McHale Project: 15019.0 ISTROENERGO Performance Test Procedure – CTG Performance Rev. 5
McHale & Associates, Inc.
APPENDIX C
Instrument List
39 of 63
McHale Project: 15019.0 ISTROENERGO Performance Test Procedure – CTG Performance Rev. 5
McHale & Associates, Inc.
Measurement Instrument Accuracy
Station / Temporary
Primary / Secondary
Quantity Plant ID / KKS
Net Electrical Output, PNet
CT-0.2% PT-0.2%
Meter – 0.08% Unc – 0.29%
CT-Station PT-Station
Meter-Temporary Primary
CT’s – 3 per CTG PT’s – 3 per CTG Meter – 1 per CTG
01BAT10CE010-T11, -T21, -T31 01BAT10CE100-T11, -T21, -T31 02BAT10CE010-T11, -T21, -T31 02BAT10CE100-T11, -T21, -T31
Generator Power Factor, PF
CT-0.5% PT-0.2%
Meter-0.08% Unc-0.54%
CT-Station PT-Station
Meter-Temporary Primary
CT’s – 3 per CTG PT’s – 3 per CTG Meter – 1 per CTG
Unit 1: GCT4, 01VT Unit 2: GCT4, GPT
System Voltage, HV 0.2%
PT-Station Meter-Temporary
Primary PT’s – 3 per CTG Meter – 1 per CTG
01BAT10CE010-T11, -T21, -T31 02BAT10CE010-T11, -T21, -T31
Generator Voltage, LV 0.2%
PT-Station Meter-Temporary
Primary PT’s – 3 per CTG Meter – 1 per CTG
Unit 1: 01VT Unit 2: GPT
System Frequency, HZ 0..08%
PT-Station Meter-Temporary
Primary PT’s – 3 per CTG Meter – 1 per CTG
01BAT10CE010-T11, -T21, -T31 02BAT10CE010-T11, -T21, -T31
Ambient Temperature, Tamb
0.14C Temporary Primary 8 per CTG Inside Gas Turbine Filter House. Upstream of filters.
Barometric Pressure, Pamb
0.065% Temporary Primary 2 per CTG Gas Turbine Centerline. Outside of enclosure.
Wet Bulb Temperature, Twb
0.14C Temporary Primary 4 per CTG Inside Gas Turbine Filter House. Upstream of filters.
Gas Fuel Temperature at Site Boundary, TNG
0.14C Temporary Primary 2 TI-00EKG10 CT520 TI-00EKG20 CT520
Gas Fuel Pressure at Site Boundary, PNG
0.065% Temporary Primary 2 PI-00EKG20 CP520 PI-00EKG10 CP520
Gas Fuel Flow, MNG, MPres, MTemp
Meter – 0.2% Pres – 0.065% Temp – 0.14C Unc – 0.35%
Meter - Station Pres – Temporary
Temp - Station Primary
Meter – 2 Pres – 2
Temp – 2
Meter – FIR-00EKG10 CF030 Pres – PIR-00EKG10 CP030 Temp – TIR-00EKG10 CT030 Meter – FIR-00EKG20 CF030 Pres – PIR-00EKG20 CP030 Temp – TIR-00EKG20 CT030
Fuel Oil Flow, MLF 0.2% Station Primary 1 FT6247
40 of 63
McHale Project: 15019.0 ISTROENERGO Performance Test Procedure – CTG Performance Rev. 5
McHale & Associates, Inc.
Fuel Analysis, LHVNG, LHVLF
N/A Temporary Primary N/A Laboratory Analysis of Gas and Liquid Fuel Samples
Chilled Water Flow, MCW 0.5% Station Primary 1
01 PGA10 CF001 02 PGA10 CF001
Chilled Water Supply Temperature, CCW
0.14C Station Primary 1 TT306
Chilled Water Return Temperature, HCW 0.14C Station Primary 1
01 PGA20 CT001 02 PGA20 CT001
HP Turbine Speed N/A Station Secondary 1 per CTG SE6800/SE6801
LP Turbine Speed N/A Station Secondary 1 per CTG SE6812/SE6813 PS3-CDP N/A Station Secondary 1 per CTG PT6804/PT6814 P3-HP Compressor Inlet Pressure
N/A Station Secondary 1 per CTG PT6859A/PT6859B
T3CRF – CDT N/A Station Secondary 1 per CTG TE6838A/TE6838B T48
N/A Station Secondary 1 per CTG TE6843/TE6844/TE6845/TE6846/TE6847/TE6848/TE6849/TE6850 / T48SEL
WAR36 – Combuster Water to Air Ratio
N/A Station Secondary 1 per CTG FE-6243
T25INF – HPC Inlet Temp
N/A Station Secondary 1 per CTG TE6837A/TE6837B
T2 – LP Compressor Inlet Temp
N/A Station Secondary 1 per CTG TE6821A/TE6821B
Note: Station instruments will be recorded by the facility DCS Historian. Temporary instruments will be recorded by the temporary McHale Data Acquisition System. See section 2.5 for details.