Integrated Building Environmental Design
Beijing Parkview Green
10 May 2008
![Page 2: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/2.jpg)
Developer : Beijing Chyau Fwu Properties Co., Ltd.
Architect : Integrated Design Associates
Engineering Consultant : Ove Arup & Partners Hong Kong Ltd.
![Page 3: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/3.jpg)
Forbidden City
Location: Beijing, China
No. building: 4 buildings enclosed by a Microclimate Envelope
Building usage: Class-A office, retail, hotel, restaurant and carpark
Floor area: 200,000 m²
Building height: 87m
No. of storey:
• 3-storey basement carpark
• 4-storey retail floor
• 7~10-storey office floor
• 6-story hotel
Latitude = 39.93NLongitude = 116.28E
Elevation = 55m
Building Information
Development Site
Site
![Page 4: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/4.jpg)
• New paradigm of sustainable building in China
• Sustainable & environmentally-friendly design to the neighbourhood, the covered common spaces and the occupied areas in buildings
• Low natural resources consumption and energy efficient buildings
• Minimal social and environmental impact to surrounding building occupants
• Cost effective and low O&M cost green technologies
• Maximize use of hybrid ventilation
• Low environmental impact
• Good indoor environmental quality
• Safe, healthy and liveable space
Design Objectives
Resources Use
Site Amenities Site Impacts
Neighbourhood Amenities
Neighbourhood Impacts
Loadings
BUILDING
IEQ
Building Amenities
OPEN SPACE
Resources Use
Site Amenities Site Impacts
Neighbourhood Amenities
Neighbourhood Impacts
Loadings
BUILDING
IEQ
Building Amenities
OPEN SPACE
![Page 5: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/5.jpg)
Beijing Climatic Data – Outdoor Temperature & HumidityWeather Condition in Beijing
-20.00
-10.00
0.00
10.00
20.00
30.00
40.00
Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec
Month
Dry
-bul
b Te
mpe
ratu
re
M ean M in M ax
Weather Condition in Beijing
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec
MonthR
elat
ive
Hum
idity
(%)
• Annual Average Outdoor Temp. 11.7 oC
• Average Outdoor Temp. of the Hottest Month (July) 25.9 oC
• Average Outdoor Temp. of the Coldest Month (Jan) -4.8 oC
• When outside critical illuminance is 5,000 lx, available time of daylight is about 3,900 hours
• Maximum altitude in summer is 73.7°
• RH 40%-80%
![Page 6: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/6.jpg)
Beijing Wind Rose
0
5
10
15N
NNE
NE
ENE
E
ES E
S E
S S E
S
S S W
S W
WS W
W
WNW
NW
NNW
WinterSummerSpringAutumn
Summer prevailing wind: SW
Winter prevailing wind: N, NNW
SW (10%)NNW (13%)N (13%)
-Frequency of Occurrence
1.92.82.5Average Wind Speed
SummerWinterAnnual
Outdoor Air Speed (m/s)
Beijing Climatic Data - Wind
• Located on the fringe of the loess belt
• Sandy and dusty weather originated in Inner Mongolia, Gansu and the Ningxia Hui Autonomous Region will affect the region in spring season.
![Page 7: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/7.jpg)
Architectural Deign
![Page 8: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/8.jpg)
Massing
![Page 9: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/9.jpg)
Architectural Design
4 buildings enclosed by Microclimate Envelope
Block A
Block CBlock B
Block D
Atrium space amongst buildings
Retail
Offices
Hotel
![Page 10: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/10.jpg)
3
5
7
9
11
13
18
6789
6
4
![Page 11: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/11.jpg)
![Page 12: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/12.jpg)
![Page 13: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/13.jpg)
1
1.7
76
26
Planning Parameters
260 Roof angle
Height Limit
Building Separation120,000m2
26% External Green Area40% Internal Green Area
Environmental consideration informsBuilding Shape
25,000m2
55,000m2
![Page 14: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/14.jpg)
Daylight Analysis
0700 0900 1200 1400 1700
![Page 15: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/15.jpg)
North
Natural Vent Intake
Natural Vent Intake
Mech Vent Intake
Mech Vent Intake
Sunken Level 2 - Layout
Beijing Wind Rose
0
5
10
15N
NNE
NE
ENE
E
ES E
S E
S S E
S
S S W
S W
WS W
W
WNW
NW
NNW
WinterSummerSpringAutumn
![Page 16: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/16.jpg)
Sunken Level 2 (retail portion)
L1 (Street level)
L3 (office portion)
L9 (low block top floor)
L13 (hotel portion)
L18 (high block top floor)
exhaust
intakeintake
exhaust
intake
![Page 17: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/17.jpg)
Fabric Construction of Microclimate Envelope
![Page 18: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/18.jpg)
ETFE Roof – Construction & Configuration• All cushions are constructed from 2 or more layers of ETFE foil.
