innovative drilling system with built in kick-off ramp

Upload: afzal-akthar

Post on 01-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    1/27

    INNOVATIVE DRILLINGSYSTEM WITH BUILT INKICK-OFF RAMPALLOWINGDEPENDABLE CURVE

    BUILDINGPresented b

    M A!"#$ A%tr

    M'ster A$'

    S()'t Bd#(r'#

    V'*e% C&+(dr

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    2/27

    INTRODUCTION

    ,Neess't 's t&e )+t&er +! #$$Inn+*#t'+n.

    T&'s te&n+$+/ 0#s de*e$+1ed b en/'neers2 dr'$$ers #t Chesapeake Operating Inc.,

    +1er#t'n/ +n Gr#n'te 0#s& !+r)#t'+n 'n

    O%&$+&+)# USA

    Better t+ (nderst#nd t&e $$en/es t+

    #11re'#te t&e Inn+*#t'*e s+$(t'+n

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    3/27

    GRANITE WASH FORMATION

    Stret&es !r+)N+rt& Te3#s t++%&$+&+)#+*er'n/ 455 S67

    )'$es 85 +r )+re

    e3e$$entreser*+'rs

    en+(ntered 'n+ne *ert'#$ 0e$$

    F+(s t+ e31$+'tL'6('d r'&reser*es

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    4/27

    APPLICATION CHALLENGES

    F+r)#t'+n C$$en/es

    F+r)#t'+n 's complex2 +ns'dered 3Dchallenge

    M#n drilling challenges be+nd 12000 ftde1t& s1e'9#$$ when building a curve tohorizontal #t 8:;

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    5/27

    DRILLING CHALLENGES

    M#=+r $$en/es en+(ntered 'n

    t&e dr'$$'n/ +1er#t'+n 0ere>

    1!oor tool performance

    2"nreliable side trac#ing techni$ues

    3%ore number of trips in curve initiationoperation

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    6/27

    POOR TOOL PERFORMANCE

    &rratic nature of formation )#%es 'td'?($t !+r dr'$$er t+ (se +@set to

    optimize bit selection t+ e?'ent$ dr'$$'n highly abrasive formation

    Dr'$$er &+ses # proven tri'cone bitdressed 0't& abrasion resistant cutters

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    7/27

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    8/27

    "()&*+,-*& .+D&/),+(/&(+4"&.

    M+st 1re*#$ent s'de tr#%'n/te&n'6(e 's cement plug method

    0&'& t#%es 3 to 5 days to getplug set

    Ot&er )et&+d (sed 's conventionalwhipstoc# anchor system0&'&

    re6('res # separate trip

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    9/27

    INNOVATIVE SOLUTION FOR THECHALLENGES

    +nnovative technical solution 0#sre6('red t+ remove the

    uncertainties 'n e)ent 1$(/ 2+n*ent'+n#$ t++$s (sed !+r (r*eb('$d'n/ +1er#t'+n

    S+$(t'+n 1r+1+sed to establish areliable #ic# o structure 7

    curve free of dog legs in a single

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    10/27

    +((89,/+9& D)+**+( .:./&%

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    11/27

    DESCRIPTION OF INNOVATIVE TOOLS USEDEPANDABLE ANCHOR

    T&e #n&+r s$'1s0&en &dr#($'#$$

    #t'*#ted #nd set

    Pr+*'des 1+'nt9r) /r'1 'n t&e1'$+t &+$e 0#$$ t++(nter#t #nr+t#t'+n#$ tenden

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    12/27

    STEEL RAMP

    T&e ; s$+1ed !#e+! t&e r#)1 1r+*'des# 9r) be/'nn'n/ +!t&e (r*e

    Pr+*'des s(11+rt !+rd'ret'+n#$ dr'$$'n/

    BHA 'n (r*eb('$d'n/ 2 $#ter#$dr'$$'n/ +1er#t'+n

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    13/27

    DIAMOND IMPREGNATED BIT

    L'/&t set - )ed'()1r+9$e s1e'#$ b't >se$eted to achievehigher -")7

    Men'#$$ #tt#&edt+ t+1 +! t&e r#)10't& # s&e#r b+$t to

    facilitateseparation from thedrilling -,+ner#)1 's +r'ented #nd#n&+r 's set

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    14/27

    TURBODRILL

    W't& )($t'st#/e 1+0erset'+n d'ret'+n#$ be#r'n/1#%#/e

    De$'*ers ')1r+*ed 0e$$b+re

    6(#$'t 2 red(es d+0n&+$e *'br#t'+ns

    ; d+(b$e bend &+(s'n/ t+red(e t&e e@et'*e b't t+bend d'st#ne #$$+0'n/BHA t+ #&'e*e &'/&er BUR

