Register now for what is expected to be an enlightening and topical seminar focused on committed and on-going projects in the Sunshine Coast Region. Four esteemed speakers covering traffic and transport projects and topics are being discussed. Brought to you by the Queensland Branch of AITPM, the seminar is relevant to both government and private industry.
Infrastructure Challenges
in the Sunshine Coast Region
Thursday 25 June 2009 - 1.00PM – Sebel Maroorchydore
Speakers include:
Nic Cooney – Manager Infrastructure Policy, Sunshine Coast Regional Council
Ken Deutscher – Project Director (Connecting SEQ 2031), Department of Transport and Main Roads
Terry Upton – Department of Transport and Main Roads
Mark Bachels – National Place Making Executive, Parsons Brinkerhoff
Registrations Close 24 June 2009 Registration Fee $50 members, $80 non-members
Limited Seats – BOOK NOW!!
AITPM QLD Branch 2009 Seminar
LIMITED SEATS - BOOK NOW!!
www.aitpm09sunshine.eventbrite.com
AITPM Seminar
Sunshine Coast
25 June 2009
Ken DeutscherProject Director
Consultant to Department of Transport and Main Roads
1
Connecting SEQ 2031
An Integrated Regional Transport Plan for South East Queensland
What Connecting SEQ 2031 will deliver
� Primary transport plan bringing together various modal and geographic-based transport plans and studies and linking to broader government policy and planning (Regional Plan, Toward Q2)
� Specified under SEQ Regional Plan (2009 draft SEQ RP states at DRO 12.1.6 that Connecting SEQ 2031 be developed)
� A master plan which provides the policy framework to guide transport investment and assist SEQIPP prioritisation
� Meet requirements of the Transport Planning and Coordination Act 1994 (Part A, s22) to deliver integrated regional transport plans to complement regional plans
But put SIMPLY:
“A long term plan to fix transport in SEQ”
2
SEQ State Government Transport Planning Context
State Government
Priorities
Transport
Planning and
Coordination Act
Integrated
Planning Act
Legislation
SEQ Regional Plan IntegratedTransport
Coordination
Regional Infrastructure Program
Mo
dal
Str
ateg
ies
Congestion
Management
Strategy
SEQ Freight
Strategy
Previous 1997 IRTP successful but over 10 years old
2008 2009 2010
j j a s o n d j f m a m j j a s o n d j f m a m j
Sign Off /
Launch
Draft SEQ RP
Exhibition
Preparation of
Draft SEQ RP
Strategy Development – Responding to the Challenges (e.g. incl. SEQRP inputs, strategy development, modelling and testing scenarios)
Bringing it all Together(strategy evaluation and project prioritisation)
Drafting Connecting SEQ 2031(link to SEQ RP release)
Community / stakeholder engagement
Finalising Draft
Final Draft
SEQ RP
LaunchDraft Connecting SEQ 2031
Transport Working Paper – Identifying the Challenges(e.g. Broad Strategies for Draft SEQ RP input)
Modelling and Testing
Revised Scenarios
Where to from here1up to budget year 09/10
TRENDS AND CHALLENGES
Doubling of Population in SEQ 2006 to 2056
2,793,164
788,231
501,179
666,731
1,857,813
3,451,888
466,433
1,158,741
295,084
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
2006 2031 2056
WEST MORETON SD
SUNSHINE COAST SD
GOLD COAST SD
BRISBANE SD
(Ipswich 142,000)
(Ipswich 434,000)
5 460 6024 243 8372 705 705
Source: PIFU estimates, 2009
Source: PIFU (March 2009) and NIEIR (August 2008)
Imbalance between population and employment growth
SEQ by TransLink Sub Region: Growth 2006-2031
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
Brisbane Northern Eastern Southern Western Gold Coast Sunshine Coast
Population Jobs
SEQ by TransLink sub region: Growth 2006-2031
Employment distribution
47% of SEQ jobs will still be in City of Brisbane
Brisbane passenger kms by modeSource: BITRE
0
5
10
15
20
25
1977
1979
1981
1983
1985
1987
1989
1991
1993
1995
1997
1999
2001
2003
2005
2007
km
s (
Bil
lio
n)
Ferry
Bus
Heavy rail
Motor-cycles
Commercial vehicles
Cars
Mode share (Brisbane)
56.1%
9.6%
8.8%
25.3%
Vehicle Driver
Vehicle Passenger
Public Transport
Walk / Cycle
The transport task
2004
Source: Household travel survey
Peak Spreading
am peak6:15 – 8:45 pm peak
2:30 – 6:00
Average weekday traffic volume - Pacific
Motorway at Capt Cook BridgeSource: South East Queensland Traffic Census 2005
0
2000
4000
6000
8000
10000
12000
0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Hour beginning
2005 1996
pm peak3:15 – 5:30
am peak6:30 – 8:30
pm peak2:45 – 6:00
am peak6:15 – 8:45
Traffic Composition on 'priority one' freight route sites (2008)
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
24
-ho
ur tr
affic
cou
nt
B-Doubles 869 515 1,179 978 511 649 393
Semi-trailers 2,558 3,716 4,960 3,576 1,684 3,268 1,196
Rigid trucks 6,211 2,500 8,981 6,729 5,126 8,130 2,608
Other Vehicles 61,997 12,685 68,247 37,292 59,884 72,262 43,862
Gatew ay
Motorw ay East of
Sandgate Road
Port of Brisbane
Mw y, Murarrie
Gatew ay Mw y,
Rochedale
Logan Mw y,
Larapinta
Ipsw ich Mw y,
Wacol
Ipsw ich Mw y,
Rocklea
Kessels Rd,
Macgregor
Congestion on Freight Priority Routes Causes for concern - Greenhouse emissions
� Qld is a world leader in per capita greenhouse emissions
� Transport emissions 12% of total but increasing the fastest
� 58% increase 1990 to 2005
� 100% increase the trend for 1990 to 2015; doubling in 25 years
� Target is a 5-15% reduction between 2000 and 2020
Australian Oil Price
Weekly Spot Pr ce of Gippsland 2 API Crude
$0 00
$20 00
$40 00
$60 00
$80 00
$ 00 00
$ 20 00
$ 40 00
$ 60 00
an-2
002
Ap
-2002
ul-2002
Oct-
2002
Dec-2
002
Ap
-2003
ul-2003
Sep
2003
Dec-2
003
Ma
-2004
un-2
004
Sep
2004
Dec-2
004
Ma
-2005
un-2
005
Sep
2005
Dec-2
005
Ma
-2006
un-2
006
Sep
2006
Dec-2
006
Ma
-2007
un-2
007
Sep
2007
Dec-2
007
Ma
-2008
un-2
008
Sep
2008
Dec-2
008
Ma
-2009
un-2
009
Sep
2009
Dec-2
009
Ma
-20
0
un-2
00
Sep
20
0
Dec-2
00
USD ice AUD ce AUD Real ce 20% pe yea 5% pe yea
Cause for concern – rising energy costs Cause for concern - pollution
the state lacks public transport, draft cabinet documents show.”
