance Cover - Public liability insurance for an insured amount of [INR insert
amount] per occurrence and not less than [INR insert amount] in
aggregate
- Either professional indemnity or errors and omissions insurance for
an insured amount of [INR insert amount] per occurrence and not
less than [INR insert amount] in aggregate.
- Product liability for an insured amount of [INR insert amount] per
occurrence and not less than [INR insert amount] in aggregate.
- Workers compensation as required by law
Material Breach means a breach by either Party (ITG or Bidder ) of any of its obligations
under this Agreement which has or is likely to have an Adverse Effect on
the Project which such Party shall have failed to cure;
Required
Deliverables
shall have the same meaning ascribed to it in Annexure C of this
Agreement;
Parties means ITG and bidder for the purposes of this Agreement and “Party” shall
be interpreted accordingly;
Performance
Guarantee
Means the guarantee provided by a Nationalized Bank in favour of the
bidder The amount of Performance Security shall be 10% of the overall cost
of the project. This performance security shall be valid till six months after
the completion of the project i.e. ---- years from the date of signing of
contract or for such time as is required under this Agreement;
Planned
Application
Downtime
means the unavailability of the application services due to maintenance
activities such as configuration changes, upgradation or changes to any
supporting infrastructure wherein prior intimation (at least two working
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 39 | P a g e
days in advance) of such planned outage shall be given and approval
sought from ITG as applicable;
Planned network
outage
means the unavailability of the network services due to infrastructure
maintenance activities such as configuration changes, upgradation or
changes to any supporting infrastructure. Prior intimation of such planned
outage shall be given and approval sought from ITG as applicable and shall
be notified at least two working days;
Project means Pilot, Project Implementation (roll out) and Maintenance in terms of
the Agreement;
Project
Implementation
means Project Implementation as per the testing standards and acceptance
criteria prescribed by ITG or its nominated agencies;
Project
Implementation
Phase
shall be from the Effective Date of the Agreement to the date of final
acceptance testing & certification as set out in Clause 5.4 of this Agreement;
Project
Implementation
Unit (PIU)
shall be constituted by ITG to monitor the activities, deliverables and
progress of the Project. PIU will comprise of the staff members of ITG,
other officials from concerned department and external experts (as defined
in the RFP);
Project Timelines shall have the same meaning ascribed to in Annexure C;
Providing Party shall have the same meaning ascribed to it in Clause 12.5;
Receiving Party shall have the same meaning ascribed to it in Clause 12.5;
Replacement bidder means any third party that ITG or its nominated agencies appoint to
replace bidder upon expiry of the Term or termination of this Agreement to
undertake the Services or part thereof;
Required Consents means the consents, waivers, clearances and licenses to use ITG's
Intellectual Property Rights, rights and other authorizations as may be
required to be obtained for the software and other items that ITG or their
nominated agencies are required to make available to bidder pursuant to
this Agreement;
Services means the services delivered to the Stakeholders of ITG or its nominated
agencies, employees of ITG or its nominated agencies, and to professionals,
using the tangible and intangible assets created, procured, installed,
managed and operated by the bidder including the tools of information and
communications technology and includes but is not limited to the list of
services specified in Annexure B;
Service Level means the level of service and other performance criteria which will apply
to the Services delivered by the bidder
SLA means the Performance and Maintenance SLA executed as part of this
Master Service Agreement;
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 40 | P a g e
Stakeholders means the students, Franchisee‟s, Investors, Citizens, ITG or its nominated
agencies, ITG, employees and the Departments of State Government;
Term shall have the same meaning ascribed to it in Clause 3.1;
Third Party Systems means systems (or any part thereof) in which the Intellectual Property
Rights are not owned by ITG or bidder and to which bidder has been granted
a license to use and which are used in the provision of Services;
Unplanned
Application
Downtime
means the total time for all the instances where services in the software
requirement specification document prepared by the bidder are not
available for more than 5 consecutive minutes;
Network in ITG users refers to all the IT assets installed by the bidder as part of the
Project for networking;
Unplanned network
outage
means the total time for all the instances where services in the software
requirement specification document prepared by the bidder are not
available for more than 5 consecutive minutes;
Application means the software application developed as a part of scope of work set
out in Clause 2.1(a)
Application
Downtime
means the time for which user/s is not able to access the application.
However, in calculating downtime, scheduled downtime (for example,
backup time, batch processing time, routine maintenance time) would not
be considered;
Network Uptime Uptime refers to network availability between ITG‟s Head Quarters to Data
center. “%Uptime” means ratio of „up time‟ (in minutes) in a month to
Total time in the month (in minutes) multiplied by 100;
Warranty 3 years for software from date of Go live and 5 years for hardware from
date of installation
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 41 | P a g e
SCHEDULE – II – Change Control Schedule
This Schedule describes the procedure to be followed in the event of any proposed change to the
Master Service Agreement (“MSA”), Project Implementation Phase, SLA and Scope of Work and
Functional Requirement Specifications. Such change shall include, but shall not be limited to,
changes in the scope of services provided by the bidder and changes to the terms of payment as
stated in the Terms of Payment Schedule.
ITG and SI recognize that frequent change is an inevitable part of delivering services and that a
significant element of this change can be accomplished by re-organizing processes and
responsibilities without a material effect on the cost. The SI will endeavour, wherever reasonably
practicable, to effect change without an increase in the terms of payment as stated in the Terms of
Payment Schedule and ITG or its nominated agencies will work with the bidder to ensure that all
changes are discussed and managed in a constructive manner. This Change Control Schedule sets
out the provisions which will apply to all the changes to this agreement and other documents
except for the changes in SLAs for which a separate process has been laid out in Clause 11 of the
SLA.
This Change Control Schedule sets out the provisions which will apply to changes to the MSA.
CHANGE MANAGEMENT PROCESS
a. CHANGE CONTROL NOTE ("CCN")
i. Change requests in respect of the MSA, the Project Implementation, the operation, the
SLA or Scope of work and Functional Requirement specifications will emanate from the
Parties' respective Project Manager who will be responsible for obtaining approval for
the change and who will act as its sponsor throughout the Change Control Process and
will complete Part A of the CCN attached as Annexure A hereto. CCNs will be
presented to the other Party's Project Manager who will acknowledge receipt by
signature of the CCN.
ii. The SI and ITG or its nominated agencies, during the Project Implementation Phase and
ITG or its nominated agencies during the Operations and Management Phase and
while preparing the CCN, shall consider the change in the context of the following
parameter, namely whether the change is beyond the scope of Services including
ancillary and concomitant services required and as detailed in the RFP and is
suggested and applicable only after the testing, commissioning and certification of the
Pilot Phase and the Project Implementation Phase as set out in this Agreement.
iii. It is hereby also clarified here that any change of control suggested beyond 25 % of the
value of this Project will be beyond the scope of the change control process and will be
considered as the subject matter for a separate bid process and a separate contract. It is
hereby clarified that the 25% of the value of the Project as stated in herein above is
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 42 | P a g e
calculated on the basis of bid value submitted by the bidder and accepted by ITG or its
nominated agencies or as decided and approved by ITG or it Nominated Agencies. For
arriving at the cost / rate for change upto 25% of the project value, the payment terms
and relevant rates as specified in Annexure D shall apply.
b. Quotation
i. The SI shall assess the CCN and complete Part B of the CCN, in completing the Part B
of the CCN the SI shall provide as a minimum:
1. a description of the change
2. a list of deliverables required for implementing the change;
3. a time table for implementation;
4. an estimate of any proposed change
5. any relevant acceptance criteria
6. an assessment of the value of the proposed change;
6. material evidence to prove that the proposed change is not already covered
within the Agreement and the scope of work
ii. Prior to submission of the completed CCN to ITG, or its nominated agencies, the
Service Provider will undertake its own internal review of the proposal and obtain all
necessary internal approvals. As a part of this internal review process, the SI shall
consider the materiality of the proposed change in the context of the MSA and the
Project Implementation affected by the change and the total effect that may arise from
implementation of the change.
c. Costs
Each Party shall be responsible for its own costs incurred in the quotation, preparation of
CCNs and in the completion of its obligations described in this process provided the SI
meets the obligations as set in the CCN. In the event the SI is unable to meet the obligations
as defined in the CCN then the cost of getting it done by third party will be borne by the SI.
d. Obligations
The SI shall be obliged to implement any proposed changes once approval in accordance
with above provisions has been given, with effect from the date agreed for implementation
and within an agreed timeframe. SI will not be obligated to work on a change until the
parties agree in writing upon its scope, price and/or schedule impact.
SCHEDULE – III - EXIT MANAGEMENT SCHEDULE
1 PURPOSE
1.1 This Schedule sets out the provisions, which will apply on expiry or termination of the
MSA, the Project Implementation, Operation and Management SLA.
1.2 In the case of termination of the Project Implementation and/or Operation and
Management, the Parties shall agree at that time whether, and if so during what period, the
provisions of this Schedule shall apply.
1.3 The Parties shall ensure that their respective associated entities carry out their respective
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 43 | P a g e
obligations set out in this Exit Management Schedule.
2 TRANSFER OF ASSETS
2.1 ITG shall be entitled to serve notice in writing on the SI at any time during the exit
management period as detailed hereinabove requiring the SI and/or its sub contractors to
provide ITG with a complete and up to date list of the Assets within 30 days of such notice.
ITG shall then be entitled to serve notice in writing on the SI at any time prior to the date
that is 30 days prior to the end of the exit management period requiring the SI to sell the
Assets, if any, to be transferred to ITG or its nominated agencies at book value as
determined as of the date of such notice in accordance with the provisions of relevant laws.
2.2 In case of contract being terminated by ITG, ITG reserves the right to ask SI to continue
running the project operations for a period of 6 months after termination orders are issued.
2.3 Upon service of a notice under this Article the following provisions shall apply:
(i) in the event, if the Assets to be transferred are mortgaged to any financial
institutions by the SI, the SI shall ensure that all such liens and liabilities have been
cleared beyond doubt, prior to such transfer. All documents regarding the discharge
of such lien and liabilities shall be furnished to ITG.
(ii) All risk in and title to the Assets to be transferred / to be purchased by ITG
pursuant to this Article shall be transferred to ITG, on the last day of the exit
management period.
(iii) ITG shall pay to the SI on the last day of the exit management period such sum
representing the Net Block (procurement price less depreciation as per provisions of
Companies Act) of the Assets to be transferred as stated in the Terms of Payment
Schedule.
(iv) Payment to the outgoing SI shall be made to the tune of last set of completed
services / deliverables, subject to SLA requirements.
(v) The outgoing SI will pass on to ITG and/or to the Replacement SI, the subsisting
rights in any leased properties/ licensed products on terms not less favorable to
ITG/Replacement SI, than that enjoyed by the outgoing SI.
3 COOPERATION AND PROVISION OF INFORMATION
3.1 During the exit management period:
(i) The bidder will allow ITG or its nominated agency access to information reasonably
required to define the then current mode of operation associated with the provision
of the services to enable ITG to assess the existing services being delivered;
(ii) promptly on reasonable request by ITG, the SI shall provide access to and copies of
all information held or controlled by them which they have prepared or maintained
in accordance with this agreement relating to any material aspect of the services
(whether provided by the bidder or sub contractors appointed by the Bidder ). ITG
shall be entitled to copy of all such information. Such information shall include
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 44 | P a g e
details pertaining to the services rendered and other performance data. The bidder
shall permit ITG or its nominated agencies to have reasonable access to its
employees and facilities as reasonably required by the Chairman, PIU to
understand the methods of delivery of the services employed by the bidder and to
assist appropriate knowledge transfer.
4 CONFIDENTIAL INFORMATION, SECURITY AND DATA
4.1 The bidder will promptly on the commencement of the exit management period supply to
ITG or its nominated agency the following:
(i) information relating to the current services rendered and customer and performance
data relating to the performance of sub contractors in relation to the services;
(ii) documentation relating to Computerization Project‟s Intellectual Property Rights;
(iii) documentation relating to sub-contractors;
(iv) all current and updated data as is reasonably required for purposes of ITG or its
nominated agencies transitioning the services to its Replacement bidder in a readily
available format nominated by ITG, its nominated agency;
(v) all other information (including but not limited to documents, records and
agreements) relating to the services reasonably necessary to enable ITG or its
nominated agencies, or its Replacement bidder to carry out due diligence in order to
transition the provision of the Services to ITG or its nominated agencies, or its
Replacement bidder (as the case may be).
4.2 Before the expiry of the exit management period, the bidder shall deliver to ITG or its
nominated agency all new or up-dated materials from the categories set out in Schedule
above and shall not retain any copies thereof, except that the bidder shall be permitted to
retain one copy of such materials for archival purposes only.
4.3 Before the expiry of the exit management period, unless otherwise provided under the
MSA, ITG or its nominated agency shall deliver to the bidder all forms of bidder confidential
information, which is in the possession or control of Chairperson, PIU or its users.
5 EMPLOYEES
5.1 Promptly on reasonable request at any time during the exit management period, the bidder
shall, subject to applicable laws, restraints and regulations (including in particular those
relating to privacy) provide to ITG or its nominated agency a list of all employees (with job
titles) of the bidder dedicated to providing the services at the commencement of the exit
management period.
5.2 Where any national, regional law or regulation relating to the mandatory or automatic
transfer of the contracts of employment from the bidder to ITG or its nominated agency, or a
Replacement bidder ("Transfer Regulation") applies to any or all of the employees of the
bidder , then the Parties shall comply with their respective obligations under such Transfer
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 45 | P a g e
Regulations.
5.3 To the extent that any Transfer Regulation does not apply to any employee of the bidder ,
department, or its Replacement bidder may make an offer of employment or contract for
services to such employee of the bidder and the bidder shall not enforce or impose any
contractual provision that would prevent any such employee from being hired by the
Chairperson, PIU or any Replacement bidder
6 TRANSFER OF CERTAIN AGREEMENTS
On request by ITG or its nominated agency the bidder shall effect such assignments, transfers,
licences and sub-licences as the Chairperson, PIU may require in favour of the Chairperson, PIU,
or its Replacement bidder in relation to any equipment lease, maintenance or service provision
agreement between bidder and third party lessors, vendors, and which are related to the services
and reasonably necessary for the carrying out of replacement services by ITG or its nominated
agency or its Replacement bidder
7 RIGHTS OF ACCESS TO PREMISES
7.1 At any time during the exit management period, where Assets are located at the Bidder 's
premises, the bidder will be obliged to give reasonable rights of access to (or, in the case of
Assets located on a third party's premises, procure reasonable rights of access to) ITG or its
nominated agency and/or any Replacement bidder in order to make an inventory of the
Assets.
