HILLCREST GOLF COURSE MASTER PLAN Initial Development Framework: August 2020 INITIAL DEVELOPMENT FRAMEWORK AUGUST, 2020 PUBLIC REVIEW

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

INITIAL DEVELOPMENT FRAMEWORK

AUGUST, 2020PUBLIC REVIEW

Page 2: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

WINTER 2020

SPRING 2020

SUMMER 2020

FALL 2020

NOVEMBER 2020

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

Research, Data Collection, and Initial Public Engagement

Initial Site Approaches Development

Initial Site Approaches Public Review

Finalist Scenarios and Draft Master Plan Text Development

Finalist Scenarios Public Review

we are here

The City of Saint Paul, in collaboration with the community and consultant team, collected and reviewed information on the site’s the history, current conditions, opportunities, and constraints. This included technical and sustainability analyses as well community wants and needs. This information will was used to develop Hillcrest Master Plan’s Goals and Priorities.

Using the goals and priorities developed in Phase 1, the Hillcrest team developed initial development concepts for the site.

The initial development concepts are being presented to the public for their review. Multiple tools, from on-line surveys to in-person events, will be used to capture community feedback on this initial development concepts.

Feedback from the community, associated governmental agencies, and other stakeholders will be reviewed and analyzed. The development concept will be adjusted to incorporate this feedback. The Master Plan document will be developed.

Finalist development scenarios will be created that incorporate this feedback

• Anne DeJoy (Planning Commissioner)

• Osman Egal (Saint Paul/Maplewood resident)

• Jon Fure (Saint Paul resident)

• Kathryn Murray (Saint Paul resident)

• James Westin (Saint Paul resident)

• Rachel Finazzo Doll (District 2 Community Council representative)

• Linda Martinez-Higgins (Maplewood resident)

• Tiffany Scott Knox (Maplewood resident)

• Tong Thao (Business representative)

• Que Vang (Housing representative)

• Ethan Osten (Multimodal transportation representative)

The Hillcrest Community Advisory Committee (CAC) provides feedback to City staff and consultants throughout the master planning process. Topics include land use priorities, street and trail networks, open space and neighborhood connections. The CAC’s mission includes that its members represent the broader community in addition to (their) own unique perspectives.

The Community Advisory Committee (CAC) was appointed by Mayor Melvin Carter from among over 70 applications via an open application process. The members of your CAC are:

The City of Saint Paul - in collaboration with the Saint Paul Port Authority, community members, and consultants - is developing a master plan. The purpose of the master plan is to develop a future vision for the site including future land uses and street network for the site. Key goals of the plan include how to build opportunity and community wealth on the redeveloped Hillcrest site – bringing more housing, jobs, and public amenities.

Hillcrest is a 112-acre site in the northeast corner of Saint Paul - at the intersection of Larpenteur Ave and McKnight Road. The site was developed in the early 20th Century as a golf course. The golf course closed in 2017. In July of 2019, the Saint Paul City Council approved bonds for the Saint Paul Port Authority to purchase the site with the intent to redevelop the site to benefit the surrounding com-munities.

WHAT IS A MASTER PLAN?

WHO IS LEADING THIS EFFORT?The City of Saint Paul is leading the master plan process, in collaboration with community members, consultants, and the Port Authority.

WHERE IS HILLCREST?

2021

PHASE 6

Formal City ProcessCity staff put forward final scenario and Master Plan document for CAC comment and public hearings at Planning Commission and City Council.

WHAT IS THE CAC?

TIMELINE

Larpenteur Ave

McKinight Road

DOWNTOWN ST. PAUL

MISSISSIPPI RIVER

4.5 miles

Page 3: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

WETLANDSThe Site has several wetlands and ponds that are in the process of being delineated. If deisgnated as “jurisdictional” they are subject to federal requirements. If not, they are subject to watershed district requirements.

TOPOGRAPHYThough the site has been artificially graded as a golf course, it has always been the high point of Ramsey County - thus the name, “hillcrest”. The ridge connecting the three peaks defines waterflow on the site, with 2/3rds of the site drainging to the south and 1/3 draining to the north.

