INITIAL ENVIRONMENTAL EXAMINATION March 2016 VIET NAM: PRODUCTIVE RURAL INFRASTRUCTURE DEVELOPMENT PROJECT IN THE CENTRAL HIGHLANDS Subproject: “Repairing and Upgrading Cu Jut Irrigation Works System, Cu Jut District, Dak Nong Province” Prepared by Central Project Management Unit – Agriculture Project Management Board - Ministry of Agriculture & Rural Development for the Asian Development Bank

Upload: others

Post on 20-Sep-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

INITIAL ENVIRONMENTAL EXAMINATION

March 2016

VIET NAM: PRODUCTIVE RURAL INFRASTRUCTURE

DEVELOPMENT PROJECT IN THE CENTRAL HIGHLANDS

Subproject: “Repairing and Upgrading Cu Jut Irrigation Works System, Cu Jut District, Dak Nong Province”

Prepared by Central Project Management Unit – Agriculture Project Management Board -

Ministry of Agriculture & Rural Development for the Asian Development Bank

Page 2: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

page i

CURENCY EQUIVALENTS

(as of August 01, 2015)

Currency unit – Vietnamese Dong (VND)

VND 1.00 = $0.0000472

$1.00 = VND 21,175

ABBREVIATIONS

ADB Asian Development Bank

AP Affected persons

CEP Commitment on Environmental Protection

CPC Communal People’s committee

CPMU Central Project Management Unit

DARD Department of Agriculture and Rural Development

DONRE Department of Natural Resources and Environment

DPC District People’s Committee

EIAR Environmental Impact Assessment Report

EMDF Ethnic Minority Development Framework

EMP Environmental Management Plan

DARD Department of Agriculture and Rural Development

HH Household

IMA Independent monitoring agency

IEE Initial Environmental Examination

IPM Integrated Pest Management

LIC Loan Implementation Consultant

MONRE Ministry of Natural Resources and Environment

PC People’s Committee

PPC Provincial Peoples Committee

PPMU Provincial Project Management Unit

RF Resettlement Framework

SIR Subproject Investment Report

TPC Town People’s Committee

UXO Unexploded Ordnance

Page 3: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

page ii

WEIGHTS AND MEASURES

km – kilometer

kg – kilogram

ha – hectare

m – meter

NOTE

In this report, "$" refers to US dollars.

This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 4: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

page iii

TABLE OF CONTENTS

I. INTRODUCTION .............................................................................................................. 1

II. POLICY FRAME, LEGISLATION AND MANAGEMENT ................................................. 2

2.1 ADB policy ..................................................................................................................... 2

2.2 Environment regulations of Vietnam government ........................................................... 2

III. SUBPROJECT DESCRIPTION ...................................................................................... 4

IV. DESCRIPTION OF EXISTING ENVIRONMENT .......................................................... 14

V. ENVIRONMENTAL IMPACT SCREENING ................................................................... 21

5.1 Positive impacts ....................................................................................................... 21

5.2 Negative impacts ...................................................................................................... 21

VI. ENVIRONMENTAL MANAGEMENT PLAN ................................................................. 35

6.1 Environmental impacts and mitigation measures ......................................................... 35

6.2 Environmental monitoring ............................................................................................ 48

6.2.1 Environmental effect monitoring ........................................................................ 48

6.2.2 Environmental compliance monitoring ............................................................... 48

6.3 Building capacity for EMP implementation ................................................................ 52

6.4 Budget for EMP implementation ............................................................................... 53

VII. IMPLEMENTATION RESPONSIBILITY AND REPORTING .................................... 53

7.1 Implementation responsibility ................................................................................... 53

7.2 Report system .............................................................................................................. 54

VIII. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE .............................. 56

8.1 Public consultation in the subproject preparation phase ........................................... 56

8.1.1 Description of activities to date .......................................................................... 56

8.1.2 Outcomes of the public consultation to date ...................................................... 56

8.2 Consultation in future ............................................................................................... 57

8.3 EMP disclosure ........................................................................................................ 57

IX. GRIEVANCE REDRESS MECHANISM ....................................................................... 58

9.1 Purpose of the mechanism ....................................................................................... 58

9.2 Grievance redress mechanism ................................................................................. 58

X. CONCLUSION, COMMITMENT AND RECOMMENDATION ........................................ 59

10.1 Conclusion ............................................................................................................... 59

10.2 Commitment ............................................................................................................. 59

10.3 Recommendations ................................................................................................... 59

XI. ANNEX ......................................................................................................................... 60

Annex 1: Public consultation images and at the subproject site ........................................... 60

Annex 2: Minutes of public consultation ............................................................................... 62

Annex 3: Minutes and diagram of disposal yards (this subproject does not have) ................ 82

Annex 4: Monitored Results of environmental parameters ................................................... 83

Annex 5: Environmental requirement in the bidding document ............................................. 91

Page 5: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

page iv

LIST OF TABLES

Table 1: General information of the subproject ....................................................................... 4

Table 2: Baseline Environment ............................................................................................ 14

Table 3: Environmental impact screening ............................................................................ 21

Table 4: Environmental mitigation plan ................................................................................ 35

Table 5: Environmental effect monitoring ............................................................................. 48

Table 6: Environmental compliance monitoring .................................................................... 48

Table 7: Schedule of training on capacity building ............................................................... 52

Table 8: Budget for EMP implementation ............................................................................. 53

Table 9: Responsibility of stakeholders ................................................................................ 53

Table 10: Monitoring and reporting system .......................................................................... 54

Table 11: Public consultation description ............................................................................. 56

Table 12: Results of public consultation ............................................................................... 57

Table 13: Expected public consultation activities ................................................................. 57

Page 6: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 1

I. INTRODUCTION

The productive rural infrastructure development project in the central highlands is funded by ADB. Ministry of Agriculture and Rural Development (MARD) is the project investor. This project will be implemented in the 5 provinces (Lam Dong, Dak Nong, Dak Lak, Gia Lai and Kon Tum) of the Central Highlands.

The long-term purpose of the project is to contribute to hungry alleviation and poverty reduction programs of the Government through sustainable development of the society, ecology and environment at community level by developing infrastructures for production, improving socio-economic conditions and living standards of people in the area. The short-term objectives of the project are (i) to rehabilitate and upgrade deteriorated or damaged irrigation system and rural roads; (ii) to strengthen management capacity and implementation of ODA projects, infrastructure management at community including province, district and commune levels to gradually improve living standards and conditions of the poor in the project area in the Central Highlands; (iii) to build models, institutional policies on "water saving irrigation technology for strategic and economic valuable plants" and "management and exploitation of irrigation schemes sustainably with the participation of all economic sectors ".

One sub-project of the project is “repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province” that will be implemented in three communes including Nam Dong, Dak Drong and Cư Knia, Cu Jut district, Dak Nong province. This Initial Environmental Examination (IEE) of the subproject is prepared to meet the requirements of environmental safety of ADB and the Government of Vietnam. It includes 11 parts:

(i) Introduction

(ii) Policy frame, legislation and management

(iii) Sub-project description

(iv) Description of existing environment

(v) Environmental impacts screening

(vi) Environmental Management Plan

(vii) Implementation arrangement, monitoring and reporting

(viii) Public consultation and information disclosure

(ix) Complaint Mechanism

(x) Conclusion commitment and Recommendation

(xi) Annexes

Page 7: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 2

II. POLICY FRAME, LEGISLATION AND MANAGEMENT

2.1 ADB policy

ADB safeguard policy statement (SPS) 2009 imposes safeguard requirements for all its funded projects. The SPS 2009 clarifies reason, scope and contents of the environmental assessment. Safeguard policy statement emphasizes on environmental and social sustainability in progress of economic growth and poverty reduction in Asia and the Pacific, therefore the objectives of SPS focus on:

i. areas Avoid adverse impacts of projects on the environment and affected people, where possible;

ii. Minimize/mitigate and/or compensate for adverse impacts on environment and affected people when avoidance is not possible; and

iii. Help borrowers/clients to strengthen their safeguard systems and develop the capacity to manage environmental and social risks.

SPS requires preparing environmental safeguard documents in the process of preparing a project including environmental management plan (EMP). The borrower/client needs to monitor EMP implementation. The monitoring will identify outstanding issues of EMP implementation and propose appropriate mitigation measures. Periodic monitoring report on EMP activities will be submitted to ADB every semi-annual during construction of the project.

Moreover, all subprojects under the loan 3032-VIE need to follow the specific guidance on environmental assessment as stated in the Environmental Assessment Review Framework (EARF) of the project, prepared by the project owner and approved by ADB. The subprojects under loan 3032-VIE only categorized as Category B or C will be included in the list of eligible subprojects for possible funding under the proposed Project. It is anticipated that all eligible subprojects will fall into Category B, whereby some adverse environmental impacts are expected, but of a lesser.

The subproject ““Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province” is selected based on the project’s EARF that may cause the insignificant environment impacts and ranked as categorized B because: (i) It is not close to any preserved areas; (ii) there are not any households whose houses will be affected due to land acquisition to the subproject implementation;;(iii) it estimates there are about 36 households whose land will be acquired to implement the subproject but not any households will lose more than 10% their land. (iv) some environmental adverse impacts but these impacts will take place within subproject sites but can be controlled by mitigation measures. Thus an IEE needs to be prepared with an enclosed EMP.

2.2 Environment regulations of Vietnam government

The project must also comply with the environmental regulations. The Vietnam legal framework comprises of the following items:

- The Law on Environmental Protection adopted by the National Assembly of the Socialist Republic of Vietnam dated January 01, 2015. The law regulates general environmental protection requirements, policies and resources for protecting the environment;

- The Law on Labor adopted by the National Assembly of the Socialist Republic of Vietnam dated June 18, 2012 that regulates general requirement on safety and occupational health;

- The Law on Water Resources adopted by the National Assembly of the Socialist Republic of Vietnam dated June 21, 2012 that regulates general requirements on water resources management;

- Law on Biodiversity (No. 20/2008/QH12) (Requires proposed investment projects within buffer zones of conservation areas to have an approved EIAR );

Page 8: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 3

- Law on Cultural Heritage (No. 28/2001/QH10) Law Amending and Supplementing a Number of Articles of the Law on Cultural Heritage (No. 32/2009/QH12) - Prohibits illegal construction or expropriation of land at historical-cultural sites or scenic landscapes.

- Law on Construction(No.50/2014/QH13)- Basic principles to uphold in all stages of

construction projects include environmental protection, coping with climate change,

public/workers’ safety, and prevention of, and responding to, fire and explosion;

- Decree No. 18/2015/NĐ-CP on April 01, 2015 of the Government that regulates on environmental protection planning, strategic environmental assessment, environmental impact assessment (EIA) and environmental protection commitment (EPPs);

- Decree No. 179/2013/NĐ-CP on November 14, 2013 of the Government that regulates on administrative violations in the domain of environmental protection;

- Decree No. 38/2015/ND-CP on June 15, 2015 of the Government that stipulates on waste and disposal management;

- Decree No. 127/2014/ND-CP on December 31, 2014, of the Government that stipulates environmental monitoring service activities; Decree No. 179/2013/ND-CP on November 14, 2013 of the Government that stipulates administrative fines for environmental protection;

- Decree No. 201/2013/NĐ-CP on November 27, 2013 of the Government that details the Law on water resources;

- Circular No. 27/2015/TT-BTNMT on May 29, 2015 of the Ministry of Natural Resources and Environment (MONRE) that guides details on strategic environmental assessment, environmental impact assessment and environmental management plans;

- Circular 36/2015/TT-BTNMT on June 30, 2015 of the Ministry of Natural Resources and Environment (MONRE) that stipulates on Hazardous waste management;

- Circular 27/2013/TT-BLDTBXH on November 18,2013 of the Ministry of Labor, War invalids and Social Affairs that guides training on labor safety and hygiene;

- Decision 3733/2002 /QĐ-BYT on October 10, 2002 of the Ministry of Health that promulgates 21 labor hygiene standards, 5 principles and 7 labor hygiene measurements;

- TCVN 4118:2012: National technical standard for irrigation works/systems and design requirements;

- TCVN 6707:2009: National technical standard Hazardous waste – Warning signs;

- TCVN 6706:2009: National technical standard Hazardous waste – Classification ;QCVN 05:2013/BTNMT: National technical regulation on ambient air quality;

- QCVN 26:2010/BTNMT: National technical regulation on noise;

- QCVN 27:2010/BTNMT: National technical regulation on vibration;

- QCVN 01:2009/BYT: National technical regulations on drinking water;

- QCVN 02:2009/BYT: National technical regulations on domestic water;

- QCVN 06:2009/BTNMT: National technical regulation on hazardous substances in ambient air;

- QCVN 07:2009/BTNMT: National technical regulation on hazardous waste thresholds;

- QCVN 08:2008/BTNMT: National technical regulation on surface water quality;

- QCVN 14:2008/BTNMT: National technical regulation on domestic wastewater;

- QCVN 04 – 05:2012/ BNNPTNT: National technical regulations on irrigation works – main regulations on design.

Page 9: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 4

III. SUBPROJECT DESCRIPTION

Table 1: General information of the subproject

DESCRIPTION SUB-PROJECT DATA

I. GENERAL INFORMATION

Sub-Project Name Repairing, upgrading Cu Jut irrigation works system

Sub-Project type Repairing, upgrading irrigation works system

Sub-Project Owner Department of Agricultures and Rural Development (DARD) Dak Nong

Sub-Project owner’s representative

PPMU Dak Nong

Address of Sub-Project Owner’s representative

Tran Hung Dao street, Nghia Trung Ward, Gia Nghia Town, Dak Nong province

Name and title of head of sub-project owner’s representative

Pham Huu Hao, Director

Telephone, fax and email details of sub-project owner’s representative

Phone: 050130.545.809; Fax: 050130.545.809Email: [email protected]

Full name of the PPMU’s environmental officer

Le Viet Hoa, Phone: 0948395353; Fax: 05013.545.809

Email: [email protected]

II. SUBPROJECT DESCRIPTION

1. New or innovating or upgrading project

Repairing and upgrading rural infrastructure

2. Components of the subproject

Repairing and upgrading three irrigation works system and interconnecting road in Cu Jut district include following components:

(i) Irrigation works of Cu Pu reservoir at Nam Dong commune; (ii) Irrigation works of Dak Dier reservoir at Cu Knia commune;

and (iii) Irrigation works of Dak Drong reservoir at Dak Drong

commune.

2.1. Irrigation Cu Pu reservoir in Nam Dong commune

a. Reservoir: Technical parameters of Reservoir

Reservoir Grade : Grade 3

Catchment area : 1.3 km2

Design flood frequency : 1.5 %

Irrigation supply assurance frequency : 75 %

Design flood water level : 510.21 m

Normal water level (NWL) : 510.00 m

Dead water level : 502.40 m

Reservoir water volume with NWL: 703.72 x 10 6 m 3 Dam crest level : 510.8 m

Page 10: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 5

DESCRIPTION SUB-PROJECT DATA

Height of wave wall : 0.8 m

Wide of dam : 5.0 m

Length of dam : 139.8 m

Technical proposal

* Soil dam: raising the elevation of dam crest increased from 509.7 m to 510.8 m. Solving existing permeability problem by bentonite clay (GCL) on upstream slope, and covered by reinforced concrete slab M200 with 10 cm of thickness. . The wide of dam crest B=5m is utilized for transportation with road category of A, and wave-wall with 0.8 m of height and made by reinforced concrete M200 in upstream side. The downstream slope will locate drains; * Spillway: repair existing spillway with width of 3.2 m. Threshold

Elevation 510.00 m with regulation. Flood discharge is 3.65 m3 / s.

b. Irrigation canal and its works: Repairing, upgrading works on the canal, the damaged sections of the canal will be demolished and reconstructed with the cross section the same with the existing one.

c. Interconnecting road: 2.725 km of interconnecting road from the residential area to the headwork and the production area will be constructed per the grade A rural road. The road is 5.0 m of width in which, road surface is 3.5 m and made by reinforced concrete M250 with 16 cm of thickness, layered by 12 cm crushed stone;

2.2 Irrigation Dak Dier reservoir in Cu K’Nia commune

a. Head-works: No construction.

b. Irrigation canal & pump station:

- Constructing 655 m irrigation canals N1, N2, N3, N4, N5, which are behind of the irrigation sluices on the main canal KC1; and extend further 450 m of irrigation N6 to supplement irrigation for Dak D’rong. The bed of canals is made by reinforced concrete;

- Completing irrigation canals and works, including 3,765m of canals of T, T1, T2, T3, T4, T4-1, T5 and T5-1, to ensure irrigation capacity for 60 ha of supplementary irrigation area;

- Building 01 pump station to get water at the end of the main canal KC1 and completely build the irrigation canal and works on the canal to supply irrigation water for 60 ha at high area (at the end of main canal KC1);

c. Interconnecting road:

- 3.6 km of interconnecting roads from the residential area to the head-works and the production area will be constructed per the grade A rural road. The roads are with 5.0 m of width, in which road surface is 3.5 m and made by reinforced concrete M250 with 16 cm of thickness and layered by 12 cm of crushed stone;

- 4.3725 km of the irrigation bank roads will be reinforced per the grade C rural road to serve agricultural production. The roads are with 3.0 m of width, in which road surface is 2.0 m and made by crushed stone with 10 cm of thickness;

2.3 Irrigation Dak D’Rong reservoir in Dak

a. Head works:

Page 11: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 6

DESCRIPTION SUB-PROJECT DATA

D’Rong commune

- Soil dam : is still good quality, only need to treat penetration at elevation of 374.10 m ( small penetration flow)

- Raising wave-wall up to 0.3 m with 0.2 m of thickness and made by reinforced concrete M200;

- Building 145 m2 of operational office as grade IV of infrastructure;

b. Irrigation canal:

- Concreting the last 697 m of main irrigation canal N2-2 by reinforced concrete with rectangular shape 50 x 70 cm;

- Construct new irrigation canals: N1-2 canal with 473.0m long, canal N2-1 from the irrigation sluice at K2 +025 on canal N2, canal N1-2-1 with 144m long on the canal N1-2-1. Canals are made by reinforced concrete with rectangular shape, in which the first two canals are in size of 40 x 50 cm, while the canal N1-2-1 is in size of 30 x 40 cm;

c. Interconnecting road:

- Repairing and upgrading 10.552 km of interconnecting roads from the residential area to the head-works and the production area with the grade A & B of rural road. These A roads are with 5.0 m of width, in which road surface is 3.5 m, made by reinforced concrete M250 with 16 cm of thickness and layered by 12 cm of crushed stone. While the B category is 3 m of width (in which road surface is 2.0 m), made by reinforced concrete M250 with 14 cm of thickness and layered by 10 cm of crushed stone;

Quantity of drainage culvert

Sub-project will remain almost drainage culverts on the road systems, and several culverts will be repaired and new constructed as following:

On the road surrounding the reservoir in Cu Knia commune there are 8 culverts at Km0+235, Km0+535, Km0+758, Km0+982, Km1+283, Km1+307, Km1+385, Km1+566. All the culverts were available and will be repaired and reused. There are also three newly built culverts at Km1+240, Km1+935 và Km2+350.

