installation instructions vkmvh(n,p) valve kit · warning this valve kit is to be installed be an...
TRANSCRIPT
WARNINGThis valve kit is to be installed be an Empire Comfort Systems Dealer (or other qualified agency1)* in accordance with the manufacturer’s instructions and all codes and requirements of the authority having jurisdiction. Failure to follow instructions could result in serious injury or property damage. The qualified agency performing this work assumes responsibility for this conversion.
1National Fuel Gas Code Z223.1 (Latest Edition)
*The term “qualified individual”, firm, corporation or company which either in person or through a representative is engaged in and is responsible for (a) the installation of gas piping or (b) the connection, installation repair, or servicing of equipment, who is experienced in such work, familiar with all precautions required, and has complied with all the requirements of the authority having jurisdiction.
CHECK SAFETY SHUTDOWN PERFORMANCE
WARNINGPerform the safety shutdown test anytime work is done on a gas system to avoid the possibility of fire or explosion with property damage, personal injury or loss of life.
Page 1
INSTALLATION INSTRUCTIONSVKMVH(N,P) VALVE KIT
FOR USE ON VENTED BURNER MODELS: BFL(2124,30)MTN
INSTRUCTIONS MUST BE LEFT WITH THE OWNER FOR FUTURE REFERENCE AFTER INSTALLATION.
TOOLS NEEDED:• 3/8" Open-end wrench • 7/16" Open-end wrench • 9/16" Open end wrench• 1/4" Hex driver
• 5/16" hex driver• Phillips screw driver • Adjustable wrench
39384-2-0718Page 2
TABLE 1Match-Light Components - Disassembly Diagram (Figure 1)
A OrificeFittingElbow KEEP - WILL BE REUSEDB Match-Light Tube Assembly REMOVE AND DISCARDC Match-LightOrifice REMOVE AND DISCARDD TubeConnector,Brass REMOVE AND DISCARDE 3/8" NPTUnion REMOVE AND DISCARDF Nipple Weldment REMOVE AND DISCARDG 1/2"FlareX3/8"NPTElbow,Brass KEEP - WILL BE REUSEDH #10 Screws REMOVE AND DISCARD
Figure 1
1. Removethelogs,fiberheatsink,androckwoolfromtheburnersurface.
2. Disconnectthegaslineandremovetheburnerfromthefirebox.Movetheburnertoasuitableworkarea.
3. Usinga9/16"wrench,removetheMatchLightTubeAssembly(B)fromtheOrificeFittingElbow(A)andtheTubeConnector(D).
4. Usinganadjustablewrench,removethe1/2"FlareElbow(G)fromthenippleonthesideoftheburner.
Keepthisforlater.5. Usinga5/16"hexdriver,removethethree#10screws
(H),NippleWeldment(F),3/8"NPTUnion(E),andTubeConnector(D).
6. Un-screwtheOrificeFittingElbow(A)fromtheVenturiAirShutter.RemovetheorificefromtheFittingElbow.DiscardtheorificebutKEEPTHEFITTINGELBOWFORLATER.
REFERENCE FIGURE 1 AND TABLE 1 DURING THE FOLLOWING DISASSEMBLY STEPS:
39384-2-0718 Page 3
BURNER SUPPLY TUBE SELECTION:1. RefertoFigure 2todeterminewhichsizeburneryou
areworkingwith.Selecttheappropriatetubefromthevalvekitanddiscardtheotherone.
