innovative mechanical excavation techniques for mining

22
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G HERRENKNECHT AG. O C C C O C Q S INNOVATIVE MECHANICAL EXCAVATION TECHNIQUES FOR MINING APPLICATIONS JACK BROCKWAY CEO AND PRESIDENT OF HTS USA/CANADA Toronto, PDAC, 4 March 2014

Upload: others

Post on 25-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N GH E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT AG.O C C C O C Q SINNOVATIVE MECHANICAL EXCAVATION TECHNIQUES

FOR MINING APPLICATIONS

JACK BROCKWAY CEO AND PRESIDENT OF HTS USA/CANADA

Toronto, PDAC, 4 March 2014

Page 2: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

Founded in 1977Founded in 1977

Conversion to Herrenknecht AG in 1998

Today around 4,600 employees worldwide, 2,000 in Schwanau, Today around 4,600 employees worldwide, 2,000 in Schwanau, around 200 young people in trainingaround 200 young people in training

Page 3: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT CORE MARKETSHERRENKNECHT CORE MARKETS.

Corporate

CoreMarkets

Corporate Brand

Markets

Core

Additional Equipment Additional Equipment Additional Equipment

Core Brands

Group Brands

Additional Services Additional Services Additional Services

Page 4: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

MILESTONES OF COMPANY HISTORYMILESTONES OF COMPANY HISTORY.

1975/77 1977 1980 1998 1999 2002 20082005 2010 2011 2012

Engineer office, Lahr Office and

AssemblyComplete product

Assemblyin China

World‘s largestTunnel BoringM hi d li d f

35 yearsHerrenknecht

Foundation of

plant in Schwanau

Conversion of

range TBM

Total operating performance of 1 013 Mrd €

(Guangzhou) Machine delivered forItaly: Ø 15.55m

Final breakthrough atthe Gotthard Base

e e ec t

Herrenknecht GmbH

Conversion of GmbH in AG

Market leader in mechanized tunnellingtechnology

1.013 Mrd. €2,915 employees

the Gotthard Base Tunnel

First place in brandranking by theGerman Wirtschafts-German WirtschaftsWoche magazine

Page 5: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT WORLDWIDE ON ALL CONTINENTSHERRENKNECHT WORLDWIDE ON ALL CONTINENTS.

Canada

USA

Russia

UkraineUKNetherlands

France SwitzerlandGermany

ItalySpain

Mexico

VenezuelaSaudi Arabia

Abu Dhabi

Iran

India

Thailand

China

Brazil

SingaporeMalaysiaPanama

ArgentinaChile

Australia

Subsidiary

Representative

Page 6: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT GROUPHERRENKNECHT GROUP.COMPANY FIGURES.

1.143

Order inflow in Mio. Euro

1 104 1.135

Total output in Mio. Euro

1.042

939 908 916

1.051

874

1.013953 952

1.104

2007 2008 2009 2010 2011 20122007 2008 2009 2010 2011 2012

Page 7: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT GROUPHERRENKNECHT GROUP.COMPANY FIGURES.

5.1194.848

Employees at the end of the year*

231 239 246231

Trainees at the end of the year

3.632 3.7293.915 147

199231 239 231

3.053

2007 2008 2009 2010 2011 20122007 2008 2009 2010 2011 2012

2007 2008 2009 2010 2011 20122007 2008 2009 2010 2011 2012

* Without trainees, incl. agency worker

Page 8: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

INFRASTRUCTURE - GLOBAL TRENDSINFRASTRUCTURE - GLOBAL TRENDS.

P l i h d b i iPopulation growth and urbanization

Lack of resources

Industrialization and automation

Increased demand for mobility for people and goods

Need for new supply and disposal systems

Large infrastructure projects, with parallel sub-projectsg p j , p p j

Page 9: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT PRODUCT PORTFOLIOHERRENKNECHT PRODUCT PORTFOLIO.OVERVIEW OF CORE PRODUCTS TUNNELLING.

EPB Shield Mixshield Gripper TBM

Multi-mode TBMFlexible machine technology f

Single Shield TBM Double Shield TBM

for highly variable ground. The machine mode can be changeddepending on the groundconditions.Single Shield TBM Double Shield TBM

Page 10: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT PRODUCT PORTFOLIOHERRENKNECHT PRODUCT PORTFOLIO.OVERVIEW OF CORE PRODUCTS TUNNELLING.

AVN Machine Partial-face Excavation Machine

Auger BoringMachine

HDD Rig Direct Pipe® Vertical Shaft SinkingHDD Rig Direct Pipe® Vertical Shaft SinkingMachine

Page 11: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT PRODUCT PORTFOLIOHERRENKNECHT PRODUCT PORTFOLIO.ADDITIONAL EQUIPMENT.

fFull-Range-Tunnelling for optimized jobsite processes

Page 12: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT PRODUCT PORTFOLIOHERRENKNECHT PRODUCT PORTFOLIO.SERVICES.

Installation services

Personnel

Spare and wear parts

Excavation tools

Refurbishment

Rental equipment &Rental equipment & used machines

Page 13: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

MILESTONES OF PRODUCT DEVELOPMENT.MILESTONES OF PRODUCT DEVELOPMENT.