TREESTrees on site consist of red and bur oaks, maple, elms and river birch trees aong the edges of the site and arranged along the fairways. Many of the trees were planted for the golf course, several are over 100 years old. These trees create urban habitat and

SURROUNDING COMMUNITYThe neighborhoods to the east and west are quiet neighborhoods with primarilly, though not exclusively single family homes.

SOILS AND CONTAMINATIONMuch of the soil will have to be removed due to mercury contimination. The contamination is highest in the tee boxes and greens of the golf course. Removal of the contaminated soil will result in the loss of many trees. Soils on the southern portion of the site have a high potential for infiltration.

CURRENT SITE CONDITIONS

WETLAND AND PONDS

HIGH STORMWATER INFILTRATION POTENTIAL

VIEWPOINT - SITE HIGH POINT

SIGNIFICANT TREE

STORMWATER FLOW

RIDGE

SEARCH CORRIDOR

The Site’s current landscape reflects its previous use as a community golf course. It is distinctive for the rolling topography, mature tree canopy, and water features. Less visible is soil contamination associated with previous pesticide use on the course.

The development scenarios will incorporate aspects of the existing site that the community and/or technical advisory committee identify as valuable to the ecology, culture, or function of the site and/or surronding systems. Remeditation of the mercury pollution will be part of any future development.

