innovative solutions on stormwater detention systems
TRANSCRIPT
![Page 1: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/1.jpg)
Innovative Solutions on Stormwater Detention Systems
DID Malaysia
Ir. Dr. Teo Fang Yenn
Department of Drainage and Irrigation Malaysia
Ministry of Natural Resources and Environment
![Page 2: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/2.jpg)
Stormwater Management in Malaysia
MSMA
![Page 3: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/3.jpg)
Stormwater Detention Systems
![Page 4: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/4.jpg)
• Paver with aggregate
• Underdrain
Research & Development - Past Innovations
• REDAC, USM
• Bio-Ecological Drainage System
• Pre-cast Concrete Unit
• Industrialized Building System
![Page 5: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/5.jpg)
Storage Facilities Under the Road
VS
![Page 6: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/6.jpg)
• StormPavSystem and Method of
Green Pavement
+ Concrete Technology
+ Stormwater Detention
+ Soil Stabilization
Single Unit:
Top Cover
Hollow Cylinder
Bottom Cover
The Innovative Solutions
Differences with Past Studies :
1. StormPav is more mobilized / less
dependent on heavy machineries
2. StormPav is of high strength concrete
meant for heavy loading up to 100 kN/unit
due to its small & compact size
3. Low risk compared to Past Studies
Dr. Darrien Mah Yau Seng
![Page 7: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/7.jpg)
![Page 8: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/8.jpg)
Investigation
• SWMM Modelling • Physical Modelling
![Page 9: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/9.jpg)
• Research Monograph by UNIMAS Publisher (Kota Samarahan)
• Published in November 2016
• ISBN 978-969-2008-05-7
![Page 10: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/10.jpg)
Salient Features
o Hollow cylinder acts as water storage to hold water atcapacity of 0.19 m3/m2 pavement area
o Service hole in hexagonal block acts as orifice for drainingsurface water downward at about 10,000 mm/hour
o Hollow cylinder acts to trap pollutant and low risk of subsoilpollutant thus it provides potential water cycle benefitthrough infiltration
o Hollow cylinder having empty space of 0.19 m3/m2
pavement area acts to lower heat island effect
o Hollow cylinder acts to accelerate melting of snow due tointernal air circulation space of 0.19 m3/m2 pavement area
![Page 11: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/11.jpg)
Green Technology
• StormPav has the potential to earn the credit points in U.S. Green Building Council’s Leadership in Energy & Environmental Design (LEED) on Green Building Rating System (Sustainable Sites Credit 6.1), IBS concrete products for other environmental benefits, such as reducing heat island effects (Sustainable Site Credit 7.1) and regional materials (Materials and Resources Credit 5).
• StormPav has also the potential to earn credit points in Malaysian Green Building Index, GBI, for Township on (i) Heat Island design principles (CEW1, 4), (ii) Flood management and avoidance (EEC4, 1), (iii) Sustainable stormwater design and management (EEC8, 2) (iv) Health design (CPD6, 2) (v) Low impact material (BDR1, 1), (vi) Regional material (BDR3, 1), (vii) Quality in construction (BDR4, 2), (viii) Site sedimentation and pollution control (BDR6, 1), (ix) Sustainable construction practice (BDR7, 2), and (x) Innovation (BSI2, 6).
![Page 12: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/12.jpg)
Prototypes
Idea first surfaced in 2012
![Page 13: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/13.jpg)
5 Urban Area
Until end of 2014 to have enough moulds
![Page 14: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/14.jpg)
First mass casting in February 2015
![Page 15: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/15.jpg)
Until September 2016 to have enough units for pilot project
![Page 16: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/16.jpg)
• Pilot Study – a collaboration with JKR Sarawak Research Centre
Infiltration about 10mm/hr to underlying peat
Saturated
Kpg Mang
Paya
Paloh*
NO overflow NO stagnant water inside
10mm peat
15mm clay
Decayed peat
![Page 17: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/17.jpg)
• Layout of Pilot Study
2 Transition Zone
Pilot project completed in mid February 2017
![Page 18: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/18.jpg)
• Appointment as Research Fellow
• 3rd MoU with JKR Sarawak
(2015-2019)
![Page 19: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/19.jpg)
• Presentationto Directorof JKR Sarawak on 6 July 2017
![Page 20: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/20.jpg)
• Kpg Mang pilot project is on shallow peat
• Courtesy visit to JKKK (Community Leaders) Kpg Mang on 8 April 2017
Community
![Page 21: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/21.jpg)
Wireless Rain Gauge
Receiver: use power bank as power
source & wi fi from handphone
Wireless Water Level Indicator
R2 = 0.73
SWMM based on Horton’s equation,
Surface Permeation = 10,000 mm/hr
Bottom Infiltration = 10 mm/hr
Rising limb poorly
represented
Hydrological Monitoring
![Page 22: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/22.jpg)
UNIMAS Innovation Technology Exposition InTEX 2016 – May 2016
![Page 23: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/23.jpg)
1 – 4 December 2016
![Page 24: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/24.jpg)
UNIMAS Innovation Technology Exposition InTEX 2017 – May 2017
![Page 25: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/25.jpg)
Patent Filing Number
• StormPavPending MyIPO
patent filing
![Page 26: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/26.jpg)
Commercialization
• StormPavLicencing withSyarikat Faajar(local company)
![Page 27: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/27.jpg)
Costing
StormPav Conventional
RM120/m2 RM240/m2
- Labour ~ Simple ~ Layer by layer
~ Modular IBS ~ Aggregates
- Time ~ Rapid ~ Weather
~ Distance of site
![Page 28: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/28.jpg)
Research Acculturation Grant
Scheme (RAGS) :
Individual Lot Stormwater
Detention Underneath
Residential Car Porch
Other Application (1)
![Page 29: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/29.jpg)
![Page 30: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/30.jpg)
![Page 31: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/31.jpg)
Investigation
• Physical Modelling • CFD Modelling
![Page 32: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/32.jpg)
Road Intersection as Stormwater Detention Basin
Other Application (2)
![Page 33: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/33.jpg)
![Page 34: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/34.jpg)
Investigation
Permeability 0.0067m/s or 24,120mm/hr
0.0036m/s or 12,960mm/hr
0.0025m/s or 9,000mm/hr
• Physical Modelling• CFD Modelling
Rainfall 90mm/hr (Red Alert)
55mm/hr (Heavy)
30mm/hr (Light)
![Page 35: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/35.jpg)
Acknowledgements
Concrete Team
Prof Dr Md Abdul Mannan
Prof Dr Ng Chee Khoon
Dr Delsye Teo Ching Lee
Dr Chen Mien Sin (JKR Sarawak)
Mr Lim Hung Ling
Mr Constantine Lee Lim Fah
Highway Team
Prof Dr Wan Hashim Wan Ibrahim
Water Team
Dr Darrien Mah Yau Seng
Ir Dr Teo Fang Yenn (DID M’sia)
Mdm Norazlina Bateni
Mdm Rosmina Ahmad Bustami
Prof Dr FJ Putuhena
Geotechnical Team
Associate Prof Ir Dr Siti Noor Linda Taib
![Page 36: Innovative Solutions on Stormwater Detention Systems](https://reader033.vdocument.in/reader033/viewer/2022050306/626f3c290ae40e44ac6c61b4/html5/thumbnails/36.jpg)
Thank You!