Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d1 1

Upload: corey-pope

Post on 24-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Information Architecture and Business Process

Re-engineering

CMPT 455/826 - Week 4, Day 1

(Based on Kettinger)

Sept-Dec 2009 – w4d1 1

Page 2: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Processes

• Warning:– This discussion involves all kinds of processes

• Processes (in the abstract)• Business Processes• Business Process Re-engineering Processes• IT Processes• IA Processes• Process Assessment Processes• Meta-processes• etc. etc. etc. • (we should identify and define them when we are all done and can better recognize them)

– It is important that you consider • which processes are really being discussed at any time• regardless of whether they are made explicit or not

Sept-Dec 2009 – w4d1 2

Page 3: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Consider the Introduction

• BPR is justified in terms of past (current) issues– Causes include:

• downsizing, mergers, buyouts• done at the strategic organizational level

– Desire for:• increased processing speed• reduced cost• improved speed• improved quality• increased revenue• done at the tactical organizational level

– All these examples are largely looking to the past

Sept-Dec 2009 – w4d1 3

Page 4: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

And consider the actual present

• In bad financial times, such as we currently have,– there is even more focus on these backward looking issues

• While it is important to understand the past– to avoid reliving its mistakes

• If the past didn’t provide the right answers– we really need to look somewhere else

• Besides everyone else is also looking in the past– so that won’t give us a competitive advantage

Sept-Dec 2009 – w4d1 4

Page 5: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Recognizing what BPR is about

• Who uses BPR?– Remember the distinctions between

• strategic management and tactical management• (future focused) vs (current focused)

• When will the re-engineered processes take effect?– It takes time to change processes

• so BPR should be future focused

– Major changes take the approval of senior management• so BPR should fit their needs• as well as the needs of any tactical managers who might recommend it• (in some organizations, BPR is considered part of strategic planning)

Sept-Dec 2009 – w4d1 5

Page 6: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Making BPR effective

• We need to focus on more than just the past and present

• We need to consider the needs of the future

• What are some forward looking strategic goals that should also be considered by BPR?

Sept-Dec 2009 – w4d1 6

Page 7: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Putting BPR in context

• A historical note:

– remember that the paper was published in 1996– back then organizations were still struggling

• to integrate their corporate databases

– so they needed to start with the past and present

• A hysterical note:

– A paper published recently– “Information flows and business process integration”– in the Business Process Management Journal Vol. 15 No. 1, 2009

• recommended four principles for BPR (as if this were a new revelation):1. timeliness;

2. accessibility;

3. transparency; and

4. granularity.

• They look a lot like some of the principles that led to databases!

Sept-Dec 2009 – w4d1 7

Page 8: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

The BPR Process

• Fig.4 focuses on 4 legacy-oriented sub-processes of planning:– (of course planning is a BPR process)– Identification of Business Processes

• relative the businesses products, services and support resources

– Prioritization of these (Business) Processes• (essential or desirable)

– Establishing (Business) Process Performance Measures– Modeling of (Business) Processes

• But there is only so much you can do with old processes– What future looking activities should be added?

– What kind of information is needed to make them successful?

Sept-Dec 2009 – w4d1 8

Page 9: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Process Performance Measures

• The paper discusses potential problems– e.g. lawsuits

• of inappropriate measures– e.g. billing quotas leading to unnecessary repairs

• How can we determine whether a performance measure is appropriate or not?

Sept-Dec 2009 – w4d1 9

Page 10: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Performance

• The section on “Performance Measures”– focuses on effectiveness and efficiency– but introduces satisfaction in its example

• ISO 9241-11 Guidance on Usability defines usability as– effectiveness, efficiency, and satisfaction– in a context of use

• How might satisfaction be important to BPR?

• How can context of use be considered in BPR?

Sept-Dec 2009 – w4d1 10

Page 11: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

IA and BPR

• There’s a more fundamental relationship than this paper on IA and BPR acknowledges that is between – information and processes

• What is it?

Sept-Dec 2009 – w4d1 11

Page 12: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Processes

A process can’t exist on its own:

Sept-Dec 2009 – w4d1 12

Process

Page 13: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Processes

A process can’t exist on its own, it needs data

Sept-Dec 2009 – w4d1 13

Process

Inputs Outputs

Page 14: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Processes

A business process can’t exist on its own:

Sept-Dec 2009 – w4d1 14

BusinessProcess

BusinessInputs

BusinessOutputs

Page 15: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Processes

As data passes through business processes, some is captured and reused:

Sept-Dec 2009 – w4d1 15

BusinessProcess

BusinessInputs

BusinessOutputs

Data

BusinessData

Page 16: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Processes

Captured data can provide business information:

Sept-Dec 2009 – w4d1 16

BusinessProcess

BusinessInputs

BusinessOutputs

Data

BusinessData

BusinessInformation

Page 17: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Processes

Captured data can also be used to control business processes:

Sept-Dec 2009 – w4d1 17

BusinessProcess

BusinessInputs

BusinessOutputs

Data

BusinessData

BusinessInformation

Information to control and modify the Business Process

Page 18: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

And What about IT Processes?

• Please note:– The preceding consideration of Processes

• holds true, whether or not IT is involved

• (the Data pictured in the diagram, could be in any form, including in the mind of an employee)

– IT Processes can help• capture and process data related to Business Processes (Data Processing)• evaluate this data (Information Processing)• forecast future data scenarios (Decision Support processing)

• automate Business Processes

• model and BPR Business Processes (and IAs as well)• modify / adapt Business Processes

Sept-Dec 2009 – w4d1 18

Page 19: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Now Lets create a taxonomy:

• Processes (in the abstract)

– Basic processes (fulfilling some concrete business goal)

• Business Processes• IT Processes (support Business Processes)

– Meta-processes (in the abstract)

• Business Process Re-engineering Processes• IA Processes• Process Assessment Processes

Sept-Dec 2009 – w4d1 19

Page 20: Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11

Some further thoughts

from: Alan Eardley, Hanifa Shah and Andrea Radman “A model for improving the role of IT in BPR”, Business Process Management Journal, Vol. 14 No. 5, 2008, pp. 629-653

Sept-Dec 2009 – w4d1 20

Role of IT Characteristics of the role

Constraint Legacy IT systems dominate main business processes. Inflexible IT infrastructures. Lack of skill and/or investment in new IT. Business processes embedded in existing IT systems. Lack of potential for investment in IT due to budgetary factors. Lack of perception of the potential of IT by management. Strategic alignment is low

Catalyst New IT has been acquired. Changes in the business have been made that favour the use of IT. New management that sees the potential of IT in business change. New relationship developed with IT vendor, consultant, or service provider. Strategic alignment at crucial stage

Neutral Lack of IS applications and IT infrastructure in the organisation. No IS or IT strategy in place. Business change targets are not well defined. The business is in an industry with low information intensity or little competition through IT. Strategies and infrastructures are in alignment

Driver The business has technological capability and seeks to exploit it through business opportunities. Possibly a new business or a technological innovation. Sufficientinvestment is available and IT development is not a limiting factor. Strategic alignmentprocess is proceeding rapidly

Enabler IT is a key performance factor and a “competitive arena” in the industry. Management has a clear business vision and a future change plan. Business change targets are well defined. Sufficient investment is available and IT development not a limiting factor. Strategic alignment in process

Proactive Management has a clear business vision and future change plan. The IS and IT infrastructure are well developed. There are few constraints on IT development. Management sees the potential of IT. Strategies and infrastructure are in alignment