INFRASTRUCTURE INFRASTRUCTURE DEVELOPMENT IN DEVELOPMENT IN BALOCHISTANBALOCHISTAN
P L A N N I N G & D E V E L O P M E N T D E P A R T M E N T G O V E R N M E N T O F B A L O C H I S T A N
PUBLIC SECTOR DEVELOPMENT PROGRAMME(PSDP) 2003-04
Panjgur
Kech
Gwadar
Mastung
Kharan
Awaran
Lasbela
Kalat
Khuzdar
Jafarabad
Bolan
JhalMagsi Nasira
bad
Zhob
Qila Saifullah
Loralai
Mus
a Kh
el
Barkha
n
Pishin
Qu etta
Chagai
Qila A
bdull
ah
Kohlu
Dera Bugti
Sibi
Ziarat
Number of Districts 26
AREA 347,190 Km2
(44% of Pakistan)POPULATION 6.511 Million(1998) (5.1% of Pakistan)
BALOCHISTAN
NATURAL RESOURCESCOASTLINE
770 km (70% of Pakistan)Potential for Fisheries development, Tourism and Sea Ports.
FISHERIESFish production (Total) 121,212 M. tonnesLocal Consumption 11,757 M. tonnesExportable surplus 109,455 M. tonnes
AGRICULTURE & FRUITESWheat 8,716 (00) tonnesRice 4,339 (00) tonnesJawar 231 (00) tonnesMaize 73 (00) tonnesBarley 399 (00) tonnesVegetable 3,849 (00) tonnesFruits 14,310 (00) tonnes
MAJOR MINERAL RESOURES OF BALOCHISTAN
MINERAL RESERVES (in metric tonnes)
QUALITY PRODUCTION(in metric tonnes)
Barite 300,000 Medium to high grade 22,000
Building Stones Large deposits Good quality 13,000
Chromite Under estimation Low to medium grade 32,000
Coal 195,000,000 Lower grade(lig-A to bit-C)
1,700,000
Copper Ore >500,000,000 Low grade to medium grade
Production to start in December,2002.
Dolomite Large deposits Good quality No production
Fluorite Small deposits Low to medium grade 750
Gold >300 Low grade No production
Gypsum >200,000,000 Medium to high grade No production
Iron Ore >273,000,000 Low to medium grade Production to start shortly
Source: Geological Survey of PakistanContinued….
MAJOR MINERAL RESOURES OF BALOCHISTAN
MINERAL RESERVES (in metric tonnes)
QUALITY PRODUCTION (in metric tonnes)
Zinc/Lead 16,000,000 Low to medium grade Production to start by end of 2003
Limestone Large deposits High quality 200,000
Marble (ordinary) Large deposits High quality 100,000
Pumice Being estimated Medium quality 1,500
Silica Sand(Glass Sand) Being estimated Medium quality 26,270
Silver >50 Low grade No production
Sulphur 100,000 Low to medium grade 565
Source: Geological Survey of Pakistan
Note:- Aggregates, bulk raw materials and other stones are not included.- Production figures are average of last 5 years.
NATURAL RESOURCESGAS PRODUCTION
LocationsLocations Production (mmcft)Production (mmcft) Rate (mmbtu)Rate (mmbtu)SuiSui 281,996281,996 22.14 (Pak Rs.)22.14 (Pak Rs.)Pir KohPir Koh 32,83832,838 66.92 (Pak Rs.)66.92 (Pak Rs.)LotiLoti 14,08514,085 63.20 (Pak Rs.)63.20 (Pak Rs.)UchUch 56,53556,535 3.17 (US $)3.17 (US $)
Budget 2003-200428%
72%
Non DevelopmentDevelopment
Total 32.782 billion
Non-Development: 23.482 billion
Development: 9.300 billion
PSDP 2003-2004
87%
13%
Local FPA
LOCAL Rs. 8.107 BillionFPA Rs. 1.193 BillionTotal Rs. 9.300 Billion
0.27%725.1000.00025.100Social Welfare16
5.86%66544.7010.000544.701Public Health Engineering15
7.40%60688.183152.043536.140Health14
12.62%1181173.821341.300832.521Education13
17.22%1541601.884318.0001283.884Water12
35.06%2913260.958122.7023138.256Roads11
3.68%37341.9800.000341.980Physical Planning & Hsng:10
0.76%2070.4400.00070.440Sports & Tourism9
0.63%658.1760.00058.176Manpower8
0.11%310.3370.00010.337Minerals7
0.24%422.4540.00022.454Industries6
0.02%12.0000.0002.000Fisheries5
0.02%21.5000.0001.500Wildlife4
0.42%838.6060.00038.606Forestry3
0.41%937.7540.00037.754Livestock2
2.00%12185.66076.460109.200Agriculture1
%ageSchemesTotalFPAGoBNew + Ongoing Schemes
SectorS. No.