The road on main bank of canal KC2, there are three old culverts and one old intake culverts at Km2+707.55 will be repaired and reused.

Quantity of bridges Interconnecting roads in the subproject area will be upgraded on the existing roads or along the canal. Thus subproject will not construct or upgrade bridges on the roads.

Irrigation and drainage structures

The existing irrigation structures include reservoir, soil dam, spillways, intakes and irrigation canals. The outdated and deteriorated sections of irrigation systems will be repaired and upgraded as mentioned above;

The drains, which are located on dam and road slopes, and existing irrigation canals are working as drainage function. In addition, some roads in Dak D’rong have existing longitudinal drainage structures. Therefore, no longitudinal drainage structure will be built in this sub-project;

Page 12: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 7

DESCRIPTION SUB-PROJECT DATA

Area1 of site clearance (Occupied land area)

Co

mp

on

en

t

Occupied land area (ha) in each sub-component

Note

Road

Rese

rvo

ir

Te

mp

ora

ry

mate

ria

l yard

Cana

l

Man

age

men

t b

uild

ing

To

tal

Cu Pu reservoir

1.28 0.88 0.75 2.91 (i) Occupied area for

roads include existing foundation area (iii) area in reservoirs is managed by Dak Nong Irrigation management company

Dak Dier reservoir

3.75 0.6 1.54 5.89

Dak Drông reservoir

6.62 0.2 0.9 0.15 7.87

Total 11.65 0.88 1.55 2.44 0.15 16.7

Other roads that intersect with subproject’s roads

Some inter-commune roads intersect with the subproject road is (i) Nam Dong road; (ii) Dak Rong road and some other inter-village roads.

The main streams that across the road

- Rivers

- Reservoirs

- Other streams

- The entire of rivulets and streams in the subproject area is in basin of Serepok River flowing from South to North through the boundaries of two provinces of Dak Nong and Dak Lak and going to the Kingdom of Cambodia.

- In the subproject, there are 03 reservoirs: Cu Pu reservoir, Dak Dier reservoir and Dak D’Rong reservoir.

- There are some streams flowing through communes such as: Ea Gang, 1.5km from Cu Pu reservoir, stream flowing Nam Dong and Tam Thang communes; Dak Dier stream at the southwest of Dak Dier reservoir; Dak D’Rong stream at the Southwest of Dak D’Rong reservoir. Around the reservoirs, there are also a lot of swallow brooks.

Number of hills and mountains

All areas of reservoirs as Cu Pu, Dak Dier and D'Dak Rong and their neighboring area have a complex and fragmented mountain and hill system with altitudes vary from +320 m to + 425 m. Only the production field is relatively flat.

III. Construction activities

Commencement (month/year)

Quarter I of 2016

Finish (month/year) Quarter IV of 2016

Number of construction worker

Around 100 workers

Are there any camps for workers? Yes/no

Yes, there will be 03 camps, with estimated 100 workers will be mobilized on the sites

1 Area of clearance and numbers of affected households updated as available data which has been mentioned in

Feasibility Study of the Sub-project by January, 2016

Page 13: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 8

DESCRIPTION SUB-PROJECT DATA

Will the construction take place in rainy seasons?

For upgrading of head-works of Reservoirs

In rainy season, there could be some activities such as site preparation, materials gathering , building camps., operational houses and dam slopes, planting grasses on slopes diversion flow canal etc X The main construction activities will be implemented in the dry season, however, it will consider the cultivation periods of local people into construction plan to avoid cultivation period of local people (See more detail in construction method below).

For upgrading of rural road: Yes, In case of favorable weather conditions

Number of concrete mixers

06 mobilizing concrete mixers with the capacity from 250 – 500 l each.

Construction methods Construction methods to avoid cultivation period

Construction of Cu Pu head work, Dak DRong dam: withdrawing water from reservoir during 5 months: from December to April for repairing whole head-works. From May reservoir will be stored again to supply water for agricultural production.

During construction months of Reservoir head-works , construction flow diversion will be implemented to supply water for agricultural production . So that construction of works will avoid to cause affects to cultivation

Construction of canals: the same time with repairing /upgrading dams, head-works when withdrawing water from reservoir

Other components: construction road, rural road, operational house will be constructed in remain months of the year.

Temporary location and area occupation and material source

- Source of materials:

a. Works of Cu Pu reservoir and interconnecting road

- Waterproof and embankment materials for Cu Pu dam:

+ Waterproof membrane GCL is purchased from Ho Chi Minh City then transported to the work site by road.

+ Embanked soil: will be taken in upstream of reservoir, distance about 25 meters from dam foot (this land area belong to Cu Pu reservoir area )

+Rubble stone: will be used from stone peeled at the roof of upstream of dam.

- Soil for embanking canal and leveling road: will be taken from canal & road excavated soil as well as from excavation soil in Cu Pu reservoir;

- Construction materials such as iron, cement, stone, sand are bought at the center of Cu Jut district then transported approximately 8 km to the site;

b. Works of Dak Dier reservoir and interconnecting road:

- Embanked soil: The embankment soil for roads and banks of canals will be taken from soil mine in Dak Dier, this mine has been planned and with plenty of capacity. This soil mine is operated

Page 14: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 9

DESCRIPTION SUB-PROJECT DATA

since 2010 under Dak Nong irrigation exploitation & management Company with potential reserves & the soil mine is compensated since 2010

- Construction materials: iron, cement, stone, sand, ... are bought at center Cu Jut district then transported about 20km to the site.

c. Works of Dak Drong reservoir and interconnecting road:

- Embanked soil: The embankment soil for roads and banks of canals will be taken from soil mine in Dak Drong, about 300 – 500 m to the site . This soil mine is large knoll & public land & agreed by Dak Drong CPC

- Construction materials: iron, cement, stone, sand, ... are bought at center Cu Jut district then transported about 20km to the site.

The subproject will not need to exploit the material but only utilize excavated soil for embankment in which, the excavated soil is 50,815.89 m3 while embankment volume is 47,522.03 m3

- Material gathering yard:

The temporary yard for store the material will be defined by contractors during construction with households (renting) or CPC.

Measures to manage and balance excavation/ embankment spoil/stone

Excavated soil is 50,815.89 m3 while embankment volume is 47,522.03 m3.

Balance : 3,293.86 m3

Discarded soil quantity: 7,622 m3 (about 15 % of excavated soil)

The excavated soil will be used for backfill of management/production road along the canal system

Discarded soil /sludge will be dumped at 3 disposal sites as bellow

For Irrigation Cu Pu reservoir & Interconnecting road: in Nam Dong commune:

Disposal site is far from Cu Pu dam about 500 m to the west in Nam Dong Commune- This disposal site is old one and is compensated & approved by Nam Long CPC

For Irrigation Dak Dier reservoir & Interconnecting road: in Cu Knia commune.

Disposal site is downstream of Dak Dier dam, about 100 m in Cu Knia Commune. This disposal site is old one and is compensated & approved by Cu Knia CPC

For Irrigation Dak DRong reservoir & Interconnecting road: in Dak Drong commune.

Disposal site is about 200 m to the spillway. This disposal site is old one and is compensated & approved by Dak DRong CPC

In addition, discarded soil will be utilized by households for dumping/feeding in local peoples gardens ( local peoples ‘s opinion at Public Consultation meetings)

Approximate volume of construction materials

Approximated volume construction materials:

a. Works of Cu Pu reservoir and interconnecting road: Embanked

Page 15: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 10

DESCRIPTION SUB-PROJECT DATA

soil: 14,686.22 m3; sand: 1,952.1 m3; macadam: 1,348 m3; asphalt: 46.36 m2; formwork: 4,518.12m2; steel: 36,816 kg; concrete cement: 2,135.68m3; GCL waterproof membrane: 5,382.82 m2; cement (grouting for waterproof): 89.6 tons.

b. Works of Dak Dier reservoir and interconnecting road: Embanked soil: 18,675.01 m3; sand: 434.835 m3; asphalt: 345.98 m2; formwork: 14,552.67 m2; steel: 91.34 kg; concrete cement: 3,644.24 m3; reinforced concreted culverts: 20m long; HDPE pipe D20: 42 pieces; HDPE pipe D40: 3 pieces; steel pipe D40: 3 pieces.

c. Works of Dak D’Rong reservoir and interconnecting road: Embanked soil: 14,160.8 m3; sand: 1,912.202m3; asphalt: 2,248.08m2; formwork: 5,055.69m2; steel: 2,773.9 kg; concrete cement: 5,502.19 m3;

Number and condition of vehicles and construction equipment

The subproject will employ 5 Bulldozer 110CV; 5 excavators <= 1.25m3; 4 crane 16T; 21 compactors; 12 cutting machines; 7 concrete mixer 250L; 03 generators 50KVA; 3 hoists 0.8T; 7 saws 2.7 KW; 3 water pumps 20CV; 3 compressors 240m3 / h; 3 self-operation hammer drill D105-110mm; 8 concrete drill 4.5 KW; 7 electric welding machines 23kW; 10 trucks & vans.

Such vehicles and equipment will be in good conditions and have periodical verifications.

IV. Operation and maintenance activities

Maximum speed 15 km/h

Designed load Weight < 6 tons

Designed vehicles density

50 vehicles/day-night

Maintenance activities Exploitation of Hydraulic Works One Partner Limited Company Cu Jut Branch directly manages and operates this works. The agency is responsible for operation and maintenance works after completion.

For irrigation system

(i) Regularly operate and maintain: Carried out regularly to minimize broken for works, including: drainage canal heart, do clearance, repair temporary broken, maintain exhaust and paint for mechanical equipment

(ii) Periodically operate and maintain: Carried out at broken and downgraded section to restore works item. Displace mechanic items and repair broken items. Carry out dredging and maintain canal side.

Frequency: one/ seven year

Operation and maintenance in case of emergency: carry out repair for broken and downgraded items. Carry out check, propose technical method and cost for repairing based on current regulation of State.

For rural road system (frequency of one per five year)

- Cleaning road surface;

Page 16: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 11

DESCRIPTION SUB-PROJECT DATA

- Dredging canal along roads;

- Repair broken/damaged parts on concreted road surface;

- Maintaining expansion joints on concreted road surface;

- Regularly painting road and traffic signs;

- Supplementing stone for slope protection.

V. Resettlement No relocated HHs, only land acquisition but affected peoples has agreed to donate their land.(detailed information from Detailed Measurement Survey that not completed yet)

Affected households 36

Severely affected households 0

Relocated households 0

Total acquired area (ha) Temporarily = N/A Permanently =N/A

Acquired agricultural land area (ha)

Temporarily = N/A Permanently = N/A

Acquired forestry land area (ha) Temporarily = 0 Permanently = 0

Acquired aquaculture land area (ha)

Temporarily = 0 Permanently = 0

Acquired residential land area (ha)

Temporarily = 0 Permanently =0

Acquired garden land area (ha) Temporarily = 0 Permanently =0

Other acquired lands (ha) Temporarily = 0 Permanently =0

VI. The Subproject cost

Total subproject cost (VND) Estimated 100,590,606,000 VND

Page 17: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 12

Figure 1: Map of subproject

(a) Location of sub-project area with Cu Pu, Dak Drong, Dak Dier reservoirs

(b) Topography of Cu Pu reservoir and surrounding area

Page 18: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 13

(c) Location map of the subproject components

Page 19: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 14

IV. DESCRIPTION OF EXISTING ENVIRONMENT

Baseline environment data of the subproject has been collected from secondary data and field trip could be summarized as following

Table 2: Baseline Environment

DATA ITEM SUBPROJECT DATA

4.1 PROJECT LOCATION

Town The subproject locates at 03 communes Nam Dong, Cu Knia and Dak D’Rong.

District Cu Jut

Province Dak Nong

Geographical position The sub-project is in the North of Dak Nong province and in the Southwest of Highlands. The coordinates of the subproject (coordinates VN2000) is as follows:

From X: 1391418.4 to X: 1398018.8

From Y: 421,838.6 to Y: 433119,9

4.2 NATURAL ENVIRONMENTAL CONDITIONS

Air quality

The subproject is located in the mountainous area. There is no industrial or mining activities are taking place.

Center of Technology & Environment and Natural Resources Management - University of Agriculture and Forestry Ho Chi Minh City took 3 samples at Cu Pu irrigation works, 3 samples at Đăk D’Rông irrigation works and Đăk Diêr irrigation works in September 17, 2014. 7 parameters including noise, dust, SO2, NO2, CO, temperature from each sample were analyzed. The analysis results showed that air quality around the project was quite good, all the parameters are within limits of National technical standards for ambient air quality QCVN 05 : 2013/BTNMT. (See more details of ambient air quality analysis in annex 4)

Noise and vibration

The subproject is located in mountain area with low traffic density and opened green space. Moreover, it is found that Industrial/mining activities are underdeveloped in the area, therefore noise level is very low.

The measurement of noise level in comparing with National Technical standards on noise level, QCVN 26:2010/BTNMT indicates that sub-project area is in good condition without noise pollution, noise level in the Cu Pu reservoir area: 49.5 – 61.0 dBA (See more details of ambient air quality analysis in annex 4)

Climate and natural disasters

The subproject area is influenced by the tropical monsoon and plateau tropical monsoon climate. The year is divided into two distinct seasons:

- The rainy season is from May to October (accounting for approximate 90% of annual rainfall).

- The dry season is from November to April of the next year (accounting for approximate 10% of annual rainfall). May and June are the transitional months (beginning of rainy season).

Page 20: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 15

DATA ITEM SUBPROJECT DATA

The temperature of this areas:

� Average annual temperature: 23.560C.

� The highest temperature: 27.50C.

� The lowest temperature: 20.10C.

Air humidity:

� Humidity average /year: 82.9%

� The highest humidity month: 8, 9, 10 (87-93%)

� The lowest humidity month: 1, 2, 3 (71-81%)

� Sunshine hour:

� Total average number of sunshine hours each year is 2,304.2 hours.

� The highest number of sunshine hours per month is 272.6 hours.

� The lowest number of sunshine hours per month is 81.7 hours.

Wind: According to the meteorological data at the Buon Ma Thuat station (the closest station) in 30 years (1979 - 2008), the wind speed corresponding to its frequency and direction is determined as follows:

- Average wind speed is 2.7m /s. Maximum wind speed is 20m/s.

- Major wind direction is Northeast (NE), West (W) and East (E).

(source: Statistical Yearbook of Dak Nong province, 2013)

Natural disasters: A report by Dak Nong – Department of Agricultural and Rural Development (DARD) said that there are typically natural disasters in Dak Nong in recent years (i) sweeping floods; (ii) landslides; (iii) Floods; and (iv) droughts

- Sweeping floods took place in Dak Nong in recent years. In which one on September 14,15 and 16, 2012 in Dak Glong and Tuy Duc districts. It swept away 14 bridges and three persons. According to local people, this is a fiercest sweeping flood in 10 recent years through the province. Another one on October 07, 2013 in Quang Tan commune, Tan Duc district, it swept away temporary bridges, trees and farms and two persons died.

- Land slide often has taken place in the southern districts as Dak Song, Dak Dlong, Dak R Lap, Tuy Duc and Gia Nghia town. From 1992 to present, this phenomenon has happened with different extents and has risks, but not clarified reasons. In recent years land slices often takes place (i) in constructing the national highway No14 due to too high slope talus development; (ii) Gia Nghia-Quang Khe road; (iii) and bauxite mining areas etc..

- Flood phenomenon often takes place in the northern districts including Krong No and Cu Jut where have rather flat terrains. Like other provinces in the central highland, rivers and streams in Dak Nong do not have dykes so when it rains a long time, water from rivers, streams will flow to lower areas. Some typical floods in

Page 21: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 16

DATA ITEM SUBPROJECT DATA

Dak Nong was (i) on October 10, 2006, a flood in Dak Nong river has sunk hundred houses as heavy rain in days in upstream areas. As a result water level has risen up 2-5m and caused the flood. (ii) On September 10-28, 2012, a flood caused flooding for produce farms at Dak R’moan, Gia Nghia. (iii) on December 29-30, 2013, water on rivers and streams of Dak Nong reached peaks and had risks to happen sweeping floods in areas in Ea Krong river, Cu Jut district but luckily it did not happen.

