inside cwm' newsletter - winter-spring 2008-09...page 5 — vol. 5, no. 1, winter - spring...

5
Twenty-four CWMers were presented with anniversary awards for service at the com- pany’s 2008 Annual Awards Ceremony. Cash gifts for service terms, ranging from 10 to 35 years, were presented by CEO Walter Treiber. The leading honoree in the year’s presen- tation was 35-year CWM veteran Ted Bystryk, (photo above), Manager of the Secondary I n s i d e CWM Inside CWM is published by Chicago White Metal Casting, and its CNC Technologies and Contract Manufacturing Divisions, for all of our employees and for our sales rep- resentatives and supplier partners who are equally vital to our success. Visit us at: www.cwmdiecast.com/ www..cnc-technology.com/ www.cwm-contractmfrg.com/ CWM is located near O’Hare International Airport in Bensenville, IL U.S.A. ©2004 Chicago White Metal Casting, Inc. Committed to Total Customer Satisfaction with CWM’s ISO 9001 & ISO 14001 Registered Management Systems: Excellence is Expected ® 24 Chicago White Metal 2008 Service Awards go to 10- to 35-year Veterans Nick Ugarte Named ‘08 Employee of Year Along with outstanding technical skills, Employee of the Year Nick Ugarte brings a positive approach and a high degree of pro- fessionalism to his work. By targeting per- sonal improvement objectives he stays abreast of new technologies. He is also committed to providing pro- duction process updates on a daily basis to help mobilize production teams across various depart- ments when needed. At the annual Ceremony, Nick was presented with his special $1,000 cash award. CWM 2008 Employee of the Year Nick Ugarte, Production Process Technician. Ted Bystryk (left), 35-year CWM veteran, shown here after receiving his anniversary award from Walter Treiber, CEO. Five CWM Promotions Announced in 4 Depts. Promotions were announced by CWM for Steve Wojtal, Tom Mrock, Dave Crevie, Dan O'Connor and Francisco Acosta. Steve Wojtal: Director of Engineering Formerly Tool & Die Dept. Mgr., Steve has been appointed CWM Director of Engineer- ing, bringing his deep tooling knowl- edge and years of ex- perience to his new role. Among other (Continued on page 2) (Continued on page 4) The current times we find ourselves in are an opportunity for a change in our existing lifestyle. Since we are unable to change history, let us not dwell on what has happened during the past year. Where are we today and what will the next twelve months provide for us per- sonally and for the company? Daily we are being faced with anxiety, stress and fear. Anxiety is a feeling and fear is a perception. What is contributing to these feelings and perceptions? Lack of control. Focus on the Positive So let's focus on the positive aspects of what we have: Do we have our health? Do we work for a company that has a track record of survival in difficult times? Do we enjoy what we are doing both at work and at home? If we can honestly say "yes,” then things can't be that bad. Look at Opportunities Ahead CWM has a number of wonderful opportuni- ties for 2009. Many of the new die casting dies built in 2008 will see production in 2009. Since January 1st, we have received addi- tional new tooling. Along with the opportunities comes the difficult task of reducing our internal costs so that we continue to attract new work. This year in particular, with the domestic and worldwide recession, CWM is being pressed to reduce costs. A Challenge CWM Will Meet & Conquer Over the next several months, CWM will A GREEN BIZ COMPANY Unchartered Waters Walter Treiber, CEO & Chairman explore opportunities in every area of the company to insure that we are strategically positioned to compete most effectively in the competitive die casting arena. Take a Long-Term Perspective So, in my opinion, the best advice for the current times is to take a long-term perspec- tive. Do not make decisions in the midst of emotional turmoil. We live in the greatest country in the world. We have a new president with new ideas and a fresh approach to how govern- ment needs to operate. The USA will survive, CWM will survive and working together we will survive. Steve Wojtal Vol. 5, No. 1 Winter-Spring 2008-‘09

Upload: others

Post on 12-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Inside CWM' Newsletter - Winter-Spring 2008-09...Page 5 — Vol. 5, No. 1, Winter - Spring 2008-‘09 Inside CWM This 10-point OEM checklist can be a helpful guide to making the optimum

Twenty-four CWMers were presented withanniversary awards for service at the com-pany’s 2008 Annual Awards Ceremony. Cashgifts for service terms, ranging from 10 to 35years, were presented by CEO Walter Treiber.