7.2 The bidder shall also give ITG or its nominated agency or its nominated agencies, or any
Replacement bidder right of reasonable access to the Implementation Partner's premises
and shall procure ITG or its nominated agency or its nominated agencies and any
Replacement bidder rights of access to relevant third party premises during the exit
management period and for such period of time following termination or expiry of the
MSA as is reasonably necessary to migrate the services to ITG or its nominated agency, or a
Replacement bidder
8 GENERAL OBLIGATIONS OF THE Bidder
8.1 The bidder shall provide all such information as may reasonably be necessary to effect as
seamless a handover as practicable in the circumstances to ITG or its nominated agency or
its Replacement bidder and which the bidder has in its possession or control at any time
during the exit management period.
8.2 For the purposes of this Schedule, anything in the possession or control of any bidder ,
associated entity, or sub contractor is deemed to be in the possession or control of the bidder
8.3 The bidder shall commit adequate resources to comply with its obligations under this Exit
Management Schedule.
9 EXIT MANAGEMENT PLAN
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 46 | P a g e
9.1 The bidder shall provide ITG or its nominated agency with a recommended exit
management plan ("Exit Management Plan") which shall deal with at least the following
aspects of exit management in relation to the MSA as a whole and in relation to the Project
Implementation, and the Operation and Management SLA.
(i) A detailed program of the transfer process that could be used in conjunction with a
Replacement bidder including details of the means to be used to ensure continuing
provision of the services throughout the transfer process or until the cessation of the
services and of the management structure to be used during the transfer;
(ii) plans for the communication with such of the Bidder 's sub contractors, staff,
suppliers, customers and any related third party as are necessary to avoid any
material detrimental impact on ITG‟s operations as a result of undertaking the
transfer;
(iii) (if applicable) proposed arrangements for the segregation of the Bidder 's networks
from the networks employed by ITG and identification of specific security tasks
necessary at termination;
(iv) Plans for provision of contingent support to ITG, and Replacement bidder for a
reasonable period after transfer.
9.2 The bidder shall re-draft the Exit Management Plan annually thereafter to ensure that it is
kept relevant and up to date.
9.3 Each Exit Management Plan shall be presented by the bidder to and approved by ITG or its
nominated agencies.
9.4 The terms of payment as stated in the Terms of Payment Schedule include the costs of the
bidder complying with its obligations under this Schedule.
9.5 In the event of termination or expiry of MSA, and Project Implementation, each Party shall
comply with the Exit Management Plan.
9.6 During the exit management period, the bidder shall use its best efforts to deliver the
services.
9.7 Payments during the Exit Management period shall be made in accordance with the Terms
of Payment Schedule.
9.8 This Exit Management plan shall be furnished in writing to ITG or its nominated agencies
within 90 days from the Effective Date of this Agreement.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 47 | P a g e
SCHEDULE – IV - AUDIT, ACCESS AND REPORTING
1 PURPOSE
This Schedule details the audit, access and reporting rights and obligations of ITG or its nominated
agency and the Bidder
.
2 AUDIT NOTICE AND TIMING
2.1 As soon as reasonably practicable after the Effective Date, the Parties shall use their best
endeavours to agree to a timetable for routine audits during the Project Implementation
Phase and the Operation and Management Phase. Such timetable during the
Implementation Phase, ITG or its nominated agency and thereafter during the operation
Phase, ITG or its nominated agency shall conduct routine audits in accordance with such
agreed timetable and shall not be required to give the bidder any further notice of carrying
out such audits.
2.2 ITG or its nominated agency may conduct non-timetabled audits at his/ her own discretion
if it reasonably believes that such non-timetabled audits are necessary as a result of an act of
fraud by the bidder , a security violation, or breach of confidentiality obligations by the
bidder , provided that the requirement for such an audit is notified in writing to the bidder a
reasonable period time prior to the audit (taking into account the circumstances giving rise
to the reasonable belief) stating in a reasonable level of detail the reasons for the
requirement and the alleged facts on which the requirement is based. If the bidder considers
that the non-timetabled audit was not appropriate, the matter shall be referred to the
escalation procedure as set out in the Governance Schedule.
2.3 The frequency of audits shall be a (maximum) half yearly, provided always that ITG or its
nominated agency shall endeavour to conduct such audits with the lowest levels of
inconvenience and disturbance practicable being caused to the bidder Any such audit shall
be conducted by with adequate notice of 2 weeks to the bidder
2.4 ITG will ensure that any 3rd party agencies (except CAG) appointed to conduct the audit
will not be the competitor of bidder and will be bound by confidentiality obligations.
3 ACCESS
The bidder shall provide to ITG or its nominated agency reasonable access to employees,
subcontractors, suppliers, agents and third party facilities as detailed in the RFP, documents,
records and systems reasonably required for audit and shall provide all such persons with routine
assistance in connection with the audits and inspections. The Chairperson, PIU / Steering
Committee shall have the right to copy and retain copies of any relevant records. The bidder shall
make every reasonable effort to co-operate with them.
4 AUDIT RIGHTS
4.1 ITG or its nominated agency shall have the right to audit and inspect suppliers, agents and
third party facilities (as detailed in the RFP), data centres, documents, records, procedures
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 48 | P a g e
and systems relating to the provision of the services, but only to the extent that they relate
to the provision of the services, as shall be reasonably necessary to verify:
(i) The security, integrity and availability of all data processed, held or conveyed by
the Partner on behalf of ITG and documentation related thereto;
(ii) That the actual level of performance of the services is the same as specified in the
SLA;
(iii) That the bidder has complied with the relevant technical standards, and has
adequate internal controls in place; and
(iv) The compliance of the bidder with any other obligation under the MSA and SLA.
(v) Security audit and implementation audit of the system shall be done once each year,
the cost of which shall be borne by the bidder
(vi) For the avoidance of doubt the audit rights under this Schedule shall not include
access to the Bidder 's profit margins or overheads, any confidential information
relating to the Bidder ‟ employees, or (iii) minutes of its internal Board or Board
committee meetings including internal audit, or (iv) such other information of
commercial-in-confidence nature which are not relevant to the Services associated
with any obligation under the MSA.
5 AUDIT RIGHTS OF SUB-CONTRACTORS, SUPPLIERS AND AGENTS
5.1 The bidder shall use reasonable endeavours to achieve the same audit and access provisions
as defined in this Schedule with sub-contractors, suppliers and agents who supply labour,
services, equipment or materials in respect of the services. The bidder shall inform ITG or its
nominated agency prior to concluding any sub-contract or supply agreement of any failure
to achieve the same rights of audit or access.
5.2 REPORTING: The bidder will provide quarterly reports to the Chairperson, PIU / Steering
committee regarding any specific aspects of the Project and in context of the audit and
access information as required by ITG or its nominated agency.
6 ACTION AND REVIEW
6.1 Any change or amendment to the systems and procedures of the bidder , or sub-contractors,
where applicable arising from the audit report shall be agreed within thirty (30) calendar
days from the submission of the said report.
6.2 Any discrepancies identified by any audit pursuant to this Schedule shall be immediately
notified to ITG or its nominated agency and the bidder Project Manager who shall
determine what action should be taken in respect of such discrepancies in accordance with
the terms of the MSA.
7 TERMS OF PAYMENT
ITG shall bear the cost of any audits and inspections. The terms of payment are exclusive of any
costs of the bidder and the sub-contractor, for all reasonable assistance and information provided
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 49 | P a g e
under the MSA, the Project Implementation, Operation and Management SLA by the bidder
pursuant to this Schedule.
8 RECORDS AND INFORMATION
For the purposes of audit in accordance with this Schedule, the bidder shall maintain true and
accurate records in connection with the provision of the services and the bidder shall handover all
the relevant records and documents upon the termination or expiry of the MSA.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 50 | P a g e
SCHEDULE – V - GOVERNANCE SCHEDULE
1 PURPOSE
The purpose of this Schedule is to:
(i) establish and maintain the formal and informal processes for managing the
relationship between ITG and the bidder (including the outputs from other
Schedules to this Agreement;
(ii) define the principles that both Parties wish to follow to ensure the delivery of the
Services;
(iii) ensure the continued alignment of the interests of the Parties;
(iv) ensure that the relationship is maintained at the correct level within each Party;
(v) create the flexibility to revise and maintain the relationship and this Agreement
during the Term;
(vi) set out the procedure for escalating disagreements; and
(vii) enable contract administration and performance management.
2 GOVERNANCE STRUCTURE
1. Project Managers: The relationship under this Agreement will be managed by the
Project Managers appointed by each Party, who will provide the interface between
the executive management of the respective Parties.
2. Project Implementation Unit (PIU): Within 7 days following the Effective Date, ITG
or its nominated agencies and the bidder shall each appoint a Project Manager. In the
event that either Party wishes to substitute its Project Manager it will do so in
manner in which the original appointment is made and notify the other Party of
such substitution as soon as reasonably practicable but at the latest within 7 days of
the substitution.
3. The Project Managers shall have responsibility for maintaining the interface and
communication between the Parties.
4. The PIU will meet formally on a fortnightly / monthly / quarterly, as required,
basis at a time and location to be agreed between them. These meetings will cover, as
a minimum, the following agenda items: (i) consideration of Quarterly Performance
Reports; (ii) consideration of matters arising out of the Change Control Schedule;
(iii) issues escalated in accordance with the escalation procedure as set out in the
Governance Schedule; (iv) matters to be brought before the PIU in accordance with
the MSA and the Schedules; (v) any matter brought before the PIU by the bidder
under this Article; and (vi) any other issue which either Party wishes to add to the
agenda.
5. In the event that there is any material factor which affects the delivery of the
Services or the terms of payment as stated in the Terms of Payment Schedule, the
Parties agree to discuss in the PIU any appropriate amendment to the Agreement or
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 51 | P a g e
any Service Level Agreements or Statement of Works including any variation to the
terms of payment as stated in the Terms of Payment Schedule. Any variation so
agreed shall be implemented through the change control procedure as set out in the
Change Control Schedule.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 52 | P a g e
3 GOVERNANCE PROCEDURES
3.1 The bidder shall document the agreed structures in a procedures manual.
3.2 The agenda for each meeting of the PIU shall be set to reflect the discussion items referred
to above and extraordinary items may be added either with the agreement of the Parties or
at the request of either Party. Copies of the agenda for meetings of the PIU, along with
relevant pre-reading material, shall be distributed at least one week in advance of the
relevant meeting.
3.3 All meetings and proceedings will be documented such documents to be distributed to the
Parties and copies shall be kept as a record. All actions, responsibilities and accountabilities
arising out of any meeting shall be tracked and managed.
3.4 The Parties shall ensure as far as reasonably practicable that the PIU shall resolve the issues
and resolve the objectives placed before them and that members representing that Party are
empowered to make relevant decisions or have easy access to empowered individuals for
decisions to be made to achieve this.
3.5 In order to formally submit a Disputed Matter to the aforesaid for a, one Party ("Claimant")
shall give a written notice ("Dispute Notice") to the other Party. The Dispute Notice shall be
accompanied by (a) a statement by the Claimant describing the Disputed Matter in
reasonable detail and (b) documentation, if any, supporting the Claimant's position on the
Disputed Matter.
3.6 The other Party ("Respondent") shall have the right to respond to the Dispute Notice within
7 days after receipt of the Dispute Notice. In the event that the parties are unable to resolve
the Disputed Matter within a further period of 7 days, it shall refer the Disputed Matter to
next level of the dispute resolution for action as per the process mentioned in article 9.1
3.7 All negotiations, statements and / or documentation pursuant to these Articles shall be
without prejudice and confidential (unless mutually agreed otherwise).
3.8 If the Disputed Matter is having a material effect on the operation of the Services (or any of
them or part of them) the Parties will use all their respective reasonable endeavours to
reduce the elapsed time in reaching a resolution of the Disputed Matter.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 53 | P a g e
SCHEDULE – VI - TERMS OF PAYMENT SCHEDULE
The following schedule would be followed for payment during the Project implementation:
S. No.
Payment Milestone % of Total Fee
Basis of Approval
1. Deployment of necessary hardware at SDC establishment and submission of assessment report.
5 Approval of the DeGS and ITG/DoIT. The payment will be disbursed on the basis of district - wise readiness.
2. Successful District Readiness for all offices, i.e. Completion of all activities/commissioning of all hardware & networking equipment‟s in a district; i.e. Hardware Network Training (w.r.t. 26 Services) Data Digitization (w.r.t 26
Services) Placement of Technical Support in
the district
15
3. “Go-Live” of first set of 10 Services in State of Goa
15 Definition of “Go-Live” is appended below, Copy of STQC certification
4. “Go-Live” of remaining set of 16 Services in State of Goa
15 Definition of “Go-Live” is appended below, Copy of STQC certification
5. Operations and Maintenance Phase (3 years for software from date of Go live and 5 years for hardware from date of installation )
40 To be paid quarterly (3.33 % per quarter) for 36 (12 Quarters)
6. Successful Exit Management 10 Minutes of meeting of the Apex Committee
Total 100
Key note: 1. Payment will only be released to the System Integrator (SI) after all the compliance as per Go-Live
definition has been met by the System Integrator (SI) 2. Payment of hardware procurement & data digitization shall be based on actuals
Definition of Go-Live Go-live of e-district project in a district as fulfillment of all the following categories: Go-Live of the services includes successful District Readiness for all offices, i.e. Completion of all
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 54 | P a g e
activities like Placement of all the Associate Project Manager (Division), Technical Support Leads (District), Site preparation, Networking, Commissioning of all Hardware, Training, Data Digitization in all the district and “Successful delivery of targeted transactions” as explained below:- Successful Delivery of Targeted Transactions 1. Go -live of 26 services as provided in the RFP are made live. Go-live for these 26 services
would imply there would be at least the following number of transactions per month for a
period of 3 consecutive months for that service based on the population of the district as
following:
a. Districts with population <5 Lakhs –at least 10 transactions per month for each service
b. Districts with population <10 Lakhs- at least 20 transactions per month for each service
c. Districts with population >10 Lakhs- at least 30 transactions per month for each service
a. Among the services listed in the RFP, at least 10 services should attain high volume of
transactions for three consecutive months in that district. High volume of transactions are
defined as:Districts with population <5 Lakhs –High volume services would be those
defined as at least 50 transactions per month per service for the entire district
b. Districts with population <10 Lakhs but >5 Lakhs – High volume services would be those
defined as at least 100 transactions per month per service for the entire district
c. Districts with population >10 Lakhs. High volume services would be those defined as at
least 150 transactions per month per service for the entire district
2. At least three of the “High Volume services” as defined above in Sl no. (2) Should be
amenable to delivery across the counter,
3. The aggregate transactions for all services for all services (including High Volume
services)made live, out of the services included in the RFP, reach the following levels for at
least three consecutive months in that district
a. Districts with population <5 Lakhs –at least 750 transactions per month for the entire
district
b. Districts with population <10 Lakhs but >5 Lakhs –at least 1500 transactions per month for
the entire district
c. Districts with population >10 Lakhs –at least 2500 transactions per month for the entire
district Note: Transaction would be defined a complete service being delivered to the citizen which may include submission of an application by the citizen, back end processing and service delivery. Across the counter service delivery will also count as a transaction.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 55 | P a g e
27 Annexures
ANNEXURE – A – FORMAT FOR CHANGE COTROL NOTICE
Change Control Note CCN Number:
Part A: Initiation
Title:
Originator:
Sponsor:
Date of Initiation:
Details of Proposed Change
(To include reason for change and appropriate details/specifications. Identify any attachments as
A1, A2, and A3 etc.)