- Drought, climate in Dak Nong has two clear seasons, rainy season is from May to October and dry season from November to April. Since deforestation for agriculture takes place commonly while rainy volume is reduced, rainy season finished sooner so surface and ground water has reduced significantly.

In Spring -Winter Crop of 2004-2005 , Dak Nong Province is damaged heavily by drought, ten thousands crop plants are dried & complete loss, mostly coffee with approximately 30,000 ha, about 3,000 ha of pepper, 2,000 ha of wet rice are damaged with value of approximately 2,000 billion VND ( Source : Study on Drought assessment of Dak Nong – Phan Thi Thanh Hang – Institute of Vietnam Geography & Science –Technology)

Topography and soil

- The subproject area is dominated by tectonics of plateaus; the terrain is relatively complex, only irrigated areas of the reservoirs are relatively flat. The topography is lower from West to East, from South to North; the average elevation is about 330m. The topography is with alternate valleys, rivers and streams.

- Sub-project is located on an area with 4 main categories of soil as follows: Yellow land on clay, black soil on basalt and Jail, red-brown soil on basalt and converged sloping valleys.

Surface water resource - The entire system of rivulets and streams in the subproject area is in basin of Serepok River flowing from South to North through the boundaries of two provinces of Dak Nong and Dak Lak and flows into the Kingdom of Cambodia.

- In the subproject, there are 03 reservoirs: Cu Pu reservoir, Dak Dier reservoir and Dak D’Rong reservoir.

- There are some streams flowing through communes such as: Ea Gang, 1,5km from Cu Pu reservoir, stream flowing Nam Dong and Tam Thang communes; Dak Dier stream at the southwest of Dak Dier reservoir; Dak D’Rong stream at the Southwest of Dak D’Rong reservoir. Around the reservoirs, there are also a lot of swallow brooks.

The above water resources are for domestic usage and agricultural activities of the local people.

Underground water Groundwater in subproject area is without pressure and located at the depth of 5 m - 30 m. Local people exploit it for domestic purposes.

Water quality

The 6 samples of surface water had been collected and analyzed with 10 parameters in 3 areas of subproject. The results of analyses have been compared with National technical standard for surface water quality QCVN 08:2009/BTNMT proves that almost

Page 22: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 17

DATA ITEM SUBPROJECT DATA

parameters are in limits except Fe-total in 3 samples (NM 4 in Dak Drong; NM 5 & NM 6 in Dak Dier).

There is 9 parameters of groundwater quality at 6 wells of households around 3 reservoirs (Cu Pu, Dak Dier and D'Rong) were sampled and analyzed by the Centre of Technology & Environment and Natural Resources Management-University of Agriculture and Forestry Ho Chi Minh City in September 2014 showed that all parameters were within the allowable limits of QCVN 09: 2008/BTNMT. Coliform indicator in the groundwater samples exceeded the threshold from 50 to 3,600 times (Coliform = 150 – 11,000 MPN / 100 ml of 02 groundwater samples of two households living in Cu Pu reservoir area)(Annex 4).

Flooding Flooding occurs only at cultivation area in valleys or adjacent to streams where altitudes are lower than residential areas and roads. Flooding occurs rarely, which takes place when heavy rainfall continues several days.

Terrestrial fauna and flora

+ The main flora in the subproject area includes agricultural crops (paddy, cassava, maize, beans, coffee, pepper, rubber...);

+ Terrestrial fauna in the area includes cattle, pigs, chickens, etc.;

+ No protected wild animal has been found in the area.

Aquatic fauna and flora + Aquatic fauna: fish, shrimp, eels and snails ...

+ Aquatic plants: algae, duckweed, grass ...

+ No aquatic fauna & flora species listed in the Red Data Book of Vietnam

Protected areas No ecological/protected area is within or near the subproject area. The closet protected area to sub-project is National Park of Yok Don, but really distance towards south-west of Dak Drong commune;

4.3 ENVIRONMENTAL AND SOCIAL CONDITIONS

Unexploded bombs, mines

The construction activities will be taken place at 03 reservoirs, irrigation canals and connecting roads to reservoirs.

However, almost construction places are in existing foundations, which had been built and used in recent years (Dak Drong – 2002; Dak Dier – 2011 and Cu Pu – 2001), therefore no need for checking UXO in those places. Only areas of expanded canals, roads and soil mines will be checking UXO, but in small areas and those places have been cultivated for long period;

Land use

Land adjacent the sub-project area includes: (i) agriculture and forestry land; (ii) non-agricultural land, distributed in the communes as follows:

- Agricultural land: Paddy, corn, cassava, 2 crops / year; - Forestry land: Perennial and industrial trees such as

rubber, coffee, etc.

Land use in three communes of the sub-project as following:

- Nam Dong comumne: Total natural land area is 3,967.31ha. In

Page 23: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 18

DATA ITEM SUBPROJECT DATA

which argricultural land is 3.502,7 ha (88.3%) including (i) land for industrial tree e.g coffee, peper, rubber of 46,34%; (ii) land for annual trees and rice of 51.6%.

- Dak Drong commune: Total natural land area is 5,889ha. In which argricultural land is 4,424.9ha (75.14%) including (i) land for industrial tree e.g coffee, peper, rubber of 25.17%; (ii) land for annual trees and rice of 74.25%.

- Cu Knia commune: Total natural land area is 2.965ha. In which argricultural land is 2,097.65ha (70.75%) including (i) land for industrial tree e.g coffee, peper, rubber of 47.8%; (ii) land for annual trees and rice of 51.2%.

Residential area near the sub-project

Residents in the subproject area mostly concentrate at the center of the commune or areas along the roads. The smallest distance from residential areas to the roads is 1.5 m. The Cu Pu reservoir is close to residents of villages 12 and 15 of Nam Duong commune. The Dak Dier reservoir is close to villages 5, 6 and 8 of Cu Knia. Dak Drong reservoir is close to villages 11, 12 and 19 of Dak Drong.

Rural infrastructures

The road network connecting among villages and communes is almost soil road, except intersection with gravel district road in Cu Pu. Those roads are from 3 – 5 m of width (from 1 – 2 m in canal banks), in degrading situation and difficult for travelling especially during rainy season:

- Cu Knia: The commune has 4 schools, 46 classrooms, 1 clinic.

- Nam Dong Commune: The commune has 8 schools, 116 classrooms, 1 clinic.

- Dak D'Rong: The commune has 7 schools, 135 classrooms, 1 clinic.

In the sub-project are, there is a low-voltage power system parallel to the upgraded road. However, according to observation, this power line is at least 3 m from the edge of the road, so this power line will not be affected by the sub-project construction activities.

Agriculture and aquaculture

+ Annual crop of the subproject area are paddy, cassava, maize and perennial crops such as coffee, rubber.

+ The total annual aquaculture area of communes are as follows:

- Cu Knia commune: 29.26 ha

- Nam Dong commune: 125 ha

- Dak D'Rong commune: 20.65 ha

+ The aquatic species are Ctenopharyngodon idella, Cirrhinus, carp, Hypophthalmichthys, tilapia,...

+ Surface water in the subproject area taken mainly at 3 reservoirs Cu Pu, Dak Dier reservoirs and Reservoir D'Dak Rong; groundwater resources are drilled from a depth of 5 – 30 m.

Population -Statistics by the end of 2014 of Dak G'Rong:

+ The number of households: 3,115.

Page 24: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 19

DATA ITEM SUBPROJECT DATA

+ Population: 14,080 people.

+ Population growth: 1.56% /year

+ Poverty rate: 14.09%

- Statistics to the end of 2014 of Nam Dong Commune:

+ The number of households: 3,851

+ Population: 15,864 people

+ Population growth: 1.32% / year

+ Poverty rate: 11.04%

- Statistics to the end of 2014 of Cu Knia:

+ The number of households: 1,573.

+ Population: 7,247 people

+ Population growth: 1.3% / year

+ Poverty rate: 11.6%

Ethnic minority groups Most of people in the subproject area are Kinh (migration from the North) and some local ethnic minorities (Tay, Nung, Dao, Thai, Hmong, M'Nông, Muong ...)

Livelihood

- D'Dak Rong is a commune at Southwest of Cu Jut district.

+ Economic structure: construction accounts for 12%; Agriculture and forestry account for 72.5%; trade and services account for 15.5%;

+ 7,744 people is in the labor ages accounting for 55% of the total population, in which agricultural labor accounts for 85% of total labor.

+ About Budget 2014:

- Total revenues in 2014 is: 11.183 billion VND.

- Total expenditures in 2014 is: 7.741 billion VND.

- Balance is: 3.442 billion VND.

- Nam Dong is a commune at Northwest of Cu Jut district.

+ Economic structure: Agroforestry accounts for 70.5%; trade and services account for 15.5%; handicraft - construction accounts for 14%.

+ Number of labors: 8,844 people, accounting for 55.75% of the total population, in which agricultural labors account for 77.56% of total labor.

+ About Budget 2014:

- Total revenues 2014: 16,640,493,376 VND.

- Total expenditures in 2014: 11,560,295,533 VND.

- Balance: 5,080,197,843 VND.

- Cu Knia ia a commune at the Northwest of Cu Jut district:

+ Economic structure proportion: Agriculture and Forestry

Page 25: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 20

DATA ITEM SUBPROJECT DATA

account for 74.8%; trade and services account for 19.9%; handicrafts - construction is about 5.3%.

+ Labor: 3,365 people, accounting for 52.85% of the total population, in which agricultural labor accounts for 52.8% of the total labor.

+ About Budget 2014:

- Total revenues 2014: 7,195,285,237 VND.

- Total expenditures in 2014: 6,966,114,623 VND.

- Balance is: 229, 170,614 VND.

Cultural and natural heritages

In the subproject area, no cultural and natural heritages are recorded.

Public health Each commune has one commune health center, which can diagnose and treat simple and most common diseases such as diarrhea, red eye, respiration and skin diseases.

Traffic and transportation + In the sub-project area there are only roads which are very low traffic density and just serve for domestic traffic of local people;

+ The main means of transportation include pedestrians, bicycles and motorcycles.

Page 26: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 21

V. ENVIRONMENTAL IMPACT SCREENING

5.1 Positive impacts

Constructing the subproject "Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province" will bring positive impacts on environment and society as follows:

- It will ensure water to irrigate initiatively for 532 hectares of wet paddy, 285ha of coffee, pepper and 216 hectares of maize, 400 hectares of cotton and crops.

- It links the traffic from residential areas with production areas and works so that transporting materials and fertilizers for production as well as agricultural products will be more convenient. It creates favorable conditions for mechanizing agricultural production, bringing scientific advances into production, intensive cultivation to increase crop yields. The sub-project also reduces cultivation and labor costs and improves income of local peoples in the subproject area.

- It contributes to early completion of criteria No.2 - on transport, criteria No.3 - on irrigation, criteria No.10 - on incomes, criteria No.11 - on poverty rate of the new rural criteria in construction plan of new rural areas, which have been approved and are deployed at the locality.

5.2 Negative impacts

However, the subproject could also create several negative impacts, especially during construction phase, which need to be managed through appropriate mitigation measures. The negative impacts from subproject could be summarized in the following table.

Table 3: Environmental impact screening

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

I. Pre-construction phase

Risk when detecting unexploded ordnance

Yes Moderate Negative Temporary

Description: Unexploded ordnance detection along the constructed road & canals may be risky for detectors and local people. However, the Cu Pu, Dak Dier and D'Rong reservoir had been constructed since 2001 therefore; detecting unexploded ordnance had been done. While the upgraded roads are in the existing ones which small adjustment, and the new constructed canals are located in the fields, which have cultivated so long, therefore the possibility of finding unexploded ordnance is very low. though the possibility of finding unexploded ordnance is low, its consequences, if explosion occur, causing to detectors and local people are high, which could be death or losing body parts. This activity needs to be managed carefully by authorized people.

Objects : Detectors and local peoples living closed to UXO points.

Affected level: This impact is moderate.

Location: Impact could occur in Cu Pu reservoir as well as along the whole road and canals.

Time: Short time during the detection and treatment period.

Impacts on Yes Minor Negative Permanent Description: Almost the activities of sub-project will be

Page 27: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 22

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

HHs due to site clearance (land acquisition)

taken place in existing foundation and alignment, however, sub-project components still require the land acquisition. However, the area of land need to be acquired is not much and 0.88 ha of losing land in Cu Pu reservoir (as rising dam crest) is under management of Irrigation Unit of Cu Pu and no need compensation. The acquired lands are in management areas of reservoirs, canals and roads as well as in productive areas, therefore, almost acquired lands are agricultural land, except material storages and 03 camps will be located in vacant land.

The acquisition of agricultural land will affect 36 HHs of 180 peoples, in which 10 of them are minorities. However, as described above, because the scattered of sub-project activities, the acquired land of each household is limited with small amount for permanently acquisition, while temporary acquired land will be returned after completion. Even though, the acquired of productive lands, though not much, of local people could slightly burden on their economic situation. Therefore, compensation plan need to be prepared and implemented.

In addition, this impacts has been informed to local people through public consultation, and all affected households have agreed to development of sub-project as well as voluntarily donate their land.

Objects : Affected peoples to be land acquired in Nam Dong, Cu Knia and Dak Drong Communes.

Affected level: Thus, social impact due to land acquisitions is minor due to these affected HHs will get beneficiary from upgraded road that it creates favorable condition for travelling from resident area to the agricultural production area & surrounding areas. However, compensation program still need to be implemented to reduce economic burdens for affected

households.

Location: 36 households along the upgraded roads and canals.

Time: Both permanent and temporary during preparation and construction phases.

Lose natural /plantation forest due to improving the crest level of dam

Yes Minor Negative Permanent

Description: Subproject will raising dam crest elevation from 509.7 to 510.8 m, this make 0.88 ha of land will be submerged permanently. However, the losing area around Cu Pu reservoir is management land of reservoir, and managed by Irrigation Unit. This land is uncultivated land, only glasses, shrub. Therefore, no forest land will be lost. However, it will impact on grasses , shrub in Cu Pu reservoir area;

Objects: Vegetation cover of 0.88 ha will be submerged as raising dam crest

Affected level: This activity of sub-project will not effect on forest, while impact on vegetation around reservoir is

Page 28: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 23

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

considered as insignificant;

Location: at Cu Pu reservoir;

Time: Permanent;

Inappropriate construction plan in term of time to crop activities of local people

Yes Moderate Negative Temporary

Description: Although the construction period is only 12 months but it can cause significant impacts on crops of local people if the construction schedule takes place at the same time with crop activities of local peoples, then could potential impact on socio-economic situation of local people. In fact, the construction of Cu Pu reservoir, and irrigation canals, have to be implemented mainly in dry season, which are the same period with cultivation. So that, this impact need to be managed and mitigated carefully;

Objects: Crops of local peoples are irrigated by subproject canals

Affected level: Because of potential consequences, this impact is considered as moderate;

Location: on all construction sites of the irrigation component

Time: temporary

Canal design is inappropriate with use and does not consider climate change

Yes

Minor

Negative

Permanent

Description: Inappropriate technical consideration during design of dam and canals can be listed as (i) inappropriate consideration on risk of landslide and soil erosion (ii) it can become a dyke that blocks water flow and cause local flooding in rainy seasons. (iii) Climate change/flooding issue has not been taken account into their design. According to “Report on Climate Change Scenarios of Vietnam, MONRE-2011”, With medium emission scenarios (B2): By the end of the century, annual rainfall would increase by about 2 to 7% in most of the regions. In Highland Region, including Dak Nong, where to be affected at least in competition with other areas in Vietnam, forecast is an increase about 0.9 - 3% (0.9% for Dak Nong) compared to 1980 – 1990 period.. In general, the dry season rainfall would decrease while rainy season rainfall would increase. However, with medium emission scenarios (B2): by the end of the century, maximum one day rainfall in the North Region would increase by about 50% compared to 1980 - 1990 period, about 20% in the Central North Region. Otherwise, maximum one day rainfall would decrease in the Central South & High Land, the South Regions about 10% to 30 % (10% in High Land Region). However, it may occurs extraordinary one day rainfall, which 2 times bigger than compared to current record in different regions

In dry season, rainfall decrease 10-14 % for High Land Region. The increase of temperature in accompanying with less rainfall in dry season could result in drought or less water availability, while the high concentration of rainfall as well as increase magnitude of extreme rainfall

Page 29: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 24

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

could lead to extreme hazards such as flooding, landslide.

The in appropriation of design without considering CC impacts in reservoir and canal designs could result in significant impacts such as lacking and/or without water for irrigation during dry season, which is less rainfall in future, then reduce productivity. In addition, the higher precipitation and extreme rainfall could cause to flood and/even emergency of reservoir (this impact has been analyzed in operational phase).

However, the aim of sub-project is increase water availability for irrigation during dry season and concrete dam for ensuring safety during operation, especially during rainy season as improving existing works of dam and canals. In addition, the design of sub-project has carefully considered hydro-meteorological data series including during past years & extreme events and future trends of climate change as reducing potential impacts.

Objects

� Crops of local peoples are irrigated by subproject canals

� Local peoples in downstream of 3 Reservoris : Cu Pu, Dak Dier & Dak Drong

Affected level: Sub-project improve situations of existing reservoir and canals with consideration of climate condition, therefore, this impact is insignificant.