PUBLIC SECTOR DEVELOPMENT PROGRAM 2003-2004
123
Continued….
100.00%8289300.3391192.6348107.705TOTAL PSDP 6.08%2565.0000.000565.000Public Rep. Pro.24
3.86%14359.399130.889228.510Other Schemes23
0.43%140.0000.00040.000Std: &. Res:22
1.40%3130.0000.000130.000Sp.Programme21
0.24%322.0000.00022.000Power20
0.95%388.38651.24037.146Environment19
0.32%430.0000.00030.000BDA18
0.02%12.0000.0002.000Rural Development17
0.27%725.1000.00025.100Social Welfare16
%ageSchemesTotalFPAGoBNew + Ongoing Schemes
SectorS. No.
PUBLIC SECTOR DEVELOPMENT PROGRAM 2003-2004
SECTOR WISE ALLOCATIONS
3260.958
1601.884
1173.821
185.66341.98
688.183
1503.152
0
500
1000
1500
2000
2500
3000
3500
Rs. in
milli
on
Road Water Education Agriculture PhysicalPlanning &
Housing
Health Others*
Sectors
Others Include:
Livestock, Forestry, Industries, Minerals, Manpower, Social Welfare, Rural Development, BDA, QDA, WASA, Environment, Special Programmes,Studies & Research.
PROVINCIAL ROADS
547.290 337.290 210.000 Ziarat18
1,057.301 916.301 141.000 Zhob17
517.000 280.000 237.000 Bolan16
648.000 -648.000 Jaffarabad15
421.760 251.760 170.000 Naseerabad14
1,516.540 1,285.540 231.000 Kalat13
640.025 307.025 333.000 Mastung12
1,649.000 1,442.000 207.000 Khuzdar11
1,511.000 1,232.000 279.000 Lasbela10
1,452.390 1,281.390 171.000 Awaran9
1,131.000 934.000 197.000 Gwadar8
1,648.970 1,471.970 177.000 Turbat7
1,635.890 1,491.890 144.000 Panjgur6
1,646.001 1,295.001 351.000 Kharan5
1,439.837 1,161.837 278.000 Chagai4
1,312.500 1,056.000 256.500 Qila Abdullah3
901.000 648.000 253.000 Pishin2
783.991 402.071 381.920 Quetta1
TotalShingleBlack Topped
Length in Kilometer
DistrictS. No.
Continued …
PROVINCIAL ROADS
26,237.177 20,157.317 6,079.860 Total
460.000 282.000 178.000 Sibi26
875.923 601.923 274.000 Dera Bugti25
988.020 947.020 41.000 Qila Saifullah24
361.000 97.000 264.000 Jhal Magsi23
421.100 334.000 87.100 Barkhan22
1,283.819 1,192.409 91.410 Kohlu21
429.500 306.000 123.500 Musakhel20
958.320 602.890 355.430 Loralai19
TotalShingleBlack Topped
Length in Kilometer
DistrictS. No.