• Each foil layer is 100~250 microns thick.
• ETFE foils are highly elastic materials. Elongation at break point is approx. 400%.
• ETFE has a long-term memory, i.e. long-term elasticity.
• The cushion rise / dip for 15%~20% of span is allowed.
• Nominal inflation pressure 200Pa. (same as National Swimming Centre)
• Cushion foil and structure able to handle both wind up-lift and wind pressure.
• Cushion internal pressure to be controlled by air pump.
exhaust
![Page 19: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/19.jpg)
Overview of Green Features
![Page 20: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/20.jpg)
Green Features• Hybrid ventilation and Night cooling in office• Free cooling for air-side systems• Skygraden• Thermal break on facade interior (double skin
facade)• Daylighting• Rainwater recycling• AC condensate resued for cooling tower• Evaporative cooling• Heat Pipe• Earth cooling in basement (fresh air pre-cool)• Variable speed pump and ventilation fans• Evaporative type water cooled air-conditioning
Technical Studies
• Hybrid ventilation • Ventilated facade• Ground source heat pump• Photovoltaic system• Heat pipe application• Radiant cooling / heating• Heat recovery chillers• Building thermal and pressure
distribution• Building solar and daylight access• Building energy simulation• Ecological enclosure thermal and
ventilation study • Energy efficient air distribution system• Air-side and water-side free cooling• Outdoor and indoor cooling tower
schemes• Chiller plant heat rejection study• And……..
Internal Condition of Various Areas by changing Different Roof Glazing Materials
[Autum n Season]
24.0
25.0
26.0
27.0
28.0
29.0
30.0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7
Shading Coefficient
Tem
pera
ture
(deg
.C)
Roof of Low Block 1
Roof of High Block 1
Atirum at Level 1
Atrium at Street Level
Skygarden at High Block 1
![Page 21: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/21.jpg)
Hybrid Ventilation Design in Atrium Area
![Page 22: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/22.jpg)
Microclimatic Envelope Design
• Spring & Autumn Seasons• Introduce natural ventilation – enhance thermal comfort in Atrium and
Sky-gardens• Introduce natural ventilation – reduce energy consumption for Office air-
conditioning systems• Reduce energy consumption of air-conditioning system for other areas,
I.e. Hotel and Retail by reduction of solar heat gain
• Summer Season• Reduce energy consumption of air-conditioning system for all areas, I.e.
Office, Hotel and Retail by reduction of solar heat gain• Introduce natural ventilation – Increase the air movement inside the
atrium and thermal comfort
• Winter Season• Isolation from freezing environment – Increase Atrium air temperature
and thermal comfort• Reduce energy consumption of heating system by reduction of fabric
heat loss
Function of Microclimatic Envelope
![Page 23: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/23.jpg)
Microclimatic Envelope Design Spring & Autumn Seasons
Office Floors – Natural Ventilation OperatingRetail Floors – Air-conditioning OperatingAtrium – Hybrid Ventilation Operating
Exhaust Vent Opened
Exhaust Vent Opened
Ground Floor Inlet Vent Opened
Reduction of Solar Radiation A/C energy consumption: -63%
Natural Ventilation Atrium Thermal Comfort Temperature29°C- 31°C (0.5m/s-1.0m/s)
Envelope Inlet Vent Opened Increase fresh air inlet and assist exhaust air vent
Envelope Exhaust Vent Opened Vent out stratified hot air
![Page 24: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/24.jpg)
Natural Ventilation – windy condition
![Page 25: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/25.jpg)
Natural Ventilation – windless condition
![Page 26: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/26.jpg)
Office Floors – Air-conditioning OperatingRetail Floors – Air-conditioning OperatingAtrium – Hybrid Ventilation Operating
Exhaust Vent Opened
Exhaust Vent Opened
Ground Floor Inlet Vent Opened
Summer SeasonMicroclimatic Envelope Design
With Additional System Atrium Thermal Comfort Temperature 29°C- 31°C (0.5m/s-1.0m/s)
Reduction of Solar Radiation A/C energy consumption: -13%