SITE BOUNDARY

Larpenteur Ave

McKinight Road

2’ CONTOUR

Page 4: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

SYSTEM CONNECTIONS

å

å

å

å

åå

å

å å

å

å

å

å

å

å

å

åå

å

å

ååå

å

å

å

å

å

å

åå

å

åå

å

å

å

kj

kjkjkjkj

kj

kjkj

kj

kjkj

kjkjkjkj

kjkj

kjkjkjkj

Colby Hills Park

Colby HillsPark

SterlingOaks Park

Beaver Creek

NebraskaPark

MaplewoodNatureCenter

Goodrich GolfDome/Aldrich

Ice Arena

GoodrichGolf Course

HillcrestCountry Club

Goodrich Park

Beaver CreekPreserve

City HallCampus

JimsPrairie

Urban EcologyEnviromental

Learning Center

Eldridge TotLot

NorthwoodPark

SouthwoodNature

Preserve

HillsidePark

Geranium Park

GethsemanePark

HillcrestKnoll Park

PrioryNeighborhood

Preserve

Maryland AveOpen Space

Hayden HeightsRecreation

Center

Hazel ParkRecreation

Center

Parks & RecBuilding

Parking Lot

Ramsey CountyFairgrounds/Parks

& Rec BuildingRamsey County Parks

& Rec Horseshoe Court

Beaver LakeCounty Park

Beaver LakeCounty Park

Holloway Marsh

HollowayMarsh

Helen

St N

E CaliforniaAve

Olivia Ct

BurkeAve E

7th S

t N

E Magnolia Ave

N Pedersen St

5th S

t N

E Ames Ave

E Lacrosse Ave

E Maryland Ave

Ariel St

E Geranium Ave

Edge

water

Blvd

E JessamineAve

E Rose Ave

EchoAve

Frost Ave E

N Ru

th St

E York Ave

E Sims Ave

E Case Ave

E RoseAve

E Arlington Ave

E Montana Ave

MemoryCt

Northwood Dr E

Maryland Ave E

Laurie Rd E

E Cottage Ave

Oak Cir

E Clear Ave

E Nebraska Ave

E Ivy Ave

E Ross St

E Arlington Ave

N Pederson St

Fern

dale

St N

Prospe

rityRd

SouthwindLa

Mck

night

Rd

N

Polaris Ct

Arlington Ave E

Sterlin

g St

N

MontanaCir

Burke Ave

7thSt N

7th St E

BelmontCt

E Bush Ave

Belmont La E

2nd

St N

Myrt

le St

N

3rdSt N

Myrt

le St

Tevlin Ct

TewannaPl

N Iro

quois

Ave

N Ruth St

N W

inthr

op St

SkillmanAve E

E Reaney Ave

N Ho

ward

St

Fern

dale

St N

Nebraska Ave

RyanAve E

N Ru

th St

N Va

n Dyk

e St

Beeb

e Rd

N

TilsenCt E

Sterlin

g St

N

E Idaho Ave

Geranium St E

N Br

een S

t

Ripley Ave E

KnollCir

Cres

tview

Dr

E Bush St

Marg

aret S

t N

Amy

Cir

MyrtleSt N

N Lu

ella S

t

Holloway Ave E

Michael La

MagnoliaAve E

N Hazel St

EscanabaAve

Gary

Pl

Mary St

N W

hite

Bear

Ave

N W

hite B

ear A

ve

N Ha

zel S

tN

Haze

l St

N Va

n Dyk

e St

Ariel

St N

Helen La

7th S

t N

Germ

an St

N

Price Ave

N Lu

ella S

t

Ruth

St N

N M

cknig

ht R

d

Char

lesSt

N

Evar St

Furn

ess P

kwy

2nd

St N

1st S

t N

N W

inthr

op St

IdahoAve E

E Jor

dan

Ave

E Sherwood Ave

N Fla

ndra

u St

EldridgeAve E

N Ru

th St

SouthAve E

Haze

l St N

Nebraska Ave E

6th S

t N

RipleyAve E

BrandSt E

5th

St N

E Nokomis Ave

Reaney Ave E

E Stillwater Ave

Mar

yjoe

La N

RipleyAve E

Myrt

leCt

SouthwindDr

County Road B

Edith St

Glendon St N

Montana Ave

Furne

ss Pk

wy

Polar

is Pl N

1st Ave E

E Nok

omis

Ave

N Ha

zel S

t

IowaAve E

N Iro

quois

Ave

CountyRoad B

EldridgeAve E

OakHillPl N

E Iowa Ave

Bush Ave

Sterlin

g St

N

BrandSt E

Manito

u Ave

Maryland Ave E

Eldridge Ave E

Ivy Ave

Evar St

Harvester Ave

GeraniumAve E

Cowern Pl E

BurkeAve

Curri

eSt

N

Sterling St N

TierneyAve E

ShryerAve E

Betty

Jane C

t

N W

inthr

op St

MidvalePl

Mary St N

7th Ave E

7th Ave E

E CaseAve

Mar

ySt

N

RyanCt E

E Nokomis Ave

RipleyAve

Stillwater Rd

Mck

night

Rd

N

Jenn

ifer

Ct

North Saint Paul Rd

EldridgeAve E

RoseAve

ShryerAve E

Hoyt Ave E

E Mechanic Ave

KingstonAve

E 7th St

Curri

e St

E LarpenteurAve

E Orange Ave

Stanic

hPl

N

N Da

rlene

St

Barte

lmy L

a N

CountyRoad B

Burke Ave E

N Fla

ndra

u St

SouthAve E

BelmontLa E

SkillmanAve E

N Br

een

St

Cowern Pl E

E Hyacinth Ave

E MagnoliaAve

Lake

StCounty Road B

E Stillwater Ave

South Ave E

Curri

eSt

N

E Reaney Ave

Mohaw

kAv

e

E Ames Ave

E 7th St

Mey

er St

E Larpenteur Ave

E Lacrosse Ave

E Case Ave

N Cr

aig Pl

E Hawthorne Ave

N Va

nDy

ke A

ve

N Da

vid St

Stanic

h Ct

Benet Rd

RipleyAve E

Nortonia Ave

Arte

ll St

Arlington

Ave

Sterlin

gSt

N

Skillman Ave E

3rd

St N

6th S

t N

Furn

ess P

kwy

Haze

l St N

Van D

yke

St N Craig

Pl

Tilsen Ave

Shryer Ave E

MemoryLa

Burke Ave E

E Ames Pl

Stanic

h St

Skillman Ave E

N Wau

kon A

ve

Sterlin

g St

N

E California Ave

E Ross Ave

E Hoyt Ave

Glend

on St

Mar

y St N

E Hoyt Ave

Ivy St

N

Van D

yke S

t N

Parkway Dr

E Nevada Ave

Fland

rau S

t N

Belm

ont L

a

Ripley Ave E

Larpenteur Ave E

N M

cknig

ht R

d

Kingtston Ave E

Montana Ave E

E Hawthorne Ave

E Maryland Ave

Howa

rd St

N Lake

wood

Dr

Case Ave

Furness St N

Lake

wood

Dr

Myrt

le St

N

City Center Dr

Whit

e Bea

r Ave

N

Van

Dyke

St N

Lake

wood

Dr

©̈150

456730

456765

456729

456731

456729

456765

456765

456725

456731

456768

456730

5

City ofSaintPaul

City ofMaplewood

City of NorthSaintPaul

Barr

Foot

er: A

rcGIS

10.7.