Sydney Morning Herald 25 March 2009
Looking aheadH
• Key SEQ transport challenges due to:
– projected population growth
– forecast increase in travel (both on road and rail with competing space for passengers and freight)
– continued expansion of urban form and poor job/housing balance
– addressing emissions and responding to climate change agenda
– vulnerability to peak oil
– increasing costs to provide transport infrastructure and services
– Diminishing liveability
2 793 164
788 231
501 179
6 6 731
1 857 813
3 451 888
466 33
1 158 741
295 084
0
1 000 000
2 000 000
3 000 000
4 000 000
5 000 000
6 000 000
2006 2031 2056
WEST MORETON SD
SUNSHINE COAST SD
GO D COAST SD
BRISBANE SD
WHERE THESE TRENDS WILL
TAKE US
An undesirable path:
� Each new resident creates 3 new person trips by car /day averaging 10-12 km in length
� Modelling suggests even with planned major investments in roads, rail and busways, congestion will increase
� Continued urban expansion will lead to increased exposure to risks of energy vulnerability; stranded suburbs
� Climate change goals cannot be achieved without reducing growth in consumption of transport services
� Deteriorating air quality
� Funding may be increasingly difficult to get
When major change is needed.....
To achieve sustained social change here must be:
1.A reason to change......
• Economic
• Pragmatic
• Conscientious
• To meet an accepted challenge
2.An ability to change.......
• Alternative transport option can fulfil that need
• Trip need can be replaced or combined
SEQ water example...
WHERE DO WE WANT TO BE?
Desired outcomes for Transport in SEQ
1. Amenity and liveability: making the region a better place to be
2. Equity and accessibility: people can access goods, services, facilities and jobs, without the need to rely on a car
3. Economic prosperity and employment growth: freight and business traffic can move efficiently and reliably
4. Efficient transport : investment and land use patterns maximise the efficiency of the system
5. Managed congestion: travel times are re i b n the cost of congestion is stabilised or reduced
6. Environmentally responsible: protects environment and supports climate change and energy efficiency goals
7. Individual physical activity for health: active transport is a convenient and safe option for many trips
8. System is resilient: network has alternative routes when major incidents or events occur and the vulnerability to reduced supply of oil is minimised
9. Safety and security: people are safe and secure with low threat levels and a reduction in the occurrence of accidents on the road and rail network
FIXED
FIXED
But problems are complex and inter-related:
FOR EXAMPLE, For outcome 5 :- “Managed Congestion ”
Five key response areas:
1. Land use & planning - land use to make journeys shorter and easier
2. Travel demand management - reducing demand, spreading peaks
3. Travel options - better and more PT, cycling & pedestrian facilities
4. Efficiency - optimising existing network
5. Capacity - Support growth: new road infrastructure
Travel
Options
Capacity
Ef iciency
Land Use
Planning
Pricing &
Travel
Demand
Mgt
21
WE NEED A STRATEGY
Strategy options to achieve the outcomes
1. Base case; SEQIPP 2018 and current policy settings
2. Road traffic investment focus; invest in roads so traffic growth to be accommodated on road system
3. Public transport infrastructure and services focus; invest majority of resources in transit and its supporting modes
4. Building blocks; “conservative”; balanced transport investment in addition to SEQIPP with low impact policy framework
5. Comprehensive; “transformational”; high level policy intervention with marginal cost of motoring increased
6. Staged comprehensive;
• work on “Building blocks” in first 10 years
• Congestion charging in major centres
• move to “Comprehensive” after 2020;
23
“Pragmatic reform”
Transport strategy options – policy and investment mix
Base infrastructure & services
Policy and TDM
Roads for general traffic
PT & active
2018 Base Traffic growth
PT growth Building blocks
Comprehensive Staged
Base level
Plannedlevel
Connecting SEQ 2031 Modelling Suite
Sunshine Coast VISUM model developed by TransLink for CoastConnect and updated for 2031
Gold Coast VISUM model developed by TransLink for Gold Coast Rapid Transit and updated for 2031
Metropolitan Brisbane EMME/2 BSTM MM model developed by BCC and QT/ DMR and updated for 2031
SEQ Region EMME/2 SEQ MM model being developed by DTMR for 2031
Modelling suggests-
We can’t build our way out of it-
Base Case Strategy 2 – Road traffic investment focus
Modelling suggests-
But we can ‘comprehensively’ make a difference-
Base Case Strategy 5 – Comprehensive
Strategy 6 - Major impacts from testing inner city cordon charge
Green – reduction in trafficRed – addition in traffic
Number of daily person trips by mode
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
Base 200
6
Base
2031
Roa
d Foc
used
203
1
Public
Tra
nspor
t Focu
sed
2031
Building Blo
cks 20
31
Com
preh
ensive
203
1
Stage
d 20
31
Nu
mb
er
of
pri
vate
veh
icle
tri
ps