Location: All upgraded canals & Cu Pu reservoir.

Time: Permanent.

II. Construction phase

Landslide, soil erosion or sedimentation

Yes Minor Negative Temporary

Description: The construction activities, especially excavating, filling/ embankment work and storing materials, taken place in reservoirs of Cu Pu, Dak Drier & Dak DRONG as well as in upgraded roads and canals will create debris and/or cause materials falling into surface water sources. If they are not collected, it could cause to increasing sedimentation in the canal bed, blocking water flow from main canal into the branches due to debris, solid waste not collected properly; sedimentation may affect the rice fields of the local peoples in Nam Dong, Dak Drong and Dak Dier communes. However, as described in material sources, the excavated soil will be used for upgrading of management/ production/ interior field road along the canal system. In addition, the amount of excavation and embankment at each construction place is quite limited and scattered of construction activities and mainly implemented during dry season, therefore the magnitude of impact is small and duration of impact is short.

Objects Crops of local peoples that irrigated by subproject canals

Page 30: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 25

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

Affected level: This impact is insignificant;

Location: Slope of the upgraded roads and canals bed and Cu Pu reservoir, in which with the highest potential impact is in slopes of Cu Pu dam because of the extent of workload

Time: Temporary during the construction phase.

Polluted surface water

Yes Moderate Negative Temporary

Description: surface water on Cu Pu, Dak Dier, Dak Drong reservoirs, Ea Gang, Dak Dier, Dak Drong streams and other small streams surrounding the subproject area could be polluted due to construction activities. Those are (i) domestic wastewater from 03 worker camps; (ii) grease from construction machine maintenance and (iii) runoff water passing through from constructional areas/activities during rainy days as well as (iv) discarded soil and/or sludge from excavation, embankment in Cu Pu reservoir, and upgraded canals and roads as well as materials storage. If such pollutants falling/flowing into water bodies could result in water pollution, which reduces water quality for irrigation, domestic use (which is quite limit currently) as well as impact on aquatic-ecology in sub-project area;

However, because of the limitation (100 workers) and scattering of workers (03 camps) and construction machines, the generations of domestic wastewater (approximate 10 m

3/day but in 03 communes) and the

grease are limited, as well as the amount of constructing materials into water bodies during rainy days is also small. In addition, the construction of Cu Pu reservoir and its works mostly conducted during dry season with withdrawing all water in Cu Pu reservoir, therefore, the extent of impact is small and controlled in according to previous impact of increasing sedimentation into water bodies;

Objects:

� Water in Cu Pu , Dak Dier, Dak Drong reservoirs,

� Ea Gang, Dak Dier, Dak Drong streams

Affected level: Because the significant role of surface water bodies, this impact is considered as moderate, an appropriate mitigations need to be implemented;

Location: Cu Pu, Dak Dier, Dak Drong reservoirs and their irrigation canals are the main potential locations of this impact, however, nearby water surface bodies such as, Ea Gang, Dak Dier, Dak Drong streams and other small streams need to be concerned also..

Time: Temporary during the construction phase;

Noise and vibration

Yes Minor Negative Temporary

Description: The upgraded road of the subproject is connecting roads between reservoirs, residential areas and in field paths. Noise from construction machines such as concrete mixers, bulldozers and from material transportation trucks may impact on residential areas

Page 31: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 26

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

along the upgraded roads.

Objects

� Resident areas closed to 3 reservoirs : Cu Pu, Dak Drier, Dak DRong

� Resident areas along the material transportation roads & upgraded roads.

Affected level: The impact is insignificant because extent of the road construction component is small so only few equipment’s will be mobilized to the site, the irrigation component is far from residential area (400m);

Location: Residential areas in Cu Kniwa, Nam Dong and Dak D’Rong communes and travellers.

Time: temporary during the construction phase

Air pollution Yes Minor Negative Temporary

Description: The construction activities will generate dust, air pollution, particularly in dry/sunny days. Dust could also be generated from excavation activities and operation of trucks on the inter-commune roads, or mobilizing mixing concrete, which need to be managed to reduce impacts on local people. Other air pollutant such as NOx, SO2X will be minor since the number of construction equipment mobilized on the site will be small. However, the construction is scattered and the extent of construction activities per place is limited, therefore, the transportation vehicles and operation of construction machines are also limited. In addition, according to site visit, the construction of irrigation canals is distance, at least 400 m from residential areas. And the number of people travelling on roads is quite small;

Objects : Resident areas closed to 3 reservoirs : Cu Pu, Dak Drier, Dak DRong. Resident areas along the material transportation roads & upgraded roads.

Affected level: This impact is minor;

Location: Residential areas in Cu Knia, Nam Dong and Dak D’Rong communes and traffic participants;

Time: Temporary during the construction phase

Soil pollution Yes Minor negative temporary

Description: Soil quality in the subproject area could be affected by (i) domestic wastewater from 03 worker camps; (ii) grease from construction machine maintenance and (iii) domestic and construction waste (solid waste). Soil could be also impacted due to scattering material and death concrete from construction site. If those wastes are not collected and treated in proper manners, it could contaminate soil, especially wastewater with high contaminants and grease as hazardous substances. However, the total of workers is only 100 and scattered in 03 worker camps, therefore the amount of wastewater generated (approximate 10m

3

per day, with 100 lit per person); the amount of solid waste generated (30 kg per day, 0.3 kg/person/day as

Page 32: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 27

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

stated in National Environmental Report 2011 for rural area) are small amount. Furthermore the grease discharged is in-regularly as well as fragmented in different sites because of limiting and scattering machines

Objects:

• Soil quality of cultivated land along upgraded roads

• Local peoples in the beneficiary area

Affected level: This impact is minor, but still need to be managed in waste management section;.

Location: The agricultural area along the irrigation canals and rural roads component;

Time: Temporary during the construction phase;

Local flooding

Yes Moderate negative temporary/permanent

Description: Constructing concrete canals or roads may block local water flows in rainy seasons and generate local flooding. Sometime, design is inappropriate or contractor will not fully follow the technical specification, which could lead to blocking existing intakes, culverts and/or, material, spoil on the flow. The scattering construction material/waste to streams/river could also lead to block the water flow. This could effect on crops of local people. However, the construction schedule has planned to work mainly in dry season, as well as withdrawing all water in Cu Pu reservoir, therefore, the possibility of flooding by blocking water flow is low. In addition, the historical data has indicated that there is no heavy flooding in sub-project areas and construction activities do not implement on existing intakes, culverts, therefore the existing drainage system is remained;

Objects: Crops of local peoples that irrigated by subproject canals and local peoples in the beneficiary area

Affected level: The level of impact is moderate, therefore the management measures need to be fully considered and implemented;

Location: In Cu Pu reservoir, water intakes, culverts along upgraded roads and irrigation canals;

Time: Temporary during the construction phase, it can be permanent if it comes from design errors.

Unsafe for people travelling during the road construction

Yes Minor negative Temporary

Description: The upgraded roads are interconnecting roads around reservoirs, interior field paths, interconnecting roads between residential areas and production areas. Therefore, during construction phase the availability of construction vehicles, materials, machines as well as construction activities on roads may cause (i) traffic accidents, especially the elderly and children, cattle; (ii) the difficulties of movement of goods through the upgraded roads. However, the extent of workload on roads is small, the road construction method is completing section by section with warning

Page 33: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 28

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

signs and informed schedule for local residents. In addition, as site visit assessment, the traffic density on those roads are quite small;

Objects: Local peoples in the subproject area & peoples traveling through upgraded road sites

Affected level: This impact is minor, but still need to be controlled to eliminate occurrence of traffic accidents.

Location: along the upgraded roads as well as transportation routes of sub-project activities;

Time: temporary during the construction phase

Impacts on ecology

Yes Moderate negative temporary

Description: The subproject does not go through natural reserves, national parks and ecology with high value in terms of science, which need to protect therefore, it does not affect the ecology. However, during construction, small vegetation covers within the reservoirs of Cu Pu and Dak Drong, and along upgraded roads and the newly constructed canals could be destroyed. However, the affected flora is invaluable. In addition, during construction of canals, soil and rock can slide down the canals and affect aquatic ecological environment. However, the extent of construction is small and fragmented in many places, therefore it will not significant impact on canal aqua-ecology. Furthermore, the construction of Cu Pu & Dak Drong reservoirs required to withdraw all water, this could result in disappearing of aqua-species available in reservoir currently, and take time to recover after completion of construction. However, the site assessment has indicated that the aqua-ecology in Cu Pu and Dak Drong is very poor and this reservoir is almost out of water storage function because of penetration.

Objects:

• Vegetation covers within the reservoir of Cu Pu and Dak Drong as well as upgraded roads and canals

• Aquatic flora & fauna in Cu Pu & Dak Drong reservoirs

Affected level: Because the potential consequences in Cu Pu & Dak Drong reservoirs, this impact is considered as moderate, and aqua-ecology need to be recovered after construction completing;

Location: Along the upgraded roads, canals and Cu Pu & Dak Drong reservoirs;

Time: Temporary during construction phase;

Impacts of solid waste

Yes Minor negative temporary

Description: Solid wastes in the construction phase including (a) non-toxic waste may be (i) construction waste (soil, sand, stone). The feasibility study report shows that there will be approximately 3,000m

3 of

abundant soil (after balancing between excavation and embankment of Cu Pu reservoir and upgraded roads and canals, which has mentioned in description section

Page 34: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 29

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

of sub-project). If this amount is not collected, transported and treated in properly manner, it may cause non-aesthetic or difficulty for cultivation activity later on. (ii) Domestic waste form worker camps is about 0.3 kg/person day (as stated by National Environmental Report 2011, for rural solid waste) * 12 months of construction (continuously) x 30 days x 100 workers equal about 10.95 tons, and (b) Toxic wastes can be oil mops, fuel boxes, chemical boxes. If theses wastes are not collected, treated appropriately, they may pollute soil, water air and un-aesthetic.

The amount of solid waste and hazardous waste generated during this phase is small and scattered depending on allocation of workers, construction machines and vehicles. While the abundant of soil will be (i) dumped in disposal sites and/or (ii) utilized by local people for agricultural and leveling purposes as agreed in public consultation;

Objects

• Air quality in & around worker camps

• Water quality of water bodies nearby worker camps

• Workers living in the camps

Affected level: This impact is minor, however, generated waste still need to be fully handled as regulated by legal requirement.

Location: In 03 worker camps and in construction places of sub-project

Time: Temporary during construction phase

Impacts/ damage on infrastructures

Yes Minor negative Temporary

Description: According to the field survey, the current inter-communal roads are asphalt, but they were deteriorated, damaged and difficult for travel; many sections of inter-village roads were concreted according to the criteria of new rural area. The other roads are soil one and also in deteriorating situation.. The roads are narrow from 3 – 5 m, and even lesser for canal bank roads (approximate 2 m); and the road load is less than 5 tons/axis. Moreover, neighbouring roads/bridges connecting to the sub-project road also have small load too. So they may be damaged if the material or waste transport from the construction is not controlled well;

However, the extent of transportation that needs for sub-project is small and scattered in 03 different communes. In addition, there is no electrical, supply water as well as drainage pipe along roads, therefore, no impact on those infrastructures;

Objects

• Road infrastructures utilized by sub-project

• Local peoples in the subproject area

• Peoples traveling through the transportation road

Affected level: This impact is minor, but construction

Page 35: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 30

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

contractor need to have construction and transportation plan to minimize impact;.

Location: All roads/sluices or bridges around the subproject area

Time: Temporary during construction phase;

Social disturbance by worker gathering

Yes Minor Negative Temporary

Description: Construction workers can cause social effects or disease transmission such as sore eyes, cholera, flu and respiratory problems. Social aspect: some social problems can appear such as gambling, drug addiction, prostitute, violence, conflict amongst workers, or between workers with local people. there is also a risk of sexually transmitted diseases (STD), including HIV/AIDS need to be considered. However, the number of worker of sub-project is only 100 people, allocated in 03 communes and required to be managed as legal requirement for temporary residents. In addition, the construction period is only taken place within 12 months.

Object: people in communes of Nam Dong, Cu Knia and Dak Drong.

Affected level: This impact is minor, however, to ensure social security of local communes, workers need to be managed and controlled.

Location: Nam Dong, Cu Knia and Dak Drong communes.

Time: Temporary during construction phase.

Impacts on health of local people and construction workers

Yes Minor Negative Temporary

Description: During the construction phase, dust and noise, generated from construction activities, transport vehicles and machines such as concrete mixers, bulldozers, will be the main factors, which are directly affect health of the workers and local communities, especially in case of safety regulations are not complied or managed improperly such as sleeplessness, eye affection, skin disease and hear relative diseaseX. These could cause to occupational accidents during working and/or traffic accident for people passing through construction places. In lesser consequences, the workers may get sick because of unsafe living conditions, unsafe food and inappropriate personal protection equipment. However, few workers concentrated in each construction place, as well as low traffic density along constructed road, which results in less people being exposed to this impact. In addition, the construction activities do not require complicated skills, as well as required to follow environment and labor safety requirements, therefore it is low probability of occurring of accidents;

Objects: Workers in the sites and residential areas along the transport route and near the canal construction area;

Affected level: This impact is at minor level, however,

Page 36: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 31

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

because the significant of human health and lives, including worker and local resident, it is required to strictly follow legal requirement for construction safety and environment;

Location: Nam Dong, Cu Knia, Dak D’Rong communes and workers constructing the subproject.

Time: Temporary during construction phase;

Impacts around the mines of soil, stone and sand

Yes Minor negative temporary

Description: According to the report from Dak Nong PPMU, the embanked soil of the subproject will be taken from upstream of reservoir and utilize excavated soil from upgraded roads and canals in the dry season; sand, stone are purchased from licensed mines.

Objects: Local residents along transportation roads and local residents living around mines of soil, stone & sand

Affected level: Impacts of this mining are insignificant because it was licensed and under the control of local authorities and DARD via environmental commitment.

Location: Cu Pu reservoir, upgraded roads and newly constructed canals.

Time: Temporary during construction phase

Impact on existing irrigation systems

Yes Moderate Negative Temporary

Description: The constructions, which are taken place on existing foundations of Cu Pu reservoir and irrigation canals in Nam Dong, Cu Knia and Dak Drong communes, will temporarily stop irrigation function. In specific, the construction of Cu Pu reservoir required to with draw all water in reservoir, while upgrading of canals will require blocking constructed sections. Therefore, during construction and stabilization periods, the irrigation functions of upgraded canals and connected canals will be temporarily affected. Then, it could potential impact on crops if mitigation measures are not implemented properly. The duration of construction in Cu Pu reservoir and Dak Drong is quite long (approximate 6 months and related to withdrawing water for repairing dam), while the duration of construction in canals is quite short, and scattered, as well as constructed section by section;

Objects:

• Crops of local peoples that irrigated by subproject canals & connected canals

• Local peoples in the beneficiary area communes of Nam Dong, Cu Knia and Dak Drong

Affected level: The impact is moderate, generally, and need to implement mitigation measures during construction to reduce impacts on crops of local people;

Location: Cu Pu & Dak Drong reservoirs and upgraded canals in Nam Dong, Cu Knia, Dak D’Rong communes;

Time: Temporary during construction phases;

Page 37: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 32

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

Impact on surrounding agricultural land and cultivation activities

Yes Minor Negative Temporary

Description: The construction activities of sub-project could effect on surrounding agricultural activities of local people such as temporarily blocking irrigation water towards downstream of irrigation canals and reservoir; temporarily challenging local people in transferring materials and/or products to productive areas vice versa due to placing equipment on/around canal, temporary material storage to be scattered to the surrounding areas. However, the extent of construction activities is small and scattered in 03 communes, and the main travelling times to productive areas are in early morning or late afternoon, which are different with construction times. This will reduce difficulties in travelling and transferring materials and/or goods. While the construction of canals will be completed section by section to ensure functioning of irrigation canals, except the construction of Cu Pu and Dak Drong reservoirs will implemented continuously in several months;

Object:

• Local people who are cultivating depending on water supply from Cu Pu, Dak Dier and Dak Drong irrigation systems;

• Local people who are using upgraded roads for accessing production areas

Affected level: This impact on surrounding areas is minor;

Location: Areas surrounding Cu Pu & Dak Drong reservoirs and areas surrounding upgraded irrigation canals and roads in Nam Dong, Dak Drong and Cu Knia communes;

Time: Temporary during construction phases;

Cultural objects or graves found

No - - -

Description: There is no any cultural objective as well as graves in areas of construction of sub-project. Therefore, construction of sub-project will not impact on those subjects;;

Environmental recovery activities

Yes Minor Negative

& Positive

Temporary and Permanent

Description: The construction contractor needs to recover damaged environment as well as local infrastructures, if they occur, caused by construction activities. These activities will cause (1) negative impacts as construction activities such as repairing road surface, growing undesirable cutting plants. These could temporary emit pollutant gases from construction machines, transportation vehicles, as well as generate solid waste, hazardous waste and wastewater. However, they are in small amount and extent.

