INSTRUMENT
STATUS AND
PERFORMANCE
Guido Levrini
Page 2ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
ASAR
Instrument operability issues solved: Echo shift -> fine tuning of on board parameters Historic swath parameters (‘Neustrelitz effect’) N-2 timing patch Incorrect Wave mode exit -> solved by MP rules Wave mode switch down -> patch AP mode SWST annotations -> patch Incorrect GMM exit -> hopefully solved this week!
Instrument completely operable: no remaining open problem
No TRM failure since launch (4 TRM’s lost in Tx due to PSU) Excellent instrument stability (~0.2 dB, better than expected) Antenna patterns completely characterized (all beams/ all pol *)
* All HH, VV, VH beams
5/7 HV beams
* All HH, VV, VH beams
5/7 HV beams
Page 3ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
Page 4ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
MERIS
Instrument availability: ~ 100% Calibration technique & mechanism: perfectly working Spectral calibration: characterization confirmed (± 1 Å) by
recent spectral campaigns (begin Nov) Spectral stability: excellent Radiometric calibration: very good overall stability.
Slow degradation in the blue (@412 nm) -> now in the order of 2 % Smile correction fully verified -> under implementation in Level
1b.
Page 5ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
AATSR Nominal operations, 100% instr.
availability Temperatures nominal, Cal S/S OK,
Coolers functioning nominally, Blanking Pulses OK
Scan mechanism: small jitter (on occasions)
Spectral calibration: OK Pointing characterization: OK Dynamic range (all channels) optimized Radiometric stability: visible channels
affected by water condensation. Outgassing: water removed each time, it
comes back at lower rate -> we gradually -but inefficiently - get rid of the water
Page 6ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
RA-2
Over Ice: excellent tracking capabilities Over Ocean: excellent range noise performance (1.8 cm) On board parameters optimized: no change since Cal Review S band accumulation anomaly cured by operational work-around Datation correction implemented in Level 1b
Absolute Sigma zero calibration (1st time ever) -> the computed bias is:
Range Absolute Calibration all data collected analysis to be finalized (to reduce error bars)
Page 7ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
DORIS / LRR / MWR
DORIS Orbit radial accuracy (rms) Navigator: < 30 cm Preliminary (2d): < 5 cm Precise (20d): < 3 cm
LRR: good laser coverage
MWR 23.8 GHz channel perfectly stable Suspected slow drift of the 36.5 GHz channel: under
investigation
Page 8ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
MIPAS Good NESR performance Detector non linearity in spec
(lower end of dynamic range under optimization) Radiometric stability: in spec, but affected by ice formation
After warm-up, the water builds up slower -> periodic decontamination
In-flight ILS within budget L2 more sensitive than expected -> scheme under improvement
Spectral calibration: OK (including refined NL component in L2) Pointing: OK. Update on 13 Nov (~25 mdeg in pitch). LOS OK FOV characterization: OK (using the planet Mercury). Cooler Anomaly (6-22 Aug, 1-11 Oct). No H/W problem.
VCS sensitive to environmental conditions -> Use coarse balancing only.
MIPAS NESR0
(High Resolution Calibrated Spectrum)
1.0E-09
1.0E-08
1.0E-07
500 700 900 1100 1300 1500 1700 1900 2100 2300 2500
Wavenumber (cm-1)
NE
SR
(W
cm
-2 s
r-1 c
m)
In-Flight (223K)
Requirement
On-Ground (231K)
Page 9ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
GOMOS Good instrument operability Excellent tracking capabilities (down to 3 km!) Radiometric stability: excellent Spectral calibration: OK (± 1/30 pixel) Spectral stability: excellent No ghosts on the CCD CCD sensitive to proton radiation (-> hot pixels and RTS):
operating temperature decreased (+10 -> -4 C, minimum achievable)
dark charge calibration approach changed (every orbit now) ground processing under update
Independent CCD Expert Investigation Board set-up
Page 10ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
SCIAMACHY
All mechanisms working ‘Flash’ Ice decontamination (during ‘Leonids’) worked. Dark current stability: excellent in ch.1-6, affected by ice in
ch.7-8 Straylight: Ok in nadir for ch.1-6. Ch.7-8 under investigation Etalon correction: OK. PPG: OK for ch. 1-6, under investigation for ch. 7-8. Spectral calibration: excellent stability Sun mean reference: recently determined offset under
investigation (does not affect DOAS)
Polarization: Nadir is OK, Limb just starting.
Page 11ENVISAT Validation Workshop - ESRIN - 9–13 December 2002
CALENDAR OF MAIN PROCESSOR UPGRADES
AATSR 21 June 4 July On-going
ASAR 31 May 13 Sept 12 Nov this week ?
MERIS 8 April 21 June 14 August On-going
RA-2/MWR 21 April 5 July 18 Nov
GOMOS 21 June 7 August On-going
MIPAS 18 April 30 May On going
SCIAMACHY 30 May 5 Sept this week ?
N. B. = Updates of Aux Data files to be added