Authorised by ITG Date:
Name:
Signature:
Received by the SI
Date:
Name:
Signature:
Change Control Note
CCN Number:
Part B : Evaluation
(Identify any attachments as B1, B2, and B3 etc.)
Changes to Services, charging structure, payment profile, documentation, training, service levels
and component working arrangements and any other contractual issue.
Brief Description of Solution:
Impact:
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 56 | P a g e
Deliverables:
Timetable:
Charges for Implementation:
(including a schedule of payments)
Other Relevant Information:
(including value-added and acceptance criteria)
Authorised by the Bidder Date:
Name:
Signature:
Change Control Note CCN Number :
Part C : Authority to Proceed
Implementation of this CCN as submitted in Part A,
in accordance with Part B is: (tick as appropriate)
Approved
Rejected
Requires Further Information (as follows, or as
Attachment 1 etc.)
For ITG and its nominated agencies For the Bidder
Signature Signature
Name Name
Title Title
Date Date
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 57 | P a g e
ANNEXURE – B - LIST OF SERVICES PROVIDED BY THE BIDDER
Various services to be offered by the bidder will consist of:
1. Project Planning and Management
2. System Study and Design
3. Business Process Reengineering for the selected applications/ services
4. Development of e-District Application
5. Network Connectivity
6. Digitization of data in English and the local language
7. Hardware Procurement & Commissioning
8. STQC Certification and C-DAC/TDIL Certification (for localization).
9. UAT & Go live
10. Capacity Building / Training
11. Operation & Maintenance (O&M)
Note:
ITG will sign the end user license agreement for the software brought from any 3rd party for
the purpose of this Project however Impelementation Agency shall be solely responsible to
make payment for the cost of software to such third party software vendor.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 58 | P a g e
ANNEXURE – C –PROJECT PLAN & DELIVERABLES
The project implementation plans along with indicative timelines as anticipated by the Purchaser for e-District Goa Project are:
Sr. Activity Sub Activity Timelines (In
Months)
1 Signing of Contract with SI T
2 Current State Assessment Report
Field visit & submission of updated assessment report of District/ Taluka / Gram level provided by SPMU and validated by DeGS comprising of :
T + 1
Requirement of all activities for commissioning at all sites; i.e.
Hardware
Networking
Training
Placement of Technical Support in the district
Documents for digitization
Site preparation
3 System Requirement Specification
Submission of SRS document along with all relevant design documents including but not limited to:
T+2
Detailed System Study Report
Updated and approved FRS
SRS document
HLD documents
e-District Application architecture documents.
ER diagrams and other data modelling documents.
Logical and physical database design.
Data dictionary and data definitions.
Application component design including component deployment views, control flows, etc.
a. LLD documents (including but not limited to)
Application flows and logic.
GUI design (screen design, navigation, etc.).
a. All Test Plans
Requirements Traceability Matrix
3 Deployment of SDC hardware. Deployment of necessary hardware at SDC establishment including Final Acceptance Test
T + 6
4 Completion of Application Development T + 6
5 Completion of User Acceptance Testing – For first set of 10 services T + 7
6 “Go-Live” of first 10 Services in the State of Goa.
IT Infrastructure deployment and testing for one district w.r.t. first set of 10 services
T + 8
Training & capacity building for both the districts w.r.t. first set of 10 services
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 59 | P a g e
Sr. Activity Sub Activity Timelines (In
Months)
Data Digitization and Migration of concerned records to centralized database after approval and digitally signing by authorized government officials w.r.t. first set of 10 services
Any other Activity required for the Go- live of these 10 services
STQC approval of Software Modules
Go-Live of services
Completion of User Acceptance Testing – For remaining set of 16 services
T + 10
7 “Go-Live” of remaining 16 Services in the State of Goa.
IT Infrastructure deployment and testing for both the districts w.r.t. remaining set of 16 services
T + 11
Training & capacity building for both the districts w.r.t. remaining set of 16 services
Data Digitization and Migration of concerned records to centralized database after approval and digitally signing by authorized government officials w.r.t. remaining set of 16 services
STQC approval of Software Modules
Go-Live of services
8 Operations and Maintenance Phase
3 years for software from date of Go live and 5 years for hardware from date of installation
T + 47
9 Successful Exit Management T+ 47
Note: Assessment activities has to be updated by SI
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 60 | P a g e
ANNEXURE – D - BID
Summary of Cost Components
S.
No. Item Total Price VAT
State Entry Tax (If any)
Total cost
(total price +
taxes)
a)
Hardware related costs with
onsite comprehensive
warranty for the period of 5
years from the date of
installation (A)
b) Networking related costs (B)
c)
Application Customization /
Development and database
creation cost (C)
d)
Operations and Maintenance
Costs (Quarterly Expenses
(software) for 3 years for
software from date of Go
live and 5 years for
hardware from date of
installation (D)
e) Data Digitization (E)
f)
Deployment & operation &
maintenance of requisite
infrastructure for period of 5
years from date of installation
at State Data centre & IT
Disaster Recovery(F)
Total Cost
Total cost in figures:
Details of Cost Component
S. No.
Category
Component No of Compone
nts / Units of Service
Rate per unit
(including all taxes except VAT &
state entry tax)
VAT State
Entry Tax (If any)
Total Cost
A. Hardware Related Costs with the Comprehensive onsite warranty of 5 years from date of installation
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 61 | P a g e
S. No.
Category
Component No of Compone
nts / Units of Service
Rate per unit
(including all taxes except VAT &
state entry tax)
VAT State
Entry Tax (If any)
Total Cost
1.
Infrastructure / Hardware
Desktop/ Computer
369
Laptop 1 Digital Web camera
10
Scanners (A4 size)
9
Scanners (A3 size)
3
Heavy Duty Laser Printer (A4 size)
108
Laser Printer (A3 size)
2
Passbook Printers
2
UPS (1 KVA, Online)
178
2.
Infrastructure Installation and Testing / Miscellaneous Charges
Others
Total A:
B. Networking Related Costs
1.
Network Related Infrastructure & Horizontal connectivity costs
Routers
8 Port Switch 1
16 Port Switch 1
24 Port Switch 1
LAN Cabling (including
IO,CAT 6 cable , Casing Capping
Crimping)
400 network points
2. UPS electrical cabling
15/5 AMP socket with switch and wiring with
500 UPS electrical points
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 62 | P a g e
S. No.
Category
Component No of Compone
nts / Units of Service
Rate per unit
(including all taxes except VAT &
state entry tax)
VAT State
Entry Tax (If any)
Total Cost
casing & capping
Total B:
C. Application Development & Database Creation
1. e-District Application
a
Development of eDistrict Services (as per the scope defined) Including training, hand holding cost and helpdesk support
Total C:
D : Operations and Maintenance Costs (Quarterly Expenses (Software) for <3> years of contract after „”Go-Live”) (D)
1.
Application Maintenance & Operation of eDistrict applications
Total D:
E. Data Digitization
For details of effort, please refer Volume II.
1. Scanning of A4 size For 100000 pages
2. Scanning of A3 size For 50000 pages
3. Scanning of legal size For 75000
pages
4. Cost of data entry For 200000
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 63 | P a g e
S. No.
Category
Component No of Compone
nts / Units of Service
Rate per unit
(including all taxes except VAT &
state entry tax)
VAT State
Entry Tax (If any)
Total Cost
records (to be quoted on the basis of 1000 characters )
Total E:
Note: The figures indicated for data digitization are indicative only
F. Deployment and Operation & maintenance of requisite infrastructure for period of 5 years from date of installation at State Data centre & IT Disaster Recovery
For Details of BOM. Please
refer volume II
1. Database Server 2
2. Application Server 2
3. Web Server 2
4. Backup and Reporting
Server 2
5. Development Server 2
6. Application Load Balancer 2
7. 10U Blade enclosure 1
8. KVM Switch 1
9. L3 network switch 1
10. Laptops 2
11. 5TB SAN Box 1
2 System Software
1. Server OS 10
2. RDBMS 2
3. Application server 2
4. Systems Management
software 2
5. Development environment 2
6. Virtualization software 1
7. Anti-Virus software 10
Total F:
Additional information to be provided by the bidder [ It is mandatory for bidder to provide this information which will not be a part of financial bid evaluation. Failing to provide this information will result into rejection of bid]
a. Cost of eDistrict Application software AMC for additional 2 years [after initial 3 years,
however it will be the State‟s call whether to give extended service contract for AMC to the
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 64 | P a g e
eDistrict SI or not, which will be informed to SI/bidder 3 months prior to completion of
initial 3 years warranty . On award of AMC contract for next 2 years, the eDistrict
SI/bidder must provide AMC support. Any refusal/denial by SI/bidder for AMC support
will be treated as violation of the contract and will lead to blacklisting of the SI/bidder by
the State and further encashment of the performance bank guarantee]
b. Support Manpower
Support Manpower
S.No Support Manpower Rate/Month (inclusive of service tax)
Total
1. Project Manager
2. System/ Network Administrator
3. Solution Architect
4. Database Administrator
5. Software Programmer and Business Analyst
6. District Manager
7. District Technical Support
8. Helpdesk Executive
….
Total
c. Total Training Cost in Rs………
Training
Training Cost Per Person Nos. resources to be trained
Rate ( Inclusive of service tax)
Total
1. Basic computer skills 100
2. Advanced training on the Application modules
50
Total
d. Web Services
Web Services
Development of Web Services Nos. Web Services
Total Value Inclusive of service tax
1. Development of End to End Services 14
2. Development of Web Services (of NIC) 12
3. Development of interface for data from various departments
for selected services under e-District.
26
Total
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 65 | P a g e
ANNEXURE – F – ROLES AND RESPONSIBILITIES OF THE PARTIES
Roles and Responsibilities of Bidder
1. Preparation of Detailed Project Plan in line with the overall plan provided in the RFP. The
same should be prepared in consultation with ITG.
2. Procure, install, commission, operate and maintain:
a. Requisite hardware & system software at ITG‟s HQ, Data Center and other locations
as per the requirements mentioned in this RFP
b. Networking equipments, connectivity and LAN as per the requirements mentioned in
this RFP,
c. Meet the defined SLAs for the performance of the system.
3. Addressing technology obsolescence by appropriate upgradation, replacement and / or
replenishment of systems deployed at various locations (data center, HQ and other
locations).
4. Insure the entire hardware against the infrastructure deployed at various locations for the
entire duration of the contract against vandalism, theft, fire and lightening.
5. Keep all system software i.e. OS, antivirus, office applications etc., for Servers, PCs etc. at
Data Centre and various locations, up to date by installing regular upgrades / patches.
6. Rectification of system software problems due to crashing or malfunctioning of the OS,
RDBMS or front end within the time limits to meet the SLAs as defined in RFP.
7. Develop / customize, deploy and maintain the requisite Software Solution as per the
requirements of the Corporation at appropriate locations.
8. Provide necessary support for the resolution of bugs, patches & upgrades of the software
solution.
9. Provide necessary manpower for managing the Change Requests.
10. Design various manuals like User manual, Trouble Shooting manual etc. for the system.
11. Provide computer basic skills training and advanced training on application modules to the
staff members and stakeholders of the Corporation.
12. Maintain the business continuity.
13. Deploy requisite manpower and infrastructure for the digitization of the existing data.
14. Deploy the required manpower to manage the operations.
15. Ensuring the SLAs for downtime of system, software development / customization,
procurement and delivery of hardware & networking equipments, errors in data entry as
defined in RFP Voulme 1 are met.
16. Management and quality control of all services and infrastructure.
17. Any other services which is required for the successful execution of the project.
18. Regular Backup as per the schedule and Disaster Recovery.
19. Generation of MIS reports as per the requirements of ITG.
20. Generation of the report for the monitoring of SLAs.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 66 | P a g e
21. Meet the defined Technical Specifications for the IT Infrastructure including Hardware and
networking equipments keeping in mind the application and future requirements of the
Corporation.
Roles and Responsibilities of ITG
1. Provide adequate space at ITG‟s HQ for setting up of infrastructure, software development and
other activities to be carried out by the Bidder.
2. Coordination between all the divisions for providing necessary information for the study and
development / customization of the necessary solution.