In addition, (2) the recovery activities of environment, such as repairing road surface, growing undesirable cutting plants could bring positive impacts. They are including concrete and strengthen roads, which could result in long-term use and safety for local people as

Page 38: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 33

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

well as increasing green space in recovery areas;

The recovery of aqua-ecology in Cu Pu & Dak Drong reservoirs is necessary, however, the aqua species could easily be grown from the availability in upstream flow. This recovery bring long-term benefits for local eco-system. However, the recovery areas might limited because the surrounding areas do not has significant plants need to be reserved, and local infrastructures need to be recovered as soon as possible to ensure continuous transportation;

Objects: Local people in the subproject area & peoples traveling through the road need to recover

Affected level: These are both positive and negative impacts but at minor level;

Location: Cu Pu reservoir, constructed and impacted places in Nam Dong, Dak Drong and Cu Knia communes;

Time: Temporary during construction phases;

III Operational phase

Canal obstructing or flooding because of not on time dredging

Yes Minor Negative temporary

Description:

Irrigation canal system is congested due to improper operation of regulation culverts in canal or obstruction of rubbish, affecting the water conveyance. Water overflow in canal and partial inundation may occur along canals and affect cultivation activities.

Objects: Local peoples living along upgraded canals

Affected level: This impact is insignificant;

Location: Along upgraded canals;

Time: During the operational phase;

Erosion or land side

Yes Minor Negative temporary

Description: In the first phase of operation, upgraded road, soil dams, canal banks have not been tightly compressed and covered by vegetation. Therefore, heavy rain can cause landslide and canal/reservoir deposit. Rainwater of heavy rain flows from the hills to canals and it sweeps soil, sand and stone depositing canals; land erosion at soil mines will increase on rainy days.

Objects: Local peoples in the subproject area in communes of Nam Dong, Cu Knia and Dak Drong

Affected level: insignificant

Location: Along canals

Time: during the operational phase

More traffic accidents

Yes Minor Negative permanent

Description: After upgrading the roads, the traffic density might increase because of higher speed of motorists, particularly youths when the road surface is at good status and not controlled by polices.

Objects: Local people in the subproject area & peoples

Page 39: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 34

Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

traveling through the upgraded road

Affected level: Minor

Location: Along the upgraded road;

Time: Long term in operational phase

Impact on water quality due to increase of fertilizer or pesticide volume

Yes Minor Negative permanent

Description: The upgrading irrigation systems could potentially increase production. As consequence, the fertilizer and/or pesticide would potentially increase and influence both surface and ground water in project area as well as in downstream. Such impacts are because of both increasing volume of fertilizer and pesticide, and increasing runoff water during irrigation.

Objects: Canal water quality in the subproject area & water bodies closed to the cultivated area irrigated by the subproject

Affected level: The impacts is predicted as minor because the use of fertilizer and pesticide occur in 3 different areas with small amount increase; and the trend of using environmental-friendly products in future.

Location: Canals and the downstream

Time: Long term in operational phase

Dam break during operation

Yes Minor Negative Permanent

Description: According to PPMU report, these dams have operated since 1989, in which Cu Pu dam had been constructed since 2000, to date and they have no break at all. However, during operation, some impacts from natural disasters such as weather, storms and floods may potentially cause dam break. This may cause loss of life and property or destroy crops and property of the people at downstream of the dams. However, the upgrading Cu Pu dam will positively ensure its strength and reduce the possibility of dam break comparing with current deteriorated situation. In addition, the meteorological, hydrological data are updated to integral into the technical design, therefore reduce the risk of dam broken;

Objects: Local peoples in downstream of Cu Pu dam

Affected level: This impact is minor;

Location: Cu Pu dam

Time: Long term in operational phase

Page 40: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 35

VI. ENVIRONMENTAL MANAGEMENT PLAN

From the analysis and evaluation of environmental impacts in section V, this section below outlines the environmental management plan (EMP), including (i) Environmental mitigation measures; (ii) Environmental monitoring; (iii) Capacity strengthening program

6.1 Environmental impacts and mitigation measures

Table 4: Environmental mitigation plan

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

Pre-construction phase

1

Risk during detecting unexploded objects (UXO)

To ensure safety for local people and detecting workers

- Coordinate with the appropriate agencies at the design stage to identify if UXO is a potential threat to works

- Based on the findings, engage an authorized UXO clearing contractor, as necessary;

- Ensure that the contractors shall only commence site works after the UXO clearing agency has certified that the project areas are already been cleared.

PPMU,

UXO detection agency,

CPC

Impact could occur in Cu Pu reservoir as well as and upgraded roads and canals

Before construction activities

Cost to prepare the sub- project by PPMU

2

Impacts on HHs due to site clearance (land acquisition)

Minimize social impacts to households along the sub project sites

- Compensation plan need to be conducted to identity assets on acquired land for compensation and supporting affected households as reducing burdens on economic;

- Implement mitigation measures as proposed in sub-project compensation plan;

- Conducting public consultation to inform potential impact of land acquisition to local people;

- Land and assets on land must be donated with voluntariness of HHs through meaningfully public consultation.

PPMU 36 households along the upgraded roads and canals

Before construction activities

Cost to prepare the sub- project by PPMU

Page 41: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 36

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

3 Lose natural /plantation forest due to improving the crest level of dam

Minimize impacts on natural forest in Cu Pu and Dak D’rong reservoirs

- The losing flora is small vegetation and less valuable plants, without forest, this land is uncultivated land, only grasses, shrub

- This area around reservoirs is managed by Irrigation Operation Units and Nam Dong CPC, therefore, no compensation is required for acquired land and affected plants and vegetation;

Construction contractors and PPMU

at Cu Pu reservoir; Before construction activities

Cost to prepare the sub- project by PPMU

4

Inappropriate construction plan in term of crop time to local people

It ensures that the sub- project does not interrupt, affect to farming activities

- Constructional plan needs to be consulted with DARD, local authority/people and informed publicly on notice boards of 03 communes;

- Construction of Cu Pu head work , Dak DRong dam: withdrawing water from reservoir during 5 months : from December to April for repairing whole head-works. . From May , reservoir will be stored again to supply water for agricultural production.

- Construction of canals: the same time with repairing /upgrading dams, head-works when withdrawing water from reservoir

- Construct section by section in road component to remain transportation function of road during construction period;

- The material plan needs to be prepared and included the following requirement:

� Required materials, potential sources and estimated quantities available;

� Material supply manners: preferring to purchase from existing material quarries;

� Agreement with the local authorities;

� Check with environmental

Construction contractors and PPMU

In all construction sites of the irrigation component in Cu Knir, Nam Dong and Dak D’Rong communes

Detail design and construction phases

Cost to prepare the sub- project by PPMU

Page 42: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 37

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

permission/certification of the quarries to ensure that environmental impacts and mitigation measures have been considered by owners;

� Material transportation manner plans and schedules;

5

Canal design inappropriate with use and not consider climate change

Maximize benefit to local people from the project implementation

To ensure CC has been considered and integrated in design: Climate parameters and its changes, especially precipitation in the past years need to be careful considered and integrated in during identifying technical specifications of Cu Pu dam and the upgraded canals

Design consultant , PPMU,

Canal users

All upgraded canals & Cu Pu reservoir.

Pre-construction and construction phases

Cost to prepare the sub- project by PPMU

Construction phase

1

Landslide, Soil erosion and sedimentation

It controls soil erosion and sedimentation risk

- Install sediment fence and/or sediment traps around the temporary excavated material area to collect sediment before it enters to Cu Pu Reservoir

- Store material, soil must be far from Cu Pu, Dak DRong, Dak Dier reservoirs, canals, which cause sedimentation.

- Minimize area of land clearance and duration of works within this area;

- Avoid clearing activities or earthworks during the rainy days where possible

- If any excavated soil, waste or sedimentation damage cultivation area, contractors have to provide compensation for farmers.

- Restoration of areas cleared for the construction sites;

Contractors

The upgraded roads and canals and Cu Pu reservoir, in which with the highest potential impact is in Cu Pu reservoir because of the extent of workload

During the construction phase

In construction contract value

Page 43: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 38

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

2

Surface water source can be contaminated

It is to minimize water source contamination

- Discarded lubricant, other chemicals have to be kept in dry and covered area;

- Discarded lubricants/ chemicals from construction sites need to be collected, transported and treated according to the Circular No.36:2015-BTNMT of MONRE;

- Construction waste needs to be transported by adequate manners to the agreed disposal sites in Cu Knia, Nam Dong and Dak D’Rong communes ;

- Provide 06 dustbins and 03 mobility septic tanks at work sites to manage wastewater and domestic waste from worker camps site;

- Disposal of solid wastes into canals, stream, other watercourses, agricultural field shall be prohibited through (i) notices in signboards at sites by constructional contractors at sites

- Washing truck/vehicles next to the water bodies, existing rivers, streams and canals such as Cu Pu, Dak Drong, Dak Dier reservoirs, as well as other surface water bodies nearby, will not be allowed;

- Cover material storage areas when raining is needed. Temporary storage of constructional and domestic waste on the sites will be no longer than 24 hours.

Contractors Cu Pu, Dak Dier, Dak Drong reservoirs and their irrigation canals, road improvement, worker camps, disposal locations .

During the construction phase

In constructional contract value

3

Noise/ vibration

It ensures noise/vibration at standard QCVN 26,27/2010/BTNMT

- Construction vehicles, machines and equipment need to meet standards of exhaust, noise, and vibration as regulated by the Government. The Contractor needs to submit the Engineer documents proving that all

CPMU. LIC, PPMU, contractors

On all construction sites of all civil work components under this subproject

During the construction phase

In constructional contract value

Page 44: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 39

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

construction vehicles, equipment, and machines are checked and meet requirements concerning noise and vibration generation of the current Vietnam standards;

- The travelling of trucks, which serve for transporting materials and waste, will be scheduled to reduce accumulation of noise sources;

- All noise and vibration generation activities shall be restricted at rest time of local people (12-13h and 20h to 6h) on road items, as: (i) along the upgraded roads (approach road of Cu Pu dam, roads around Dak Dier, Dak D’Rong reservoirs); (ii) road connecting between village 11 and village 12, roads of villages 2,16 and roads on the main canal N2 in Dak D’Rong commune; (iii) pump station in village 8 of Cu Knia commune.

- Construction schedule needs to be publicly announced to local people.

Residential areas in Cu Knir, Nam Dong and Dak D’Rong communes and travellers.

4 Air pollution

It ensures air pollution complied with QCVN:05-2013/BTNMT

- Watering sector under construction and related road in dry & low humidity days , increasing the frequency of watering when passing through communities

- All trucks must be covered when transporting pollution materials as well as waste;

- Equipment/ vehicles have to be verified and licensed. In addition, they are required regularly maintained to ensure emitted gases are in thresholds;

- Equipment and machines will not be allowed to move outside of construction sites to ensure

CPMU. LIC, PPMU, contractors

Residential areas in Cu Knia, Nam Dong and Dak D’Rong communes and traffic participants;.

During the construction phase

In constructional contract value

Page 45: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 40

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

control of emission sources;

- All vehicles must be washed cleanly before going out construction sites;

- All material/ waste storages shall be located away from any households and sensitive areas;

5

Soil contamination

It is to minimize soil contamination

- No construction materials and/or wastes fall into agricultural land in the subproject areas;

- Discarded lubricant, chemicals must be kept in dry area or covered if raining;

- Toxic waste, if any, need to be collected, transported and treated according to Circular No.36:2015/BTNMT of MONRE;

- Regularly collect solid wastes and transport to local land fill sites have agreed with Cu Knir, Nam Dong and Dak D’Rong communes CPCs. To eliminate diseases and landscape, solid waste need to be dumped and covered by lime and covered by soil layer;

- Provide dustbins and mobility septic tanks in all construction sites and worker camps;

CPMU. LIC, PPMU, contractors

The agricultural area along the irrigation canals and rural roads component, 03 worker camps;

During the construction phase

In constructional contract value

6 Local flooding

Ensures that the construction does not interrupt farming activities

- Setting up appropriate construction schedule at the sites to avoid rainy season, for head works construction & concretion of canals especially for excavation activities. This has been strictly applied for excavation, embankment and construction in Cu Pu reservoir, and irrigation canals;- Manage storage of materials and/or waste to avoid them falling into water flows in irrigation canals

contractors

In Cu Pu reservoir, water intakes, culverts along upgraded roads and irrigation canals;

During the construction phase

In constructional contract value

Page 46: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 41

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

as well as blocking intakes and culverts;

- Regularly checking flow situation of canals, intakes, culverts and implementing digging if materials/waste block water flow;

- Placement of washing instruments/ vehicles next to the rivers, streams, existing canals will not allowed such as Ea Gang, Dak Drong, Dak Dier streams and Cu Pu, Dak Drong, Dak Dier reservoirs;

- Monitoring the compliance of construction contractor with mitigation measures;

7

Traffic accident may increase and difficulty for usual life of local people

It ensures traffic safety and minimize life disturbance of local people

- Install traffic signals at site to minimize speed of vehicles or signal of areas under construction, especially at the intersections;

- Install lamps at night at construction sites;

- Inform the community about construction schedule through informal public consultation or any local people meetings and notice board;

- Construction activities should be done section by section, to minimize temporary acquired areas on roads;

- Training for drivers of sub-project as well as worker to work safety ;

- Provide at least 01 workers to monitor vehicle to go in and out of construction sites as well as warning people to ensure traffic safety;

contractors along the upgraded roads as well as transportation routes of sub-project activities;

During the construction phase

In constructional contract value

8 Impact on terrestrial ecology

to minimize impacts terrestrial ecology

- Cut trees outside of right of way by workers will be banned;

- Re-plant vegetable cover section by section after construction work completed;

contractors Along the upgraded roads, canals and Cu Pu reservoir;

During the construction phase

In constructional contract value

Page 47: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 42

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

9

Impacts by solid wastes

to minimize impacts to environment by solid wastes

- Abundant volume (approximate 3000 m3) has

to be regularly removed to 03 dumping sites agreed with Cu Knir, Nam Dong and Dak D’Rong communes CPCs. In addition, local residents have agreed to reuse this discard soil for land yards and leveling, therefore the disposal amount is reduced;

- The transportation of abundant soil will be reused by local resident, but impacts during transporting need to be avoided ;

- Equip dustbins and mobility septic tanks to work sites (it is proposed that there will be 06 dustbins and 03 mobility septic tanks provided at each construction site);

- Weekly collect solid waste at 03 worker camps with a local solid waste collection and dumped in disposal sites of Cu Knir, Nam Dong and Dak D’Rong communes. The sanitary measures need to be done, including covering lime and soil layer over the solid waste;

- Disposal of solid wastes into canals, stream, other watercourses, agricultural field and public areas shall be prohibited;

- Burning of construction and domestic wastes shall be prohibited;

contractors In 03 worker camps and in construction places of sub-project

During the construction phase

In constructional contract value

10

Impacts to existing infrastructure

Minimize adverse impacts to existing infrastructures

- Work with existing infrastructure owners (electricity, water...) to identify locations of underground items if any;

- Load capacity of trucks do not exceed local bridge /road’s (it is best of less than 10 ton truck);

contractors Nam Dong, Cu Knia and Dak Drong communes;

During the construction phase

In constructional contract value

Page 48: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 43

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

- After construction has completed, all public facilities must be re-checked to ensure theirs functions have not been affected by sub-project activities, if any damage has been complained, contractor need to be responsible for repairing and compensating;

11

Disturbance to local people’s life due to crowded workers

To minimize disturbances to local people’s life due to workers

- A recruitment priority should be given to local workers:

- Register provisional residence for workers staying at camps;

- Contractor needs to regulate camp sanitation regulations;

- Carry out HIV/AIDS prevention program and sex transmission infection;

- Propagate and raise awareness of the construction workers to maintain discipline, habits and customs and create good relationships with local people, reduce social evils;

- It is best if contractors organize meals for all workers at each site to ensure hygiene and food safety;

- Spray insecticides at 03 worker camps;

- Train and guide labor safety measures and prevention of common diseases for workers;

Contractors Nam Dong, Cu Knia and Dak Drong communes;

During the construction phase

In constructional contract value

12

Risks to health and safety to local people and workers

To ensure good health and safety to local people and workers

- Provide sufficient labor safety to workers such as shoes, helmets etc. And instruct workers how to use;

- A first aid kit will be provided at each construction site to ensure patients can receive

Construction contractor

People in Nam Dong, Cu Knia, Dak D’Rong communes and workers

During construction phase

Included in the construction contract

Page 49: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 44

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

first aid timely before transporting them to the medical station/hospital

- Install power network at site in accordance with safety regulations of the state and ensure that the power lines, the power outlets to be located at dry and safe places;

- Install warning signs at the electric receptacles;

- Install information signs about the project, the labor regulations at site;

- Install fences, warning signs at the intersection between the drains and roads;

- Remain the light during the nigh time on all construction sites.