1, 20

20-0

1-08

11:24

File:

I:\Cl

ient\R

amse

y_W

ashin

gton

_Met

ro_W

D\W

ork_

Orde

rs\20

19_F

easib

ility_

Studie

s\003

_Hillc

restG

olfCo

urse

\Map

s\Rep

orts\

Exist

ing_C

ondit

ions_D

ec20

19\F

igure

5 - Pa

rks, G

reen S

pace

, and

Hab

itat C

orrid

ors.m

xd U

ser:

JRV

Study Area

kjBurr or Red Oaks Greater then18" Diameter on Hillcrest Site

å Private School

å Public School

Waterway

State Trail

Minnesota Rail Lines

Approximate Habitat Corridor

Wetland

Lakes and Ponds

Met Council Collaborative Parks

Native Plant Community (MBS)

Native Prairie

Central Region Regionally Ecological Significant Areas

High Ecological Score

Outstanding Ecological Score

Sites of Biodiversity Significance (MBS)

Outstanding

High

Municipal Boundary

Figure 5

PARKS, GREEN SPACE, ANDHABITAT CORRIDORS!;N

0 1,000 2,000Feet

1 inch = 1,000 feetImagery: Nearmap; April 4, 2019

March 25, 2020

EXHIBIT 3: Existing and Proposed TransitMarch 25, 2020

EXHIBIT 2: Existing Bike Facilities EXHIBIT 1: Study Intersections and Pedestrian Facilities

March 25, 2020

OPEN SPACE AND HABITAT PUBLIC TRANSPORATION BICYCLE TRAILS PEDESTRIAN INFRASTUCTURE

The site is connected to a variety of urban and ecological systems that extend beyond the project boundary. The approaches identify ways to connect to the existing systems to benefit the new development and potentially improve the systems they are effecting.

Page 5: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

POLICY & TECHNICAL PRIORITIES HIGHLIGHTS

+/- 1000 JOBS +/- 1000 HOUSEHOLDSSaint Paul’s East Side has seen a signifi cant loss of living wage jobs over the past 30 years. Often taken for granted, living wage jobs and light industrial jobs have been middle class engines for over 100 years - off ering job opportunities that support many workers and their families. The Port Authority (owners of the Hillcrest Property) endeavors to bring approximately 1000 jobs to the site in the form of light industrial, production, modern manufacturing and potentially offi ce.

Housing at Hillcrest will likely occur in a range of styles, sizes and types - including single family homes, townhouses, apartments, cooperative living arrangements, as well as housing for seniors and larger families. Senior housing is particular value in this area of the city with a growing population over the age of 65.

A portion of the site has been desingated as a NEIGHBORHOOD NODE in the City’s Comprehensive Plan. NEIGHBORHOOD NODES are compact, mixed use areas that provide shops, services, neighborhood-scale civic and institutional uses, recreational facilities and employment close to residences. The community node development on Hillcrest will serve not only the new residents but the existing surronding communities.

Lower Density Housing

+/- 20 ACRES OF OPEN SPACEAs a part of City ordinance and the Port Authoty’s agreement withthe City, there wil be approximately 20 acres of open space on the site. Open space will be owned by the city and the Port and will be a combination of active park space, passive park space, ecological resoration and repair, and privately owned publicly accessible plazas.

Active Park Space

Passive Open SpaceHigher Density Housing

+ + +EMPLOYMENT HOUSING OPEN SPACE NEIGHBORHOOD

NODEEMPLOYMENT HOUSING OPEN SPACE NEIGHBORHOOD

ACTIVITY THROUGH SHARED USE

Page 6: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

1. New development should respect the quiet nature of the existing neighborhood. Whereas we recognize that new development may “open up” our neighborhood, we value our trees, quiet streets, access to nature, and sense of neighborhood. New development should not eliminate these qualities.