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
Nu
mb
er
of
PT
tri
ps
Car Driver Car Passenger Total PT
BRISBANE METROPOLITAN Modelling suggests-
2031: Building Blocks2031: Base
Sunshine Coast modelling of congestion
2031: Base
Sunshine Coast modelling of congestion
2031: Comprehensive
Person trips by mode
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
Public Transport 22,016 31,172 32,590 44,520 35,011 46,735 38,555
Car Passenger 548,909 980,840 994,861 990,800 980,186 989,017 992,402
Car Driver 616,324 1,177,202 1,177,261 1,171,447 1,175,679 1,170,373 1,174,669
2006 - Base 2031 - Base Road focused PT focused Building Blocks Comprehensive Staged
Sunshine Coast VKT by vehicle type
0
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
18,000,000
Car 6,869,913.3 15,542,285.6 15,547,269.1 15,542,068.9 15,584,144.5 15,308,525.6 15,545,416.1
Freight 802,197.0 1,527,272.3 1,527,329.3 1,531,128.4 1,534,651.6 1,515,599.6 1,528,952.5
Public Transport 17361.4 74712.8 74712.8 153457.5 115897.5 153457.5 143086.9
2006 - Base 2031 - Base Road focusedPublic Transport
FocusedBuilding Blocks Comprehensive Staged
Sunshine Motorway Car Volumes (24 hour)
Maroochy-Nambour Rd South to Moolloobah Interchange
90,836 92,93487,314
83,505
75,37480,011
43,307
2006
- Bas
e
2031
- Bas
e
Roa
d focu
sed
PT focu
sed
Build
ing
Block
s
Com
preh
ensive
Stage
d
VKT for PT only
VKT for public transport
17,361
74,713 74,713
153,457
115,898
153,457143,087
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
2006
- Base
2031
- Ba
se
Road
focu
sed
Pub
lic T
rans
port
Focu
sed
Building
Block
s
Compre
hensiv
e
Sta
ged
Sunshine Coast public transport growth
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
2006 2018 2026
6%
10%
13.50%
Da
ily
pa
ss
en
ge
r b
oa
rdin
gs
Total passenger task by growth rate:•SUNTRAN target of 10% would mean 190 000 boardings/day in 2026•The task of growing from 20 000 boardings/day to 190 000 is massive
10% mode share
5.8% mode share
47 000 in 2031
PLANNING
Connecting SEQ 2031: Key project work
� Major modelling program
� SEQ Strategic road network plan
� Long term rail strategy
� 2031 bus HfP planning
� High Occupancy Vehicle strategy
� Freight strategy work 2031
� Employment and centres
� Demand management consideration
� Economic and financial work
Tier 1Inter city express
Tier 2 suburban express
Tier 3 metro-styleinner suburban Regional Freight issues
� Mode shift to rail; includes short haul from port
� Coordination across modes; New intermodal terminals
� Segregation of freight from passenger on rail
� Advancing commercial vehicles through congestion
� Impact on communities – right vehicles on the right roads
Clear policy on freight is needed to pursue:
� 82% trips by car
� 67% ‘school trips’ by car
� 1% cycle to work
� 5% cycle to school
� 46% homes own a bike
� 79% cycle trips by males
� Each week 2.5 million cars do ‘school run’ or 500,000 car trips per day
But
� 50% of car trips are less than 5km
� Mountain Creek High School 14.5% cycle (600 cycle trips/day)
� RBWH average cycle to work trip 6 2km
Active transport: can it work in a low density community?
Changing travel behavior� If everyone in SEQ substituted 2 private
car trips per week for travel by bicycle:
10% of all trips by bike
� If each person substituted 2 trips by bike& 4 trips by walking
Up to 30% active transport mode share
LAND USE AND TRANSPORT
Affordable housing:
� Takes account of the cost of buying and living
� Not just a narrow view at time of purchase
� Maintains lifestyle quality and affordability
� without undermining congestion, energy efficiency,
climate change goals ;and
� can be efficiently serviced by public and non motorised
transport....
Generational change to a transit oriented city?
living:
CBD
TOD residential or commercial
major activity centre
Greenfield community
urban footprint (7+ du/ha)
Trans t devel. cor. (25+ du/ha)
High dens ty (50 + du/ ha)
HFP public transport corridor
1 = high density transit oriented
2 = transit development corridor3 = transit supportive fringe
3 categories of smart urban growth
Public Transport needs consolidated demands to be effective:
Sequencing of Greenfield areas so
PT goes in early
DIALOGUE: AN ESSENTIAL
INGREDIENT
Within and across governments
With the community
Dialogue is not something we do well1
9
I do not take a single newspaper, nor read one a month, and I feel myself infinitely the happier for it. Thomas Jefferson 3rd president of US (1743 - 1826)
A newspaper consists of just the same number of words, whether there be any news in it or not. Henry FieldingEnglish dramatist & novelist (1707 - 1754)
The one function TV news performs very well is that when there is no news we give it to you with the same emphasis as if there were. David Brinkley
US television newscaster (1920-2003)
Under democracy one party always devotes its chief energies to trying to prove that the other party is unfit to rule - and both commonly succeed, and are right. H. L. Mencken
US editor (1880 - 1956)
Some simple questions about the big issues
� Growth; is it good? Can we stop it? Up or out?