LENGTH OF NATIONAL HIGHWAYS IN BALOCHISTANN-25 (816 Km) Karachi - Khuzdar - Quetta –Chaman (98%)N-40 (617 Km) Quetta - Dalbandin - Nokondi – Taftan (100%)N-50 (307 Km) Quetta - Zhob - D. I. Khan (75%)N-65 (295 Km) Quetta - Sibi - Dera Allah Yar (77%)N-70 (256 Km) Qila Saifullah - Loralai – Rakhni (58%)
Total 2,371KM (36%) of all Highways in Pakistan (6600 Km)
PHYSICAL TARGETS ACHIEVEDDURING 1995 TO 2004
301332.202013.30Total---2003-04--603.802002-035347.00652.732001-0212733.40399.842000-01662.50124.471999-20003-64.401998-9917.0032.001997-98212.5052.561996-971169.8083.501995-96
ShingleBlack Top BridgesRoad Construction in Km
Financial Year
Mineral Roads
Infrastructure in coal mining areas of Balochistan Rs. 29.821 millionWidening/Improvement of shingle road fromNarwar Rescue Station to Sarwe Karne Tangi Rs. 3.7 millionConstruction of Coal Mines Road at Mach, Bolan. Rs. 0.845 millionConstruction/Improvement of coal mines shingleroad at Duki, Loralai Rs. 1.256 millionConstruction/Improvement of levy post at BalaChamalan Buddi, Kohlu. Rs. 0.322 millionConstruction of coal mines road from Gilani Coal Co.to Degari main road, Mastung. Rs. 3.522 millionConstruction of shingle road from Bala Dhak,Nausham & Chamalang Coal mines fields to Barkhan Rs. 8.100 millionConstruction of Shingle road from As Tangi toPir Ismail Ziarat Top road Rs. 7.630 millionKhawaja Imran Road, Muslimbagh Rs. 40.00 million
FOREIGN AIDED PROJECTS COMPLETED AND IN PIPELINE
ADB Assisted ProjectsFarm to Market Roads
Phase – I 78 Km (completed)Phase – II 197 Km (completed) Rs. 644.168 mPhase – III (Rural Access Roads Phase 1) 193 Km (completed) Rs. 1,120.900 m
First Provincial Highways (Surab-Basima) 84 Km (completed) Rs. 760.036 m
Balochistan Road Sector Development Project 1120 Km (in-pipeline) Rs. 8,851.000 mJBIC Assisted Projects
Basima-Nag Road 130 Km (completed) Rs. 842.520 m
SUMMARY
Total length of roadsBlack top 6,080.360 KmShingle 20,166.317 Km
Targets for 2003-04On-going Schemes 882 KmNew 200 KmTotal 1082 KmAllocation on road sector Rs. 3.261 billionTotal Roads to be black topped 19084.317 KmTotal Amount Required Rs. 57.520 billion
US$ 9.917 billionTime required 18 years
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
Quetta
Sibi
Bolan
Gandawa
Jaffarabad
Nasirabad
Dera Bugti
BarkhanKohlu
LoralaiZiaratPishin
Q A Q. SaifullahMusakhel
Zhob
Mastung
Kalat
Khuzdar
Uthal
Awaran
Turbat
Gwadar
Panjgur
Kharan
Nushki
20,157.317Shingle
6,079.860Black Topped
Length (Km)Type of Road
BalochistanRoad Network
National HighwaysProvincial Highways/Roads
Blacktop
Shingle Roads
District Boundary
L E G E N D
PROPOSED ROAD LINKS FROM GWADAR
B A L
O C
H I
S T
A N
CHAMAN
QUETTA
SIBI
KALAT
KHARANNOK-KUNDI
KHUZDAR
PANJGUR
TURBATMAND
GWADAR
JIWANI
PASNI
ORMARA
HOSHAB
HINGOL
SONMIANI
N-2
5
N-40 N-65
KARACHI
LORALAI
ZHOB
N-70
N-50UTHAL
TAFTAN
RATODERO
NAL
BELA
AWARAN
GABDZERO POINT
BESIMA
NOSHKI
SURAB
NAG
LADGASHT
GARWAG
PAROM
SAINDAK
DALBANDIN
PISHUN
MASTUNG
To DaduTo Dadu
To To ZahidanZahidan
To To QandaharQandahar
PROPOSED RAIL LINK FROM GWADAR
B A L
O C
H I
S T
A N
CHAMAN
QUETTA
SIBI
KALAT
KHARANNOK-KUNDI
KHUZDAR
PANJGUR
TURBATMAND
GWADAR
JIWANI
PASNI
ORMARA
HOSHAB
HINGOL
SONMIANI
N-2
5
N-40 N-65
KARACHI
LORALAI
ZHOB
N-70
N-50UTHAL
TAFTAN
RATODERO
NAL
BELA
AWARAN
GABDZERO POINT
BESIMA
NOSHKI
SURAB
NAG
LADGASHT
GARWAG
PAROM
SAINDAK
DALBANDIN
PISHUN
MASTUNG
DISTANCESDISTANCESGwadar Gwadar –– DalbandinDalbandin = = 515 Km.515 Km.
