Innovations in transport and installation methods. Henrik Fomsgaard Lynderup September 2009. Future trends in offshore wind energy. Larger projects. More projects installed per year. Financing and equipment availability are key challenges. Large projects are stretched over more seasons. - PowerPoint PPT PresentationTRANSCRIPT
© Siemens Wind Power A/S. All rights reserved
Innovations in transport and installation methodsHenrik Fomsgaard LynderupSeptember 2009
© Siemens Wind Power A/S. All rights reserved
Future trends in offshore wind energy
More projects installed per yearLarger projects
© Siemens Wind Power A/S. All rights reserved
Financing and equipment availability are key challenges
Large projects are stretched over more seasons Financing becomes more difficult
More projects each year More competition for ports and vessels
© Siemens Wind Power A/S. All rights reserved
The solution is simple!
By optimized installation methods By pre-commissioning onshore
Requires specialized vessels
Requires flexible start dates
Faster project execution
Year-round operations
Staggered projects
© Siemens Wind Power A/S. All rights reserved
Minimizing offshore work is a good idea!
% man hours used onshore
Cost index for installation, commissioning and testing
10 20 30 40 50 60 70 80 90 100
0,1
0,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
1,0Siemens approach today
Fully-assembled offshore
Fully-assembled onshore
© Siemens Wind Power A/S. All rights reserved
It all links together…
Fully assembled turbines in the port
Specialized quay and equipment
An accessible market
Minimum 250 turbines per year in 5 years within reach
Specialized vessels with 350 Nm reach
High utilization to minimize price
© Siemens Wind Power A/S. All rights reserved
Serial assembly at the quay wall
A centralized setup will improve efficiency
© Siemens Wind Power A/S. All rights reserved
Specialized vessels are required to increase volumes and utilization
Faster More WTGs on board Less weather-sensitive
Larger volume in port
Source: Beluga Hochtief Offshore High utilization of vessel and port
Specialized vessels
Sea Installer
Larger range from port
Year-round installation
Source: A2SEA