Envelope Inlet Partially Vent Opened Reduce infiltrated air and assist exhaust air vent
Envelope Exhaust Vent Opened Vent out stratified hot air
Summer outdoor temp: 35°C
Atrium ground level
temp.:36.7°C
Max. Temp at low block top level:
37.7°C
Max. Temp at high block top level:
40.5°C
![Page 27: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/27.jpg)
Exhaust Vent Closed
Exhaust Vent Closed
Ground Floor Inlet Vent Opened
Winter SeasonMicroclimatic Envelope Design
With Additional System Atrium Thermal Comfort Temperature3°C - 10°C (< 0.5m/s)
Additional Fabric Insulation Heating energy consumption: 80%
Envelope Inlet Vent Closed Restrict freezing air infiltration and retain internal air temperature
Envelope Exhaust Vent Closed retain internal hot air
Winter outdoor temp: -10°C
Atrium ground level temp.: 0°C
Max. Temp at low block top level:
7°C
Max. Temp at high block top level:
7°C
Office Floors – Air-conditioning OperatingRetail Floors – Air-conditioning OperatingAtrium – Hybrid Ventilation Operating
![Page 28: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/28.jpg)
Energy Saving for HVAC SystemFunction of microclimate envelope – reduce system energy consumption
Office = 800 MWh
Hotel = 70 MWh
Retail = 280 MWh
Office = 8000 MWh
Hotel = 470 MWh
Retail = 2700 MWh
Office = 1700 MWh
Hotel = 470 MWh
Retail = 3300 MWh
System cooling / heating load (with microclimate envelope)
Office = 4000 MWh
Hotel = 340 MWh
Retail = 1400 MWh
Office = 9100 MWh
Hotel = 540 MWh
Retail = 3300 MWh
Office = 10300 MWh
Hotel = 530 MWh
Retail = 4100 MWh
System cooling / heating load (without microclimate envelope)
13% (cooling/ heating)
Summer
80% (heating)
Winter
63% (cooling)
Spring & Autumn
Total AC energy saving
![Page 29: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/29.jpg)
Atrium Comfort Improvement
AC System Layout Plan at SL2 Atrium
Atrium:
Supplementary air conditioning (AHU)
Atrium:
Supplementary air conditioning (FCU)
![Page 30: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/30.jpg)
Less effective than supply air system, require chilled water supply, pipeworks cannot be laid under EVA
Radiant cooling
Less effective than supply air system, require large amount of make-up water, condensation at retail shop glass surface adjacent to the pool
Pool evaporative cooling
Atrium air supply system
Exhaust air reuse
Optional thermal environment improvement system
Utilize office exhaust / atrium cooling unit
SA flowrate 70 m3/s
SA temp 25.0°C
Utilize retail exhaust
Exhaust air flowrate 32 m3/s
SA temp 25.0°C
Atrium Comfort Improvement
Summer – SL2 Atrium Environment
![Page 31: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/31.jpg)
Innovative HVAC Design
![Page 32: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/32.jpg)
Load Estimation
• Dynamic thermal analysis
• 3D model separated in different zones
• Heat transfer between building and the surroundings
• Consider solar heat gain, fabric gain, convective heat gain, internal load
Perimeter Zone
Interior Zone
![Page 33: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/33.jpg)
Hybrid Ventilation System in Office
Control point for office AC system
Chilled Ceiling & Underfloor Air Supply System in Office
![Page 34: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/34.jpg)
Hybrid ventilation system will be adopted on office floors. Hybrid ventilation system consists of 3 individual operating modes:
• Air Conditioning Mode• Natural Ventilation Mode• Free Cooling Mode
Hybrid Ventilation Modes
• Provide pleasant internal temperature level
• Protect against summer overheating, reflection effects and draughts
• Eliminating “cold wall” effects and ingress of cold breeze in winter
• Reduce energy use for heating and cooling
• Encourage use of semi-outdoor space
![Page 35: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/35.jpg)
Key Issues in Hybrid Ventilation
• Operational strategy for the microclimate envelope and all buildings in different seasons
• Air circulation and temperature distribution within the microclimate envelope
• Air circulation for hybrid ventilated space – office and circulation area