    Te)1+r#r'$ $+%ed t+!#'$'t#te sett'n/ +! #ne31#nd#b$e #n&+r

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    15/27

    WHIPSTOCK ORIENTING TOOL

    Gr+ (sed !+r+r'ent#t'+n !+r r#)1!#e t+ t&e des'red

    #"')(t&7 A$tern#t'*e$ MWD

    t++$ +($d 1r+*'de+r'ent#t'+n 0't&

    +t&er d'ret'+n#$d#t# d(r'n/ dr'$$'n/7

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    16/27

    APPLICATION OF THE INNOVATIVESOLUTION

    A 9e$d r(n !+r #11$'#t'+n +! t&e'nn+*#t'*e te&n+$+/ +nd(ted b

    Chesapake Operating Inc. 'n M#58

    8b;ective0#s t+ dr'$$ # $#ter#$ 0e$$!r+) # *ert'#$ 1'$+t &+$e t+ t#1 $'6('d2 +ndens#te $'6('d r'& !+r)#t'+n

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    17/27

    DRILLING PROGRAMME

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    18/27

    DRILLING PROCESS

    Dr'$$'n/ 1$#n #$$ed!+r # s'n/$e tr'1 d+0n&+$e t+ 'n't'#te t&e

    (r*e b('$d'n/ 2 dr'$$#s $+se t+ $#nd'n/1+'nt #s 1+ss'b$e

    ood tool

    performance 2smooth hole0't&+(t $ed/es 0eredes'red

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    19/27

    B+tt+) H+$e Asse)b$ BHA

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    20/27

    T&e #b+*e dr'$$'n/ sste) 0#s r(n 'nt&e &+$e 2 t&e deet+r 0#s&dr#($'#$$ set 0't& # KOP #t

    845 !t

    Dr'$$'n/ #sse)b$ d'sen/#/ed !r+)deet+r r#)1 2 +r'ented 1r+1er$!+r s(bse6(ent (r*e b('$d'n/+1er#t'+n

    P$#nned $#nd'n/ 1+'nt 0#s re#&ed2 $#ter#$ dr'$$'n/ +1er#t'+n +nt'n(ed

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    21/27

    A!ter dr'$$'n/ !+r 54!t 2 'n$'n#t'+n #tJ75; # s(r*e bMWD t++$ 0#s t#%en

    2 re+rded

    S(r*e 1+'nts 0ere1$+tted (s'n/

    R(nner T2D #n#$s'ss+!t0#re s&+0'n/(r*e 1r+9$e 0't&DLS $e/ends

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    22/27

    SUMMARY OF DRILLING OPERATION

    Sste) successfully run &dr#($'#$$

    set #nd #n&+red !+r s(bse6(ent dr'$$'n/+1er#t'+n #$$ in a single operation #s1$#nned

    Dr'$$'n/ Asse)b$ 0't& t(rb'ne #nd t&e')1re/n#ted b't dr'$$ed a smooth curve0't&+(t (ndes'r#b$e $ed/es

    (o other ma;or issues d(r'n/ +1er#t'+n0ere en+(ntered

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    23/27

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    24/27

  • 8/9/2019 Innovative Drilling System With Built in Kick-Off Ramp

    25/27

    CONSLUSIONSFIELD RUN RESULTS VALIDATED FOLLOWING &: 8->&/+9&. ,(D .:./&% =&,/")&.

    +nnovative drilling system e$')'n#tes t&e need!+r #n e3tr# tr'1 re6('red !+r sett'n/ 0&'1st+%