� Taxes; do we pay enough tax to provide what we need?
� Lifestyles; should we need a car to do the things we need to do?
� Motoring; do you enjoy driving? Would you rather stroll than drive?
� Should we build roads to fight congestion, or should we be able to rely on public transport for much more of our travel?
� Community: should we share travel or travel alone?
� Shared responsibility; Are we constructive, concerned citizens or whingers?
� Collective action: Your city your say; or OUR city?
50
1/07/2009 Page 1
Infrastructure Challenges in
the Sunshine Coast Region
Update on Main Roads
Projects
Presented by: Terry Upton
Strategic Planner
�orth Coast Region
AITPM QLD Branch
2009 Sunshine Coast Seminar25 June 2009
Sunshine Coast State - controlled Road Network
n i S t l Sunsh ne Coast Regional Counc l
S p S S pp S ppy Downs
n M unta n Cre ek
u r mun
B mB mBuder mBude r m
Pac f c Parad se
Eumund
wwTe want nTewant n
BBee rwah
Peache ste r
LLandsborough
eeMa enyMa e ny
CC o nConondCononda e
eeM ntv eMontv e
aMoo oo ah
m wPa m odsPa mwoods
eMap e on�ambour
B B
W eWoombyeMaroo hydore
Moo aMoo oo ab
aCa ound
Coo um
n aYand na
�oosa Heads
PPPom anPom na
Cooroy
eKen worth
Cooran
WW t a
Broo oo
a c Volumes
AAD
35 0 0 o 0 000
7 5 0 o 35 000
5 0 0 o 7 500
0 o 5 000
Main Roads’ Challenges
� Developing a Road �etwork to support:
� Population Growth
� Traffic Growth
� State and Local Government Planning Policy
� Effective maintenance to ensure safe and
efficient traffic operations.
Main Roads Planning Philosophy
� Previous
1. Improve transport network connectivity
2. Address traffic safety and economic drivers
3. Provide additional capacity on major road links
� Current
1. Make best use of existing resources
2. Support/facilitate Public Transport and active
modes
3. Work towards completion of ‘master plan’
Current and Recently Completed Projects
L
L
C
UD
O
D
CLO
UDR
ROD
MAR HYD R R AD
S s uSunshine Coas Regiona Counci
Mou Cre M n ta n Creek
o S ppy Do ns S ppy Downs
rr m un
mmBu der mBuder m
P Pac f c Par d se
EEumu nd
nTewant n
B erwah
ester
ands o ghLandsborou gh
e nMa ny
Con onda e
M eMontv e
Moo oo ah
PPa m woods
pMap eton��am bour
B B B
MMa oochydore
Moo boMoo oo a
Coo um
Yand n a
�oosa Heads
P aPomo na
Cooroy
KK wwK woKen wo th
Coo nCooran
tW tW tta
o oBroo o
LEGEND
U ban otp i t
Wo ks in p g ess and commt ed
Recen ly comp e ed p oec s
Recently Completed Projects
� Caloundra Road Duplication (Bruce Highway to Piece Avenue)
� �ew interchange at Racecourse Road
� MMTC (Caloundra Road to Creekside Boulevard)
� Sunshine Motorway Duplication (Sippy Downs Drive to Kawana Way)
� �ew interchange at Dixon Road
� Sunshine Motorway Duplication (Maroochydore Road to Pacific Paradise)
� �ew interchange north of Pacific Paradise
� Upgrade David Low Way interchange
� �ew link road to David Low Way
� �ew access to airport at Runway Drive
� Maroochydore Road Duplication (Bruce Highway to Conara Road)
� �ew 4 lane corridor from Bruce Highway to Pike Street
� �ew interchange at Sandalwood Lane
1/07/2009 Page 2
Caloundra Road Duplication Caloundra Road Duplication
Caloundra Road DuplicationCaloundra Road Duplication
MMTC – Caloundra Road to Creekside BoulevardMMTC – Caloundra Road to Creekside
Boulevard
1/07/2009 Page 3
Sunshine Motorway – Sippy Downs Dr to
Kawana Way
Sunshine Motorway - Sippy Downs Dr to Kawana Way
Sunshine Motorway Duplication (Maroochydore
Road to Pacific Paradise
Sunshine Motorway Duplication
(Maroochydore Road to Pacific Paradise)
Sunshine Motorway Duplication (Maroochydore
Road to Pacific Paradise
Sunshine Motorway Duplication
(Maroochydore Road to Pacific Paradise)
1/07/2009 Page 4
Maroochydore Road Duplication (Bruce Highway to
Conara Road)
Maroochydore Road Duplication (Bruce
Highway to Conara Road)
Maroochydore Road Duplication (Bruce Highway to
Conara Road) Works in Progress and Committed
� Steve Irwin Way (Bruce Highway to Mooloolah Connection Road)
� Beerwah By-pass (Steve Irwin Way to Peachester Road)� Remove open level crossing – funded by QT
� �ew route from Steve Irwin Way to Peachester Road
� MMTC – Arterial Road (Creekside to Kawana Town Centre)� Preload or ?