To DaduTo Dadu
REVENUE COLLECTION STATION WISE
2,337.738 2,665.423 3,986.515 Total
9.742 16.658 15.065 Zhob23
-0.260 -Recovery Cell22
1.345 2.139 8.471 Sezure Branch21
0.923 37.379 33.622 WH Auction20
8.226 10.063 7.081 Ware House19
-43.713 29.466 FC Auction18
1.915 5.664 9.151 FC17
-14.655 0.966 C/Section Auction SWH16
1.792 1.272 1.773 Car Section15
116.294 143.031 37.311 AFT14
2.363 4.842 3.604 B.G Cell13
3.998 7.269 1.372 Turbat12
223.481 318.255 493.907 Chaman11
102.736 103.214 1.314 Gwadar10
39.958 43.645 57.133 Panjgoor9
--0.830 Pasni8
-0.118 0.068 Jiwani7
8.320 33.930 94.874 Mand6
0.481 3.065 1.789 Taftan5
56.131 161.227 471.221 R/Station Dry Port4
434.907 706.249 23.103 NLC Dry Port3
112.332 359.074 306.073 Gaddani2
1,212.794 649.701 2,388.321 Gaddani (Ship)1
2003-04 2002-03 2001-02 StationS. No.
NUSHKI
KirdgapInamBostanBencha
NawarZaaro
Chaghi
Pishuk
Padak
AhmedWal
Killi Abdul RehmanKilli Denang
Dalbandin
Baratakzai
Amri
Jhuli
KOH-I-SULTAN
Yakmach
IsmaililandiSuran
Chilgazai
PostiZiarat Balanosh
Nokkundi
Gharioabad
Mashkaicha
Talab
Juzak
Saindak
Kirtaka
Borcha
Rabat
Zahidan
Taftan
Panihan
Gawal Stop
Sohtgan
A F G H A N I S T A N
I R A N
KHARANHaji Khachi
Kohar
Albat
District Boundary
National HighwayProvincial HighwayShingle Roads/Tracks
VillageDistrict Headquarter
PSDP 2002-03PSDP 2003-04
L E G E N D
CHAGAI
1161.387Shingle
278.000Black Topped
Length (Km)Type of Road
KHARAN
District Boundary
National HighwayProvincial HighwayShingle Roads/Tracks
VillageDistrict Headquarter
PSDP 2002-03PSDP 2003-04
L E G E N D
Albat
Kohar
Darech
Gungle Garruk
Dali
Basima
Pathak
Kashnap
Nag
Sabzab
Palantak
Haji Kacchi
Hurnagui
Kohan
Washuk
Salam Bak
Tunk
Jodakalai
ChukiPatkin
Lijjay
Nimargh
AhmedWal
1295.001Shingle
351.000Black Topped
Length (Km)Type of Road
Kharan
PANJGUR
Sabzab
Tunk
Tasp
Gar Kalang
Kalang
PlantakCross
Grawag
Gorankind
ParomSaidan
GwargoShingarCross
Gichk
Ragai
District Boundary
National HighwayProvincial HighwayShingle Roads/Tracks
VillageDistrict Headquarter
PSDP 2002-03PSDP 2003-04
L E G E N D
Panjgur
1491.89Shingle
144Black Topped
Length (Km)Type of Road
KECH
Niwano
Mand
Balnigor
Bit (Buleda)
Hoshab
TejabanSamiKakak
Pidark
Gulshanibent
Dasht Kudan
Bericha
TumpBalgather
Badrang
RodkanDandar
Gwarkop
NasirabadRodbun
ShahabGomazi
PathaneSilad Mirani
DamKalat
Zarin Bug
Bullo
District Boundary
National HighwayProvincial HighwayShingle Roads/Tracks
VillageDistrict Headquarter
PSDP 2002-03PSDP 2003-04
L E G E N D
Turbat
1471.97Shingle
177Black Topped
Length (Km)Type of Road
GWADAR
Gwadar
Pasni
Ormara
OrmaraGomazai
Balra
Barsol
Airport
Kandelak
Kalmat
Shadi Kore
Kallag
Nallent
Chibre Kani
Sur BandarNigorePishukan
PollerayDuk
Zarin Bug
Suntsar
Jewani
BerichaDulserGwar Cop
Gabid
District Boundary
National HighwayProvincial HighwayShingle Roads/Tracks