3. Co-ordination with DIT, PAWAN (?) operator and other state agencies to assist the selected
bidder in execution of the project.
4. Coordinate with Bidder for conducting workshops for the Stakeholder departments.
5. Provide the data available in the form of physical files or existing databases to the selected
bidder for digitization purposes.
6. Deployment of staff members of the – organization for verification of the digitized data within
the defined timelines.
7. Ensure that Data Backups are being taken regularly by bidder as per the schedule agreed upon.
8. Ensure that the hardware and other infrastructure deployed at HQ, DC etc. meets the
specifications as mentioned in RFP and is maintained properly to meet the SLAs as defined in
RFP.
9. Monitoring of overall timelines, SLAs and calculation of penalties accordingly.
10. Issuing the Acceptance Certificate on successful deployment of the software application,
hardware deployed, digitized data and for other components of the Scope of Work (wherever
required).
11. Any other requirements that could arise during operations for effective governance and to
meet any administrative requirement.
12. To create internal capacity now for execution of the project after takeover from the bidder.
13. Ensuring the staff members and other stakeholders attend the training programs as per the
schedule defined by the bidder and agreed upon by ITG.
14. Provide sign off on the deliverables of the project including SRS, design documents etc.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 67 | P a g e
NON-DISCLOSURE AGREEMENT
THIS AGREEMENT is made on this the <<‟Day‟>> day of <<‟Month‟>> 20--- at <<‟Location‟>>,
India.
BETWEEN
Info Tech Corporation of Goa Ltd, Government of Goa, having its office at 4th Floor, Alcon
Construction, Above Alcon Hyundai Showroom, Porvorim,Bardez, Goa,India, hereinafter referred
to as „ITG‟ or „ITG’, which expression shall, unless the context otherwise requires, include its
permitted successors and assigns);
AND
<<‟Implementing Agency Full Name’>>, a Company incorporated under the Companies Act, 1956,
having its registered office at <<‟Implementing Agency Regd Office‟>> (hereinafter referred to as „the
Bidder /SI’ which expression shall, unless the context otherwise requires, include its permitted
successors and assigns).
Each of the parties mentioned above are collectively referred to as the „Parties‟ and individually as
a „Party‟.
WHEREAS:
1. ITG is desirous to implement the project of e-District Mission Mode Project - Goa.
2. ITG and bidder have entered into a Master Services Agreement dated <<‟Date‟>> (the
“MSA”) as well as a Service Level Agreement dated <<‟Date‟>> (the “SLA”) in furtherance
of the Project.
3. Whereas in pursuing the Project (the “Business Purpose”), a Party (“Disclosing Party)
recognizes that they will disclose certain Confidential Information (as defined hereinafter) to
the other Party (“Receiving Party”).
4. Whereas such Confidential Information (as defined hereinafter) belongs to Receiving Party as
the case may be and is being transferred to the Disclosing Party to be used only for the
Business Purpose and hence there is a need to protect such information from unauthorized
use and disclosure.
NOW THEREFORE, in consideration of the mutual covenants, promises, assurances,
representations and provisions set forth herein, the Parties hereto agree as follows:
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 68 | P a g e
1 Definitions and Interpretation
1.1 Definitions
[Terms and expressions used in this Agreement (including the Introduction) shall have the same
meanings set out in Schedule I of MSA.]
1.2 Interpretation
In this Agreement, unless otherwise specified:
(a) references to Clauses, Sub-Clauses, Paragraphs and Schedules are to clauses, sub-
clauses, paragraphs of and schedules to this Agreement;
use of any gender includes the other genders;
references to a „company‟ shall be construed so as to include any company, corporation or other
body corporate, wherever and however incorporated or established;
references to a „person‟ shall be construed so as to include any individual, firm, company,
government, state or agency of a state, local or municipal authority or government body or any
joint venture, association or partnership (whether or not having separate legal personality);
a reference to any statute or statutory provision shall be construed as a reference to the same as it
may have been, or may from time to time be, amended, modified or re-enacted;
any reference to a „day‟ (including within the phrase „business day‟) shall mean a period of 24
hours running from midnight to midnight;
references to a „business day‟ shall be construed as a reference to a day (other than a Sunday) on
which banks in the state of <<‟State‟>> are generally open for business;
references to times are to Indian standard time;
a reference to any other document referred to in this Agreement is a reference to that other
document as amended, varied, novated or supplemented at any time; and
all headings and titles are inserted for convenience only. They are to be ignored in the
interpretation of this Agreement.
1.3 Measurements and Arithmetic Conventions
All measurements and calculations shall be in the metric system and calculations done to 2 (two)
decimal places, with the third digit of 5 (five) or above being rounded up and below 5 (five) being
rounded down except in money calculations where such amounts shall be rounded off to the
nearest INR
1.4 Ambiguities within Agreement
In case of ambiguities or discrepancies within this Agreement, the following principles shall apply:
(a) as between two Clauses of this Agreement, the provisions of a specific Clause
relevant to the issue under consideration shall prevail over those in a general
Clause;
as between the provisions of this Agreement and the Schedules, the Agreement shall prevail, save
and except as expressly provided otherwise in the Agreement or the Schedules; andas between any
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 69 | P a g e
value written in numerals and that in words, the value in words shall prevail.
1.5 Priority of agreements
The Parties hereby expressly agree that for the purpose of giving full and proper effect to this
Agreement, the MSA and this Agreement shall be read together and construed harmoniously. In
the event of any conflict between the MSA and this Agreement, the provisions contained in the MSA
shall prevail over this Agreement.
2 Term
This Agreement will remain in effect for five years from the date of the last disclosure of
Confidential Information (“Term”), at which time it will terminate, unless extended by the
disclosing party in writing.
3 Scope of the Agreement
(a) This Agreement shall apply to all confidential and proprietary information
disclosed by Disclosing Party to the Receiving Party and other information which
the disclosing party identifies in writing or otherwise as confidential before or
within (30) thirty days after disclosure to the Receiving Party (“Confidential
Information”). Such Confidential Information consists of certain specifications,
documents, software, prototypes and/or technical information, and all copies and
derivatives containing such Information that may be disclosed to the Disclosing
Party for and during the Business Purpose, which a party considers proprietary or
confidential.
(b) Such Confidential Information may be in any form or medium, tangible or
intangible, and may be communicated/disclosed in writing, orally, or through
visual observation or by any other means to the Receiving Party.
4 Obligations of the Receiving Party
The Receiving Party shall:
(a) use the Confidential Information only for the Business Purpose and shall hold the
Confidential Information in confidence using the same degree of care as it normally
exercises to protect its own proprietary information, taking into account the nature
of the Confidential Information, and grant access to Confidential Information only
to its employees on a „need to know basis‟ and restrict such access as and when not
necessary to carry out the Business Purpose.
cause its employees to comply with the provisions of this Agreement;
Reproduce Confidential Information only to the extent essential to fulfilling the Business Purpose,
and prevent disclosure of Confidential Information to third parties; disclose the Confidential
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 70 | P a g e
Information to its consultants/contractors on a need to know basis; provided that by doing so, the
Receiving Party agrees to bind such consultants/ contractors to terms at least as restrictive as those
stated herein. The Receiving Party upon making a disclosure under this Clause shall:
I. Advise the consultants/contractors of the confidentiality obligations imposed on
them by this Clause.
II. upon the Disclosing Party's request, the Receiving Party shall either return to the
disclosing party all Confidential Information or shall certify to the disclosing party
that all media containing Confidential Information have been destroyed.
III. Provided, however, that an archival copy of the Confidential Information may be
retained in the files of the Receiving Party's counsel, solely for the purpose of
proving the contents of the Confidential Information.
IV. not to remove any of the other Party‟s Confidential Information from the premises
of the Disclosing Party without prior written approval.
V. exercise extreme care in protecting the confidentiality of any Confidential
Information which is removed, only with the Disclosing Party‟s prior written
approval, from the Disclosing Party‟s premises. Each Party agrees to comply with
any and all terms and conditions the disclosing party may impose upon any such
approved removal, such as conditions that the removed Confidential Information
and all copies must be returned by a certain date, and that no copies are to be made
off of the premises.
VI. Upon the Disclosing Party‟s request, the Receving Party shall promptly return to
the Disclosing Party all tangible items containing or consisting of the disclosing
party‟s Confidential Information all copies thereof.
5 Exceptions to Confidential Information
The foregoing restrictions on each party's use or disclosure of Confidential Information shall not
apply to the Confidential Information if the Receiving Party can demonstrate that such
Confidential Information:
was independently developed by or for the Receiving Party without reference to the Information,
or was received without restrictions; or
has become generally available to the public without breach of confidentiality obligations of the
Receiving Party; or
I. was in the Receiving Party's possession without restriction or was known by the
Receiving Party without restriction at the time of disclosure; or
II. is the subject of a subpoena or other legal or administrative demand for disclosure;
provided, however, that the Receiving Party has given the disclosing party prompt
notice of such demand for disclosure and the Receiving Party reasonably cooperates
with the disclosing party's efforts to secure an appropriate protective order; or
III. is disclosed with the prior consent of the disclosing party; or
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 71 | P a g e
IV. was in its possession or known to it by being in its use or being recorded in its files
or computers or other recording media prior to receipt from the disclosing party
and was not previously acquired by the Receiving Party from the disclosing party
under an obligation of confidence; or
V. the Receiving Party obtains or has available from a source other than the disclosing
party without breach by the Receiving Party or such source of any obligation of
confidentiality or non-use towards the disclosing party.
6 Ownership of the Confidential Information
I. Each Party recognizes and agrees that all of the disclosing Party‟s Confidential
Information is owned solely by the Disclosing Party (or its licensors) and that the
unauthorized disclosure or use of such Confidential Information would cause
irreparable harm and significant injury, the degree of which may be difficult to
ascertain.
II. By disclosing the Confidential Information or executing this Agreement, Disclosing
Party does not grant any license, explicitly or implicitly, under any trademark,
patent, copyright, mask work protection right, trade secret or any other intellectual
property right. The Disclosing Party disclaims all warranties regarding the
information, including all warranties with respect to infringement of intellectual
property rights and all warranties as to the accuracy or utility of such information.
III. Access to Confidential Information hereunder shall not preclude an individual who
has seen such Confidential Information for the purposes of this Agreement from
working on future projects for the Disclosing Party which relate to similar subject
matters, provided that such individual does not make reference to the Confidential
Information and does not copy the substance of the Confidential Information
during the Term. Furthermore, nothing contained herein shall be construed as
imposing any restriction on the Receving Party's disclosure or use of any general
learning, skills or know-how developed by the Receving Party's personnel under
this Agreement.
IV. Execution of this Agreement and the disclosure of Confidential Information
pursuant to this Agreement do not constitute or imply any commitment, promise,
or inducement by either Party to make any purchase or sale, or to enter into any
additional agreement of any kind.
7 Dispute Resolution
I. If a dispute arises in relation to the conduct of this Contract (Dispute), a party must
comply with this clause 7 before starting arbitration or court proceedings (except
proceedings for urgent interlocutory relief). After a party has sought or obtained
any urgent interlocutory relief that party must follow this clause 7.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 72 | P a g e
II. A party claiming a Dispute has arisen must give the other parties to the Dispute
notice setting out details of the Dispute.
III. During the 14 days after a notice is given under clause 7(b) (or longer period if the
parties to the Dispute agree in writing), each party to the Dispute must use its
reasonable efforts through a meeting of Senior Executive (or their nominees) to
resolve the Dispute. If the parties cannot resolve the Dispute within that period
then any such dispute or difference whatsoever arising between the parties to this
Contract out of or relating to the construction, meaning, scope, operation or effect of
this Contract or the validity of the breach thereof shall be referred to a sole
arbitrator to be appointed by mutual consent of both the parties herein. If the
parties cannot agree on the appointment of the arbitrator within a period of one
month from the notification by one party to the other of existence of such dispute,
then the Arbitrator shall be appointed by the High Court of the jurisdiction
specified in this agreement. The provisions of the Arbitration and Conciliation Act,
1996 will be applicable and the award made there under shall be final and binding
upon the parties hereto, subject to legal remedies available under the law. Such
differences shall be deemed to be a submission to arbitration under the Indian
Arbitration and Conciliation Act, 1996, or of any modifications, Rules or re-
enactments thereof. The Arbitration proceedings will be held at the jurisdiction
specified in Item 27. Any legal dispute will come under the sole jurisdiction
specified in Item 27.
IV. The Receving Party agrees that the Disclosing Party shall have the right to obtain an
immediate injunction enjoining any breach of this Agreement, as well as the right to
pursue any and all other rights and remedies available at law or in equity for such a
breach.
8 Variation
This Agreement may only be varied in writing and signed by both Parties.
9 Waiver
Waiver including partial or conditional waiver, by either Party of any default by the other Party in
the observance and performance of any provision of or obligations under this Agreement:-
I. shall be in writing
II. shall not operate or be construed as a waiver of any other or subsequent default hereof or
of other provisions of or obligations under this Agreement;
III. shall be executed by a duly authorized representative of the Party; and
IV. shall not affect the validity or enforceability of this Agreement in any manner.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 73 | P a g e
10 Exclusion of Implied Warranties
This Agreement expressly excludes any warranty, condition or other undertaking implied at law
or by custom or otherwise arising out of any other agreement between the Parties or any
representation by either Party not contained in a binding legal agreement executed by both Parties.
11 Entire Agreement
This Agreement and the Annexure together constitute a complete and exclusive statement of the
terms of the agreement between the Parties on the subject hereof, and no amendment or
modification hereto shall be valid and effective unless such modification or amendment is agreed
to in writing by the Parties and duly executed by persons especially empowered in this behalf by
the respective Parties. All prior written or oral understandings, offers or other communications of
every kind pertaining to this Agreement are abrogated and withdrawn.
12 Severability
If for any reason whatever, any provision of this Agreement is or becomes invalid, illegal or
unenforceable or is declared by any court of competent jurisdiction or any other instrumentality to
be invalid, illegal or unenforceable, the validity, legality or enforceability of the remaining
provisions shall not be affected in any manner, and the Parties shall negotiate in good faith with a
view to agreeing to one or more provisions which may be substituted for such invalid,
unenforceable or illegal provisions, as nearly as is practicable to such invalid, illegal or
unenforceable provision. Failure to agree upon any such provisions shall not be subject to the
dispute resolution procedure set forth under this Agreement or otherwise.