The leading honoree in the year’s presen-tation was 35-year CWM veteran Ted Bystryk,(photo above), Manager of the Secondary

Inside CWMInside CWM is published by Chicago White Metal Casting, and its CNC Technologiesand Contract Manufacturing Divisions, for all of our employees and for our sales rep-resentatives and supplier partners who are equally vital to our success. Visit us at: www.cwmdiecast.com/ www..cnc-technology.com/ www.cwm-contractmfrg.com/CWM is located near O’Hare International Airport in Bensenville, IL U.S.A.©2004 Chicago White Metal Casting, Inc.

Committed to Total Customer Satisfaction with CWM’s ISO 9001 & ISO 14001 RegisteredManagement Systems: Excellence is Expected

®

24 Chicago White Metal 2008 ServiceAwards go to 10- to 35-year Veterans

Nick Ugarte Named‘08 Employee of YearAlong with outstanding technical skills,Employee of the Year Nick Ugarte brings apositive approach and a high degree of pro-fessionalism to his work. By targeting per-sonal improvement objectives he staysabreast of new technologies.

He is also committed to providing pro-duction process updates on a daily basis to

help mobilizeproductionteams acrossvarious depart-ments whenneeded.

At the annualCeremony, Nickwas presentedwith his special$1,000 cashaward. �

CWM 2008 Employee of theYear Nick Ugarte, ProductionProcess Technician.

Ted Bystryk (left), 35-year CWM veteran, shown here afterreceiving his anniversary award from Walter Treiber, CEO.

Five CWM PromotionsAnnounced in 4 Depts.Promotions were announced by CWM forSteve Wojtal, Tom Mrock, Dave Crevie, DanO'Connor and Francisco Acosta. Steve Wojtal: Director of EngineeringFormerly Tool & DieDept. Mgr., Steve hasbeen appointed CWMDirector of Engineer-ing, bringing hisdeep tooling knowl-edge and years of ex-perience to his newrole. Among other

(Continued on page 2)

(Continued on page 4)

The current times we find ourselves in are anopportunity for a change in our existing

lifestyle. Since we areunable to changehistory, let us notdwell on what hashappened during thepast year. Where are

we today and whatwill the next twelve

months provide for us per-sonally and for the company?

Daily we are being faced with anxiety,stress and fear. Anxiety is a feeling and fear isa perception. What is contributing to thesefeelings and perceptions? Lack of control.Focus on the PositiveSo let's focus on the positive aspects of whatwe have:

Do we have our health? Do we work for a company that has a

track record of survival in difficult times? Do we enjoy what we are doing both at

work and at home? If we can honestly say "yes,” then things

can't be that bad.Look at Opportunities AheadCWM has a number of wonderful opportuni-ties for 2009. Many of the new die castingdies built in 2008 will see production in 2009.Since January 1st, we have received addi-tional new tooling.

Along with the opportunities comes thedifficult task of reducing our internal costs sothat we continue to attract new work. Thisyear in particular, with the domestic andworldwide recession, CWM is being pressedto reduce costs. A Challenge CWM Will Meet & ConquerOver the next several months, CWM will

A G R E E N B I Z C O M P A N Y

Unchartered WatersWalter Treiber, CEO & Chairman

explore opportunities in every area of thecompany to insure that we are strategicallypositioned to compete most effectively in thecompetitive die casting arena.Take a Long-Term PerspectiveSo, in my opinion, the best advice for thecurrent times is to take a long-term perspec-tive. Do not make decisions in the midst ofemotional turmoil.

We live in the greatest country in theworld. We have a new president with newideas and a fresh approach to how govern-ment needs to operate. The USA will survive,CWM will survive and working together wewill survive. �

Steve Wojtal

Vol. 5, No.1 Winter-Spring2008-‘09

Page 2: Inside CWM' Newsletter - Winter-Spring 2008-09...Page 5 — Vol. 5, No. 1, Winter - Spring 2008-‘09 Inside CWM This 10-point OEM checklist can be a helpful guide to making the optimum

�CWM HonorsE M P L O Y E E S O F

T H E M O N T H

Inside CWM V o l . 5 , N o . 1 , W i n t e r - S p r i n g 2 0 0 8 - ‘ 0 9 — P a g e 2

Veterans with 10- to 35-years of CWM Service in ‘08(Continued from page 1)

(Continued on page 3)

35 YearsTed BystrykMgr., Secondary Machiningand Subassembly Family: Children: Barbara& Bernadette; PP ee tt :: Coco (Chihuahua) Interests:Fishing and tennis.