- Timely repair damaged road surfaces and bridges;

constructing the subproject

13

Impacts around the mines of soil, stone and sand

Minimize environmental impacts caused by mining raw materials for construction

- In mines of soil, stone Contractor should follow environmental protection issues, including:

- Working machines must be under periodically quality controlled;

- Oil and other chemical pollutants from working machines should be strictly controlled and stored separately, avoiding leakages;

- Workers should use protective equipment while working within the Site;

- Temporary earth drainage system and ditch should be formed to store waste water safely in rainy season to reduce turbidity before releasing water into cultivated area;

Mines’ owners;

Construction contractor

Cu Pu reservoir, upgraded roads and newly constructed canals

In preparing materials for construction phase

Included in the construction contract

Page 50: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 45

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

- Water should be regularly sprayed within borrow areas to reduce dust generation;

- The contractor should select registered service providers with necessary licenses to supply construction materials such as sand and stone;

14

Impact on existing irrigation systems

Avoiding and minimizing situation of lacking water for irrigation

- The construction of irrigation system must be scheduled and planned considering water availability for fields. Those plans need to be consulted with local DARD and communes and informed to local residents;

- The construction flow diversion which are supplementary for constructed sections, need to be implemented to ensure water for irrigation;

- Construction need to implemented section by section to minimize impacts as whole;

Construction contractor;

Cu Pu reservoirs and upgraded canals in Nam Dong, Cu Knia, Dak D’Rong communes

During construction phase

Included in the construction contract

15

Impact on surrounding agricultural land and cultivation activities

Avoiding and minimizing impacts on surrounding agricultural activities

- The construction planned need to be consulted with local DARD and communes and announced in notice board of Nam Dong, Dak Drong and Cu Knia communes; especially the withdrawing water plans of Cu Pu reservoirs, and blocking canals during construction;

- Construction of roads need to be completed section by section to ensure travelling ability on upgraded roads;

- Gathering materials and equipment on banks of canals need to be tidy and ensure a roads for travelling of local people to the fields;

Construction contractor;

Areas surrounding Cu Pu reservoir and areas surrounding upgraded irrigation canals and roads in Nam Dong, Dak Drong and Cu Knia communes

During construction phase

Included in the construction contract

Page 51: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 46

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

16 Environmental recovery activities

Ensure damaged environment and related infrastructures will be recovered after completing construction

- Re-planting undesirable cutting plants after completing construction activities;

- Repairing damaged infrastructures as soon as possible;

- Flow water into Cu Pu & Dak Drong reservoirs and upgraded canals, and protect areas from fishing activities to recover aqua-ecosystem;

Construction contractor; PPMU; DARD and CPC

Cu Pu & Dak Drong reservoirs, constructed and impacted places in Nam Dong, Dak Drong and Cu Knia communes

During and after construction phase

Included in the construction contract

III. Impacts in the operation phase

1

Canal obstructing of flooding

Ensure drainage - Regularly check and maintain canals

- Periodically dredge canals after each harvest or after heavy rain that erode hillside;

Irrigational exploration station of district and province;

Officials of communes

Irrigational canals and water intake gates.

During operational phase

Operational and maintenance cost

2

Erosion or land slide

Manage erosion and land slide

- Consider the necessary of reinforcing canal banks;

- Plant vegetation cover on canal bank;

- Regularly maintain canals;

- Reinforce, tightly press and plant grass at talus at the reservoir side of the approach road Cu Pu dam, roads around Dak Dier, Dak D'Rong reservoirs.

Irrigational exploration agency

- All canals

- All upgraded roads.

During operational phase

Operational and maintenance cost

3

Traffic accident increase

Ensure traffic safety

- Install speed limit signs, load limit signs; ensure traffic safety at residential areas and at road intersections;

- Propagandize to enhance awareness of traffic safety for local people.

Department of Infrastructure - Economy of Cu Jut district

Along the upgraded roads especially at the road intersection

During operational phase

Operational and maintenance cost

Page 52: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 47

No. Impacts

Objectives

Mitigation Measures

Mitigation measures Responsibility Location Time Cost

4

Impact on water quality due to use of fertilizer or pesticide

Mitigate impacts on surface water

- Cooperate with the extension service agencies to ensure that farmers receive training on sustainable farming methods, pest management;

- Pits to collect covers of pesticides, fertilizer must be constructed far from water reservoir and flood areas; or recommend people collecting these wastes, do not scatter them on field, canals.

- Biological, environmental friendly pesticides must be prioritized to use.

- Pesticides which are less toxic, less durable in environment, high selective must be used.

- Type of pesticides, treatment and time of treatment must be appropriate to reduce the number of spaying, volume of pesticides and pollution for environment and plant.

DARD of Dak Nong;

Operation & Management team of Dak Drong, Nam Dong, Cu Knia.

Irrigational canals and water intake gates

During operational phase

Included in operational and maintenance cost

5

Dam break during operation

Ensure dam safety, prevent flooding locally and at the downstream of Cu Pu, Dak Dier, Dak D’Rong reservoirs.

- Regularly check dams and reservoirs, particularly during the rainy season and whenever there is a problem caused by natural disasters, weather;

- Keep tracks information of meteorology. when flooding is forecasted, precaution, rescue measures must be applied per direction of the Central and local flood prevention Board;

- Upon detection of abnormalities, it is requested to report it timely and check, calculate the parameters to provide appropriate mitigation options;

Dak Nong Water Resources Exploitation Engineering Co., Ltd - Cu Jut Branch;

And people in the Nam Dong Commune, Cu Knia and Dak Drong.

Cu Pu, Dak Dier, Dak Drong reservoirs

During operational phase

Included in operational and maintenance cost

Page 53: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 48

6.2 Environmental monitoring

Environmental monitoring consists of (i) Environmental effect monitoring and (ii) Environmental Compliance Monitoring.

6.2.1 Environmental effect monitoring

Table 5: Environmental effect monitoring

Mitigation Measure

Parameters Location Methods Frequency Responsibility Cost

Construction Stage

Control of air quality and noise impact

Dust generation or operation of noise equipment

Along the road component

Observation, document review and public consultation

Weekly Contractor Included in the Monitoring Consultant Contract

Control of water quality

Sediment loads, rubbish, oil or other visible pollutants

Significant water bodies crossed by canals

Observation, document review and public consultation, worker interview

Weekly and after large rain evens

Contractor

Operation Stage

Surface water quality

Turbidity, grease

Major Streams from which they provide water for irrigation canals

Observation, document review and public consultation

2 times per year for first 2 years (1 time in wet season and 1 time in dry season

PPMU

Included in operation cost

Soil quality

Evidence of salinity or acidification

At 3 representative locations in each subproject irrigated area

Observation, document review and public consultation

2 times per year for first 2 years (1 time in wet season and 1 time in dry season)

PPMU

6.2.2 Environmental compliance monitoring

Table 6: Environmental compliance monitoring

Mitigation Measure

Parameters Location Methods Frequency Responsibilit

y Cost

Construction Stage

EMP implementation provisions in construction contracts, construction supervision contracts

Availability of EMP implementation provisions in contracts

N/a Check contracts

First monitoring time

LIC, CPMU, PPMU

Included in the Monitoring Consultant Contract

Manpower to Environment staff N/a Discussion Six month LIC, PPMU, ditto

Page 54: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 49

Mitigation Measure

Parameters Location Methods Frequency Responsibilit

y Cost

implement EMP

mobilization at PPMU, supervisor, contractors

with stakeholders, document review

period supervisor and contractors

Landslide, erosion and sedimentation controls

Condition and capacity of controls

Performance of all mitigation measure

Throughout construction site

Observation, document review and public consultation

After large rain events

Contractor/Construction supervision consultant (CSC)

ditto

Surface water pollution

Turbidity, grease

Performance of all mitigation measure

Ea Gang, Dak Drong, Dak Dier streams and Cu Pu, Dak Drong, Dak Dier reservoirs.

Observation, document review and public consultation

Random

LIC, PPMU, supervisor and contractors

Soil contamination

Solid waste, grease availability

Performance of all mitigation measure

Throughout construction site

Observation, document review and public consultation

Random

LIC, PPMU, supervisor and contractors

Materials storage

Condition of materials storage area

Throughout construction site

Observation, document review and public consultation and worker interview

Weekly

LIC, PPMU, supervisor and contractors

Construction equipment and vehicles

Noise and exhaust generation; covering of trucks; oil/ fuel leaks

Throughout construction site

Observation, document review and public consultation and worker interview

Random

LIC, PPMU, supervisor and contractors

Construction camp conditions

Cleanliness; waste disposal facilities; general condition

All construction camps

Observation, document review and worker interview

Weekly

LIC, PPMU, supervisor and contractors

Vegetation clearing Boundaries

of vegetation clearing

Areas of sensitive vegetation

Observation, document review and public consultation

Weekly during clearing works

LIC, PPMU, supervisor and contractors

Solid wastes management on the site

Dustbins and mobility septic tanks at work site

Check with waste generation,

In all construction sites

Observation, document review and worker interview

Weekly

LIC, PPMU, supervisor and contractors

Page 55: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 50

Mitigation Measure

Parameters Location Methods Frequency Responsibilit

y Cost

collected, transported and treated manners and documents

Performance of all mitigation measure

Waste disposal

Site cleanliness and condition; temporary waste storage area

Throughout construction site

Observation, document review and public consultation

Weekly

LIC, PPMU, supervisor and contractors

Local flooding Possibility of local flooding due to construction activities

Performance of all mitigation measure

Throughout construction site

Observation, document review and public consultation

Random

LIC, PPMU, supervisor and contractors

Ditto

Traffic

accident may

increase and

difficulty for

usual life of

local people

Availability of signals or staff to control/guide road user at site

Road component at all villages around the subproject

Observation, document review and public consultation

Random

LIC, PPMU, supervisor and contractors

Ditto

Impacts to

existing

infrastructure

Agreement letters between contractors and local authorities in using public facilities

Types of damages; level of compensation; satisfaction from local authorities as well as local residents

In all construction sites

Observation, document review and worker interview

Weekly

LIC, PPMU, supervisor and contractors

Ditto

Impact on

terrestrial

ecology

(i) if are trees cut outside of ROW; (ii) if re-plant vegetable cover

Road component

Observation, document review and public consultation

Random

LIC, PPMU, supervisor and contractors

Ditto

Disturbance to

local people’s

life due to

crowded

workers

Status of workers: Registration to local authorities and conflicts available in the areas between local residents and workers

Throughout construction site

Observation, document review and public consultation

Random

LIC, PPMU, supervisor and contractors

Ditto

Page 56: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 51

Mitigation Measure

Parameters Location Methods Frequency Responsibilit

y Cost

Risks to health

and safety to

local people

and workers

Equipment available; percent of workers equipped with;

Provision of any warning signals in the sites

Performance of all mitigation measure

Throughout construction site

Observation, document review and public consultation and worker interview

Weekly

LIC, PPMU, supervisor and contractors

Impact on

existing

irrigation

system

Available of water for irrigation in crops;

Irrigation canals and production fields

Observation, document review and public consultation

Monthly and Weekly in dry season

LIC, PPMU, supervisor and contractors

Ditto

Impacts on

surrounding

agricultural

land and

cultivation

activities

Available of water for irrigation in crops;

Crops impacts of communes

Agricultural areas around and in downstream of sub-project

Observation, document review and public consultation

Monthly and Weekly in dry season

LIC, PPMU, supervisor and contractors Ditto

Cultural and

historical

heritages Check any cases and performance of contractors

Throughout construction site

Observation

and public consultation and document review

If any

LIC, PPMU, supervisor and contractors Ditto

Environmental

recovery

Clearance activities

Worksites, and disposal location

Observation and public consultation

Once before hand over

LIC, PPMU, supervisor and contractors

Ditto

Operation Stage

Canal

obstructing of

flooding

Ensure canals to be operated well

Irrigation component

Observation and public consultation

6 monthly for first 5 years of operation

PPMU

Included in operational stage budge

Risk of traffic

accident

increase due

to better road

surface

Controlling traffic accident

Road component

Observation and discussion with local authority

6 monthly for first 5 years of operation

PPMU

Impact on water quality due to use of fertilizer or pesticide

Water usage safety

Households in vicinity of irrigation canals

Observation and discussion with local authority

6 monthly for first 5 years of operation

PPMU

Erosion or land slide

Ensure the canals/reservoirs/roads to be operated well

Both components

Observation and discussion with local

6 monthly for first 5 years of operation

PPMU

Page 57: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 52

Mitigation Measure

Parameters Location Methods Frequency Responsibilit

y Cost

authority

Environmental recovery

Ensure environment is recovered

Both components

Observation and discussion with local authority

6 monthly for first 5 years of operation

PPMU

6.3 Building capacity for EMP implementation

The relevant stakeholders need to ensure the EMP implementation as their responsibilities. All CPMU, Dak Nong PPMU, CSC, CC need to appoint officers/staffs to in charge of environmental management. However, most of these officers/staffs are also assigned for other works and they are not specialized in environmental management. Thus, to ensure EMP is implemented in compliance with sponsor policies and Vietnamese legislation, these officers/staffs must be guided /trained on EMP implementation capacity building. Training on EMP implementation must be held for different groups with different requirements.

- Dak Nong PPMU and CSC: The staffs that are in charge of environment will be trained (at least once in the first 3 months of the project) on monitoring and preparing environmental reports.

- Construction contractor: Will be trained (immediately after contract signing) on implementing mitigation measures and preparing reports.

Table 7: Schedule of training on capacity building

Agency Session Participant Frequency of

training Duration and type

Responsibility Cost

Dak Nong PPMU

Environment al monitoring and report preparation

Environmental staffs, engineers

1 time when starting the project and then update it, if any, depending on implementation

1 day of training

CPMU/ LIC Included in the project management cost.

CSC Environment al monitoring and report preparation

People who are in charge of environment and people related to environmental management

1 time when starting the project and then update it, if any, depending on implementation

1 day of training

CPMU/ LIC Included in the project management cost.

Construction Contractors

Implement mitigation measures

Main contractors report to Dak Nong PPMU

1 time when signing contract then update it, if any, depending on implementation

1 day of training, monthly report form

CPMU/LIC Included in the project management cost.

Page 58: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 53

6.4 Budget for EMP implementation

Table 8: Budget for EMP implementation

Item Preparation

phase Construction phase Operation phase Total

Construction supervision consultant

Included in the contract with Dak Nong PPMU

Internal monitoring of Dak Nong PPMU

Included in the project management cost of Dak Nong PPMU

Include in the contract of CC, CSC and Dak Nong PPMU management cost.

Province and local budget

Included in contracts and other operational budgets.

Implementing mitigation measures

Subproject preparation cost

Included in the construction contracts

Operation and maintenance cost

Monitoring EMP implementation (undertaken by LIC)

Included in the contract between CPMU & LIC

Public consultation and information disclosure

15,000,000 VND 15,000,000 VND 15,000,000 VND 45,000,000 VND

VII. IMPLEMENTATION RESPONSIBILITY AND REPORTING

7.1 Implementation responsibility

Three agencies, which are related directly to EMP implementation, are PPMU, CSC and CC. The responsibilities of relevant stakeholders in EMP implementation are presented as table below.

Table 9: Responsibility of stakeholders

Agency Responsibilities

CPMU

- Recruit consultant for preparing safeguard policies;

- Review, adopt and submit to ADB IEE reports;

- Assign LIC to monitor EMP implementation;

- Guide PPMU to integrate EMP into tender documents/ CSC contract;

- Review monitoring reports of LIC and internal reports of PPMU.

- Report EMP implementation to ADB.

- Assign experienced staff to follow up and monitor EMP implementation.

LIC

- Prepare manual for EMP implementation and train on EMP implementation for PPMUs, CSCs and CCs;

- Help PPMU integrate environmental safeguard requirements specified in the EMP into bidding documents/ construction supervision and construction contracts;

- Periodically monitor EMP compliance every 6 months;

- Report monitoring results and propose recommendations on EMP implementation to CPMU and sponsor every 6 months.

Dak Nong PPMU

- Dak Nong PPMU is liable for any recommendations regarding improvement of the project with the aim of protecting and maintaining the environment. It Includes environmental complaints and complaints resolution related to subproject implementation;

- Appoint specialized personnel to monitor environment of the subproject;

- Publicly post EMP information at CPC where the project goes through;

- Integrate environmental requirements, including sanctions for failure to comply EMP into bids / contracts with CC and CSC;

- Instruct and approve site EMP prepared by construction contractor;

Page 59: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 54

Agency Responsibilities

- Support and coordinate with the EMP implementation units;

- Ensure adequate fund for EMP implementation;

- Arrange and join capacity building training on EMP implementation conducted by LIC;

- Periodically report EMP implementation to CPMU and Dak Nong DONRE.

Construction supervision consultant (CSC)

- Appoint staffs to be in charge of environment and participate in training courses conducted by LIC;

- Review SEMP prepared by contractors and submitting it to Dak Nong PPMU to get approval.

- Beside monitor construction quality, CSC also implement compliance monitoring on environmental safeguard of construction contractors every day as stipulated in SEMP;

- Report monitoring results and findings to Dak Nong PPMU monthly;

Construction contractor

- Appoint staffs to monitor environmental issues of the construction. This staff can be a concurrent staff if the workload of environmental is not heavy.

- Base on the EMP, CC will prepare a SEMP;

- Implement mitigation measures to minimize potential negative impacts as instructed in the EMP;

- Closely coordinates with local communities to perform environmental mitigation measures during construction process;

- Ensure that all construction activities have complete documents from the relevant authorities;

- Implement all measures to minimize negative impacts and to protect environment;

- Ensure that staff and employees understand the process and their duties in the EMP;

- Report to PPMU the difficulties and problems, if any;

- Report to stakeholders the environmental issues and coordinate with them to solve those issues;

Dak Nong PPC/DONRE

- Monitor any violation under policies on environmental management and protection of Vietnam;

- Evaluate any change of the design which can cause environmental impacts;

DPC/DONRE

- Approve EMP of the subproject in accordance with the provisions of Vietnamese laws;

- Monitor EMP implementation through internal monitoring system of the DPC.

Social organizations, women union and other associations

- Play a key role as a bridge between local community and PCs;

- Community Monitoring;

- Mobilize community participation in subproject implementation;

- Combine with the PPMU and contractors to perform road measures to prevent public services from damage;

- Participate in resolving environmental problems.

Local community

- In Vietnam, the community has the right and responsibility to regularly monitor environmental activities in the construction process to ensure that the rights and their safety is protected fully and mitigation measures are implemented effectively;

- In case of problems, they will report to community team, contractors or PPMU.