13 No Partnership
This Agreement shall not be interpreted or construed to create an association, joint venture or
partnership between the Parties, or to impose any partnership obligation or liability upon either
Party, and neither Party shall have any right, power or authority to enter into any agreement or
undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise
bind, the other Party except as expressly provided under the terms of this Agreement.
14 Third Parties
This Agreement is intended solely for the benefit of the Parties and their respective successors and
permitted assigns, and nothing in this Agreement shall be construed to create any duty to,
standard of care with reference to, or any liability to, any person not a Party to this Agreement.
15 Successors and Assigns
The Agreement shall be binding on and shall inure to the benefit of the Parties and their respective
successors and permitted assigns.
16 Notices
Any notice or other communication to be given by any Party to the other Party under or in
connection with the matters contemplated by this Agreement shall be in writing and shall be given
by hand delivery, recognized courier, registered post, email or facsimile transmission and
delivered or transmitted to the Parties at their respective addresses set forth below:
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 74 | P a g e
If to ITG:
Attn: <***>
Tel:
Fax:
Email:
Contact:
With a copy to:
If to the Bidder :
Attn. <***>
Phone: <<‟SI Telephone‟>>
Fax No. <<‟SI Fax‟>>
17 Language
All notices required to be given by one Party to the other Party and all other communications,
documentation and proceedings which are in any way relevant to this Agreement shall be in
writing and in the English language.
18 Counterparts
This Agreement may be executed in counterparts, each of which, when executed and delivered,
shall constitute an original of this Agreement.
19 Mitigation
Without prejudice to any express provisions of this Agreement on any mitigation obligations of the
Parties, each of ITG and the bidder shall at all times take all reasonable steps to minimize and
mitigate any loss for which the relevant Party is entitled to bring a claim against the other Party
pursuant to this Agreement.
20 Removal of Difficulties
The Parties acknowledge that it is conceivable that the Parties may encounter difficulties or
problems in the course of implementation of the Project and the transactions envisaged under this
Agreement. The Parties agree and covenant that they shall mutually discuss such difficulties and
problems in good faith and take all reasonable steps necessary for removal or resolution of such
difficulties or problems.
IN WITNESS WHEREOF THE PARTIES HAVE EXECUTED AND DELIVERED THIS
AGREEMENT AS OF THE DATE FIRST ABOVE WRITTEN.
RFP for Selection of System Integrator for State-wide roll-out of e-district MMP – Goa – Volume III
Statewide rollout of the eDistrict MMP 75 | P a g e
SIGNED, SEALED AND DELIVERED
For and on behalf of the bidder by:
SIGNED, SEALED AND DELIVERED
For and on behalf of ITG by:
(Signature)
(Name)
(Designation)
(Address)
(Fax No.)
(Signature)
(Name)
(Designation)
(Address)
(Fax No.)
In the presence of:
1.
2.
Statewide rollout of the eDistrict MMP 76 | P a g e
SERVICE LEVEL AGREEMENT
THIS AGREEMENT is made on this the <<‟Day‟>> day of <<‟Month‟>> 20---- at <<‟Location‟>>,
India.
BETWEEN
Info Tech Corporation of Goa Ltd, Government of Goa, having its office at 4th Floor, Alcon
Construction, Above Alcon Hyundai Showroom, Porvorim,Bardez, Goa, India, hereinafter
referred to as „ITG‟ or „Buyer‟, which expression shall, unless the context otherwise requires,
include its permitted successors and assigns);
AND
<<‟Implementing Agency Full Name‟>>, a Company incorporated under the Companies Act, 1956,
having its registered office at <<‟Location‟>> (hereinafter referred to as „the Bidder /SI’ which
expression shall, unless the context otherwise requires, include its permitted successors and
assigns).
Each of the parties mentioned above are collectively referred to as the „Parties‟ and individually as
a „Party‟.
WHEREAS:
1. ITG is desirous to implement the project of eDistrict in <<‟State’>>.
2. The Buyer and bidder have entered into a Master Services Agreement dated <<‟‟Date‟>>
(the “MSA”).
NOW THEREFORE, in consideration of the mutual covenants, promises, assurances,
representations and provisions set forth herein, the Parties hereto agree as follows:
1 Definitions and Interpretation
1.1 Definitions
[Terms and expressions used in this Agreement (including the Introduction) shall have the
meanings set out in Annexure A.]
1.2 Interpretation
In this Agreement, unless otherwise specified:
references to Clauses, Sub-Clauses, Paragraphs and Schedules are to clauses, sub-clauses,
paragraphs of and schedules to this Agreement;
use of any gender includes the other genders;
references to a „company‟ shall be construed so as to include any company, corporation or other
body corporate, wherever and however incorporated or established;
Statewide rollout of the eDistrict MMP 77 | P a g e
references to a „person‟ shall be construed so as to include any individual, firm, company,
government, state or agency of a state, local or municipal authority or government body or any
joint venture, association or partnership (whether or not having separate legal personality);
a reference to any statute or statutory provision shall be construed as a reference to the same as it
may have been, or may from time to time be, amended, modified or re-enacted;
any reference to a „day‟ (including within the phrase „business day‟) shall mean a period of 24
hours running from midnight to midnight;
references to a „business day‟ shall be construed as a reference to a day (other than a Sunday) on
which banks in the state of<<‟State‟>> are generally open for business;
references to times are to Indian Standard Time;
a reference to any other document referred to in this Agreement is a reference to that other
document as amended, varied, novated or supplemented at any time; and
all headings and titles are inserted for convenience only. They are to be ignored in the
interpretation of this Agreement.
1.3 Measurements and Arithmetic Conventions
[All measurements and calculations shall be in the metric system and calculations done to 2 (two)
decimal places, with the third digit of 5 (five) or above being rounded up and below 5 (five) being
rounded down except in money calculations where such amounts shall be rounded off to the
nearest INR.]
1.4 Ambiguities within Agreement
In case of ambiguities or discrepancies within this Agreement, the following principles shall apply:
(a) as between two Clauses of this Agreement, the provisions of a specific Clause
relevant to the issue under consideration shall prevail over those in a general
Clause;
as between the provisions of this Agreement and the Schedules, the Agreement shall prevail, save
and except as expressly provided otherwise in the Agreement or the Schedules; and
as between any value written in numerals and that in words, the value in words shall prevail.
1.5 Priority of agreements
The Parties hereby expressly agree that for the purpose of giving full and proper effect to this
Agreement, the MSA and this Agreement shall be read together and construed harmoniously. In
the event of any conflict between the MSA and this Agreement, the provisions contained in the MSA
shall prevail over this Agreement.
2 Structure
This SLA shall operate as a legally binding services agreement specifying terms which apply to the
Parties in relation to the provision of the Services by the bidder to the Buyer and its nominated
agencies under this Agreement and the MSA.
Statewide rollout of the eDistrict MMP 78 | P a g e
3 Objectives of this SLA
The bidder shall be required to ensure that the Service Levels which shall ensure the following:
Improving the efficiency of operations for the citizen services providing departments in the state of
Goa.
Leveraging the benefits in new system in order to:
I. Reduce of manual records and replace with computerized standardized documents.
II. Infuse transparency in operations by enabling the stakeholders to have easy access to the
records and provision of login ids and digital signatures to infuse accountability in
operations
III. Enable faster request processing in delivery of services with better turn around time.
IV. Facilitate automated data transfer with state-wide connectivity to prevent unnecessary
duplication & simplify preparation of registers and reports.
V. Generate meaningful MIS from the system.
VI. Provide inbuilt mechanism of security and quality control for critical personal data.
To meet the aforementioned objectives the bidder will provide the Service Levels in accordance
with the performance metrics as set out in detail in this Agreement. Further this Agreement shall
govern the provision of the contracted professional services of the bidder to ITG and its nominated
agencies after the Effective Date.
4 Scope of SLA
This Agreement has been executed in relation to the outsourcing portion of the Project between the
Parties. The detailed Service Levels have been set out in Annexure B to this Agreement.
This Agreement shall ensure the following:
Establishment of mutual responsibilities and accountability of the Parties;
Definition each Party‟s expectations in terms of services provided;
Establishment of the relevant performance measurement criteria;
Definition of the availability expectations;
Definition of the escalation process;
Establishment of trouble reporting single point of contact; and
Establishment of the framework for SLA change management
The following parties are obligated to follow the procedures as specified by this Agreement:
I. Buyer
II. Bidder
Statewide rollout of the eDistrict MMP 79 | P a g e
5 Agreement Owners
The following personnel shall be notified to discuss the Agreement and take into consideration any
proposed SLA change requests:
Title Telephone Email
Buyer Authorized
Representative, ITG
<<‟Telephone
ITG‟>>
ITG‟>>
Bidder Authorized
Representative, Bidder
<<‟Telephone SI‟>>
SI‟>>
6 Contact List
In the event that there is any change in the listed contacts, the same shall be communicated and
updated prior to such change occurring. The Single Point of Contact (“POC”) for the bidder shall be
<<‟POC Name‟>> and will be available 24X7.
Name Title Location Telephone
Buyer Authorised
Representative, ITG
<<‟Location ITG‟>> <<‟Telephone
ITG‟>>
Bidder Authorized
Representative, Bidder
<<‟Location SI‟>> <<‟Telephone
SI‟>>
7 Principal Contacts
The Buyer and the bidder will nominate a senior staff member to be the principal contact regarding
operation of this Agreement. At the date of signing of this Agreement, the nominated principal
contacts are:
Buyer principal contact: _________________________
Bidder principal contact: _________________________
8 Commencement and Duration of this Agreement
Agreement shall commence on the date on which it is executed by the Buyer and the System
integrator (hereinafter the “Effective Date”) and shall, unless terminated earlier in accordance with
its terms or unless otherwise agreed by the Parties, expire on the date on which this Agreement
expires or terminates, which shall be a period of four years starting from the date of the Final
Acceptance Test.
9 Exclusions to the Agreement
This Agreement shall not govern the following services:
I. Consulting services; and
Statewide rollout of the eDistrict MMP 80 | P a g e
II. System integrator‟s business processes not related to the Project.
10 Terms of Payment and Penalties
I. In consideration of the Services and subject to the provisions of the MSA and this
Agreement, the Buyer shall pay the amounts in accordance with the Terms of
Payment Schedule of the MSA.
II. For the avoidance of doubt, it is expressly clarified that the Buyer and/or its
nominated agencies may also calculate a financial sum and debit the same against
the terms of payment as defined in the Terms of Payment Schedule of the MSA as a
result of the failure of the System integrator to meet the Service Levels set out as
Annexure B of this Agreement, such sum being determined in accordance with the
terms of the set out as Annexure B of this Agreement.
11 Updating of this Agreement
I. The Parties anticipate that this Agreement shall need to be re-evaluated and
modified to account for changes in work environment and technology from time to
time. Hence they herby agree to revise the terms of the Agreement on an annual
basis.
II. The Parties hereby agree upon the following procedure for revising this Agreement:
A. Any and all changes to this Agreement will be initiated in writing between
the Buyer and the System integrator, The service levels in this Agreement
shall be considered to be standard for the Buyer and shall only be modified
if both Parties agree to an appended set of terms and conditions;
B. Only the Buyer or the System integrator may initiate a revision to this
Agreement;
C. A notice of the proposed revision (“SLA Change Request”) shall be served to
the Buyer or the System integrator as the case may be;
D. The SLA Change request would be deemed to be denied in case it is not
approved within a period of <<‟Days‟>> days;
E. In the event that Buyer/System integrator approves of the suggested change
the change shall be communicated to all the Parties and the SLA Change
request would be appended to the Agreement;
F. The Buyer shall update and republish the text of Agreement annually to
include all the SLA Change Requests that have been appended to the
Agreement during the course of the year. Such republished Agreement shall
be circulated to all the Parties within <<‟Days‟>> days of such change taking
place.
Statewide rollout of the eDistrict MMP 81 | P a g e
12 Document History
All revisions made to this Agreement shall be listed in chronological order as per the format set
out below and a copy of the same shall be provided to the Parties:
Version Date Description of changes
<<‟Version‟>> <<‟Date‟>> <<‟Desc‟>>
13 Scope of Services
I. The bidder shall ensure that Services are available at various locations as per the
requirements of the project;
II. The bidder shall provide support services for addressing problems related to the
provision of services of the selected bidder through the POC. Such POC shall be
available over telephone on <<‟Telephone SI‟>> number 24 hours a day, 7 days a
week
III. The bidder guarantees that he shall achieve the Service Levels for the Project;
IV. The bidder shall be liable to penalties in case of failure to comply with the Service
Levels. However any delay not attributable to the bidder shall not be taken into
account while computing adherence to the Service Levels.
14 Performance Review
The POC‟s of both the Buyer and the bidder shall meet on a quarterly basis to discuss priorities,
service levels and system performance. Additional meetings may be held at the request of either
the bidder or the Buyer. The agenda for these meetings shall be as follows:
I. Service performance;
II. Review of specific problems/exceptions and priorities; and
III. Review of the operation of this Agreement and determine corrective action to
overcome deficiencies.
