infrastructure solutions 80… · infrastructure solutions background: excavator trends in 2000:...

13
Infrastructure Solutions

Upload: others

Post on 02-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions

Page 2: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions MSD 2250R

Page 3: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions Background:

Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs Attachment Weight: 2500R = 14,600lbs Total Package: 82,500lbs Today: Excavator Weight: PC360 = 79,093lbs Attachment Weight: 2500R = 14,600lbs Total Package: 93,693 lbs

Particularly in demolition, excavators are moved regularly to new job sites 85,000lbs maximum load for 5 axle permit

LaBounty needs a shear targeting the 65,000-70,000lb excavators

Manufacturer Model Weight Caterpillar 329E 64,060 Volvo EC300D 67,260 Komatsu PC290LC-10 68,234 Liebherr R934C 70,350 Liebherr R936 72,425

“Smaller” excavator models are being used more often to conserve operating costs

Excavator weights increased 10%-25%

Page 4: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions

MSD 2500R Pivot Components & Heavy Duty Wraps

Proven MSD Reversed Cylinder Technology with Speed Valve

Heavy Duty Fabricated Tubes (reduce stick deflection)

Standard LaBounty Features

Durability, Quality, Service

MSD 2500R Rotation Group

Patented Wrap-around Blades

Dual Guide Pucks

Expertise, Knowledge, Professional

Indexable Saber Tip

Optional Saber Guard (black wear plates)

• Protects the cylinder rod from being damaged. • Enables the reduced stick height design increasing visibility and reduces weight.

The heavy duty components contribute to the durability and long life expectancy of the LaBounty Shears.

Prevents upper jaw deflection increasing durability and life expectancy of the shear.

Allows for the piercing tip blade to be rotated reducing the cost of ownership.

The replaceable blades reduce welding and maintenance time.

• Allows for placing the smaller shear on a heavier duty carrier without damage to the critical rotation components. • 360 degree powered rotation.

Reduces stick deflection and “buckling” of the shear stick.

Page 5: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions

Shorter upper primary/ lower secondary blade

• Increased apex force • Increased gathering capability

New Reduced Size Saber Tip • Swept back (wear reduction) • Reduced cost

Guide Blade Commonality

• Blade common to upper and lower • Smaller profile • Reduces area for jamming • Fewer Blade SKU’s

Jaw Geometry & Blade Changes

Page 6: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions

2250

R

2500

R

Product Comparison

2500 and 2000 have deeper jaw. 2250 has shorter primary blade= shallower and shorter

Page 7: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions 2250 Maintenance Talking Points Slide Screw and Slide Screw Lock Plate

• Slide screw now also greases the threads (ease of removal) • Lock plate retention bolt is now protected in a counter-bore in the lock plate

Upper Jaw Wear Bars • Upper wear surface now protected by .75 wide x .50 tall AR500 wear bars

Optional Saber Guard Plating

• AR 500 plating on the upper and lower working surfaces

Page 8: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions 2250 Maintenance Talking Points

Multi Machine Mount - Standard • Allows mounting on a variety of machines • Simple pin kit is all that is required to convert • Formed side plates for weight reduction

Easier Hydraulic Swivel Removal

• No need to split shear in half (remove slewing ring bolts) • Remove the motor/gearbox and(4) lock plate bolts • Removes through upper head • Lifting eyes are included in the maintenance kit

Access hole for removal Lift chain access

Heavy Duty Rotation • MSD 2500R Slewing Ring • 2nd member mounts from 55,000 lb – 90,000 lb

Std. style fabrication

Lock plate bolts

Page 9: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions MSD 800R

Page 10: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions Primary Applications Primary Application Secondary Application Tertiary Application

Light Duty Scrap on Scrap Yards

Interior Demolition Cutting Pipes Oil Fields

Mini Excavator or Bobcat

Mini Excavator or Bobcat with Rubber Tires

Backhoe or Mini Excavator

App

C

arrie

r

Manual Burner, MSD7R, Genesis VP15, Cat S305

MSD7R, Robots, Genesis VP15, Cat S305

Magnum RHS607R, MSD7R, Cat S305

Com

p

Page 11: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions Current Application Limitations Primary Application Secondary Application Tertiary Application

MSD7R, Cat S305 MSD7R, Robots, Genesis VP15, Cat S305

Magnum, MSD7R, Cat S305 U

sed

Toda

y

Can’t cut thick wall pipe

or 10” I-Beams

Jaw Opening Can’t cut 10”

Concrete or I-beams

Power Can’t Cut thick wall Is

sues

Page 12: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions

Heavy Duty Pivot Components & Wraps

Proven MSD Reversed Cylinder Technology

Heavy Duty Fabricated Tubes (reduce stick deflection)

MSD 800 Features

Durability, Quality, Service

MSD 1000R Rotation Group Patented Wraparound Blades

Expertise, Knowledge, Professional

Weld-in Tip

Large 15” Jaw Opening

• Protects the cylinder rod from being damaged. • Enables the reduced stick height design increasing visibility and reduces weight.

The heavy duty components contribute to the durability and long life expectancy of the LaBounty Shears.

The replaceable blades reduce welding and maintenance time. • Allows for placing the smaller shear on

a heavier duty carrier without damage to the critical rotation components. • 360 degree powered rotation.

Reduces stick deflection and “buckling” of the shear stick.

Makes for easy replacement of a common wear area saving on maintenance time.

The 15” opening will fit and process most any lighter ferrous and nonferrous materials including pipe, cable, concrete pillars, or I-beams.

Page 13: Infrastructure Solutions 80… · Infrastructure Solutions Background: Excavator Trends In 2000: Excavator Weight: PC300 = 67,900lbs . Attachment Weight: 2500R = 14,600lbs . Total

Infrastructure Solutions Application Sheets

Two Cylinder Options