Figure 2
39384-2-0718Page 4
Figure 3
39384-2-0718 Page 5
TABLE 2Millivolt Components, Assembly Diagram (Figure 3)
Description Part Number Notes
A OrificeFittingElbow RetainedFromMatch-LightConfiguration
B Orifice
P310 Orifice,2.2mm-24"LPBurnerP256 Orifice,#41-30"LPBurnerP283 Orifice,#26-24"NGBurnerP325 Orifice,#12-30"NGBurner
C BurnerSupplyTubeAssembly38664 UseLongerTubeFor30"Burner38639 UseShorterTubeFor24"Burner
D #8X3/8"ScrewsE #10X1/2"ScrewsF Pilotw/Thermopile R12052 AddR12069PilotOrificeForLPOnlyG ValveBracket 38632H MillivoltValve R12636(NG)R10408(LP)
Figure 4
39384-2-0718Page 6
Figure 5
PILOTSUPPLYLINE
REMOVETHISFITTINGFROMVALVEPRIOR
TOATTACHINGPILOTSUPPLYLINE
BLACKSWITCHLEADSTOTH/TP(LEFT)ANDTH(RIGHT)TERMINALS(POLARITYNOTCRITICAL)
REDPILOTLEADTOTH/TP(LEFT)TERMINAL
WHITEPILOTLEADTOTP(CENTER)TERMINAL
39384-2-0718 Page 7
1. SelectthecorrectOrifice(B)foryourapplicationfromTable 2and,usinga3/8"wrench,installitintotheOrificeFittingElbow(A)retainedfromthedisassemblysequence.DONOTuseanincorrectorifice.
2. InstalltheOrificeFittingElboww/OrificebackintotheVenturiAirShutter,pointingrearwards.
3. Usinga9/16"wrench,attachtheMillivoltTubeAssembly(C)totheMVValve(H)asshowninFigure 4.
4. FeedtheTubeAssemblythroughthefront-mostholeintheburnerlegasshowninFigure 4.
5. AttachtheValveBracket(G)totheburnerlegusinga5/16"hexdriverandthree#10x1/2"Screws(E)asshowninFigures 3 and 4.
6. AttachoppositeendofTubeAssembly(C)totheOrificeFittingElbow(A)usinga9/16”wrench.
7. Usinga1/4"hexdriverandtwo#8x3/8"Screws(D),attachthePilot(F)totheburnerbaseasshowninFigure 3.
8. AttachthePilotSupplyLinetotheValve(H)usinga7/16"wrench,(removebrassfittingfromvalve(H)beforeattachingPilotSupplyLine).See Figure 5.
9. NeatlyroutePilotSupplyLinesoitwillnotinterferewiththeFiberHeatSink.
10. RemovethetoggleswitchfromtheValveBracket(G)togainaccesstotheterminalsonthefrontofthevalve.
11. UsingaPhillipsscrewdriver,attachtheredandwhitePilotleadstothevalveterminalsasshowninFigure 5.
12. UsingaPhillipsscrewdriver,attachtheblackswitchleadstothevalveterminalsasshowninFigure 5.
13. Re-attachtheswitchtotheValveBracket(G).14. Attachthelightinginstructionplatetotheburnerleg
usingtheincludedlengthofchain.15. Returnburnerassemblytofireplace.16. ConnectgaslinetoBrassFlareElbowontopoftheValve.17. Compoundsusedonthreadedjointsofgaspiping
shallberesistanttotheactionofliquefiedpetroleumgases.Thegaslinesmustbecheckedforleaksbytheinstaller.Testingforleaksonallexposedconnectionsshouldbedonewithleaktestsolutionorasoapsolution.Aftertestingiscomplete,allsolutionshouldbecleanedoff.Onunexposedconnections,apressuretestshouldbemade.Neveruseanexposedflametocheckforleaks.Burnermustbedisconnectedfrompipingatinletofcontrolvalveandpipecappedorpluggedforpressuretest.Neverpressuretestwithfireplaceconnected;controlvalvewillsustaindamage!
18. Replacerockwoolonburnersurface.SeeburnerInstallationManualformoreinformation.
19. ReinstallFiberHeatSink20. Reinstalllogsaccordingtologinstructionmanual.21. Installationiscomplete.
REFERENCE FIGURES 3, 4, 5 AND TABLE 2, DURING THE FOLLOWING ASSEMBLY STEPS:
39384-2-0718Page 8
www.empirecomfort.com
Empire Comfort Systems Inc.Belleville, ILIfyouhaveageneralquestionaboutourproducts,[email protected]. Ifyouhaveaserviceorrepairquestion,pleasecontactyourdealer.