innovation district subarea study skipper road / 42nd
TRANSCRIPT
![Page 1: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/1.jpg)
1
Innovation Place Subarea StudySkipper Road / 42nd Street / 46th Street
September 20, 2017
![Page 2: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/2.jpg)
Study Area
INTRODUCTION2
![Page 3: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/3.jpg)
Study Objectives
INTRODUCTION3
❖ How can we improve safety and travel efficiency for all modes?
❖ What are the potential solutions?
❖ What are the infrastructure costs for these solutions?
![Page 4: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/4.jpg)
Review of Past Studies and Land Use Plans
INTRODUCTION4
❖ Consistent key themes of 13 past studies within proximity to the study area
❖ Pedestrian safety improvements in the University Area
❖ Improve auto connections between New Tampa and USF
❖ Transit options recommended (e.g., circulator, expanded service)
![Page 5: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/5.jpg)
New and Proposed Developments
INTRODUCTION5
Student Housing
❖ 512 new rooms
❖ 725 rooms under construction
❖ 1,797 rooms proposed
❖ 1,000 new rooms on USF
campus
Other Development
❖ New Publix on campus
![Page 6: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/6.jpg)
Origin-Destination Study Key Questions
EXISTING CONDITIONS6
❖ Where are drivers on Bruce B. Downs north of the focus area going?
❖ For those drivers on Bruce B. Downs north of the focus area going to
USF, which route are they taking?
❖ What percentage of trips on Bruce B. Downs from north of the focus
area are less than three miles?
![Page 7: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/7.jpg)
Destination of southbound trips passing through Bruce B. Downs gate
EXISTING CONDITIONS7
❖ The AM peak is divided into two
periods:
❖ AM peak 1 represents
typical commuters
❖ AM peak 2 is more
representative of students
❖ Typical AM peak hour is
7am-9am
❖ 17 to 28 percent of drivers are
going to USF
![Page 8: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/8.jpg)
Route choice of southbound trips passing through Bruce B. Downs gate destined for USF
EXISTING CONDITIONS8
❖ More than half of vehicles
traveling south from Bruce B.
Downs to USF take Bruce B.
Downs the entire way
❖ 58 percent during the
typical AM peak period
❖ Of the vehicles traveling through
the Focus Area:
❖ 79 percent take 42nd Street
❖ 33% vs. 9%
![Page 9: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/9.jpg)
Southbound trips passing through Bruce B Downs gate with total trip distance less than three miles
EXISTING CONDITIONS9
❖ Most of the trips destined for the
Influence area are less than
three miles long
❖ These trips are a potential
market for mode shifts from
automobile to transit or bicycle
❖ Building new roadway capacity
may not be the only solution
![Page 10: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/10.jpg)
Injury Crash Analysis (past five years)
EXISTING CONDITIONS10
Source: Crash Data Management System (2012-2016)
❖ Fletcher Avenue averages 41 or
more injury crashes per mile
annually
❖ 42nd Street and 46th Street
intersections with Fletcher are
high crash intersections
averaging ~50 crashes annually
❖ Intersection of Bruce B Downs
and Fletcher Avenue is
experiences over 60 injury
crashes annually
![Page 11: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/11.jpg)
Injury Crashes Involving Pedestrians and Bicyclists (past five years)
EXISTING CONDITIONS11
Source: Crash Data Management System (2012-2016)
❖ 21 bike/ped crashes on Fletcher
Avenue north of USF
❖ 1 fatality
❖ 3 severe injury
❖ 6 injury
❖ 11 minor injury
❖ 19 crashes on Bruce B Downs
between Fowler Avenue and
Bearss Avenue
❖ 1 fatality
❖ 3 severe injury
❖ 6 injury
❖ 9 minor injury
![Page 12: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/12.jpg)
Identified Issues
EXISTING CONDITIONS12
![Page 13: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/13.jpg)
Existing Typical Section – 42nd Street @ Fletcher Avenue
EXISTING CONDITIONS13
❖ Cut-through traffic to the University
❖ Conflict between auto traffic and
bicyclists / pedestrians
❖ Increase emphasis on pedestrians,
bicyclists, and transit users
![Page 14: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/14.jpg)
Existing Typical Section – 46th Street @ Fletcher Avenue
EXISTING CONDITIONS14
❖ Cut-through traffic to the University
and other areas to the east
❖ Conflict between auto traffic and
bicyclists / pedestrians
❖ Provide efficient auto throughput to
move auto traffic away from
pedestrians/bicyclists on 42nd Street
![Page 15: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/15.jpg)
Planned Improvements
EXISTING CONDITIONS15
Source: Hillsborough County CIP
❖ Construction on-going on Bruce
B. Downs – widens road to eight
lanes and constructs multi-use
trail on south side of the road
❖ A PD&E study of 46th Street
and Skipper Road is planned
for October 2017
❖ A PD&E study of Bruce B.
Downs and Bearss Avenue
intersection is planned for
2017
❖ Funds have been committed to
fill sidewalk gaps and install a
mid-block crossing on 42nd
Street
![Page 16: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/16.jpg)
Today
Next steps16
❖Are there any other issues, ideas, or opportunities for the
study area?
❖Are there any fatal flaws in the study?
❖Please fill out a COMMENT FORM before you leave
![Page 17: Innovation District Subarea Study Skipper Road / 42nd](https://reader034.vdocument.in/reader034/viewer/2022052106/62875c639a839a156d37ee54/html5/thumbnails/17.jpg)
17
Innovation Place Subarea StudySkipper Road / 42nd Street / 46th Street
September 20, 2017