• Materials selection for the included roof of microclimate envelope
• Materials selection for different elevation of microclimate envelope and buildings
• Vent (intake & exhaust) openings design on microclimate envelope
• Air intake locations (orientation & level) and adjacent usages
• Control interface with HVAC systems
• Performance monitoring
![Page 36: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/36.jpg)
Office Floors 办公室 Underfloor AC systemTypical office (High block & Low block L3-7)
Perimeter zone
Internal zone
Underfloor fan box c/w hot water supply
Underfloor fan box size 600x600
![Page 37: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/37.jpg)
Office Floors 办公室 Chilled ceiling system
Typical office (12x12m2)
Perimeter zone
Internal zone
![Page 38: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/38.jpg)
AIRFLOW DIAGRAM (TYPICAL OFFICE FLOOR) - NATURAL VENTILATION MODE
LEGEND
EXHAUST / RETURN AIR DAMPER IN OPEN POSITION
FRESH AIR FLOW PATH
VOID FOR AIR EXHAUST
EXHAUST / RETURN AIR FLOW PATH
VOID FOR AIR INTAKE
WINDOW IN OPEN POSITION
WINDOW IN CLOSE POSITION
EXHAUST / RETURN AIR DAMPER IN CLOSE POSITION
NATURALLY VENTILATED OFFICE SPACE
NATU
RALL
Y VE
NTIL
ATED
OFF
ICE
SPAC
E
NATURALLY VENTILATED OFFICE SPACENATURALLY VENTILATED OFFICE SPACE
NATURALLY VENTILATED OFFICE SPACE
NATURALLY VENTILATED OFFICE SPACE
NATU
RALL
Y VE
NTIL
ATED
OFF
ICE
SPAC
E
NATU
RALL
Y VE
NTIL
ATED
OFF
ICE
SPAC
E
AREA WITHOUTPARTITION WALL
Office Ventilation DesignNatural Ventilation Mode
![Page 39: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/39.jpg)
AIRFLOW DIAGRAM (TYPICAL OFFICE FLOOR) - PARTIAL A/C & NV MODE
AHU
AHU AHU
AH
U
AH
UA
HU
AIR
COND
ITIO
NED
OFFI
CE S
PACE
NATURALLY VENTILATED OFFICE SPACE
AIR CONDITIONED OFFICE SPACE NATURALLY VENTILATED OFFICE SPACE
NATURALLY VENTILATED OFFICE SPACE
NATURALLY VENTILATED OFFICE SPACE
NATURALLY VENTILATED OFFICE SPACE AIR CONDITIONED OFFICE SPACE
AIR
COND
ITIO
NED
OFFI
CE S
PACE
AIR CONDITIONED OFFICE SPACE
NATURALLY VENTILATED OFFICE SPACE
NATURALLY VENTILATED OFFICE SPACE
NATU
RALL
Y VE
NTIL
ATED
OF
FICE
SPA
CENA
TURA
LLY
VENT
ILAT
ED
OFFI
CE S
PACE
AIR
COND
ITIO
NED
OFFI
CE S
PACE
AIR CONDITIONED OFFICE SPACE
AIR CONDITIONED OFFICE SPACE
AIR CONDITIONED OFFICE SPACE
AIR CONDITIONED OFFICE SPACE
LEGEND
WINDOW IN OPEN POSITION
WINDOW IN CLOSE POSITION
EXHAUST / RETURN AIR DAMPER IN CLOSE POSITION
VOID FOR AIR EXHAUST
EXHAUST / RETURN AIR FLOW PATH
VOID FOR AIR INTAKE
EXHAUST / RETURN AIR DAMPER IN OPEN POSITION
FRESH AIR FLOW PATH
PARTITION WALLAREA WITHOUT
Office Ventilation DesignAir Conditioning Mode
![Page 40: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/40.jpg)
Low Block Natural Ventilation Exhaust 低座自然通风排风分布
Low Block Free Cooling Intake & Exhaust 低座外气空调送排风分布
Office Ventilation DesignFree Cooling Mode
![Page 41: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/41.jpg)
FCU
Staircase and lobby pressurization
Office, retail, hotel toilet exhaust, office copy room exhaust, smoke extraction
Ceiling FCU can be used in Guest Room
Hotel – HVAC Provision
![Page 42: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/42.jpg)
AHUAHU
Supply Air grille
Return Air 回风
L18 Hotel Lobby
Hotel Lobby – Underfloor AC System
![Page 43: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/43.jpg)
Other Building Services Design Considerations
![Page 44: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/44.jpg)
Fire Engineering – Evacuation Modelling
![Page 45: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/45.jpg)
Construction Progress
![Page 46: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/46.jpg)
Site Construction Progress
![Page 47: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/47.jpg)
Construction of Microclimate Envelope
![Page 48: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/48.jpg)
Interior Fitting-out Mock Up
![Page 49: Integrated Building Environmental Design Beijing Parkview …Integrated Building Environmental Design Beijing Parkview Green 10 May 2008 Developer : Beijing Chyau Fwu Properties Co.,](https://reader033.vdocument.in/reader033/viewer/2022052006/6019ab11d7005510e102b36d/html5/thumbnails/49.jpg)