2. Neighborhoods should be walkable with connections to nearby parks, schools, public transportation and other amenities.

3. New development should address the serious housing shortage in Saint Paul.

4. New jobs on the site should be for a diverse working class, providing sustainable living wage jobs and have local hiring goals; stable jobs for skilled labor for all education levels, and not with high turnover rates.

5. Development on the site should strengthen existing businesses and also support the growth of small, local, and entrepreneurial businesses. This can include (but is not limited to) provisions and allowances for home (and ga-rage) based businesses, affordable commercial workspaces, co-working and collaboration spaces, incubators/accelerators and startup retail including small shops and kiosks.

6. Any retail should be pedestrian-accessible, not automobile-based strip commercial. Attract distinctive small businesses like a coop grocery market, ice cream shop, small cafes, and entertainment venues.

7. Industrial/manufacturing building types should integrate with the neighborhood’s character and be located on the edges of the site near higher volume streets like Larpenteur and McKnight.

8. The site (and the area) needs better public transportation connections. Therefore, the site should be developed in a manner that enables improved transit and encourages the use of public transportation.

9. Extend trails into the site, creating a pedestrian and recreational connection that allows people from the neigh-borhood to access the site, public spaces, and businesses.

10. Analyze the public services that will be necessary to provide for public safety such as additional fire and police, or a new elementary school.

11. Preserve and respect the unique topography and features of the site and maintain healthy mature trees. The rolling hills, wetlands and trees are valuable resources that define the site, perform important ecological func-tions, and for many are part of childhood memories. Incorporate them into park space, gardens, wetlands and other amenities usable year-round to distinguish the site.

12. The development should have ample green space, open space, and park space to support the needs of the people who will be living and working there and meet the City’s green space and park requirements. These spaces should be connected to surrounding neighborhoods and Beaver Lake with multi-use trails and side-walks.

13. The site should have ample community spaces for people to gather and get to know each other and break down barriers – community center, swimming pool, picnic space, splash pad and playground for young families, natural reserve for kids to explore, dog park and other public or semipublic elements that help create communi-ty. Also places for activities like community/educational gardens and a farmers market, and programming such as art in the park and community murals.

14. Design of housing should encourage pride in one’s home and the community. [As revised by the CAC.]

15. Housing should emphasize an interaction with other residents and with nature.

16. Ideally, new jobs would be "green jobs.”

17. Provide a mix of housing options on the Hillcrest site that blends into the existing community and allows people to both stay on the East Side and choose to live on the East Side. This may include smaller single family homes including two-three bedrooms for young families, cottages, twin and town homes, duplexes, live/work homes, homes that are affordable to many incomes and family types, senior options (assisted and independent living cottages), and starter homes, all with yards and green space a priority.

18. New housing should consider emerging and existing family types – such as multi generational, extended, and single person households, cooperative housing arrangements, and intergenerational mixes.

19. New development should help complete the Greater East Side by providing jobs, health services, pedestri-an-accessible commercial and retail uses, and new housing that the East Side currently does not have. Retail should primarily serve the immediate area and not compete with White Bear Avenue.

20. Limit connections to the west and south that carry fast and high volumes of vehicular traffic. Connections into the site from the west and south should be carefully designed so as to avoid excess traffic flow through the neighborhood. Many neighborhood streets do not have sidewalks, so pedestrian safety is a priority. If traffic is increased, provide sidewalks.

CONNECT

BLEND

ACTIVATE

CONSERVE

BUILD

THEMESCOMMUNITY ENGAGEMENT COMMUNITY PRIORITIES

The purpose of Phase 1 Engagement was to introduce the public to the project, to give background information, and to listen to participants visions and concerns for redevelopment of the Site. Discussions were generally structured around community character, living/housing, working/jobs, and overall community priorities.

Following the phase 1 community engagement, the Community Advisory Committee developed 20 community priorities for the Hillcrest Master Plan Project based on the community responses that will be carried through the development of site approaches.