� MMTC – Sub Arterial (Creekside to Town Centre)� �ew link – funded by Stockland
� Bruce Highway – Cooroy to Curra (Stage A & B)� Stage B first (Sankeys Road to Traveston Road)
� Stage A second (Cooroy to Sankeys Rd)
Beerwah By-pass (Steve Irwin Way to
Peachester Road) – by QT MMTC Concept Planning
1/07/2009 Page 5
25
MMTC Arterial Road
Kawana Town Centre Interchange
25
Bruce Highway – Cooroy to Curra(Selected corridor)
• Involves a 61km realignment of the Bruce
Highway, including a bypass of Gympie
• Selected corridor was developed in response to community feedback
• Selected route was released July 2008 and has been endorsed by Queensland and Australian governments
• Will be built in four sections:
A Cooroy southern interchange to Sankeys Road - 13km
B Sankeys Road to Traveston Road - 11.5km
C Traveston Road to Keefton Road – 12km
D Keefton Road to Curra – 26.5km
Planning Studies
D
R
R
COUN
R RO
D
R R M R M R HYD R R AD
n u C c lSunshine Coast Regional Counc l
S ppy Downs
r n M n ta n C eek
d rBu der mBuder m
uu nu nr mun
Pac f c Parad se
Eumun dEumu nd
nTewant n
wBee wah
nL nd borou gh
eMa eny
CCon onda e
Montv e
oMoo oo ah
Pa mwoods
Map eton �am ou r�ambour B B B
MaMa oochydore
Moo bMoo oo a
Coo um
dn d naYand n a
o �o sa �oosa Heads
m nanPomona
Cooroy
wKen wor h
oC or nCooran
WW ta
Broo oo
ann ng Stud es
n p og ess & nea y comple e
Commi ted u u e s tud es
U ban oo p nt
Strategic / Detailed Planning Studies
� In Progress and �early Completed
� Sunshine Motorway Duplication (Pacific
Paradise to Eumundi �oosa Road)
� Sunshine Motorway Duplication (Kawana
Way to Karawatha Drive)
� Steve Irwin Way (Landsborough to Bruce
Highway)
� MMTC (Kawana Town Centre to Mooloolah
River interchange)
� �orthern East – West Arterials
� Cooroy – �oosa Road
� Eumundi – �oosa Road
� Yandina – Coolum Road
Sunshine MotorwayMMTC (Kawana Town Centre to
Mooloolah River Interchange)
1/07/2009 Page 6
MMTC Concept Planning Strategic / Detailed Planning Studies
�Committed Future Studies
� �ambour Connection Road (�ambour to
Bruce Highway)
� Bruce Highway – Cooroy to Curra (Stages
C and D are north of Sunshine Coast)
� Mooloolah River Interchange (detailed
planning)
� �orth Coast Regional Cycle �etwork
� MMTC South of Caloundra Road
Currently Known Future Infrastructure
=
=
=
L
D
R R
COUN
R RO
D
R R R R HYD R R
n u C c lSunshine Coast Regional Counc l
S ppy Downs
r n M n ta n C eek
d rBu der mBuder m
uCu nu nr mun
Pac f c Parad se
MA
u g H
PP v
u u d u
AA
y y
M yd
Eu un dEumu nd
nTewant n
wBee wah
Peach erPeach e ter
nL nd borou gh
eMa eny
CCon onda e
Montv e
oMoo oo ah
Pa mwoods
Map eton �am ou r�ambour B B B
MaMa oochydore
Moo bMoo oo a
Coo um
dd nYand n a
o �o sa �oosa Heads
m nanPomona
Cooroy
wKen wor h
oC or nCooran
WW ta
Broo oo
Future Directions Versus Economic
Circumstances
� CoastConnect (Caloundra – Maroochydore)
� CAMCOS
� Sunshine Coast Regional Hospital
� Maroochydore Town Centre
� Kawana Town Centre
� Sippy Downs Town Centre
� Palmview
� Caloundra South
� CALTOC
Thank you
For further information contact:
The Department of Transport and
Main Roads on 07 5482 0333
1
ABOUT THE SUNSHINE COAST REGION
Vision – Australia’s most sustainable region – vibrant, green, diverse
• 3127 km3127 km3127 km3127 km2222
• 4,194 km of roads4,194 km of roads4,194 km of roads4,194 km of roads• 140 sets of signals140 sets of signals140 sets of signals140 sets of signals• 250 roundabouts250 roundabouts250 roundabouts250 roundabouts• 800 km of bikeways800 km of bikeways800 km of bikeways800 km of bikeways• 1,000,000 trips generated each day1,000,000 trips generated each day1,000,000 trips generated each day1,000,000 trips generated each day• 87% coast population travel to work by car, mostly alone87% coast population travel to work by car, mostly alone87% coast population travel to work by car, mostly alone87% coast population travel to work by car, mostly alone• 211 km of coastline211 km of coastline211 km of coastline211 km of coastline• 113 km113 km113 km113 km2222 of waterwaysof waterwaysof waterwaysof waterways• 13,000 hectares of parks & bushlands (4% of total area 13,000 hectares of parks & bushlands (4% of total area 13,000 hectares of parks & bushlands (4% of total area 13,000 hectares of parks & bushlands (4% of total area
with about 5ha/1000 people structured park)with about 5ha/1000 people structured park)with about 5ha/1000 people structured park)with about 5ha/1000 people structured park)
• 300,000 population (500,000 by 2031)300,000 population (500,000 by 2031)300,000 population (500,000 by 2031)300,000 population (500,000 by 2031)• 4444thththth largest Local Government in Australialargest Local Government in Australialargest Local Government in Australialargest Local Government in Australia• 2,800 employees2,800 employees2,800 employees2,800 employees• 09/10 budget of $751million with09/10 budget of $751million with09/10 budget of $751million with09/10 budget of $751million with
$251 million capital & $500 million operational$251 million capital & $500 million operational$251 million capital & $500 million operational$251 million capital & $500 million operational• Area 3 times larger than the Gold CoastArea 3 times larger than the Gold CoastArea 3 times larger than the Gold CoastArea 3 times larger than the Gold Coast• 150,000 rateable properties150,000 rateable properties150,000 rateable properties150,000 rateable properties• Median age 41 yearsMedian age 41 yearsMedian age 41 yearsMedian age 41 years• Eight million visitors per yearEight million visitors per yearEight million visitors per yearEight million visitors per year• 1,350 customer contacts per day1,350 customer contacts per day1,350 customer contacts per day1,350 customer contacts per day• Additional 8,500 people per yearAdditional 8,500 people per yearAdditional 8,500 people per yearAdditional 8,500 people per year