15 Representations and Warranties of Buyer
The Buyer hereby represents and warrants to the bidder as follows:
I. it has full power and authority to execute, deliver and perform its obligations under
this Agreement and to carry out the transactions contemplated herein and that it
has taken all actions necessary to execute this Agreement, exercise its rights and
perform its obligations, under this Agreement and carry out the transactions
contemplated hereby;
II. it has taken all necessary actions under Applicable Law to authorize the execution,
delivery and performance of this Agreement and to validly exercise its rights and
perform its obligations under this Agreement;
III. it has the financial standing and capacity to perform its obligations under the
Statewide rollout of the eDistrict MMP 82 | P a g e
Agreement;
IV. this Agreement has been duly executed by it and constitutes a legal, valid and
binding obligation enforceable against it in accordance with the terms hereof and its
obligations under this Agreement shall be legally valid, binding and enforceable
obligations against it in accordance with the terms thereof;
V. the execution, delivery and performance of this Agreement shall not conflict with,
result in the breach of, constitute a default under, or accelerate performance
required by any of the Applicable Laws or any covenant, contract, agreement,
arrangement, understanding, decree or order to which it is a party or by which it or
any of its properties or assets is bound or affected;
VI. there are no actions, suits or proceedings pending or, to its knowledge, threatened
against it at law or in equity before any court or before any other judicial, quasi-
judicial or other authority, the outcome of which may result in the default or breach
of this Agreement or which individually or in the aggregate may result in any
material impairment of its ability to perform its material (including any payment)
obligations under this Agreement;
VII. it has no knowledge of any violation or default with respect to any order, writ,
injunction or any decree of any court or any legally binding order of any
Government Instrumentality which may result in any material adverse effect on the
bidder‟s ability to perform its obligations under this Agreement and no fact or
circumstance exists which may give rise to such proceedings that would adversely
affect the performance of its obligations under this Agreement.
16 Representations and Warranties of the Bidder
The bidder hereby represents and warrants to the Buyer as follows:
I. it is duly organized and validly existing under the laws of India, and has full power
and authority to execute and perform its obligations under this Agreement and to
carry out the transactions contemplated hereby;
II. it has taken all necessary corporate and other actions under Applicable Laws to
authorize the execution and delivery of this Agreement and to validly exercise its
rights and perform its obligations under this Agreement;
III. this Agreement has been duly executed by it and constitutes its legal, valid and
binding obligation, enforceable against it in accordance with the terms hereof, and
its obligations under this Agreement shall be legally valid, binding and enforceable
obligations against it in accordance with the terms hereof;
IV. the execution, delivery and performance of this Agreement shall not conflict with,
result in the breach of, constitute a default under, or accelerate performance
required by any of the terms of its Memorandum and Articles of Association or any
Applicable Laws or any covenant, contract, agreement, arrangement,
understanding, decree or order to which it is a party or by which it or any of its
Statewide rollout of the eDistrict MMP 83 | P a g e
properties or assets is bound or affected;
V. there are no actions, suits, proceedings, or investigations pending or, to its
knowledge, threatened against it at law or in equity before any court or before any
other judicial, quasi-judicial or other authority, the outcome of which may result in
the breach of this Agreement or which individually or in the aggregate may result
in any material impairment of its ability to perform any of its material obligations
under this Agreement;
VI. it has no knowledge of any violation or default with respect to any order, writ,
injunction or decree of any court or any legally binding order of any government
instrumentality which may result in any material adverse effect on its ability to
perform its obligations under this Agreement and no fact or circumstance exists
which may give rise to such proceedings that would adversely affect the
performance of its obligations under this Agreement;
VII. it has complied with Applicable Law in all material respects and has not been
subject to any fines, penalties, injunctive relief or any other civil or criminal
liabilities which in the aggregate have or may have a material adverse effect on its
ability to perform its obligations under this Agreement;
VIII. no representation or warranty by it contained herein or in any other document
furnished by it to the Buyer or to any government instrumentality in relation to the
Required Consents contains or shall contain any untrue or misleading statement of
material fact or omits or shall omit to state a material fact necessary to make such
representation or warranty not misleading; and
IX. no sums, in cash or kind, have been paid or shall be paid, by it or on its behalf, to
any person by way of fees, commission or otherwise for entering into this
Agreement or for influencing or attempting to influence any officer or employee of
the Buyer in connection therewith.
17 Indemnities
The Parties agree to indemnify each other under this Agreement in accordance with the terms and
principles set out in the MSA.
18 Dispute Resolution
Any dispute, difference or claim arising out of or in connection with the Agreement which is not
resolved amicably shall be decided in accordance with the dispute resolution procedure as set out
in the MSA.
Statewide rollout of the eDistrict MMP 84 | P a g e
19 Miscellaneous
I. Assignment and charges
This Agreement shall be binding on and enure for the benefit of each Party‟s successors in title. No
Party shall assign, or declare any trust in favour of a third party over, all or any part of the benefit
of, or its rights or benefits under, this Agreement.
II. Governing law and jurisdiction
This Agreement shall be construed and interpreted in accordance with and governed by the laws
of India, and the courts at the State of <<‟State‟>> shall have jurisdiction over matters arising out
of or relating to this Agreement.
III. Waiver of sovereign immunity
The Parties unconditionally and irrevocably:
A. agree that the execution, delivery and performance by them of the Agreement
constitute commercial acts done and performed for commercial purpose;
B. agree that, should any proceedings be brought against a Party or its assets, property or
revenues in any jurisdiction in relation to the Agreement or any transaction
contemplated by the Agreement, no immunity (whether by reason of sovereignty or
otherwise) from such proceedings shall be claimed by or on behalf of such Party with
respect to its assets;
C. waive any right of immunity which it or its assets, property or revenues now has, may
acquire in the future or which may be attributed to it in any jurisdiction; and
D. consent generally to the enforcement of any judgment or award against it in any such
proceedings to the giving of any relief or the issue of any process in any jurisdiction in
connection with such proceedings (including the making, enforcement or execution
against it or in respect of any assets, property or revenues whatsoever irrespective of
their use or intended use of any order or judgment that may be made or given in
connection therewith).
IV. Variation
This Agreement may only be varied in writing and signed by both Parties.
V. Waiver
A. Waiver including partial or conditional waiver, by either Party of any default by the
other Party in the observance and performance of any provision of or obligations under
this Agreement:-
1. shall be in writing
2. shall not operate or be construed as a waiver of any other or subsequent default
hereof or of other provisions of or obligations under this Agreement;
3. shall not be effective unless it is in writing and executed by a duly authorized
Statewide rollout of the eDistrict MMP 85 | P a g e
representative of the Party; and
4. shall not affect the validity or enforceability of this Agreement in any manner.
VI. Exclusion of implied warranties
[This Agreement expressly excludes any warranty, condition or other undertaking implied at law
or by custom or otherwise arising out of any other agreement between the Parties or any
representation by either Party not contained in a binding legal agreement executed by both
Parties.]
VII. Survival
A. Termination or expiration of the Term shall:
1. not relieve the bidder or the Buyer, as the case may be, of any obligations
hereunder which expressly or by implication survive hereof; and
2. except as otherwise provided in any provision of this Agreement expressly
limiting the liability of either Party, not relieve either Party of any obligations or
liabilities for loss or damage to the other Party arising out of, or caused by, acts
or omissions of such Party prior to the effectiveness of such termination or
expiration or arising out of such termination or expiration.
B. All obligations surviving termination or expiration of the Term shall cease on
termination or expiration of the Term. [In case the obligations have to survive for
some period after closure of the project, the same may be mentioned]
(h) Entire Agreement
[This Agreement and the Annexure together constitute a complete and exclusive statement of the
terms of the agreement between the Parties on the subject hereof, and no amendment or
modification hereto shall be valid and effective unless such modification or amendment is agreed
to in writing by the Parties and duly executed by persons especially empowered in this behalf by
the respective Parties. All prior written or oral understandings, offers or other communications of
every kind pertaining to this Agreement are abrogated and withdrawn.]
(i) Severability
[If for any reason whatever, any provision of this Agreement is or becomes invalid, illegal or
unenforceable or is declared by any court of competent jurisdiction or any other instrumentality to
be invalid, illegal or unenforceable, the validity, legality or enforceability of the remaining
provisions shall not be affected in any manner, and the Parties shall negotiate in good faith with a
view to agreeing to one or more provisions which may be substituted for such invalid,
unenforceable or illegal provisions, as nearly as is practicable to such invalid, illegal or
unenforceable provision. Failure to agree upon any such provisions shall not be subject to the
dispute resolution procedure set forth under this Agreement or otherwise.]
(j) No partnership
[This Agreement shall not be interpreted or construed to create an association, joint venture or
partnership between the Parties, or to impose any partnership obligation or liability upon either
Statewide rollout of the eDistrict MMP 86 | P a g e
Party, and neither Party shall have any right, power or authority to enter into any agreement or
undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise
bind, the other Party except as expressly provided under the terms of this Agreement. ]
(k) Third parties
[This Agreement is intended solely for the benefit of the Parties and their respective successors and
permitted assigns, and nothing in this Agreement shall be construed to create any duty to,
standard of care with reference to, or any liability to, any person not a Party to this Agreement.]
(l) Notices
[Any notice or other communication to be given by any Party to the other Party under or in
connection with the matters contemplated by this Agreement shall be in writing and shall be given
by hand delivery, recognized courier, registered post, email or facsimile transmission and
delivered or transmitted to the Parties at their respective addresses set forth below: ]
If to ITG:
Attn: <***>
Tel:
Fax:
Email:
Contact:
With a copy to:
If to the Bidder :
Attn. <***>
Phone: <<‟Telephone SI‟>>
Fax No. <<‟Fax SI‟>>
(m) Language
[All notices required to be given by one Party to the other Party and all other communications,
documentation and proceedings which are in any way relevant to this Agreement shall be in
writing and in the English language.]
(n) Counterparts
[This Agreement may be executed in two counterparts, each of which, when executed and
delivered, shall constitute an original of this Agreement.]
(o) Mitigation
[Without prejudice to any express provisions of this Agreement on any mitigation obligations of
the Parties, each of the Buyer and the bidder shall at all times take all reasonable steps to minimize
Statewide rollout of the eDistrict MMP 87 | P a g e
and mitigate any loss for which the relevant Party is entitled to bring a claim against the other
Party pursuant to this Agreement.]
(p) Removal of Difficulties
The Parties acknowledge that it is conceivable that the Parties may encounter difficulties or
problems in the course of implementation of the Project and the transactions envisaged under this
Agreement. The Parties agree and covenant that they shall mutually discuss such difficulties and
problems in good faith and take all reasonable steps necessary for removal or resolution of such
difficulties or problems.
Statewide rollout of the eDistrict MMP 88 | P a g e
IN WITNESS WHEREOF THE PARTIES HAVE EXECUTED AND DELIVERED THIS
AGREEMENT AS OF THE DATE FIRST ABOVE WRITTEN.
SIGNED, SEALED AND DELIVERED
For and on behalf of the bidder by:
SIGNED, SEALED AND DELIVERED
For and on behalf of the ITG by:
(Signature)
(Name)
(Designation)
(Address)
(Fax No.)
(Signature)
(Name)
(Designation)
(Address)
(Fax No.)
In the presence of:
1.
2.
Statewide rollout of the eDistrict MMP 89 | P a g e
20 ANNEXURE A – Definitions
Agreement means this Service Level agreement together with all Articles,
Annexures, Schedules and the contents and specifications of the RFP;
Applicable Law(s) means any statute, law, ordinance, notification, rule, regulation,
judgment, order, decree, bye-law, approval, directive, guideline,
policy, requirement or other governmental restriction or any similar
form of decision of, or determination by, or any interpretation or
administration of ITG as may be in effect on the date of the execution
of this Agreement and during the subsistence thereof, applicable to
the Project;
Business Hours shall mean the working time for ITG users which is 9:30 AM to 6:30
PM daily. Again for Web Server and other components which enable
successful usage of web portals of, ITG, the working time should be
considered as 24 hours for all the days of the week. It is desired that
IT maintenance, other batch processes (like backup) etc. should be
planned so that such backend activities have minimum effect on the
performance;
Effective Date shall have the same meaning ascribed to it in Clause 8;
MSA shall have the same meaning ascribed to it in Recital 2;
Parties means the Buyer and System integrator for the purposes of this
Agreement; “Party” shall be interpreted accordingly;
POC shall have the same meaning ascribed to it in Clause 6
Project shall have the same meaning ascribed to it in Recital 1;
SLA Change
Request
shall have the same meaning ascribed to it in Clause 11 (b) (iii);
Service Level means the level of service and other performance criteria which will
apply to the Services as set out in the SLA parameters effective
during the Term of this Agreement;
Term or
Agreement Period
Means the duration of this Agreement as set out in Clause 8 of this
Agreement.
Application
Response Time
Defined as time the system takes to fetch requested (a form or a
report) from the server.
Statewide rollout of the eDistrict MMP 90 | P a g e
21 ANNEXURE B – Service Levels
1 Purpose:
This document describes the service levels to be established for the Services offered by the SI to the State. The SI shall monitor and
maintain the stated service levels to provide quality service.
2 Definitions:
(a) “Scheduled Maintenance Time” shall mean the time that the System is not in service due to a scheduled activity as defined in this
SLA. The scheduled maintenance time would not be during 16X6 timeframe. Further, scheduled maintenance time is planned
downtime with the prior permission.
(b) “Scheduled operation time” means the scheduled operating hours of the System for the month. All scheduled maintenance time
on the system would be deducted from the total operation time for the month to give the scheduled operation time. The total
operation time for the systems and applications within the Primary DC, DRC and critical client site infrastructure will be 12 hrs X
7 days X 12 months. The total operation time for the client site systems shall be 12 hours.
(c) “System or Application downtime” means accumulated time during which the System is totally inoperable within the Scheduled
Operation Time but outside the scheduled maintenance time and measured from the State Government employees log a call with
the SI team of the failure or the failure is known to the SI from the availability measurement tools to the time when the System is
returned to proper operation.
(d) “Availability” means the time for which the services and facilities are available for conducting operations on the State
Government system including application and associated infrastructure. Availability is defined as:
{(Scheduled Operation Time – System Downtime) / (Scheduled Operation Time)} * 100%
(e) “Helpdesk Support” shall mean the 12 (hours) x 6(days) basis support centre which shall handleFault reporting, Trouble
Ticketing and related enquiries during this contract.
(f) “Incident” refers to any event / abnormalities in the functioning of the Data Centre Equipment / Services that may lead to
disruption in normal operations of the Data Centre, System or Application services.
(g) “Error” in data digitization or data migration exercise, refers to the mistakes made intentional/ unintentional by SI which may or
may not change the actual meaning of the subject.
Statewide rollout of the eDistrict MMP 91 | P a g e
3 Interpretations:
(a) The business hours are 9:30 AM to 6:30 PM on all working days (Mon-Sat) excluding Public Holidays or any other Holidays
observed by the State. The SI however recognizes the fact that the State Government offices will require to work beyond the
business hours on need basis.