7.2 Report system

Besides monitoring on EMP implementation, stakeholder is also responsible for periodic report

EMP implementation. Table below shows the system of monitoring and reporting.

Table 10: Monitoring and reporting system

Phase Report Frequency Responsibility Submit to

Page 60: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 55

Phase Report Frequency Responsibility Submit to

Con

str

uction

Periodically report on implementation of mitigation measures: Present in details of EMP activities of the subproject/packages and monitoring results.

Every month Construction contractor

Dak Nong PPMU and CSC

Periodically report on EMP implementation of construction contractor: Present in details of EMP activities of the subproject and monitoring results.

Every month

CSC Dak Nong

Periodically report on EMP implementation of the subproject: Present in details of EMP activities of the subproject and monitoring results.

Every 3 month during construction phase

Dak Nong PPMU

- CPMU;

- DONRE of district;

Periodically monitoring report on EMP implementation of the subproject: Present in details environmental activities of the subproject and activities in compliance with EMP of the subproject and monitoring results.

Every 6 month during construction phase

CPMU/LIC ADB

Op

era

tion

Periodically report on EMP implementation at operation: Present in details activities in compliance with EMP of the subproject in the operation phase.

Every 6 month District PUMA

CPMU

Page 61: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 56

VIII. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE

Public consultation and information disclosure of the subproject have to be implemented continuously from the design phase to the construction phase. It is to collect community ideas/ as well as encourage local people’ participation in preparing and implementing the subproject/EMP. Public consultation till the point of preparing IEE of the subproject.

8.1 Public consultation in the subproject preparation phase

8.1.1 Description of activities to date

Table 11: Public consultation description

Consultation method Description of activities

By dispatches and meeting with local officers

Date of correspondence

Dak Nong PPMU contact with local authorities by telephone to agree on public consultation.

April 15, 2015 in Cu Knia, Dak D’Rong and Nam Dong commune.

Dates of meetings (if requested)

April 15, 2015

Minutes of meeting attached (yes/ no)

No

Public meeting

Organization date

- Morning of April 20, 2015 in Dak D’Rong.

- Evening of April 20, 2015 in Cu Knia commune.

- Morning of April 21st, 2015 in Nam Dong

commune.

Organization location CPC of Dak D’Rong and Nam Dong communes; culture house of village 8 in Cu Knia commune.

Invitees Beneficiaries, headers of villages and representative of town local authorities.

Invitation method Per the public media of the commune (header of villages announce every HH). The Women Association also invites women to attend the meetings.

Meeting schedule attached (yes/ no)

Yes

Minutes of meeting attached (yes/ no)

Yes

Number of participants - Cu Knia commune: 29 people (10 females).

- Dak D’Rong commune: 79 people (12 females).

- Nam Dong commune: 64 people (14 females).

8.1.2 Outcomes of the public consultation to date

All ideas/concerns from local people during the public consultation were reported by SPC to PPMU and integrated into the IEE as stable in table 4 (EMP) of IEE and 100% of participants agreed with development of sub-project. See the summary of the main ideas/concerns as the table below:

Page 62: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 57

Table 12: Results of public consultation

Issues raised Required follow-up actions?

Description By Whom?

Existing road damage Local people - Contractors’ trucks with maximum capacity of less than 10 tons.

Abundant spoil from constructional activities (if any) to be used by local people

Local people - Contractors have to notify abundant solid waste to local people if it is available.

Original environment recovery

Local people Contractors have to recover environment at sites e.g

- Inappropriate landfills of the subprojects;

- Mines, especially soil mines;

- Temporary land occupation around sites and on roads,

- Check survival of trees and plant complementarily if any

Bad quality of the proposed works Local people - Local people agree to take part in community monitoring team set up by PPMU and local authorities;

8.2 Consultation in future

Table 13: Expected public consultation activities

Activities Participants Expected results Schedule Cost

Community meeting before construction commence

Dak Nong PPMU, CC,

CSC, representative of

local authorities and

local people.

- Announce

construction items and

construction plan.

- Agree on details of

mitigation measures

(especially water off

schedule).

1 week before

construction

commence.

Included in EMP

budget.

Periodic

meeting

CC, CSC and

representative of local

authorities,

organizations and local

people.

- Periodically monitor

mitigation measures

application, and

outstanding issues;

- Propose mitigation

measures and agree

on implementation.

Every 1 month

from the

construction

commence.

Included in the

contracts

8.3 EMP disclosure

- After adopted, Dak Nong PPMU is responsible for posting IEE summary at Nam Dong, Dak Drong and Cu Knia People’s Committee.

- IEE will be posted on website of DONRE of Dak Nong and ADB Websites.

Page 63: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 58

IX. GRIEVANCE REDRESS MECHANISM

9.1 Purpose of the mechanism

During the deployment of the subproject, local people are disseminated environmental protection activities such as EMP. Negative impacts on the environment may occur during the construction and operational phases. Any comments/ suggestions of local people will be solved quickly, transparently and protected by law, particularly for affected people by the subproject. Complaint handling mechanism was classified by level and responsibilities of involved parties.

9.2 Grievance redress mechanism

Per the environmental management frame, there are 03 steps to redress complaint as below:

Stage 1: If a household has any complaint he/she can submit a complaint to the CPC-community monitoring board. CPC will work with CSC and CC to solve complaints.

Stage 2: If the complaint is not resolved, the complainant will submit an application to the Cu Jut DPC to resolve the complaint.

Stage 3: If more than 15 days but no response from Cu Jut DPC, the complainant may submit a complaint to the Dak Nong PPC (through Dak Nong DONRE). Dak Nong PPC will require Cu Jut DPC to solve the complaint. In case the complaint is still not resolved, Dak Nong PPC will require environmental police to investigate and requested stakeholders to resolve the complaint. See the mechanism in figure 1 below:

Figure 1: Grievance redresses mechanism

Page 64: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 59

X. CONCLUSION, COMMITMENT AND RECOMMENDATION

10.1 Conclusion

The results of environmental screening and environmental impact assessment show that the subproject may cause some environmental impacts. But the impact is insignificant. However, the appropriate mitigation measures have also proposed to manage the negative impacts and maximize the benefit of the subproject. The responsibility of implementation, monitoring of the stakeholders have also identified to ensure environmental compliance.

10.2 Commitment

Dak Nong PPMU of the subproject repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province, commit:

- Implement requirements of environmental safety as stated in IEE via information dissemination, integrating environmental safety as stated in this IEE in bidding documents, in construction contracts and in the CSC contracts; mobilize human resources and monitor internally the IEE compliance.

- Report environmental safety implementation to Dak Nong DONRE and CPMU periodically as specified in the IEE.

- Compensate and resolve environmental pollution if there are any problem during operation of the sub-project.

- Handle complaints if any.

10.3 Recommendations

Base on the IEE report, Dak Nong PPMU recommends:

- No further environmental assessment is needed because the impacts on environment is insignificant.

- Based on IEE, Dak Nong PPMU would like to request functional Authority to give approval of IEE for Upgrading of Cu Jut Irrigation work system to create basis for next implementation steps, ensuring the implementation progress, effectiveness and benefits of the project .

Page 65: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 60

XI. ANNEX

Annex 1: Public consultation images and at the subproject site

Consultation in the design stage of the subproject

Public consultation to prepare safeguard policy documents

Cu Pu dam works

Approach road of Cu Pu dam

Existing Dak Dier dam

Boundary road of Dak Dier dam

Page 66: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 61

60 ha of agricultural land in Cu Knia has not

irrigation water

Existing irrigation canals in Cu Knia commune

Page 67: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 62

ANNEX 2: MINUTES OF PUBLIC CONSULTATION

Page 68: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 63

Page 69: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 64

Page 70: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 65

Page 71: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 66

Page 72: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 67

Page 73: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 68

Page 74: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 69

Page 75: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 70

Page 76: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 71

Page 77: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 72

Page 78: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 73

Page 79: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 74

Page 80: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 75

Page 81: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 76

Page 82: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 77

Page 83: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 78

Page 84: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 79

Page 85: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 80

Page 86: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 81

Page 87: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 82

ANNEX 3: MINUTES AND DIAGRAM OF DISPOSAL YARDS

(This subproject does not have)

Page 88: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 83

ANNEX 4: MONITORED RESULTS OF ENVIRONMENTAL PARAMETERS

Monitored results of air environment parameters at Cu Pu irrigation works and interconnecting road.

No.

Monitored parameters

Unit

Monitored results Technical standard

Monitored methods KK 1 KK 2 KK 3

1 Temperature

0C 26.6 28.3 28.5 - Specialized

device

2 Humidity % 84.7 73.4 72.6 - Specialized

device

3 Noise dBA 49.5 – 50.3 69.7 – 70.1 60.1 – 61.3 70** TCVN

3985 – 1999

4 Dust µg/m3 80.7 90.6 97.5 300* TCVN

5067 – 1995

5 SO2 µg/m3 78.3 84.3 83.8 350* TCVN

5971 – 1995

6 NO2 µg/m3 69.5 77.6 76.3 200* TCVN

7172 – 2002

7 CO µg/m3 1,150 1,300 1,270 30,000* TCVN

5972 – 1995

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Note:

*: QCVN 05:2013/ BTNMT (1 hour).

**: QCVN 26:2010/ BTNMT- (6h-21h).

- KK1: Air sample at Cu Pu dam with. Coordinates: X: 1397964; Y: 0432475.

- KK2: Air sample at intersection of approach road of Cu Pu dam and road from the commune to the town. Coordinates: X: 1397990; Y: 0431278.

- KK3: Air sample at intersection of approach road of Cu Pu dam and road from village 2 to the center of Nam Dong commune. Coordinates: X: 1399190; Y: 0432422.

Monitored results of air environment parameters at Dak D’Rong irrigation works and interconnecting road.

No.

Monitored parameters

Unit Monitored results

Technical standard

Monitored methods

KK 4 KK 5 KK6

1 Temperature

0C 31.1 30.7 30.2 - Specialized device

2 Humidity % 61.8 57.8 64.5 - Specialized device

3 Noise dBA 51.8 - 54.9 60.9 - 62.3 59.8 - 60.1 70* TCVN

3985 – 1999

4 Dust µg/m3 140.6 130.9 127.6 300 TCVN

5067 – 1995

5 SO2 µg/m3 103.2 101.3 96.3 350 TCVN

5971 – 1995

Page 89: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 84

6 NO2 µg/m3 84.3 89.7 84.3 200 TCVN

7172 – 2002

7 CO µg/m3 1,450 1,400 1,300 30,000 TCVN

5972 – 1995

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Note:

*: QCVN 05:2013/ BTNMT (1 hour).

**: QCVN 26:2010/ BTNMT- (6h-21h).

- KK4: Air sample at Dak D’Rong dam. Coordinates: X:1395456; Y: 0422297.

- KK5: Air sample in village 19. Coordinates: X:1396849; Y:0423016.

- KK6: Air sample in village 16. Coordinates: X: 1399489; Y: 0425719.

Monitored results of air environment parameters at Dak Dier irrigation works and interconnecting road.

No. Monitored parameters

Unit

Monitored results Technical standard

Monitored methods

KK 8 KK 9 KK 10

1 Temperature 0C 29.9 30.3 29.6 -

Specialized device

2 Humidity % 60.3 59.7 61.3 - Specialized

device

3 Noise dBA 57.8 – 58.9

60.6 – 60.8

60.1 – 61.3 70* TCVN

3985 – 1999

4 Dust µg/m3 105.3 112.3 103.6 300 TCVN

5067 – 1995

5 SO2 µg/m3 101.6 94.3 93.6 350 TCVN

5971 – 1995

6 NO2 µg/m3 88.4 84.7 81.3 200 TCVN

7172 – 2002

7 CO µg/m3 1,350 1,200 1,400 30,000 TCVN

5972 – 1995

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Note:

*: QCVN 05:2013/ BTNMT (1 hour).

**: QCVN 26:2010/ BTNMT- (6h-21h).

- KK8: Air sample at Dak Dier dam. Coordinates: X:1392655; Y: 0423420.

- KK9: Air sample at the expected pump station. Coordinates: X: 1394322; Y: 0423094.

- KK10: Air sample at main canal KC2. Coordinates: X: 1393731; Y: 0424088.

Monitored results of groundwater parameters at Cu Pu irrigation works and interconnecting road.

No. Monitored parameters

Unit Monitored results QCVN

09:2008/ BTNMT

Monitored methods NN 1 NN 2

Page 90: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 85

1 pH* - 6,86

(t =27,60C)

7,58

(t =27,60C)

5,5 – 8,5

TCVN 6492:2011

2 Turbidity NTU 4 0 - TCVN 6184:2008

3 Hardness mgCaCO3/L 80 260 500 TCVN 6224:1996

4 Cl- mg/L 7.88 35.5 250 TCVN 6194:2011

5 SO42- mg/L 7.16 15.7 400

SMEWW 4500 SO42- E

:2012

6 Fe mg/L 2.88 0.30 5 TCVN 6177:1996

7 Mn mg/L KPH

(LOD = 0.01)

KPH

(LOD = 0.01) 0.5 TCVN 6002:1995

8 Coliforms MPN/100mL 1.1 x 104 1.1 x 104 3 TCVN 4882:2007

9 As mg/L < 0.0003 KPH

(LOD = 0.0001) 0.05 ACIAR-AAS 001-2007

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Note

- KPH: Not detected, LOD: Level of detection.

- NN1: Groundwater sample at Ms. Nguyen Thi Luyen household.

Coordinates: X: 1397977; Y: 0431797.

- NN2: Groundwater sample at Mr. Ta Thanh household in village 10 of Nam Dong.

Coordinates: X: 1398169; Y: 0431251.

Monitored results of groundwater parameters at Dak D’Rong irrigation works and interconnecting road.

No. Monitored parameters

Unit Monitored results QCVN

09:2008/ BTNMT

Monitored methods NN 3 NN 4

1 pH* - 7.72

(t =27.70C)

7.66

(t =27.60C) 5,5 – 8,5 TCVN 6492:2011

2 Turbidity NTU 0 0 - TCVN 6184:2008

3 Hardness mgCaCO3/L 158 141 500 TCVN 6224:1996

4 Cl- mg/L 26.3 5.91 250 TCVN 6194:2011

5 SO42- mg/L 15.1 3.64 400

SMEWW 4500 SO42-

E :2012

6 Fe mg/L 0.19 0.18 5 TCVN 6177:1996

7 Mn mg/L KPH

(LOD = 0.01)

KPH

(LOD = 0.01) 0,5 TCVN 6002:1995

8 Coliforms MPN/100mL 2100 150 3 TCVN 4882:2007

9 As mg/L KPH

(LOD = 0.0001)

KPH

(LOD = 0.0001) 0,05

ACIAR-AAS 001-2007

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Page 91: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 86

Note

- KPH: Not detected, LOD: Level of detection.

- NN3: Groundwater sample at Ms.Hoang Thi Hanh household in village 10.

Coordinates: X: 1396756; Y: 0424955

- NN4: Groundwater sample at Mr. Nguyen van Luyen in village 12.

Coordinates: X: 1395472; Y: 0422318

Monitored results of groundwater parameters at Dak Dier irrigation works and interconnecting road.

No. Monitored parameters

Unit

Monitored results QCVN

09:2008/ BTNMT

Monitored methods NN 5

NN 6

1 pH* - 6,90

(t =27,60C)

7,70

(t =27,60C) 5,5 – 8,5 TCVN 6492:2011

2 Turbidity NTU 0 0 - TCVN 6184:2008

3 Hardness mgCaCO3/L 48 236 500 TCVN 6224:1996

4 Cl- mg/L 13.8 8.21 250 TCVN 6194:2011

5 SO42- mg/L 2.61 18.8 400

SMEWW 4500 SO42- E

:2012

6 Fe mg/L 0.13 0.24 5 TCVN 6177:1996

7 Mn mg/L KPH

(LOD = 0.01)

KPH

(LOD = 0.01) 0.5 TCVN 6002:1995

8 Coliforms MPN/100mL 210 2.400 3 TCVN 4882:2007

9 As mg/L KPH

(LOD = 0.0001)

KPH

(LOD = 0.0001)

0.05 ACIAR-AAS 001-2007

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Note

- KPH: Not detected, LOD: Level of detection.

- NN5: Groundwater sample at Mr. Luong Hung Thua household near the spillway of Dak Dier reservoir. Coordinates: X: 1392702; Y: 0423065.

- NN6: Groundwater sample at Mr. Luc Van Hien household near the spillway of Dak Dier reservoir.

Coordinates: X: 1394634; Y: 0424352.

Monitored results of surface water parameters at Cu Pu irrigation works and interconnecting road.

No. Monitored parameters

Unit

Monitored results QCVN 08:2008/ BTNMT

Type B1

Monitored methods NM 1 NM 2

1 pH* - 7.59

(t =27.60C)

7.56

(t =27.60C) 5.5 – 9 TCVN 6492:2011

Page 92: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 87

2 BOD5 mgO2/L 1 1 15 TCVN 6001:2008

3 COD* mgO2/L 3 3 30 SMEWW 5210.C:2012

4 TSS * mg/L 5 6 50 TCVN 6625:2000

5 N-NH4+ * mg/L

KPH

(LOD=0.19)

KPH

(LOD=0.19) 0.5 TCVN 5988:1995

6 PO43-* mg/L 0.048 0.021 0.3 TCVN 6202:2008

7 NO3- mg/L 0.59 1.40 10

SMEWW 4500 NO3- E

:2012

8 Fe total mg/L 0.35 0.44 1.5 TCVN 6177:1996

9 DO mgO2/L 4.8 4.7 ≥ 4 Specialized device

10 Coliforms MPN/100mL 9.1 1.1 x 105 7,500 TCVN 4882:2007

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Note

- KPH: Not detected, LOD: Level of detection.