COOLUM – NAMBOUR BUS SERVICE CHALLENGES• Managing GrowthManaging GrowthManaging GrowthManaging Growth• Funding InfrastructureFunding InfrastructureFunding InfrastructureFunding Infrastructure• Maintaining Levels of ServiceMaintaining Levels of ServiceMaintaining Levels of ServiceMaintaining Levels of Service• Community ExpectationsCommunity ExpectationsCommunity ExpectationsCommunity Expectations• Planning Scheme Planning Scheme Planning Scheme Planning Scheme –––– Settlement Patterns Settlement Patterns Settlement Patterns Settlement Patterns –––– Sustainability Sustainability Sustainability Sustainability • Regional Plan; bring forward areasRegional Plan; bring forward areasRegional Plan; bring forward areasRegional Plan; bring forward areas• Sustainable TransportSustainable TransportSustainable TransportSustainable Transport• Political Representation (Perceived?)Political Representation (Perceived?)Political Representation (Perceived?)Political Representation (Perceived?)• AmalgamationAmalgamationAmalgamationAmalgamation• Three Planning SchemesThree Planning SchemesThree Planning SchemesThree Planning Schemes• Lowest public transport patronage levels in SEQ Lowest public transport patronage levels in SEQ Lowest public transport patronage levels in SEQ Lowest public transport patronage levels in SEQ
(1.36% (1.36% (1.36% (1.36% → 3.8% by 2018)3.8% by 2018)3.8% by 2018)3.8% by 2018)
SustainableSustainableSustainableSustainable –––– Meeting the needs of the present without Meeting the needs of the present without Meeting the needs of the present without Meeting the needs of the present without compromising the ability of future generations to meet their compromising the ability of future generations to meet their compromising the ability of future generations to meet their compromising the ability of future generations to meet their own needsown needsown needsown needs
DEVELOPMENT OF STRUCTURAL RELATIONSHIPS FOR INTEGRATED TRANSPORT
• 13 August 2008 Ordinary Meeting
• Planning & Delivery of Integrated Transport Initiatives
• Council – External Agencies – Community
• Regional Strategy & Planning/Infrastructure Services Departments
TRANSPORT REFERENCE GROUP
• Inform, Advise, Direct• Chair• Membership (Portfolio Chair, Councillors, CEO, Executive
Directors, Senior Staff) • Charter• Monthly Meetings
2
TRANSPORT COMMUNITY GROUP
• Advise, Inform, Advocate at a Strategic Level
• Broad Community Representation
• Expressions of Interest
• Council endorsed selection
• Charter
• Bi-monthly meetings
• Membership (Portfolio Chair, Councillors, Community x 15, Executive Directors, Staff)
TRANSPORT CONSULTATIVE GROUP
• Advise, Inform, Advocacy supporting an integrated transport system
• State Transport Agencies
• Membership (Mayor, Portfolio Chair, CEO, Senior QTMR, TL & Senior Council Staff)
• Bi-monthly meetings
• Charter
TRANSPORT INTEGRATED TEAM
• Doing the Work + Review & Input
– ITP, Planning Scheme, Growth Management, Corporate Plan, State Agency Planning, Capital Program
• Membership – Across Departments (Staff Only – Executive Directors + 8)
• Direction from Transport Reference Group
• Charter
• Monthly Meetings
TRANSPORT GROUP INTERACTIONS
Transport Integrated TeamTransport Integrated TeamTransport Integrated TeamTransport Integrated TeamMonthly Meeting held before Transport Reference Group
Transport Community GroupTransport Community GroupTransport Community GroupTransport Community GroupTwo monthly Meeting held before
Transport Reference Group
Transport Consultative GroupTransport Consultative GroupTransport Consultative GroupTransport Consultative GroupTwo monthly Meeting held before
Transport Reference Group
Traffic Advisory Committee
Speed Mgt Committee
Others B.U.G. R.R.G. State Project Groups
Transport Reference GroupTransport Reference GroupTransport Reference GroupTransport Reference Group
Monthly Meetings
PUBLIC TRANSPORT LEVY
• Endorsed 2 June 2009
• $20 per rateable property; $3 million/year
• Aims – P.T. Infrastructure
– Partner (TL & QT)
– Advocacy (top up funding)
– Fund Public & Community Transport
• Policy protects allocation of funds
• State Government Response
• Five Year Program produced
1. PUBLIC TRANSPORT PLANNING (STATE)
• CoastConnect (Caloundra-Maroochydore)• CoastConnect (Maroochydore-Noosa)• CoastConnect (Maroochydore-Nambour)• Beerburrum to Landsborough Rail Upgrade• Landsborough to Nambour Rail Upgrade• CAMCOS Realignment Studies• TransLink 2009 Network Plan• Multi-Modal Transport Corridor (MMTC)• Connecting SEQ 2031 (New IRTP for SEQ)
3
COASTCONNECT (Caloundra-Maroochydore)
• Quality Bus connection between Caloundra and Maroochydore
• SEQIPP $297 million (2011-2018)
• Various Treatments
• CDIMP Stage
• Interdependencies
• Community Input
• Council’s Position
• Further Consultation
COASTCONNECT (Maroochydore-Noosa)
• Nautilus History
• Priority Bus/HOV lanes
• Maroochydore to Noosa Civic via Sunshine Motorway and Walter Hay Drive
• MWH (Mid 2009)
COASTCONNECT (Maroochydore-Nambour)
• Nautilus History
• Bus/HOV lanes
• Maroochydore to Nambour via Maroochydore Rd and Nambour Connection Rd
• PB (Late 2009)
• Main Roads Study combined
BEERBURRUM TO LANDSBOROUGH RAIL UPGRADE
• Upgrade alignment and track numbers• SEQIPP ($652 million) (Caboolture-Landsborough)• The 17km rail line between Beerburrum and
Landsborough is planned to be straightened and duplicated. Plans include road realignments, as well as upgrades to the Glasshouse Mountains, Beerwah and Landsborough rail stations. Involves construction of 11 Rail Bridges & 1 vehicle underpass. The project will follow on from the track duplication between Caboolture and Beerburrum.