30 YearsMieczyslawa (Mischa)KoniecznaOffice Custodial (Retired)Interests:Loves to take walks. Enjoys cooking and traveling.

30 YearsAnthony (Tony)LoCocoExec. Vice President, CFOFamily:Children: Julie, LauraInterests:Owner of a day care center and cafe

30 YearsCristina MarchanQuality Improvement CoordinatorFamily: Spouse: MarcosBarrera (Deceased, former CWM employee);Children: Marcos Jr., Nataly,Zoraida & Christian

25 YearsFredrick D. LootsMaintenance SupervisorInterests:Golfing

25 YearsTom (Big T) MrockNew Program Introduction ManagerFamily:Spouse: KathleenInterests:Landscaping, golfing, networking

20 YearsMichael DimitroffVP, Sales & MarketingFamily:Spouse: Carol;Children: Daniel (5), William (4)Pets: Boudie (dog), Milo & Spot (cats)

20 YearsStanley MyrdaczTrim Machine OperatorFamily:Spouse: Maria;Children: Maggie

30 YearsZygmunt (Ziggy)SlotaProduction SupervisorFamily:Spouse: HelenaInterests:Working with wood, traveling, soccer

Machining Dept., including post-casting machining& subassembly. Ted supervises the activities ofCWM’s Contract Manufacturing Div., from simpleassemblies to comprehensive packaging programs.

All of the honorees are listed here, together withtheir immediate family members. Planning andarrangements for the ceremony and luncheon weremade by Anne Andrews, Angela Favata, and LeonelVelazquez and his Maintenance Dept. crew.

These CWM employees have been honored asEmployees of the Month.October ‘08: Anna Sral (1987)Office custodian Anna Sral has a commit-ment to excellence which is reflected in her

efforts to maintain aspotless environmentin every corner ofthe building, espec-tially in the R&DCenter, a frequentsite for client meet-ings. And she alwaysworks with a smile.

November ‘08: Mike Stientjes (1992)Mike, a mechanic with the maintenance de-partment, brings a tremendous amount ofknowledge to assisthim in troubleshoot-ing multiple projectsinvolving all alloys.He is also dedicatedto sharing his skillsand knowledge bytraining other tech/mechanics.December ‘08: Nick Ugarte (1996)Nick came to the Process Team only twoyears ago from the QA department. He has

contributed manymajor initiatives tothe department, en-abling CWM to lowerdefect percentagesfor various productssubstantially. He alsobrings a positive ap-proach to problems.

January ‘09: Ziggy Slota (1978) Ziggy has achieved a great deal in his 30years with the production team. He has a keyrole in new productqualification. Hiscreative approach totrimming solutionshas led to reducinghand deburring costsand improvements incycle times, safety,and trim quality. �

Anna Sral

Mike Stientjes

Nick Ugarte

Ziggy Slota

Page 3: Inside CWM' Newsletter - Winter-Spring 2008-09...Page 5 — Vol. 5, No. 1, Winter - Spring 2008-‘09 Inside CWM This 10-point OEM checklist can be a helpful guide to making the optimum

15 YearsAntonio (Tony) AgrelaCNC Production SupervisorFamily: Spouse: Ana P.Children: Monica, Antonio Jr. Pets:Bear (Bull Massive)Interests: Camping

15 YearsPerry WrightAluminum Furnace TenderFamily: Spouse: Mary; Children: Nicole, Paris,Robert, Taylor & Sinclair Pets: Star, Tyson & SnowInterests:Work on classic cars

10 YearsCharles WoodsMechanical QualityAssurance Inspector Interests:Reading, movies, open wheel racing(Formula 1, IRL)

20 YearsAleksander (Alex)OzogMaintenance MechanicFamily: Spouse: Margaret;Children: IsabellaInterests: Sports, CoinCollecting (including aprize 1462 Russian ruble)

15 YearsJozefa GajProduction Packer Family:Spouse: Bronislaw Children: Marta, Renata,Eryk, ErnestInterests: Traveling toPoland to see family

10 YearsManrique BarreraTooling CoordinatorFamily:Spouse: Ana Grimaldo; Children: Juan (19 mos.)Interests:Playing soccer

20 YearsAndres SantanaProcess TechnicianFamily:Children: Andy (12)Interests:Soccer

15 YearsCecylia JaglowskaProduction Packer Family:Spouse: Donat; Children:Dariusz, Dorota, Artur;Pets: Roki (dog)Interests: Gardening,traveling