Community Forum

160 attendees

Pop Up Meeting (x3)

60 attendees

On line Surveys

22 responses

PHASE 1

build strong connections to existing infrastructure and community systems

spark community and economic activity through innovative development

conserve existing site features that celebrate

the character and ecological value of the

site

thoughtfully integrate the new development

into the existing neighborhoods

provide new community resources through site

development

+/- 220 engagementsTotal

Page 7: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

ACTIVATECONNECT BLENDthe new development in the hillcrest site will create connections to the surrounding infrastructure network and will balance the needs of pedestrians, cyclists, and vehicles.

CONSERVEthe new development looks to spark economic and community activity on the site. This is often created through placement of complementary land uses - housing, public open space, retail, and employment. Each approach proposes a different way to balance the land uses and activate the site.

the community has identified natural features on the site - including the topography, mature trees, and wetland - as valuable features to maintain in the new development. Each approach proposes a different way to approach this conservation.

the new development should complement the surrounding neighborhoods and act as a bridge between the communities of st. paul and maplewood.

BUILDthe site will use varying scales in blocks and buildings to meet the needs of each of the land uses. Each approach looks to balance the scales to support new activity as well as blend into the surronding development.

INITIAL APPROACHESFour initial approaches were developed from the community, city policy priorities, and technical priorities. Each approach presents a different distribution and alignment of land uses - residential, open space, employment, trails, and public right-of-way - and their relationship to the existing site conditions and system connections.

DESIGN TOOLS

PROCESS

Community Priorities City Policy Priorities Technical Priorities Site Conditions & System Connections+ ++ DEVELOPMENT

APPROACH

Page 8: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

LAND-USESresidential 1 : higher densityresidential 2 : lower densityopen spacepark landwetlandemployment: industrialemployment: officetrailright-of-way

ACTIVATECONNECT BLENDA single north south connection meanders through the site with east west roads connecting to existing local network at select roads. This placement conserves the wetland and existing hillcrest in their current locations. Trails connect the site to the existing trail network and allow for easy pedestrian and bicycle circulation in the new development.

CONSERVE

BUILD

All wetlands, majority of significant trees, and the existing hillcrest are conserved in this approach.

Employment land uses are located in the center of the site. Lower to higher density residential development are used to blend the site into the existing neighborhoods’ grid.

This approach activates the site near the intersection of McKnight and Larpenteur by locating housing, employment, and retail around flexible public space - including a 5+ acre active park and hill crest.

This approach conserves the current location and extents of the hill crest and wetlands as central site features. Proposed land uses are placed around these features and existing site topography.

LAND USE AcresROW 15

Trail Easement 3

Total Open Space 33Open Space (including wetlands, not active park) 25Active Park 8

Employment (Industrial + Office) 29Office 2Industrial 27

Total Residential 32Residential 1 24Residential 2 8

Total Area 112

existing roadexisting bus routeexisting trail

proposed trailproposed road 70’ ROWproposed road 80’ ROW

existing significant treeexisting wetland

hillcrest

PLAN VIEW

Ivy

Clear

Hoyt

Cottage

Sherwood

NebraskaNebraska

Montana

Larpenteur

Hoyt

Arlington

Arlington

McK

nigh

t

APPROACH 1 : LIGHT TOUCH

hillcrest open space

central trail

MCKNIGHT ROAD

LARP

ENTE

UR

AVE

FURNESS TRAIL

NEBRASKA AVEMONTA

NA AVE

ARLINGTON AVE

residential housing expansion

centralized low density industrialconserved wetland open space

5-acre active park

community node (mixed use, housing, open space, and retail)

NORTH

NORTH

Page 9: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

APPROACH 2 : CONSERVATION

hillcrest open space

LAND-USESresidential 1 : higher densityresidential 2 : lower densityopen spacepark landwetlandemployment: industrialemployment: officetrailright-of-way

central trail

MCKNIGHT ROAD

LARP

ENTE

UR

AVE

FURNESS TRAIL

NEBRASKA AVEMONTA

NA AVE

ARLINGTON AVE

residential housing expansion

ACTIVATECONNECT BLENDA single north south connection meanders through the site with east west roads connecting to existing local network at select roads. This road placement creates a range of block scales needed for the different land uses - smaller blocks for residential use and larger areas for industrial. Trails connect the site to the existing trail network and allow for easy pedestrian and bicycle circulation in the new development.