• Project Deferred
LANDSBOROUGH to NAMBOUR RAIL UPGRADE
• SEQIPP ($804 million) (2008-2026 + ?)• The Project will include construction of a double-
track railway along a predominantly new route, with room for extra tracks if required. The project will improve the efficiency, service frequency, operating speeds and reliability of trains, and cater for the increasing demand for rail services in the corridor caused by population and freight transport growth.
• EIS Stage – soon to be released• Council’s position/Multi-disciplinary Team
CAMCOS REALIGNMENT STUDIES
• Caloundra South: Better suited to development and PT outcomes
• Maroochydore: Review to suit planning for Maroochydore Centre Planning including Horton Park Golf Course development
4
TRANSLINK 2009 NETWORK PLAN
• TTA Organisation• TransLink 2009 Network Plan:
� 10 year Strategy and Plan� 4 year Services & Infrastructure Improvement Plan
• Challenges• Partnership• Where is it?
MUTI-MODAL TRANSPORT CORRIDOR (Public Transport)
• Caloundra Rd to Maroochy Blvd
• Final Planning study for this corridor
• SEQIPP $3.26 billion (2008-2026)
• Cars, Freight, CAMCOS/PT, Cyclists, Pedestrians
• Staged delivery, recognising links to the new Hospital and CoastConnect/Nicklin Way
• Nicklin Way extension (CoastConnect)
• Mooloolah River Interchange
See over for Diagram
MULTI-MODAL TRANSPORT CORRIDOR - The MMTC is a transport corridor from
Caloundra Road to Maroochydore.CONNECTING SEQ 2031
• New Integrated Regional Transport Plan (IRTP) for SEQ
• Previous 1997-2007
• Regional Plan Review & SEQIPP
• Launch final IRTP in mid-2010
• Four Pillars
• SCRC keen to be involved
2. ROAD TRANSPORT NETWORK PLANNING (STATE)
• Nambour Connection Road (CoastConnect West)
• MMTC
• Sunshine Motorway (Pacific Paradise to Coolum to Eumundi-Noosa Rd)
• East-West Links (Yandina-Coolum, Eumundi-Noosa and Cooroy-Noosa)
• Bruce Highway Corridor Study (Beerburrum to Sunshine Motorway)
• Nambour to the Bruce Highway, including Forest Glen
• Combined Study (QT & DMR)
• SEQIPP $210 million (2008-2026)
• Community Consultation
• Rural Highway MAC to PAC
• Retain/Enhance connected communities
• Safety, Corridor Protection and Local Road Network
NAMBOUR CONNECTION ROAD
5
MULTI-MODAL TRANSPORT CORRIDOR (Road Network)• Sunshine Motorway Extension• Major intra-regional corridor• Builds on SM2032• SEQIPP $3.26 billion 2008-2026 +• Dependent projects• Deliver in stages• Co-ordinate State Agencies• Local Road Network connectivity• Community connectivity• Service to CoastConnect, Maroochydore and
Sunshine Coast University Hospital
See over for Diagram
MULTI-MODAL TRANSPORT CORRIDOR - The MMTC is a transport corridor from
Caloundra Road to Maroochydore.
SUNSHINE MOTORWAY (Pacific Paradise to Coolum to Eumundi-Noosa Road)
• Future Long Term Corridor Study• Corridor Constraints• Two consultancies• CoastConnect Maroochydore-Noosa
• SEQIPP Project $1.6 billion 2019- 2026+• Links to East-West Corridor Studies• Complete in 2009• Corridor Protection and PT capability
EAST-WEST CORRIDOR LINKS (Bruce Highway connecting to the Sunshine Motorway)
• Main Roads’ Studies
• Commenced 2007; completion 2009
• Yandina-Coolum, Eumundi-Noosa and Cooroy-Noosa Roads
• Yandina-Coolum Rd linked to Motorway Studies
• Investigating future safety and capacity requirements
• Level of Service to accommodate good PT capability into the future
BRUCE HIGHWAY CORRIDOR STUDY(Beerburrum to Sunshine Motorway)
• Bruce Highway
• Caloundra Road to Sunshine Motorway
• Growth, Safety and Capacity
• Link to North Coast Rail Upgrade required
• 6 Lanes in the North = 6++ lanes to the South; balance with better Public Transport
• SEQIPP ($420 million) (2008-2019)
3. SUNSHINE COAST REGIONAL COUNCIL TRANSPORT ACTIVITIES• SCRC Transport Groups• SCRC Integrated Transport Plan• Multi-Modal Travel Forecasting Model• SEQIPP Review• SEQ Regional Plan Review• Noosa Transit Centre• Noosa Coastal Bypass• South Coolum Road Corridor Study• Stringybark Rd-Dixon Rd Corridor Study• Transport Planning Input to Maroochydore CBD, Palmview,
Caloundra South and CalTOC Planning • Cycle Network Planning and Delivery• Coastal Pathway• PIP’s Transport
6
SCRC TRANSPORT GROUPS• Reference Group (Internal)
• Transport Consultative Group (External)
• Transport Community Group (External)
• Transport Integrated Team (Internal)
Transport Integrated TeamTransport Integrated TeamTransport Integrated TeamTransport Integrated TeamMonthly Meeting held before Transport
Reference Group
Transport Community GroupTransport Community GroupTransport Community GroupTransport Community GroupTwo monthly Meeting held before
Transport Reference Group
Transport Consultative GroupTransport Consultative GroupTransport Consultative GroupTransport Consultative GroupTwo monthly Meeting held before
Transport Reference Group
Traffic Advisory Committee
Speed Mgt Committee
Others B.U.G. R.R.G. State Project Groups
Transport Reference GroupTransport Reference GroupTransport Reference GroupTransport Reference GroupMonthly Meetings
SCRC INTEGRATED TRANSPORT PLAN
• Essential document to guide transport planning, land use planning, capital works planning and development assessment.
