  • 7/24/2019 Initial Cost

    1/1

    DESCRIPTION QTY UNIT UNIT COST TOTAL

    Portland Cement 53 Bag 220.00 11,660.00

    Sand (3cu.m per truckload) 2 Truck load 2,500.00 5,000.00

    3/8" Gravel 1 Truck load 3,800.00 3,800.00

    5" CHB 616 pcs 8.50 5,236.00

    12mm dia. RSB 15 pcs 134.00 2,010.0010mm dia. RSB 15 pcs 93.00 1,395.00

    #16 Tie Wire 5 Kgs. 70.00 350.00

    1/4 thk. Ordinary plywood 2 pcs 320.00 640.00

    2"x3"x10' cocolumber 75 bd. ft 14.00 1,050.00

    1.5" common nail 2 Kgs. 65.00 130.00

    3" common nail 2 Kgs. 60.00 120.00

    31,391.00

    37,669.20

    TOTAL 69,060.20

    LABOR COST

    MATERIAL COST