OCTOBER 2009

Prepared By: Sura Al Shami

WET UTILITIES DESIGN WORK STAGES

HIP – Sharjah / Water & Power Business Group

Page 2: Infrastructure projects

Infrastructure Project – Wet Utilities Work

CONTENTS

• Brief Introduction

• Stages of the Design Work

• Open Discussion and Questions

Page 3: Infrastructure projects

Infrastructure Project – Wet Utilities Work

INTRODUCTION

• Infrastructure development projects refer to development of new or upgrading the existing development projects comprising of one or more of the land use types like residential, commercial, recreational and industrial etc.

Page 4: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Airport Plot Development – Abu Dhabi

Page 5: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Land Development

Survey & Investigation

Master Planning

Grading Plans &

Earth Work Design

Roads Design

Design of Utilities

Dry Utilities

Wet Utilities

Power Telecom Street Lighting

Water Supply Foul Drainage Storm Water Irrigation Fire Fighting

Page 6: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Master Planning Support & Data Collection

Concept Design

Preliminary Design

Detail Design

Tender

Construction, Supervision, Commissioning and Handing over (not covered)

Review & Approval from Client and related

Authorities

Infrastructure development project comprise of the following stages

Page 7: Infrastructure projects

Infrastructure Project – Wet Utilities Work

STAGE 1: Master Planning Support and Data Collection

• Collection and review of all the available data including topographic maps, geological maps, existing land use, climatic data and existing utilities etc.

• Preparation of existing utilities inventory including (data collection, review and site appraisal, utility authority liaison - RFI’s)

• Assessment for the condition and loads on the existing facilities and identify requirements for upgrade, diversion, protection…etc

• Demands assessment for the new development under consideration.

• Preparation and submission of an Inception Report for client review and approval

Page 8: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Survey Data

Page 9: Infrastructure projects

Land Use Layout

Infrastructure Project – Wet Utilities Work

Page 10: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Land Use Summery Tables

Page 11: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Existing Irrigation System from Agriculture Dept

Page 12: Infrastructure projects

Infrastructure Project – Wet Utilities Work

STAGE 2: Concept Design

• Development of design strategy and options.

• Evaluation of alternatives and cost estimate analysis.

• Setting up the Utilities Design Standards and Criteria.

• Fixing of the utility corridors for different ROWs of roads as per the services authorities requirements.

• Preparation of utilities concept design drawings including the preliminary size and locations of the primary infrastructure (reservoirs, pumping stations, RO and STP plants, sub stations etc) and concept network layouts

• Preparation and submission of Concept Design Report

Page 13: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Utilities Corridors

Page 14: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Concept Layout for SW Network

Page 15: Infrastructure projects

Infrastructure Project – Wet Utilities Work

STAGE 3: Preliminary Design

• Firming up the systems layout plans.

• Hydraulic design and sizing of systems (usually by means computer programs for hydraulic design and analysis).

• Preliminary civil, M&E and structural design of primary structures like reservoirs, pumping stations etc and setting up the design parameters for RO plants and STP.

• Preparation of preliminary drawings (Layouts and Details)

• Quantity survey and preliminary cost estimates.

• Preparation of Preliminary Design Report

Page 16: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Preliminary Layout for Foul Network

Page 17: Infrastructure projects

Infrastructure Project – Wet Utilities Work

STAGE 4: Detail Design

• Finalization of the layout in exact corridor

• Conflict resolution with other services

• Final hydraulic design and systems sizing

• Preparation of manhole schedules and profiles

• Detailed civil, M&E and structural designs for LS, PS, tanks and Reservoir.

• Preparation of final detailed drawings

• Preparation of a Detailed Design Report

Page 18: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Manhole Schedule

Page 19: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Longitude Profile

Page 20: Infrastructure projects

Infrastructure Project – Wet Utilities Work

STAGE 5: Tender

• Quantity surveys and preparation of Bill of Quantities.

• Preparation of technical specifications.

• Specialty equipments or items, such as packaged STP or RO plants

• Preparation of Tender Documents.

• Invitation for Tenders

Page 21: Infrastructure projects

Infrastructure Project – Wet Utilities Work

BOQs Example

Page 22: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Invitation to Tenderers Example

Page 23: Infrastructure projects

Infrastructure Project – Wet Utilities Work

Open Discussion and Questions