• Will express Council’s sustainability position on Transport.
• Guided by the Transport Community Group
• Reference recent works, e.g. SunTran, Maroochy Transport Strategy.
• Scoping document commenced.
• Provide focus & inform the new Planning Scheme
MULTI-MODAL TRAVEL FORECASTING MODEL
• Current SCTFM
• Multi-Modal Forecasting needed
• State Agencies Partnerships
• Sunshine Coast Regional Council Lead Agent
• Data Collection and Management
• Part of SEQ Model
• Predictive and Advocacy
• Future Network requirements
• Enables/supports detailed modelling/planning
• Collaborative State Agencies & Local Government; single strategic model
SEQIPP REVIEW
• 2008 Major SEQIPP Review
• 2009 Minor SEQIPP Review
• Major Review linking to Regional Plan Review
• 2031 Planning Horizon
• Project slippage
• Release of 2009 SEQIPP?
SEQIPP 2008 Review Extracts
Total value now at $107.5 billion, up from $88 billion.
Largest Infrastructure Plan in Australia.
Includes 60 new projects with over 300 identifiable projects.
Over $10 billion has been spent to date. (i.e. since 2005).
Transport makes up 78% of the total.
$18.1 billion allocated for the Sunshine Coast, across all networks, with 10 new projects, including the Multi Modal Transport Corridor (MMTC) at $3.1 billion.
SEQ REGIONAL PLAN REVIEW
• Initial SEQ Regional Plan 2005
• Five yearly review
• Draft released on 07/12/08
• Council’s Growth Management Position Paper as input
• Planning Horizon 2031
• Response to the State by 3 April 2009
• Preliminary position Ordinary Meeting 19 Feb 2009
• SCRC Submission Ordinary Meeting 12 March 2009
• Growth Management & Urban Footprint
NOOSA TRANSIT CENTRE
• Located south-east corner of Noosa Junction
• Will integrate with adjoining retail
• Good access to the new by-pass road
• Capacity for expansion and bus layover
• Estimated $8 – $10 million Capital Cost
• Partnership with TransLink
7
NOOSA COASTAL BYPASS
• Tewantin Bypass• Connects Eumundi-Noosa Rd to Cooroy-
Noosa Rd• Estimated cost $30 million (Main Roads
funding to be finalised)• Stage 1–2 lanes; Stage Two – 4 lanes• Benefits
� Relieves Tewantin of through traffic� Relieves Beckmans Rd congestion � Links two state controlled roads
• Council road
SOUTH COOLUM ROAD CORRIDOR STUDY
• Coolum ILTP identified the need to link South Coolum Rd to Suncoast Beach Drive
• Appropriate corridor for demand
• Project commissioned: MWH
• Completion mid year
• Inform Future Capital Works Program
• Future Capital Works• Extends from Goshawk Blvd to Power Rd
• Provides additional east-west transport link with better traffic distribution
STRINGYBARK RD – DIXON RD CORRIDOR STUDY• Corridor Study complete (EPBCA advice)• Land Acquisition Report to go to Council
TRANSPORT PLANNING INPUT TO M’DORECBD, PALMVIEW, CALOUNDRA SOUTH ANDCalTOC PLANNING• State Government requirement to make ‘Developer
Ready’
• Integrate Land Use Plan and Transport Plan
• Sustainable transport
• Significant Transport requirements
• Plan transport corridors to align with the land use plan:- widths, lanes, multi-modal, intersections, turn lanes/queue lengths etc
CYCLE NETWORK PLANNING & DELIVERY
• Caloundra City Bicycle and Pedestrian Strategy 04/08
• Maroochy Bikeways Plan Review 03/07
• Noosa Cycling and Walking Strategy 04
• SunTran set principles
• Maroochy Transport Strategy Cycle Action Plan
• SEQIPP funding $139 million (60% SCRC 40%DMR)
• SCRC $8 million 2008/09
• QT developing a 5 Year rolling CNP program
• DMR Cycle Network Link Strategy
Cycling Vision
“A network of arterial and local cycleways providing an attractive, safe, affordable, healthy and efficient way to travel for all purposes. Cycling is increasingly the first choice mode for many trips”
COASTAL PATHWAY
• SunROC 2004 Coastal Pathway endorsed
• Follow coastline wherever possible
• Pathway eligible for QT PCNP funding
• Coastal Pathway Master Plan to be completed
• Recreational, commuter and tourism outcomes
8
PRIORITY INFRASTRUCTURE PLANS - TRANSPORT
• PIPs for Caloundra, Maroochy and Noosa identify trunk Transport projects
• Enable developer contributions to be collected to assist infrastructure delivery
• Commit Council to deliver
• Additional “Local Function Charge” for State Controlled Roads
• Three PIPs to be delivered by one Council