2014 Electric T&D Benchmarking
Agenda for the Introductory Discussion
◼ Introductions
◼ Purpose of the Meeting
◼ Schedule for the Week
◼ Who’s in the Community
◼ Expectations for the Week
◼ Next Steps
2
Purpose of the Meeting
The primary purpose of the meeting is to discuss the findings from this year’s benchmarking study, including the core subjects and the discussion topics
◼ Highlight performance trends
◼ Identify emerging practices
◼ Share practices with peer companies
A secondary purpose is to begin preparations for next steps
◼ On-site presentations for leaders
◼ Uses of the results at home
◼ Topics of interest for next year
◼ Growing the community in 2015
3
Schedule for the Week
4Note: webinars will be conducted for each of the sessions shown in green
2014 T&D Benchmarking Community
Austin EnergyBC HydroCenterPoint EnergyChelan PUDCPS Energy DTE EnergyExelon
BGEPECOComEd
Hydro One
Hydro-QuebecKCP&LNorthwestern EnergyOncor Electric DeliveryPPL ElectricPSE&GPSE&G-Long Island (former LIPA)Tucson ElectricWestar Energy
5
Speakers for the Conference
BG&E Successful Approaches for Engaging Customers in Demand Response Programs
Cheryl HindesManager – Load AnalyticsHeather AndersonManager – Energy Efficiency Programs
Austin EnergyPlanning, Design and Implementation of an Advanced Distribution Management System (ADMS)
David Tomczyszyn, P.E.Power System Consulting Engineer
6
A special thanks to the companies (and individuals) who agreed to share their experiences in our Discussion Topics
PSE&GDA’s Role Within the Energy Strong Program
Richard WernsingManager, Asset Strategy - Electric
KCP&LDA Technology Training and Support
Bill MengeDirector, SmartGrid
Community Insights
Conference
Connect
7
Our Approach to Benchmarking
Leader’s Conference
On-SiteInsights
PerformanceImprovement
Projects
Plan
LearnShare Act
Review Conference
Survey
Develop Questionnaire
Kick-offMeeting
Focus AreaTopics
Review & Validate
Data
Collect Data
ConferenceCalls
Prep
arati
ons
Leader activityGroup activityInterest groupIndividual company activity1QC Activity
FocusWebinar / Discussion
Groups
Analysis / Synthesis of Data
Revi
ew &
Val
idat
e D
ata
Review reports & statistics
Focus Area Topic
Discussions
This Week
Many activities and a lot of work have brought us to this week’s conference.
Final stages of data
stewarding
Expectations for the Week
8
9
What to Expect this Week
For the core areas of the study, we will present results, and engage some discussion within the group, with a focus on covering a few areas:◼ Scope of the area◼ Results and trends in performance◼ Best long-term practices, and what is emerging◼ How various processes flow through the different functional organizations◼ How benchmarking help in improvement efforts
Discussion Topics◼ Distribution Automation
Survey findings and 1QC perspectives Presentations from the community
◼ Secondary Networks
Develop Network Strategy
Develop and Approve Asset Plans
Project/Portfolio Management
A Process Model for Managing the Network
10
Expand Network
Operate Network
Sustain Network
Add New Customers
Respond to Emergencies
We’ll present much of the information in the context of the process model shown below, with a number of the major process blocks broken into “modules” for analysis and discussion.
T&D Module Structure
11
Distribution ◼ Distribution Strategy
Intelligent Grid◼ Dist. Asset Management◼ New Business ◼ Network Expansion
Design Construction Productivity
◼ Sustain Network Vegetation Management Replacement/Upgrades Reliability Improvement
◼ Distribution Operations OMS
◼ Emergency Response
Substation◼ Substation Strategy
Substation Automation Mobile/Spares
◼ Sub. Asset Management ◼ Sustain Substations
Maintenance planning Field maintenance Including NERC
standards Replacement/upgrades
◼ Expand Substations Planning/Engineering/
Design Job estimating Field Construction
Transmission◼ Transmission Strategy
Automation NERC standards
◼ Trans. Asset Management ◼ Transmission Operations
Center (TOC)◼ Sustain
Maintenance ROW
◼ Planning/Engineering/ Design ◼ Field Construction
WMS Contractor Productivity
Our questionnaire was structured this year to more closely align with the process model, and create “modules” within the practice area sections
Note: These modules will be covered during the Insights Conference. Safety and Capital Project Management Modules will also be covered, in separate presentations.
Presenting Results for the Modules
12
The basic structure for the presentations will have a situation description, along with a chart showing key success factors, followed by supporting results.
13
What You Should Do this Week
◼ Ask questions
◼ Share your ideas
◼ Meet the representatives from the other companies
◼ Ask other companies how they use the results
◼ Ask other companies about the on-site presentations and how they’re set up and used. Consider what themes would you like covered at your on-site.
◼ Think about particular areas of focus that apply to your company, how information can be shared, how your teams can benefit from these results
14
Available Outputs and Uses
Questionnaire Results◼ Statistical report
Charts, graphs, tables All sections, plus a “profiles”
section◼ Performance Profiles
Specific to each member company
◼ Insights Conference Presentations Summaries of each major
section
Discussion Topic Results◼ Webinar Recordings
Click to listen◼ PowerPoint Summary Files◼ Insights Conference Presentations
Summary of Findings Presentations by Members
On-Site Presentations◼ Tailored to your request◼ Covering both questionnaire and
discussion topic results◼ Can be presentation or discussion
Next Steps Following the Meeting
Any final data modifications and updates◼ Due: September 8
Preparations for On-Sites◼ Schedule with your Data Steward◼ Select key areas of focus◼ Determine format of the session(s)
Thoughts and plans for 2015◼ Topic areas of interest◼ Companies to recruit to the community◼ Ad-hoc surveys
15
Thank you for your Input and Participation!
16
Corporate Offices
California
400 Continental Blvd. Suite 600El Segundo, CA 90245(310) 426-2790
Maryland
3 Bethesda Metro Center Suite 700Bethesda, MD 20814
Ken Buckstaff [email protected]
New York | Texas | Wyoming | Wisconsin
Debi McLain [email protected]
Dave [email protected]
Your Presenters
First Quartile Consulting is a utility-focused consultancy providing a full range of consulting services including continuous process improvement, change management, benchmarking and more. You can count on a proven process that assesses and optimizes your resources, processes, leadership management and technology to align your business needs with your customer’s needs.
Visit us at www.1stquartileconsulting.com | Follow our updates on LinkedIn
About 1QC
Satellite Offices
Dave [email protected]