- NM1: Surface water sample of Cu Pu reservoir. Coordinates: X: 1397640; Y: 0432464.

- NM2: Surface water sample at irrigation area of Cu Pu reservoir.

Coordinates: X: 1397926; Y: 0433070.

Monitored results of surface water parameters at Dak D’Rong irrigation works and interconnecting road.

No. Monitored parameters

Unit

Monitored results QCVN 08:2008/ BTNMT

Type B1

Monitored methods NM 3 NM 4

1 pH* - 7.83

(t =27.80C)

7.68

(t =27.90C) 5.5 – 9 TCVN 6492:2011

2 BOD5 mgO2/L 1 1 15 TCVN 6001:2008

3 COD* mgO2/L 3 3 30 SMEWW 5210.C:2012

4 TSS * mg/L 12 19 50 TCVN 6625:2000

5 N-NH4+ * mg/L

KPH

(LOD=0.19)

KPH

(LOD=0.19) 0.5 TCVN 5988:1995

6 PO43-* mg/L 0.048 0.12 0.3 TCVN 6202:2008

7 NO3- mg/L 1.84 2.44 10

SMEWW 4500 NO3- E

:2012

8 Fe total mg/L 1.25 4.28 1.5 TCVN 6177:1996

9 DO mgO2/L 4.7 4.8 ≥ 4 Specialized device

10 Coliforms MPN/100mL 430 1,500 7,500 TCVN 4882:2007

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Note

- KPH: Not detected, LOD: Level of detection.

- NM3: Surface water sample at Dak D’Rong reservoir. Coordinates: X: 1395514; Y: 0422108.

Page 93: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 88

- NM4: Surface water sample at irrigation area of Dak D’Rong reservoir.

Coordinates: X: 1396727; Y: 0423598.

Monitored results of surface water parameters at Dak Dier irrigation works and interconnecting road.

No. Monitored parameters

Unit

Monitored results QCVN 08:2008/ BTNMT

Type B1

Monitored methods NM 5 NM 6

1 pH* - 7,87

(t =27,60C)

7,68

(t =28,00C) 5,5 – 9 TCVN 6492:2011

2 BOD5 mgO2/L 1 1 15 TCVN 6001:2008

3 COD* mgO2/L 3 3 30 SMEWW 5210.C:2012

4 TSS * mg/L 13 12 50 TCVN 6625:2000

5 N-NH4+ * mg/L

KPH

(LOD=0,19)

KPH

(LOD=0,19) 0,5 TCVN 5988:1995

6 PO43-* mg/L 0,070 0,075 0,3 TCVN 6202:2008

7 NO3- mg/L 6,43 10,2 10

SMEWW 4500 NO3- E

:2012

8 Fe total mg/L 3,26 6,51 1,5 TCVN 6177:1996

9 DO mgO2/L 4,5 4,7 ≥ 4 Specialized device

10 Coliforms MPN/100mL 430 < 3 7500 TCVN 4882:2007

Source: Center of Technology and Environment & Natural Management, September 14, 2015

Note

- KPH: Not detected, LOD: Level of detection.

- NM5: Surface water sample at Dak Dier reservoir. Coordinates: X: 1392828; Y: 0423114.

- NM6: Surface water sample at irrigation area of Dak Dier reservoir.

Coordinates: X: 1394011; Y: 0423519.

Page 94: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 89

ANNEX 6: BUDGET OF ENVIRONMENTAL MONITORING

No. Description Unit Quantity

Unit price

Total

Legislation

(1000đ) (1000đ)

I Monitoring air sample (9 location x 1 sample/location) 10,566 TT 28/2011/ TT-

BTNMT

a Parameters

1 TSP Sample 9 100 900 TT232/2009/

TT-BTC

2 NOx Sample 9 200 1800 ditto

3 SO2 Sample 9 200 1800 ditto

4 Lead dust (Pb) Sample 9 320 2880 ditto

b Weather 0

1 Temperature Sample 9 40 360 TT 232/2009/

TT-BTC

2 Wind direction Sample 9 40 360 ditto

3 Wind velocity Sample 9 40 360 ditto

4 Humidity Sample 9 40 360 ditto

b Noise 0

1 Laeq Sample 9 52 468 TT 232/2009/

TT-BTC

2 LAmax Sample 9 52 468 ditto

c Vibration (2 locations x 1 hr/location)

0

1 Velocity Sample 9 30 270 TT 232/2009/

TT-BTC

2 Acceleration Sample 9 30 270 ditto

3 Frequency Sample 9 30 270 ditto

Page 95: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Page 90

No. Description Unit Quantity

Unit price

Total

Legislation

(1000đ) (1000đ)

II Monitoring surface water (5 locations x 1 Sample) 12,108 TT 29/2011/TT-

BTNMT

1 Temperature Sample 6 3 18 TT232/2009/TT-

BTC

2 TSS Sample 6 60 360 ditto

3 pH Sample 6 40 240 ditto

4 BOD Sample 6 95 570 ditto

5 COD Sample 6 100 600 ditto

6 Amoni (NH4+) Sample 6 70 420 ditto

7 Nitrat (NO3-) Sample 6 70 420 ditto

8 Total N (T-N), Sample 6 80 480 ditto

9 Total P (T-P) Sample 6 80 480 ditto

10 Grease Sample 6 300 1800 ditto

11 Pesticide Sample 6 600 3600 ditto

12 Lead (Pb) Sample 6 80 480 ditto

13 Copper (Cu) Sample 6 80 480 ditto

14 Zinc (Zn) Sample 6 80 480 ditto

15 Asen (As) Sample 6 100 600 ditto

16 Iron (Fe) Sample 6 80 480 ditto

17 Mercury (Hg) Sample 6 100 600 ditto

Total 22,674

Page 96: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

91

ANNEX 5: ENVIRONMENTAL REQUIREMENT IN THE BIDDING DOCUMENT

No. Impacts Mitigation measures Location

1

Landslide, Soil erosion and sedimentation

- Install sediment fence and/or sediment traps

around the temporary excavated material area

to collect sediment before it enters to Cu Pu

Reservoir

- Store material, soil must be far from Cu Pu,

Dak DRong, Dak Dier reservoirs, canals, which

cause sedimentation.

- Minimize area of land clearance and duration

of works within this area;

- Avoid clearing activities or earthworks during

the rainy days where possible

- If any excavated soil, waste or sedimentation

damage cultivation area, contractors have to

provide compensation for farmers.

- Restoration of areas cleared for the

construction sites;

The upgraded roads and canals and Cu Pu reservoir, in which with the highest potential impact is in Cu Pu reservoir because of the extent of workload

2

Surface water source can be contaminated

- Discarded lubricant, other chemicals have to

be kept in dry and covered area;

- Discarded lubricants/ chemicals from

construction sites need to be collected,

transported and treated according to the

Circular No.36:2015-BTNMT of MONRE;

- Construction waste needs to be transported by

adequate manners to the agreed disposal area

in Cu Knia, Nam Dong and Dak D’Rong

communes ;

- Provide dustbins and mobility septic tanks at

work sites to manage wastewater and

domestic waste from worker camps site;

- Disposal of solid wastes into canals, stream,

other watercourses, agricultural field shall be

prohibited through (i) notices in signboards at

sites by constructional contractors at sites

- Washing truck/vehicles next to the water

bodies, existing rivers, streams and canals

such as Cu Pu, Dak Drong, Dak Dier

reservoirs, as well as other surface water

bodies nearby, will not be allowed.

- Cover material storage areas when raining is

needed. Temporary storage of constructional

and domestic waste on the sites will be no

longer than 24 hours.

Cu Pu, Dak Dier, Dak Drong reservoirs and their irrigation canals, road improvement, worker camps, disposal locations .

Page 97: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

92

No. Impacts Mitigation measures Location

3

Noise/ vibration

- Construction vehicles, machines and

equipment need to meet standards of exhaust,

noise, and vibration as regulated by the

Government. The Contractor needs to submit

the Engineer documents proving that all

construction vehicles, equipment, and

machines are checked and meet requirements

concerning noise and vibration generation of

the current Vietnam standards;

- The travelling of trucks, which serve for

transporting materials and waste, will be

scheduled to reduce accumulation of noise

sources;

- All noise and vibration generation activities

shall be restricted at rest time of local people

(12-13h and 20h to 6h) on road items, as: (i)

along the upgraded roads (approach road of

Cu Pu dam, roads around Dak Dier, Dak

D’Rong reservoirs); (ii) road connecting

between village 11 and village 12, roads of

villages 2,16 and roads on the main canal N2

in Dak D’Rong commune; (iii) pump station in

village 8 of Cu Knia commune.

- Construction schedule needs to be publicly

announced to local people.

On all construction sites of all civil work components under this subproject

Residential areas in Cu Knir, Nam Dong and Dak D’Rong communes and travellers.

4 Air pollution

- Watering sector under construction and

related road in dry & low humidity days ,

increasing the frequency of watering when

passing through communities

- All trucks must be covered when transporting

pollution materials as well as waste;

- Equipment/ vehicles have to be verified and

licensed. In addition, they are required

regularly maintained to ensure emitted gases

are in thresholds;

- Equipment and machines will not be allowed

to move outside of construction sites to ensure

control of emission sources;

- All vehicles must be washed cleanly before

going out construction sites;

- All material/ waste storages shall be located

away from any households and sensitive

areas;

Residential areas in Cu Knia, Nam Dong and Dak D’Rong communes and traffic participants;.

5 Soil contamination - No construction materials and/or wastes fall The agricultural area along

Page 98: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

93

No. Impacts Mitigation measures Location

into agricultural land in the subproject areas;

- Discarded lubricant, chemicals must be kept in

dry area or covered if raining;

- Toxic waste, if any, need to be collected,

transported and treated according to Circular

No.36:2015/BTNMT of MONRE;

- Regularly collect solid wastes and transport to

local land fill sites have agreed with Cu Knir,

Nam Dong and Dak D’Rong communes CPCs.

To eliminate diseases and landscape, solid

waste need to be dumped and covered by lime

and covered by soil layer;

- Provide dustbins and mobility septic tanks in

all construction sites and worker camps;

the irrigation canals and rural roads component, 03 worker camps;

6 Local flooding

- Setting up appropriate construction schedule

at the sites to avoid rainy season, for head

works construction & concretion of canals

especially for excavation activities. This has

been strictly applied for excavation,

embankment and construction in Cu Pu

reservoir, and irrigation canals;- Manage

storage of materials and/or waste to avoid

them falling into water flows in irrigation canals

as well as blocking intakes and culverts;

- Regularly checking flow situation of canals,

intakes, culverts and implementing digging if

materials/waste block water flow;

- Placement of washing instruments/ vehicles

next to the rivers, streams, existing canals will

not allowed such as Ea Gang, Dak Drong,

Dak Dier streams and Cu Pu, Dak Drong, Dak

Dier reservoirs;

- Monitoring the compliance of construction

contractor with mitigation measures;

In Cu Pu reservoir, water intakes, culverts along upgraded roads and irrigation canals;

7

Traffic accident may increase and difficulty for usual life of local people

- Install traffic signals at site to minimize speed

of vehicles or signal of areas under

construction, especially at the intersections;

- Install lamps at night at construction sites;

- Inform the community about construction

schedule through informal public consultation

or any local people meetings and notice board;

- Construction activities should be done section

by section, to minimize temporary acquired

areas on roads;

along the upgraded roads as well as transportation routes of sub-project activities;

Page 99: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

94

No. Impacts Mitigation measures Location

- Training for drivers of sub-project as well as

worker to work safety ;

- Provide at least 01 workers to monitor vehicle

to go in and out of construction sites as well

as warning people to ensure traffic safety;

8

Impact on terrestrial ecology

- Cut trees outside of right of way by workers

will be banned;

- Re-plant vegetable cover section by section

after construction work completed;

Along the upgraded roads, canals and Cu Pu reservoir;

9

Impacts by solid wastes

- Abundant volume (approximate 3000 m3) has

to be regularly removed to 03 dumping sites

agreed with Cu Knir, Nam Dong and Dak

D’Rong communes CPCs. In addition, local

residents have agreed to reuse this discard

soil for land yards and leveling, therefore the

disposal amount is reduced;

- The transportation of abundant soil will be

reused by local resident, but impacts during

transporting need to be avoided ;

- Equip dustbins and mobility septic tanks to

work sites (it is proposed that there will be 06

dustbins and 03 mobility septic tanks provided

at each construction site);

- Weekly collect solid waste at 03 worker camps

with a local solid waste collection and dumped

in disposal sites of Cu Knir, Nam Dong and

Dak D’Rong communes. The sanitary

measures need to be done, including covering

lime and soil layer over the solid waste;

- Disposal of solid wastes into canals, stream,

other watercourses, agricultural field and

public areas shall be prohibited;

- Burning of construction and domestic wastes

shall be prohibited;

In 03 worker camps and in construction places of sub-project

10

Impacts to existing infrastructure

- Work with existing infrastructure owners

(electricity, water...) to identify locations of

underground items if any;

- Load capacity of trucks do not exceed local

bridge /road’s (it is best of less than 10 ton

truck);

- After construction has completed, all public

facilities must be re-checked to ensure theirs

functions have not been affected by sub-

project activities, if any damage has been

Nam Dong, Cu Knia and Dak Drong communes;

Page 100: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

95

No. Impacts Mitigation measures Location

complained, contractor need to be responsible

for repairing and compensating;

11

Disturbance to local people’s life due to crowded workers

- A recruitment priority should be given to local

workers:

- Register provisional residence for workers

staying at camps;

- Contractor needs to regulate camp sanitation

regulations;

- Carry out HIV/AIDS prevention program and

sex transmission infection;

- Propagate and raise awareness of the

construction workers to maintain discipline,

habits and customs and create good

relationships with local people, reduce social

evils;

- It is best if contractors organize meals for all

workers at each site to ensure hygiene and

food safety;

- Spray insecticides at 03 worker camps;

- Train and guide labor safety measures and

prevention of common diseases for workers;

Nam Dong, Cu Knia and Dak Drong communes;

12

Risks to health and safety to local people and workers

- Provide sufficient labor safety to workers such

as shoes, helmets etc. And instruct workers

how to use;

- A first aid kit will be provided at each

construction site to ensure patients can

receive first aid timely before transporting

them to the medical station/hospital

- Install power network at site in accordance

with safety regulations of the state and ensure

that the power lines, the power outlets to be

located at dry and safe places;

- Install warning signs at the electric

receptacles;

- Install information signs about the project, the

labor regulations at site;

- Install fences, warning signs at the intersection

between the drains and roads;

- Remain the light during the nigh time on all

construction sites.

- Timely repair damaged road surfaces and

bridges;

People in Nam Dong, Cu Knia, Dak D’Rong communes and workers constructing the subproject

13 Impacts around - In mines of soil, stone Contractor should Cu Pu reservoir, upgraded

Page 101: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

96

No. Impacts Mitigation measures Location

the mines of soil, stone and sand

follow environmental protection issues,

including:

- Working machines must be under periodically

quality controlled;

- Oil and other chemical pollutants from working

machines should be strictly controlled and

stored separately, avoiding leakages;

- Workers should use protective equipment

while working within the Site;

- Temporary earth drainage system and ditch

should be formed to store waste water safely

in rainy season to reduce turbidity before

releasing water into cultivated area;

- Water should be regularly sprayed within

borrow areas to reduce dust generation;

- The contractor should select registered service

providers with necessary licenses to supply

construction materials such as sand and

stone;

roads and newly constructed canals

14

Impact on existing irrigation systems

- The construction of irrigation system must be

scheduled and planned considering water

availability for fields. Those plans need to be

consulted with local DARD and communes

and informed to local residents;

- The construction flow diversion which are

supplementary for constructed sections, need

to be implemented to ensure water for

irrigation;

- Construction need to implemented section by

section to minimize impacts as whole;

Cu Pu reservoirs and upgraded canals in Nam Dong, Cu Knia, Dak D’Rong communes

15

Impact on surrounding agricultural land and cultivation activities

- The construction planned need to be

consulted with local DARD and communes

and announced in notice board of Nam Dong,

Dak Drong and Cu Knia communes; especially

the withdrawing water plans of Cu Pu

reservoirs, and blocking canals during

construction;

- Construction of roads need to be completed

section by section to ensure travelling ability

on upgraded roads;

- Gathering materials and equipment on banks

of canals need to be tidy and ensure a roads

for travelling of local people to the fields;

Areas surrounding Cu Pu reservoir and areas surrounding upgraded irrigation canals and roads in Nam Dong, Dak Drong and Cu Knia communes

16 Environmental - Re-planting undesirable cutting plants after Cu Pu reservoir,

Page 102: INITIAL ENVIRONMENTAL EXAMINATION - adb.org · Initial Environmental Examination (IEE) Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

Initial Environmental Examination (IEE)

Subproject: Repairing, upgrading Cu Jut irrigation works system, Cu Jut district, Dak Nong province”

97

No. Impacts Mitigation measures Location

recovery activities completing construction activities;

- Repairing damaged infrastructures as soon as

possible;

- Flow water into Cu Pu reservoir and upgraded

canals, and protect areas from fishing

activities to recover aqua-ecosystem;

constructed and impacted places in Nam Dong, Dak Drong and Cu Knia communes