Information To Assess Right Way Forward. Cause of damage Would you have surgery without seeing a physician to see what is wrong? Extent of damage Job blow out Expands to become structural Structural significance of damage If it will not become unsafe or cause loss leave it - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Information To Assess Right Way Forward](https://reader036.vdocument.in/reader036/viewer/2022082611/568131c8550346895d982e90/html5/thumbnails/1.jpg)
Information To Assess Right Way Forward Cause of damage
Would you have surgery without seeing a physician to see what is wrong?
Extent of damage Job blow out Expands to become structural
Structural significance of damage If it will not become unsafe or cause loss leave it
Likely future damage if left – two extremes If it wont fail in design life leave it A stich in time
Prognosis if repaired Some repairs cause more problems than they solve
Life Cycle Cost – Cheap and repetitive vs once off and long life
![Page 2: Information To Assess Right Way Forward](https://reader036.vdocument.in/reader036/viewer/2022082611/568131c8550346895d982e90/html5/thumbnails/2.jpg)
Client Interview Ask questions
What does he want in terms of Overall Life Aesthetics Operational interference Safety Budget (lowest cost now or long term)
Risk Consequence of failure (Likelihood comes from survey)
History Design, construction, operation and maintenance
Inform Company policy on
Approach to assessment and repair Liability involved Risk minimalisation
Confirm in writing*
![Page 3: Information To Assess Right Way Forward](https://reader036.vdocument.in/reader036/viewer/2022082611/568131c8550346895d982e90/html5/thumbnails/3.jpg)
Damage Assessment
Damage
Spalling
Cracking
Active Corrosion
Future Activation
Future Damage
Survey Method
Visual
Visual
Potential, Drummy
Cl-, Carb, Cover
Resistivity
Polarisation
Repair
Patch
Injection
CP
Coating
Environmental
Control
![Page 4: Information To Assess Right Way Forward](https://reader036.vdocument.in/reader036/viewer/2022082611/568131c8550346895d982e90/html5/thumbnails/4.jpg)
Split structure into environments Prepare proformas based on
structural assessment detailing & general arrangement expected damage environmental exposure usage
Prepare inspection & testing plan Adopt defect classification code
![Page 5: Information To Assess Right Way Forward](https://reader036.vdocument.in/reader036/viewer/2022082611/568131c8550346895d982e90/html5/thumbnails/5.jpg)
Spray Zone
Splash Zone
Variable Pressure Hollow Leg
High Pressure Hollow Leg
Intermediate Zone
![Page 6: Information To Assess Right Way Forward](https://reader036.vdocument.in/reader036/viewer/2022082611/568131c8550346895d982e90/html5/thumbnails/6.jpg)
Lo
w V
alu
eL
ow
Val
ue
Hig
h V
alu
eH
igh
Val
ue
ComplexComplex SimpleSimple
Simplicity = Operability x InterpretabilitySimplicity = Operability x Interpretability
Val
ue
= A
pp
lica
bil
ity
/ C
ost
Val
ue
= A
pp
lica
bil
ity
/ C
ost
HighUse
LowUse
IEold
251 6
0.2
15
IEnew/Thick
REP
IEnew/Crack
GPRold
GPRnew
LPR
CR
TP
ISAT
RCMr
DRH