(b) "Non-Business Hours" shall mean hours excluding “Business Hours”.
(c) 12X7 shall mean hours between 8:30AM -8.30 PM on all days of the week.
(d) The availability for a cluster will be the average of availability computed across all the servers in a cluster, rather than on individual
servers. However, non compliance with performance parameters for infrastructure and system / service degradation will be
considered for downtime calculation.
(e) The SLA parameters shall be monitored on a monthly basis as per the individual SLA parameter requirements. However, if the
performance of the system/services is degraded significantly at any given point in time during the contract and if the immediate
measures are not implemented and issues are not rectified to the complete satisfaction of the State Government, then the State
Government will have the right to take appropriate disciplinary actions including termination of the contract.
(f) A Service Level violation will occur if the SI fails to meet Minimum Service Levels, as measured on a half yearly basis, for a
particular Service Level. Overall Availability and Performance Measurements will be on a monthly basis for the purpose of Service
Level reporting. An “Availability and Performance Report” will be provided by the SI on monthly basis in the suggested format
and a review shall be conducted based on this report. A monthly Availability and Performance Report shall be provided to at the
end of every month containing the summary of all incidents reported and associated SI performance measurement for that period.
The monthly Availability and Performance Report will be deemed to be accepted by the State Government upon review and signoff
by both SI and the State Government. Where required, some of the Service Levels will be assessed through audits or reports e.g.
utilization reports, measurements reports, etc., as appropriate to be provided by the SI on a monthly basis, in the formats as
required by audit will need to be provided by the SI. Audits will normally be done on regular basis or as required by the State
Government and will be performed by the State Government or the State Government appointed third party agencies.
(g) EMS system as specified in this RFP shall play a critical role in monitoring the SLA compliance and hence will have to be
customized accordingly. The 3rd party testing and audit of the system shall put sufficient emphasis on ensuring the capability of
EMS system to capture SLA compliance correctly and as specified in this RFP. The selected System Integrator (SI) must deploy EMS
tool and develop additional scripts (if required) for capturing the required data for SLA report generation in automated way. This
tool should generate the SLA Monitoring report in the end of every month which is to be shared with the State Government on a
monthly basis. The tool should also be capable of generating SLA reports for a half-year. The State Government will audit the tool
and the scripts on a regular basis. SPMC shall assess the EMS requirements and include the same in the RFP.
Statewide rollout of the eDistrict MMP 92 | P a g e
(h) The Post Implementation SLAs will prevail from the start of the Operations and Maintenance Phase. However, SLAs will be subject
to being redefined, to the extent necessitated by field experience and the developments of technology practices globally. The SLAs
may be reviewed on an annual/bi-annual basis as the State Government decides after taking the advice of the SI and other agencies.
All the changes would be made by the State Government in consultation with the SI.
(i) The SI is expected to provide the following service levels. In case these service levels cannot be achieved at service levels defined in
the tables below, it shall result in a breach of contract and invoke the penalty clause. Payments to the SI are linked to the compliance
with the SLA metrics laid down in the tables below. The penalties will be computed and calculated as per the computation
explained in this Annexure. During the contract period, it is envisaged that there could be changes to the SLA, in terms of addition,
alteration or deletion of certain parameters, based on mutual consent of both the parties i.e. the State Government and SI.
(j) Following tables outlines the key service level requirements for the system, which needs be ensured by the SI during the operations
and maintenance period. These requirements shall be strictly imposed and either the State Government or a third party
audit/certification agency shall be deployed for certifying the performance of the SI against the target performance metrics as
outlined in the tables below.
4 Service Level Agreements (SLAs)
4.1 The SLAs for various components of the project are given below.Data Digitization Activities
S. No. SLA Terms Description
1. % Accuracy ITG officials and concerned line department officials will physically verify the digitized
records submitted by the SI vendor against the original records and will identify the
erroneous fields in each record. The % accuracy for each batch will be calculated as follows:
Total no. of erroneous fields in the batch - X
Total no. of records in the batch - Y
Field per record - N
Accuracy per batch (%) = (X*100)/(Y*N)
2. Digitization Cost Digitization cost = A*Y, where “A” is the rate per record digitized and Y is the total no. of
records in the batch.
Statewide rollout of the eDistrict MMP 93 | P a g e
Service
Category
Service
Level
Title /
Objective
Definition Data
Capture
Measureme
nt Interval
Reporting
Period
Hours
of
Suppor
t
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependency
Increase
d Impact
Severity
Weight
Data
Accuracy
Accuracy
of the data
digitized
by the SI
vendor
when
compared
against the
original
records
The ratio
between
the total
no. error
free of
records in
a batch of
data that
were
successfull
y digitized
to the total
no. of
records in
that batch
of data
ITG‟s
appointed
shall take
physical
count of
data that
was
migrated
successfull
y into the
new
system as
compared
to that
which
existed in
the old
legacy
source
Weekly Fortnightl
y
56x2 > 90% > 80% Completenes
s and
integrity of
source data
To be
base
lined for
first 2
weeks
using
time and
motion
study on
the effort
made.
50% of
Data
Digitizatio
n Cost.
Data Entry
Completio
n Time
Timeliness
for
completio
n of data
entry
Actual No.
of pages of
A4 size
documents
keyed into
the system
vis-à-vis
Average
Number of
pages
actually
keyed into
the system
by the
Fortnightly Fortnightl
y
NA
(Data
capture
at the
end of
each
day for
12 pages
per
operator
hour
with an
average
of 40%
8 pages
per
operator
hour
Up time of
Data entry
systems.
To be
baseline
d for
first two
months
for a
steady
20% of
Data
Digitizatio
n Cost for
per page
fall in data
entry
Statewide rollout of the eDistrict MMP 94 | P a g e
Service
Category
Service
Level
Title /
Objective
Definition Data
Capture
Measureme
nt Interval
Reporting
Period
Hours
of
Suppor
t
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependency
Increase
d Impact
Severity
Weight
the agreed
rate of data
entry
group of
data entry
operators
per
manhour
of data
entry
operation.
number
of
operato
r hours
in the
day.
data
density
per
page.
team of
oeprator
s to
arrive at
the
average
operator
hour
data
entry
speed.
speed
below 8
pages per
operator
hour
averaged
over three
months
period.
Data
Digitizatio
n
Completio
n Time
Timeliness
for
completio
n of data
digitizatio
n
Actual No.
of pages of
documents
scanned
into the
system vis-
à-vis the
agreed rate
of page
scanning
per
operator
hour
Average
Number of
pages
actually
scanned
into the
system by
the group
of data
scanning
operators
per
manhour
of data
scanning
operation.
Fortnightly Fortnightl
y
NA
(Data
capture
at the
end of
each
day for
number
of
operato
r hours
in the
day.
55 pages
per
operator
hour
with an
average
of 40%
data
density
per
page.
40 pages
per
operator
hour
Up time of
Data
scanning
systems.
To be
baseline
d for
first two
months
for a
steady
team of
oeprator
s to
arrive at
the
average
operator
hour
data
20% of
Data
Digitizatio
n Cost for
per page
fall in data
entry
speed
below 40
pages per
operator
hour
averaged
over three
months
period.
Statewide rollout of the eDistrict MMP 95 | P a g e
Service
Category
Service
Level
Title /
Objective
Definition Data
Capture
Measureme
nt Interval
Reporting
Period
Hours
of
Suppor
t
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependency
Increase
d Impact
Severity
Weight
scanning
speed.
Data
Migration
Completio
n Time
Timeliness
for
completio
n of data
migration
into the e-
District
database.
Actual No.
of
Megabytes
of data
migrated
into the
system vis-
à-vis the
agreed rate
of data
migration
per
operator
hour
Average
Number of
pages
actually
migrated
into the
system by
the group
of data
migration
operators
per
manhour
of data
migration
operation.
Fortnightly Fortnightl
y
NA
(Data
capture
at the
end of
each
day for
number
of
operato
r hours
in the
day.
5 GB of
data
migrate
d per
operator
hour..
2 GB of
data per
operator
hour
Up time of
Data
Migration
systems.
To be
baseline
d for
first two
months
for a
steady
team of
oeprator
s to
arrive at
the
average
operator
hour
data
migratio
n speed.
20% of
Data
Digitizatio
n Cost for
per GB fall
in data
migration
speed
below 5
GB per
operator
hour
averaged
over three
months
period.
Please note:
The maximum penality under this shall be to the extent of the 15% of the contract value
Accuracy of less than 90% will be considered as the Breach of the Agreement and ITG reserves the Right to terminate the agreement.
In all such cases, where the accuracy is below 100%, the SI will be responsible to carry out corrections with no additional cost to ITG.
Statewide rollout of the eDistrict MMP 96 | P a g e
4.2 Supply, Installation & Commissioning Phase
Service
Category
Service
Level Title
/ Objective
Definition Data
Capture
Measurem
ent
Interval
Reporting
Period
Hour
s of
Supp
ort
Target
Service
Level
Minimum
Service
Level
Service
Level
Dependen
cy
Increas
ed
Impact
Severity
Weight
Supply,
installation
and
Commissio
ning of
hardware –
SDC
Supply,
installation
and
Commissio
ning of
hardware –
SDC
The
bidder is
required
to
supply,
install &
commissi
on the
hardwar
e at SDC
Sign-off
by ITG or
its
appointed
representa
tive.
On the
scheduled
date of
commissio
ning.
At the end
of the
scheduled
date of
commissio
ning.
NA As per
agreed
commissio
ning
schedule.
One day
delay
permitted
per INR 1
crore of
value of
hardware
to be
commissio
ned.
Availabi
lity of
SDC
Necessar
y
approval
from the
State
Govern
ment
NA
INR
100,000 per
INR 1
crore of
value of
hardware
to be
commissio
ned, for
every
week‟s
delay
beyond the
agreed
commissio
ning
schedule.
Supply,
installation
and
Commissio
Supply,
installation
and
Commissio
The
bidder is
required
to
Sign-off
by ITG or
its
appointed
On the
scheduled
date of
commissio
At the end
of the
scheduled
date of
NA As per
agreed
commissio
ning
Two days
delay
permitted
per INR 1
Readines
s of Field
Office
for
NA INR 5,000
per INR
500,000 of
value of
Statewide rollout of the eDistrict MMP 97 | P a g e
Service
Category
Service
Level Title
/ Objective
Definition Data
Capture
Measurem
ent
Interval
Reporting
Period
Hour
s of
Supp
ort
Target
Service
Level
Minimum
Service
Level
Service
Level
Dependen
cy
Increas
ed
Impact
Severity
Weight
ning of
hardware –
Field
Offices
ning of all
identified
hardware
at each of
the Field
Offices
supply,
install &
commissi
on all the
identified
hardware
at each
designate
d field
office
locations.
representa
tive.
ning. commissio
ning.
schedule. crore of
value of
hardware
to be
commissio
ned.
installati
on and
commiss
ioning of
hardwar
e.
Necessar
y
approval
from the
State
Govern
ment
hardware
to be
commissio
ned, for
every
fortnight‟s
delay for
every field
office
location
beyond the
agreed
commissio
ning
schedule
for that
field office
location.
All the
identified
hardware
for the
designated
office
location
should be
Statewide rollout of the eDistrict MMP 98 | P a g e
Service
Category
Service
Level Title
/ Objective
Definition Data
Capture
Measurem
ent
Interval
Reporting
Period
Hour
s of
Supp
ort
Target
Service
Level
Minimum
Service
Level
Service
Level
Dependen
cy
Increas
ed
Impact
Severity
Weight
commissio
ned. The
penalty
will be
levied even
if one of
the
identified
hardware
item is not
commissio
ned at the
designated
field office
location.
Supply,
installation
and
Commissio
ning of
Network
connectivit
y including
LAN –
Field
Offices
Supply,
installation
and
Commissio
ning of
Network
Connectivit
y including
LAN at
each of the
Field
Offices
The
bidder is
required
to
supply,
install &
commissi
on the
network
connectiv
ity
between
Sign-off
by ITG or
its
appointed
representa
tive.
On the
scheduled
date of
commissio
ning.
At the end
of the
scheduled
date of
commissio
ning.
NA As per
agreed
commissio
ning
schedule.
Two days
delay
permitted
per INR
50,000 of
value of
contract
for
network
connectivit
y for the
entire
Availabi
lity of
network
PoP to
connect
to SDC
Necessar
y
approval
from the
State
Govern
NA INR 10,000
per INR
500,000 of
value of
hardware
to be
commissio
ned, for
every
fortnight‟s
delay for
every field
Statewide rollout of the eDistrict MMP 99 | P a g e
Service
Category
Service
Level Title
/ Objective
Definition Data
Capture
Measurem
ent
Interval
Reporting
Period
Hour
s of
Supp
ort
Target
Service
Level
Minimum
Service
Level
Service
Level
Dependen
cy
Increas
ed
Impact
Severity
Weight
the
designate
d office
location
and the
nearest
SWAN
PoP as
well as
supply,
installati
on and
commissi
oning of
LAN at
each
designate
d field
office
locations.
district. ment
office
location
beyond the
agreed
commissio
ning
schedule
for
network
connectivit
y with
nearest
SWAN
PoP.
INR 10,000
per INR
500,000 of
value of
hardware
to be
commissio
ned, for
every
fortnight‟s
delay for
every field
Statewide rollout of the eDistrict MMP 100 | P a g e
Service
Category
Service
Level Title
/ Objective
Definition Data
Capture
Measurem
ent
Interval
Reporting
Period
Hour
s of
Supp
ort
Target
Service
Level
Minimum
Service
Level
Service
Level
Dependen
cy
Increas
ed
Impact
Severity
Weight
office
location
beyond the
agreed
commissio
ning
schedule
for LAN.
4.3 Operation and Maintenance (O&M) Support
S.
No. SLA Terms Description
1. System Uptime - Time for which user is able to access the applications, website and other
components of the IT solution during the working hours. The system
can be down due to any of the reasons including failure of hardware,
network, system software, application etc.
