innovative prefabricated building systems and events/news/affordable... · alternative building...
TRANSCRIPT
Innovative Prefabricated Building Systems
Giving it a go
1
The challenge for the wood industryindustry
Trend in wood volume per unit of floor area (1945 2008)Trend in wood volume per unit of floor area (1945-2008)
0 30
0.35
0.20
0.25
0.30
m3 ) p
er m
2
0.10
0.15
Volu
me
(m NSW
VICQLD
WA
0.00
0.05
1945 1955 1965 1975 1985 1995 2005
V WA
SA
TAS
Source: Greve & Diem, 1984, 1985; Jones & Juniper, 1982; McGregor Envir. Services, 2000; C&D Recycling, 2006; Sustainability Victoria, 1999, 2000; Cuffley, 1993; etc
2
The challenge for the housing industryindustry
• Housing Lead Times; Approval to Completion– 53% of private dwellings take 9 months to p g
complete. – 31% of private dwellings will take up to 18
months to complete.
Source: BIS Shrapnel, Building in Australia 2008
3
The challenge for the consumer!consumer!
4
The direction we are heading
Multi-unit Approvals
Share of Multi-unit starts could reach 43-47% by 2020
Multi unit Approvals
34.00%
36.00%
2020
30.00%
32.00%
tal)
24 00%
26.00%
28.00%
(% o
f to
20.00%
22.00%
24.00%31
/08/
1985
31/0
8/19
8631
/08/
1987
31/0
8/19
8831
/08/
1989
31/0
8/19
9031
/08/
1991
31/0
8/19
9231
/08/
1993
31/0
8/19
9431
/08/
1995
31/0
8/19
9631
/08/
1997
31/0
8/19
9831
/08/
1999
31/0
8/20
0031
/08/
2001
31/0
8/20
0231
/08/
2003
31/0
8/20
0431
/08/
2005
31/0
8/20
0631
/08/
2007
31/0
8/20
08
5
Alternative building systemsHow to build faster and at lower cost – in wood
Building Systems
SingleDwellings
Multi -Residential
Schools/Offices/Industrial buildings. Class 3, 9
L l 1 2 1 2 3 3 2 2 2Levels 1-2 1-2 ≤3 ≤3 ≤2 ≤2 ≤2
$ Value Low High Low High medium High High
Timber Frame/SubTimber Frame/Sub floorPanelized Building Systems
Moment ResistantFrames (STIC)
Composite systemsComposite systems
DTS provisions
Requires an alternative solution that exists
Requires and alternative solution but no commercial solution
6
The cost of this house in NT is $450K
7
Our Prefabricated Concepts
Final_A[1].mov
8
Our flat pack panelised building system
Building Type Floor Area m2 Estimated costs1 B d 65 $155 000
system
1 Bedroom 65 $155,0002 Bedroom 86 $185,0003 Bedroom 119 $245,000
Budget includes:Floor, wall and roof panel & truss systemWindows doors fit-outWindows, doors, fit outSite labourElectrical and Plumbing subcontractingBuilders preliminaries and marginp gFreight estimated at $10K
9
10
The components
11
3 days to lock up
12
Where to Next?Where to Next?
13
Equipment to frame and sheath panels is standardpanels is standard
14
Panelised Floor SystemsSystems
Floor Stiffness •T-section SSP shows an increase of about 30%.
•Box-section SSP displays an increase of about 75%Box section SSP displays an increase of about 75%
•Reference, Christophe Gerber, Investigation of the ultimate behaviours and FEA of wood stressed-skin panels, Faculty of Engineering, UTS 15
16
The floor panelThe floor panel
17
Panelised Building System –1. Suitable for industrial scale prefabrication at F&T plants
2. Integrated building system
3 Suitable for high set or slab on ground construction3. Suitable for high set or slab on ground construction.
4. Flat pack panels suitable for construction in remote areas where transport and skills are costly
5. Suitable for sloped sites, multi-storey & commercial buildings
6. Light weight, safe and easy to install
7. Improves onsite OH&S, quality and speed of construction.
18
3 day build
19