DESCRIPTION QTY UNIT UNIT COST TOTAL
Portland Cement 53 Bag 220.00 11,660.00
Sand (3cu.m per truckload) 2 Truck load 2,500.00 5,000.00
3/8" Gravel 1 Truck load 3,800.00 3,800.00
5" CHB 616 pcs 8.50 5,236.00
12mm dia. RSB 15 pcs 134.00 2,010.0010mm dia. RSB 15 pcs 93.00 1,395.00
#16 Tie Wire 5 Kgs. 70.00 350.00
1/4 thk. Ordinary plywood 2 pcs 320.00 640.00
2"x3"x10' cocolumber 75 bd. ft 14.00 1,050.00
1.5" common nail 2 Kgs. 65.00 130.00
3" common nail 2 Kgs. 60.00 120.00
31,391.00
37,669.20
TOTAL 69,060.20