- Scheduled downtime for example, backup time, batch processing time,
routine maintenance time will not be considered while evaluating the
system uptime. However, the selected SI will be required to schedule
such downtime with prior approval of ITG. The selected SI will plan
scheduled downtime outside working time. In exceptional
circumstances, ITG may allow the SI to plan scheduled downtime in the
working hours.
2. Bugs / Issues in the Application Software / Critical bugs / issues – Bugs / issues affecting more than one division
Statewide rollout of the eDistrict MMP 101 | P a g e
S.
No. SLA Terms Description
Hardware device / Network Equipment or more than one user in a division,
Non-critical bugs / issues – Bugs / issues affecting at most one user in a
division.
Service
Category
Service
Level Title
/
Objective
Definition Data
Capture
Measureme
nt Interval
Reportin
g Period
Hours
of
Suppo
rt
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependen
cy
Increase
d
Impact
Severity
Weight
System
Uptime
and
Performan
ce - SDC
System
uptime
and
performan
ce of the
system -
SDC
Time for
which user
is able to
access the
applicatio
ns, website
and other
componen
ts of the IT
solution
during the
working
hours. The
system can
be down
due to any
of the
reasons
including
failure of
hardware,
No. of
recorded
hours on
server logs
of
uninterrupt
ed usage of
the system
by users
during total
working
hours for
the week.
Weekly Weekly 24x7 99.9% 99% Power
Backup
Upgrade
s
System
Restores
To be
base
lined for
first 6
months
INR 300,000
per month
for every
drop in
percentage
point of
uptime
below 99.5 %
[The non
availability
for
application
service,
website
measured on
monthly
basis and
excluding
the
scheduled
Statewide rollout of the eDistrict MMP 102 | P a g e
Service
Category
Service
Level Title
/
Objective
Definition Data
Capture
Measureme
nt Interval
Reportin
g Period
Hours
of
Suppo
rt
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependen
cy
Increase
d
Impact
Severity
Weight
network,
system
software,
applicatio
n etc.
Scheduled
downtime
for
example,
backup
time, batch
processing
time,
routine
maintenan
ce time
will not be
considered
while
evaluating
the system
uptime.
However,
the
selected SI
will be
maintenance
shutdown.
Performance
of system
refers to the
proper and
timely
functioning
of the
system‟s
functionaliti
es. The
applications
should be
available
and
performing
as per
functionaliti
es]
Statewide rollout of the eDistrict MMP 103 | P a g e
Service
Category
Service
Level Title
/
Objective
Definition Data
Capture
Measureme
nt Interval
Reportin
g Period
Hours
of
Suppo
rt
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependen
cy
Increase
d
Impact
Severity
Weight
required to
schedule
such
downtime
with prior
approval
of ITG.
The
selected SI
vendor
will plan
scheduled
downtime
outside
working
time. In
exceptiona
l
circumstan
ces, ITG
may allow
the SI
vendor to
plan
scheduled
downtime
in the
Statewide rollout of the eDistrict MMP 104 | P a g e
Service
Category
Service
Level Title
/
Objective
Definition Data
Capture
Measureme
nt Interval
Reportin
g Period
Hours
of
Suppo
rt
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependen
cy
Increase
d
Impact
Severity
Weight
working
hours.
System
Uptime
and
Performan
ce – Field
Offices
System
uptime
and
performan
ce of the
system –
Field
Offices
Availability
of each
hardware &
peripheral
at each of
the
designated
field office
location
No. of
recorded
hours on
server logs
of
uninterrupt
ed usage of
the
department
specific
systems by
user
department
s during
total
working
hours for
the week.
Monthly Monthly 12 hrs
x 6
days
(8 AM
to 8
PM)
>96% >92% Power
Backup
To be
base
lined for
first 6
months
INR 1500 per
instance of
violation for
a drop in
uptime
between
<92% and
>=90%.
Additional
INR 1500
per instance
of violation
for every 5%
drop in
percentage
point of
uptime
below 90%.
Network
Availabilit
y
Average
Network
Availabilit
y between
each of the
designated
The total
number of
hours the
network
was
available
Recording
the no. of
hours of
network
outage
during
Monthly Monthly 12 hrs
x 6
days
(8 AM
to 8
PM)
> 99% > 95% Telepho
ne
Exchang
e Line
GBBN
To be
base
lined for
first 6
months
INR 50,000
per month
for every
drop in
percentage
point of
Statewide rollout of the eDistrict MMP 105 | P a g e
Service
Category
Service
Level Title
/
Objective
Definition Data
Capture
Measureme
nt Interval
Reportin
g Period
Hours
of
Suppo
rt
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependen
cy
Increase
d
Impact
Severity
Weight
office
location
and the
nearest
GBBN
PoP.
during the
working
hours.
working
hours.
uptime
below 98%
Issue
Resolution
Efficiency
– Severity
1 Issues
Resolution
time for
bugs /
issues in
the
application
Complete
System
Down/No
Application
available at
data centre
Issue Sev-1
Response
Time,
Issue Sev-1
Resolution
Time
Response
Time –
From the
time of
reporting of
Sev-1 Issue,
Resolution
Time –
From Time
of
Reporting
of Sev-1
Issue
As and
when
Issue
comes
up.
24x7 Response
Time =
15
minutes,
Resolutio
n Time =
1 hour
Response
Time =
30
minutes,
Resolutio
n Time =
120
minutes
Nil To be
base-
lined
during
the first
year of
operatio
n.
INR 50,000
per 30
minutes
delay in
response
time.
INR 50,000
per 30
minutes
delay in
resolution
time.
Issue
Resolution
Efficiency
– Severity
2 Issues
Resolution
time for
bugs /
issues in
the
application
s
System is
not
operating at
full capacity
but is still
operational.
Issue Sev-2
Response
Time,
Issue Sev-2
Resolution
Time
Response
Time –
From the
time of
reporting of
Sev-2 Issue,
Resolution
Time –
As and
when
Issue
comes
up.
24x7 Response
Time =
30
minutes,
Resolutio
n Time =
2 hour
Response
Time =
30
minutes,
Resolutio
n Time =
4 hours
Nil To be
base-
lined
during
the first
year of
operatio
n.
INR 1
5,000 per 30
minutes
delay in
response
time.
INR 5,000
per 30
Statewide rollout of the eDistrict MMP 106 | P a g e
Service
Category
Service
Level Title
/
Objective
Definition Data
Capture
Measureme
nt Interval
Reportin
g Period
Hours
of
Suppo
rt
Target
Service
Level
Minimu
m
Service
Level
Service
Level
Dependen
cy
Increase
d
Impact
Severity
Weight
From Time
of
Reporting
of Sev-2
Issue
minutes
delay in
resolution
time.
Issue
Resolution
Efficiency
– Severity
3 Issues
Resolution
time for
bugs /
issues in
the
application
System
Operation is
normal but
needs
improveme
nt.
Issue Sev-3
Response
Time,
Issue Sev-3
Resolution
Time
Response
Time –
From the
time of
reporting of
Sev-3 Issue,
Resolution
Time –
From Time
of
Reporting
of Sev-2
Issue
As and
when
Issue
comes
up.
24x7 Response
Time = 3
hours,
Resolutio
n Time =
6 hours
Response
Time = 6
hours,
Resolutio
n Time =
12 hours
Nil To be
base-
lined
during
the first
year of
operatio
n.
INR 1,000
per hour
delay in for
response
time.
INR 1,000
per hour
delay in
resolution
time.
Please note:
Following conditions will be considered as the Breach of the Agreement in case of O&M Phase and in any of the following conditions ITG
reserves the Right to terminate the agreement
o System uptime at SDC of less than 98% continuously for a quarter;
o More than 3 incidents of not resolving the bugs / issues within the defined time limits in a quarter;
o Average page loading time for application & reports to be more than 20 seconds evaluated for a quarter;
Statewide rollout of the eDistrict MMP 107 | P a g e
The SLA measurement tool designed & developed by Bidder shall be tested and certified for its accuracy, reliability and
completeness by a 3rd Party before it is deployed.
4.4 Training and Change Management
Service
Category
Service
Level Title
/ Objective
Definitio
n
Data
Capture
Measureme
nt Interval
Reportin
g Period
Hours
of
Support
Target
Service
Level
Minimu
m
Service
Level
Service Level
Dependency
Increased
Impact
Severit
y
Weight
Training
Satisfactio
n
Satisfaction
level of the
training
sessions
conducted
by vendor
for staff
members
&
stakeholde
rs
The
feedback
shall be
received
by the
officials
of ITG
after each
training
session.
ITG may
decide to
use the
SLA in
case
insufficie
nt
training
sessions
are
conducte
d by the
Feedback
ratings
received
from
Training
participant
s, no. of
participant
s and no.
of
Trainings
delivered
Monthly Monthly No. of
Training
hours
delivere
d
Feedbac
k
ratings
> 8
Feedback
ratings >
7
Participant
attendance/turn
out
Availability of
ITG committed
Training facility
> 10
trained
participan
ts being
able to
trained
other
members
of staff in
a period of
1 month
20% of
the per
person
cost for
that
type of
trainin
g.
Statewide rollout of the eDistrict MMP 108 | P a g e
Service
Category
Service
Level Title
/ Objective
Definitio
n
Data
Capture
Measureme
nt Interval
Reportin
g Period
Hours
of
Support
Target
Service
Level
Minimu
m
Service
Level
Service Level
Dependency
Increased
Impact
Severit
y
Weight
SI
vendor.
Please Note:
Feedback rating of less than 6 by 25% of the trainees of a batch will be considered as the Breach of the Agreement and ITG reserves the Right to
terminate the agreement
The bidder will be solely responsible for conducting additional training sessions for the staff members providing the rating less than 6.
4.5 Calculating Penalties as Service Credits
4.5.1 Service Credits and Amount at Risk
Service Credits are calculated as provided below, but the aggregate amount of such Service Credits paid or credited for any given month
will not exceed the following limitations (“Amount at Risk”):
For Service Level Failures and Service Credits within a Service Category, twelve percent (12%) of Fees for Services (excluding pass-
through expenses and other expense reimbursements, if any) within that Service Category during the relevant month.
For Service Level Failures in all Service Categories, ten percent (10%) of Fees for Services (excluding pass-through expenses and
other expense reimbursements, if any) within all Service Categories during the relevant month.
Service Credit amounts in excess of the foregoing limitations do not carry forward into subsequent months or measurement periods.
Service Credits will be applied to the invoice in the month immediately following the Service Level Failure(s) or paid in cash for the final
month when the Agreement expires or terminates.
Statewide rollout of the eDistrict MMP 109 | P a g e
4.5.1.1 Reporting of Service Levels and Credits
Service Level performance and (if applicable) Service Credits are measured and reported monthly (or at other mutually agreed intervals) in
Service Provider‟s regular reports. The monthly reports shall also describe all failures to achieve Service Levels for the month, reasons for
any excused failures, results of root cause analyses, and corrective action proposed and taken to prevent recurrence of failures to meet
Service Levels.
4.5.1.2 Calculation of Service Credits
Service Credits are calculated as follows: the Amount at Risk for the relevant Service Category times the relevant Severity Weight. Service
Credits for Increased Impact Failures shall be two hundred percent (200%) of the amount otherwise payable for less severe Failures.
Example
Minimum Service Level Failure
Assume that:
Service Provider misses the Minimum Service Level Application uptime.
Failure is unexcused.
Monthly Fees for the relevant Service Category total INR 100,000 (in case there is a consolidated monthly fee payable to the vendor,
then the entire fee has to be broken up into various elements and divided for each SLA, without exceeding 100%)
Amount at Risk for Service Category is INR 12,000.
Severity Weight is 30%.
Credit Calculation:
Service Credit = Amount at Risk times Severity Weight
INR 3,600 = INR 12,000 x 30%
Increased Impact Failure
Statewide rollout of the eDistrict MMP 110 | P a g e
Same assumptions as above, except
Performance below “Increased Impact” level.
Credit Calculation:
Increased Impact Service Credit = Amount at Risk times Severity Weight times 200%
INR 7,200 = [INR 12,000 x 30%] x 2
4.5.2 Unacceptable Service
The following Service Level Failures or combinations of Service Level Failures constitute Unacceptable Service, and grounds for
termination of the Agreement, in whole or in part, if Service Provider becomes obligated to pay the following amounts of Service Credits
(whether or not such Credits are actually collected):
One Hundred Percent (100%) of the Amount at Risk for any two Service Categories within any rolling period of twelve (12) months
or less; or
Seventy-five percent (75%) of the Amount at Risk for the Agreement as a whole within any rolling period of twelve (12) months or
less
Identification of the foregoing circumstances as Unacceptable Service (and subsequent identification of any other circumstances as
Unacceptable Service) are without prejudice to contentions that other or different circumstances, individual Service Level Failures, or
combinations of Service Level Failures may also, by themselves or in combination with other facts or circumstances, constitute material
breach of the Agreement, and grounds for termination.
4.5.3 Continuous Improvement
Minimum Service Levels and Increased Impact Service Levels will be modified at twelve (12) month intervals for each Service Category
promptly following the anniversary of the date related Service Levels were first effective. Upon Government entity/department‟s request,
(i) Minimum Service Levels may be increased to the average figure for the preceding six (6) months; and Increased Impact Service Levels
Statewide rollout of the eDistrict MMP 111 | P a g e
may be increased to the second lowest measurement within the preceding six (6) months, provided that neither increase shall exceed five
percent (5%) of the difference between one hundred percent (100%) and the relevant Minimum or Increased Impact Service Level then in
effect.
4.5.4 General Provisions
4.5.4.1 Maximum Service Credits
The maximum amount payable as Service Credits for any single month shall not exceed the Amounts at Risk (but this limitation does not
limit Government entity/department‟s right to recover damages for material breach, or other remedies, subject to the notice, cure periods,
limitations of liability and other applicable provisions of the Agreement).
4.5.4.2 Waivers
Government entity/department may waive any Service Level Failure or Service Credit, but no such waiver shall be binding or effective
unless given in writing, and no such waiver shall constitute a continuing waiver of similar or other such Service Level Failures or other
breaches of the Agreement. Government entity/department may at any time direct future compliance with any waived requirement.