CONSERVE

BUILD

High value existing wetlands on the eastern edge of the site and adjacent significant trees were maintained in this approach. A hillcrest is identified near to the location of the existing site’s highest peak

Employment land uses are located in the center of the site. Lower and higher density residential development are used to blend the site into the existing neighborhoods’ grid to the west and south. Maintaining the existing wetlands in the east of the site creates a green buffer between the site development and adjacent residential neighborhoods.

This approach activates the site near the intersection of McKnight and Larpenteur by locating housing and retail around flexible public space - including a 5+ acre active park and hillcrest.

centralized low density industrialconserved wetland open spaceThis approach balances the conservation of the existing natural site features with acreage identifed for new development. This approach focuses development around the intersection of McKnight Road and Larpenteur Ave.

LAND USE AcresROW 17

Trail Easement 4

Total Open Space 29Open Space (including wetlands, not active park) 24Active Park 5

Employment (Industrial + Office) 23Office 1Industrial 22

Total Residential 40Residential 1 23Residential 2 17

Total Area 113**Includes 1 acres ROW outside of existing site

existing roadexisting bus routeexisting trail

proposed trailproposed road 70’ ROWproposed road 80’ ROW

existing significant treeexisting wetland

proposed hillcrest

PLAN VIEW

5-acre active parkcommunity node (mixed use, housing, open space, and retail)

Cottage

Sherwood

NebraskaNebraska

Montana

Larpenteur

Hoyt

Arlington

Arlington

McK

nigh

t

NORTH

NORTH

Page 10: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

APPROACH 3 : RESHAPE

hillcrest open space

LAND-USESresidential 1 : higher densityresidential 2 : lower densityopen spacepark landwetlandemployment: industrialemployment: officetrailright-of-way

central trail

MCKNIGHT ROAD

LARP

ENTE

UR

AVE

FURNESS TRAIL

NEBRASKA AVEMONTA

NA AVE

ARLINGTON AVE

community node 1(mixed use, housing, open space, and retail)

central low density industrial

ACTIVATECONNECT BLENDa single north south connection meanders through the site with east west roads connecting to existing local network at select roads. This road placement creates larger blocks in the center of the site needed for industrial use. A open space buffer runs along the western edge of the site between the industrial land uses and the neighboring residential community. Trails connect the site to the existing trail network and allow for easy pedestrian and bicycle circulation in the new development.

CONSERVE

BUILD

high value existing wetlands and adjacent significant trees were maintained in this approach. A hillcrest is identified near to the location of the existing site’s highest peak.

employment land uses are located in the center of the site. Residential development and public open spaces are used to blend the site into the existing neighborhoods’ grid to the north and south. Maintaining the existing wetlands in the east of the site creates a green buffer between the site development and adjacent residential neighborhoods.

this approach activates the site near the intersection of McKnight and Larpenteur by locating housing and retail around flexible public space - including a 5+ acre active park and hillcrest.

This approach maximizes acreage identified for employment. High value wetland areas are maintained. Two active community open space nodes are created around the hillcrest in the north and the active park land in the south of the site.

LAND USE AcresROW 14Trail Easement 3

Total Open Space 33Open Space (including wetlands, not active park) 21Active Park 6

Employment (Industrial + Office) 38Office 2Industrial 36

Total Residential 26Residential 1 21Residential 2 5

Total Area 113**Includes 1 acres ROW outside of existing site

existing roadexisting bus routeexisting trail

proposed trailproposed road 70’ ROWproposed road 80’ ROW

existing significant treeexisting wetland

proposed hillcrest

PLAN VIEW

open space buffer

community node 2(housing, employment, and active park)

5-acre active park

conserved wetland open space

Cottage

Sherwood

NebraskaNebraska

Montana

Larpenteur

Hoyt

Arlington

Arlington

McK

nigh

t

NORTH

NORTH

Page 11: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

APPROACH 4 : SCULPT

hillcrest park

LAND-USESresidential 1 : higher densityresidential 2 : lower densityopen spacepark landwetlandemployment: industrialemployment: officetrailright-of-way

central trail

MCKNIGHT ROAD

LARP

ENTE

UR

AVE

FURNESS TRAIL

NEBRASKA AVEMONTA

NA AVE

ARLINGTON AVE

community connector green space

ACTIVATECONNECT BLENDA single north south connection meanders through the site with east west roads connecting to existing local network at select roads. This road placement creates a range of block scales needed for the different land uses - smaller blocks for residential use and larger areas for industrial. Trails connect the site to the existing trail network and allow for easy pedestrian and bicycle circulation in the new development.