VillageDistrict Headquarter
PSDP 2002-03PSDP 2003-04
L E G E N D
934Shingle
197Black Topped
Length (Km)Type of Road
LASBELA
District Boundary
National HighwayProvincial HighwayShingle Roads/Tracks
VillageDistrict Headquarter
PSDP 2002-03PSDP 2003-04
L E G E N D
Uthal
Sukken
Jam Yousafabad
BelaIsmalani
Barabagh
Paiteepir
Shan Ndorani
Dureji
Hassan Goth
BandMuradKhan
Nakakhai
SonmianiVingoi
Liari
Phore
Malir
Kand
Lakhra
R.Goth
MangiaGoth
Hub
VinderBaghicha
Kanraj
Lohi
1232Shingle
279Black Topped
Length (Km)Type of Road
Gulag
Balbal
Ispilinji
KohakDil band
Kabo
ZargatMareve
Kandmarave
Umardhore
Mastung
Kanak
Sheikh Wasil
Kirdgap
Killi Pasandkhan ZardSarband
Margat
Pir Ismail
Spezand
Kolpur
Degari
SinjdiQuetta
SariabAghberg
Panjpai
District Boundary
National HighwayProvincial HighwayShingle Roads/Tracks
VillageDistrict Headquarter
PSDP 2002-03PSDP 2003-04
L E G E N D
Mangochar
Kirdgap
307.025Shingle
333Black Topped
Length (Km)Type of Road
MASTUNG
Robdar
EXPECTED RESULTS
Development of Road infrastructure will act as catalyst to:Development of Road infrastructure will act as catalyst to:Capitalize on opportunities for trade with landlocked Central Capitalize on opportunities for trade with landlocked Central Asian States through linkage of Asian States through linkage of GwadarGwadar DeapDeap Sea Port to Sea Port to Major Cities and Highways Via Road and RailwaysMajor Cities and Highways Via Road and RailwaysServe the geoServe the geo--strategic interestsstrategic interestsPromote trade and transport with gulf statesPromote trade and transport with gulf statesIncrease in revenues of Barter trade with neighboring Increase in revenues of Barter trade with neighboring countries Iran and Afghanistancountries Iran and AfghanistanUnlock mineral development potential of interior Balochistan Unlock mineral development potential of interior Balochistan Assist in export of minerals, livestock, Fruits and Dates and Assist in export of minerals, livestock, Fruits and Dates and FisheriesFisheriesProvide access to main highways and towns for rural Provide access to main highways and towns for rural agriculture areasagriculture areasIncrease job opportunitiesIncrease job opportunitiesEnsure sustainable development and alleviate povertyEnsure sustainable development and alleviate poverty
RECOMMENDATIONThere is a great need to exploit the potentials in Balochistan.Its geographical location provides excellent linkages with Iran, Afghanistan, Central Asia and the Gulf States.The Best way to accelerate the economic growth is the completion of road network.The quick benefits can be accrued with fast completion of proposed roads.With present resources it is not possible to complete them. There is a great need of Federal and Foreign Financial Assistance as much as possible.