10 YearsGonzala MarchanProduction PackerFamily:Spouse: Javier P. GarciaChildren: Alejandro,Ericka, Julio, CarmenInterests:Cooking

20 YearsCarolyn TreiberCorporate DirectorFamily:Spouse: Walter; Children: Mary Shannon,Tommy, CollinsInterests:Traveling

15 YearsMike PurciarelloEngineering Project Mgr.Family:Children: Courtney (15)Pets:Punkin (Lab-Pointer)Interests:Pool, hiking, reading

10 YearsRajiv PatelSPC Quality Coordinator Family:Spouse: Vrunda;Children: Preena (10), Priyanka (8)

20 YearsRita WayneSenior Client SupportRepresentativeFamily:Children: Michael, Gary(Currently in US Navy)Interests: Movies, spend-ing time with friends

15 YearsConnell WoodMaintenance TechnicianFamily:Spouse: Heather; Children: Jessica, Julia, Erica

10 YearsEugene ThomasQuality AssuranceTechnicianFamily:Spouse: Kenya; Children:Kierra, Tara, TamaraInterests:Pool games, sports, movies

P a g e 3 — V o l . 5 , N o . 1 , W i n t e r - S p r i n g 2 0 0 8 - ‘ 0 9 Inside CWM

Awards Received at Annual Chicago White Metal Casting Anniversary Ceremony(Continued on page 2)

Page 4: Inside CWM' Newsletter - Winter-Spring 2008-09...Page 5 — Vol. 5, No. 1, Winter - Spring 2008-‘09 Inside CWM This 10-point OEM checklist can be a helpful guide to making the optimum

The above message in CWM’s new marketing program to product engineers & specifiers, appearingin Machine Design magazine, will reach over 180,000 qualified OEM readers with each appearance.

Inside CWM P a g e 4

duties he will be overseeing the design andconstruction of all CWM tooling and super-vising the work of the project engineeringstaff. Steve joined CWM in 1979.Tom Mrock: New Program Introduc-tion Mgr. In this newly createdNPI position, Tom will be inter-facing with customers, CWM per-sonnel and suppliers in the earlyphases of newly awarded, as wellas potential, programs to estab-lish the optimum finishing pro-cess. He joined CWM in 1983.

Dave Crevie: Tool& Die Dept. Supvr.Moving from Tool &Die Dept. Asst. Mgr.,Dave will be oversee-ing all work in themaintenance and re-pair of production

tooling. He is a 22-year CWM veteran.Dan O’Connor: Director ofPurchasing Dan, who joinedCWM in 1984, will be directingpersonnel engaged in procuringservices, components and sup-plies, as well as material han-dling activities in the traffic de-partment. He was formerlyManager of Traffic & Material Handling.

Francisco Acosta: Traffic SupervisorFrancisco, a formerpurchasing compo-nent expeditor, will becoordinating all ma-terials shipments &receipt of deliveries. �

Tom Mrock

Dave Crevie

Dan O’Connor

Francisco Acosta

Five CWM Promotions (Continued from page 1)

Bill Britton, Former CWMerBill Britton, 88, a CWM guard who provided acordial welcome to visitors for 10 years, diedin October. He is survived by his wife Betty, a14-year CWM employee now retired, two sons,Barry and Kent, and three grandchildren.

Bill was an avid fan of both the St. LouisCardinals and the Fighting Illini. He alsoliked to fish, play golf, and in general enjoythe outdoors.

Betty and Bill retired together in 1998. �

ISO 9001 & ISO 14001 Mgmt. Systems

Check15 Check-lists & guidelinesto aid buyerdecisions

OEM die casting design data: Yoursat CWM’s website cwmdiecast.com

Certified Aluminum, Magnesium & Zinc Die Casting andMiniature Zn & ZA-8EXCELLENCE IS EXPECTEDBensenville, IL 60106-1382Tel: 1-630-595-4424

OEM Web Resource Center

Die Casting Design Library

Die Casting Design & Production Downloads

CONTENTS

Buyer Resources

Engineering Bulletins

Applic/Tech Briefs

CWM Case Studies

Die Casting FAQ

OEM Seminar Info

Design Guides

Reference Manuals

Design CD-ROMS

Online Webinars

��

��

��

��

��

���

� SearchOnlineFAQ offersanswers towide rangeof queries

Answers to most-askedOEM questions

Optimize18 Engrg.Bulletinsto optimizeyour castingdesigns

� Dig In3 DesignGuides forplanning tofinal-finishanswers

Update10 TechBriefs to updateyour data base

� Reference5 Manuals& CDs toreference design datain-depth

Explore12 Case Studiesto spring-board newapproaches

� View OnlineOEM Design Webinarsfor on-demandviewing 24/7

®

Over 70 Years of Die Casting Innovation

Over 70design andbuying aidsavailable by PDFdownloadA unique OEM resourcefor more cost-effective design, purchasing &

production ofcustom die cast components

A GREEN BIZ COMPANY

Page 5: Inside CWM' Newsletter - Winter-Spring 2008-09...Page 5 — Vol. 5, No. 1, Winter - Spring 2008-‘09 Inside CWM This 10-point OEM checklist can be a helpful guide to making the optimum