CONSERVE

BUILD

High value existing wetlands and adjacent significant trees were maintained in this approach. A hillcrest is identified near to the location of the existing site’s highest peak

The large area identified for employment use is located in the center and eastern edges of the site. Lower density residential development and public open spaces are used to blend the site into the existing neighborhoods’ grid.

This approach activates the site near the intersection of McKnight and Larpenteur by locating housing and retail around flexible public space - including a 5+ acre active park and hillcrest.

centralized low density industrial

expanded wetland area This approach maximizes development of the land for employment and housing. Wetland areas are relocated to the southern end of the site following existing grade.

LAND USE AcresROW 16Trail Easement 3

Total Open Space 26Open Space (including wetlands, not active park) 21Active Park 5

Employment (Industrial + Office) 37Office 1Industrial 36

Total Residential 32Residential 1 16Residential 2 16

Total Area 113**Includes 1 acres ROW outside of existing site

existing roadexisting bus routeexisting trail

proposed trailproposed road 70’ ROWproposed road 80’ ROW

existing significant treeexisting wetland

proposed hillcrest

PLAN VIEW

community node(mixed use, housing, and retail)

Cottage

Sherwood

NebraskaNebraska

Montana

Larpenteur

Hoyt

Arlington

Arlington

McK

nigh

t

NORTH

NORTH

(including wetlands, not active park)

Page 12: INITIAL DEVELOPMENT FRAMEWORK PUBLIC REVIEW · 16 hours ago  · Initial Development Framewor: August 2020 HILLCREST GOLF COURSE MASTER PLAN WINTER 2020 SPRING 2020 SUMMER 2020 FALL

HILLCREST GOLF COURSE MASTER PLANInitial Development Framework: August 2020

COMPARISON OF THE APPROACHES

APPROACH 4 : SCULPTAPPROACH 3 : RESHAPEAPPROACH 2 : CONSERVATIONAPPROACH 1 : LIGHT TOUCH

responds most directly to the features of the land, preserving them in place

keeps wetlands and pondsminimal grading around the hillcrest

gathers valuable natural and cultural resources in one location and builds intensely elsewhere

gathers and expands wetlands in single location, creates a broad corridor through site

adjusts the hillcrest slightlyactive park to the north

pushes the hill and moves the ponds to expand design possibilities

Keeps all wetlands, eliminate ponds,

significant grading to push and sculpt the hill, two areas of open space connected by trail,

active park on the south

sculpts a hill and moves the wetlands to create more design possibilities

Keeps select wetlands, eliminate ponds,

significant grading to sculpt the hill, two areas of open space connected by trail, active park on the north

0.0

500.0

1000.0

1500.0

Jobs Housing Units

Jobs/Housing

0.0

500.0

1000.0

1500.0

Jobs Housing Units

Jobs/Housing

0.0

500.0

1000.0

1500.0

Jobs Housing Units

Jobs/Housing

0.0

500.0

1000.0

1500.0

Jobs Housing Units

Jobs/Housing

Land Distribution

Acres Residential

Acres Lt Industrial

Acres Retail

Acres Office

Acres Right of Way + Trails

Acres Parks and Open Space

Land Distribution

Acres Residential

Acres Lt Industrial

Acres Retail

Acres Office

Acres Right of Way + Trails

Acres Parks and Open Space

Land Distribution

Acres Residential

Acres Lt Industrial

Acres Retail

Acres Office

Acres Right of Way + Trails

Acres Parks and Open Space

Land Distribution

Acres Residential

Acres Lt Industrial

Acres Retail

Acres Office

Acres Right of Way + Trails

Acres Parks and Open Space

Land Distribution

Acres Residential

Acres Lt Industrial

Acres Retail

Acres Office

Acres Right of Way + Trails

Acres Parks and Open Space