Integrated Corridor ManagementInitiative Overview
Brian CroninCongestion Program ManagerITS Joint Program Office
2
Corridors
• Currently surface transportation systems are made up of several independent networks
– Freeways, including managed lanes– Arterials– Bus Routes– Rail Transit
• Efforts to date to “reduce congestion” have focused on optimization of individual networks
• These adjacent network links overlay to form transportation corridors – Metropolitan areas contain several major corridors
• Corridors offer an opportunity to operate and optimize the entire system as opposed to the individual networks
3
Generic Corridor
Local Jurisdiction 2 – Traffic Signal System
Local Jurisdiction 1 – Traffic Signal System
Bus Company – AVL system
State DOT – Freeway Management System
Regional Rail Agency – Train Management System
P
Local Jurisdiction 2 – Traffic Signal System
Local Jurisdiction 1 – Traffic Signal System
Bus Company – AVL system
State DOT – Freeway Management System
Regional Rail Agency – Train Management System
P
4
Missing Integration
• Technical Integration– Lack of cross network device-to-device data, communication,
and procedure integration
• Operational Integration– Lack of integrated cross network operational strategies and
analysis capabilities
• Institutional Integration– Lack of operational capability and technology that supports cross
network distribution of responsibilities and sharing of control
5
Integrated Corridor Management(ICM)
• Goal of Initiative– to provide the institutional guidance, operational capabilities, and
ITS technical methods needed for effective Integrated Corridor Management Systems.
• Purpose– To demonstrate that ITS technologies can be used to efficiently
and proactively manage the movement of people and goods in major transportation corridors by facilitating integration of the management of all the networks in a corridor.
• Future State– Widespread use of integrated corridor management tools and
strategies to improve mobility through integrated management of transportation assets.
6
Revised ICM Program Plan
Sit
e D
emo
stra
tio
ns
Fea
sib
ility
September 2005 February 2009
Dev
elo
pm
ent
Fea
sib
ility
Sit
e A
pp
licat
ion
s F
easi
bili
ty
Stakeholder Working Group
Phase 2: Corridor Tools, Strategies, & Integration
Phase 1: Foundational Research
Phase 3: Corridor Sites Concept Development
FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10
Phase 4: ICM Operations Concept Knowledge and Technology Transfer
Phase 3: Site Operations
Analysis and Evaluation
Phase 4: ICM Implementation Knowledge and Technology Transfer
Standards Completion, and Deployment
Phase 3: Site Demonstrations
January 2008
7
Phase 1 – Foundational Research
• Goal – Develop an understanding of the operational, technical, and institutional integration issues associated with deploying integrated corridor management and ICM systems.– Background and Basic Concepts
• Definitions, corridor types, operational experience, cross-network management approaches & strategies, funding strategies
– ICM Concept of Operations for Generic Corridor• Formal document providing a user-oriented description of ICM
operations and systems
– ICM Planning & Implementation Guidance• Process steps needed to support development & deployment of ICM
and integrated corridor management systems
– Development Feasibility
8
What are the issues?
• Operational– Impact of the various ICM strategies (Simulation / analysis tools – “corridor analysis”)
– Network Shift philosophy (“inform” vs. pro-active “instruct”)
– Balancing needs of corridor (Local traffic vis-à-vis through traffic)
– ICM performance measures (Combining roadway & transit)
• Technical– Communications links between networks– Standards & network system interfaces– Data reliability– Corridor surveillance (including cross – network linkages and junctions)
• Institutional– Involvement of all APPROPRIATE stakeholders– Buy – in from decision makers / executives– Buy – in from network operators– Common language and common performance measures
9
Next Steps
• Development Phase (Phase 2)– Develop corridor analysis tools– Refine and identify ICM strategies– Develop common performance measures– Develop standards to support technical integration– Identify ways to distribute responsibility and share control
10
Next Steps
• Field Test Phase (Phase 3)– Stage 1
• Issue Request for Applications through www.grants.gov• Select Pioneer Sites; develop corridor concepts of operations & functional
requirements
– Stage 2• Select sample corridors and strategies• Conduct corridor analysis and evaluation
– Stage 3• Select sites for ICM Demonstrations• Implement ICMS and Evaluate
11
Contact Information
• John Harding (202-366-0640)– [email protected]
• Brian Cronin (202-366-8841)– [email protected]
• Dale Thompson (202-493-3420)– [email protected]
• Sean Ricketson (202-366-6678)– [email protected]
• ICM website – http://www.itsa.org/icm.html– Copy of presentations and deliverables (Tech Memos) posted there.