P a g e 5 — V o l . 5 , N o . 1 , W i n t e r - S p r i n g 2 0 0 8 - ‘ 0 9 Inside CWM

This 10-point OEM checklist can be ahelpful guide to making the optimumsupplier decision for successful re-sults in producing a new housing orcomponent as a custom die casting.

A careful review of a prospective supplier’swebsite will give you many of the requiredanswers; an unannounced plant visit will fillin the blanks, confirm any assumptions andprovide confidence in your final conclusion.

Will you be asked the right ques-tions at the start of your project?Request a comprehensive description of theinitial engineering consultations that will beheld with your team. They should be clearlyaimed at insuring that all details of yourproject are fully understood and that thesupplier’s preplanning and analysis will as-sure meeting every important specification. Can you count on being given fullyobjective alloy recommendations?If you are not initially certain of which diecasting alloy is the best choice for your de-sign, can you have confidence in receivingan unbiased recommendation? Currentsupplier production in all of the most popu-lar alloys in Al, Mg and Zn will help assuresuch confidence.� Are pre-production computer sim-ulations offered for your design?Does the die caster offer a high-order of in-house process simulation technology, suchas the advanced Magmasoft® die cast soft-ware system. Accurate predictions fromCAD files of final metal flow, prior to die de-

sign and construction, will reduce leadtimes, improve quality and lower total costs. � Can you take advantage of inte-grated in-house prototyping?Where prototypes are required, can they beskillfully, efficiently and rapidly supplied, ei-ther as billet machined and/or as RP ABSmodels? In-house prototyping model datacan also be used to speed and reduce thecosts of required final-finishing operations. Are you guaranteed the highest-quality tool steel for your project?Can you receive documentation of testingand certification that the tool steel used foryour project meets NADCA* standards, toinsure the impact strength and long life ofthe die steel you will be purchasing.� Will only certified quality alloys beused in the production of your part?Certified aluminum, magnesium or zinc alloys used in the production of your diecast parts are guaranteed to be free of im-purities. Such assurance is essential to theintegrity of your castings and their long-term performance in your product.� Will your casting production re-ceive automated process monitoring?In volume die casting production, auto-mated process-monitoring systems can as-sure you of consistent part-to-part qualityand the lowest possible reject rate; 6-sigmareports should be available if requested.� Is experienced post-casting CNCmachining available to you in-house?With designs not feasible for net-shape diecasting production, you will want assurance

Form 9314B ©2009 Chicago White Metal Casting , Inc.

The CWM website (http://www.cwmdiecast.com) in addition to providing information on many of the items above, provides awealth of die casting design and production guidance in its OEM Resource Center section, over 70 downloadable documents.*NADCA: North American Die Casting Association

of an experienced and efficient in-housepost-casting machining capability. Advan-ced CNC centers and proven expertise in thespecial machining requirements for high-tech cast parts will assure meeting exactingspecifications at the lowest unit costs. � Are the latest ISO Quality & Environ-mental Mgmt. systems in place?ISO quality management and ISO environ-mental management systems registrationshould be a given. Evidence of recertifica-tion to the latest series of these internationalstandards should be available. �� Is there a solid track record of ex-cellent overall company performance?Has the custom production performancerecord of the company distinguished itselfover time? What is its reputation in its in-dustry? Has the company been an innovatorin its chosen production processes?

For your next custom die casting project,Chicago White Metal Casting invites youto evaluate its capabilities, based on theabove and any of your own criteria. Wewelcome your visit to our plant at any time.

649 N. Route 83, Bensenville, IL 60106Tel: 1-630-595-4424 Fax: 1-630-595-9160CWM E-mail: [email protected] Website: http://www.cwmdiecast.com

Weighing key factors in choosing a supplier for highest-quality results at the lowest unit cost

Selecting the Best Custom Die Caster for Your Next Part Production Project