Tunnelling infrastructures

ns1983/1984 19901985/1986 1993/1994 1999 2005/2006 2010

solu

tion/

Micro Machines,Non-accessible Diameters

Single ShieldØ 11.80 m Bötzberg

/MixshieldØ 6.0 m Hera

/EPB ShieldØ 6.26m Taipei

Gripper TBMØ 9.53m Tscharner

/MixshieldØ 15.43mShanghai

EPB ShieldØ 15.55mSparvo

Exploration

-aro

und

2005FoundingHerrenknecht

2007first 2000HP / 350 ton

2011First Jack-up Rig leaves the port of

1977Foundation of Herrenknecht GmbH

Mining

All-Herrenknecht

Vertical/ 350 ton hook load rig

leaves the port of Rotterdamm

2008/2009Herrenknecht Mining

2010RBR 550VFVianden

2011BBM TestSBR Engineering RBR 600VF Marti RBR 400VF EdilRBR 400VF Edilmac

Page 14: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT MINING | Development

MI-005RBR600VF

MI-014BBM1500

MI-007RBR900VF

MI-011BBM1100

MI-016RBR600VF

MI-001RBR600VF

MI-009Jumbo

HERRENKNECHT MINING | Development

MI-003SBR RBR600VF BBM1500RBR900VF BBM1100 RBR600VFRBR600VF JumboSBR

2010 2011 2012 2013

MI-012 MI-015MI-002 MI-006MI-004 MI-010MI-008 0RBR600VF

0 5RBR400VF

MI 002BBM1100

MI 006BBM1500

MI 004SBR

0 0BBM1100RBR400VF

Page 15: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

NEW BUSINESS SEGMENT MININGNEW BUSINESS SEGMENT – MINING.PRODUCT PORTFOLIO.

Raise Boring RigRaise Boring Rig

Multi service vehiclesMulti service vehicles

Shaft boring machinesShaft boring machinesBelt conveyor systemsBelt conveyor systems

Multi-service vehiclesMulti-service vehicles

Boxhole Boring MachineBoxhole Boring Machine

Shaft Drilling JumboShaft Drilling JumboGripper TBMGripper TBM

Page 16: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

BOXHOLE BORING MACHINE BBM

f f

BOXHOLE BORING MACHINE BBM.

Fast and safe construction of slot holes with small diameters

D illi di t f t 1 5 tDrilling diameters of up to 1.5 meters

Maximum drilling length of 60 meters

In the Cadia East Gold Mine in Australia more than 40 slot holes were successfully drilled

Page 17: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

RAISE BORING RIG RBR

f f

RAISE BORING RIG RBR.

Construction of shafts in rock down to 2,000 meters in depth

High flexibility even under space constraints

Pilot drill vertically or at a downward angle of up to 45 degrees

Rig pulls the reamer on the drill string upwards

Power plant Nant de Drance: 2 x 424m deep vertical penstocks

Page 18: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

SHAFT DRILLING JUMBO SDJ

C ti l h ft t ti

SHAFT DRILLING JUMBO SDJ.

Conventional shaft constructionin hard rock

Shaft diameters of up to 12Shaft diameters of up to 12 meters

With booms the borehole isWith booms the borehole isdrilled and blasted afterwards

Drilling cycle is carried outDrilling cycle is carried out manually or automatically and with all booms at the same time

First project at pumped storagepower plant Nant de Drance( )(∅ 8m)

Page 19: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

SBR PROJECT TASK AND CHALLENGESSBR – PROJECT, TASK AND CHALLENGES.

▍ Project

▍ Potash Mine Saskatchewan Canada▍ Potash Mine, Saskatchewan, Canada

▍ Shaft depth ~ 1000 m

▍ Task

▍ Development of a shaft sinking method for deep blind shafts in soft and frozen ground

▍ Ch ll▍ Challenges

▍ Enhanced safety in shaft sinking

▍ Changing geology

▍ Variable diameters

▍ 700 m of frozen ground

▍ E i f▍ Excavation of cut-outs

▍ Weight restrictions

▍ Muck removal from bench

Page 20: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

TECHNICAL DATA OF THE SBR

SBR is supsended by headframe (ropes)

TECHNICAL DATA OF THE SBR.SHAFT BORING ROADHEADER.

SBR is supsended by headframe (ropes)

Geology: medium-hard rock (up to 120 MPa)

Possible shaft diameters: 8 – 11,4 m

Machine weight: 320 tMachine weight: 320 t

Depth: up to 1000 m

Conveying sytem in SBR: Pneumatic Mucking System

Instantanious cutting rate: 3-6 m/dg /

Machine height: 45 m

Shaft wall support: shotcrete and rock bolting unit

Page 21: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

SHAFT BORING MACHINE SBMSHAFT BORING MACHINE SBM.

Shaft depth: 2,000 m(as per requirement)

Diameter: 10 – 12mDiameter: 10 – 12m

Total Weight: approx. 2,800t

Geology: Hard rockGeology: Hard rock

Stabilization through Gripper system

Stabilization shield in the lower partStabilization shield in the lower part

Cutterhead with disc cutters

W di tt b dil l dWorn disc cutters can be readily replaced in a safe and secure working area

Material is transported by a vertical beltMaterial is transported by a vertical belt conveyor

Page 22: Innovative Mechanical Excavation Techniques for Mining

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

THINK POSITIVETHINK POSITIVE.

TOGETHER WE ARE BUILDING THE FUTURE.